New Fortress Energy Inc

For the period ended Dec 31, 2024. Filed Mar 10, 2025.

View on SEC.gov

About this filing

A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.

FY2024 · Filed Mar 10, 2025

NFE$4.49+16.6%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-K

Period ended 2023-12-31; filed 2024-02-29.

0001749723-24-000011

Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-K

Period ended 2024-12-31; filed 2025-03-10.

0001749723-25-000029

Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 244 previous paragraphs and 294 current paragraphs.

102 unchanged; 78 reworded; 111 added; 61 removed; 3 previous and 3 current paragraphs rearranged.

Tables are not compared: 15 previous and 15 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (111)

Current report

In March 2024, our contract to provide emergency power services to support the grid stabilization project was terminated, and we completed a series of transactions that included the sale of turbines and related equipment deployed to support the grid stabilization project to PREPA. We were also awarded a new gas sale agreement with PREPA to supply up to 80 TBtu annually to PREPA's gas-fired power plants, including to the turbines that were sold to PREPA. The contract initially has a one year term that is renewable annually for three additional annual periods.

Current report

We are pursuing a $659 million request for equitable adjustment related to the early termination of our contract to provide emergency power services. The actual amount of any such adjustment and the timing of any related payments may be materially different than management’s current estimate. As a result, the Company cannot offer any assurance as to the actual amount that may be recovered pursuant to such request or subsequent claim, if any.

Current report

In August 2024, we acquired 100% of the outstanding equity interest of Usina Termeletrica de Lins S.A. ("Lins"), which owns key rights and permits to develop a natural gas-fired power plant for up to 2.05GW located in the State of Sao Paulo, within the city limits of Lins. We expect to participate in upcoming power auctions in Brazil scheduled for June 2025, and to the extent that we are successful in these auctions, we expect to develop a gas-fired power plant using natural gas from the Santa Catarina Facility.

Current report

Fast LNG is anchored by key benefits over conventional liquefaction projects. In particular, we believe installing modular equipment in a shipyard will meaningfully expedite timelines. In addition, placing solutions offshore provides greater access to natural gas and optimized marine logistics.

Current report

We describe our operational and planned FLNG projects below.

Current report

In March 2024, we closed the acquisition of PortoCem Geração de Energia S.A. ("PortoCem"), a wholly-owned subsidiary of Ceiba Fundo de Investimento em Participações Multiestratégia- Investimento no Exterior ("Ceiba Energy") in exchange for newly issued 4.8% NFE redeemable Series A Convertible Preferred Stock. PortoCem isthe owner of a 15-year 1.6GW capacity reserve contract in Brazil. We have transferred the 1.6 GW capacity reserve contract to a site owned by NFE that is adjacent to the Barcarena Facility, where NFE is building the 1.6 GW simple cycle, natural gas-fired power plant ("PortoCem Power Plant") to supply the capacity reserve contract using gas from the Barcarena Facility. We expect the PortoCem Power Plant to be completed in 2026.

Current report

In the third quarter of 2023, An Bord Pleanála ("ABP"), Ireland's planning commission, denied our application for the development of an LNG terminal and power plant. We challenged this decision, and in September 2024, the High Court of Ireland ruled that ABP did not have appropriate grounds for the denial of our permit. In November, ABP sought leave to appeal the High Court's decision, the High Court has not yet heard the request to leave appeal. If the leave is not granted, ABP will be directed to reconsider our permit application on accordance with Irish Law. The continued development of this project is uncertain and there are multiple risks, including regulatory risks, that could preclude the development of this project, and the results of these risks could have a material effect on our results of operations.

Current report

We recently launched Klondike, a power and data center development business dedicated to working with hyperscale customers to build and operate data centers. This venture comes in response to a significant need for turnkey digital infrastructure to support the next stage of explosive growth in artificial intelligence.

Current report

Klondike will develop independent power sources that utilize and provide behind-the-meter on-site power. This innovative approach is designed to address all major constraints of digital infrastructure development, providing grid stability, significant transmission capacity, power reliability, energy cost savings, and scalability. This approach not only reduces the demand for power from the grid but also contributes power back to it.

Current report

Klondike plans to develop a geographically diverse portfolio of data center sites to satisfy the requirements of hyperscale users. Klondike has more than 1,000 acres of developable land across sites in Brazil, Ireland, and the United States that it either owns or leases. These locations have, or will have, large existing power plants or permits in process to build several gigawatts of power, connectivity to fiber networks, access to transmission and water.

Current report

In February 2025, one of our consolidated subsidiaries entered into an agreement to issue up to $350.0 million aggregate principal amount of 15% Senior Secured Notes due 2029 (the “Brazil Financing Notes”) at a purchase price of 97.75% of par. The Brazil Financing Notes bear interest at a rate of 15.0% and mature on August 30, 2029; the principal is due in full on the maturity date. Interest is payable quarterly in arrears beginning on March 30, 2025, and for the first 30 months that the Brazil Financing Notes are outstanding, interest due can be paid in kind and added to the principal amount. A portion of the proceeds from the issuance of the Brazil Financing Notes was used to repay the Barcarena Debentures in full.

Current report

In March 2025, we entered into an amendment to the Term Loan B Agreement. Pursuant to the amendment, certain lenders agreed to provide incremental term loans in an aggregate principal amount of up to $425.0 million. The incremental term loans are subject to the same terms as the initial Term Loan B, including interest rates and maturity date. Net proceeds will be used primarily to fund capital expenditures of our onshore Fast LNG project at Altamira, and for other corporate expenses. In connection with the amendment, all unused term loan commitments under the Term Loan A Credit Agreement were terminated.

Current report

On March 6, 2025, we entered into a Backstop Agreement (the "Backstop Agreement") with a lender, pursuant to which we may, at our sole option, issue and sell to this lender (subject to the satisfaction of certain conditions) senior debt securities up to an aggregate principal amount sufficient to generate gross proceeds of $100.0 million with a term of at least three years from the closing date. Proceeds received would be used to satisfy the repayment of the outstanding borrowings under the Revolving Facility (defined below) required by the reduction of commitments by September 30, 2025. The Backstop Agreement would be terminated in the event that we complete the sale of assets or receives proceeds associated with a contract termination fee sufficient to satisfy such required repayment.

Current report

On September 26, 2024, the United States Coast Guard ("USCG") filed a Letter of Recommendation with FERC in which it assessed our Letter of Intent dated April 12, 2024, and our Waterway Suitability Assessment, dated August 26, 2024, in respect of future ship to ship transfers with alternative vessels, and recommended against the allowance of the proposed operations. Further, on September 26, 2024, the USCG issued a Letter of Warning in respect of our ongoing ship to ship transfers of LNG operations within the San Juan port limits. On October 21, 2024, we filed an appeal with the USCG under 33 CFR 160.7. In December 2024 and February 2025, we submitted an updated Letter of Intent and Waterway Suitability Assessments detailing our alternative operational plans to the USCG and are working collaboratively with the USCG to obtain a new Letter of Recommendation to FERC in support of our operations, which we expect to be imminently forthcoming. In concert with our collaboration with the USCG regarding our new operational plans, we withdrew our appeal on February 14, 2025.

Current report

On October 25, 2024, FERC issued a notice of intent to prepare an Environmental Impact Statement, which included, among other things, two public scoping sessions in Puerto Rico held on November 18, 2024 in accordance with the National Environmental Policy Act.

Current report

•Our future results of operations will include the cost of operating our Fast LNG solution that were not included in our historical financial statements. We placed our first Fast LNG project into service from an accounting perspective in the fourth quarter of 2024. This project represents our largest ever capital project and placing the asset into service from an accounting perspective will significantly increase the depreciation recognized in future periods; such depreciation will also impact the cost of LNG delivered from the FLNG facility. We also expect interest expense to increase as we are no longer able to capitalize borrowing costs associated this development.

Current report

While the asset is in service from an accounting perspective, we will continue to commission the asset to achieve run rate production. Such costs that enhance the asset will be capitalized on our Consolidated Balance Sheets.

Current report

Additionally, we began to deliver power to the Puerto Rican grid as part of the grid stabilization project in the second quarter of 2023. In the first quarter of 2024, our contract was terminated and assets related to the grid stabilization project were sold to PREPA. Under our new island-wide gas sale agreement with PREPA, we continue to supply gas to these power generation assets.

Current report

In February 2024, the Company completed the sale of substantially all of its stake in Energos for a total consideration of $136.4 million and retaining an investment in Energos valued at $1.0 million. As a result of this transaction, we no longer include the results of Energos in our results of operations.

Current report

(1)Cost of sales in our segment measure only includes realized gains and losses on derivative transactions that are an economic hedge of commodity purchases and sales, and a realized gain of $139.1 million for the year ended December 31, 2023 was recognized as a reduction to Cost of sales in the segment measure. We recognized unrealized losses of$106.4 million on the mark-to-market value of derivative transactions for the year ended December 31, 2023, and these losses reconcile Cost of sales in the segment measure to Cost of sales in the Consolidated Statements of Operations and Comprehensive (Loss) Income. No realized gains or losses were recognized for the year ended December 31, 2024.

Current report

We have excluded contract acquisition costs that do not meet the criteria for capitalization from the segment measure. Contract acquisition costs of$6.2 million for the year ended December 31, 2023 reconcile Cost of sales in the segment measure to Cost of sales in the Consolidated Statements of Operations and Comprehensive (Loss) Income. We did not incur such costs in the year ended December 31, 2024.

Current report

(3)For the year ended December 31, 2024, Consolidation and Other adjusts for the inclusion of deferred earnings from contracted sales of$150.0 million which were recognized during the third and fourth quarters of 2024.

Current report

(4)Deferred earnings from contracted sales represent forward sales transactions that were contracted in the second and third quarters of 2024 and prepayment for these sales was received. Revenue has been recognized in the Consolidated Statements of Operations and Comprehensive (Loss) Income during the third and fourth quarters of 2024.

Current report

Total revenue for the Terminals and Infrastructure Segment increased by $46.7 million for the three months ended December 31, 2024 as compared to the three months ended September 30, 2024. The increase was primarily driven by income from the novation of an LNG supply contract during the fourth quarter of 2024 and higher Henry Hub index pricing, offset by lower volumes delivered and cargo sales.

Current report

•The Company novated an LNG supply contract to a customer, recognizing $235.6 million within segment revenue in the fourth quarter. NFE recognized $60.0 million of deferred earnings from contracted sales with this customer in the third quarter of 2024, and this prepayment is included in the reconciliation between segment revenue and consolidated revenue recognized.

Current report

•Volumes delivered to downstream terminal customers decreased from 20.7 TBtu in the third quarter of 2024 to 18.4 TBtu in the fourth quarter of 2024. The decrease was due to vessel maintenance in our LNG supply chain that briefly deferred deliveries to our customers.

Current report

•Revenue recognized from cargo sales decreased during the three months ended December 31, 2024 to $91.9 million from $174.5 million during three months ended September 30, 2024.

Current report

•In the second and third quarters of 2024, we recognized an estimate of the incentive fees that we expected to earn under our contract with Genera. In the first quarter of 2025, we modified our agreement with Genera to remove all future incentive payments in exchange for a payment of $110.0 million. The subsequent modification of the agreement required us to evaluate the incentive fees recognized in 2024, and we recognized a reversal of $57.0 million of revenue that was recognized earlier in 2024.

Current report

Total revenue for the Terminals and Infrastructure Segment decreased by$96.8 millionfor the year ended December 31, 2024 as compared to the year ended December 31, 2023, and segment revenue was impacted by the following in 2024:

Current report

•For the year ended December 31, 2024, volumes delivered to downstream customers were 81.3 TBtu as compared to 68.3 TBtu for the year ended December 31, 2023. We placed the La Paz Power Plant into service during the third quarter of 2023, and recorded a full year of revenue during 2024 compared to two quarters of revenue during 2023.

Current report

•During 2024, we recognized $235.6 million of income within segment revenue from the novation of an LNG supply contract.

Current report

Although we recognized the contract novation income and delivered significantly higher volumes in the current year, our revenue was impacted by lower Henry Hub pricing and lower cargo sale revenue.

Current report

•The Company had$291.0 million in cargo sales for the year ended December 31, 2024. Revenue from cargo sales was $618.5 million for the year ended December 31, 2023, which included $332.0 million of contract settlements.

Current report

•In 2023, we began to support the grid stabilization project in Puerto Rico, commissioning power generation assets in the second and third quarters of 2023. Our customer terminated the grid stabilization project in the first quarter of 2024, resulting in lower revenue from the project in 2024. However, we continue to sell volumes into these power plants under a new island-wide gas sale agreement signed with PREPA.

Current report

Cost of sales decreased $36.9 million for the three months ended December 31, 2024 as compared to the three months ended September 30, 2024.

Current report

•We delivered 11% lower volumes to our customers in the fourth quarter. Our cost of LNG to supply our downstream customers increased by $8.6 million during the three months ended December 31, 2024, due to higher cost of gas purchased at $8.75 per MMBtu for the three months ended December 31, 2024 compared to $6.65 per MMBtu for the three months ended September 30, 2024.

Current report

•The higher cost of LNG to deliver to downstream customers was partially offset by lower cost of selling cargos. We incurred $35.6 million less cost of selling cargos during the fourth quarter of 2024 compared to the third quarter of 2024.

Current report

•Vessel costs increased by $67.0 million, for the year ended December 31, 2024 as compared to the year ended December 31, 2023. The increase is primarily driven by additional vessels being used for servicing our terminals during 2024.

Current report

Operations and maintenance increased by $2.3 million for the three months ended December 31, 2024 as compared to the three months ended September 30, 2024. We incurred additional operations and maintenance costs for planned maintenance at our terminals and power plants during the three months ended December 31, 2024.

Showing the first 40 of 111 passages. Open the source sections for the rest.

Removed paragraphs (61)

Previous report

Our initial Fast LNG units are being constructed at the Kiewit Offshore Services shipyard near Corpus Christi, Texas. The Kiewit facility specializes in the fabrication and integration of offshore projects. In partnership with Kiewit, we believe we have established an efficient and repeatable process to reduce cost and time to build incremental liquefaction capacity. Our first Fast LNG unit has been deployed offshore to Altamira, Mexico, and we expect to deploy additional units over the next two years.

Previous report

We plan to deploy several Fast LNG units at different locations around the world and describe our currently planned projects below.

Previous report

In the fourth quarter of 2023, we entered into an agreement to acquire a 1.6GW PPA in exchange for newly issued 5% NFE redeemable Series A Convertible Preferred Stock, the closing of which remains subject to customary closing conditions, including regulatory approval for the transfer of the PPA. NFE has applied to transfer the 1.6 GW PPA to a site owned by NFE that is adjacent to the Barcarena Facility, where NFE will build a power plant to supply the PPA using gas from the Barcarena Facility. We expect to begin delivering electricity under the acquired PPA in July 2026.

Previous report

We have financed the development of the Barcarena Power Plant pursuant to a financing agreement. For information on this financing agreement, see “—Long-Term Debt and Preferred Stock” in this Annual Report.

Previous report

On February 14, 2024, we completed a transaction to sell substantially all of our stake in Energos, receiving proceeds of approximately $136.4 million. As a result of the transaction, we recognized an other than temporary impairment of our investment in Energos of $5.3 million for the year ended December 31, 2023, and this loss was recognized in Income (loss) from equity method investments in the Consolidated Statements of Operations and Comprehensive Income.

Previous report

On February 28, 2024, we entered into a commitment letter for the Company to receive $700 million in financing secured by our onshore FLNG project in Altamira, Mexico as well as the collateral securing the 2025 Notes and the 2026 Notes. The commitment letter is subject to the finalization of a credit agreement and customary closing conditions. The proceeds will be used to complete our onshore FLNG project in Altamira.

Previous report

Additionally, we began to deliver power to the Puerto Rican grid from the Palo Seco Power Plant as part of the grid stabilization project in the second quarter of 2023. At the end of September 2023, we placed additional power generation assets in service at the San Juan Power Plant. We expect that our power generation assets at both the Palo Seco Power Plant and at the San Juan Power Plant will operate at full capacity, and we expect that our revenue and results of operations will benefit from significant gas consumption required to operate these assets.

Previous report

(1)Prior to the completion of the sale of our ownership interest in CELSEPAR, Terminals and Infrastructure included our effective share of revenues, expenses and operating margin attributable to our 50% ownership of CELSEPAR. Terminals and Infrastructure does not include the unrealized mark-to-market gains on derivative instruments of $1.5 million and $0.4 million for the three months ended December 31, 2023 and September 30, 2023, respectively. The segment measure also excludes losses and gains of $106.4 million and $106.1 million for the years ended December 31, 2023 and 2022, respectively, reported in Cost of sales.

Previous report

(2)Prior to the Hilli Exchange, Ships included our effective share of revenues, expenses and operating margin attributable to our 50% ownership of the Hilli Common Units.

Previous report

Total revenue for the Terminals and Infrastructure Segment increased by $247.2 million for the three months ended December 31, 2023 as compared to the three months ended September 30, 2023. The increase was primarily driven by additional volumes delivered in Puerto Rico, and increases to the Henry Hub index that forms a portion of the pricing to invoice most of our downstream customers in this segment.

Previous report

•Volumes delivered to downstream terminal customers increased from 20.1 TBtus in the third quarter of 2023 to 22.2 TBtu in the fourth quarter of 2023. We continue to support the grid stabilization project in Puerto Rico, and we recognized a full quarter of operations for our San Juan Power Plant during the fourth quarter; we completed the commissioning of these additional power assets at the San Juan Power Plant in September 2023. We also realize higher margins for volumes delivered at the temporary power plants at Palo Seco and San Juan, and our segment operating margin in the fourth quarter benefited from delivering additional volumes to these projects.

Previous report

Total revenue for the Terminals and Infrastructure Segment decreased by $27.5 million for the year ended December 31, 2023 as compared to the year ended December 31, 2022. The decrease was primarily driven by lower LNG cargo sales, no pro rata share of revenue from our former investment in CELSEPAR and a reduction in the Henry Hub index that forms a portion of the pricing to invoice most of our customers in this segment. The decrease in revenue was partially offset by increased revenue from sales to downstream terminal customers.

Previous report

The decrease in revenue in the year ended December 31, 2023 when compared to the year ended December 31, 2022 was primarily attributable to the following:

Previous report

•LNG cargo sales to third parties decreased by $557.4 million for the year ended December 31, 2023, decreasing from $1,175.9 million for the year ended December 31, 2022 to $618.5 million for the year ended December 31,

Previous report

In the second half of 2023, we utilized all LNG purchased under our long-term supply contracts for sales to our downstream terminal customers.

Previous report

•After the completion of the sale of our investment in CELSEPAR in the fourth quarter of 2022, we no longer recognize revenue from this investment in our segment measure. Our share of revenue from CELSEPAR was $148.3 million for the year ended December 31, 2022, which was primarily comprised of fixed capacity payments received under related PPAs.

Previous report

Such decrease was offset by increases to revenue in the year ended December 31, 2023 when compared to the year ended December 31, 2022, due to the following:

Previous report

•Volumes delivered to downstream customers were 68.3 TBtu for the year ended December 31, 2023 as compared to 39.5 TBtu for the year ended December 31, 2022, and these increased volumes were primarily attributable to our operations in Puerto Rico, Jamaica and Mexico.

Previous report

•In the prior year, maintenance activities significantly lowered consumption at our facilities; there was no significant maintenance downtime during 2023. The maintenance downtime in the prior year was across our facilities, including downtime at our CHP Plant for unplanned maintenance, downtime at our Montego Bay Facility due to a reconfiguration of our assets required by the Port of Montego Bay and maintenance at PREPA's San Juan Power Plant. Volumes delivered across from these facilities increased by 13.5 TBtu as compared to the year ended December 31, 2022.

Previous report

•In May 2023, we began to support the grid stabilization project in Puerto Rico, commissioning power generation assets at the Palo Seco Power Plant. In September 2023, we finished commissioning additional power generation assets at the San Juan Power Plant. We have delivered 13.3 TBtu at a higher margin at these power plants during the year ended December 31, 2023.

Previous report

Cost of sales increased $51.3 million for the three months ended December 31, 2023 as compared to the three months ended September 30, 2023.

Previous report

•Cost of LNG purchased from third parties for sale to our downstream customers increased by $25.7 million for the three months ended December 31, 2023 as compared to the three months ended September 30, 2023. The increase was primarily attributable to a 10% increase in volumes delivered compared to the three months ended September 30, 2023. The weighted-average cost of LNG purchased from third parties for sale to our customers increased from $6.78 per MMBtu for the three months ended September 30, 2023 to $7.08 per MMBtu for the three months ended December 31, 2023

Previous report

•We also incurred additional costs of $19.6 million to make reimbursable improvements to our assets that are utilized as part of the Puerto Rican grid stabilization project. The reimbursement of these costs has been recognized as Other revenue.

Previous report

Cost of sales decreased by $377.5 million for the year ended December 31, 2023 as compared to the year ended December 31, 2022.

Previous report

•Cost of sales for the year ended December 31, 2022 included $28.6 million of our share of cost of sales from our investment in CELSEPAR, which was primarily comprised of LNG costs to fuel a power plant owned by CELSEPAR.

Previous report

Operations and maintenance increase by $17.5 million for the three months ended December 31, 2023 as compared to the three months ended September 30, 2023, which was primarily related to additional vessel costs incurred in our terminal operations as costs related to the Winter and Princess are recognized in our terminal costs following the conclusion of these vessels long-term charters.

Previous report

•In 2023, we leased turbines to generate power at the Palo Seco Power Plant as part of the grid stabilization project in Puerto Rico. We also undertook activities to ensure that we have LNG supply available for our expanded Puerto

Previous report

Rican operations, including leasing berth space to place a storage vessel to service Puerto Rico, increasing operations and maintenance costs when compared to the prior year.

Previous report

•These increases were partially offset by the exclusion of our share of Operations and maintenance from the investment in CELSEPAR; after the sale of our investment in CELSEPAR in the fourth quarter of 2022, we do not include these costs during the year ended December 31, 2023.

Previous report

On March 15, 2023, we completed the "Hilli Exchange. In the fourth quarter of 2022, we recognized a loss on the investment in Hilli LLC of $118.6 million; this loss was recognized in Loss from equity method investments in the Consolidated Statements of Operations and Comprehensive Income. Upon completion of the Hilli Exchange during the first quarter of 2023, we recognized an additional loss on disposal of $37.4 million, which was included in Other expense (income), net. As a result of the Hilli Exchange we no longer have an ownership interest in the Hilli. NFE shares received from GLNG were cancelled upon the closing of the Hilli Exchange.

Previous report

As of December 31, 2023, three FSRUs and one LNG carrier were leased to customers under long-term arrangements. In July 2023, we sold the vessel Spirit for a total consideration of $15.8 million resulting in a gain of $7.8 million. The gain on sale is included in Gain on sale of assets, net in the Consolidated Statements of Operations and Comprehensive Income. In December 2023, we entered into an agreement to sell the vessel Mazo, for $22.4 million; the sale closed in the first quarter of 2024, and as such, the vessel has been classified as held for sale as of December 31, 2023. In conjunction with the classification as held for sale, the Company recognized an impairment of $10.9 million within Asset impairment expense in the Consolidated Statements of Operations and Comprehensive Income.

Previous report

Total revenue for the Ships segment decreased $3.3 million for the three months ended December 31, 2023 as compared to the three months ended September 30, 2023. Subsequent to the Energos Formation Transaction, we continue to be, for accounting purposes, the owner of vessels included in the transaction (except the Nanook), and as such, we continue to recognize revenue from the charter of these vessels to third parties. The decrease in revenue was primarily driven by end of third-party charter of Winter and Princess during the fourth quarter of 2023.

Previous report

Total revenue for the Ships segment decreased by $151.0 million for the year ended December 31, 2023 as compared to the year ended December 31, 2022. The decrease in revenue was primarily the result of the sale of the Nanook as part of the Energos Formation Transaction; we no longer recognize revenue related to the Nanook in 2023. After the Hilli

Previous report

Vessel operating expenses decreased by $2.5 million for the three months ended December 31, 2023, compared to the three months ended September 30, 2023 primarily due to end of third-party charter of Winter and Princess during the fourth quarter of 2023.

Previous report

Selling, general and administrative decreased by $30.9 million for the year ended December 31, 2023, compared to the year ended December 31, 2022. The decreases were primarily due to lower share-based compensation expense, as we did not recognize any cost related to employee performance share units in 2023, as well as lower professional fees and screening costs.

Previous report

For the three months ended December 31, 2023, we did not incur significant transaction and integration costs as compared to the prior quarter.

Previous report

For the year ended December 31, 2023, we incurred $6.9 million for transaction and integration costs, as compared to $21.8 million for the year ended December 31, 2022. In the prior year, we incurred transaction and integration costs primarily associated with the sale of our investment in CELSEPAR and the Energos Formation Transaction, and there were no such similar significant transactions during the year-ended December 31, 2023.

Previous report

Depreciation and amortization increased by $13.5 million for the three months ended December 31, 2023 as compared to the three months ended September 30, 2023. In September 2023, we placed assets at the San Juan Power Plant in service as part of the grid stabilization project in Puerto Rico. Additionally, in September 2023 we placed our La Paz Power Plant into partial service, and we recognized a full quarter of depreciation in the fourth quarter of 2023.

Previous report

Depreciation and amortization increased by $44.7 million for the year ended December 31, 2023 as compared to the year ended December 31, 2022, primarily the result of assets including turbines placed into service as part of the grid stabilization project at the Palo Seco Power Plant and San Juan Power Plant during 2023.

Previous report

As a result of our acquisition of Hygo Energy Transition Limited in 2021, we recognized long-lived assets associated with the expansion of the Sergipe Power Plant. During theyear ended December 31, 2022, we recognized asset impairment expense of $50.7 million, as the fair value of these assets was less than the carrying value, and the asset group was held for sale. In December 2023, we entered into an agreement to sell the vessel Mazo, for $22.4 million; the sale closed in the first quarter of 2024. The vessel has been classified as held for sale as of December 31, 2023, and in conjunction with the classification as held for sale, the Company recognized an impairment of $10.9 million.

Showing the first 40 of 61 passages. Open the source sections for the rest.

Reworded paragraphs (78)

Previous wording

We are a global energy infrastructure company founded to help address energy poverty and accelerate the world’s transition to reliable, affordable, and clean energy. We own and operate natural gas and liquefied natural gas ("LNG") infrastructure and an integrated fleet of ships and logistics assets to rapidly deliver turnkey energy solutions to global markets; additionally, we have expanded our focus to building our modular LNG manufacturing business. Our near-term mission is to provide modern infrastructure solutions to create cleaner, reliable energy while generating a positive economic impact worldwide. Our long-term mission is to become one of the world’s leading companies providing power free from carbon emissionsby leveraging our global portfolio of integrated energy infrastructure. We discuss this important goal in more detail in this Annual Report, “Items 1 and 2: Business and Properties” under “Sustainability—Toward a Low Carbon Future.”

Current wording

We are a global energy infrastructure company founded to help address energy poverty and accelerate the world’s transition to reliable, affordable and clean energy. We own and operate natural gas and liquefied natural gas ("LNG") infrastructure, and an integrated fleet of ships and logistics assets to rapidly deliver turnkey energy solutions to global markets; additionally, we have expanded our focus to building our modular LNG manufacturing business. Our near-term mission is to provide modern infrastructure solutions to create cleaner, reliable energy while generating a positive economic impact worldwide. Our long-term mission is to become one of the world’s leading companies providing power free from carbon emissions by leveraging our global portfolio of integrated energy infrastructure. We discuss this important goal in more detail in this Annual Report, “Items 1 and 2: Business and Properties” under “Sustainability—Toward a Low Carbon Future.”

Previous wording

Our Terminals and Infrastructure segment includes the entire production and delivery chain from natural gas procurement and liquefaction to logistics, shipping, facilities and conversion or development of natural gas-fired power generation. We currently source LNG from long-term supply agreements with third-party suppliers and from our own liquefaction facility in Miami, Florida. Upon the completion of commissioning in 2024, we expect to begin to source a portion of our LNG from our modular liquefaction facilities, which we refer to as "Fast LNG" or "FLNG." The Terminals and Infrastructure segment includes all terminal operations in Jamaica, Puerto Rico, Mexico and Brazil, as well as vessels utilized in our terminal or logistics operations. We centrally manage our LNG supply and the deployment of our vessels utilized in our terminal or logistics operations, which allows us to optimally manage our LNG supply and fleet.

Current wording

Our Terminals and Infrastructure segment includes the entire production and delivery chain from natural gas procurement and liquefaction to logistics, shipping, facilities and conversion or development of natural gas-fired power generation. We currently source LNG from long-term supply agreements with third-party suppliers. Our first floating liquefaction unit, which we refer to as "Fast LNG" or "FLNG", began producing LNG in July 2024, and, once fully commissioned, we plan to source a portion of our LNG needs from this facility. The Terminals and Infrastructure segment includes all terminal operations in Jamaica, Puerto Rico, Mexico and Brazil, as well as vessels utilized in our terminal or logistics operations. We centrally manage our LNG supply and the deployment of our vessels utilized in our terminal or logistics operations, which allows us to optimally manage our LNG supply and fleet.

Previous wording

Our Ships segment includes all vessels which are leased to customers under long-term arrangements. The Company’s investment in Energos (defined below) is also included in the Ships segment. Over time, we expect to utilize these vessels in our own terminal operations as charter agreements for these vessels expire.

Current wording

Our Ships segment includes certain vessels which are currently chartered under long-term arrangements to third parties and are part of the Energos Formation Transaction (defined below). Over time, we expect to utilize these vessels in our own terminal operations as charter agreements for these vessels expire, and these vessels are included in our Terminals and Infrastructure segment.

Previous wording

The Old Harbour Facility is an offshore facility consisting of an FSRU that is capable of processing up to 750,000 MMBtus from LNG per day. The Old Harbour Facility commenced commercial operations in June 2019 and supplies natural gas to the 190MW Old Harbour power plant (“Old Harbour Power Plant”) operated by SJPC. The Old Harbour Facility is also supplying natural gas to our dual-fired combined heat and power facility in Clarendon, Jamaica (“CHP Plant”). The CHP Plant supplies electricity to JPS under a long-term agreement. The CHP Plant also provides steam to Jamalco under a long-term take-or-pay agreement. The Old Harbour Facility also supplies gas directly to Jamalco to utilize in their gas-fired boilers.

Current wording

The Old Harbour Facility is an offshore facility consisting of an FSRU that is capable of processing up to 750,000 MMBtus of LNG per day. The Old Harbour Facility commenced commercial operations in June 2019 and supplies natural gas to the 190MW Old Harbour power plant (“Old Harbour Power Plant”) operated by SJPC. The Old Harbour Facility is also supplying natural gas to our dual-fired combined heat and power facility in Clarendon, Jamaica (“CHP Plant”). The CHP Plant supplies electricity to JPS under a long-term agreement. The CHP Plant also provides steam to Jamalco under a long-term take-or-pay agreement. The Old Harbour Facility also supplies gas directly to Jamalco to utilize in their gas-fired boilers.

Previous wording

Our San Juan Facility became fully operational in the third quarter of 2020. It is designed as a landed micro-fuel handling facility located in the Port of San Juan, Puerto Rico. The San Juan Facility has multiple truck loading bays to provide LNG to on-island industrial users. The San Juan Facility is near the PREPA San Juan Power Plant and serves as our supply hub for the PREPA San Juan Power Plant and other industrial end-user customers in Puerto Rico.

Current wording

Our San Juan Facility became fully operational in the third quarter of 2020. It is designed as a landed micro-fuel handling facility located in the Port of San Juan, Puerto Rico. The San Juan Facility has multiple truck loading bays to provide LNG to on-island industrial users. The San Juan Facility is near the PREPA San Juan Power Plant and serves as our supply hub for the PREPA San Juan Power Plant, industrial end-user customers in Puerto Rico, and after being awarded a new gas sale agreement in the first quarter of 2024, PREPA's gas-fired power plants throughout the island of Puerto Rico.

Previous wording

In the first and second quarters of 2023, we entered into agreements with Weston Solutions, Inc. ("Weston") for the installation and operation of approximately 350MW of additional power to be generated at the Palo Seco Power Plant and San Juan Power Plant in Puerto Rico as well as the supply of natural gas and ADO. Weston has been contracted by the U.S. Army Corps of Engineers to support the island’s grid stabilization project with additional power capacity to enable maintenance and repair work on Puerto Rico’s power system and grid. We commissioned 150MW of duel-fuel power generation using our gas supply in the second quarter of 2023, and the remaining 200MW was commissioned in September 2023.

Current wording

In 2023, we entered into agreements for the installation and operation of approximately 350MW of additional power to be generated at the Palo Seco Power Plant and San Juan Power Plant in Puerto Rico as well as the supply of natural gas. Our customer was contracted by the U.S. Army Corps of Engineers to support the island’s grid stabilization project with additional power capacity to enable maintenance and repair work on Puerto Rico’s power system and grid. We commissioned 350MW of duel-fuel power generation using our gas supply in less than 180 days.

Previous wording

In the first quarter of 2023, our wholly-owned subsidiary, Genera PR LLC ("Genera"), was awarded a 10-year contract for the operation and maintenance of PREPA’s thermal generation assets with the goal of reducing costs and improving reliability of power generation in Puerto Rico. We receive an annual management fee and are eligible for performance-based incentive fees, beginning after the service period under the contract commenced on July 1, 2023.

Current wording

In the first quarter of 2023, our wholly-owned subsidiary, Genera PR LLC ("Genera"), was awarded a 10-Year contract for the operation and maintenance of PREPA’s thermal generation assets with the goal of reducing costs and improving reliability of power generation in Puerto Rico. We receive an annual management fee and are eligible for performance-based incentive fees. The service period under the contract commenced on July 1, 2023.

Previous wording

In the fourth quarter of 2022, we finalized short-form agreements with CFE to expand and extend our supply of natural gas to multiple CFE power generation facilities in Baja California Sur and to sell the La Paz Power Plant to CFE. We executed the final long-form gas sales agreement in the second quarter of 2023, which is subject to certain conditions precedent including the execution of the final agreement to sell the La Paz Power Plant.

Current wording

In the fourth quarter of 2022, we finalized short-form agreements with CFE to expand and extend our supply of natural gas to multiple CFE power generation facilities in Baja California Sur and to sell the La Paz Power Plant to CFE. In the third quarter of 2024, we executed a 10-year gas sales agreement to supply natural gas to additional CFE facilities on take-or-pay basis.

Previous wording

The Santa Catarina Facility is located on the southern coast of Brazil and consists of an FSRU with a processing capacity ofapproximately 500,000 MMBtu from LNG per day and LNG storage capacity of up to 138,000 cubic meters. We are developing a 33-kilometer, 20-inch pipeline that will connect the Santa Catarina Facility to the existing inland Transportadora Brasileira Gasoduto Bolivia-Brasil S.A. (“TBG”) pipeline via an interconnection point in the municipality of Garuva. The Santa Catarina Facility and associated pipeline are expected to have a total addressable market of 15 million cubic meters per day. We expect to complete our Santa Catarina Facility and commence operations in the first half of 2024.

Current wording

We placed our Santa Catarina Facility in service in the fourth quarter of 2024. The Santa Catarina Facility is located on the southern coast of Brazil and consists of an FSRU with a processing capacity of approximately 500,000 MMBtu from LNG per day and LNG storage capacity of up to 138,000 cubic meters. We have developed and constructed a 33-kilometer, 20-inch pipeline that connects the Santa Catarina Facility to the existing inland Transportadora Brasileira Gasoduto Bolivia-Brasil S.A. (“TBG”) pipeline via an interconnection point in the municipality of Garuva. The Santa Catarina Facility and associated pipeline are expected to have a total addressable market of 15 million cubic meters per day of natural gas.

Previous wording

Our Miami Facility began operations in April 2016. This facility has liquefaction capacity of approximately 8,300 MMBtu from LNG per day and enables us to produce LNG for sales directly to industrial end-users in southern Florida, including Florida East Coast Railway via our train loading facility, and other customers throughout the Caribbean using ISO containers.

Current wording

Our Miami Facility began operations in April 2016. This facility has liquefaction capacity of approximately 8,300 MMBtu of LNG per day and enables us to produce LNG for sales directly to industrial end-users in southern Florida, including Florida East Coast Railway via our train loading facility, and other customers throughout the Caribbean using ISO containers. On June 30, 2024, the Company entered into a definitive agreement to sell its Miami Facility for $62 million. The transaction closed in the fourth quarter of 2024.

Previous wording

NFE provides reliable, affordable and clean energy supplies to customers around the world that we plan to satisfy through the following sources: 1) our current contractual supply commitments; 2) additional LNG supply contracts expected to commence in 2027; 3) our Miami Facility; and 4) supply from our own Fast LNG production. We have secured commitments to purchase and receive physical delivery of LNG volumes for 100% of our expected committed volumes for each of our downstream terminals inclusive of our Montego Bay Facility, Old Harbour Facility, San Juan Facility, La Paz Facility, Puerto Sandino Facility, Barcarena Facility and Santa Catarina Facility. Additionally, we have binding contracts for LNG volumes from two separate U.S. LNG facilities, each with a 20-year term, which are expected to commence in 2027. Finally, we plan to commence production from our first Fast LNG facility upon the completion of commissioning in 2024. We plan to expand that capacity when additional Fast LNG units come online over the next two years.

Current wording

NFE provides reliable, affordable and clean energy supplies to customers around the world that we plan to satisfy through the following sources: 1) our current contractual supply commitments; 2) our own FLNG production; and 3) additional LNG supply contracts expected to commence in 2027. Our first FLNG facility began to produce LNG in July 2024, and we expect to generate up to 70 TBtus annually from this facility. When expected production from FLNG is combined with our commitments to purchase and receive physical delivery of LNG volumes, we expect to have sufficient supply for 100% of our committed volumes for each of our downstream terminals inclusive of our Montego Bay Facility, Old Harbour Facility, San Juan Facility, La Paz Facility, Barcarena Facility and Santa Catarina Facility. Additionally, we have binding contracts for LNG volumes from two separate U.S. LNG facilities, each with a 20-year term, which are expected to commence in 2027 and 2029.

Previous wording

Natural gas and LNG markets have experienced unprecedented price volatility in recent years. The majority of our LNG supply contracts are based on a natural gas-based index, Henry Hub, plus a contractual spread. We limit our exposure to fluctuations in natural gas prices as our pricing in contracts with customers is largely based on the Henry Hub index price plus a fixed fee component. Additionally, with our own Fast LNG production, we plan to further mitigate our exposure to variability in LNG prices. In 2022 and 2023, our revenue and results of operations have benefited from selling cargos into the global LNG market. As FLNG facilities commence production, our long-term strategy is to sell substantially all cargos produced to customers on a long-term, take-or-pay basis through our downstream terminals.

Current wording

Geopolitical events have substantially impacted and may continue to impact the natural gas and LNG markets, which have experienced significant volatility in recent years. The majority of our LNG supply contracts are based on a natural gas-based index, Henry Hub, plus a contractual spread. We limit our exposure to fluctuations in natural gas prices as our pricing in contracts with customers is largely based on the Henry Hub index price plus a fixed fee component. Additionally, with our own Fast LNG production, we plan to further mitigate our exposure to variability in LNG prices, and our long-term strategy is to sell substantially all cargos produced to customers on a long-term, take-or-pay basis through our downstream terminals.

Previous wording

Our Ships segment includes Floating Storage and Regasification Units ("FSRUs"), Floating Storage Units ("FSUs") and LNG carriers ("LNGCs"), which are leased to customers under long-term arrangements. At the expiration of third party charters of vessels owned by Energos Infrastructure (“Energos”), an entity formed in 2022 and described in more detail below, we have chartered these vessels for our own operational purposes. The results of operations of vessels utilized in our terminal operations are reflected in the Terminals and Infrastructure segment.

Current wording

Our shipping assets include Floating Storage and Regasification Units ("FSRUs"), Floating Storage Units ("FSUs") and LNG carriers ("LNGCs"). Our shipping assets are included in both of our operating segments. Certain vessels are currently chartered to third parties under long-term arrangements and are included in the Energos Formation Transaction (defined below); such vessels are included in our Ships segment. At the expiration of third party charters of these vessels, we plan to utilize these vessels for our own operational purposes. Vessels we operate at our terminal operations or that we decide to sub-charter are included in our Terminals and Infrastructure segment.

Previous wording

In August 2022, we completed a transaction(the “Energos Formation Transaction”)with an affiliate of Apollo Global Management, Inc., pursuant to which we transferred ownership of 11 vessels to Energos in exchange for approximately $1.85 billion in cash and a 20% equity interest in Energos. Ten of the vessels were subject to current or future charters with NFE and one vessel (the Nanook) was not subject to a future NFE charter. The in-place and future charters to NFE of ten vessels prevent the recognition of the sale of those vessels to Energos, and the proceeds associated with these vessels have been treated as a failed sale leaseback. As a result, these ten vessels continue to be recognized on our Consolidated Balance Sheets as Property, plant and equipment, and the proceeds are recognized as debt. Consistent with this treatment as a failed sale leaseback, (i) the third party charter revenues continue to be recognized by us as Vessel charter revenue; (ii) the costs of operating the vessels is included in Vessel operating expenses for the remaining terms of the third-party charters and (iii) such revenues are included as part of debt service for the sale leaseback financing debt and are included in additional financing costs within Interest expense, net. In February 2024, we sold substantially all of our stake in Energos.

Current wording

In August 2022, we completed a transaction(the “Energos Formation Transaction”)with an affiliate of Apollo Global Management, Inc., pursuant to which we transferred ownership of eleven vessels to Energos in exchange for approximately$1.85 billion in cash and a 20% equity interest in Energos. Ten of the vessels were subject to current or future charters with NFE and one vessel (the Nanook) was not subject to a future NFE charter. The in-place and future charters to NFE of ten vessels prevent the recognition of the sale of those vessels to Energos, and the proceeds associated with these vessels have been treated as a failed sale leaseback. As a result, these ten vessels continue to be recognized on our Consolidated Balance Sheet as Property, plant and equipment, and the proceeds are recognized as debt. Consistent with this treatment as a failed sale leaseback, (i) the third party charter revenues continue to be recognized by us as Vessel charter revenue; (ii) the costs of operating the vessels is included in Vessel operating expenses for the remaining terms of the third-party charters and (iii) such revenues are included as part of debt service for the sale leaseback financing debt and are included in additional financing costs within Interest expense, net. In February 2024, we sold substantially all of our stake in Energos.

Previous wording

Our projects currently under development include our development of a series of modular liquefaction facilities to provide a source of low-cost supply of LNG to customers around the world through our Fast LNG technologies; our LNG terminal facility and power plant in Puerto Sandino, Nicaragua (“Puerto Sandino Facility”); our LNG terminal (“Barcarena Facility”) and power plant (“Barcarena Power Plant”) located in Pará, Brazil; our LNG terminal located on the southern coast of Brazil ("Santa Catarina Terminal"); our LNG terminal (“Ireland Facility”) and power plant in Ireland; and our first green hydrogen project ("ZeroPark I"). We are also in active discussions to develop projects in multiple regions around the world that may have significant demand for additional power, LNG and natural gas, although there can be no assurance that these discussions will result in additional contracts or that we will be able to achieve our target revenue or results of operations.

Current wording

Our projects currently under development include our development of a series of modular liquefaction facilities to provide a source of low-cost supply of LNG to customers around the world through our Fast LNG technologies; our LNG terminal facility and power plant in Puerto Sandino, Nicaragua (“Puerto Sandino Facility”); our LNG terminal (“Ireland Facility”) and power plant in Ireland, our first green hydrogen project ("ZeroPark I") and Klondike Digital Infrastructure, our newly-launched power and data center infrastructure business ("Klondike"). We are also in active discussions to develop projects in multiple regions around the world that may have significant demand for additional power, LNG and natural gas, although there can be no assurance that these discussions will result in additional contracts or that we will be able to achieve our target revenue or results of operations.

Previous wording

We are currently developing multiple modular liquefaction facilities to provide a source of low-cost supply of LNG to customers around the world. We have designed and are constructing liquefaction facilities for our growing customer base that we believe are both faster and more economical to construct than many traditional liquefaction solutions. Our initial “Fast LNG,” or “FLNG,” design pairs advancements in modular, midsize liquefaction technology with jack up rigs, semi-submersible rigs or similar marine floating infrastructure to enable a lower cost and faster deployment schedule than other greenfield alternatives. Semi-permanently moored floating storage unit(s) (FSUs) will provide LNG storage alongside the floating liquefaction infrastructure, which can be deployed anywhere there is abundant and stranded natural gas. As noted below, we are also in discussions with CFE to utilize our FLNG design in an onshore application.

Current wording

We are currently developing multiple modular liquefaction facilities to provide a source of low-cost supply of LNG to customers around the world. We have designed and are constructing liquefaction facilities for our growing customer base that we believe are both faster and more economical to construct than many traditional liquefaction solutions. Our first “Fast LNG,” or “FLNG,” design pairs advancements in modular, midsize liquefaction technology with jack up rigs, semi-submersible rigs or similar marine floating infrastructure to enable a lower cost and faster deployment schedule than other greenfield alternatives. Semi-permanently moored FSUs will provide LNG storage alongside the floating liquefaction infrastructure, which can be deployed anywhere there is abundant and stranded natural gas. As noted below, we are also in discussions with CFE to utilize our FLNG design in an onshore application.

Previous wording

In the first quarter of 2023, we executed an agreement, which includes conditions to effectiveness that have not been satisfied, with CFE to supply natural gas for one FLNG unit located off the coast of Altamira, Tamaulipas, Mexico. The 1.4 million ton per annum (“MTPA”) FLNG unit will utilize CFE’s firm pipeline transportation capacity on the Sur de Texas-Tuxpan Pipeline to receive feedgas volumes. Our first FLNG unit has been installed and connected to the gas pipeline at Altamira, and we are in the process of commissioning the project.

Current wording

Our first Fast LNG unit has been deployed off the coast of Altamira, Tamaulipas, Mexico. The 1.4 million ton per annum (“MTPA”) FLNG unit utilizes CFE’s firm pipeline transportation capacity on the Sur de Texas-Tuxpan Pipeline to receive feedgas volumes. Our first FLNG unit has been installed and connected to the gas pipeline at Altamira, and we are in the process of finalizing commissioning the project. While we experienced delays in commissioning our first FLNG unit, which impacted our results of operations in 2024 and may impact our results in future periods, in July 2024, we began to produce LNG. We have placed this asset into service from an accounting perspective in the fourth quarter of 2024, and we expect to achieve run-rate production in 2025.

Previous wording

We have also entered into a non-binding MOU with CFE to develop and operate an onshore liquefied natural gas terminal with up to four 1.4 MTPA FLNG units. The terminal is to be located at the existing Altamira LNG import facility and would source feedgas from the Sur de Texas-Tuxpan Pipeline. The Altamira onshore LNG facility is a world class import facility that will be converted to export LNG similar to other gulf coast regasification terminals. Existing infrastructure at the facility includes two 150,000m3 storage tanks, deepwater marine berth and access to local gas and power networks.

Current wording

We expect to deploy up to two 1.4MTPA additional FLNG units onshore at the existing Altamira LNG import facility. The terminal would source also feedgas from the CFE from the Sur de Texas-Tuxpan Pipeline. The Altamira onshore LNG facility is a world class import facility that will be converted to export LNG similar to other gulf coast regasification terminals. Existing infrastructure at the facility includes two 150,000m3 storage tanks, deepwater marine berth and access to local gas and power networks.

Previous wording

In addition, we are considering a plan to install up to two FLNG units approximately 16 nautical miles off the southeast coast of Grand Isle, Louisiana. We have filed applications with the U.S. Maritime Administration ("MARAD") and the U.S. Coast Guard to obtain our deepwater port license application for this facility which remain subject to review and approval as described under “Risk Factors—Risks Related to Our Business—Failure to obtain and maintain permits, approvals and authorizations from governmental and regulatory agencies and third parties on favorable terms could impede operations and construction.” If constructed, the facility would be capable of exporting up to approximately 145 billion cubic feet of natural gas per year, equivalent to approximately 2.8 MTPA of LNG.

Current wording

In addition, we are considering a plan to install up to two FLNG units approximately 16 nautical miles off the southeast coast of Grand Isle, Louisiana. We have filed applications with the U.S. Maritime Administration ("MARAD") and the U.S. Coast Guard to obtain our deepwater port license application for this facility. The facility will be capable of exporting up to approximately 145 billion cubic feet of natural gas per year, equivalent to approximately 2.8 MTPA of LNG.

Previous wording

We are developing an offshore liquefied natural gas receiving and storage facility off the coast of Puerto Sandino, Nicaragua, as well as an onshore regasification facility. We have entered into a 25-year PPA with Nicaragua’s electricity distribution companies, and we expect to utilize approximately 57,000 MMBtu from LNG per day to provide natural gas to the Puerto Sandino Power Plant in connection with the 25-year power purchase agreement. As part of our long-term partnership with the local utility, we are evaluating solutions to optimize power generation efficiency and allow for additional electrical capacity in a market that is underserved. We expect to complete this optimization in 2024.

Current wording

We are developing a liquefied natural gas receiving, transloading and regasification facility in Puerto Sandino, Nicaragua, as well as a pipeline connecting the facility with our Puerto Sandino Power Plant. We have entered into a 25-year PPA with Nicaragua’s electricity distribution companies, and we expect to utilize approximately 57,000 MMBtu from LNG per day to provide natural gas to the Puerto Sandino Power Plant in connection with the 25-year power purchase agreement. Construction of the terminal and power plant is substantially complete; however, we will determine timing of final commissioning and commencement under our PPA based on the most optimal use of our LNG supply chain. As part of our long-term strategy, we are also evaluating solutions to optimize power generation and delivery to other markets, connected to our power plant through a regional transmission line.

Previous wording

The Barcarena Facility consists of an FSRU and associated infrastructure, including mooring and offshore and onshore pipelines. The Barcarena Facility is capable of processing over one million MMBtu from LNG per day and storing up to 160,000 cubic meters of LNG. We have entered into a 15-year gas supply agreement with a subsidiary of Norsk Hydro ASA for the supply of natural gas to the Alunorte Alumina Refinery in Pará, Brazil, through our Barcarena Facility. We substantially completed our Barcarena Facility in 2022 and expect to commence operations, including delivery to the Alunorte Alumina Refinery in the first half of 2024.

Current wording

The Barcarena Facility consists of an FSRU and associated infrastructure, including mooring and offshore and onshore pipelines. The Barcarena Facility is capable of delivering almost 600,000 MMBtu from LNG per day and storing up to 160,000 cubic meters of LNG. We have entered into a 15-year gas supply agreement with a subsidiary of Norsk Hydro ASA for the supply of natural gas to the Alunorte Alumina Refinery in Pará, Brazil, through our Barcarena Facility.

Previous wording

The Barcarena Facility will also supply our new 630MW combined cycle thermal power plant to be located in Pará, Brazil (the “Barcarena Power Plant”). The power plant is fully contracted under multiple 25-year power purchase agreements to supply electricity to the national electricity grid. We expect to complete the Barcarena Power Plant and begin delivering power to nine committed offtakers for 25 years beginning in 2025.

Current wording

The Barcarena Facility will also supply our new 630MW combined cycle natural gas-fired power plant to be located in Pará, Brazil (the “Barcarena Power Plant”). The power plant is fully contracted under multiple 25-year power purchase agreements to supply electricity to the national electricity grid. We expect to complete the Barcarena Power Plant in 2025.

Previous wording

We intend to develop and operate an LNG facility and power plant on the Shannon Estuary, near Tarbert, Ireland. In April 2023, we were awarded a capacity contract for the development of a power plant for approximately 353 MW of electricity generation with a duration of ten years as part of the auction process operated by Ireland’s Transmission System Operator. The power plant is required to be operational by October 2026. In the third quarter of 2023, An Bord Pleanála, Ireland's planning commission, denied our application for the development of an LNG terminal and power plant. We are challenging this decision. The continued development of this project is uncertain and there are multiple risks, including regulatory risks, that could preclude the development of this project, and the results of these risks could have a material effect on our results of operations.

Current wording

We intend to develop and operate an LNG facility and power plant on the Shannon Estuary, near Tarbert, Ireland. In April 2023, we were awarded a capacity contract for the development of a power plant for approximately 353 MW of electricity generation with a duration of ten years as part of the auction process operated by Ireland’s Transmission System Operator. The power plant is required to be operational by October 2026.

Previous wording

Our first clean hydrogen project, known as ZeroPark I, is located in Beaumont, Texas. The ZeroPark I facility is sited within a 10-mile radius of the two largest refineries in the western hemisphere and numerous petrochemical manufacturers, many of which require significant amounts of hydrogen for their businesses. ZeroPark I, as planned, could use up to 200 MW of power, constructed in two distinct phases, each using 100 MW of electrolysis technology. In total, ZeroPark I is expected to produce up to 86,000 kg of clean hydrogen per day, or approximately 31,000 TPA. We have commenced design, engineering and permitting for ZeroPark I and expect to commence operations on the first phase in the first half of 2025. Additionally, we have secured a binding offtake commitment for the clean hydrogen produced at ZeroPark I. Once completed, we expect our Beaumont Facility to be the largest green hydrogen plant in the United States.

Current wording

Our first clean hydrogen project, known as ZeroPark I, is located in Beaumont, Texas. The ZeroPark I facility is sited within a 10-mile radius of the two largest refineries in the western hemisphere and numerous petrochemical manufacturers, many of which require significant amounts of hydrogen for their businesses. ZeroPark I, as planned, could use up to 200 MW of power, constructed in two distinct phases, each using 100 MW of electrolysis technology. In total, ZeroPark I is expected to produce up to 86,000 kg of clean hydrogen per day, or approximately 31,000 TPA. We have commenced design, engineering and permitting for ZeroPark I. Additionally, we have secured a binding offtake commitment for the clean hydrogen produced at ZeroPark I. Once completed, we expect ZeroPark I to be the largest green hydrogen plant in the United States.

Previous wording

•Our historical financial results do not reflect our Fast LNG solution that will lower the cost of our LNG supply. We currently purchase the majority of our supply of LNG from third parties, sourcing approximately 99% of our

Current wording

•Our historical financial results do not reflect our Fast LNG solution that will lower the cost of our LNG supply. We currently purchase the majority of our supply of LNG from third parties, sourcing approximately 93% of our LNG volumes from third parties for the year ended December 31, 2024. We anticipate that the deployment of Fast LNG liquefaction facilities will significantly lower the cost of our LNG supply and reduce our dependence on third-party suppliers. Though the commissioning of our first Fast LNG unit was delayed from the initially anticipated date, which impacted our results of operations in this period and may impact our results in future periods, we began to produce LNG from our first Fast LNG unit in July 2024. We sold the first full cargo from this facility on September 30, 2024, and we anticipate reaching run rate production in 2025..

Previous wording

•Our historical financial results do not include significant projects that have recently been completed or are near completion. Our results of operations for the year ended December 31, 2023 include our Montego Bay Facility, Old Harbour Facility, San Juan Facility, certain industrial end-users and our Miami Facility. We have placed our La Paz Facility in service in 2021, and in the third quarter of 2023, we placed the La Paz Power Plant into service. We have executed agreements to extend and amend oursupply of natural gas to multiple CFE power generation facilities in Baja California Sur, and as such, our revenue and results of operations have begun to be impacted by our operations in Mexico. We are also continuing to develop our Puerto Sandino Facility, Barcarena Facility, Santa Catarina Facility and Ireland Facility, and our current results do not include revenue and operating results from these projects.

Current wording

•Our historical financial results do not include significant projects that have recently been completed or are near completion. Our results of operations for the year ended December 31, 2024 include our Montego Bay Facility, Old Harbour Facility, San Juan Facility, La Paz Power Plant and certain industrial end-users. We placed the Santa Catarina Facility into service in the fourth quarter of 2024. We have also completed construction of our Barcarena Facility and are in the final stages of commissioning. We are also continuing to develop our Barcarena Power Plant, PortoCem Power Plant, Puerto Sandino Facility and Ireland Facility, and our current results do not include revenue and operating results from these projects.

Previous wording

•Our historical financial results include the results from our investments in the common units of Hilli LLC and CELSEPAR. On March 15, 2023, we completed a transaction with Golar LNG Limited (“GLNG”) for the sale of our investment in the common units of Hilli LLC (“Hilli Common Units”), disponent owner and operator of the Hilli Episeyo (the “Hilli”) through its subsidiary Golar Hilli Corporation, in exchange for approximately 4.1 million NFE shares and $100 million in cash (the "Hilli Exchange"). In the fourth quarter of 2022, we sold our interest in Centrais Elétricas de Sergipe Participações S.A. (“CELSEPAR”), the indirect owner of the Sergipe Power Plant in Brazil. As a result of these transactions, we no longer have any ownership interest in either the Hilli or the Sergipe Power Plant, and their results will no longer be included in NFE's results of operations.

Current wording

•Our historical financial results include the results from our investments in the common units of Hilli LLC and Energos. On March 15, 2023, we completed a transaction with Golar LNG Limited (“GLNG”) for the sale of our investment in the common units of Hilli LLC (“Hilli Common Units”), disponent owner and operator of the Hilli Episeyo (the “Hilli”) through its subsidiary Golar Hilli Corporation, in exchange for approximately 4.1 million NFE shares and $100 million in cash (the "Hilli Exchange"). As a result of this transaction, we no longer have any ownership interest in the Hilli, and their results are no longer included in NFE's results of operations.

Previous wording

(4)Cost of sales is presented exclusive of costs included in Depreciation and amortization in the Consolidated Statements of Operations and Comprehensive Income.

Current wording

(2)Cost of sales is presented exclusive of costs included in Depreciation and amortization in the Consolidated Statements of Operations and Comprehensive (Loss) Income.

Previous wording

(3)Consolidation and Other adjusts for the inclusion of the effective share of revenues, expenses and operating margin attributable to our 50% ownership of CELSEPAR and Hilli Common Units in our segment measure prior to the disposition of these investments, the exclusion of the unrealized mark-to-market gain or loss on derivative instruments and the exclusion of non-capitalizable contract acquisition costs.

Current wording

In 2023, the effective share of revenues, expenses and operating margin attributable to our ownership of the common units of Hilli LLC were included in the segment measure prior to the disposition of this investment. Unrealized mark-to-market gains or losses on derivative instruments and the exclusion of non-capitalizable contract acquisition costs were also removed.

Previous wording

•The average Henry Hub index pricing used to invoice our downstream customers increased by 13% for the three months ended December 31, 2023 as compared to the three months ended September 30, 2023.

Current wording

•The average Henry Hub index pricing used to invoice our downstream customers increased by 29% for the three months ended December 31, 2024 as compared to the three months ended September 30, 2024.

Previous wording

•The average Henry Hub index pricing used to invoice our downstream customers decreased by 59% for the year ended December 31, 2023 as compared to the year ended December 31, 2022.

Current wording

•The average Henry Hub index pricing used to invoice our downstream customers decreased by 17% for the year ended December 31, 2024 as compared to the year ended December 31, 2023.

Previous wording

Cost of sales includes the procurement of feedgas or LNG, as well as shipping and logistics costs to deliver LNG or natural gas to our facilities. Our LNG and natural gas supply are purchased from third parties or converted in our Miami Facility. Costs to convert natural gas to LNG, including labor, depreciation and other direct costs to operate our Miami Facility are also included in Cost of sales. Starting in the third quarter of 2023, our subsidiary, Genera, began to provide operations and maintenance services to PREPA's thermal generation assets, and cost to provide these services is included in Cost of sales. Under our contract with PREPA, we pass all of these costs onto PREPA, and such billings are recognized as revenue.

Current wording

Cost of sales includes the procurement of feed gas or LNG, as well as shipping and logistics costs to deliver LNG or natural gas to our facilities. Historically, our LNG and natural gas supply has been purchased from third parties or converted in our Miami Facility. Following the sale of our Miami Facility, we continue sourcing LNG from third parties and we expect a portion of our supply to be generated by our first FLNG unit. Costs to convert natural gas to LNG, including labor, depreciation and other direct costs to operate our liquefaction facilities are also included in Cost of sales. Starting in the third quarter of 2023, our subsidiary, Genera, began to provide operations and maintenance services to

Previous wording

Operations and maintenance increased by$36.8 million for the year ended December 31, 2023 as compared to the year ended December 31, 2022, which was attributable to the following activity:

Current wording

Cost of sales increased by $299.8 million for the year ended December 31, 2024 as compared to the year ended December 31, 2023, which was attributable to the following activity:

Previous wording

•We incurred increased cost of LNG purchased from third parties for sale to our downstream customers of $48.0 million during the year ended December 31, 2023 due to increased volumes delivered; we delivered 74% more volumes to our downstream terminal customers in the current period as compared to the year ended December 31, 2022. While we delivered significantly more volumes to our downstream customers, our pricing to purchase LNG for delivery to such customers was substantially lower, decreasing to $7.23 per MMBtu for the year ended December 31, 2023 from $10.84 per MMBtu for the year ended December 31, 2022.

Current wording

•We incurred increased cost of LNG to supply our downstream customers of $64.5 million during the year ended December 31, 2024 due to increased volumes delivered. We delivered 19% more volume to our downstream terminal customers in the current period. Our pricing to purchase LNG for delivery to such customers was slightly lower at $7.20 per MMBtu for the year ended December 31, 2024 compared to $7.23 per MMBtu for the year ended December 31, 2023.

Previous wording

•We recognized additional payroll and other operating costs of $35.6 million to provide services under Genera's operations and maintenance contract.

Current wording

•We recognized payroll and other operating costs of $101.4 million to provide services under Genera's operations and maintenance contract for the year ended December 31, 2024 compared to $35.6 million for the year ended December 31, 2023; these costs are passed onto PREPA. Only six months of such costs were incurred during the year ended December 31, 2023 as our contract commenced on July 1, 2023.

Previous wording

•We incurred decreased cost of LNG purchased from third parties for LNG cargo sales of $310.3 million during the year ended December 31, 2023.

Current wording

•We incurred decreased cost of LNG for cargo sales during the year ended December 31, 2024 by $19.2 million as our LNG cargo sale activity has been marginally lower in 2024.

Previous wording

•During the year ended December 31, 2023, realized gains of $139.1 million from the settlement of commodity swap transactions, entered into as an economic hedge to reduce the market risks associated with commodity prices, were included as reduction of cost of sales. For segment performance measures, unrealized mark to market gains and losses are excluded until settled.

Current wording

•In the year ended December 31, 2023, realized gains of $139.1 million from the settlement of commodity swap transactions, entered into as an economic hedge to reduce the market risks associated with commodity prices, were included as reduction of cost of sales in the segment measure. For segment performance measures, unrealized mark to market gains and losses are excluded until settled. No such transactions occurred in 2024.

Previous wording

The weighted-average cost of our LNG inventory balance to be used in our operations as of December 31, 2023 and December 31, 2022 was $7.33 per MMBtu and $10.42 per MMBtu, respectively.

Current wording

The weighted-average cost of our LNG inventory balance to be used in our operations as of December 31, 2024 and December 31, 2023 was $6.90 per MMBtu and $7.33 per MMBtu, respectively.

Previous wording

Revenue in the Ships segment is comprised of operating lease revenue under time charters, fees for positioning and repositioning vessels as well as the reimbursement of certain vessel operating costs. Prior to the completion of the Energos Formation Transaction, we also recognized revenue related to the interest portion of lease payments and the operating and service agreements in connection with the sales-type lease of the Nanook. We included the interest income earned under sales-type leases as revenue as amounts earned under chartering and operating service agreements represented our ongoing ordinary business operations.

Current wording

Revenue in the Ships segment is comprised of operating lease revenue under time charters, fees for positioning and repositioning vessels as well as the reimbursement of certain vessel operating costs. As of December 31, 2024, three vessels included in the Energos Formation Transaction were leased to customers under long-term arrangements and are included in this segment.

Previous wording

Exchange at the end of the first quarter of 2023, we no longer recognize revenue from the Hilli, further decreasing revenue in the Ships segment. Additionally the charters for two vessels concluded in the first quarter of 2023 and the charters for another two vessels concluded in the fourth quarter of 2023, lowering vessel revenue for the year ended December 31, 2023. We plan to utilize these vessels in our operations following conversion and other upgrades starting in 2024.

Current wording

Total revenue for the Ships segment decreased by $123.0 million for the year ended December 31, 2024 as compared to the year ended December 31, 2023. After the disposition of our investment in the common units of Hilli LLC at the end of the first quarter of 2023, we no longer recognize revenue from the Hilli, decreasing revenue in the Ships segment. Additionally the charters for four vessels concluded in 2023, and one vessel in 2024, lowering vessel revenue for the year ended December 31, 2024. We are now utilizing these vessels in our operations.

Showing the first 40 of 78 pairs. Open the source sections for the rest.

Rearranged current paragraphs (3)

Current report — wording carried from elsewhere

•Starting in the third quarter of 2023, Genera, began to provide operations and maintenance services to PREPA's thermal generation assets, and cost to provide these services is included in Cost of sales. Under our contract with PREPA, we pass all of these costs onto PREPA, and such billings are recognized as revenue. The Company provided full year of operations and maintenance services during 2024 compared to six months of services in 2023.

Current report — wording carried from elsewhere

PREPA's thermal generation assets, and cost to provide these services is included in Cost of sales. Under our contract with PREPA, we pass all of these costs onto PREPA, and such billings are recognized as revenue.

Current report — wording carried from elsewhere

Our cash flow used in investing activities was $2,074.6 million for the year ended December 31, 2024, which decreased by $829.5 million from cash used in investing activities of $2,904.1 million for the year ended December 31, 2023. Cash outflows from investing activities during the year ended December 31, 2024 were used primarily for continued development of our Fast LNG project and the construction of the PortoCem Power Plant and Barcarena Power Plant. Cash outflows were offset by proceeds from the sale of assets including the sale of turbines and related equipment to PREPA, our investment in Energos, the Mazo and the Miami Facility.
Rearranged previous paragraphs (3)

Previous report — wording carried elsewhere

LNG volumes from third parties for the year ended December 31, 2023. We anticipate that the deployment of Fast LNG liquefaction facilities will significantly lower the cost of our LNG supply and reduce our dependence on third-party suppliers. We expect to deploy our first Fast LNG unit upon the completion of commissioning in 2024.

Previous report — wording carried elsewhere

Cash outflows for investing activities during theyear ended December 31, 2022 were used for continued development of our Fast LNG project, Santa Catarina Facility, and Barcarena Facility. Cash outflows were offset by proceeds of $593.0 million from the sale of the finance lease of the Nanook and $500.1 million from selling our investment in CELSEPAR.

Previous report — wording carried elsewhere

The Letter of Credit Agreement contains usual and customary representations and warranties, usual and customary affirmative and negative covenants and events of default.