Energy Vault Holdings, Inc.
For the period ended Dec 31, 2025. Filed Mar 18, 2026.
View on SEC.govAbout this filing
A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.
FY2025 · Filed Mar 18, 2026
What changed in Risk Factors?
Read the current filingPrevious report: 10-K
Period ended 2024-12-31; filed 2025-04-01.
0001828536-25-000032
Item 1A. Risk FactorsCurrent report: 10-K
Period ended 2025-12-31; filed 2026-03-18.
0001828536-26-000022
Item 1A. Risk FactorsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 340 previous paragraphs and 346 current paragraphs.
266 unchanged; 62 reworded; 16 added; 11 removed; 1 previous and 2 current paragraphs rearranged.
Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (16)
Current report
We may be unable to achieve our strategic priorities in emerging markets.
Current report
Emerging markets are a significant focus of our strategic plan. The developing nature of these markets presents a number of risks. We may be unable to attract, develop, and retain appropriate talent to manage our businesses in emerging markets. Deterioration of social, political, labor, or economic conditions in a specific country or region may adversely affect our operations or financial results. Emerging markets may not meet our growth expectations, and we may be unable to maintain such growth or to balance such growth with financial goals and compliance requirements. Among the risks in emerging market countries are bureaucratic intrusions and delays, contract compliance failures, engrained business partners that do not comply with local or U.S. law, fluctuating currencies and interest rates, limitations on the amount and nature of investments, restrictions on permissible forms and structures of investment, unreliable legal and financial infrastructure, regime disruption and political unrest, uncontrolled inflation and commodity prices, fierce local competition by companies with better political connections, and corruption. In addition, the costs of compliance with local laws and regulations in emerging markets may negatively impact our competitive position as compared to locally owned manufacturers.
Current report
Net bookings represent the sum of contracted bookings and contingent option bookings, net of cancellations, measured in total aggregate contract value and total MWhs. Contracted bookings are from customer contracts signed during the period. Contingent option bookings are from projects where the Company holds an enforceable exclusive purchase right and intends to exercise that right, even if the option has not been exercised as of period end. For the year ended December 31, 2025 net bookings totaled $1.1 billion.
Current report
Our ability to use certain of our current and future net operating loss and tax credit carryforwards may be limited and could adversely affect our operating results and cash flows.
Current report
Changes to applicable tax laws or regulations or the interpretation thereof or the imposition of new or increased taxes or fees could increase our future tax liabilities and adversely affect our business, financial condition, and cash flows.
Current report
We are subject to various complex evolving U.S. federal, state and local tax laws, policies, statutes, rules, regulations and ordinances, each of which could be changed, modified, interpreted or applied adversely to us, in each case, possibly with retroactive effect. From time to time, U.S. federal and state level legislation has been proposed that would, if enacted into law, make significant changes to tax laws, including to certain key U.S. federal and state income tax provisions currently applicable to us. It is unclear whether any such changes will be enacted and, if enacted, how soon any such changes could take effect. Additionally, U.S. states or non-U.S. jurisdictions in which we operate or own assets may impose new or increased taxes or fees on our operations. The passage of any such legislation or other changes or modifications of current tax laws, any significant variance in our interpretation of current tax laws or a successful challenge of one or more of our tax positions by the IRS or other tax authorities could increase our future tax liabilities and adversely affect our business, results of operations, financial condition and cash flows.
Current report
The United States has enacted significant tariffs and proposed changes to previously existing tariffs. In particular, the United States has finalized Section 301 tariff actions covering certain China-origin products, including a scheduled increase in the tariff rate applicable to lithium-ion non-electric vehicle batteries to 25% effective January 1, 2026. In addition, Section 232 tariffs were increased to 50% effective June 4, 2025 (subject to certain country-specific provisions).
Current report
Further, President Trump has continued to rely on the tariff power to drive trade negotiations globally resulting in fluctuating tariff rates especially with respect to tariff rates on imports from China.
Current report
For example, the IRA, adopted by the U.S. Congress in August 2022, contained a number of tax incentive provisions that directly support the adoption of energy storage solutions and services, including the Technology Neutral Credits and changes to the previous Section 48 non-“technology neutral” ITC. Among such changes were provisions that allow a taxpayer that placed in service a standalone energy storage technology with a minimum capacity of 5 kWh to claim an ITC, if certain requirements are met. On July 4, 2025, the OBBBA was signed into law and significantly modified certain provisions of the IRA, including those related to energy storage. Some of these changes could dampen demand for battery energy storage systems in the U.S., while other changes preserve robust support for standalone battery storage.
Current report
The OBBBA also implemented new FEOC/PFE restrictions that apply to all Technology Neutral Credits under Section 45Y and Section 48E of the Code, the advanced manufacturing credit (Section 45X of the Code), and other related incentives. Such FEOC/PFE rules are intended to deny tax credits to projects that are owned or controlled by certain foreign entities, or that source components from or make payments to such entities, including, but not limited to, Chinese entities. Under these rules, project owners or component suppliers with disqualifying foreign-entity ties must satisfy new sourcing and ownership tests or potentially forfeit credit eligibility; however, legacy IRA credits under Sections 45 and 48 of the Code for projects with construction commenced by December 31, 2024, remain fully grandfathered and unaffected by the FEOC/PFE regime. It is possible that our stock ownership could change in the future such that we become a PFE. Final eligibility and compliance will depend on forthcoming U.S. Department of Treasury, IRS, and FERC guidance on domestic-content metrics, PFE ownership testing rules, PFE material-assistance certifications, and storage-specific interconnection standards.
Current report
There is continuing uncertainty on certain aspects of the IRA and related guidance and the OBBBA and forthcoming related guidance. The full impact of the modifications to the tax credits and FEOC/PFE restrictions in the OBBBA, its accompanying guidance, and potential future changes in law that may apply to our business and operations as well as our customers’ and suppliers’ businesses cannot be known with certainty and we may not recognize the full extent of benefits we currently anticipate, which may materially and adversely impact our business, financial condition, and results of operations. We are continuing to evaluate the potential overall impact and applicability of these tax credits, as modified by the OBBBA, and any potential future changes in law on our business and operations.
Current report
Further, most existing environmental laws and regulations preceded the introduction of energy storage technology and were adopted to apply to technologies existing at the time. These laws therefore do not necessarily reflect the realities of new technologies, and as policymakers work to adapt or establish regulatory frameworks or standards that apply to energy storage, we may be subject to various challenges. For example, it is possible that regulators could delay or prevent us from conducting our business in some way pending agreement on, and compliance with, shifting or expanding regulatory requirements. Safety laws and compliance related to energy storage may change over time, including standards related to lithium ion batteries and fire safety and minimizing the risk of starting or being impacted by a fire. Such actions could delay the sale to and installation by us or our customers of energy storage systems, require their modification or replacement, result in fines or trigger claims of warranties and defaults under customer contracts. Any of these developments could adversely affect our business, financial performance, and results of operations.
Current report
Our services depend on the creation of renewable energy by third parties, and changes to regulations and policies affecting renewable energy may adversely impact our business.
Current report
The installation and operation of our energy storage systems and the creation of renewable energy that they store may also require obtaining and maintaining applicable governmental approvals and permits, including EHS approvals and permits, which vary by jurisdiction. The denial of or delays in obtaining a permit essential to a project or the imposition of impractical conditions impairs the ability of those who provide renewable power to us and our customers or our own ability to develop a project. Further, unforeseen delays in the review and permitting process for renewable energy projects could increase the costs of the renewable energy that we store. Such delays may arise from litigation challenging project permits or approvals or from factors beyond our control, such as changes in policies and regulations regarding renewable energy projects, including energy storage systems. For example, on January 20, 2025, President Trump issued an executive order prohibiting federal agencies from issuing permits or approvals for wind energy projects pending a review of federal permitting procedures; though the U.S. District Court for the District of Massachusetts subsequently vacated the order in December 2025. We cannot predict when or whether federal or other governmental authorities may take similar actions with respect to other forms of renewable energy, but any policies limiting the production of renewable energy may adversely impact our business.
Current report
Additionally, our use of AI and machine learning may result in significant legal and regulatory risks. The legal landscape regarding the ownership, use and protection of AI-generated innovations remains uncertain in U.S. and foreign courts. If we fail to obtain or maintain protection for technologies developed through or reliant upon AI, our competitors may more easily design around our IP, diminishing our competitive advantage. Additionally, the regulation of AI is rapidly evolving. For example, international regulations like the EU AI Act, may increase our research and development costs, require disclosures that make it harder to protect our trade secrets, or result in fines and litigation if we fail to comply.
Removed paragraphs (11)
Previous report
Bookings represent the total aggregate contract value and total MWhs to be delivered from customer contracts signed during the period, net of the total aggregate value and total MWhs of contracts that were cancelled during the period and is calculated using the same methodologies as our backlog. For the year ended December 31, 2024 bookings totaled $223.9 million.
Previous report
Our ability to use net operating losses and other tax attributes to offset future taxable income may be subject to certain limitations.
Previous report
Changes in tax laws and regulations may have a material adverse effect on our business, financial condition, and result of operations.
Previous report
New income, sales, use, or other tax laws, statutes, rules, regulations, or ordinances could be enacted at any time, which could affect the tax treatment of any of our future U.S. and non-U.S. earnings. Further, existing tax laws, statutes, rules, regulations, or ordinances could be interpreted, changed, modified, or applied adversely to us. Generally, future changes in applicable U.S. and non-U.S. tax laws and regulations, or their interpretation and application, potentially with retroactive effect, could have an adverse effect on our business, financial conditions, and results of operations. We are unable to predict whether such changes will occur and, if so, the ultimate impact on our business.
Previous report
For the year ended December 31, 2024, the Company recognized $11.7 million in impairment charges on our investment in KORE Power, Inc. due to a decline in their financial performance.
Previous report
•pay substantial damages (including treble damages and attorneys’ fees if our infringement is determined to be willful);
Previous report
The United States has recently enacted and proposed to enact significant new tariffs, as well as changes to existent tariffs. In particular, the Section 301 tariff rate on lithium-ion non-EV batteries imported from China has been amended several times since the beginning of 2025 and may continue to change.
Previous report
Additionally, President Trump has directed various federal agencies to further evaluate key aspects of U.S. trade policy and there has been ongoing discussion, commentary, and action regarding potential significant changes to U.S. trade policies, treaties, and tariffs. Effective March 4, 2025, the U.S. implemented a 25% additional tariff on imports from Canada (subject to certain exceptions for energy or energy resources) and Mexico, and a 20% additional tariff on imports from China. In response to these tariffs, Canada has proposed retaliatory tariffs. On March 6, 2025, the Trump Administration announced that Canadian and Mexican goods covered by the U.S.-Mexico-Canada Agreement would not be subject to the additional 25% tariff until April 2, 2025.
Previous report
In August 2022, the United States passed the IRA, which includes a number of government incentives that support the adoption of energy storage products and services and are anticipated to benefit the Company and its operations. Forthcoming additional guidance to implement the IRA from the U.S. Department of Treasury and other federal administrative agencies could be drafted in such manner that would not be as anticipated and may be adverse to the Company’s interests and the current U.S. administration has indicated that they will be reducing or eliminating many of these incentives.
Previous report
We expect to continue incurring significant increased expenses and administrative burdens as a public company, which could negatively impact our business, financial condition and results of operations.
Previous report
We incur increased legal, accounting, administrative and other costs and expenses as a public company. We expect such costs and increases to be increased further after we are no longer an emerging growth company. The Sarbanes-Oxley Act, including the requirements of Section 404, as well as rules and regulations subsequently implemented by the SEC, the Dodd-Frank Wall Street Reform and Consumer Protection Act of 2010 and the rules and regulations promulgated and to be promulgated thereunder, the Public Company Accounting Oversight Board and the securities exchanges, impose additional reporting and other obligations on public companies. Compliance with public company requirements will increase costs and make certain activities more time-consuming. A number of those requirements require us to carry out activities we have not done previously. Furthermore, if any issues in complying with those requirements are identified (for example, if the auditors identify a significant deficiency or material weaknesses in the internal control over financial reporting), we could incur additional costs to rectify those issues, and the existence of those issues could adversely affect our reputation or investor perceptions.
Reworded paragraphs (62)
Previous wording
•Our B-Vault, B-Nest, G-Vault and H-Vault products are based on established principles that are deployed in a novel way to create new technologies to store energy and potential customers may be hesitant to make a significant investment in our technology or abandon the technology they are currently using.
Current wording
•Our B-VAULT, G-VAULT and H-VAULT products are based on established principles that are deployed in a novel way to create new technologies to store energy and potential customers may be hesitant to make a significant investment in our technology or abandon the technology they are currently using.
Previous wording
•Our developed pipeline of awarded or shortlisted third-party EPC, EEQ, and long-term service opportunities, and the long-term economics associated with potential projects identified for our own and operate portfolio, may be subject to change and be impacted by anticipated equipment and commodity costs, tariffs, as well as changes in foreign currency exchange rates in markets in which we source materials or conduct business.
Current wording
•Our developed pipeline of awarded or shortlisted third-party EPC, EEQ, and long-term service opportunities, and the long-term economics associated with potential projects identified for our Own & Operate portfolio, may be subject to change and be impacted by anticipated equipment and commodity costs, tariffs, as well as changes in foreign currency exchange rates in markets in which we source materials or conduct business.
Previous wording
•Our owned projects are based on our estimates of construction costs, timelines, future revenues, and operating costs. If those estimates are inaccurate, our anticipated revenues and profits may be materially and adversely effected.
Current wording
•Our owned projects are based on our estimates of construction costs, timelines, future revenues, and operating costs. If those estimates are inaccurate, our anticipated revenues and profits may be materially and adversely affected.
Previous wording
Prior to the first half of 2022, we focused principally on developing and proving our fundamental gravity energy storage technology, marketed as our G-Vault products, which we are seeking to further refine and commercialize. Beginning in 2022, we expanded our offerings to include BESSs and HESSs. In 2024, we launched our B-Nest product. To date, we have only completed three BESSs and one GESS, which was the EV1 Tower in Lugano, Switzerland (the “EV1 CDU”), which served as a commercial demonstration unit until its decommissioning in September 2022. As a result, we have a limited history operating our business and constructing energy storage systems, and therefore a limited history upon which you can base an investment decision.
Current wording
Prior to the first half of 2022, we focused principally on developing and proving our fundamental gravity energy storage technology, marketed as our G-VAULT products, which we are seeking to further refine and commercialize. Beginning in 2022, we expanded our offerings to include BESSs and hydrogen or HESSs. In 2024, we launched our B-Nest product, which we no longer market. We began a multi-year transition from providing this technology portfolio solely to third parties through a build-and-transfer model or licensing model. To date, we have only completed five BESSs, only one HESS in Calistoga, California, and only two gravity energy storage solutions, one of which has since been decommissioned. As a result, we have a limited history operating our business and constructing energy storage systems, and therefore a limited history upon which you can base an investment decision.
Previous wording
Our future growth in a nascent and rapidly-evolving industry is dependent on a number of factors, including rising demand for clean electric power solutions that can provide electric power with lower carbon emissions and replacement of conventional generation sources and the adoption speed of digital software applications to modernize the efficiency of power assets and the electric grid. Among other renewable energy market trends, we expect our business results to be driven by declines in the cost of generation of renewable power, decreases in the cost of manufacturing battery modules and cells, customer needs for services and digital applications, commercial, legal, regulatory, and political pressure for the reduced use of and reliance on fossil fuels and electric power generation that relies on fossil or other non-renewable fuels, and a rapidly growing energy storage market driven by increasing demand from utilities, independent power producers, and large energy users. However, predicting future revenues and appropriately forecasting and budgeting for our expenses is difficult, and we have limited operating history to predict trends that may emerge and take hold and materially affect our business. Our future operations and strategy is therefore subject to all of the risks inherent in light of the expenses, difficulties, complications and delays frequently encountered in connection with the growth of any new business in a nascent industry, as well as those that are specific to our business in particular.
Current wording
Our future growth in a nascent and rapidly-evolving industry is dependent on a number of factors, including rising demand for clean electric power solutions that can provide electric power with lower carbon emissions and replacement of conventional generation sources and the adoption speed of digital software applications to modernize the efficiency of power assets and the electric grid. Among other renewable energy market trends, we expect our business results to be driven by declines in the cost of generation of renewable power, decreases in the cost of manufacturing battery modules and cells, customer needs for services and digital applications, commercial, legal, regulatory, and political pressure for the reduced use of and reliance on fossil fuels and electric power generation that relies on fossil or other non-renewable fuels, and a rapidly growing energy storage market driven by increasing demand from utilities, independent power producers, and large energy users. However, predicting future revenues and appropriately forecasting and budgeting for our expenses is difficult, and we have limited operating history to predict trends that may emerge and take hold and materially affect our business. Our future operations and strategy are therefore subject to all of the risks inherent in light of the expenses, difficulties, complications and delays frequently encountered in connection with the growth of any new business in a nascent industry, as well as those that are specific to our business in particular.
Previous wording
Our business model depends on acceptance of our technology by our customers, retaining existing customers, and the success of our business model.
Current wording
Our business model depends on acceptance of our technology by our customers, retaining existing customers, obtaining new customers, and the success of our business model.
Previous wording
As a recent market entrant in a developing industry, our results of operations and financial condition are dependent upon our success in establishing or entering new markets, developing and commercializing our energy storage systems, and undertaking marketing activities. We face significant risks associated with our business strategy of targeting utilities, independent power producers, and large energy users and deploying our energy storage systems at a scale that leads to broad market acceptance and profitability. The relative success of our energy systems will be dependent upon a number of factors, including their ability to provide our customers with reliable and dependable energy storage for the durations that they require, while still being cost-effective, and our ability to effectively manage any customer concerns.
Current wording
As a recent market entrant in a developing industry, our results of operations and financial condition are dependent upon our success in establishing or entering new markets (including data center developers), developing and commercializing our energy storage systems, and undertaking marketing activities. We face significant risks associated with our business strategy of targeting utilities, independent power producers, and large energy users, such as data center developers, and deploying our energy storage systems at a scale that leads to broad market acceptance and profitability. The relative success of our energy systems will be dependent upon a number of factors, including their ability to provide our customers with reliable and dependable energy storage for the durations that they require, while still being cost-effective, and our ability to effectively manage any customer concerns.
Previous wording
In addition to the development and acceptance of our core energy storage technologies, we anticipate further developing and marketing our digital platform for the management and optimization of energy storage systems. If this platform is not adopted by users of our energy storage products or on a standalone basis, we may not recoup our investment in its development and our results of operation may be negatively impacted.
Current wording
In addition to the development and acceptance of our core energy storage technologies, we anticipate further developing and marketing our digital platform for the management and optimization of energy storage systems. If this platform is not adopted by users of our energy storage products or on a standalone basis, we may not recoup our investment in its development and our results of operations may be negatively impacted.
Previous wording
In attempting to attract new customers to support our growth, we intend to refine our customer agreements based on experience. Moreover, new types of product offerings may require our customers to find partners willing to finance these new projects, which may have different terms and financing conditions from prior transactions. If the terms of these transactions or the structure of these projects fails to attract financiers, we may not be able to proceed with growing our business and our potential for growth may be limited. Additionally, financing options are also limited by the borrower’s willingness to commit to making fixed payments regardless of the performance of the energy storage systems or our performance of our obligations under the customer agreement.
Current wording
In attempting to attract new customers to support our growth, we intend to refine our customer offerings based on experience. Moreover, new types of product offerings may require our customers to find partners willing to finance these new projects, which may have different terms and financing conditions from prior transactions. If the terms of these transactions or the structure of these projects fails to attract financiers, we may not be able to proceed with growing our business and our potential for growth may be limited. Additionally, financing options are also limited by the borrower’s willingness to commit to making fixed payments regardless of the performance of the energy storage systems or our performance of our obligations under the customer agreement.
Previous wording
Our energy storage systems will be subject to various operating risks that may cause them to generate less value for our customers than expected. These risks include a failure or wearing out of our equipment or the equipment that our equipment connects into, an inability to find suitable replacement equipment or parts, or disruption in our distribution systems. Any extended interruption or failure of our projects or our customer’s projects, including systems we operate under long term service agreements, for any reason to generate the expected amount of output could adversely affect our business, financial condition and results of operations. In addition, our customers’ willingness to acquire additional systems or services from us may be impacted in the future if any of our systems incur operational issues that indicate expected future cash flows from the system are less than the carrying value. Any such outcome could adversely affect our operating results or ability to attract new customers.
Current wording
Our energy storage systems will be subject to various operating risks that may cause them to generate less value for our customers than expected. These risks include a failure or wearing out of our equipment or the equipment that our equipment connects into, an inability to find suitable replacement equipment or parts, or disruption in our distribution systems. Any extended interruption or failure of our projects or our customer’s projects, including systems we operate under long term service agreements, for any reason to generate the expected amount of output could adversely affect our business, financial condition and results of operations. We have experienced outages in the past, including at our Cross Trails BESS, and could continue to do so in the future. In addition, our customers’ willingness to acquire additional systems or services from us may be impacted in the future if any of our systems incur operational issues that indicate expected future cash flows from the system are less than the carrying value. Any such outcome could adversely affect our operating results or ability to attract new customers.
Previous wording
We provide limited warranties and performance guarantees for our energy systems. We make investment decisions for our owned projects based in part on an estimate of the useful life of our products. To date, we have deployed three operational BESSs and our estimates about product performance and life may prove to be incorrect. Failure to meet these warranties and performance guarantee levels for our customers may require the purchase price to be adjusted downward based on agreed-upon performance targets, or require us to make cash payments to the customer based on actual performance, as compared to expected performance. Failure to meet these expected performance levels on our owned projects could materially and adversely impact the expected performance of such projects.
Current wording
We provide limited warranties and performance guarantees for our energy systems. We make investment decisions for our owned projects based in part on an estimate of the useful life of our products. To date, we have deployed five operational BESSs and our estimates about product performance and life may prove to be incorrect. Failure to meet these warranties and performance guarantee levels for our customers may require the purchase price to be adjusted downward based on agreed-upon performance targets, or require us to make cash payments to the customer based on actual performance, as compared to expected performance. Failure to meet these expected performance levels on our owned projects could materially and adversely impact the expected performance of such projects.
Previous wording
Our success depends on our ability to generate revenue and operate profitably, which depends in part on our ability to identify target customers and convert such contacts into meaningful orders or expand on current customer relationships. To date, we have only deployed three operational energy systems. While our contracts do provide that our customers will be obligated to pay us certain fees in the event of termination for their convenience, such fees may not be sufficient to cover our costs and we would not realize the expected revenue associated with such cancelled contracts. Potential and contracted customers may abandon their indications of interest, or fail to honor contractual obligations and non-binding letters of interest may be cancelled or delayed by a customer for any reason or its terms may be amended in a manner adverse to us in connection with negotiating a definitive sales agreement. For that reason, there can be no assurance that any current or future indications of interest (including awards, submitted proposals or short-lists) or non-binding letters of intent will result in binding orders or sales. Furthermore, in light of our limited operating history, it is difficult for us to predict the rates at which the non-binding letters of intent or other indications of interest in our pipeline will result in binding orders or sales. It is also difficult for us to predict how quickly we will be able to fill binding orders in the event that we obtain multiple orders. In addition, revenue is expected to be recognized in stages, and customers may in some cases delay actual cash payments regardless of progressive billings. Additionally, a customer’s ability to make payments could decline during the sales process, even to the point of insolvency or bankruptcy. As a result, our operating results and cash flow may be materially lower than we expect.
Current wording
Our success depends on our ability to generate revenue and operate profitably, which depends in part on our ability to identify target customers and convert such contacts into meaningful orders or expand on current customer relationships. To date, we have only deployed five operational BESSs. While our contracts do provide that our customers will be obligated to pay us certain fees in the event of termination for their convenience, such fees may not be sufficient to cover our costs and we would not realize the expected revenue associated with such cancelled contracts. Potential and contracted customers may abandon their indications of interest, or fail to honor contractual obligations and non-binding letters of interest may be cancelled or delayed by a customer for any reason or its terms may be amended in a manner adverse to us in connection with negotiating a definitive sales agreement. For that reason, there can be no assurance that any current or future indications of interest (including awards, submitted proposals or short-lists) or non-binding letters of intent will result in binding orders or sales. Furthermore, in light of our limited operating history, it is difficult for us to predict the rates at which the non-binding letters of intent or other indications of interest in our pipeline will result in binding orders or sales. It is also difficult for us to predict how quickly we will be able to fill binding orders in the event that we obtain multiple orders. In addition, revenue is expected to be recognized in stages, and customers may in some cases delay actual cash payments regardless of progressive billings. Additionally, a customer’s ability to make payments could decline during the sales process, even to the point of insolvency or bankruptcy. As a result, our operating results and cash flow may be materially lower than we expect.
Previous wording
In addition, a key component of our growth strategy is to develop or expand our relationships with third parties. For example, we are investing resources in establishing strategic relationships with market players across a variety of industries, including, large renewable project developers, commercial agents, environmental organizations and unions, to generate new customers or to grow our business. These programs may not roll out as quickly as planned or produce the results we anticipated. A significant portion of our business depends on attracting new partners and retaining existing partners, and such relationships may not be predicated on enforceable agreements or any agreements at all.
Current wording
In addition, a key component of our growth strategy is to develop or expand our relationships with third parties. For example, we are investing resources in establishing strategic relationships with market players across a variety of industries, including, large renewable project developers, data center developers, commercial agents, environmental organizations and unions, to generate new customers or to grow our business. These programs may not roll out as quickly as planned or produce the results we anticipated. A significant portion of our business depends on attracting new partners and retaining existing partners, and such relationships may not be predicated on enforceable agreements or any agreements at all.
Previous wording
We rely on a limited number of third-party suppliers for some of the components and raw materials such as steel, cement, polymers and, in certain cases, coal ash waste and retired wind turbine blades, and other materials that may be of limited supply for our G-Vault products and batteries, inverters, enclosures, and transformers for our BESSs. If any of our suppliers fail or are unable to provide sufficient components or raw materials at the level of quality required, or if our suppliers fail or are unable to or unwilling to provide us with the contracted quantities (as we have limited or in some case no alternatives for supply), or if our suppliers cancel the contracted quantities without sufficient lead time to order the materials from another supplier, or if our suppliers fail or are unable to deliver the components or raw materials in a timely manner, then delays, cancellations, penalty payments, or damage to our reputation could occur, which could have a material adverse effect on our business and our results of operations. If we fail to develop or maintain our relationships with any of our suppliers, or if there is otherwise a shortage, lack of availability, or cancellation of the purchase of any required raw materials or components, we may be unable to manufacture our energy storage systems or such products may be available only at a higher cost or after a long delay.
Current wording
We rely on a limited number of third-party suppliers for some of the components and raw materials such as batteries, inverters, enclosures, and transformers for our BESSs. If any of our suppliers fail or are unable to provide sufficient components or raw materials at the level of quality required, or if our suppliers fail or are unable to or unwilling to provide us with the contracted quantities (as we have limited or in some case no alternatives for supply), or if our suppliers cancel the contracted quantities without sufficient lead time to order the materials from another supplier, or if our suppliers fail or are unable to deliver the components or raw materials in a timely manner, then delays, cancellations, penalty payments, or damage to our reputation could occur, which could have a material adverse effect on our business and our results of operations. If we fail to develop or maintain our relationships with any of our suppliers, or if there is otherwise a shortage, lack of availability, or cancellation of the purchase of any required raw materials or components, we may be unable to manufacture our energy storage systems or such products may be available only at a higher cost or after a long delay.
Previous wording
Additionally, there are increasing expectations in various jurisdictions that companies monitor the environmental and social performance of their suppliers, including sourcing of materials and compliance with a variety of labor practices, as well as consider a wider range of potential environmental and social matters, including the end-of-life considerations for products. In addition, increasing concern and focus on limiting forced labor may result in additional regulations targeting the markets we operate in and from which we source products and materials. Certain existing laws impose prohibitions on the importation of goods made with forced labor or compulsory prison labor, including the Tariff Act of 1930, the Uyghur Forced Labor Prevention Act (“UFLPA”), and other global laws against forced labor. The UFLPA places restrictions on imports from Xinjiang, a key source of materials in global supply chains. Compliance can be costly, require us to establish or augment programs to diligence or monitor our suppliers, or to design supply chains to avoid certain regions altogether. Failure to comply with such regulations can result in fines, reputational damage, import ineligibility for our products or product components, or otherwise adversely impact our business. Current or future supply chain interruptions that could be exacerbated by global political tensions, such as the situation in Ukraine, conflict in the Middle East, and public health emergencies, could also negatively impact our ability to acquire necessary raw materials and components. Such delays could prevent us from delivering our energy storage systems to customers within required time frames and cause order cancellations. Developing required raw materials and constructing required components for our products are time and capital intensive. Accordingly, the number of suppliers we have for some of our components and materials is limited and, in some cases, sole sourced. We may be unable to obtain comparable components from alternative suppliers without considerable delay, expense, or at all. If our suppliers face difficulties obtaining the credit or capital necessary to expand their operations when needed, they could be unable to supply necessary raw materials and components needed to support our planned sales and services operations, which would negatively impact our sales volumes and cash flows.
Current wording
Additionally, there are increasing expectations in various jurisdictions that companies monitor the environmental and social performance of their suppliers, including sourcing of materials and compliance with a variety of labor practices, as well as consider a wider range of potential environmental and social matters, including the end-of-life considerations for products. In addition, increasing concern and focus on limiting forced labor may result in additional regulations targeting the markets we operate in and from which we source products and materials. Certain existing laws impose prohibitions on the importation of goods made with forced labor or compulsory prison labor, including the Tariff Act of 1930, the Uyghur Forced Labor Prevention Act (“UFLPA”), and other global laws against forced labor. The UFLPA places restrictions on imports from Xinjiang, a key source of materials in global supply chains. Compliance can be costly, require us to establish or augment programs to diligence or monitor our suppliers, or to design supply chains to avoid certain regions altogether. Failure to comply with such regulations can result in fines, reputational damage, import ineligibility for our products or product components, or otherwise adversely impact our business. Current or future supply chain interruptions that could be exacerbated by global political tensions, such as the situation in Ukraine, conflict in the Middle East, including the current conflict between the U.S. and Iran, and public health emergencies, could also negatively impact our ability to acquire necessary raw materials and components. Such delays could prevent us from delivering our energy storage systems to customers within required time frames and cause order cancellations. Developing required raw materials and constructing required components for our products are time and capital intensive. Accordingly, the number of suppliers we have for some of our components and materials is limited and, in some cases, sole sourced. We may be unable to obtain comparable components from alternative suppliers without considerable delay, expense, or at all. If our suppliers face difficulties obtaining the credit or capital necessary to expand their operations when needed, they could be unable to supply necessary raw materials and components needed to support our planned sales and services operations, which would negatively impact our sales volumes and cash flows.
Previous wording
Our business is subject to risks relating to construction, cost overruns and delays. The installation and operation of our energy storage systems at a particular site is generally subject to oversight and regulation in accordance with national, state, tribal, and local laws and ordinances relating to building codes, health and safety, environmental protection, Federal Energy Regulatory Commission (“FERC”) and specific Independent System Operators regulation and related matters, and typically requires obtaining and keeping in good standing various local and other governmental approvals and permits, including environmental approvals and permits, that vary by jurisdiction. In some cases, these approvals and permits require periodic renewal. It is difficult and costly to track the requirements of every individual authority having jurisdiction over energy storage system installations, to design our energy storage systems to comply with these varying standards, which may change over time, and for us and our customers to obtain all applicable approvals and permits. We cannot predict whether or when all permits and approvals required for a given project will be granted or whether the conditions associated with the permits and approvals will be achievable. The denial of a permit or approval or utility connection that is essential to a project or the imposition of impractical conditions would impair our or our customer’s ability to develop the project. In addition, we cannot predict whether the permitting and approvals process will be lengthened due to complexities and appeals. Delay in the review and permitting process for a project can impair or delay our or our customers’ abilities to develop that project or increase the cost so substantially that the project is no longer attractive. Furthermore, unforeseen delays in the review and permitting process could delay the timing of the installation of our energy storage systems and could therefore adversely affect the timing of the recognition of revenue related to hardware acceptance by our customer, or our own ability to generate revenue from our owned projects which could adversely affect our operating results in a particular period. Delays relating to constructions may also bring about cost overruns, which could further adversely affect our business.
Current wording
Our business is subject to risks relating to construction, cost overruns and delays. The installation and operation of our energy storage systems at a particular site are generally subject to oversight and regulation in accordance with national, state, tribal, and local laws and ordinances relating to building codes, health and safety, environmental protection, FERC and specific Independent System Operators (“ISOs”) regulation and related matters, and typically requires obtaining and keeping in good standing various local and other governmental approvals and permits, including environmental approvals and permits, that vary by jurisdiction. In some cases, these approvals and permits require periodic renewal. It is difficult and costly to track the requirements of every individual authority having jurisdiction over energy storage system installations, to design our energy storage systems to comply with these varying standards, which may change over time, and for us and our customers to obtain all applicable approvals and permits. We cannot predict whether or when all permits and approvals required for a given project will be granted or whether the conditions associated with the permits and approvals will be achievable. The denial of a permit or approval or utility connection that is essential to a project or the imposition of impractical conditions would impair our or our customer’s ability to develop the project. In addition, we cannot predict whether the permitting and approvals process will be lengthened due to complexities and appeals. Delay in the review and permitting process for a project can impair or delay our or our customers’ abilities to develop that project or increase the cost so substantially that the project is no longer attractive. Furthermore, unforeseen delays in the review and permitting process could delay the timing of the installation of our energy storage systems and could therefore adversely affect the timing of the recognition of revenue related to hardware acceptance by our customer, or our own ability to generate revenue from our owned projects which could adversely affect our operating results in a particular period. Delays relating to construction may also bring about cost overruns, which could further adversely affect our business.
Previous wording
In addition, the successful installation of our energy storage systems is dependent upon the availability of and timely connection to the local electric grid. Before beginning construction on an energy storage system, we may be unable to obtain in a timely fashion or at all the required consent and authorization of local utilities to ensure successful interconnection to energy grids to enable the successful discharge of renewable energy to customers. Any delays in our customers’ ability to connect with utilities, delays in the performance of installation-related services or poor performance of installation-related services will have an adverse effect on our results and could cause operating results to vary materially from period to period. FERC issued Order No. 2023 on July 28, 2023 in an attempt to address interconnection queue backlogs and related issues with the interconnection process, including with respect to energy storage facilities. Transmission owners and operators are in the process of developing proposed rules to implement Order No. 2023, the results of which remain uncertain at this time.
Current wording
In addition, the successful installation of our energy storage systems is dependent upon the availability of and timely connection to the local electric grid. Before beginning construction on an energy storage system, we may be unable to obtain in a timely fashion or at all the required consent and authorization of local utilities to ensure successful interconnection to energy grids to enable the successful discharge of renewable energy to customers. Any delays in our customers’ ability to connect with utilities, delays in the performance of installation-related services or poor performance of installation-related services will have an adverse effect on our results and could cause operating results to vary materially from period to period.
Previous wording
Our G-Vault, H-Vault, and B-Nest products are based on established principles that are deployed in a novel way to create new technologies to store energy and potential customers may be hesitant to make a significant investment in our technology or abandon the technology they are currently using.
Current wording
Our G-VAULT and H-VAULT products are based on established principles that are deployed in a novel way to create new technologies to store energy and potential customers may be hesitant to make a significant investment in our technology or abandon the technology they are currently using.
Previous wording
The design of our G-Vault, H-Vault, and B-Nest products are based on established principles that are deployed in a novel way; the products are intended to provide longer energy storage durations than are provided by other types of energy storage systems.
Current wording
The design of our G-VAULT and H-VAULT products are based on established principles that are deployed in a novel way; the products are intended to provide longer energy storage durations than are provided by other types of energy storage systems.
Previous wording
Increasing attention to, and scrutiny of, ESG matters could increase our costs, harm our reputation, impact our share price or access to or cost of capital, or otherwise adversely impact our business.
Current wording
Increased attention to, and scrutiny of, ESG matters could increase our costs, harm our reputation, impact our share price or access to or cost of capital, or otherwise adversely impact our business.
Previous wording
Companies across industries are facing increasing scrutiny from a variety of stakeholders related to their ESG and sustainability practices. Expectations regarding voluntary ESG initiatives and disclosures and consumer demand for alternative forms of energy may result in increased costs (including but not limited to increased costs related to compliance, stakeholder engagement, contracting and insurance), changes in demand for certain products, enhanced compliance or disclosure obligations, or other adverse impacts to our business, financial condition, or results of operations.
Current wording
Companies across industries are facing increasing scrutiny from a variety of stakeholders related to their ESG and sustainability practices. Expectations regarding ESG initiatives and disclosures and consumer demand for alternative forms of energy may result in increased costs (including but not limited to increased costs related to compliance, stakeholder engagement, contracting and insurance), changes in demand for certain products, enhanced compliance or disclosure obligations, or other adverse impacts to our business, financial condition, or results of operations.
Previous wording
While we may at times engage in voluntary initiatives (such as voluntary disclosures, certifications, or goals, among others) to improve the ESG profile of our company or to respond to stakeholder expectations, such initiatives may be costly and may not have the desired effect. Expectations around company’s management of ESG matters continues to evolve rapidly, in many instances due to factors that are out of our control. For example, we may ultimately be unable to complete certain initiatives or targets, or execute on any opportunities we have identified, either on the timelines initially announced or at all, due to technological, cost, or other constraints, which may be within or outside of our control. Moreover, actions or statements that we may take based on based on expectations, assumptions, or third-party information that we currently believe to be reasonable may subsequently be determined to be erroneous or be subject to misinterpretation. If we fail to, or are perceived to fail to, comply with or advance certain ESG initiatives (including the timeline and manner in which we complete such initiatives), or to not keep pace with peers on ESG initiatives and/or disclosures, we may be subject to various adverse impacts, including reputational damage and potential stakeholder engagement and/or litigation, even if such initiatives are currently voluntary. For example, there have been increasing allegations of greenwashing against companies making significant ESG claims due to a variety of perceived deficiencies in performance or methodology, including as stakeholder perceptions of sustainability continue to evolve.
Current wording
While we may at times engage in initiatives (such as voluntary disclosures, certifications, or goals, among others) to improve the ESG profile of our company or to respond to stakeholder expectations, such initiatives may be costly and may not have the desired effect. Expectations regarding Company management of ESG matters continues to evolve rapidly, in many instances due to factors that are out of our control. For example, we may ultimately be unable to complete certain initiatives or targets, or execute on any opportunities we have identified, either on the timelines initially announced or at all, due to technological difficulties, unforeseen costs, inaccurate forecasts, or other constraints, which may be within or outside of our control. Such initiatives and targets are often aspirational and we cannot guarantee we will be able to meet or make progress against any such initiatives or targets. Moreover, actions or statements that we may take based on expectations, assumptions, hypothetical scenarios, or third-party information that we currently believe to be reasonable may subsequently be determined to be erroneous or be subject to misinterpretation. If we fail to, or are perceived to fail to, comply with or advance certain ESG initiatives (including the timeline and manner in which we complete such initiatives), or to not keep pace with peers on ESG initiatives and/or disclosures, we may be subject to various adverse impacts, including reputational damage and potential stakeholder engagement and/or litigation. For example, there have been increasing allegations of greenwashing against companies making certain ESG claims due to a variety of perceived deficiencies in performance, efficacy, or methodology, including as stakeholder perceptions of sustainability continue to evolve.
Previous wording
Certain market participants, including major institutional investors and capital providers, use third-party benchmarks and scores to assess companies’ ESG profiles in making investment or voting decisions. Unfavorable ESG ratings could lead to increased negative investor sentiment towards us, which could negatively impact our share price as well as our access to and cost of capital. To the extent ESG matters negatively impact our reputation, it may also impede our ability to compete as effectively to attract and retain employees, customers, and/or business partners, which may adversely impact our operations. While many stakeholders expect companies to pursue ESG initiatives, others may seek to reduce companies’ efforts on certain ESG-related matters. Both advocates and opponents to certain ESG matters are increasingly resorting to a range of activism forms, including media campaigns and litigation, to advance their perspectives. In addition, there are also increasing levels of regulation, disclosure-related and otherwise, with respect to ESG matters. We may ultimately be subject to regulations that are not uniform in nature or reflective of shared regulatory goals. Our efforts to respond to varying requirements may not be successful and/or may subject us to additional stakeholder engagement. This and other stakeholder expectations will also likely lead to increased costs as well as scrutiny that could heighten all of the risks identified in this risk factor. Additionally, many of our customers and suppliers may be subject to similar expectations, which may augment or create additional risks, including risks that may not be known to us.
Current wording
Certain market participants, including major institutional investors and capital providers, use third-party benchmarks and processes to assess companies’ ESG profiles in making investment or voting decisions. Unfavorable ESG ratings or recommendations could lead to increased negative investor sentiment towards us, which could negatively impact our share price as well as our access to and cost of capital or the ability to complete projects. To the extent ESG matters negatively impact our reputation, it may also impede our ability to compete as effectively to attract and retain employees, customers, and/or business partners, which may adversely impact our operations. While many stakeholders expect companies to pursue ESG initiatives, some stakeholders and regulators (both domestic and international) have expressed or pursued opposing views, legislation, and investment expectations with respect to ESG-related matters. Certain employment or business policies, as well as those who believe they should be curbed, including government actors, and the complex regulatory and legal frameworks applicable to such initiatives continue to evolve. More recent political developments could mean that we face increasing criticism or litigation risks from both advocates and opponents of such matters, including various governmental agencies. Such sentiment may focus on our environmental commitments (such as reducing GHG emissions) or our pursuit of certain employment or business practices or social initiatives that are alleged to be political or polarizing in nature or are alleged to violated laws based, in part, on changing priorities of, or interpretation by, federal agencies or state governments. Unfavorable press about ratings or assessments of our ESG practices, regardless of whether or not we comply with legal requirements, may lead to negative investor sentiment toward us, which could have a negative impact on our business. We may ultimately be subject to regulations that are not uniform in nature or reflective of shared regulatory goals. Our efforts to respond to varying requirements may not be successful and/or may subject us to additional stakeholder engagement. Additionally, many of our customers and suppliers may be subject to similar expectations, which may augment or create additional risks, including risks that may not be known to us.
Current wording
•the outbreak of war or other hostilities, including the current conflict between the U.S. and Iran; and
Previous wording
The growth and profitability of our business is dependent upon our technology being more cost-effective than competing energy storage technologies. To the extent our offerings are not eligible for various regulatory incentives, while those of our competitors are, it may adversely impact our competitiveness or otherwise adversely impact our business.
Current wording
The growth and profitability of our business are dependent upon our technology being more cost-effective than competing energy storage technologies. To the extent our offerings are not eligible for various regulatory incentives, while those of our competitors are, it may adversely impact our competitiveness or otherwise adversely impact our business.
Previous wording
If we are unable to attract and retain key employees and hire qualified management, technical, engineering, and sales personnel, including a highly skilled and diverse management team with experience in the energy storage sectors, our ability to compete and successfully grow our business could be harmed.
Current wording
If we are unable to attract and retain key employees and hire qualified management, technical, engineering, and sales personnel, including a highly skilled management team with diverse experience in the energy storage sectors, our ability to compete and successfully grow our business could be harmed.
Previous wording
We believe that it is vital to our operating success that we recruit and retain key personnel, including a highly skilled and diverse management team with experience in the renewable energy and energy storage sectors. If we fail to maintain a highly skilled and diverse management team, we may not be able to achieve our strategic objectives, which would negatively impact our business and operating success. In addition, because our industry is still in a nascent stage, there is and will continue to be a scarcity of skilled personnel with experience in our industry. If we lose a member of our management team or key employee, it may prove difficult for us to replace such employee with a similarly qualified individual with experience in the renewable energy and energy storage industry, which could impact our business and operating success.
Current wording
We believe that it is vital to our operating success that we recruit and retain key personnel, including a highly skilled management team with diverse experience in the renewable energy and energy storage sectors. If we fail to maintain a highly skilled management team, we may not be able to achieve our strategic objectives, which would negatively impact our business and operating success. In addition, because our industry is still in a nascent stage, there is and will continue to be a scarcity of skilled personnel with experience in our industry. If we lose a member of our management team or key employee, it may prove difficult for us to replace such employee with a similarly qualified individual with experience in the renewable energy and energy storage industry, which could impact our business and operating success.
Previous wording
As of December 31, 2024, we employed 158 full-time employees and 5 part-time employees, none of whom are represented by unions or collective bargaining agreements. If a union sought to organize any of our other employees, such organizing efforts or collective bargaining negotiations could potentially lead to work stoppages and/or slowdowns or strikes by certain of our employees. Additionally, the EPC firms that we rely upon to install our energy storage systems may have employees represented by unions or collective bargaining agreements. Any work stoppages and/or slowdowns by certain of our employees or certain employees at the EPC firms we contract with, could adversely affect our ability to serve our customers.
Current wording
As of December 31, 2025, we employed 142 full-time employees and six part-time employees, none of whom are represented by unions or collective bargaining agreements. If a union sought to organize any of our other employees, such organizing efforts or collective bargaining negotiations could potentially lead to work stoppages and/or slowdowns or strikes by certain of our employees. Additionally, the EPC firms that we rely upon to install our energy storage systems may have employees represented by unions or collective bargaining agreements. Any work stoppages and/or slowdowns by certain of our employees or certain employees at the EPC firms we contract with, could adversely affect our ability to serve our customers.
Previous wording
We are subject to certain risks associated with the energy transition. We anticipate there will be costs associated with transitioning to lower emissions technologies, as well as risks associated with newer technologies, including risks that particular technologies we invest in may not ultimately prove successful or financially viable, as well as other risks that may not presently be known to us. Similarly, the price and availability of various inputs for the products we offer, including electricity and various metals, vary in response to market trends, which may result in higher costs and/or operational disruptions, or other adverse impacts. These impacts may also be exacerbated by various responses from policymakers, including in manners that may for national security or other factors that do not promote the availability or affordability of such materials.
Current wording
We are subject to certain risks associated with the energy transition. We anticipate there will be costs associated with transitioning to lower emissions technologies, as well as risks associated with newer technologies, including risks that particular technologies we invest in may not ultimately prove successful or financially viable, as well as other risks that may not presently be known to us. Similarly, the price and availability of various inputs for the products we offer, including electricity and various metals, vary in response to market trends, which may result in higher costs and/or operational disruptions, or other adverse impacts. These impacts may also be exacerbated by various responses from policymakers, including in manners that may, for national security or other factors, do not promote the availability or affordability of such materials.
Previous wording
Additionally, we expect to be subject to increased regulations, reporting requirements, standards, or expectations regarding the environmental impacts of our business. For example, policymakers in various jurisdictions, including the United States, United Kingdom, Australia, European Union, and the State of California, among others, have adopted or are considering adopting GHG pricing mechanisms, GHG emission limits, and/or requirements for the disclosure of certain climate-related information, which may require us to incur significant additional costs to comply and impose increased oversight obligations on our management and board of directors (“Board”). Such regulations may also impact our supply chain and the cost of various materials used in our offerings; while we are working to find alternatives to certain materials, we cannot guarantee that we will be able to find suitable alternatives at a cost, quality, or timeframe that is acceptable to us. Government efforts to promote climate resiliency may also result in increased regulatory obligations across a range of laws, not all of which may be primarily climate-related. The expectations of various stakeholders, including customers and employees, regarding such matters likewise continues to evolve. Changing market dynamics, global and domestic policy developments, and the increasing frequency and impact of meteorological phenomena have the potential to disrupt our business, the business of our suppliers and/or customers, or otherwise adversely impact our business, financial condition, or results of operations.
Current wording
Additionally, we expect to be subject to increased regulations, reporting requirements, standards, or expectations regarding the environmental impacts of our business. For example, policymakers in various jurisdictions, including the United States, United Kingdom, Australia, European Union, and the State of California, among others, have adopted or are considering adopting greenhouse gas (‘GHG”) pricing mechanisms, GHG emission limits, and/or requirements for the disclosure of certain climate-related information, which may require us to incur significant additional costs to comply and impose increased oversight obligations on our management and board of directors (“Board”). Such regulations may also impact our supply chain and the cost of various materials used in our offerings; while we are working to find alternatives to certain materials, we cannot guarantee that we will be able to find suitable alternatives at a cost, quality, or timeframe that is acceptable to us. Government efforts to promote climate resiliency may also result in increased regulatory obligations across a range of laws, not all of which may be primarily climate-related. The expectations of various stakeholders, including customers and employees, regarding such matters likewise continues to evolve. In addition, previously proposed or adopted requirements, including regulations addressing GHG emissions and climate-related disclosures, have been or may be withdrawn, legally challenged, or subject to potential repeal in certain jurisdictions, and such regulatory reversals, together with uncertainty surrounding the future status of these requirements, could reduce demand for renewable energy, including energy storage products such as ours, which could adversely affect our business. Changing market dynamics, global and domestic policy developments, and the increasing frequency and impact of meteorological phenomena have the potential to disrupt our business, the business of our suppliers and/or customers, or otherwise adversely impact our business, financial condition, or results of operations.
Previous wording
Since our inception in October 2017, we have incurred significant net losses and have used significant cash in our business. As of December 31, 2024 and 2023, we had accumulated deficits of $383.8 million and$248.1 million, respectively, and net losses of $135.8 million and $98.4 million, respectively, for the years ended December 31, 2024 and 2023. We expect to continue to expand our operations, including by investing in manufacturing, sales and marketing, research and development and infrastructure to support our growth. We anticipate that we will incur net losses for the foreseeable future and there is no guarantee that we will achieve or maintain profitability. Our ability to achieve and maintain profitability in the future will depend on a number of factors, including:
Current wording
Since our inception in October 2017, we have incurred significant net losses and have used significant cash in our business. As of December 31, 2025 and 2024, we had accumulated deficits of$487.4 millionand$383.8 million, respectively, and net losses attributable to Energy Vault Holdings, Inc. of$103.6 million and $135.8 million, respectively, for the years ended December 31, 2025 and 2024. We expect to continue to expand our operations, including by investing in manufacturing, sales and marketing, research and development and infrastructure to support our growth. We anticipate that we will incur net losses for the foreseeable future and there is no guarantee that we will achieve or maintain profitability. Our ability to achieve and maintain profitability in the future will depend on a number of factors, including:
Previous wording
•successful continued development and deployment of our energy storage systems, including our B-Vault, B-Nest, G-Vault, and H-Vault products;
Current wording
•successful continued development and deployment of our energy storage systems, including our B-VAULT, G-VAULT, and H-VAULT products;
Previous wording
The Company maintains the majority of its cash and cash equivalents in accounts with major U.S. and multi-national financial institutions, and our deposits are invested in money market funds holding U.S. Treasury bills, and similarly rated agency indebtedness.
Current wording
The Company maintains the majority of its cash and cash equivalents in accounts with major U.S. and multi-national financial institutions, with a significant portion invested in money market funds holding U.S. Treasury bills, and similarly rated agency indebtedness.
Previous wording
Our backlog represents contracted but unrecognized revenue from projects and services yet to be completed, unrecognized revenue or other income from IP licensing agreements, and unrecognized revenue from tolling arrangements. Backlog includes any potential future variable payments from tolling and offtake arrangements that the Company believes is probable of being realized. Probable future variable payments are forecasted by an independent third-party firm using simulation software that factors in current and projected energy market dynamics, historical and forecasted volatility, and location specific data. The Company considers the low-end simulation results to be probable. Potential future IP royalties are not included in backlog. As of December 31, 2024, backlog totaled $433.9 million. Backlog is a common measurement used in our industry. Our methodology for determining backlog may not, however, be comparable to the methodologies used by others. Effective in the second quarter of 2024, we updated our methodology for computing backlog. Under our previous methodology, our backlog was equivalent to our remaining performance obligations under U.S. Generally Accepted Accounting Principles (“GAAP”). We believe our new methodology for computing backlog allows us to better evaluate the growth of our Company and estimate future revenue.
Current wording
Our backlog represents (i) contracted but unrecognized revenue from third party projects and services yet to be completed, (ii) unrecognized revenue or other income from IP licensing agreements, and (iii) unrecognized revenue from tolling arrangements for projects operated by Energy Vault or affiliates, in each case, that is associated with contracted bookings and contingent option bookings (as defined below). Backlog includes contracted backlog and contingent option backlog. Contracted backlog reflects unrecognized revenue associated with binding, fully executed agreements. Contingent option backlog reflects unrecognized revenue associated with projects where the Company holds an enforceable exclusive purchase right and intends to exercise that right, even if the option has not been exercised as of period end, and is contingent on the Company exercising the applicable purchase right and subsequent project execution. If the Company does not exercise an option, or if the underlying terms or assumptions change such that inclusion is no longer appropriate, the related contingent option backlog is removed or updated in the period of change. Backlog includes any potential future variable payments from tolling and offtake arrangements that the Company believes is probable of being realized. Probable future variable payments are forecasted by an independent third-party firm using simulation software that factors in current and projected energy market dynamics, historical and forecasted volatility, and location specific data. The Company considers the low-end simulation results to be probable. Potential future IP royalties are not included in backlog. As of December 31, 2025, backlog totaled $1.3 billion. Backlog is a common measurement used in our industry. Our methodology for determining backlog may not, however, be comparable to the methodologies used by others. Effective in the second quarter of 2024, we updated our methodology for computing backlog. Under our previous methodology, our backlog was equivalent to our remaining performance obligations under U.S. Generally Accepted Accounting Principles
Previous wording
Developed pipeline represents uncontracted, potential revenue, from third-party projects where potential prospective customers have either awarded the Company a project or shortlisted the Company for consideration, but not, in either case, having awarded the Company a binder order. Developed pipeline also includes potential tolling revenue from projects where the Company is in advanced negotiations to build, own, and operate energy storage systems. Developed pipeline is an internal management metric that we construct using information from our global sales team and is monitored by management to understand the potential anticipated growth of our Company and to estimate potential future revenue. Developed pipeline is influenced by the prevailing foreign exchange rates and equipment prices and may vary from period to period if these inputs change. As of December 31, 2024, developed pipeline totaled $2.1 billion.
Current wording
Developed pipeline represents uncontracted, potential revenue, from third-party projects where potential prospective customers have either awarded the Company a project or shortlisted the Company for consideration, but not, in either case, having awarded the Company a binding order. Developed pipeline also includes potential tolling revenue from projects where the Company is in advanced negotiations to build, own, and operate energy storage systems. Developed pipeline is an internal management metric that we construct using information from our global sales team and is monitored by management to understand the potential anticipated growth of our Company and to estimate potential future revenue. Developed pipeline is influenced by the prevailing foreign exchange rates and equipment prices and may vary from period to period if these inputs change. As of December 31, 2025, developed pipeline totaled $2.4 billion.
Previous wording
As of December 31, 2024, we had $122.8 million, $35.8 million, and $9.8 million of federal, state and foreign net operating loss (“NOL”) carryforwards, respectively, that will generally carry forward to offset future taxable income (if any), until such NOLs expire (if at all). The federal NOL carryforwards do not expire, but are subject to limitation on their use equal to 80% of the taxable income in the year of use. The state NOL carryforwards will begin to expire in 2038. $6.8 million of the foreign net operating loss carryforwards do not expire. The remaining foreign net loss carryforwards begin to expire in 2025. The remaining foreign net loss carryforwards begin to expire in 2025. Additionally, as of December 31, 2024, the Company had federal and state research tax credit carryforwards of and $2.3 million and $0.6 million, respectively. The federal research tax credit carryforwards will begin to expire in 2042 and the state tax research credits do not expire.
Current wording
As of December 31, 2025, the Company had federal net operating losses of $155.6 million, state net operating losses of $58.9 million, and foreign net operating losses of $13.6 million. The federal net operating loss carryforwards do not expire, but are subject to a limitation on their use equal to 80% of the taxable income in the year of use. The state net operating loss carryforwards begin to expire in 2042. $10.6 million of the foreign net operating loss carryforwards do not expire. The remaining foreign net loss carryforwards began to expire in 2025. Additionally, as of December 31, 2025, we had U.S. federal research tax credit carryforwards of $2.8 million, which begin to expire in 2042, and U.S. state research tax credit carryforwards of $0.7 million, which can be carried forward indefinitely.
Previous wording
Our NOL carryforwards are subject to review and possible adjustment by the applicable tax authorities. In addition, in general, under Sections 382 and 383 of the Internal Revenue Code of 1986, as amended (the “Code”), if a corporation undergoes an “ownership change,” generally defined as a cumulative change of more than 50 percentage points (by value) in its equity ownership by certain stockholders over a three-year period, the corporation’s ability to use its pre-change NOL carryforwards and other pre-change tax attributes (such as research and development tax credits) to offset its post-change income or taxes may be limited. We may experience ownership changes in the future as a result of subsequent changes in our stock ownership, some of which are outside our control. Similar provisions of state and foreign tax law may apply and future regulatory changes could also limit our ability to utilize NOL carryforwards. Accordingly, we may not be able to utilize a material portion of our NOL carryforwards to offset future taxable income.
Current wording
Utilization of our NOL and tax credit carryforwards depends on many factors, including our future income, which cannot be assured. In addition, Sections 382 and 383 of the Code, generally impose an annual limitation on the amount of NOL carryforwards and tax credit carryforwards that may be used to offset taxable income when a corporation has undergone an “ownership change” (as determined under Section 382 of the Code). An ownership change generally occurs if one or more stockholders (or groups of stockholders) who are each deemed to own at least 5% of such corporation’s stock change their ownership by more than 50 percentage points over their lowest ownership percentage within a rolling three-year period. In the event that we were to undergo an ownership change, utilization of our NOL carryforwards and tax credit carryforwards would be subject to an annual limitation under Sections 382 and 383 of the Code. Any unused annual limitation may be carried over to later years. We may experience ownership changes in the future as a result of future changes in our stock ownership, some of which are outside of our control. Similar provisions of U.S. state and non-U.S. tax law may apply and future regulatory changes could also limit our ability to utilize NOL and tax credit carryforwards. Accordingly, we may not be able to utilize a material portion of our NOL or tax credit carryforwards to offset future taxable income, which could adversely affect our operating results and cash flows.
Previous wording
Our patents and patent applications, if issued, may not provide adequate protection to create a barrier to entry. The provisional and non-provisional patent applications that we own may not issue as patents or provide adequate protection to create a barrier to entry, which may hinder our ability to prevent competitors from selling products similar to ours.
Current wording
Our patents and patent applications, if issued, may not provide adequate protection to create a barrier to entry. The provisional and non-provisional patent applications that we own may not issue as patents or provide adequate protection to create a barrier to entry, which may hinder our ability to prevent the sale of competing products.
Previous wording
We cannot be certain that our pending patent applications will result in issued patents or that any of our issued patents will afford protection against a competitor. The status of patents involves complex legal and factual questions, and the breadth of claims allowed is uncertain. As a result, we cannot be certain that the patent applications that we file will result in patents being issued or that our patents and any patents that may be issued to us in the future will afford sufficient protection against competitors with similar technology. In addition, patent applications filed in foreign countries are subject to laws, rules, and procedures that differ from those of the United States, and thus we cannot be certain that foreign patent applications related to issued U.S. patents will be issued in other regions. Furthermore, even if these patent applications are accepted and the associated patents are issued, some foreign countries provide significantly less effective patent enforcement than in the United States.
Current wording
We cannot be certain that our pending patent applications will result in issued patents or that any of our issued patents will afford sufficient protection against competitors with similar technology. In addition, patent applications filed in foreign countries are subject to laws, rules, and procedures that differ from those of the United States, and thus we cannot be certain that foreign patent applications related to issued U.S. patents will be issued in other regions. Furthermore, even if our patent applications are granted, some foreign countries provide significantly less effective patent enforcement than in the United States.
Previous wording
We intend to continue to regularly assess opportunities for seeking patent and other IP protections for certain aspects of our technology, designs and methodologies that we believe provide a meaningful competitive advantage. However, our ability to do so may be limited until such time as we are able to generate sufficient cash flow from operations or otherwise raise sufficient capital to continue to invest in our IP. For example, maintaining patents in the United States and other countries requires the payment of maintenance fees, which may result in loss of our patent rights if we are unable to pay. If we are unable to so invest in our IP, our ability to protect it or prevent others from infringing on our proprietary rights may be impaired.
Current wording
We intend to continue to regularly assess opportunities for seeking patent and other IP protections for certain aspects of our technology, designs and methodologies that we believe provide a meaningful competitive advantage. However, our ability to do so may be limited until such time as we are able to generate sufficient cash flow from operations or otherwise raise sufficient capital to continue to invest in our IP as seeking and maintaining such protection can be expensive. For example, maintaining patents in the United States and other countries requires the payment of maintenance fees and annuities, which may result in loss of our patent rights if we are unable to pay. If we are unable to so invest in our IP, our ability to protect it or prevent others from infringing on our proprietary rights may be impaired.
Showing the first 40 of 62 pairs. Open the source sections for the rest.
Rearranged current paragraphs (2)
Current report — wording carried from elsewhere
(“GAAP”). We believe our new methodology for computing backlog allows us to better evaluate the growth of our Company and estimate future revenue.
Current report — wording carried from elsewhere
however, this insurance may not provide adequate coverage against potential liabilities and not all workers have or may agree to our workers’ compensation policy.
Rearranged previous paragraphs (1)
Previous report — wording carried elsewhere
The Company may retain future earnings, if any, for future operations and expansion and has no current plans to pay any cash dividends for the foreseeable future. Any decision to declare and pay dividends will be made at the discretion of the