EX-99.1 · Caucharí-Olaroz Operations Risk

Caucharí-Olaroz Operations Risk

The Caucharí-Olaroz Project is located at 3,800 m above sea level, and its process relies on natural phenomena for the concentration of the brine. The mineral resource and mineral reserve estimates are based on limited data based on wide-spaced drilling that may not be representative of the deposit locally or in total. Lithium brine reservoirs are dynamic systems that may behave differently from what was modeled. Natural seasonal variation in climatic conditions can result in brine composition changes, and the productivity of the concentration process. Careful management through on-going monitoring of current conditions and forecasting based on historical data and ranges is used to manage the impact of seasonality and climate change on brine concentration levels.

The production operation requires multiple specialized functions and management of operating risk for the successful first-start, ramp-up, operation and maintenance of the site. Pond harvesting operations will allow for continued operations of the ponds and improved recovery but can result in damage to the pond systems. The lithium carbonate plant uses flammable solvents and natural gas for certain utilities and process operations. The risks associated with utilities and processing methods could result in loss of operating volume. The initial start-up and ramp-up of operations at site has an elevated risk versus normal operations. Additional support from equipment vendors, specialists, operating reviews and first-response training are being used to manage that risk, nevertheless to the extent that these risks are realized it would result in decreased performance of the project and reduce the financial return from the operation.