Skip to main content

Hudbay Minerals Inc.

For the period ended Sep 30, 2026. Filed Oct 23, 2026.

View on SEC.gov

About this filing

What a company based outside the US has published at home or sent to its shareholders. It is how many foreign companies share results and news between annual reports.

Sep 30, 2026 · Filed Oct 23, 2026

Use the contents to explore the available documents and sections.

HBM$20.91+1.6%Stored close · as of Nov 6, 2026
See the whole filing, with its images and exhibits
Contents

EX-99.1 · 17.2 Process Flowsheet

17.2 Process Flowsheet

The general flowsheets for the sulfide concentrator are illustrated in Figure 17-1. The unit operations for the sulfide concentrator are summarized below:

Crushing and Stockpile: Primary gyratory crushing followed by discharge to a coarse ore stockpile.

2026 Copper World - DFSPage 17-1
Form 43-101F1 Technical ReportOctober 2026

Comminution: Primary grinding via a semi-autogenous grinding (SAG) mill and secondary grinding through a closed-circuit ball mill. In the Year 5 expansion, a pebble crushing circuit is added to transition to a SABC configuration.

Flotation: Bulk copper-molybdenum flotation followed by a dedicated copper and molybdenum separation stage to produce individual concentrates.

Concentrate Handling: Thickening, filtration, and loading of final copper and molybdenum concentrates for transport.

Tailings Management: Tailings thickening and disposal to the storage facility. The expansion phase includes the addition of tailings filtration and dry-stacking capabilities.