EX-99.1 · Table 16-1: Base Pit Design Components
Table 16-1: Base Pit Design Components
| Unit (ft) | ||
|---|---|---|
| Haul Road Width | ||
| Single Lane Road With | Ft | 81 |
| Base for Autonomous Double Lane Road Width | ft | 116 |
| Mining Constraints | ||
| Buffer to Property Limits - Competent/Rock | ft | 25.0 |
| Minimum Pit to Infrastructure Offset (minimum distance) | ft | 300.0 |
16.1.2 Mining Boundaries
The Base Case mine plan assumes that, during operations, the mine site will require only state and local permits, and that all mine facilities will be contained within the perimeter of Hudbay's private land holdings.
| 2026 Copper World - DFS | Page 16-14 |
|---|---|
| Form 43-101F1 Technical Report | October 2026 |
16.1.3 Minimum Mining Width
Minimum operating widths were established to guide pushback design, ensuring that engineered pits can be mined safely and efficiently with the selected mining fleet at the pit bottom. Table 16-2 summarizes these requirements: a minimum mining width of 120 ft at the ultimate pit bottom and a minimum operating width of 232 ft for internal mining phases (equivalent to two full double-lane road widths for 794AC trucks) to ensure optimum productivity.