Energy Vault Holdings, Inc.

For the period ended Dec 31, 2024. Filed Apr 1, 2025.

View on SEC.gov

About this filing

A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.

FY2024 · Filed Apr 1, 2025

NRGV$3.62+11.7%Stored close · as of Nov 9, 2026

What changed in Risk Factors?

Read the current filing

Previous report: 10-K

Period ended 2023-12-31; filed 2024-03-13.

0001828536-24-000035

Item 1A. Risk Factors

Current report: 10-K

Period ended 2024-12-31; filed 2025-04-01.

0001828536-25-000032

Item 1A. Risk Factors

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 341 previous paragraphs and 340 current paragraphs.

240 unchanged; 82 reworded; 17 added; 19 removed; 0 previous and 1 current paragraphs rearranged.

Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (17)

Current report

•Changes to United States tariff and import/export regulations.

Current report

•Our developed pipeline of awarded or shortlisted third-party EPC, EEQ, and long-term service opportunities, and the long-term economics associated with potential projects identified for our own and operate portfolio, may be subject to change and be impacted by anticipated equipment and commodity costs, tariffs, as well as changes in foreign currency exchange rates in markets in which we source materials or conduct business.

Current report

•As we conduct business in a host of geographies and may engage in activity with those operating sensitive energy infrastructure, including markets subject to capital controls, our ability to collect payments or conduct business may be impacted or change without advance notice.

Current report

•Our owned projects are based on our estimates of construction costs, timelines, future revenues, and operating costs. If those estimates are inaccurate, our anticipated revenues and profits may be materially and adversely effected.

Current report

•Third parties may assert that we are infringing upon their IP rights, which could divert management’s attention, cause us to incur significant costs, and prevent us from selling or using the technology to which such rights relate.

Current report

As we develop and own more storage projects ourselves, we make projections about construction costs and timelines, and future revenues and operating costs. The profitability of our projects are highly sensitive to these projections and if our actual results or performance differ materially from our projections, then the profitability of our owned projects could be materially less than our projections or result in losses to the Company.

Current report

Our backlog represents contracted but unrecognized revenue from projects and services yet to be completed, unrecognized revenue or other income from IP licensing agreements, and unrecognized revenue from tolling arrangements. Backlog includes any potential future variable payments from tolling and offtake arrangements that the Company believes is probable of being realized. Probable future variable payments are forecasted by an independent third-party firm using simulation software that factors in current and projected energy market dynamics, historical and forecasted volatility, and location specific data. The Company considers the low-end simulation results to be probable. Potential future IP royalties are not included in backlog. As of December 31, 2024, backlog totaled $433.9 million. Backlog is a common measurement used in our industry. Our methodology for determining backlog may not, however, be comparable to the methodologies used by others. Effective in the second quarter of 2024, we updated our methodology for computing backlog. Under our previous methodology, our backlog was equivalent to our remaining performance obligations under U.S. Generally Accepted Accounting Principles (“GAAP”). We believe our new methodology for computing backlog allows us to better evaluate the growth of our Company and estimate future revenue.

Current report

Bookings represent the total aggregate contract value and total MWhs to be delivered from customer contracts signed during the period, net of the total aggregate value and total MWhs of contracts that were cancelled during the period and is calculated using the same methodologies as our backlog. For the year ended December 31, 2024 bookings totaled $223.9 million.

Current report

Developed pipeline represents uncontracted, potential revenue, from third-party projects where potential prospective customers have either awarded the Company a project or shortlisted the Company for consideration, but not, in either case, having awarded the Company a binder order. Developed pipeline also includes potential tolling revenue from projects where the Company is in advanced negotiations to build, own, and operate energy storage systems. Developed pipeline is an internal management metric that we construct using information from our global sales team and is monitored by management to understand the potential anticipated growth of our Company and to estimate potential future revenue. Developed pipeline is influenced by the prevailing foreign exchange rates and equipment prices and may vary from period to period if these inputs change. As of December 31, 2024, developed pipeline totaled $2.1 billion.

Current report

For the year ended December 31, 2024, the Company recognized $11.7 million in impairment charges on our investment in KORE Power, Inc. due to a decline in their financial performance.

Current report

Government control of currency conversion and expatriation of funds may affect our liquidity.

Current report

We have customers and subsidiaries located in jurisdictions that impose or may impose controls on the convertibility of the local currency into foreign currencies and, in certain cases, the remittance of currency out of the jurisdiction. Therefore, we may experience delays, restrictions or limitations in completing the administrative procedures necessary to obtain and remit foreign currency to the Company, which could have a material effect on our liquidity and our business. Shortages in the availability of foreign currency in countries in which we transact, or the impossibility or difficulties in complying with the requirements and approvals of local authorities may delay, restrict or limit the ability of our customer to covert the amount owed to us to U.S. dollars and remit such amount to us, thus materially affecting our liquidity and business.

Current report

Risks Related to Our IP and Technology

Current report

Changes to U.S. tariff and import/export regulations may have a negative effect on our business, financial condition and results of operations.

Current report

The United States has recently enacted and proposed to enact significant new tariffs, as well as changes to existent tariffs. In particular, the Section 301 tariff rate on lithium-ion non-EV batteries imported from China has been amended several times since the beginning of 2025 and may continue to change.

Current report

Additionally, President Trump has directed various federal agencies to further evaluate key aspects of U.S. trade policy and there has been ongoing discussion, commentary, and action regarding potential significant changes to U.S. trade policies, treaties, and tariffs. Effective March 4, 2025, the U.S. implemented a 25% additional tariff on imports from Canada (subject to certain exceptions for energy or energy resources) and Mexico, and a 20% additional tariff on imports from China. In response to these tariffs, Canada has proposed retaliatory tariffs. On March 6, 2025, the Trump Administration announced that Canadian and Mexican goods covered by the U.S.-Mexico-Canada Agreement would not be subject to the additional 25% tariff until April 2, 2025.

Current report

As of the date of this Annual Report, discussions remain ongoing in respect of certain trade restrictions and tariffs on imports from Canada, China, and Mexico, as well as retaliatory tariffs enacted in response to such actions. In light of these events, there continues to exist significant uncertainty about the future relationship between the U.S. and other countries with respect to such trade policies, treaties, and tariffs. These developments, or the perception that any of them could occur, may have a material adverse effect on global economic conditions and the stability of global financial markets, and may significantly reduce global trade and, in particular, trade between the impacted nations and the United States. Any of these factors could depress economic activity and restrict our access to suppliers or customers and have a material adverse effect on their business, financial condition and results of operations, which in turn would negatively impact us. We have operations, customers and suppliers in the U.S., China and other countries.
Removed paragraphs (19)

Previous report

The economic benefit of our energy storage systems to our customers includes, among other things, the benefit of reducing such customer’s payments to the local electric utility company. The rates at which electricity is available from a customer’s local electric utility company is subject to change and any changes in such rates may affect the relative benefits of our energy storage systems. Further, the local electric utility may impose “departing load,” “standby” or other charges on our customers in connection with their acquisition of our energy storage systems, the amounts of which are outside of our control and which may have a material impact on the economic benefit of our energy storage systems to our customers. Changes in the rates offered by local electric utilities and/or in the applicability or amounts of charges and other fees imposed by such utilities on customers acquiring our energy storage systems could adversely affect the demand for our energy storage systems.

Previous report

Although we don’t expect a significant majority of our revenue to come from owning and operating energy storage systems based on our current outlook, there is no assurance that this type of revenue will not account for a significant portion of our business in the future.

Previous report

Our executive officers have limited experience in the management of a publicly traded company. Our management team may not successfully or effectively manage the current transition to a public company that is subject to significant regulatory oversight and reporting obligations under federal securities laws. Their limited experience in dealing with the increasingly complex laws pertaining to public companies could be a significant disadvantage in that it is likely that an increasing amount of their time may be devoted to these activities which results in less time being devoted to the management and growth of our business. We may not have adequate personnel with the appropriate level of knowledge, experience, and training in the accounting policies, practices or internal controls over financial reporting required of public companies in the United States. The development and implementation of the standards and controls necessary for us to achieve the level of accounting standards required of a public company in the United States may require costs greater than expected. It is possible that the Company will be required to expand its employee base and hire additional employees to support our operations as a public company which will increase our operating costs in future periods.

Previous report

Diesel, gasoline, natural gas, and other petroleum-based fuel prices have historically been extremely volatile, and it is difficult to ascertain whether such volatility will continue to persist. Lower gasoline and natural gas costs over extended periods of time may lower the perception in government and the private sector that cheaper, more readily available energy alternatives, such as wind and solar, should be developed and produced. If gasoline or other petroleum-based fuel prices remain at deflated levels for extended periods of time, the demand for renewable energy may decrease notwithstanding incentives to transition to renewable energy, which would have an adverse effect on our business, prospects, financial condition and results of operations.

Previous report

•continuing to improve the expected useful life of our GESS technology and reducing our warranty servicing costs;

Previous report

•ability to add waste material, such as coal ash and wind turbine blades, in the production of mobile masses;

Previous report

•legal and commercial acceptance of the incorporation of waste material (including, but not limited to, coal ash) into our mobile masses; and

Previous report

•fluctuations in costs associated with the first few groups of energy storage systems that we deploy;

Previous report

Changes in regulatory enforcement policies and priorities may negatively impact the management of our business, results of operations, and ability to compete.

Previous report

Energy and EHS regulation is constantly changing, and changes in policy, changes in interpretation or enforcement of existing laws or regulations applicable to our business, or reexamination of current practices, could adversely impact our profitability, limit our ability to continue existing or pursue new business activities, require us to change certain of our business practices, affect retention of key personnel, or expose us to additional costs (including increased compliance costs and/or customer remediation). Regulatory changes also may require us to invest significant resources, and devote significant management attention, to make any necessary changes and could adversely affect our business.

Previous report

We are subject to licensing, permitting, and operational requirements that result in substantial compliance costs, and our business would be adversely affected if we fail to obtain or maintain required licenses or if our licenses are impaired.

Previous report

Our business is subject to numerous federal, state, and local laws and regulations in the jurisdictions in which we operate. In particular, our business is subject to oversight and regulation under local ordinances, building, zoning and fire codes, EHS regulations, utility interconnection requirements, and other rules and regulations. Such licenses, permits, and approvals often require us to operate in ways that incur substantial compliance costs.

Previous report

We have obtained certain permits and are in the process of obtaining additional permits for the energy storage systems that we are constructing. Although we have obtained certain required permits and believe that obtaining and renewing any remaining permits and/or licenses will be routine, we can provide no assurance that all required permits and/or licenses will be obtained or renewed in a timely manner. Our failure to hold a given permit or certificate would impair our ability to perform our obligations under our customer contracts. The number of laws affecting our business continues to grow. If our licenses or permits were impaired, whether by expiration, nonrenewal, modification, or termination, our business would be adversely impaired.

Previous report

We can give no assurances that we will properly and timely comply with all laws and regulations that may affect us. If we fail to comply with these laws and regulations, we may be subject to legal penalties, which would adversely affect our business, prospects, and results of operations.

Previous report

In addition, governments, often acting through state utility or public service commissions, change or adopt different rates for commercial customers on a regular basis. These changes could affect our ability to deliver cost savings to future customers for the purchase of our energy storage systems.

Previous report

In addition, we maintain director and officer liability insurance, which has substantial premiums. Advocacy efforts by stockholders and third parties may also prompt additional changes in governance and reporting requirements, which could further increase costs.

Previous report

If we fail to maintain proper and effective internal control over financial reporting as a public company, our ability to produce accurate and timely financial statements could be impaired, investors may lose confidence in our financial reporting and the trading price of our common stock may decline.

Previous report

Pursuant to Section 404 of the Sarbanes-Oxley Act, the report by management on internal control over financial reporting is on our financial reporting and internal controls. The rules governing the standards that must be met for management to assess internal control over financial reporting are complex and require significant documentation, testing and possible remediation. To comply with the Sarbanes-Oxley Act, the requirements of being a reporting company under the Exchange Act and any complex accounting rules in the future, we may need to upgrade our information technology systems; implement additional financial and management controls, reporting systems and procedures; and hire additional accounting and finance staff.

Previous report

If we are unable to hire the additional accounting and finance staff necessary to comply with these requirements, we may need to retain additional outside consultants. If we, or our independent registered public accounting firm are unable to conclude that our internal control over financial reporting is effective, investors may lose confidence in our financial reporting, which could negatively impact the market price of our common stock.
Reworded paragraphs (82)

Previous wording

Our GESSs are based on established principles that are deployed in a novel way to create new technologies to store energy and potential customers may be hesitant to make a significant investment in our technology or abandon the technology they are currently using.

Current wording

•Our B-Vault, B-Nest, G-Vault and H-Vault products are based on established principles that are deployed in a novel way to create new technologies to store energy and potential customers may be hesitant to make a significant investment in our technology or abandon the technology they are currently using.

Previous wording

•Our total backlog and bookings may not be indicative of our future revenue, which could have a material adverse impact on our business, financial condition, and results of operations.

Current wording

•Our total backlog, bookings, and developed pipeline may not be indicative of our future revenue, which could have a material adverse impact on our business, financial condition, and results of operations.

Previous wording

•Our energy storage systems involve a lengthy sales and installation cycle, and if we fail to close sales on a regular and timely basis it could harm our business. Moreover, the long sales cycles for our energy storage systems may cause us to incur significant expenses without offsetting revenues.

Current wording

•Our energy storage products involve a lengthy sales and installation cycle, and if we fail to close sales on a regular and timely basis it could harm our business. Moreover, the long sales cycles for our energy storage products may cause us to incur significant expenses without offsetting revenues.

Previous wording

•Our systems include complex software and technology systems and do not have a meaningful history of operation, and there can be no assurance such systems and technology will perform as expected or that software, engineering or other technical defects will not be discovered until after a system is installed and operated by a customer. If our energy storage systems contain manufacturing or construction defects, our business and financial results could be harmed. In addition, the development and updating of these systems will require us to incur potentially significant costs and expenses.

Current wording

•Our systems include complex software and technology systems and do not have a meaningful history of operation, and there can be no assurance such systems and technology will perform as expected or that software, engineering or other technical defects will not be discovered until after a system is installed and operated by a customer or by us. If our energy storage systems contain manufacturing or construction defects, our business and financial results could be harmed. In addition, the development and updating of these systems will require us to incur potentially significant costs and expenses.

Previous wording

•If we fail to protect, defend, maintain, or enforce intellectual property rights on which our business depends, including against existing or future competitors, our growth and success may be adversely affected.

Current wording

•If we fail to protect, defend, maintain, or enforce IP rights on which our business depends, including against existing or future competitors, our growth and success may be adversely affected.

Previous wording

Prior to the first half of 2022, we focused principally on developing and proving our fundamental gravity energy storage technology, including our GESSs, which we are seeking to further refine and commercialize. Beginning in 2022, we expanded our offerings to include BESSs and HESSs. To date, we have only built two BESSs and one GESS, which was the EV1 Tower in Lugano, Switzerland (the “EV1 CDU”), which served as a commercial demonstration unit until its decommissioning in September 2022. As a result, we have a limited history operating our business and constructing energy storage systems, and therefore a limited history upon which you can base an investment decision.

Current wording

Prior to the first half of 2022, we focused principally on developing and proving our fundamental gravity energy storage technology, marketed as our G-Vault products, which we are seeking to further refine and commercialize. Beginning in 2022, we expanded our offerings to include BESSs and HESSs. In 2024, we launched our B-Nest product. To date, we have only completed three BESSs and one GESS, which was the EV1 Tower in Lugano, Switzerland (the “EV1 CDU”), which served as a commercial demonstration unit until its decommissioning in September 2022. As a result, we have a limited history operating our business and constructing energy storage systems, and therefore a limited history upon which you can base an investment decision.

Previous wording

Any future full energy storage deployments may incur more costs than we expect. Our business, reputation, results of operations and financial condition may be materially adversely affected if we do not successfully implement our systems or to the extent that such implementation occurs later or costs more than we expect, or if innovations by our competitors achieve broader or earlier market acceptance. Examples of costs that we cannot control include the costs of electronics due to global allocation shortages or costs associated with construction delays.

Current wording

Any future energy storage deployments may incur more costs than we expect. Our business, reputation, results of operations and financial condition may be materially adversely affected if we do not successfully implement our systems or to the extent that such implementation occurs later or costs more than we expect, or if innovations by our competitors achieve broader or earlier market acceptance. Examples of costs that we cannot control include the costs of electronics due to global allocation shortages or costs associated with construction delays.

Previous wording

We rely heavily on complex machinery for our operations and our production involves a significant degree of uncertainty and risk in terms of operational performance and costs. When fully operational, our energy storage systems will consist of large-scale machinery comprised of many components assembled on-site for our customers. The components of our energy storage systems are likely to suffer unexpected malfunctions from time to time and will depend on repairs and spare parts to resume operations, which may not be available when needed. Unexpected malfunctions of our energy storage systems or their constituent components may significantly affect the intended operational efficiency and performance. In addition, our energy storage systems may need to be decommissioned from time to time, and the related costs could be significant given the size and complexity of our energy storage systems. Operational performance and costs, including those related to project stoppage, can be difficult to predict and are often influenced by factors outside of our control, such as, but not limited to, scarcity of natural resources, environmental hazards and remediation, costs associated with construction, commissioning, testing or decommissioning of machines, labor disputes and strikes, difficulty or delays in obtaining governmental permits, damages or defects in electronic systems, industrial accidents, fire, seismic activity and natural disasters. Should operational risks materialize, it may result in the personal injury to or death of workers, the loss of production equipment, damage to demonstration facilities, monetary losses, delays and unanticipated fluctuations in production, environmental damage, administrative fines, increased insurance costs and potential legal liabilities, all which could have a material adverse effect on our business, results of operations, cash flows, financial condition or prospects.

Current wording

We rely heavily on complex machinery for our operations and our production involves a significant degree of uncertainty and risk in terms of operational performance and costs. When fully operational, our energy storage systems will consist of large-scale machinery comprised of many components assembled on-site for our customers or for our owned projects. The components of our energy storage systems are likely to suffer unexpected malfunctions from time to time and will depend on repairs and spare parts to resume operations, which may not be available when needed. Unexpected malfunctions of our energy storage systems or their constituent components may significantly affect the intended operational efficiency and performance. In addition, our energy storage systems may need to be decommissioned from time to time, and the related costs could be significant given the size and complexity of our energy storage systems. Operational performance and costs, including those related to project stoppage, can be difficult to predict and are often influenced by factors outside of our control, such as, but not limited to, scarcity of natural resources, environmental hazards and remediation, costs associated with construction, commissioning, testing or decommissioning of machines, labor disputes and strikes, difficulty or delays in obtaining governmental permits, damages or defects in electronic systems, industrial accidents, fire, seismic activity and natural disasters. Should operational risks materialize, it may result in the personal injury to or death of workers, the loss of production equipment, damage to demonstration facilities, monetary losses, delays and unanticipated fluctuations in production, environmental damage, administrative fines, increased insurance costs and potential legal liabilities, all which could have a material adverse effect on our business, results of operations, cash flows, financial condition or prospects.

Previous wording

Our energy storage systems have significant upfront costs, and our customers may need to obtain financing to help finance purchases. If our customers are unable to procure third-party financing or if the cost of such financing exceeds our estimates, our business would be adversely affected.

Current wording

Our energy storage systems have significant upfront costs. We will need to obtain financing to fund our own projects and our customers may need to obtain financing to help finance purchases. If we or our customers are unable to procure third-party financing or if the cost of such financing exceeds our estimates, our business would be adversely affected.

Previous wording

Our energy storage systems have significant upfront costs, and certain customers may need, or may prefer to acquire, third-party financing to purchase our systems.

Current wording

Our energy storage systems have significant upfront costs, and certain customers may need, or may prefer to acquire, third-party financing to purchase our systems. We will need to obtain third-party financing to continue our transition to owning assets as well as selling energy storage products.

Previous wording

Therefore, our growth, including the deployment of our energy storage systems, may to an extent depend on our customers’ ability to attract third-party financing partners. Their ability to obtain third-party financing depends on many factors that are outside of our control, including the ability of third parties to utilize tax credits and other government incentives, interest rate and/or currency exchange fluctuations, their perceived creditworthiness and the condition of credit markets generally. We expect that the financing of customer purchases of our energy storage systems will be subject to customary conditions such as the customer’s credit quality, and if these conditions are not satisfied, such customers may be unable to finance purchases of our energy storage systems, which would have an adverse effect on our revenue in a particular period. To the extent our customers are unable to arrange future financings for any of our current or potential projects, our business would be negatively impacted.

Current wording

Therefore, our growth, including the deployment of our energy storage systems, may to an extent depend on our own and our customers’ ability to attract third-party financing partners. The ability to obtain third-party financing depends on many factors that are outside of our control, including the ability of third parties to utilize tax credits and other government incentives, interest rate and/or currency exchange fluctuations, the borrower’s perceived creditworthiness and the condition of credit markets generally. We expect that the financing of customer purchases of our energy storage systems or our own projects will be subject to customary conditions such as the borrower’s credit quality, and if these conditions are not satisfied, such customers may be unable to finance purchases of our energy storage systems and we may not be able to fund our own projects, which would have an adverse effect on our revenue. To the extent neither our customers or us are able to arrange future financings for any of our current or potential projects, our business would be negatively impacted.

Previous wording

In attempting to attract new customers to support our growth, we intend to refine our customer agreements based on experience. Moreover, new types of product offerings may require our customers to find partners willing to finance these new projects, which may have different terms and financing conditions from prior transactions. If the terms of these transactions or the structure of these projects fails to attract financiers, we may not be able to proceed with growing our business and our potential for growth may be limited. Additionally, financing options are also limited by the customer’s willingness to commit to making fixed payments regardless of the performance of the energy storage systems or our performance of our obligations under the customer agreement

Current wording

In attempting to attract new customers to support our growth, we intend to refine our customer agreements based on experience. Moreover, new types of product offerings may require our customers to find partners willing to finance these new projects, which may have different terms and financing conditions from prior transactions. If the terms of these transactions or the structure of these projects fails to attract financiers, we may not be able to proceed with growing our business and our potential for growth may be limited. Additionally, financing options are also limited by the borrower’s willingness to commit to making fixed payments regardless of the performance of the energy storage systems or our performance of our obligations under the customer agreement.

Previous wording

If our customers are unable to procure financing partners willing to finance deployments of our products or if the cost of such financing exceeds our estimates, our business would be negatively impacted.

Current wording

If we or our customers are unable to procure financing partners willing to finance deployments of our products or if the cost of such financing exceeds our estimates, our business would be negatively impacted.

Previous wording

The economic benefit of our energy storage systems to our customers depends on the cost of electricity available from alternative sources, including local electric utility companies, which cost structure is subject to change.

Current wording

The economic benefit of our energy storage systems to us and to our customers depends on the cost of electricity available from alternative sources, including local electric utility companies, which cost structure is subject to change.

Previous wording

Additionally, the electricity stored and released by our systems may not currently be cost-competitive in some geographic markets, and we may be unable to reduce our costs to a level at which our energy storage systems would be competitive in such markets. As such, unless the cost of electricity in these markets rises or we are able to generate demand for our energy storage systems based on benefits other than electricity cost savings, our potential for growth may be limited.

Current wording

The electricity stored and released by our systems may not currently be cost-competitive in some geographic markets, and we may be unable to reduce our costs to a level at which our energy storage systems would be competitive in such markets. To the extent that either we as an owner or our customers anticipate selling power into markets as a merchant generator, our customers and the Company may not be able to achieve the anticipated level of revenues and profits. As such, unless the cost of electricity in these markets rises or we are able to generate demand for our energy storage systems based on benefits other than electricity cost savings, our potential for growth may be limited.

Previous wording

Our energy storage systems will be subject to various operating risks that may cause them to generate less value for our customers than expected. These risks include a failure or wearing out of our equipment or the equipment that our equipment connects into, an inability to find suitable replacement equipment or parts, or disruption in our distribution systems. Any extended interruption or failure of our customer’s projects, including systems we operate under long term service agreements, for any reason to generate the expected amount of output could adversely affect our business, financial condition and results of operations. In addition, our customers’ willingness to acquire additional systems or services from us may be impacted in the future if any of our systems incur operational issues that indicate expected future cash flows from the system are less than the carrying value. Any such outcome could adversely affect our operating results or ability to attract new customers.

Current wording

Our energy storage systems will be subject to various operating risks that may cause them to generate less value for our customers than expected. These risks include a failure or wearing out of our equipment or the equipment that our equipment connects into, an inability to find suitable replacement equipment or parts, or disruption in our distribution systems. Any extended interruption or failure of our projects or our customer’s projects, including systems we operate under long term service agreements, for any reason to generate the expected amount of output could adversely affect our business, financial condition and results of operations. In addition, our customers’ willingness to acquire additional systems or services from us may be impacted in the future if any of our systems incur operational issues that indicate expected future cash flows from the system are less than the carrying value. Any such outcome could adversely affect our operating results or ability to attract new customers.

Previous wording

We provide limited warranties and performance guarantees for our energy systems. To date, we have deployed two operational BESSs and our estimates about product performance and life may prove to be incorrect. Failure to meet these warranties and performance guarantee levels may require the purchase price to be adjusted downward based on agreed-upon performance targets, or require us to make cash payments to the customer based on actual performance, as compared to expected performance.

Current wording

We provide limited warranties and performance guarantees for our energy systems. We make investment decisions for our owned projects based in part on an estimate of the useful life of our products. To date, we have deployed three operational BESSs and our estimates about product performance and life may prove to be incorrect. Failure to meet these warranties and performance guarantee levels for our customers may require the purchase price to be adjusted downward based on agreed-upon performance targets, or require us to make cash payments to the customer based on actual performance, as compared to expected performance. Failure to meet these expected performance levels on our owned projects could materially and adversely impact the expected performance of such projects.

Previous wording

Our success depends on our ability to generate revenue and operate profitably, which depends in part on our ability to identify target customers and convert such contacts into meaningful orders or expand on current customer relationships. To date, we have only deployed two operational energy systems. While our contracts do provide that our customers will be obligated to pay us certain fees in the event of termination for their convenience, such fees may not be sufficient to cover our costs and we would not realize the expected revenue associated with such cancelled contracts. Potential and contracted customers may abandon their indications of interest, or fail to honor contractual obligations and non-binding letters of interest may be cancelled or delayed by a customer for any reason or its terms may be amended in an manner adverse to us in connection with negotiating a definitive sales agreement. For that reason, there can be no assurance that any current or future indications of interest (including awards, submitted proposals or short-lists) or non-binding letters of intent will result in binding orders or sales. Furthermore, in light of our limited operating history, it is difficult for us to predict the rates at which the non-binding letters of intent or other indications of interest in our pipeline will result in binding orders or sales. It is also difficult for us to predict how quickly we will be able to fill binding orders in the event that we obtain multiple orders. In addition, revenue is expected to be recognized in stages, and customers may in some cases delay actual cash payments regardless of progressive billings. Additionally, a customer’s ability to make payments could decline during the sales process, even to the point of insolvency or bankruptcy. As a result, our operating results and cash flow may be materially lower than we expect.

Current wording

Our success depends on our ability to generate revenue and operate profitably, which depends in part on our ability to identify target customers and convert such contacts into meaningful orders or expand on current customer relationships. To date, we have only deployed three operational energy systems. While our contracts do provide that our customers will be obligated to pay us certain fees in the event of termination for their convenience, such fees may not be sufficient to cover our costs and we would not realize the expected revenue associated with such cancelled contracts. Potential and contracted customers may abandon their indications of interest, or fail to honor contractual obligations and non-binding letters of interest may be cancelled or delayed by a customer for any reason or its terms may be amended in a manner adverse to us in connection with negotiating a definitive sales agreement. For that reason, there can be no assurance that any current or future indications of interest (including awards, submitted proposals or short-lists) or non-binding letters of intent will result in binding orders or sales. Furthermore, in light of our limited operating history, it is difficult for us to predict the rates at which the non-binding letters of intent or other indications of interest in our pipeline will result in binding orders or sales. It is also difficult for us to predict how quickly we will be able to fill binding orders in the event that we obtain multiple orders. In addition, revenue is expected to be recognized in stages, and customers may in some cases delay actual cash payments regardless of progressive billings. Additionally, a customer’s ability to make payments could decline during the sales process, even to the point of insolvency or bankruptcy. As a result, our operating results and cash flow may be materially lower than we expect.

Previous wording

We expect to rely on engineering, procurement, construction, or EPC, firms as third-party general contractors to install energy storage systems at our customers’ sites. We are likely to work with a limited number of such EPC firms, which may impact our ability to facilitate customer installations as planned. Our work with contractors or their sub-contractors may have the effect of our being required to comply with additional rules (including rules unique to our customers), working conditions, site remediation and other union requirements, which can add costs and complexity to an installation project. In the future, the timeliness, thoroughness and quality of installation-related services performed by our general contractors and their sub-contractors may not meet our expectations and standards and it may be difficult to find and train third-party general contractors that meet our standards at a competitive cost.

Current wording

We expect to rely on engineering, procurement, and construction, or EPC, firms as third-party general contractors to install energy storage systems at our own and our customers’ sites. We are likely to work with a limited number of such EPC firms, which may impact our ability to facilitate installations as planned. Our work with contractors or their sub-contractors may have the effect of our being required to comply with additional rules (including rules unique to our customers), working conditions, site remediation and other union requirements, which can add costs and complexity to an installation project. In the future, the timeliness, thoroughness and quality of installation-related services performed by our general contractors and their sub-contractors may not meet our expectations and standards and it may be difficult to find and train third-party general contractors that meet our standards at a competitive cost.

Previous wording

We rely on a limited number of third-party suppliers for some of the components and raw materials such as steel, cement, polymers and, in certain cases, coal ash waste and retired wind turbine blades, and other materials that may be of limited supply for our GESSs and batteries, inverters, enclosures, and transformers for our BESSs. If any of our suppliers fail or are unable to provide sufficient components or raw materials at the level of quality required, or if our suppliers fail or are unable to or unwilling to provide us with the contracted quantities (as we have limited or in some case no alternatives for supply), or if our suppliers cancel the contracted quantities without sufficient lead time to order the materials from another supplier, or if our suppliers fail or are unable to deliver the components or raw materials in a timely manner, then delays, cancellations, penalty payments, or damage to our reputation could occur, which could have a material adverse effect on our business and our results of operations. If we fail to develop or maintain our relationships with any of our suppliers, or if there is otherwise a shortage, lack of availability, or cancellation of the purchase of any required raw materials or components, we may be unable to manufacture our energy storage systems or such products may be available only at a higher cost or after a long delay.

Current wording

We rely on a limited number of third-party suppliers for some of the components and raw materials such as steel, cement, polymers and, in certain cases, coal ash waste and retired wind turbine blades, and other materials that may be of limited supply for our G-Vault products and batteries, inverters, enclosures, and transformers for our BESSs. If any of our suppliers fail or are unable to provide sufficient components or raw materials at the level of quality required, or if our suppliers fail or are unable to or unwilling to provide us with the contracted quantities (as we have limited or in some case no alternatives for supply), or if our suppliers cancel the contracted quantities without sufficient lead time to order the materials from another supplier, or if our suppliers fail or are unable to deliver the components or raw materials in a timely manner, then delays, cancellations, penalty payments, or damage to our reputation could occur, which could have a material adverse effect on our business and our results of operations. If we fail to develop or maintain our relationships with any of our suppliers, or if there is otherwise a shortage, lack of availability, or cancellation of the purchase of any required raw materials or components, we may be unable to manufacture our energy storage systems or such products may be available only at a higher cost or after a long delay.

Previous wording

A primary potential use case for our energy storage systems involves interconnection with electric distribution and transmission facilities owned and operated by regulated utilities, and independent system operators, necessary to deliver the electricity that our energy storage systems produce. A failure or delay in the operation or development of these distribution or transmission facilities could result in a loss of revenues or breach of a contract because such a failure or delay could limit the amount of renewable electricity that our energy storage systems deliver or delay the completion of our customers’ construction projects. In addition, certain of our energy storage systems’ generation may be curtailed without compensation due to distribution and transmission limitations, reducing our revenues and impairing our ability to capitalize fully on a particular customer project’s potential. Such a failure or curtailment at levels above our expectations could adversely affect our business.

Current wording

A primary potential use case for our energy storage systems involves interconnection with electric distribution and transmission facilities owned and operated by regulated utilities, and independent system operators, necessary to deliver the electricity that our energy storage systems produce. A failure or delay in the operation or development of these distribution or transmission facilities could result in a loss of revenues or breach of a contract because such a failure or delay could limit the amount of electricity that our energy storage systems deliver or delay the completion of our construction projects. In addition, certain of our energy storage systems’ generation may be curtailed without compensation due to distribution and transmission limitations, reducing our revenues and impairing our ability to capitalize fully on a particular project’s potential. Such a failure or curtailment at levels above our expectations could adversely affect our business.

Previous wording

Our business is subject to risks relating to construction, cost overruns and delays. The installation and operation of our energy storage systems at a particular site is generally subject to oversight and regulation in accordance with national, state, tribal, and local laws and ordinances relating to building codes, health and safety, environmental protection, FERC and specific Independent System Operators regulation and related matters, and typically requires obtaining and keeping in good standing various local and other governmental approvals and permits, including environmental approvals and permits, that vary by jurisdiction. In some cases, these approvals and permits require periodic renewal. It is difficult and costly to track the requirements of every individual authority having jurisdiction over energy storage system installations, to design our energy storage systems to comply with these varying standards, which may change over time, and for us and our customers to obtain all applicable approvals and permits. We cannot predict whether or when all permits and approvals required for a given project will be granted or whether the conditions associated with the permits and approvals will be achievable. The denial of a permit or approval or utility connection that is essential to a project or the imposition of impractical conditions would impair our or our customer’s ability to develop the project. In addition, we cannot predict whether the permitting and approvals process will be lengthened due to complexities and appeals. Delay in the review and permitting process for a project can impair or delay our or our customers’ abilities to develop that project or increase the cost so substantially that the project is no longer attractive to our customers. Furthermore, unforeseen delays in the review and permitting process could delay the timing of the installation of our energy storage systems and could therefore adversely affect the timing of the recognition of revenue related to hardware acceptance by our customer, which could adversely affect our operating results in a particular period. Delays relating to constructions may also bring about cost overruns, which could further adversely affect our business.

Current wording

Our business is subject to risks relating to construction, cost overruns and delays. The installation and operation of our energy storage systems at a particular site is generally subject to oversight and regulation in accordance with national, state, tribal, and local laws and ordinances relating to building codes, health and safety, environmental protection, Federal Energy Regulatory Commission (“FERC”) and specific Independent System Operators regulation and related matters, and typically requires obtaining and keeping in good standing various local and other governmental approvals and permits, including environmental approvals and permits, that vary by jurisdiction. In some cases, these approvals and permits require periodic renewal. It is difficult and costly to track the requirements of every individual authority having jurisdiction over energy storage system installations, to design our energy storage systems to comply with these varying standards, which may change over time, and for us and our customers to obtain all applicable approvals and permits. We cannot predict whether or when all permits and approvals required for a given project will be granted or whether the conditions associated with the permits and approvals will be achievable. The denial of a permit or approval or utility connection that is essential to a project or the imposition of impractical conditions would impair our or our customer’s ability to develop the project. In addition, we cannot predict whether the permitting and approvals process will be lengthened due to complexities and appeals. Delay in the review and permitting process for a project can impair or delay our or our customers’ abilities to develop that project or increase the cost so substantially that the project is no longer attractive. Furthermore, unforeseen delays in the review and permitting process could delay the timing of the installation of our energy storage systems and could therefore adversely affect the timing of the recognition of revenue related to hardware acceptance by our customer, or our own ability to generate revenue from our owned projects which could adversely affect our operating results in a particular period. Delays relating to constructions may also bring about cost overruns, which could further adversely affect our business.

Previous wording

The size of our GESSs may negatively impact our ability to enter into contracts with customers or obtain government permits and approvals.

Current wording

The size of our G-Vault products may negatively impact our ability to enter into contracts with customers or obtain government permits and approvals.

Previous wording

Our GESSs require a considerably larger space for their deployment than comparable systems based on certain technologies such as lithium-ion technology, and this can result in a significant delay in the permitting process. In addition, the size of our GESSs may represent an impediment for deployment in denser areas or areas with restrictions on the height of buildings. And, in light of the size of our systems, we generally require hard soil or the ability to get to bedrock in order to deploy our systems. These factors may negatively impact our ability to enter into customer contracts or obtain government permits and approvals, each of which may materially affect our business.

Current wording

Our G-Vault products require a considerably larger space for their deployment than comparable systems based on certain technologies such as lithium-ion technology, and this can result in a significant delay in the permitting process. In addition, the size of our G-Vault products may represent an impediment for deployment in denser areas or areas with restrictions on the height of buildings. And, in light of the size of our systems, we generally require hard soil or the ability to get to bedrock in order to deploy our systems. These factors may negatively impact our ability to enter into customer contracts or obtain government permits and approvals, each of which may materially affect our business.

Previous wording

•Our GESSs are based on established principles that are deployed in a novel way to create new technologies to store energy and potential customers may be hesitant to make a significant investment in our technology or abandon the technology they are currently using.

Current wording

Our G-Vault, H-Vault, and B-Nest products are based on established principles that are deployed in a novel way to create new technologies to store energy and potential customers may be hesitant to make a significant investment in our technology or abandon the technology they are currently using.

Previous wording

The design of our GESSs are based on established principles that are deployed in a novel way; the GESSs are intended to provide longer energy storage durations than are provided by other types of energy storage systems. We believe that the continued growth and acceptance of energy storage generally will depend significantly on continued investment by the public and private sectors in the renewable energy industry, the regulatory environment focused on transitioning away from carbon-intensive power generation and the speed of transition towards electric mobility.

Current wording

The design of our G-Vault, H-Vault, and B-Nest products are based on established principles that are deployed in a novel way; the products are intended to provide longer energy storage durations than are provided by other types of energy storage systems.

Previous wording

The adoption of renewable energy may not proceed as quickly as (or at the levels that) we expect and may be influenced by changes in regulatory environments, including incentives, fuel prices, public policy concerns and other factors beyond our control. Additionally, potential customers who previously invested in alternatives to our GESS solution may not deem a transition to our existing or future GESS solutions to be cost-effective. Moreover, given the limited history of our GESS technology, potential customers may be hesitant to make a significant investment in our products. Our business, results of operations, financial condition and prospects could be adversely affected to the extent that customers, for any reason, do not adopt our systems or migrate to our systems from another energy storage technology.

Current wording

Potential customers who previously invested in alternatives to our innovative products may not deem a transition to our existing or future advanced energy storage solutions to be cost-effective. In particular, recently the costs of lithium-ion batteries has declined precipitously making our advanced products less cost efficient in comparison. Moreover, given the limited history of our advanced products, potential customers may be hesitant to make a significant investment in our products. Our business, results of operations, financial condition and prospects could be adversely affected to the extent that customers, for any reason, do not adopt our systems or migrate to our systems from another energy storage technology.

Previous wording

In certain circumstances we expect to enter tolling arrangements in which customers purchase the energy storage and dispatch of electricity from us while we retain an ownership interest in the system. To date, we have entered into one such tolling arrangement in respect to a battery plus green hydrogen hybrid energy storage system.

Current wording

In certain circumstances we enter into tolling arrangements in which customers purchase the energy storage and dispatch of electricity from us while we retain an ownership interest in the system. To date, we have entered into two such tolling arrangements, but we are actively looking at additional opportunities.

Previous wording

Certain market participants, including major institutional investors and capital providers, use third-party benchmarks and scores to assess companies’ ESG profiles in making investment or voting decisions. Unfavorable ESG ratings could lead to increased negative investor sentiment towards us, which could negatively impact our share price as well as our access to and cost of capital. To the extent ESG matters negatively impact our reputation, it may also impede our ability to compete as effectively to attract and retain employees, customers, and/or business partners, which may adversely impact our operations. While many stakeholders expect companies to pursue ESG initiatives, other may seek to reduce companies’ efforts on certain ESG-related matters. Both advocates and opponents to certain ESG matters are increasingly resorting to a range of activism forms, including media campaigns and litigation, to advance their perspectives. In addition, there are also increasing levels of regulation, disclosure-related and otherwise, with respect to ESG matters. We may ultimately be subject to regulations that are not uniform in nature or reflective of shared regulatory goals. Our efforts to respond to varying requirements may not be successful and/or may subject us to additional stakeholder engagement. This and other stakeholder expectations will also likely lead to increased costs as well as scrutiny that could heighten all of the risks identified in this risk factor. Additionally, many of our customers and suppliers may be subject to similar expectations, which may augment or create additional risks, including risks that may not be known to us.

Current wording

Certain market participants, including major institutional investors and capital providers, use third-party benchmarks and scores to assess companies’ ESG profiles in making investment or voting decisions. Unfavorable ESG ratings could lead to increased negative investor sentiment towards us, which could negatively impact our share price as well as our access to and cost of capital. To the extent ESG matters negatively impact our reputation, it may also impede our ability to compete as effectively to attract and retain employees, customers, and/or business partners, which may adversely impact our operations. While many stakeholders expect companies to pursue ESG initiatives, others may seek to reduce companies’ efforts on certain ESG-related matters. Both advocates and opponents to certain ESG matters are increasingly resorting to a range of activism forms, including media campaigns and litigation, to advance their perspectives. In addition, there are also increasing levels of regulation, disclosure-related and otherwise, with respect to ESG matters. We may ultimately be subject to regulations that are not uniform in nature or reflective of shared regulatory goals. Our efforts to respond to varying requirements may not be successful and/or may subject us to additional stakeholder engagement. This and other stakeholder expectations will also likely lead to increased costs as well as scrutiny that could heighten all of the risks identified in this risk factor. Additionally, many of our customers and suppliers may be subject to similar expectations, which may augment or create additional risks, including risks that may not be known to us.

Previous wording

We may acquire additional assets, products, technologies, or businesses that are complementary to its existing business. The process of identifying and consummating acquisitions and the subsequent integration of new assets and businesses into our own business would require attention from management and could result in a diversion of resources from its existing business, which in turn could have an adverse effect on its operations. Acquired assets or businesses may not generate the expected financial results. Acquisitions could also result in the use of cash, potentially dilutive issuances of equity securities, the occurrence of goodwill impairment charges, amortization expenses for other intangible assets and exposure to potential unknown liabilities of the acquired business.

Current wording

We may acquire additional assets, products, technologies, or businesses that are complementary to our existing business. In particular, we are actively seeking new opportunities for our Build-Own-Operate model. The process of identifying and consummating acquisitions and the subsequent integration of new assets and businesses into our own business would require attention from management and could result in a diversion of resources from our existing business, which in turn could have an adverse effect on our operations. Acquired assets or businesses may not generate the expected financial results. Acquisitions could also result in the use of cash, potentially dilutive issuances of equity securities, the occurrence of goodwill impairment charges, amortization expenses for other intangible assets and exposure to potential unknown liabilities of the acquired business.

Previous wording

•greater difficulties in securing or enforcing our intellectual property rights in certain jurisdictions, or greater chance potential infringement of third-party intellectual property rights in new jurisdictions;

Current wording

•greater difficulties in securing or enforcing our IP rights in certain jurisdictions, or greater chance of potential infringement of third-party IP rights in new jurisdictions;

Previous wording

•changes in import tariffs imposed by local governments;

Current wording

•changes in tariffs and import/export regulations imposed by local governments;

Previous wording

Our future growth is dependent upon the pace and depth of renewable energy adoption and energy storage technologies, which are emerging industries, as well as our competition. If the markets for renewable energy and energy storage do not develop as we expect, or if they develop more slowly than we expect, our business, prospects, financial condition and operating results could be adversely affected.

Current wording

Our future growth is dependent upon the pace and depth of energy storage technologies, which are emerging industries, as well as our competition. If the markets for energy storage do not develop as we expect, or if they develop more slowly than we expect, our business, prospects, financial condition and operating results could be adversely affected.

Previous wording

Our future growth depends upon factors in our industry, including with respect to our competition, the speed at which the market adopts renewable energy, our ability to penetrate such market and the state of energy storage technologies. Because renewable energy and energy storage are emerging industries, they are evolving and characterized by rapidly changing technologies, changing government regulation and industry standards and changing consumer demands and behaviors. If the markets for these do not develop as we expect, including if they develop more slowly than we expect, demand for our energy storage systems or any digital platform that we may develop, our business, prospects, financial condition and operating results could be adversely affected.

Current wording

Our future growth depends upon factors in our industry, including with respect to our competition, the speed at which the market adopts energy storage for grid reliability, our ability to penetrate such market and the state of energy storage technologies. Because energy storage is an emerging industry, it is evolving and characterized by rapidly changing technologies, changing government regulation and industry standards, and changing consumer demands and behaviors. If this market does not develop as we expect, including if it develops more slowly than we expect, demand for our energy storage systems or any digital platform that we may develop, our business, prospects, financial condition and operating results could be adversely affected.

Previous wording

We intend to continue committing significant resources to establish a competitive position. There is no assurance we will successfully identify the right partners or produce and bring our energy storage systems and a digital platform to market on a timely basis, if at all, or that products and technologies developed by others will not render our energy storage systems and any digital platform that we may develop obsolete or noncompetitive, any of which would adversely affect our business, prospects and operating results.

Current wording

We intend to continue committing significant resources to establish a competitive position. There is no assurance we will successfully identify the right partners, or that products and technologies developed by others will not render our energy storage systems and any digital platform that we may develop obsolete or noncompetitive, any of which would adversely affect our business, prospects and operating results.

Previous wording

We believe that our success and our ability to reach our strategic objectives are highly dependent on the contributions of our key management, technical, engineering and sales personnel. The loss of the services of any of our key employees could disrupt our operations, delay the development and introduction of our products and services, including with respect to our prototype products, and negatively impact our business, prospects and operating results. In particular, we are highly dependent on the services of Robert Piconi, our Chief Executive Officer, Marco Terruzzin, our Chief Product Officer, and Andrea Pedretti, our Chief Technology Officer. None of our key employees is bound by an employment agreement for any specific term. We cannot assure you that we will be able to successfully attract and retain senior leadership necessary to grow our business. Furthermore, there is increasing competition for talented individuals in our field, and competition for qualified personnel is especially intense in the renewable energy and energy storage industry in the U.S., Australia, and Switzerland, where our offices are located. Our failure to attract and retain our executive officers and other key technology, sales, marketing and support personnel, could adversely impact our business, prospects, financial condition, and operating results.

Current wording

We believe that our success and our ability to reach our strategic objectives are highly dependent on the contributions of our key management, technical, engineering and sales personnel. The loss of the services of any of our key employees could disrupt our operations, delay the development and introduction of our products and services, including with respect to our prototype products, and negatively impact our business, prospects and operating results. In particular, we are highly dependent on the services of Robert Piconi, our Chief Executive Officer. None of our key employees is bound by an employment agreement for any specific term. We cannot assure you that we will be able to successfully attract and retain senior leadership necessary to grow our business. Furthermore, there is increasing competition for talented individuals in our field, and competition for qualified personnel is especially intense in the renewable energy and energy storage industry in the U.S., Australia, and Switzerland, where our offices are located. Our failure to attract and retain our executive officers and other key technology, sales, marketing and support personnel, could adversely impact our business, prospects, financial condition, and operating results.

Previous wording

As of December 31, 2023, we employed 179 full-time employees and 4 part-time employees, none of whom are represented by unions, except that one employee is covered by a collective bargaining agreement. If a union sought to organize any of our other employees, such organizing efforts or collective bargaining negotiations could potentially lead to work stoppages and/or slowdowns or strikes by certain of our employees. Additionally, the EPC firms that we rely upon to install our energy storage systems may have employees represented by unions or collective bargaining agreements. Any work stoppages and/or slowdowns by certain of our employees or certain employees at the EPC firms we contract with, could adversely affect our ability to serve our customers.

Current wording

As of December 31, 2024, we employed 158 full-time employees and 5 part-time employees, none of whom are represented by unions or collective bargaining agreements. If a union sought to organize any of our other employees, such organizing efforts or collective bargaining negotiations could potentially lead to work stoppages and/or slowdowns or strikes by certain of our employees. Additionally, the EPC firms that we rely upon to install our energy storage systems may have employees represented by unions or collective bargaining agreements. Any work stoppages and/or slowdowns by certain of our employees or certain employees at the EPC firms we contract with, could adversely affect our ability to serve our customers.

Previous wording

A significant downturn in the domestic or global economy may cause our customers to pause, delay, or cancel spending on our offerings or seek to lower their costs by exploring alternatives. To the extent purchases of our offerings are perceived by customers and potential customers as discretionary, our revenue may be disproportionately affected by delays or reductions in energy storage spending. Also, competitors may respond to challenging market conditions by lowering prices and attempting to lure away our customers.

Current wording

A significant downturn in the domestic or global economy may cause our customers to pause, delay, or cancel spending on our offerings or seek to lower their costs by exploring alternatives. Reductions in energy demand due to economic downturns or increased interest rates can make projects in which we invest to be less profitable than our expectations, if at all. To the extent purchases of our offerings are perceived by customers and potential customers as discretionary, our revenue may be disproportionately affected by delays or reductions in energy storage spending. Also, competitors may respond to challenging market conditions by lowering prices and attempting to lure away our customers.

Previous wording

The productivity of our or our customers’ facilities, the operation of our supply chain, the demand, performance and availability of our products, our services, our systems and our business in general may be affected by factors outside of our control, which could result in harm to our business and financial results.

Current wording

The productivity of our facilities or our customers’ facilities, the operation of our supply chain, the demand, performance and availability of our products, our services, our systems and our business in general may be affected by factors outside of our control, which could result in harm to our business and financial results.

Previous wording

The productivity of our or our customers’ facilities, the operation of our supply chain, the demand, performance and availability of our products, our services, our systems and our business in general could be adversely affected by events outside of our control, such as natural catastrophic events, geographical instability, wars, and other calamities. We cannot assure you that, collectively, our process and procedures to recover from a disaster or catastrophe will be adequate to protect us from the effects of fire, floods, typhoons, earthquakes, power loss, telecommunications failures, cyberattacks and other information security incidents, break-ins, war, riots, terrorist attacks, pandemics, or similar events outside of our control, certain of which may become more frequent or intense as a result of climate change. For more information, see our risk factor titled “We are subject to a series of risks related to climate change.”. The severity of such factors and frequency at which they occur are also outside our control. If such factors occur our business, financial condition and results of operations, including revenues, could be materially adversely affected.

Current wording

The productivity of our facilities or our customers’ facilities, the operation of our supply chain, the demand, performance and availability of our products, our services, our systems and our business in general could be adversely affected by events outside of our control, such as natural catastrophic events, geographical instability, wars, and other calamities. We cannot assure you that, collectively, our process and procedures to recover from a disaster or catastrophe will be adequate to protect us from the effects of fire, floods, typhoons, earthquakes, power loss, telecommunications failures, cyberattacks and other information security incidents, break-ins, war, riots, terrorist attacks, pandemics, or similar events outside of our control, certain of which may become more frequent or intense as a result of climate change. The severity of such factors and frequency at which they occur are also outside our control. If such factors occur our business, financial condition and results of operations, including revenues, could be materially adversely affected.

Showing the first 40 of 82 pairs. Open the source sections for the rest.

Rearranged current paragraphs (1)

Current report — wording carried from elsewhere

The Company may retain future earnings, if any, for future operations and expansion and has no current plans to pay any cash dividends for the foreseeable future. Any decision to declare and pay dividends will be made at the discretion of the