What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-K

Period ended 2024-12-31; filed 2025-04-01.

0001828536-25-000032

Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-K

Period ended 2025-12-31; filed 2026-03-18.

0001828536-26-000022

Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 185 previous paragraphs and 252 current paragraphs.

82 unchanged; 35 reworded; 135 added; 68 removed; 0 previous and 0 current paragraphs rearranged.

Tables are not compared: 11 previous and 14 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (135)

Current report

Energy Vault delivers a diversified portfolio of energy storage solutions to third parties, including proprietary gravity, battery, and green hydrogen-based technologies, supported by our technology-agnostic energy management software and integration capabilities. Beginning in 2024, we initiated a multi-year transition from primarily delivering projects through build-and-transfer arrangements and licensing models toward a more integrated model that includes selectively developing, owning, and operating energy storage assets, while continuing to provide technology, integration, software, and long-term services to customers. We believe this strategy is supported by our experience across multiple storage technologies, system integration and controls capabilities, and established global presence, as well as access to project-level capital through our Asset Vault platform.

Current report

Through this integrated model, we offer utilities, independent power producers, and large energy users solutions that may include standalone energy storage, integrated generation and storage configurations, and related power infrastructure. We manage projects across the lifecycle, from sourcing and development through permitting and interconnection, engineering and construction management, commissioning, and operations, and we provide software enabled monitoring, controls, and services intended to support asset availability, operational efficiency, and lifecycle performance.

Current report

U.S. trade policy and tariff actions have affected the cost and availability of certain inputs used in our B-VAULT products and related project delivery. Beginning February 4, 2025, the United States imposed additional duties on imports from China and Hong Kong under IEEPA, which were increased effective March 4, 2025. In parallel, the United States imposed additional IEEPA based reciprocal duties on China origin goods in April 2025, which escalated to significantly higher levels by April 10, 2025. The United States and China subsequently announced tariff reductions and pauses beginning in mid-May 2025, and in November 2025 the United States implemented additional executive actions that (i) reduced the IEEPA fentanyl related additional duty rate on China origin imports and (ii) extended the reduced reciprocal duty framework through November 10, 2026, subject to the terms and conditions of the arrangement.

Current report

These tariff actions and related uncertainty materially affected our operations. Several third party sales projects within our backlog and developed pipeline experienced delays or cancellations due to the anticipated increase in costs associated with importing B-VAULT products from China. In addition, separate from IEEPA based duties, Section 301 tariff rates applicable to certain China origin products continued to evolve. For example, pursuant to U.S. Trade Representative actions finalized in 2024, the Section 301 duty rate applicable to lithium ion non electric vehicle batteries increased to 25% effective January 1, 2026. Depending on product classification and the interaction of applicable tariff programs, cumulative duty burdens can be significant and can materially affect project pricing and competitiveness.

Current report

On February 20, 2026, the U.S. Supreme Court held that IEEPA does not authorize the President to impose tariffs, and IEEPA based tariffs were invalidated. The decision does not affect Section 301 tariffs Section 232 tariffs. The Supreme Court decision did not address the process for obtaining refunds of IEEPA based duties previously paid, and the timing and availability of any potential duty relief remain uncertain. In response, the U.S. government has indicated it may continue to impose tariffs using other statutory authorities, which could affect future tariff levels, compliance requirements, and our ability to forecast costs and secure long term sales contracts.

Current report

In addition to U.S. tariffs, China has implemented and proposed export control measures affecting certain upstream materials and manufacturing inputs relevant to batteries, including graphite related controls that can affect availability, lead times, and cost. In response to the evolving trade environment, we are actively exploring alternative sourcing options, including vendors with manufacturing capabilities outside of China, to mitigate tariff and trade restriction impacts. As of the filing date of this Annual Report, we have not successfully imported our B-VAULT products from non-Chinese suppliers on an economical basis.

Current report

Should trade tensions escalate further, or if additional tariffs, trade restrictions, export controls, or retaliatory measures are implemented or reinstated, our ability to source B-VAULT products or sell them at competitive prices could be adversely affected, which could have a material adverse impact on our business, results of operations, and cash flows.

Current report

U.S. federal, state, and local authorities continue to review, implement, and modify policies, incentives, regulations, and legislation that can affect the economics and deployment of energy storage, including through tax credits, permitting and interconnection rules, and wholesale market participation frameworks. The timing, interpretation, and implementation of these programs can vary across administrations and may involve phased guidance and rulemaking over time. As a result, there can be uncertainty regarding eligibility, compliance requirements, and the timing and magnitude of benefits available to any particular project. We cannot guarantee we will realize any or all of the anticipated benefits or incentives under any such enacted regulations or legislation. These uncertainties can affect customer decision timelines, the ability to structure and finance projects, and the documentation required to support credit eligibility and monetization.

Current report

Projects may also qualify for increased credit amounts and bonus credits, subject to detailed requirements. For example, projects may be eligible for increased credit amounts where prevailing wage and apprenticeship requirements are satisfied, and certain projects may qualify for bonus credits, including domestic content, subject to applicable rules and certification requirements. The IRS continues to publish and update guidance and resources that can affect the application of these rules to energy storage projects.

Current report

In 2025, Congress enacted the OBBBA, which introduced additional changes and compliance considerations affecting energy related tax incentives. Among other items, the OBBBA imposed FEOC/PFE concepts and related restrictions that apply to Technology Neutral Credits under Sections 45Y and 48E of the Code and the advanced manufacturing credit under Section 45X of the Code, including ownership, debt, and effective control restrictions (including through the grant of rights through various agreements or licensing rights that are otherwise retained by such entities) in respect of PFEs. The OBBBA also limits the availability of Technology Neutral Credits for projects that receive material assistance from a PFE. The applicability of the FEOC/PFE restrictions is dependent on statutory effective dates and project timing, including beginning of construction dates. Legacy credits under Sections 45 and 48 of the Code for projects that began construction by December 31, 2024 are generally governed under the prior framework, subject to applicable rules, and are not subject to the FEOC/PFE restrictions. The U.S. Department of Treasury and IRS guidance in this area continues to evolve, including guidance addressing FEOC/PFE restrictions. Additional rulemaking and market practice may affect how these requirements are applied and documented. We cannot guarantee we will realize any or all of the anticipated benefits or incentives under any such enacted regulations or other guidance. We continue to monitor these developments.

Current report

Recent reliability sector publications, including the North American Electric Reliability Corporation 2025 Long Term Reliability Assessment published in January 2026, indicate that load growth expectations have increased meaningfully, with data centers, electrification, and new large industrial and manufacturing facilities among the most cited drivers of incremental demand.

Current report

In December 2025, the Australian Energy Market Operator published the Draft 2026 Integrated System Plan, which describes development pathways for the National Electricity Market through 2050. The Draft 2026 Integrated System Plan indicates that material growth in dispatchable capacity and energy storage is expected to be required to support reliability and the integration of higher levels of renewable generation over time, reflecting ongoing expansion in the market for utility scale energy storage.

Current report

Federal, state, and local statutes and regulations concerning electricity materially influence the market for our products and services. These requirements directly affect our owned asset business and indirectly affect our third party sales business, particularly with respect to permitting, siting, and interconnection of energy storage systems, as well as compliance with applicable codes and safety standards. Regulatory frameworks also affect how energy storage participates in wholesale markets, including market rules administered by regional transmission organizations and independent system operators and related Federal Energy Regulatory Commission oversight, which can influence dispatch, revenues, and operational requirements for storage resources.

Current report

In October 2025, we launched Asset Vault, a fully consolidated subsidiary dedicated to developing, building, owning, and operating energy storage assets. In support of this strategy, we entered into a preferred equity investment arrangement with Orion Infrastructure Capital and affiliated funds (collectively “OIC”), providing a $300 million capital framework to fund the acquisition and development of a portfolio of energy storage assets. Asset Vault supports a vertically integrated model in which the Company can self-perform EPC activities and provide long-term service arrangements, while also owning and operating assets to generate recurring cash flows, subject to project financing, permitting, interconnection, offtake execution, and other factors. Additionally, pursuant to the contribution agreement, in exchange for 1.2 billion common units of Asset Vault, Energy Vault contributed to Asset Vault:

Current report

•100% of the equity interests of Calistoga Resiliency Center Holdco, LLC;

Current report

•100% of the equity interests of Cross Trails Energy Storage Project Holdco, LLC;

Current report

•100% of the equity interests of Energy Vault Stoney Creek HoldCo Pty Ltd;

Current report

•100% of the equity interests of Energy Vault Stoney Creek Holdings Unit Trust;

Current report

•and 100% of any right, title, and interest in a certain future battery energy storage system following its acquisition by Energy Vault.

Current report

Pursuant to the Contribution Agreement, in connection with OIC’s initial contribution of $35.0 million with respect to its Series A Preferred Units, the Company issued to OIC an aggregate of 5.6 million warrants to purchase common stock of the Company at an exercise price of $4.24 per share. OIC’s warrants are entitled to a cashless exercise, are subject to a three-year holding period, and are exercisable until October 9, 2030.

Current report

On October 23, 2025, the Company acquired all of the membership interests in SOSA from Savion, LLC (“Savion”) pursuant to a membership interest purchase agreement. The acquisition provides the Company with development rights to a 150 MW / 300 MWh BESS (“SOSA BESS”) to be located in Madison County, Texas.

Current report

The purchase price for the membership interests consists of both upfront and contingent components. The Company paid $4.7 million at closing. In addition, the member interest purchase agreement provides for a contingent consideration payment due within 30 days of the SOSA BESS reaching commercial operations. Under the membership interest purchase agreement, the total purchase price is $6.3 million if the SOSA BESS reaches commercial operations before June 1, 2026, or $5.7 million if it reaches commercial operations after June 1, 2026. Construction on the SOSA BESS began in early January 2026 and the Company currently expects it to reach commercial operations in the second quarter of 2027, therefore the final purchase price is expected to be $5.7 million.

Current report

In February 2026, we and our Australian development partner, Bridge Energy Pty Ltd, were awarded a 14-year Long-Term Energy Service Agreement by AusEnergy Services for the Ebor Battery Energy Storage System project in New South Wales, Australia. The 100 MW / 870 MWh project is expected to provide eight hours of dispatchable capacity and is expected to commence operations in 2028, subject to obtaining necessary contractual and regulatory approvals. We hold an exclusive option to acquire and construct the project, which will utilize our proprietary B-VAULT technology and EMS, and will be owned and operated under our Asset Vault platform.

Current report

On February 9, 2026, we announced that we executed a definitive supply agreement with Peak Energy securing 1.5 gigawatt-hours of Peak Energy's U.S. manufactured sodium-ion battery systems.

Current report

On February 11, 2026, we announced a strategic framework agreement with Crusoe, Inc. ("Crusoe") for the phased deployment of Crusoe Spark modular data centers at Energy Vault’s technology center in Snyder, Texas. The initial program is scalable up to 25 MWs of total load to be operated inside Crusoe’s proprietary Spark modular AI factory product, with planned deployments expected in 2026.

Current report

In three transactions from September 22, 2025 to December 30, 2025, we issued an aggregate of $65.0 million of convertible debentures (the “Convertible Debentures”) to YA PN II, Ltd., an affiliate of Yorkville Advisors Global, LP. On February 19, 2026, we redeemed approximately $45.0 million of the Debentures. Refer to “Liquidity and Capital Resources—Sources of Liquidity—Convertible Debentures” below for additional information.

Current report

On February 17, 2026, we closed an upsized offering of $140.0 million of our 5.250% Senior Convertible Notes due 2031 (the “Senior Convertible Notes”) in a private placement to persons reasonably believed to be qualified institutional buyers pursuant to Rule 144A under the Securities Act. The offering was upsized from the previously announced offering size of $125.0 million aggregate principal amount of Senior Convertible Notes. The initial purchasers subsequently exercised their option to purchase an additional $10.0 million of Senior Convertible Notes, in a transaction that closed on February 27, 2026. Refer to “Liquidity and Capital Resources—Sources of Liquidity—Convertible Senior Notes” below for more information.

Current report

(1) Backlog as of December 31, 2025 includes $490.0 million related to a project where the Company has the exclusive right to exercise an option to acquire the project and the Company intends to exercise its option.

Current report

Net bookings represent the sum of contracted bookings and contingent option bookings, net of cancellations, measured in total aggregate contract value and total MWhs. Contracted bookings are from customer contracts signed during the period. Contingent option bookings are from projects where the Company holds an enforceable exclusive purchase right and intends to exercise that right, even if the option has not been exercised as of period end.

Current report

Backlog represents (i) contracted but unrecognized revenue from third party projects and services yet to be completed, (ii) unrecognized revenue or other income from IP licensing agreements, and (iii) unrecognized revenue from tolling arrangements for projects operated by Energy Vault or affiliates, in each case, that is associated with contracted bookings and contingent option bookings (as defined above). Backlog includes contracted backlog and contingent option backlog. Contracted backlog reflects unrecognized revenue associated with binding, fully executed agreements. Contingent option backlog reflects unrecognized revenue associated with projects where the Company holds an enforceable exclusive purchase right and intends to exercise that right, even if the option has not been exercised as of period end, and is contingent on the Company exercising the applicable purchase right and subsequent project execution. If the Company does not exercise an option, or if the underlying terms or assumptions change such that inclusion is no longer appropriate, the related contingent option backlog is removed or updated in the period of change.

Showing the first 40 of 135 passages. Open the source sections for the rest.

Removed paragraphs (68)

Previous report

Energy Vault provides a diverse technology portfolio of turnkey energy storage platforms, including proprietary gravity, battery, and green hydrogen energy storage hardware technologies, supported by our technology-agnostic energy management system software and integration platform. In 2024, we began a multi-year transition from providing this technology portfolio solely to third parties through a build-and-transfer model or licensing model, to also taking an ownership interest in energy storage assets in select attractive markets. We believe that our experience in the build-and-transfer business, combined with our proprietary energy storage technologies and geographical footprint, uniquely positions us to build and operate storage projects with superior efficiency and reliability.

Previous report

We incorporate a customer-centric, solutions-based approach toward helping utilities, independent power producers (“IPP”), and large industrial energy users reduce their energy costs while maintaining power reliability. As the global demand for electricity increases and the world transitions to an economy powered by increasingly intermittent renewable energy such as solar and wind, the ability to provide clean, reliable, and affordable electricity to a growing global population will depend heavily on the ability to store and distribute energy at appropriate times. We are striving to create a world powered by renewable resources so that everyone will have access to clean, reliable, sustainable, and affordable energy.

Previous report

Development and Deployment Plan for Third-Party Sales of Energy Storage Products

Previous report

According to a report from the U.S. Department of Energy in December 2024, electricity demand is forecasted to grow substantially in the United States over the next few decades. Electricity demand is expected to be driven primarily by new data centers, artificial intelligence, new manufacturing facilities, electric vehicles, and sector-wide electrification. Electricity demand for data centers alone is expected to grow at a 13% to 27% compound annual growth rate through 2028.

Previous report

Deployment of renewable energy resources has accelerated over the last decade, and solar and wind have become a low cost energy source. Energy storage is critical to reducing the intermittency and volatility of renewable energy generation. However, there is no guarantee that the deployment of renewable energy will occur at the rate that is expected. Inflationary pressures, supply chain disruptions, geopolitical conflicts, government regulations, and other factors could result in fluctuations in demand for and deployment of renewable energy resources, adversely affecting our revenue and ability to generate profits in the future.

Previous report

In the markets in which we operate, there have been higher rates of inflation in recent years. If inflation continues to increase in our markets, it may increase our expenses that we may not be able to pass through to customers. It may also increase the costs of our products that could negatively impact their competitiveness.

Previous report

Federal, state, and local government statutes and regulations concerning electricity heavily influence the market for our product and services. These statutes and regulations directly affect our owned asset business and indirectly affect our third-party sales business. These statutes and regulations often relate to electricity pricing, net metering, incentives, taxation, competition with utilities and the interconnection of customer-owned electricity generation. In the United States, governments continuously modify these statutes and regulations. Governments, often acting through state utility or public service commissions, change and adopt different rates for commercial customers on a regular basis. These changes could affect our ability to deliver cost savings to our current and future customers for the purchase of electricity.

Previous report

The U.S. Congress is continuously reviewing and passing various climate change proposals, incentives, regulations, and legislation that may support the energy storage industry, including in the form of tax credits and incentives. The implementation of these laws can vary greatly across administrations and take long periods of time before the full extent of regulations are adopted. We cannot guarantee we will realize any or all of the anticipated benefits or incentives under any such enacted regulations or legislation, including the IRA. IRS private letter ruling 201809003 clarified that energy storage is eligible for federal tax credits if charged primarily by qualifying renewable resources.

Previous report

We believe we may be positioned to benefit from the bonus credits related to the energy storage systems we intend to own and operate and will stimulate demand for our customers to invest in more energy storage systems. To date, the IRA regulations, proposed regulations and/or guidance issued by the U.S. Department of Treasury and Internal Revenue Service associated with these various tax credits, including but not limited to the ITC, domestic content bonus credit, energy community bonus credit, and manufacturing production tax credit have provided some substantive clarity. However, we are continuing to seek additional clarity on certain aspects of IRA guidance and/or regulation via updated guidance and future proposed and/or final regulations. The potential impact from the change in the U.S. presidential administration to any existing regulations, including any potential ramifications for the IRA and the various tax incentive provisions as well as other government and tax incentives for clean energy and energy storage in the United States, is uncertain at this stage. Some of the guidance and rulemaking enacted under the Biden Administration could be changed or modified by the Trump Administration, creating uncertainty with respect to implementation of the IRA. It remains uncertain whether Congress will modify or repeal the IRA in connection with the budget reconciliation process or otherwise. Accordingly, no assurance can be given that our projects will be eligible for tax credits or other benefits under the IRA.

Previous report

Finally, recent U.S. tariff policy changes may impact our business and results of operations. The Section 301 tariff rate on lithium-ion non-EV batteries imported from China has been amended several times since the beginning of 2025 and may continue to change. These changes specifically target "batteries" as defined by U.S. Customs and Border Protection, encompassing the cubes, modules, and certain types of cells. The tariff rate on battery "parts"–including separators, electrolytes, cans, and electrodes is expected to remain at its current 25% level.

Previous report

There is currently much uncertainty relating to potential changes to U.S. tariff policy. In particular, the U.S. government’s recent imposition on tariffs on all imported steel may increase our costs. Changes to U.S. tariff policy may adversely impact our supply chain as well as our supply chain strategies detailed herein, both domestically and internationally, which may then have an adverse impact on our results of operations and business.

Previous report

In June 2024, the Company executed an engineer, procure, and construct contract with a customer to build a 200 MW/400 MWh BESS in Australia. Additionally, the Company signed a maintenance agreement with this customer to provide long-term maintenance services on the BESS after construction is completed for a 20-year period.

Previous report

In June 2024, the Company implemented a series of cost savings measures, expected to result in realized cost savings of $6.0 million to $8.0 million annually. During the year ended December 31, 2024, the Company recognized reorganization costs of $1.6 million, consisting of personnel reduction costs related to these cost saving measures.

Previous report

On September 13, 2024, the Company was notified by the NYSE that it was not in compliance with Section 802.01C of the NYSE Listed Company Manual because the average closing price of the Company’s Common Stock was less than $1.00 over a consecutive 30 trading-day period. The notice did not result in the immediate delisting of the Company’s Common Stock from the NYSE. On November 1, 2024, the Company received written notice from the NYSE informing the Company that it had regained compliance with the bid price rule as of October 31, 2024.

Previous report

In October 2024 the Company executed a 10-year offtake agreement with a customer for the Cross Trails BESS that is expected to commence in June 2025. The offtake agreement includes both fixed and variable price components. The aggregate expected remaining future revenue from this contract, including variable fees that the Company believes is probable, is $57.0 million. The variable revenues are forecasted by an independent third-party firm using simulation software that factors in current and projected energy market dynamics, historical and forecasted volatility, and location specific data. The Company considers the low-end simulation results to be probable.

Previous report

Between October 2024 and March 2025, the Company agreed to loan Stoney Creek BESS Pty Ltd (“Stoney Creek”) up to AUD 8.8 million (or $5.5 million) to assist them in paying for BESS project development related costs. The Company also agreed to provide Stoney Creek a bank guarantee of up to AUD 2.5 million (or $1.6 million) as security for a performance bond. On March 17, 2025, the Company entered into a share purchase agreement to acquire Stoney Creek for a nominal purchase price of one hundred Australian dollars. The closing of the acquisition is subject to regulatory review and approval in Australia. Upon closing of the acquisition, the carrying value of the note receivable is expected to be incorporated as part of the total consideration. As of the filing date of this Annual Report, the Company has loaned Stoney Creek AUD 1.4 million (or $0.9 million).

Previous report

In October, the Company executed a 100 MW/200 MWh EEQ contract to supply B-Vaults to a customer in Texas. The B-Vaults in this contract were delivered to the customer in December 2024. In December 2024, the Company executed an engineer, procure, and construct contract with a customer to build a 100 MW/200 MWh BESS in Australia. Also in December 2024, the Company executed two EEQ contracts for a combined 366.5 MWhs with a large northeastern public utility in the U.S to supply them with B-Vaults.

Previous report

(1)Developed pipeline is a new key operating metric that the Company began tracking during the second quarter of 2024, therefore prior period comparable figures have not been included.

Previous report

(2)The Company changed its definition of backlog during the second quarter of 2024, therefore the Company has presented the comparable amounts as of December 31, 2023 per the new definition.

Previous report

(3) As of March 17, 2025, the Company maintains a backlog of $660.0 million and a developed pipeline of $2.1 billion associated with additional business booked subsequent to December 31, 2024, net of any adverse impact associated with prevailing equipment costs (namely from lithium-ion battery prices and changes in foreign currency exchange rates for non-U.S. dollar denominated business).

Previous report

Depreciation and amortization expense consists of costs associated with property and equipment, and amortization of intangibles. We expect to invest in additional property, equipment, and other assets as we construct and own energy storage systems, which will result in additional depreciation expense in the future.

Previous report

Asset impairment and loss on sale of assets consists of losses associated with the write-down or sale of property and equipment.

Previous report

Impairment of equity securities relates to impairment of the Company’s investment in KORE Power, Inc. (“KORE”).

Previous report

(1) For the year ended December 31, 2023, $0.4 million in revenue from the sale of spare energy system parts has been reclassified from “other” to “sale of energy storage products.”

Previous report

Revenue for the year ended December 31, 2024 decreased by $295.3 million to $46.2 million compared to $341.5 million for the year ended December 31, 2023.

Previous report

The decrease in revenue was primarily driven by a decrease in sales of energy storage products, resulting from a reduction in active BESS projects. In 2023, the Company had three active BESS EPC projects that made substantial progress throughout the year. However, in 2024, no BESS EPC projects experienced significant progress. During 2024, the Company completed the delivery of equipment for a single BESS EEQ project.

Previous report

Cost of revenue for the year ended December 31, 2024 decreased by $284.0 million to $40.0 million compared to $324.0 million for the year ended December 31, 2023.

Previous report

Cost of revenue decreased due to the reduction in active BESS projects.

Previous report

Gross profit was $6.2 million and gross profit margin was 13.4% for the year ended December 31, 2024, compared to gross profit of $17.5 million and gross profit margin of 5.1% for the year ended December 31, 2023.

Previous report

Gross profit decreased for the year ended December 31, 2024 compared to the year ended December 31, 2023 primarily due to a decrease in revenue. However, gross profit margin increased over the same period, driven by higher margins on energy storage product sales and the introduction of higher-margin operation and maintenance services and software licensing. The improvements in margins on energy storage product sales was attributable to the Company’s active BESS EPC projects reaching their final stages in 2024, as opposed to earlier stages in 2023, as well as the Company achieving a higher margin on the EEQ contract in 2024 compared to the margins realized on EPC contracts in the prior year.

Previous report

S&M expenses decreased by $2.4 million to $15.8 million for the year ended December 31, 2024, compared to $18.2 million for the year ended December 31, 2023. The decrease was primarily attributable to a decrease in personnel-related expenses of $2.1 million and a decrease in marketing and public relation costs of $0.4 million. The decrease in personnel-related expenses was primarily due to a reduction in headcount.

Previous report

R&D expenses decreased by $11.1 million to $26.0 million for the year ended December 31, 2024, compared to $37.1 million for the year ended December 31, 2023. The decrease was primarily attributable to a $5.0 million decrease in personnel-related expenses, a $3.9 million decrease in engineering and development costs, and a $2.5 million decrease in software expenses. These decreases in costs were primarily attributable to a decrease in headcount and a focus on cost control measures.

Previous report

G&A expenses decreased by $4.9 million to $63.0 million for the year ended December 31, 2024, compared to $67.9 million for the year ended December 31, 2023. The decrease was primarily attributable to a $4.6 million decrease in personnel-related expenses, a $1.2 million decrease in software expenses, and a $0.7 million decrease in consulting costs. These cost decreases were primarily attributable to a focus on cost control measures and a reduction in headcount. Partially offsetting these cost reductions was a $1.0 million increase in legal and professional fees.

Showing the first 40 of 68 passages. Open the source sections for the rest.

Reworded paragraphs (35)

Previous wording

The IRA adopted in August 2022 contains a number of tax incentive provisions that directly support the adoption of energy storage solutions and services. Before the enactment of the IRA, the Section 48 ITC did not apply to standalone energy storage projects. The IRA added Section 48(a)(3)(A)(ix) to allow a taxpayer that placed in service a standalone energy storage technology with a minimum capacity of 5 kWh to claim the ITC, if certain requirements are met. Energy storage technology that is placed in service after December 31, 2022 and started construction for U.S. federal income tax purposes prior to January 1, 2025, may claim the ITC under Section 48(a). To qualify for the full ITC rate of 30%, an energy storage project will need to satisfy certain labor requirements relating to the payment of prevailing wages and use of apprentices, or have started construction for U.S. federal income tax purposes prior to January 29, 2023. If these requirements are not met, the project may be eligible only for a base rate of 6%. The existing energy ITC will be replaced by a CEITC or “tech neutral” regime, which is available for any investment in a qualified storage facility that is placed in service after calendar year 2024 (certain labor requirements will still apply). The IRA also included bonus credits associated with the ITC, which may be relevant to our business. There is a 10% bonus credit for projects located in certain areas designated as energy communities, an additional 10% bonus credit for projects utilizing products which collectively meet certain minimum domestic content requirements, and a 10% or 20% bonus credit for certain projects less than 5 MW located in a low-income community or that serve low-income community members. Finally, the IRA included a manufacturing production tax credit for specific renewable energy and battery storage related products and components manufactured in the U.S.

Current wording

The IRA, adopted by the U.S. Congress in August 2022, contained a number of tax incentive provisions that directly support the adoption of energy storage solutions and services. Before the enactment of the IRA, the Section 48 ITC did not apply to standalone energy storage projects. The IRA added Section 48(a)(3)(A)(ix) to allow a taxpayer that placed in service a standalone energy storage technology with a minimum capacity of 5 kWh to claim the ITC, if certain requirements are met.

Previous wording

We primarily rely on two models for project delivery, which are (i) EPC delivery and (ii) EEQ delivery. Under the EPC model, we generally rely on third-party EPC firms to construct our storage systems, under our supervision with dedicated teams tasked with project management. Under the EEQ model, we are responsible for the delivery of the equipment we provide, as well as resolving issues within our scope of supply.

Current wording

In our third-party business, we primarily rely on two models for project delivery, which are (i) EPC delivery and (ii) EEQ delivery. Under the EPC model, we generally rely on third-party EPC firms to construct our storage systems, under our supervision with dedicated teams tasked with project management. Under the EEQ model, we are responsible for the delivery of the equipment we provide, as well as resolving issues within our scope of supply.

Previous wording

Our cost projections are heavily dependent upon raw materials (such as steel), equipment (such as motors, batteries, inverters, and power electronic devices), and technical and construction service providers (such as engineering, procurement, construction firms).

Current wording

Our cost projections for our third-party business and for our owned projects are heavily dependent upon raw materials (such as steel), equipment (such as motors, batteries, inverters, and power electronic devices), and technical and construction service providers (such as engineering, procurement, construction firms). Changes in the cost or availability of these inputs, including due to tariffs, supply constraints, or inflation, can affect project pricing, delivery schedules, and margins, depending on contract terms and the timing of procurement.

Previous wording

The utility-scale energy storage industry is increasing at a rapid pace, driven by increased demand for electricity, global transitions toward renewable energy, and increased focus on grid resilience.

Current wording

The utility scale energy storage industry continues to expand, driven by increased demand for electricity, global transitions toward renewable energy, and increased focus on grid resilience.

Previous wording

Our expansion of revenue depends on the ongoing adoption of energy storage solutions by our customers and our ability to source, execute, and operate energy storage projects with attractive economics. The growth of the energy storage market that we address is primarily driven by the decreasing cost of energy storage technologies, government mandates, financial incentives to reduce GHG emissions, and efforts to enhance grid stability and efficiency. These dynamics are driving demand for increased energy storage capacity and duration.

Current wording

Our expansion of revenue depends on the ongoing adoption of energy storage solutions by our customers and our ability to source, execute, and operate energy storage projects with attractive economics. The growth of the energy storage market that we address is primarily driven by the decreasing cost of energy storage technologies, government mandates, financial incentives to reduce greenhouse gas emissions, and efforts to enhance grid stability and efficiency. These dynamics are driving demand for increased energy storage capacity and duration.

Previous wording

The market for our products is competitive, and we may face increased competition as new and existing competitors introduce energy storage solutions and components. Furthermore, as we expand our services and digital applications in the future, we may face other competitors including software providers and hardware manufacturers that offer software solutions. If our market share declines due to increased competition or if we are not able to compete as we expect, our revenue and ability to generate profits in the future may be adversely affected.

Current wording

The market for our products and services is competitive, and we may face increased competition as new and existing competitors introduce energy storage solutions, components, and project delivery models. Competitive dynamics in the battery energy storage market continue to be influenced by manufacturing scale, changes in battery and component pricing, vertical integration, and evolving trade and supply chain conditions, which can increase pricing pressure, compress margins, and affect delivery timelines. In addition, as we expand our Own and Operate activities through Asset Vault, we also compete with existing and emerging independent power producers, developers, and asset owners for project sites, interconnection capacity, offtake arrangements, and project financing. As we expand our software and services offerings, we also face competition from software providers, original equipment manufacturers, and integrators that offer software enabled controls, optimization, and asset management solutions. If we are not able to compete effectively, if our market share declines due to increased competition, or if competition reduces margins or delays project execution, our revenue, results of operations, and ability to generate profits and cash flows could be adversely affected.

Previous wording

Each of our owned installations or our customer installations must be designed, constructed, and operated in compliance with applicable federal, state and local regulations, codes, standards, guidelines, policies, and laws. To install and operate energy storage systems on its platform, we, our customers or our partners, as applicable, are required to obtain applicable permits and approvals from local authorities having jurisdiction to install energy storage systems and to interconnect the systems with the local electrical utility.

Current wording

Each of our owned installations and our customers’ installations must be designed, constructed, and operated in compliance with applicable federal, state, and local regulations, codes, standards, guidelines, and laws. To develop, install, and operate energy storage systems, we, our customers, or our partners, as applicable, are required to obtain permits and approvals from authorities having jurisdiction, including zoning and land use approvals, building and electrical permits, fire and life safety approvals, and environmental permits where applicable. Energy storage systems typically require interconnection studies and agreements with the applicable transmission provider or local utility, and interconnection timelines and requirements may be affected by evolving interconnection processes and reforms.

Previous wording

The following tables present our key operating metrics for the periods presented (amounts in thousands unless otherwise noted):

Current wording

The following tables present our key operating metrics for the periods presented (value in thousands):

Previous wording

Net bookings represent the total aggregate contract value and total MWhs to be delivered from customer contracts signed during the period (i.e., gross bookings), net of the total aggregate value and total MWhs of contracts that were cancelled during the period. The aggregate contract value includes any potential future variable payments from tolling and offtake arrangements that the Company believes are probable of being realized. Probable future variable payments are forecasted by an independent third-party firm using simulation software that factors in current and projected energy market dynamics, historical and forecasted volatility, and location specific data. The Company considers the low-end simulation results to be probable. Potential future IP royalties are not included in bookings. Due to the long-term nature of our contracts, bookings are a key metric that allows us to understand and evaluate the growth of our Company and our estimated future revenue related to our customer contracts.

Current wording

The aggregate contract value includes any potential future variable payments from tolling and offtake arrangements that the Company believes are probable of being realized. Probable future variable payments are forecasted by an independent third-party firm using simulation software that factors in current and projected energy market dynamics, historical and forecasted volatility, and location specific data. The Company considers the low-end simulation results to be probable. Potential future IP royalties are not included in bookings. Due to the long-term nature of our contracts, bookings are a key metric that allows us to understand and evaluate the growth of our Company and our estimated future revenue related to our customer contracts.

Previous wording

Backlog represents contracted but unrecognized revenue from projects and services yet to be completed, unrecognized revenue or other income from IP licensing agreements, and unrecognized revenue from tolling arrangements for projects operated by Energy Vault or affiliates. Backlog includes any potential future variable payments from tolling and offtake arrangements that the Company believes is probable of being realized. Probable future variable payments are forecasted by an independent third-party firm using simulation software that factors in current and projected energy market dynamics, historical and forecasted volatility, and location specific data. The Company considers the low-end simulation results to be probable. Potential future IP royalties are not included in backlog. Backlog is a common measurement used in our industry. Our methodology for determining backlog may not, however, be comparable to the methodologies used by others. Effective in the second quarter of 2024, we updated our methodology for computing backlog. Under our previous methodology, our backlog was equivalent to our remaining performance obligations under GAAP. We believe our new methodology for computing backlog allows us to better evaluate the growth of our Company and estimate future revenue.

Current wording

Backlog includes any potential future variable payments from tolling and offtake arrangements that the Company believes are probable of being realized. Probable future variable payments are forecasted by an independent third-party firm using simulation software that factors in current and projected energy market dynamics, historical and forecasted volatility, and location specific data. The Company considers the low-end simulation results to be probable. Potential future IP royalties are not included in backlog. Backlog is a common measurement used in our industry. Our methodology for determining backlog may not, however, be comparable to the methodologies used by others.

Previous wording

We cannot guarantee that our backlog will result in actual revenue in the originally anticipated period, or at all. Our customers may experience project delays or cancel orders as a result of external market factors and economic or other factors beyond our control. If our backlog fails to result in revenue as anticipated or in a timely manner, we could experience a reduction in revenue, profitability, and liquidity.

Current wording

We cannot guarantee that our bookings, backlog, or developed pipeline will result in actual revenue in the originally anticipated period, or at all. Our customers may experience project delays or cancel orders as a result of external market factors and economic or other factors beyond our control. Many of our projects require government approvals, third-party financing, and other contingencies, many of which are beyond our control. If our bookings, backlog, or developed pipeline fail to result in revenue as anticipated or in a timely manner, we could experience a reduction in revenue, profitability, and liquidity. See “Risk Factors - Our total backlog, bookings, and developed pipeline may not be indicative of our future revenue, which could have a material impact on our business, financial condition, and results of operations” in this Annual Report.

Previous wording

The Company generates revenue from the sale of our energy storage products, the licensing of the Company’s software solutions and IP, and from long-term service agreements to operate and maintain customer owned energy systems. To date, the Company has primarily generated revenue from the sale of our BESSs and from licensing our EVx technology. In addition to these sources of revenue, in the future we expect to generate revenue from tolling arrangements in connection with energy storage systems that we intend to own and operate.

Current wording

The Company generates revenue from the sale of our energy storage products, tolling arrangements related to owned projects, the licensing of the Company’s software solutions and IP, and from long-term service agreements to operate and maintain customer owned energy systems. To date, the Company has primarily generated revenue from the sale of our BESSs and from licensing our IP.

Previous wording

Cost of revenue primarily consists of product costs, including purchased equipment, materials and supplies, as well as costs related to subcontractors, direct labor, and product warranties.

Current wording

Cost of revenue primarily consists of product costs, materials and supplies, depreciation and amortization, and costs associated with subcontractors, direct labor, and product warranties. Product costs include the cost of purchased equipment, as well as tariffs and shipping costs directly attributable to that equipment.

Previous wording

S&M expenses consist primarily of internal personnel-related costs for marketing, sales, and related support teams, as well as external costs such as professional service fees, trade shows, marketing and sales-related promotional materials, public relations expenses, website operating and maintenance costs. Personnel-related expenses include salaries, benefits, and stock-based compensation expenses.

Current wording

S&M expenses consist primarily of internal personnel-related costs for marketing, sales, and related support teams, as well as external costs such as professional service fees, trade shows, marketing and sales-related promotional materials, public relations expenses, and website operating and maintenance costs. Personnel-related expenses include salaries, benefits, and stock-based compensation expenses.

Previous wording

R&D expenses consist primarily of internal and external expenses incurred in connection with our research activities and development programs that include materials costs directly related to product development, testing and evaluation costs, construction costs including labor and transportation of material, overhead related costs and other direct expenses consisting of personnel-related expenses and consulting expenses relating to study of product safety, reliability and development. Personnel-related expenses consist of salaries, benefits, and stock-based compensation expense.

Current wording

R&D expenses consist primarily of internal and external expenses incurred in connection with our research activities and development programs that include material costs directly related to product development, testing and evaluation costs, construction costs including labor and transportation of material, overhead related costs and other direct expenses consisting of personnel-related expenses and consulting expenses relating to study of product safety, reliability and development. Personnel-related expenses consist of salaries, benefits, and stock-based compensation expense.

Previous wording

Interest income consists of interest income from our money market funds, interest-bearing savings accounts, customer financing receivable, and convertible note receivable.

Current wording

Interest income primarily consists of interest income from our money market funds and interest-bearing savings accounts.

Previous wording

Consolidated Comparison of Year Ended December 31, 2024 to Year Ended December 31, 2023

Current wording

Consolidated Comparison of Year Ended December 31, 2025 to December 31, 2024

Previous wording

In 2024, revenue from operation and maintenance services, as well as software licensing, were new revenue streams for the Company. Revenue from two customers accounted for 75% and 19%, respectively, of the Company’s total revenue for the year ended December 31, 2024.

Current wording

Revenue from two customers accounted for 56% and 32% of total revenue, respectively, for the year ended December 31, 2025 and revenue from two customers accounted for 75% and 19% of total revenue, respectively, for the year ended December 31, 2024.

Previous wording

Since inception, we have financed our net cash used in operating and investing activities primarily through the issuance and sale of equity, and with the proceeds from the reverse recapitalization and private investment in public equity that occurred in 2022.

Current wording

Historically, Energy Vault has financed its net cash used in operating and investing activities primarily through the issuance and sale of equity, proceeds from the reverse recapitalization and private investment in public equity (“PIPE”)

Previous wording

Furthermore, through Energy Vault’s normal course of business operations, the Company has generated a sales backlog of $660.0 million as of March 17, 2025. We expect our backlog will contribute to the funding of our business in the future, aided by a robust developed pipeline of additional business activity, which we expect to further increase contracted backlog as new agreements are signed. In addition, in order to secure non-cash backed performance bonding and surety as may be required for customers as part of our project EPC agreements, the Company works with Marsh on a global basis to use non-cash backed bonding and surety instruments with top rated insurance firms, with a capability that today stands above $1 billion in capacity toward new projects.

Current wording

To support non-cash backed performance bonding and surety obligations required under project EPC agreements, the Company partners with Marsh to access bonding and surety instruments issued by top-rated insurance firms. .

Previous wording

Energy Vault has incurred negative operating cash flows and operating losses in the past and we may incur operating losses in the future. Energy Vault may seek additional capital through combinations of equity and/or debt financings depending on market conditions. If we are required to raise additional funds by issuing equity securities, dilution to stockholders would result. Any equity securities issued may also provide for rights, preferences or privileges senior to those of holders of our common stock. The Company has previously announced its intention to raise preferred equity for project-specific financing vehicles that would not be dilutive to common shareholders and is directly tied to the projects themselves. If the Company raises funds by issuing debt securities, these debt securities would have rights, preferences and privileges senior to those of holders of common stock. The terms of debt securities or borrowings could impose significant restrictions on our operations. The credit market and financial services industry have in the past, and may in the future, experience periods of uncertainty that could impact the availability and cost of equity and debt financing.

Current wording

Energy Vault has historically incurred negative operating cash flows and operating losses and may continue to incur operating losses in the future. The Company may seek to raise additional capital through combinations of equity and/or debt financings, subject to prevailing market conditions. Issuance of equity securities could result in dilution to existing stockholders and may include rights, preferences, or privileges senior to those of the Company’s common stock.

Previous wording

Management believes that its cash, cash equivalents, and restricted cash on hand as of the filing date of this Annual Report will be sufficient to fund our operating activities for at least the next twelve months without regard to any cash proceeds we may receive in the future upon the exercise of our private warrants.

Current wording

Management believes that its cash, cash equivalents, and restricted cash as of December 31, 2025, together with expected cash flows from operations and existing funding arrangements, will be sufficient to fund operating activities and meet obligations for at least the next twelve months from the date of issuance of these consolidated financial statements. This assessment does not assume any future proceeds from the exercise of outstanding warrants.

Previous wording

On November 12, 2024, we entered into a open market sales agreement with Jefferies LLC, as sales agent (the “sales agent”), pursuant to which we may, from time to time, sell shares of our common stock, having an aggregate offering price of up to $50.0 million through the sales agent under an “at-the-market” equity offering program. We may seek, from time to time, to raise additional capital either under the Sales Agreement or otherwise.

Current wording

On November 12, 2024, we entered into an open market sales agreement (“Sales Agreement”) with Jefferies LLC, as sales agent (the “Sales Agent”), pursuant to which we may, from time to time, sell shares of our common stock, having an aggregate offering price of up to $50.0 million through the Sales Agent under an “at-the-market” equity offering program. We may seek, from time to time, to raise additional capital either under the Sales Agreement or otherwise.

Previous wording

On March 31, 2025, we entered into an equity purchase agreement (the “Equity Purchase Agreement”) with an investor (the “Equity Investor”). Pursuant to the Equity Purchase Agreement, the Company has the right at its sole discretion, but not the obligation, to sell to the Equity Investor, and the Equity Investor is obligated to purchase, up to $25.0 million of newly issued shares of the Company’s common stock, from time to time during the term of the Equity Purchase Agreement, subject to certain limitations and conditions. If we don’t terminate the Equity Purchase Agreement on or before May 15, 2025, we will issue the Equity Investor shares of our common stock equivalent to 0.3% of our outstanding common stock as of March 28, 2025 and then have the right to sell shares to the Equity Investor at a market discount. Refer to Note 21 - Subsequent Events for additional details on this agreement.

Current wording

On March 31, 2025, we entered into the Hudson Equity Purchase Agreement. Pursuant to the Hudson Equity Purchase Agreement, the Company has the right at its sole discretion, but not the obligation, to sell to Hudson, and Hudson is obligated to purchase, up to $25.0 million of newly issued shares of the Company’s common stock, from time to time during the term of the Hudson Equity Purchase Agreement, subject to certain limitations and conditions.

Previous wording

The Senior Notes will bear interest at a rate of 12.5% per annum, until the earlier of (i) the Company’s receipt of any tax credit transfer proceeds and (ii) December 31, 2025, and thereafter at a rate of 9.50% per annum. The Senior Notes will be senior secured obligations of Calistoga Resiliency Center, LLC, and will be secured by a first-priority pledge of all assets and equity interests in the Borrower. The Senior Notes contain affirmative and negative covenants, including minimum cash reserves and a minimum debt service coverage ratio.

Current wording

The CRC Senior Notes bear interest at 12.5% per annum until the earlier of (i) the Company’s receipt of any tax credit transfer proceeds and (ii) December 31, 2025, and thereafter at a rate of 9.50% per annum. The CRC Senior Notes are senior secured obligations of CRC, backed by a first-priority pledge of all CRC assets and equity interests. The CRC Senior Notes include customary affirmative and negative covenants, including minimum cash reserves and a minimum debt service coverage ratio.

Previous wording

The Company may, at its option, redeem the Senior Notes in whole or in part prior to maturity, subject to specified call protection provisions and prepayment premiums as outlined in the agreement. In the event of a change of control, the Company may be required to offer to repurchase the Senior Notes at a specified price.

Current wording

Principal and interest are payable semi-annually, with installments due each February 28 and August 31. The Company may, at its option, redeem all or a portion of the CRC Senior Notes prior to maturity, subject to specified call protection provisions and any prepayment premiums set forth in the agreement. In the event of a change of control, the Company may be required to offer to repurchase the notes at a specified price.

Previous wording

The following tables summarizes our cash, cash equivalents, and restricted cash balances as of December 31, 2024 and 2023 (amounts in thousands):

Current wording

The following table summarizes our cash, cash equivalents, and restricted cash balances as of December 31, 2025 and 2024 (amounts in thousands):

Previous wording

Our principal commitments as of December 31, 2024 consisted primarily of obligations under operating leases, finance leases, warranty liabilities, a deferred pension, and issued purchase orders. Our non-cancellable purchase obligations as of December 31, 2024 totaled $1.9 million.

Current wording

Our principal commitments as of December 31, 2025 consisted primarily of obligations under debt financing arrangements, operating leases, finance leases, a deferred pension, warranty liabilities, and issued purchase orders. Our non-cancellable purchase obligations as of December 31, 2025 totaled approximately $5.4 million, which is all expected to be paid in the next twelve months.

Previous wording

To complement our consolidated statements of operations and comprehensive loss, we use non-GAAP financial measures of adjusted S&M expenses, adjusted R&D expenses, adjusted G&A expenses, adjusted operating expenses, and adjusted EBITDA. Management believes that these non-GAAP financial measures complement our GAAP amounts and such measures are useful to securities analysts and investors to evaluate our ongoing results of operations when considered alongside our GAAP measures. The presentation of these non-GAAP measures is not meant to be considered in isolation or as an alternative to other measures of financial performance calculated in accordance with GAAP. These non-GAAP measures and their reconciliation to GAAP financial measures are shown below.

Current wording

To complement our consolidated statements of operations and comprehensive loss, we use non-GAAP financial measures of adjusted S&M expenses, adjusted R&D expenses, adjusted G&A expenses, adjusted operating expenses, adjusted net loss, and adjusted EBITDA. Management believes that these non-GAAP financial measures complement our GAAP amounts and such measures are useful to securities analysts and investors to evaluate our ongoing results of operations when considered alongside our GAAP measures. The presentation of these non-GAAP measures is not meant to be considered in isolation or as an alternative to other measures of financial performance calculated in accordance with GAAP. These non-GAAP measures and their reconciliation to GAAP financial measures are shown below.

Previous wording

The following table provides a reconciliation from GAAP net loss to non-GAAP adjusted EBITDA, with net loss being the most directly comparable GAAP measure (amounts in thousands):

Current wording

The following table provides a reconciliation from net loss to non-GAAP adjusted EBITDA, with net loss being the most directly comparable GAAP measure (amounts in thousands):

Previous wording

•although depreciation and amortization are non-cash charges, the assets being depreciated and amortized will often have to be replaced in the future, and our adjusted EBITDA measure does not reflect any cash requirements for such replacements;

Current wording

•although depreciation, amortization, and accretion are non-cash charges, the assets being depreciated and amortized will often have to be replaced in the future, and our adjusted EBITDA measure does not reflect any cash requirements for such replacements;

Previous wording

For a summary of significant accounting policies, refer to Note 2 -Summary of Significant Accounting Policies of our audited consolidated financial statements included in this Annual Report on Form 10-K.

Current wording

For a summary of significant accounting policies, refer to Note 2, Summary of Significant Accounting Policies of the consolidated financial statements included in this Annual Report on Form 10-K.

Previous wording

The Company encounters credit loss risks associated with the collection of accounts receivable, contract assets, and customer financing receivable. The accounting estimates related to the Company’s allowance for credit losses is a critical accounting estimate because the underlying assumptions used for the allowance can change from time to time and credit losses could potentially have a material impact on our results of operations.

Current wording

The Company encounters credit loss risks associated with the collection of accounts receivable, contract assets, customer financing receivable, and convertible note receivable. The accounting estimates related to the Company’s allowance for credit losses is a critical accounting estimate because the underlying assumptions used for the allowance can change from time to time and credit losses could potentially have a material impact on our results of operations.

Previous wording

We are an “emerging growth company” as defined in Section 2(a) of the Securities Act of 1933, as amended, and have irrevocably elected to take advantage of the benefits of this extended transition period for new or revised standards. We are expected to remain an emerging growth company through the end of 2026 and expect to continue to take advantage of the benefits of the extended transition period. This may make it difficult or impossible to compare our financial results with the financial results of another public company that is either not an emerging growth company or is an emerging growth company that has chosen not to take advantage of the extended transition period exemptions for emerging growth companies because of the potential differences in accounting standards used.

Current wording

We are an “emerging growth company” as defined in Section 2(a) of the Securities Act of 1933, as amended, and have irrevocably elected to take advantage of the benefits of this extended transition period for new or revised financial accounting standards. We are expected to remain an emerging growth company through the end of 2026 and expect to continue to take advantage of the benefits of the extended transition period. This may make it difficult or impossible to compare our financial results with the financial results of another public company that is either not an emerging growth company or is an emerging growth company that has chosen not to take advantage of the extended transition period exemptions for emerging growth companies because of the potential differences in accounting standards used.