GoldMining Inc.
For the period ended Jul 31, 2026. Filed Jul 22, 2026.
View on SEC.govAbout this filing
What a company based outside the US has published at home or sent to its shareholders. It is how many foreign companies share results and news between annual reports.
Jul 31, 2026 · Filed Jul 22, 2026
Use the contents to explore the available documents and sections.
GLDG$0.78+4.1%Stored close · as of Nov 6, 2026
Contents
EX-99.2 · Table 16.5 - Final Pit Design Parameters
Table 16.5 - Final Pit Design Parameters
| Operational Parameters | ||
|---|---|---|
| Parameter · Value | ||
| Bench Height | meters | 10.00 |
| Minimum Berm Width | meters | 6.00 |
| Road Width | meters | 12.00 |
| Road Gradient | % | 10.00 |
| Overall Slope Angle - Saprolite | degrees | 29.17 |
| Overall Slope Angle - Fresh Rock | degrees | 46.01 |
| Bench Face Angle - Saprolite | degrees | 40.00 |
| Bench Face Angle - Fresh Rock | degrees | 70.00 |
| GoldMining Inc. NI 43-101 Report – São Jorge Project | Page 169 |
|---|
The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.