Lithium Argentina AG
For the period ended Dec 31, 2023. Filed Mar 21, 2024.
View on SEC.govAbout this filing
The yearly report of certain Canadian companies, filed under a joint US and Canadian system. It is the main yearly account these companies give US investors, largely as filed in Canada.
FY2023 · Filed Mar 21, 2024
Use the contents to explore the available documents and sections.
Contents
EX-99.1 · Mining Operations
Mining Operations
Based on the results of the pumping tests carried out for the Pastos Grandes Project (as described above) brine abstraction from the Salar de Pastos Grandes will take place by installing and operating a conventional production wellfield. Pumping rates of individual wells could range between 20 l/s and 45 l/s. Well completion depths will vary between 200 m and 600 m (lower brine aquifer). The brine wellfield configuration will be finalized as part of the on-going Project optimization.
The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.