EX-99.2 · Table 21‑14: Processing Operating Costs

Table 21‑14: Processing Operating Costs

DescriptionAnnual Cost (USD $000)Unit Cost (USD $/Tonne Processed
Labor3,0070.55
Major Consumables
Grinding Media8,4541.54
Reagents29,3675.36
Liners7,0111.28
Maintenance Supplies
Pumps, Piping, Valves, and Fittings3,9620.72
Electrical Supplies1,5090.28
Miscellaneous Maintenance Supplies3,3040.60
Operations Supplies
Fuel and Lubricants1,0900.20
Miscellaneous Consumables1,6040.29
Other Operating Costs1,8800.34
Power Supply20,3853.72
Total81,57314.90
GoldMining Inc.
NI 43-101 Report – La Mina ProjectPage 230
21.5G&A COSTS

General and administrative costs were developed utilizing standard mine functional areas. Manpower, materials and other charges can be viewed by department in Table 21‑15 and Table 21‑16. The G&A build-up estimated unit rate is $0.66/ore tonne