Aya Gold & Silver Inc.
For the period ended Oct 20, 2026. Filed Oct 21, 2026.
View on SEC.govAbout this filing
What a company based outside the US has published at home or sent to its shareholders. It is how many foreign companies share results and news between annual reports.
Oct 20, 2026 · Filed Oct 21, 2026
Use the contents to explore the available documents and sections.
Contents
EX-99.1 · Table 16-19 Development Performance Rate
Table 16-19 Development Performance Rate
| Activity / Per Dev Team | Unit | Underground Rate |
|---|---|---|
| Decline and Mine Access | m/day | 8 |
| Lateral waste development, multiple headings | m/day | 8 |
| Sill development, multiple headings | m/day | 8 |
| Vertical Development | m/day | 3 |
The dilution factor and the recovery for the mineralized development used are at 0% and 100% respectively, and the incremental NSR cut-off applied for development is 77 $/tonne. In addition, an uplift factor was used to account for added meter from infrastructure that was not designed at this stage and additional Opex meters. A factor of 10% was used on the Capex meters and 5% on the Opex meters.
Table 16-20 presents the LOM development plan summarized by development type and categorized into Capital and Operating.
AYA GOLD & SILVER INC.236
The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.