Table 17.2 - Process Design–** Unit Operations**
| Area | Criteria / Unit | Nominal Value |
|---|---|---|
| Crushing and Stockpile | Run of Mine (ROM), Maximum Size - mm | 700 |
| Crushing and Stockpile | Crusher Circuit Product Size (P80) - mm | 5 |
| Crushing and Stockpile | Stockpile Capacity (live) - hr | 8 |
| Crushing and Stockpile | Conveyor Belt Speed - Average | 2 m/sec |
| Crushing and Stockpile | Belt Filling - Maximum | 80% |
| Crushing and Stockpile | Maximum Belt Inclination | 12 degrees |
| Crushing and Stockpile | Feeder Speed | 0.2 m/sec |
| Crushing and Stockpile | Feeder Filling | 95% |
| Mill and Classification | Bond Ball Mill Work Index @106 mm - P80 - kWh/t | 15.5 |
| Mill and Classification | Mill - % ball filling | 40% |
| Mill and Classification | Grinding Circuit Product Size (P80) - µm | 75 |
| Mill and Classification | Cyclone Feed Pressure | Max. 2 kgf/cm² |
| Gravity Concentration | Gold Centrifuge - 50% Feed - 1 unit | - |
| Gravity Concentration | Intensive Leach Reactor - ILR - 1 unit | ILR 2000BA |
| ILR-Intensive Leach Reactor-Gravimetric Gold | Number Batches/day | 1 |
| ILR-Intensive Leach Reactor-Gravimetric Gold Gravity Concentration-IRL | Residence time - hr | 10 to 12 |
| Pre-Leach Thickening | Thickener Underflow Density - % w/w | 60 |
| Pre-Leach Thickening | Pre-Leach Residence Time - hr | 5 |
| CIL | CIL Tanks - unit | 8 |
| CIL | Overall CIL Residence Time - hr Total | 24 |
| CIL | Coal Concentration in Tanks - g/L | 30 |
| CIL | Circuit Density - % w/w | 50 |
| ADR | Elution time - hr | 6 to 8 |
| ADR | Number of Desorption Cycles per Mont | 20 |
| ADR | Elution Batch Size (Carbon) - t/d | 3 |
| ADR | Amount of Coal in each Elution - t | 3 |
| Cyanide Destruction | Cyanide Destruction Technology | SO₂/air |
| Cyanide Destruction | Number of Stages | 2 |
| Cyanide Destruction | Total Retention Time | To be defined |
| GoldMining Inc. NI 43-101 Report – São Jorge Project | Page 219 |
|---|