EX-99.2 · Table 17.2 - Process Design – Unit Operations

Table 17.2 - Process Design–** Unit Operations**

AreaCriteria / UnitNominal Value
Crushing and StockpileRun of Mine (ROM), Maximum Size - mm700
Crushing and StockpileCrusher Circuit Product Size (P80) - mm5
Crushing and StockpileStockpile Capacity (live) - hr8
Crushing and StockpileConveyor Belt Speed - Average2 m/sec
Crushing and StockpileBelt Filling - Maximum80%
Crushing and StockpileMaximum Belt Inclination12 degrees
Crushing and StockpileFeeder Speed0.2 m/sec
Crushing and StockpileFeeder Filling95%
Mill and ClassificationBond Ball Mill Work Index @106 mm - P80 - kWh/t15.5
Mill and ClassificationMill - % ball filling40%
Mill and ClassificationGrinding Circuit Product Size (P80) - µm75
Mill and ClassificationCyclone Feed PressureMax. 2 kgf/cm²
Gravity ConcentrationGold Centrifuge - 50% Feed - 1 unit-
Gravity ConcentrationIntensive Leach Reactor - ILR - 1 unitILR 2000BA
ILR-Intensive Leach Reactor-Gravimetric GoldNumber Batches/day1
ILR-Intensive Leach Reactor-Gravimetric Gold Gravity Concentration-IRLResidence time - hr10 to 12
Pre-Leach ThickeningThickener Underflow Density - % w/w60
Pre-Leach ThickeningPre-Leach Residence Time - hr5
CILCIL Tanks - unit8
CILOverall CIL Residence Time - hr Total24
CILCoal Concentration in Tanks - g/L30
CILCircuit Density - % w/w50
ADRElution time - hr6 to 8
ADRNumber of Desorption Cycles per Mont20
ADRElution Batch Size (Carbon) - t/d3
ADRAmount of Coal in each Elution - t3
Cyanide DestructionCyanide Destruction TechnologySO₂/air
Cyanide DestructionNumber of Stages2
Cyanide DestructionTotal Retention TimeTo be defined
GoldMining Inc. NI 43-101 Report – São Jorge ProjectPage 219