PLATINUM GROUP METALS LTD
For the period ended Aug 31, 2024. Filed Oct 9, 2024.
View on SEC.govAbout this filing
What a company based outside the US has published at home or sent to its shareholders. It is how many foreign companies share results and news between annual reports.
Aug 31, 2024 · Filed Oct 9, 2024
Use the contents to explore the available documents and sections.
Contents
EX-99.1 · Case
Case 1
Within a mining block, stopes will be mined from bottom-up to directly beneath the backfilled stopes in the mining block above. The backfill in the stope above will be exposed and must have sufficient strength to remain intact. Prior to backfilling stopes that will be mined beneath, the stope floor must be properly mucked clean to ensure there will be no loose muck that will affect the fill quality. The stope cavity survey will be used to confirm the stope is mucked clean prior to backfilling. The design parameters for Case 1 backfill strength are summarized in Table 16-56.
Waterberg Technical Report
The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.