EX-99.1 · Caucharí-Olaroz Project Commercial Production Risk

Caucharí-Olaroz Project Commercial Production Risk

The Company and Ganfeng continue to actively oversee Minera Exar’s construction, advancement and ramp-up at the Caucharí-Olaroz Project. It is common in new mining operations to experience unexpected costs, problems and delays during construction, commissioning, mine start-up and ramp-up. Most, if not all, projects of this kind suffer delays during these periods due to numerous factors, including late delivery of supplies and equipment and other supply chain interruptions, skilled labour shortages, adverse weather conditions, equipment failures, design or engineering failures, delays in delivery of funding, the rate at which expenditures are incurred, scheduling delays, and delays in obtaining the required permits or approvals. Many of these risks are described in further detail in other risk factors in this AIF. Any of these factors could result in changes to economic returns or cash flow estimates of the project or have other negative financial implications. There is no assurance that the Caucharí-Olaroz Project will successfully complete construction and/or ramp-up in production quantity and quality on schedule, or at all, that operating and sustaining costs will be consistent with the budget, or that Minera Exar’s activities will result in profitable mining operations. If the Company is unable to develop the Caucharí-Olaroz Project into a commercial operating mine, its business and financial condition will be materially adversely affected.

Further, the Caucharí-Olaroz Project is designed to produce battery-grade lithium carbonate. This requires sensitive chemical processing that can be difficult to produce on a commercial scale and involves additional complexities compared to the commissioning process for other types of mineral production operations. There are substantial price differentials for lithium products that meet battery-grade specifications and those that do not. If Minera Exar is unable to commercially produce lithium carbonate to a purity and performance level that meets battery-grade specifications, a reduction in revenues is expected as the pricing for non-battery grade lithium is generally lower as compared to battery-grade products.