PLATINUM GROUP METALS LTD
For the period ended Aug 31, 2024. Filed Oct 9, 2024.
View on SEC.govAbout this filing
What a company based outside the US has published at home or sent to its shareholders. It is how many foreign companies share results and news between annual reports.
Aug 31, 2024 · Filed Oct 9, 2024
Use the contents to explore the available documents and sections.
Contents
EX-99.1 · North Complex Sublevel Interval
North Complex Sublevel Interval
For the North Complex the sublevel interval has not changed from the 2019 DFS, with a combination of 20 m and 40 m intervals.
16.3.5.3 Mining Blocks
To achieve the planned production rate, simultaneous production will be required from multiple mining fronts. To establish multiple fronts, mining blocks will be established at 100 m vertical intervals. For the F-Zone, the 100 m vertical blocks will consist of two 40 m vertical height stopes (each stope drilled up and down) and one 20 m vertical height upper stope that will be mined up to the backfilled stopes in the block above as shown in Figure 16-31.
The mining block and/or stope heights may be adjusted to accommodate mineral resource geometry in certain areas. Within a mining block, stoping will progress from bottom-up, but the overall mining of blocks will progress top-down.
Waterberg Technical Report
The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.