Skip to main content

Hudbay Minerals Inc.

For the period ended Sep 30, 2026. Filed Oct 23, 2026.

View on SEC.gov

About this filing

What a company based outside the US has published at home or sent to its shareholders. It is how many foreign companies share results and news between annual reports.

Sep 30, 2026 · Filed Oct 23, 2026

Use the contents to explore the available documents and sections.

HBM$20.91+1.6%Stored close · as of Nov 6, 2026
See the whole filing, with its images and exhibits
Contents

EX-99.1 · Table 16-2: Minimum Mining Width

Table 16-2: Minimum Mining Width

Minimum Mining Width ParameterMeasurement (ft)
Target minimum mining width460
Minimum mining width between pushbacks190
Minimum mining width at pit bottom120

Based on the technical specifications for the primary loading unit and hauling equipment, Figure 16 2 illustrates the baseline for pit designs. Utilizing a CAT 6060 shovel paired with CAT 794 (320-ton class) haul trucks, an estimated minimum mining width of 57.6 meters (189 ft) represents a robust and well-proportioned baseline for design, serving as the reference standard for determining target distances between pushbacks.

ContentsView on SEC.gov

The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.