Process Design

The optimized flowsheet for effectively recovering scheelite from Sangdong ore relies on a structured flotation processes. The goal of this process is to produce a high-quality final concentrate containing approximately 65% WO 3. Pilot plant testing supports an overall average tungsten recovery rate of approximately 85%. The processing facility has been designed to operate at a nominal feed rate of 80 tph, with provisions allowing a design capacity extension up to 100 tph.

-A-53-

The processing plant was designed by Metso, along with AKTC technical personnel and external consultants. Process design criteria stemmed from Metso engineering data.