PLATINUM GROUP METALS LTD
For the period ended Aug 31, 2024. Filed Oct 9, 2024.
View on SEC.govAbout this filing
What a company based outside the US has published at home or sent to its shareholders. It is how many foreign companies share results and news between annual reports.
Aug 31, 2024 · Filed Oct 9, 2024
Use the contents to explore the available documents and sections.
Contents
EX-99.1 · Mining
Mining
Account for ore losses in the mine plan in secondary stopes at lower elevations and later in the LOM, where elevated BSR may present issues.
Maintain mine plan flexibility to reduce or adjust stope geometries and/or sequence as needed.
Develop and maintain a good backfill quality control program. This ensures the paste fill placed in the mine consistently has the strength and elasticity needed to maintain crown pillar stability and limit the ground subsidence potential. Best mining ground control practice calls for expedient stope cycling and backfilling.
The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.