Skip to main content

CAMECO CORP

For the period ended Dec 31, 2025. Filed Mar 19, 2026.

View on SEC.gov

About this filing

The yearly report of certain Canadian companies, filed under a joint US and Canadian system. It is the main yearly account these companies give US investors, largely as filed in Canada.

FY2025 · Filed Mar 19, 2026

Use the contents to explore the available documents and sections.

CCJ$71.30+4.3%Stored close · as of Nov 6, 2026
See the whole filing, with its images and exhibits
Contents

EX-99.1 · Operating and processing licences

Operating and processing licences

Federally, Cigar Lake holds a “Uranium Mine Licence” from the CNSC with a corresponding Licence Conditions Handbook (LCH). Provincially, Cigar Lake holds an “Approval to Operate Pollutant Control Facilities” from the SMOE and a “Water Rights Licence to Use Surface Water and Approval to Operate Works” from the Saskatchewan Watershed Authority.

The CNSC licence expires on June 30, 2031. The SMOE approval was renewed in 2024, and the current approval now expires in 2030. The Saskatchewan Watershed Authority water rights licence was obtained in 1988, was amended in 2023 and now expires in 2028.

The current Cigar Lake LCH authorizes an annual production rate up to 18 million pounds per year, with the ability for flexible production up to 24 million pounds per year to recover production shortfalls from previous years. The CNSC licence and LCH for the McClean Lake operation, issued by the CNSC in 2017, authorizes the production of up to 24 million pounds U 3 O 8 annually. The licence and LCH were amended in 2022 to authorize the expansion of the JEB TMF.

Approvals, issued by the SMOE in 1995 pursuant to theSaskatchewan Environmental Assessment Act, for Cigar Lake were based on estimated annual production rates of 18 million pounds U 3 O 8 for CLMain and 6 million pounds U 3 O 8 for CLExt. As such, the planned annual production rate of 18 million pounds U 3 O 8 for CLExt represents a change to the approved development. Information required for approval of the production rate change, including the ability for flexible production up to 24 million pounds per year, was submitted in July 2025 with Ministerial Approval provided in September 2025.