What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-K
Period ended 2023-12-31; filed 2024-03-13.
0001828536-24-000035
Item 7. Management's Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-K
Period ended 2024-12-31; filed 2025-04-01.
0001828536-25-000032
Item 7. Management's Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 168 previous paragraphs and 185 current paragraphs.
72 unchanged; 29 reworded; 83 added; 67 removed; 0 previous and 1 current paragraphs rearranged.
Tables are not compared: 10 previous and 11 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (83)
Current report
Energy Vault provides a diverse technology portfolio of turnkey energy storage platforms, including proprietary gravity, battery, and green hydrogen energy storage hardware technologies, supported by our technology-agnostic energy management system software and integration platform. In 2024, we began a multi-year transition from providing this technology portfolio solely to third parties through a build-and-transfer model or licensing model, to also taking an ownership interest in energy storage assets in select attractive markets. We believe that our experience in the build-and-transfer business, combined with our proprietary energy storage technologies and geographical footprint, uniquely positions us to build and operate storage projects with superior efficiency and reliability.
Current report
Development and Deployment Plan for Third-Party Sales of Energy Storage Products
Current report
The utility-scale energy storage industry is increasing at a rapid pace, driven by increased demand for electricity, global transitions toward renewable energy, and increased focus on grid resilience.
Current report
According to a report from the U.S. Department of Energy in December 2024, electricity demand is forecasted to grow substantially in the United States over the next few decades. Electricity demand is expected to be driven primarily by new data centers, artificial intelligence, new manufacturing facilities, electric vehicles, and sector-wide electrification. Electricity demand for data centers alone is expected to grow at a 13% to 27% compound annual growth rate through 2028.
Current report
Additionally, software solutions play a vital role in assisting energy storage owners in managing the growing complexities of renewable energy and energy storage markets. As renewable and energy storage asset portfolios expand globally, these stakeholders will need software solutions that enhance asset performance and boost revenue while reducing total ownership costs.
Current report
Each of our owned installations or our customer installations must be designed, constructed, and operated in compliance with applicable federal, state and local regulations, codes, standards, guidelines, policies, and laws. To install and operate energy storage systems on its platform, we, our customers or our partners, as applicable, are required to obtain applicable permits and approvals from local authorities having jurisdiction to install energy storage systems and to interconnect the systems with the local electrical utility.
Current report
U.S. Energy Storage Regulation and Legislation
Current report
The U.S. Congress is continuously reviewing and passing various climate change proposals, incentives, regulations, and legislation that may support the energy storage industry, including in the form of tax credits and incentives. The implementation of these laws can vary greatly across administrations and take long periods of time before the full extent of regulations are adopted. We cannot guarantee we will realize any or all of the anticipated benefits or incentives under any such enacted regulations or legislation, including the IRA. IRS private letter ruling 201809003 clarified that energy storage is eligible for federal tax credits if charged primarily by qualifying renewable resources.
Current report
The IRA adopted in August 2022 contains a number of tax incentive provisions that directly support the adoption of energy storage solutions and services. Before the enactment of the IRA, the Section 48 ITC did not apply to standalone energy storage projects. The IRA added Section 48(a)(3)(A)(ix) to allow a taxpayer that placed in service a standalone energy storage technology with a minimum capacity of 5 kWh to claim the ITC, if certain requirements are met. Energy storage technology that is placed in service after December 31, 2022 and started construction for U.S. federal income tax purposes prior to January 1, 2025, may claim the ITC under Section 48(a). To qualify for the full ITC rate of 30%, an energy storage project will need to satisfy certain labor requirements relating to the payment of prevailing wages and use of apprentices, or have started construction for U.S. federal income tax purposes prior to January 29, 2023. If these requirements are not met, the project may be eligible only for a base rate of 6%. The existing energy ITC will be replaced by a CEITC or “tech neutral” regime, which is available for any investment in a qualified storage facility that is placed in service after calendar year 2024 (certain labor requirements will still apply). The IRA also included bonus credits associated with the ITC, which may be relevant to our business. There is a 10% bonus credit for projects located in certain areas designated as energy communities, an additional 10% bonus credit for projects utilizing products which collectively meet certain minimum domestic content requirements, and a 10% or 20% bonus credit for certain projects less than 5 MW located in a low-income community or that serve low-income community members. Finally, the IRA included a manufacturing production tax credit for specific renewable energy and battery storage related products and components manufactured in the U.S.
Current report
We believe we may be positioned to benefit from the bonus credits related to the energy storage systems we intend to own and operate and will stimulate demand for our customers to invest in more energy storage systems. To date, the IRA regulations, proposed regulations and/or guidance issued by the U.S. Department of Treasury and Internal Revenue Service associated with these various tax credits, including but not limited to the ITC, domestic content bonus credit, energy community bonus credit, and manufacturing production tax credit have provided some substantive clarity. However, we are continuing to seek additional clarity on certain aspects of IRA guidance and/or regulation via updated guidance and future proposed and/or final regulations. The potential impact from the change in the U.S. presidential administration to any existing regulations, including any potential ramifications for the IRA and the various tax incentive provisions as well as other government and tax incentives for clean energy and energy storage in the United States, is uncertain at this stage. Some of the guidance and rulemaking enacted under the Biden Administration could be changed or modified by the Trump Administration, creating uncertainty with respect to implementation of the IRA. It remains uncertain whether Congress will modify or repeal the IRA in connection with the budget reconciliation process or otherwise. Accordingly, no assurance can be given that our projects will be eligible for tax credits or other benefits under the IRA.
Current report
Finally, recent U.S. tariff policy changes may impact our business and results of operations. The Section 301 tariff rate on lithium-ion non-EV batteries imported from China has been amended several times since the beginning of 2025 and may continue to change. These changes specifically target "batteries" as defined by U.S. Customs and Border Protection, encompassing the cubes, modules, and certain types of cells. The tariff rate on battery "parts"–including separators, electrolytes, cans, and electrodes is expected to remain at its current 25% level.
Current report
There is currently much uncertainty relating to potential changes to U.S. tariff policy. In particular, the U.S. government’s recent imposition on tariffs on all imported steel may increase our costs. Changes to U.S. tariff policy may adversely impact our supply chain as well as our supply chain strategies detailed herein, both domestically and internationally, which may then have an adverse impact on our results of operations and business.
Current report
In June 2024, the Company executed an engineer, procure, and construct contract with a customer to build a 200 MW/400 MWh BESS in Australia. Additionally, the Company signed a maintenance agreement with this customer to provide long-term maintenance services on the BESS after construction is completed for a 20-year period.
Current report
In June 2024, the Company implemented a series of cost savings measures, expected to result in realized cost savings of $6.0 million to $8.0 million annually. During the year ended December 31, 2024, the Company recognized reorganization costs of $1.6 million, consisting of personnel reduction costs related to these cost saving measures.
Current report
On September 13, 2024, the Company was notified by the NYSE that it was not in compliance with Section 802.01C of the NYSE Listed Company Manual because the average closing price of the Company’s Common Stock was less than $1.00 over a consecutive 30 trading-day period. The notice did not result in the immediate delisting of the Company’s Common Stock from the NYSE. On November 1, 2024, the Company received written notice from the NYSE informing the Company that it had regained compliance with the bid price rule as of October 31, 2024.
Current report
In October 2024 the Company executed a 10-year offtake agreement with a customer for the Cross Trails BESS that is expected to commence in June 2025. The offtake agreement includes both fixed and variable price components. The aggregate expected remaining future revenue from this contract, including variable fees that the Company believes is probable, is $57.0 million. The variable revenues are forecasted by an independent third-party firm using simulation software that factors in current and projected energy market dynamics, historical and forecasted volatility, and location specific data. The Company considers the low-end simulation results to be probable.
Current report
Between October 2024 and March 2025, the Company agreed to loan Stoney Creek BESS Pty Ltd (“Stoney Creek”) up to AUD 8.8 million (or $5.5 million) to assist them in paying for BESS project development related costs. The Company also agreed to provide Stoney Creek a bank guarantee of up to AUD 2.5 million (or $1.6 million) as security for a performance bond. On March 17, 2025, the Company entered into a share purchase agreement to acquire Stoney Creek for a nominal purchase price of one hundred Australian dollars. The closing of the acquisition is subject to regulatory review and approval in Australia. Upon closing of the acquisition, the carrying value of the note receivable is expected to be incorporated as part of the total consideration. As of the filing date of this Annual Report, the Company has loaned Stoney Creek AUD 1.4 million (or $0.9 million).
Current report
In October, the Company executed a 100 MW/200 MWh EEQ contract to supply B-Vaults to a customer in Texas. The B-Vaults in this contract were delivered to the customer in December 2024. In December 2024, the Company executed an engineer, procure, and construct contract with a customer to build a 100 MW/200 MWh BESS in Australia. Also in December 2024, the Company executed two EEQ contracts for a combined 366.5 MWhs with a large northeastern public utility in the U.S to supply them with B-Vaults.
Current report
The following tables present our key operating metrics for the periods presented (amounts in thousands unless otherwise noted):
Current report
(1)Developed pipeline is a new key operating metric that the Company began tracking during the second quarter of 2024, therefore prior period comparable figures have not been included.
Current report
(2)The Company changed its definition of backlog during the second quarter of 2024, therefore the Company has presented the comparable amounts as of December 31, 2023 per the new definition.
Current report
(3) As of March 17, 2025, the Company maintains a backlog of $660.0 million and a developed pipeline of $2.1 billion associated with additional business booked subsequent to December 31, 2024, net of any adverse impact associated with prevailing equipment costs (namely from lithium-ion battery prices and changes in foreign currency exchange rates for non-U.S. dollar denominated business).
Current report
Net bookings represent the total aggregate contract value and total MWhs to be delivered from customer contracts signed during the period (i.e., gross bookings), net of the total aggregate value and total MWhs of contracts that were cancelled during the period. The aggregate contract value includes any potential future variable payments from tolling and offtake arrangements that the Company believes are probable of being realized. Probable future variable payments are forecasted by an independent third-party firm using simulation software that factors in current and projected energy market dynamics, historical and forecasted volatility, and location specific data. The Company considers the low-end simulation results to be probable. Potential future IP royalties are not included in bookings. Due to the long-term nature of our contracts, bookings are a key metric that allows us to understand and evaluate the growth of our Company and our estimated future revenue related to our customer contracts.
Current report
Developed Pipeline
Current report
Developed pipeline represents uncontracted potential revenue from third-party projects where potential prospective customers have either awarded the Company a project or shortlisted the Company for consideration. It also includes potential tolling revenue from projects where the Company is in advanced negotiations to build, own, and operate energy storage systems. Developed pipeline is an internal management metric that we construct using information from our global sales team and is monitored by management to understand the potential anticipated growth of our Company and to estimate potential future revenue. Developed pipeline is influenced by the prevailing foreign exchange rates and equipment prices and may vary from period to period if these inputs change.
Current report
Developed pipeline may not generate margins equal to our historical operating results. We have only recently begun to track our developed pipeline on a consistent basis as a performance measure, and as a result, we do not have significant experience in determining the level of realization that we may achieve on these potential contracts. Our customers may experience project delays or cancel orders as a result of external market factors and economic or other factors beyond our control.
Current report
We cannot guarantee that our backlog will result in actual revenue in the originally anticipated period, or at all. Our customers may experience project delays or cancel orders as a result of external market factors and economic or other factors beyond our control. If our backlog fails to result in revenue as anticipated or in a timely manner, we could experience a reduction in revenue, profitability, and liquidity.
Current report
The Company sells its BESSs under (i) an EPC model and (ii) an EEQ model. When the Company sells a BESS under the EPC model, the Company recognizes revenue over time as we transfer control of our product to the customer. Under an EEQ model, the Company recognizes revenue related to equipment sales upon delivery to the customer and service revenue over time as we provide specialized technical services to the customer.
Current report
Provision for Credit Losses
Current report
Provision for credit losses represents the expense recognized to account for potential losses on accounts receivable, contract assets, and customer financing receivable due to customer defaults or credit deterioration. This provision reflects management’s estimate of expected credit losses based on historical trends and forward-looking assessments.
Current report
Loss on Impairment and Sale of Long-Lived Assets
Current report
Asset impairment and loss on sale of assets consists of losses associated with the write-down or sale of property and equipment.
Current report
Impairment of Equity Securities
Current report
Impairment of equity securities relates to impairment of the Company’s investment in KORE Power, Inc. (“KORE”).
Current report
(1) For the year ended December 31, 2023, $0.4 million in revenue from the sale of spare energy system parts has been reclassified from “other” to “sale of energy storage products.”
Current report
Revenue for the year ended December 31, 2024 decreased by $295.3 million to $46.2 million compared to $341.5 million for the year ended December 31, 2023.
Current report
The decrease in revenue was primarily driven by a decrease in sales of energy storage products, resulting from a reduction in active BESS projects. In 2023, the Company had three active BESS EPC projects that made substantial progress throughout the year. However, in 2024, no BESS EPC projects experienced significant progress. During 2024, the Company completed the delivery of equipment for a single BESS EEQ project.
Current report
In 2024, revenue from operation and maintenance services, as well as software licensing, were new revenue streams for the Company. Revenue from two customers accounted for 75% and 19%, respectively, of the Company’s total revenue for the year ended December 31, 2024.
Current report
Cost of revenue decreased due to the reduction in active BESS projects.
Current report
Gross profit decreased for the year ended December 31, 2024 compared to the year ended December 31, 2023 primarily due to a decrease in revenue. However, gross profit margin increased over the same period, driven by higher margins on energy storage product sales and the introduction of higher-margin operation and maintenance services and software licensing. The improvements in margins on energy storage product sales was attributable to the Company’s active BESS EPC projects reaching their final stages in 2024, as opposed to earlier stages in 2023, as well as the Company achieving a higher margin on the EEQ contract in 2024 compared to the margins realized on EPC contracts in the prior year.
Showing the first 40 of 83 passages. Open the source sections for the rest.
Removed paragraphs (67)
Previous report
Energy Vault develops and deploys utility-scale energy storage solutions designed to aid in the global transition to a clean energy future.
Previous report
Our solutions are designed to address the intermittency issues inherent in the predominant sources of renewable energy production by storing energy produced when renewable energy production is active. Once energy is stored in our solutions, it can be discharged to the grid in a controlled and reliable manner at any time, regardless of the then current ability of the renewable sources to generate power. Our energy storage solutions are designed to accommodate a wide variety of renewable power sources and to achieve an attractive levelized cost of energy relative to fossil fuels. Collectively, these abilities greatly broaden the use cases and time duration scenarios that can be addressed by certain sources of renewable power.
Previous report
Product Development and Deployment Plan
Previous report
We leverage our sustainable and differentiated technologies to provide our customers with economical solutions to meet their short, long, and extended-duration renewable energy storage needs. Our energy storage solutions are designed to accommodate a wide variety of renewable power sources and to achieve an attractive levelized cost of energy relative to fossil fuels.
Previous report
We anticipate that our market will be characterized by high growth and rapidly evolving use cases and requirements. We believe that the majority of our competitors are primarily focused on the development and marketing of vertically siloed solutions based on a singular energy storage technology. Alternatively, we have strategically chosen to design an agile and agnostic software platform that can orchestrate the management of not just one energy storage technology, but rather one or more of our diverse storage mediums and the underlying power generation assets to harmonize asset operation and drive competitive operational performance. We expect that this will broaden the use cases and time duration scenarios that can be addressed by certain sources of renewable power, and thereby drive a faster transition to more widespread utilization of renewable power.
Previous report
Our range of energy storage solutions assures our customers have what they need today, as well as what they will need in the future, thereby protecting their investments in our products within this high-growth market and its rapidly evolving use cases and requirements. For these reasons, we believe we are well positioned to compete successfully in the evolving market for energy storage solutions.
Previous report
We believe climate change poses a monumental risk to humanity and decreasing human generated GHG emissions is currently among the world’s most pressing challenges. Carbon dioxide is the primary GHG emitted through human activities and, according to the International Energy Agency, the energy sector is estimated to account for more than 75% of global human generated GHG emissions. Burning fossil fuels contributes to climate change by releasing carbon dioxide and nitrous oxide into the atmosphere.
Previous report
According to the 2H 2023 Energy Storage Market Outlook published by BloombergNEF in October 2023, the energy storage market is expected to grow at a “27% compound annual growth rate through 2030, with annual additions reaching 110 GW/372 GWh, or 2.6 times expected 2023 gigawatt installations.” Both government mandates and companies focused on reducing energy use, cost, and emissions are expected to propel the shift to renewable sources of power..
Previous report
Our business depends on the acceptance of our energy storage products in the marketplace. Even if renewable energy and energy storage become more widely adopted than they have been to date, potential customers may choose energy storage products from our competitors.
Previous report
Governments in countries throughout the world have announced and implemented various policies, regulations, and legislation to support the transition from fossil fuels to low-carbon form of energy, including through the use of energy storage solutions. For example, in August 2022, the United States Congress passed the IRA. The IRA provides incentives for the domestic manufacturing of key components of energy storage solutions as well as the construction of standalone energy storage projects. The resulting improved economics are expected to reduce the cost to implement storage within the domestic market and may amplify and accelerate the adoption of energy storage systems for short, long, and extended duration use cases, like those offered by Energy Vault. Such government policies and programs are becoming increasingly instrumental in stimulating adoption of energy storage solutions across different markets through a variety of methods, including by providing financial support, facilitating grid integration, and supporting research and development.
Previous report
Business Combination and Public Company Costs
Previous report
On February 11, 2022, Legacy Energy Vault completed the Merger. Immediately following the completion of the Merger, Novus changed its name to Energy Vault Holdings, Inc. On February 14, 2022, Energy Vault’s common stock and warrants began trading on the New York Stock Exchange under the symbols “NRGV” and “NRGV WS,” respectively.
Previous report
The Merger was accounted for as a reverse recapitalization in accordance with United States Generally Accepted Accounting Principles (“GAAP”). Under this method of accounting, Novus was treated as the “acquired” company for financial reporting purposes. Accordingly, for accounting purposes, the financial statements of the combined entity upon consumption of the Merger represented a continuation of the financial statements of Legacy Energy Vault with the Merger being treated as the equivalent of Legacy Energy Vault issuing stock for the net assets of Novus, accompanied by a recapitalization. The net assets of Novus are stated at historical cost, with no goodwill or other intangible assets recorded. Operations prior to the Merger are presented as those of Legacy Energy Vault in future reports of the combined entity. All periods prior to the Merger have been retroactively adjusted using the exchange ratio of 6.7735 (the “Exchange Ratio”) for the equivalent number of shares outstanding immediately after the Merger to effect the reverse recapitalization.
Previous report
Energy Vault raised gross proceeds of $235.9 million, including the contribution of $40.9 million of cash, net of redemptions, held in Novus’ trust account from its initial public offering and an aggregate purchase price of $195.0 million from the sale and issuance of shares of common stock in a private placement (“Private Investment in Public Equity” or “PIPE”) at $10.00 per share. Energy Vault and Novus paid $44.8 million in transaction costs, resulting in total net cash proceeds to Energy Vault from the Merger and PIPE of $191.1 million. See Note 1 and Note 3, in Part II, Item 8. “Financial Statements and Supplementary Data” for additional information about the Merger.
Previous report
In May 2023, the Company signed a technology license option agreement with a company affiliated with a member of Energy Vault’s Board. The agreement permits the customer to exercise options to enter into licensing agreements in certain territories to use the Company’s gravity storage technology for a fee of $0.5 million. The customer exercised its option for one of the territories on June 30, 2023 and paid Energy Vault an additional $0.5 million. The Company recognized $0.7 million in revenue related to the option and licensing arrangements during the year ended December 31, 2023.
Previous report
In October 2023, the Company entered into a contract with a customer to construct a 400 MWh BESS in Texas. The Company did not recognize any revenue from this contract in 2023 and expects to begin recognizing revenue from this contract in the second half of 2024.
Previous report
In December 2023, the Company signed a license and royalty agreement that allows the customer to use the Company’s gravity energy storage technology and VaultOS EMS in South Africa. The customer obtained a 10-year exclusive license and a $20.0 million licensing fee is payable annually in installments over 10 years. Royalties of 5.0% will be applied to all gross revenue streams in South Africa. The Company did not recognize any revenue from this contract in 2023 and expects to begin recognizing revenue from this contract in the first half of 2024.
Previous report
Bookings represents the total MWhs to be delivered and the aggregate contracted value for energy storage systems, tolling arrangements, and intellectual property license agreements, and software service agreements signed during the period. The aggregate contracted value excludes any potential future variable payments or royalties.
Previous report
The following table presents bookings for the periods indicated ($ in thousands):
Previous report
Backlog represents the amount of revenue we expect to realize in the future on uncompleted construction contracts, including new contracts under which work has not yet begun, as well as the remaining revenue to be recognized under the Company’s intellectual property licensing agreements. As of December 31, 2023, backlog totaled$144.2 million.
Previous report
The Company generally expects to recognize approximately 16.0% of the backlog as revenue over the next 12 months and the remainder more than 12 months from December 31, 2023. Timing of revenue for construction and installation projects included in our backlog can be subject to change as a result of customer, regulatory, or other delays or cancellations including from economic or other conditions caused by supply chain disruptions, inflation, weather, and/or other project-related factors. These effects, among others, could cause estimated revenue to be realized in periods later than originally expected, or not at all. Customers may postpone or cancel construction projects due to changes in our customer’s spending plans, market volatility, changes in government permitting, regulatory delays, and/or other factors. There can be no assurance as to our customer’s requirements or if actual results will be consistent with our estimates. As a result, our backlog as of any particular date is an uncertain indicator of future revenue and earnings.
Previous report
The following discussion describes certain line items in our Consolidated Statements of Operations and Comprehensive Loss.
Previous report
Asset Impairment
Previous report
Energy Vault began building a prototype of the EV1 in March 2020, resulting in the EV1 CDU, which was connected to the Swiss national grid in July 2020. Thereafter, through design improvements and refinements of its technology, Energy Vault announced the new EVx platform in 2021 and the Company dismantled the EV1 CDU in September 2022. The Company has recognized various impairments related to the EV1 CDU when components have been damaged or become obsolete.
Previous report
Change in Fair Value of Warrant Liability
Previous report
The Company’s Private Warrants are subject to fair value remeasurement at each balance sheet date. Prior to the redemption of all outstanding Public Warrants on August 1, 2022, the Company’s Public Warrants were subject to fair value remeasurement.
Previous report
Transaction Costs
Previous report
Transaction costs consist of legal, accounting, banking fees, and other costs directly related to the consummation of the Merger and the PIPE.
Previous report
Revenue for the year ended December 31, 2023 increased by$195.7 million to $341.5 million comp ared to$145.9 million for the year ended December 31, 2022.
Previous report
Revenue for the year ended December 31, 2023 primarily consisted of$339.9 million attributable to the building and transferring of energy storage products. This revenue related to the Company’s physical advancement on its BESS projects during the year. Revenue from three customers accounted for 64%, 22%, and 13% respectively, of the Company’s total revenue for the year ended December 31, 2023.
Previous report
Revenue for the year ended December 31, 2022 primarily consisted of$85.6 million attributable to the building and transferring of energy storage products and $58.5 million attributable to licensing the Company’s EVx intellectual property. Revenue from the building and transferring of energy storage products was attributable to the Company’s physical advancement on its BESS projects during the year. Revenue from two customers accounted for 57% and 35%, respectively, of the Company’s total revenue for the year ended December 31, 2022.
Previous report
Cost of revenue for the years ended December 31, 2023 and 2022 primarily consisted of construction costs associated with the sale of the Company’s BESSs. The increase in cost of revenue for the year ended December 31, 2023 compared to the year ended December 31, 2022 was primarily due to the increase in revenue from the sale and transfer of energy storage products.
Previous report
Gross profit was$59.3 million and gross profit margin was 40.6% for the year ended December 31, 2022. Gross profit during 2022 was primarily attributable to the Company’s intellectual property licensing revenue, which did not have any associated cost of revenue.
Previous report
S&M Expenses
Previous report
S&M expenses increased by $5.6 million to $18.2 million for the year ended December 31, 2023, compared to $12.6 million for the year ended December 31, 2022. The increase was primarily attributable to an increase in personnel-related expenses of $4.7 million and an increase in consulting costs of $0.7 million. The increase in personnel costs was due to expanded headcount and increased stock-based compensation expense. Stock-based compensation expense was $7.1 million for the year ended December 31, 2023, compared to $5.1 million for the year ended December 31, 2022.
Previous report
R&D Expenses
Previous report
G&A Expenses
Previous report
G&A expenses increased by $11.4 million to $68.1 million for the year ended December 31, 2023, compared to $56.6 million for the year ended December 31, 2022. The increase was primarily attributable to a $9.8 million increase in personnel-related expenses, a $1.4 million increase in software and IT costs, a $1.1 million increase in insurance costs, and a $0.6 million increase in consulting costs. The increase in personnel costs was due to expanded headcount and an increase in stock-based compensation expense. Stock-based compensation expense was $25.9 million for the year ended December 31, 2023, compared to $21.2 million for the year ended December 31, 2022. These cost increases were partially offset by a $1.4 million decrease in legal and professional fees.
Previous report
Depreciation and amortization expense decreased by $6.9 million to $0.9 million for theyear ended December 31, 2023, compared to $7.7 million for the year ended December 31, 2022. The decrease was primarily due to the EV1 CDU being decommissioned in 2022, resulting in the asset being fully depreciated during 2022.
Previous report
Asset Impairment
Showing the first 40 of 67 passages. Open the source sections for the rest.
Reworded paragraphs (29)
Previous wording
Our Company’s comprehensive offerings include proprietary gravity, battery, and green hydrogen energy storage solutions, supported by our technology-agnostic energy management software solutions. We incorporate a customer-centric, solutions-based approach toward helping utilities, independent power producers, and large industrial energy users reduce their energy costs while maintaining power reliability. As the world transitions to an economy powered by increasingly intermittent renewable energy such as solar and wind, the ability to provide clean and affordable electricity to a growing global population will depend heavily on the ability to store and distribute energy at appropriate times. We are striving to create a world powered by renewable resources so that everyone will have access to clean, sustainable, and affordable energy.
Current wording
We incorporate a customer-centric, solutions-based approach toward helping utilities, independent power producers (“IPP”), and large industrial energy users reduce their energy costs while maintaining power reliability. As the global demand for electricity increases and the world transitions to an economy powered by increasingly intermittent renewable energy such as solar and wind, the ability to provide clean, reliable, and affordable electricity to a growing global population will depend heavily on the ability to store and distribute energy at appropriate times. We are striving to create a world powered by renewable resources so that everyone will have access to clean, reliable, sustainable, and affordable energy.
Previous wording
We primarily rely on two models for project delivery, which are (i) EPC delivery and (ii) EEQ delivery. Under the EPC model, we generally rely on third-party EPC firms to construct our storage systems, under our supervision with dedicated teams tasked with project management. Under the EEQ model, we are responsible for the delivery and installation of the equipment we provide, as well as resolving issues within our scope of supply.
Current wording
We primarily rely on two models for project delivery, which are (i) EPC delivery and (ii) EEQ delivery. Under the EPC model, we generally rely on third-party EPC firms to construct our storage systems, under our supervision with dedicated teams tasked with project management. Under the EEQ model, we are responsible for the delivery of the equipment we provide, as well as resolving issues within our scope of supply.
Previous wording
Our cost projections are heavily dependent upon raw materials (such as steel), equipment (such as motors, batteries, inverters, and power electronic devices) and technical and construction service providers (such as engineering, procurement, construction firms). The global supply chain, on which Energy Vault relies, has been significantly impacted by (i) the COVID-19 pandemic, (ii) economic uncertainties, including the war in Ukraine and the conflict in the Middle East, and (iii) high inflation pressure on project budgeting resulting in potential significant delays and cost fluctuations, particularly with respect to microchips and many other raw materials that are within the motor and power electronic supply chains. These future timing and financial developments may impact Energy Vault’s performance from both a deployment and cost perspective.
Current wording
Our cost projections are heavily dependent upon raw materials (such as steel), equipment (such as motors, batteries, inverters, and power electronic devices), and technical and construction service providers (such as engineering, procurement, construction firms).
Previous wording
Renewable energy sources present environmental advantages over fossil fuels in terms of finite natural resource usage and GHG emission profile. A major obstacle to transitioning to renewable sources of energy such as wind and solar is the intermittent availability of these types of energy sources. Energy storage solutions are needed to balance the production intermittency of variable renewable energy to support a clean-energy future and a balanced electrical grid infrastructure.
Current wording
Over the past decade, deployment of renewable energy resources has accelerated and there has been an industry-wide push for decarbonization, which is increasing the demand for grid-scale energy storage. A major obstacle to transitioning to renewable sources of energy such as wind and solar is the intermittent availability of these types of energy sources. Energy storage solutions are needed to balance the production intermittency of variable renewable energy to support a clean-energy future and a balanced electrical grid infrastructure. Both government mandates and companies focused on reducing energy use, cost, and emissions are expected to propel the shift to renewable sources of power.
Previous wording
The growth of the energy storage market that we address is primarily driven by the decreasing cost of energy storage technologies and renewable power generation sources, government mandates, financial incentives to reduce GHG emissions, and increasing geopolitical pressures driving energy independence goals. These dynamics are driving demand for additional renewable power generation and increased capacity and storage duration in energy storage solutions.
Current wording
Our expansion of revenue depends on the ongoing adoption of energy storage solutions by our customers and our ability to source, execute, and operate energy storage projects with attractive economics. The growth of the energy storage market that we address is primarily driven by the decreasing cost of energy storage technologies, government mandates, financial incentives to reduce GHG emissions, and efforts to enhance grid stability and efficiency. These dynamics are driving demand for increased energy storage capacity and duration.
Previous wording
Although we are not regulated as a utility, federal, state, and local government statutes and regulations concerning electricity heavily influence the market for our product and services. These statutes and regulations often relate to electricity pricing, net metering, incentives, taxation, competition with utilities and the interconnection of customer-owned electricity generation. In the United States, governments continuously modify these statutes and regulations. Governments, often acting through state utility or public service commissions, change and adopt different rates for commercial customers on a regular basis. These changes could affect our ability to deliver cost savings to our current and future customers for the purchase of electricity. We believe we are well positioned to capture incentives contained in the IRA and that its enactment is favorable to our business and future operations. However, as this legislation was recently adopted and applicable U.S. Department of Treasury and Internal Revenue Service guidelines were published in the third quarter of 2023, we have not yet seen the impact these IRA incentives may have on our business, operations, and financial performance in the future and cannot guarantee that we will realize the anticipated benefits from the incentives in the IRA.
Current wording
Federal, state, and local government statutes and regulations concerning electricity heavily influence the market for our product and services. These statutes and regulations directly affect our owned asset business and indirectly affect our third-party sales business. These statutes and regulations often relate to electricity pricing, net metering, incentives, taxation, competition with utilities and the interconnection of customer-owned electricity generation. In the United States, governments continuously modify these statutes and regulations. Governments, often acting through state utility or public service commissions, change and adopt different rates for commercial customers on a regular basis. These changes could affect our ability to deliver cost savings to our current and future customers for the purchase of electricity.
Previous wording
Backlog is a common measurement used in our industry. Our methodology for determining backlog may not, however, be comparable to the methodologies used by others. The Company’s backlog agrees with the amount of our remaining performance obligations, which are described in Note 4 -Revenue Recognition.
Current wording
Backlog represents contracted but unrecognized revenue from projects and services yet to be completed, unrecognized revenue or other income from IP licensing agreements, and unrecognized revenue from tolling arrangements for projects operated by Energy Vault or affiliates. Backlog includes any potential future variable payments from tolling and offtake arrangements that the Company believes is probable of being realized. Probable future variable payments are forecasted by an independent third-party firm using simulation software that factors in current and projected energy market dynamics, historical and forecasted volatility, and location specific data. The Company considers the low-end simulation results to be probable. Potential future IP royalties are not included in backlog. Backlog is a common measurement used in our industry. Our methodology for determining backlog may not, however, be comparable to the methodologies used by others. Effective in the second quarter of 2024, we updated our methodology for computing backlog. Under our previous methodology, our backlog was equivalent to our remaining performance obligations under GAAP. We believe our new methodology for computing backlog allows us to better evaluate the growth of our Company and estimate future revenue.
Previous wording
The Company generates revenue from the sale and licensing of our energy storage solutions. To date, the Company has primarily generated revenue from the sale of our BESSs and from licensing our EVx technology. In addition to these sources of revenue, in the future we expect to generate revenue from the sale of our GESSs, the sale or licensing of the Company’s software solutions, the sale of long-term service agreements to maintain customer owned energy storage systems, and through tolling arrangements in connection with energy storage systems that we intend to own and operate.
Current wording
The Company generates revenue from the sale of our energy storage products, the licensing of the Company’s software solutions and IP, and from long-term service agreements to operate and maintain customer owned energy systems. To date, the Company has primarily generated revenue from the sale of our BESSs and from licensing our EVx technology. In addition to these sources of revenue, in the future we expect to generate revenue from tolling arrangements in connection with energy storage systems that we intend to own and operate.
Previous wording
When the Company sells a BESS, the Company recognizes revenue over time as we transfer control of our product to the customer. When the Company licenses its intellectual property, revenue is recognized at the point in time at which the customer obtains control of the licensed technology.
Current wording
When the Company licenses its IP, revenue is recognized at the point in time at which the customer obtains control of the licensed technology. When the Company licenses its software solutions or provides operation and maintenance services, the transaction price for each contract is recognized as revenue on a straight-line basis over the term of the contract.
Previous wording
Our revenue growth is dependent on continued growth in the amount of energy storage systems constructed each year and our ability to increase our share of demand in the geographic regions where we currently compete and plan to compete in the future. Additionally, our revenue growth is dependent on our ability to continue to develop and commercialize new and innovative products to meet our customer’s energy storage needs.
Current wording
Our revenue growth is dependent on continued growth in the number of energy storage systems constructed each year and our ability to increase our share of demand in the geographic regions where we currently compete and plan to compete in the future. Additionally, our revenue growth is dependent on our ability to find attractive projects to build, own, and operate.
Previous wording
Cost of revenue primarily consists of product costs, including purchased materials and supplies, as well as costs related to subcontractors, direct labor, and product warranties.
Current wording
Cost of revenue primarily consists of product costs, including purchased equipment, materials and supplies, as well as costs related to subcontractors, direct labor, and product warranties.
Previous wording
Our cost of revenue is affected by underlying costs of materials such as batteries, inverters, enclosures, transformers, and cables, as well as the cost of subcontractors to provide construction services. We do not currently hedge against changes in the price of raw materials as we do not purchase raw materials. We purchase energy storage system components from our suppliers.
Current wording
Our cost of revenue is affected by underlying costs of equipment and materials such as batteries, inverters, enclosures, transformers, and cables, as well as the cost of subcontractors to provide construction services. We do not currently hedge against changes in the price of raw materials as we do not purchase raw materials. We purchase energy storage system components from our suppliers.
Previous wording
Gross profit and gross profit margin may vary from period to period due to the timing of transferring control of significant uninstalled materials to customers under contracts to sell energy storage systems. When control of significant uninstalled materials is transferred to customers, the Company recognizes revenue in an amount equal to the cost of those materials. The profit margin inherent in these materials is deferred until the Company fulfills its obligation to install the materials during construction of the energy storage systems. As a result, gross profit and gross profit margin will vary from period to period depending on the timing of revenue recognition related to uninstalled materials.
Current wording
Gross profit and gross profit margin may vary from period to period due to the timing of transferring control of significant uninstalled equipment to customers under contracts to sell energy storage systems. When control of significant uninstalled equipment is transferred to customers in a EPC project, the Company recognizes revenue in an amount equal to the cost of that equipment. The profit margin inherent in these materials is deferred until the Company fulfills its obligation to install the materials during construction of the energy storage systems. Generally, margins in an EPC project are lower in the beginning and middle stages as the equipment is delivered, and margins are higher in the later stages as the Company performs the construction, installation, and commissioning services. As a result, gross profit and gross profit margin will vary from period to period.
Previous wording
Additionally, gross profit and gross profit margin may vary from period to period due to our sales volume, product prices, product costs, product mix, geographical mix, along with the timing of when we perform installation and construction services.
Current wording
Additionally, gross profit and gross profit margin may vary from period to period due to our sales volume, product prices, product costs, product mix, geographical mix, and change in estimates for warranty liabilities.
Previous wording
G&A expenses consist of information technology expenses, legal and professional fees, travel costs, and personnel-related expenses for our corporate, executive, finance, and other administrative functions, including expenses for professional and contract services. Personnel-related expenses consist of salaries, benefits, and stock-based compensation expense. To a lesser extent, general and administrative expense includes investor relations costs, insurance costs, rent, office expenses, and maintenance costs.
Current wording
G&A expenses consist of information technology expenses, legal and professional fees, travel costs, and personnel-related expenses for our corporate, executive, finance, and other administrative functions, including expenses for professional and contract services. Personnel-related expenses consist of salaries, benefits, and stock-based compensation expense. To a lesser extent, general and administrative expenses include investor relations costs, insurance costs, rent, office expenses, and maintenance costs.
Previous wording
Interest income consists of interest income from investments in funds containing exclusively U.S. Treasury bills and money market funds, customer financing receivable, and convertible note receivable.
Current wording
Interest income consists of interest income from our money market funds, interest-bearing savings accounts, customer financing receivable, and convertible note receivable.
Previous wording
Cost of revenue for the year ended December 31, 2023 increased by $237.4 million to $324.0 million compared to$86.6 million for the year ended December 31, 2022.
Current wording
Cost of revenue for the year ended December 31, 2024 decreased by $284.0 million to $40.0 million compared to $324.0 million for the year ended December 31, 2023.
Previous wording
Gross profit was $17.5 million and gross profit margin was 5.1% for the year ended December 31, 2023. Gross profit for 2023 was primarily attributable to the sale and transfer of the Company’s BESS projects.
Current wording
Gross profit was $6.2 million and gross profit margin was 13.4% for the year ended December 31, 2024, compared to gross profit of $17.5 million and gross profit margin of 5.1% for the year ended December 31, 2023.
Previous wording
R&D expenses decreased by $5.5 million to $37.1 million for the year ended December 31, 2023, compared to $42.6 million for the year ended December 31, 2022. The decrease was primarily attributable to a $2.7 million decrease in engineering and development costs, a $2.0 million decrease in personnel-related expenses, and a $0.8 million decrease in consulting costs. These cost decreases were primarily attributable to a focus on cost controls and a reduction in personnel. Stock-based compensation expense was $10.1 million for the year ended December 31, 2023, compared to $14.8 million for the year ended December 31, 2022. The decrease in stock-based compensation expense in 2023 compared to 2022 was partially due to a reversal of expense for non-vested RSUs that were forfeited upon the reduction in personnel.
Current wording
R&D expenses decreased by $11.1 million to $26.0 million for the year ended December 31, 2024, compared to $37.1 million for the year ended December 31, 2023. The decrease was primarily attributable to a $5.0 million decrease in personnel-related expenses, a $3.9 million decrease in engineering and development costs, and a $2.5 million decrease in software expenses. These decreases in costs were primarily attributable to a decrease in headcount and a focus on cost control measures.
Previous wording
Since inception, we have financed our net cash used in operating and investing activities primarily through the issuance and sale of equity, and with the proceeds from the Merger and the PIPE. Our cash equivalents are highly liquid investments purchased with an original or remaining maturities of three months or less. Substantially all of our restricted cash balance is held by banks as collateral for the Company’s letters of credit.
Current wording
Since inception, we have financed our net cash used in operating and investing activities primarily through the issuance and sale of equity, and with the proceeds from the reverse recapitalization and private investment in public equity that occurred in 2022.
Previous wording
Energy Vault has incurred negative operating cash flows and operating losses in the past. We may continue to incur operating losses in the future due to our on-going research and development activities. We may seek additional capital through equity and/or debt financings depending on market conditions. If we are required to raise additional funds by issuing equity securities, dilution to stockholders would result. Any equity securities issued may also provide for rights, preferences or privileges senior to those of holders of our common stock. If we raise funds by issuing debt securities, these debt securities would have rights, preferences and privileges senior to those of holders of common stock. The terms of debt securities or borrowings could impose significant restrictions on our operations. The credit market and financial services industry have in the past, and may in the future, experience periods of uncertainty that could impact the availability and cost of equity and debt financing.
Current wording
Energy Vault has incurred negative operating cash flows and operating losses in the past and we may incur operating losses in the future. Energy Vault may seek additional capital through combinations of equity and/or debt financings depending on market conditions. If we are required to raise additional funds by issuing equity securities, dilution to stockholders would result. Any equity securities issued may also provide for rights, preferences or privileges senior to those of holders of our common stock. The Company has previously announced its intention to raise preferred equity for project-specific financing vehicles that would not be dilutive to common shareholders and is directly tied to the projects themselves. If the Company raises funds by issuing debt securities, these debt securities would have rights, preferences and privileges senior to those of holders of common stock. The terms of debt securities or borrowings could impose significant restrictions on our operations. The credit market and financial services industry have in the past, and may in the future, experience periods of uncertainty that could impact the availability and cost of equity and debt financing.
Previous wording
Management believes that its cash and cash equivalents on hand as of the filing date of this Annual Report will be sufficient to fund our operating activities for at least the next twelve months without regard to any cash proceeds we may receive in the future upon the exercise of our private warrants. As of the filing date of this Annual Report, $34.6 million of the restricted cash balance at December 31, 2023 was released from restrictions and became unrestricted cash.
Current wording
Management believes that its cash, cash equivalents, and restricted cash on hand as of the filing date of this Annual Report will be sufficient to fund our operating activities for at least the next twelve months without regard to any cash proceeds we may receive in the future upon the exercise of our private warrants.
Previous wording
Our principal commitments as of December 31, 2023 consisted primarily of obligations under operating leases, finance leases, warranty obligations, deferred pensions, and issued purchase orders. Our non-cancellable purchase obligations as of December 31, 2023 totaled approximately $4.7 million.
Current wording
Our principal commitments as of December 31, 2024 consisted primarily of obligations under operating leases, finance leases, warranty liabilities, a deferred pension, and issued purchase orders. Our non-cancellable purchase obligations as of December 31, 2024 totaled $1.9 million.
Previous wording
Cash used in investing activities for the year ended December 31, 2023 consisted of$30.4 million for the purchase of property and equipment, primarily related to the energy storage systems being constructed in Snyder, Texas and Calistoga, California,$6.1 million for the purchase of property and equipment that the Company expects to resell, and $6.0 million for the purchase of equity securities in KORE.
Current wording
Cash used in investing activities for the year ended December 31, 2024 primarily consisted of $58.9 million for the purchase of property and equipment, primarily related to the construction of a hybrid energy storage system in Calistoga, California, Cross Trails BESS, and the Snyder CDU. The increase in cash used in investing activities during 2024 compared to 2023 was due to an increase in the purchase of property and equipment.
Previous wording
For the year ended December 31, 2023, cash used in financing activities was primarily attributable to $6.0 million in tax payments related to the net settlement of equity awards, and $0.9 million in repayments for insurance premium financings. These cash outflows were partially offset by $1.3 million in proceeds from insurance premium financings.
Current wording
For the year ended December 31, 2024, cash used in financing activities was primarily attributable to $2.4 million in repayments on insurance premium financings, $0.4 million in tax payments related to the net settlement of equity awards, and $0.2 million in finance lease payments, partially offset by $2.7 million in proceeds from insurance premium financings. The decrease in net cash used in financing activities during 2024 compared to 2022 was primarily due to a decrease in tax payments related to the net settlement of equity awards.
Previous wording
To complement our consolidated statements of operations, we use non-GAAP financial measures of adjusted S&M expenses, adjusted R&D expenses, adjusted G&A expenses, and adjusted EBITDA. Management believes that these non-GAAP financial measures complement our GAAP amounts and such measures are useful to securities analysts and investors to evaluate our ongoing results of operations when considered alongside our GAAP measures. The presentation of these non-GAAP measures is not meant to be considered in isolation or as an alternative to net loss as an indicator of our performance.
Current wording
To complement our consolidated statements of operations and comprehensive loss, we use non-GAAP financial measures of adjusted S&M expenses, adjusted R&D expenses, adjusted G&A expenses, adjusted operating expenses, and adjusted EBITDA. Management believes that these non-GAAP financial measures complement our GAAP amounts and such measures are useful to securities analysts and investors to evaluate our ongoing results of operations when considered alongside our GAAP measures. The presentation of these non-GAAP measures is not meant to be considered in isolation or as an alternative to other measures of financial performance calculated in accordance with GAAP. These non-GAAP measures and their reconciliation to GAAP financial measures are shown below.
Previous wording
We believe that the following accounting policies involve a high degree of judgment and complexity. Accordingly, these are the policies we believe are the most critical to aid in fully understanding and evaluating our consolidated financial condition and results of operations. For more information on our significant accounting policies, refer to Note 2 -Summary of Significant Accounting Policies of our audited consolidated financial statements included in this Annual Report on Form 10-K.
Current wording
For a summary of significant accounting policies, refer to Note 2 -Summary of Significant Accounting Policies of our audited consolidated financial statements included in this Annual Report on Form 10-K.
Previous wording
The Company recognizes revenue over time on these projects as a result of the continuous transfer of control of its products to the customer. The Company utilizes the percentage of completion method based on costs incurred as a percentage of total estimated contract costs to determine the amount of revenue to recognize. Contract costs include all direct materials and labor costs related to contract performance. Since the revenue recognition of these contracts depends on estimates, which are assessed continually during the term of the contract, recognized revenues and profits are subject to revisions as the contract progresses to completion. The cumulative effects of revisions of estimated total contract costs and revenues, together with any contract reserves which may be deemed appropriate, are recorded in the period in which the facts and changes in circumstances become known. Due to uncertainties inherent in the estimation process, it is reasonably possible that these estimates will be revised in a different period.
Current wording
The Company recognizes revenue over time for EPC contracts and technical services in EEQ contracts as a result of the continuous transfer of control of the products and services to the customer. The Company utilizes the percentage of completion method when recognizing revenue over time and percentage of completion is based on costs incurred as a percentage of total estimated contract costs. Since revenue recognition for these performance obligations depends on estimates, which are assessed continually during the term of the contract, recognized revenues and profits are subject to revisions as the performance obligations progresses to completion. The cumulative effects of revisions of estimated total contract costs and revenues, together with any contract reserves which may be deemed appropriate, are recorded in the period in which the facts and changes in circumstances become known. Due to uncertainties inherent in the estimation process, it is reasonably possible that these estimates will be revised in a different period.
Previous wording
We are an “emerging growth company” as defined in Section 2(a) of the Securities Act of 1933, as amended, and have irrevocably elected to take advantage of the benefits of this extended transition period for new or revised standard. We are expected to remain an emerging growth company through the end of 2026 and expect to continue to take advantage of the benefits of the extended transition period. This may make it difficult or impossible to compare our financial results with the financial results of another public company that is either not an emerging growth company or is an emerging growth company that has chosen not to take advantage of the extended transition period exemptions for emerging growth companies because of the potential differences in accounting standards used.
Current wording
We are an “emerging growth company” as defined in Section 2(a) of the Securities Act of 1933, as amended, and have irrevocably elected to take advantage of the benefits of this extended transition period for new or revised standards. We are expected to remain an emerging growth company through the end of 2026 and expect to continue to take advantage of the benefits of the extended transition period. This may make it difficult or impossible to compare our financial results with the financial results of another public company that is either not an emerging growth company or is an emerging growth company that has chosen not to take advantage of the extended transition period exemptions for emerging growth companies because of the potential differences in accounting standards used.
Rearranged current paragraphs (1)
Current report — wording carried from elsewhere
Cash, Cash Equivalents, and Restricted Cash