EX-99.1 · 18.2 Processing Plant
18.2 Processing Plant
The Concentrator Plant has a capacity of 60 kstpd and will process mineralization through conventional crushing, grinding, flotation, molybdenum separation, concentrate dewatering and tailings thickening. The facility also includes a two-stage cyclone station used to produce the sand for dam construction of the TSF.
The Project includes two future development initiatives:
In-pit Crushing and Conveying (IPCC) installation
Process plant throughput increase from 60k stpd to 90k stpd
The General Plant Site Arrangement is shown in Figure 18-3.