Skip to main content

Hudbay Minerals Inc.

For the period ended Sep 30, 2026. Filed Oct 23, 2026.

View on SEC.gov

About this filing

What a company based outside the US has published at home or sent to its shareholders. It is how many foreign companies share results and news between annual reports.

Sep 30, 2026 · Filed Oct 23, 2026

Use the contents to explore the available documents and sections.

HBM$20.91+1.6%Stored close · as of Nov 6, 2026
See the whole filing, with its images and exhibits
Contents

EX-99.1 · Table 16-1: Base Pit Design Components

Table 16-1: Base Pit Design Components

Unit (ft)
Haul Road Width
Single Lane Road WithFt81
Base for Autonomous Double Lane Road Widthft116
Mining Constraints
Buffer to Property Limits - Competent/Rockft25.0
Minimum Pit to Infrastructure Offset (minimum distance)ft300.0

16.1.2 Mining Boundaries

The Base Case mine plan assumes that, during operations, the mine site will require only state and local permits, and that all mine facilities will be contained within the perimeter of Hudbay's private land holdings.

2026 Copper World - DFSPage 16-14
Form 43-101F1 Technical ReportOctober 2026

16.1.3 Minimum Mining Width

Minimum operating widths were established to guide pushback design, ensuring that engineered pits can be mined safely and efficiently with the selected mining fleet at the pit bottom. Table 16-2 summarizes these requirements: a minimum mining width of 120 ft at the ultimate pit bottom and a minimum operating width of 232 ft for internal mining phases (equivalent to two full double-lane road widths for 794AC trucks) to ensure optimum productivity.

ContentsView on SEC.gov

The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.