EX-99.1 · Mining methods and techniques

Mining methods and techniques

All the mineralized areas discovered to date at McArthur River are in, or partially in, water-bearing ground with significant pressure at mining depths.

There are three approved mining methods at McArthur River: raisebore mining, blasthole stope mining and boxhole mining. However, only raisebore and blasthole stope mining remain in use. Before we begin mining an area, we freeze the ground around it by circulating chilled brine through freeze holes to form an impermeable frozen barrier.

Blasthole stope mining

Blasthole stope mining began in 2011 and is the main extraction method planned for future production. It is planned in areas where blastholes can be accurately drilled and small stable stopes excavated without jeopardizing the freeze wall integrity. The use of this method has allowed the site to improve operating costs by increasing overall extraction efficiency by reducing underground development, concrete consumption, mineralized waste generation and improving extraction cycle time.

Raisebore mining

Raisebore mining is an innovativenon-entry approach that we adapted to meet the unique challenges at McArthur River, and it has been used since mining began in 1999. This method is favourable for mining the weaker rock mass areas of the deposit and is suitable for massive high-grade zones where there is access both above and below the ore zone.

2025 ANNUAL INFORMATION FORMPage 35

Initial processing

McArthur River produces two product streams, high grade slurry andlow-grade mineralized rock. Both product streams are shipped to the Key Lake mill to produce uranium ore concentrate.

The high-grade material is ground and thickened into a slurry underground and then pumped to surface. The material is then thickened and blended for grade control and shipped to Key Lake in slurry totes using haul trucks.

Thelow-grade mineralized material is hoisted to surface and shipped as a dry product to Key Lake using covered haul trucks. Once at Key Lake, the material is ground, thickened and blended with the high-grade slurry to a nominal 5% U 3 O 8 mill feed grade. It is then processed into uranium ore concentrate and packaged in drums for further processing offsite.