Skip to main content

Bloom Energy Corp

For the period ended Dec 31, 2025. Filed Feb 9, 2026.

View on SEC.gov

About this filing

A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.

FY2025 · Filed Feb 9, 2026

BE$173.24+3.4%Stored close · as of Nov 6, 2026

What changed in Risk Factors?

Read the current filing

Previous report: 10-K

Period ended 2024-12-31; filed 2025-02-27.

0001628280-25-008747

Item 1A. RISK FACTORS

Current report: 10-K

Period ended 2025-12-31; filed 2026-02-09.

0001628280-26-006516

Item 1A. RISK FACTORS

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 415 previous paragraphs and 445 current paragraphs.

294 unchanged; 98 reworded; 37 added; 12 removed; 11 previous and 16 current paragraphs rearranged.

Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (37)

Current report

•Our AI customer mix is increasing due to the continued adoption of AI tools, and the resulting growth in AI data centers and their resulting power needs to support our business expansion. Slower expansion of AI data centers due to actual or perceived deceleration in AI adoption or other factors could have an adverse impact on our business, financial condition and results of operations.

Current report

•Our business is subject to project execution risks.

Current report

•Certain features or characteristics of some of our supply agreements could expose us to risks, such as excess inventory, insufficient inventory, or above market pricing or higher costs, which could negatively affect our results of operations.

Current report

•Our internal computer systems, and those of our third-party providers, may fail or suffer from events beyond our control, including from cybersecurity events, which could reduce revenue and earnings, increase expenses and expose us to legal and regulatory claims.

Current report

•We increasingly rely on the collection, processing, storage, sharing, and analysis of large volumes of data that requires strong data governance.

Current report

•Geopolitical events and conditions could adversely affect our business, financial condition and operating results.

Current report

Our AI customer mix is increasing due to the continued adoption of AI tools, and the resulting growth in AI data centers and their resulting power needs to support our business expansion. Slower expansion of AI data centers due to actual or perceived deceleration in AI adoption or other factors could have an adverse impact on our business, financial condition and results of operations.

Current report

While we sell our solutions to customers in a variety of industries and for a variety of applications, we have recently seen a significant increase in demand for Bloom Energy Server systems to meet the power needs of AI data centers, which are experiencing increased demand for reliable, on-site power. These AI data centers are experiencing this increased demand largely as a result of the large power consumption requirements of AI computing and the lack of available generation, transmission and interconnection from the utility grid. A deceleration in AI adoption, changes in customer capital expenditure priorities, financing constraints (including reduced availability of project finance or tax equity), longer permitting or construction lead times, local moratoria, protests or siting restrictions on data centers or distributed generation, or improved grid interconnection timelines could adversely affect AI data centers’ demand for our solutions. The rate at which AI will continue to be adopted, and the resulting increase in power needs by AI data centers and the development of new AI data centers, is inherently difficult to predict and beyond our control. However, if AI adoption does not continue at the pace that we expect, or at all, our business, financial condition and results of operations could be adversely affected.

Current report

Project execution risks may be heightened for large-scale, complex, first-of-a-kind, or geographically diverse projects as well as projects in new markets or regulatory environments. If we are unable to effectively manage these risks, our ability to deliver projects on time, within budget, and in accordance with contractual requirements could be adversely affected, which could harm our business reputation, customer relationships, cash flows, operational results, and financial condition.

Current report

•logistics and shipping constraints due to geopolitical conflicts in shipping routes;

Current report

•risk of actions taken unilaterally by a foreign government or government owned entity that could adversely affect or limit our customers’ use of our products or our customers’ or our ability to perform under our customer contracts, increase the potential for customer disputes, increase our costs or adversely impact our profitability;

Current report

Our internal computer systems, and those of our third-party providers, may fail or may suffer from events beyond our control, including security breaches and other cybersecurity events, which could compromise our intellectual property and other confidential information, disrupt our product development programs and manufacturing operations, harm product performance, and/or damage the Company’s brand and reputation, any of which could reduce our revenue and earnings, increase our expenses and expose us to legal and regulatory claims.

Current report

All of our major operations, including manufacturing, distribution, sales and accounting, are dependent on our internal computer systems and infrastructure (“IT Systems”) and those of our strategic collaborators, vendors, contractors, and consultants (“third-party providers”) and we maintain information that is confidential, proprietary, or otherwise sensitive in nature on our IT Systems, including intellectual property, financial and other trade secret and confidential information related to us, our employees, prospects, customers, suppliers and business partners (collectively, “Confidential Information”). In addition, our development programs and manufacturing operations are dependent on our IT Systems, as is the performance and full functionality of our products. For example, we use our IT Systems to remotely control and assess the performance of our products in the field.

Current report

Our IT Systems and those of our third-party providers, are vulnerable to damage from computer viruses, unauthorized access, misuse, natural disasters, terrorism, cybersecurity threats, war and, internet, telecommunications, data network and electrical failures, as well as security compromises or breaches, which may compromise our systems, infrastructure, data or that of those with whom we share such data or information or upon which our business relies, or lead to data compromise, misuse, misappropriation or leakage. Any damage or significant disruption in the operation of our IT Systems or those of our third-party providers or the failure of such systems to perform as expected (including as a result of any of the events noted in the preceding sentence or otherwise) would disrupt our business and could have a material adverse effect us.

Current report

In addition, cyber-attacks could extract Confidential Information and such attacks could also include the deployment of harmful malware, ransomware, digital extortion, business email compromises and denial-of-service attacks, social engineering (including phishing attacks) and other means to affect server reliability and threaten confidentiality, integrity and availability of information or IT Systems. If any such cyber-attack against us or our third-party providers were to result in a loss of or damage to our data; the disclosure of Confidential Information; an interruption in our operations, such as a material disruption to our product development programs, manufacturing operations or interfere with the functionality of our products, it could have a material adverse effect on us.

Current report

We increasingly rely on the collection, processing, storage, sharing, and analysis of large volumes of data that requires strong data governance. A failure to maintain strong data governance by us and/or our third-party providers could result in investigations, fines, penalties, and litigation; expose us to operational, financial and reputational risks; and adversely impact the execution of strategic objectives.

Current report

Effective data governance, including data quality, data integrity, data access controls, data lifecycle management, and compliance with applicable data protection and privacy requirements, is essential to our operations, decision-making, and

Current report

strategic initiatives. We face risks associated with maintaining accurate, complete, timely, and consistent data across multiple systems, business units, geographies, and third party platforms. Deficiencies in data governance practices, data quality, system integrations, or internal controls could result in inaccurate reporting, flawed business or operational decisions, inefficiencies, delays, increased costs, or failures to meet contractual, regulatory, or disclosure obligations.

Current report

As we expand our use of advanced analytics, automation, and artificial intelligence-enabled tools, our reliance on high quality and well governed data increases and any weakness in data governance may be amplified. In addition, we are subject to a complex and evolving landscape of data protection, privacy, cybersecurity, and data localization laws and regulations in the jurisdictions in which we operate. Failure to comply with those requirements, or to appropriately govern the use of sharing of data could result in regulatory investigations fines, penalties, or litigation.

Current report

We also rely on third party vendors, cloud service providers, and other partners to host, process, or access data. Risks related to third party data handling practices could adversely affect our data governance framework and expose us to additional operational, financial, and reputational risks.

Current report

If we are unable to effectively design, implement, and maintain a robust data governance framework that evolves with our business, our ability to operate efficiently, protect confidential information, leverage data-driven insights, and execute our strategic objectives could be adversely affected.

Current report

While during 2025 SK ecoplant Co., Ltd. and its affiliates (“SK ecoplant”) reduced their holdings in our common stock acquired through their strategic investment in us, SK ecoplant continues to hold approximately 6,971,701 shares of our common stock as of December 31, 2025, equaling 2.5% of the shares outstanding as of such date. See Part II, Item 8, Note 17—SK ecoplant Strategic Investment for additional information with respect to such investment. In addition, in October 2025, in connection with our partnership with Oracle Corporation (“Oracle”) to provide on-site solid state power for AI data centers, subject to the negotiation of a warrant mutually acceptable to us and Oracle, we agreed to issue to Oracle a warrant (the “Oracle Warrant”) to purchase up to an aggregate of 3,531,073 shares of our common stock, with an exercise price of $113.28 per share, which was the closing market price of our common stock on October 28, 2025. We and Oracle agreed that (i) the expiration date of the Oracle Warrant will be six (6) months from the date of the issuance of the Oracle Warrant, (ii) the Oracle Warrant will include customary anti-dilution adjustments, transfer restrictions and exercise procedures, and (iii) the Oracle Warrant will not entitle the holder to any voting rights, dividends or other rights as a stockholder of the Company prior to the exercise and settlement of the Oracle Warrant. The Oracle Warrant and the shares underlying the Oracle Warrant are expected to be issued in reliance on the exemption from registration pursuant to Section 4(a)(2) of the Securities Act of 1933, as amended. Assuming the issuance and exercise of the Oracle Warrant, the common stock underlying such warrant would represent approximately 1.3% of the shares outstanding as of December 31, 2025 on a pro forma basis.

Current report

Table of Contents

Current report

Index to Financial Statements

Current report

Furthermore, certain provisions in the convertible notes we have issued could make a third party attempt to acquire us more difficult or expensive. For example, if a takeover constitutes a fundamental change, then, subject to limited exceptions, noteholders will have the right to require us to repurchase their notes for cash. In addition, if a takeover constitutes a make-whole fundamental change, then we may be required to temporarily increase the conversion rate. In either case, and in other cases, our obligations under the notes and the indenture could increase the cost of acquiring us or otherwise discourage a third party from acquiring us or removing incumbent management, including in a transaction that holders of our common stock may view as favorable.

Current report

Table of Contents

Current report

Index to Financial Statements

Current report

Geopolitical events and conditions could adversely affect our business, financial condition and operating results.

Current report

Geopolitical and security issues, such as changes in U.S. government and other nations’ administration and their associated shifts in policy and priorities, armed conflict and civil or military unrest, political instability, terrorist activity and public health emergencies, could adversely affect our business, financial condition and operating results. For example:

Current report

•Trade tensions have risen between the U.S. and China. China as a country supplies multiple components including rare earth metals and compounds used in electronic and electromechanical components that are part of our tier 2 and tier 3 sub-assembly suppliers. The continued escalation of trade tensions between China and the U.S. could impact our ability to source these rare earth metals and components;

Current report

•Tensions between mainland China and Taiwan have increased significantly in recent years, presenting an elevated risk of hostilities. Our products contain components which are supplied principally from Taiwan. As such, any disruption impacting Taiwan could adversely impact our ability to obtain these components and supply our customers with products. In addition, such events could adversely affect the potential strength of the Taiwan market for our Energy Server product;

Current report

•The current administration has implemented new and revised tariffs on all U.S. trade partners as well as sanctions, and is in the process of negotiating trade deals. While we have taken measures in response to mitigate supply chain disruptions and costs caused by tariffs, and will continue to evaluate and implement additional response measures, tariffs may adversely impact us, including affecting key financial metrics such as our gross margin. The situation is expected to remain volatile and subject to changing conditions;

Current report

•The Russia and Ukraine conflict has had adverse effects on the pricing in Europe for liquified natural gas and other fuels which can be utilized by our energy server systems, which may have adversely impacted the attractiveness of our products in various countries in Europe that are potentially strong markets for us. Conflicts in the Middle East and Venezuela may also have impacts on prices for such fuels;

Current report

•Relationships between the U.S. and Europe have recently been under strain due to additional issues such as defense which could also negatively impact the demand of our products in that market; and

Current report

•If a new health epidemic or outbreak were to occur, we could experience broad and varied effects similar to the impact of COVID-19, including adverse impacts to our workforce and supply chain, inflationary pressures and increased costs, schedule or production delays, market volatility and other financial ramifications.

Current report

As a result, our operations and our financial results, including our ability to execute our business strategy, manufacture, and sell products, and the demand for our products, can be adversely affected by a number of geopolitical factors outside of our control.
Removed paragraphs (12)

Previous report

•Our products involve a lengthy sales and installation cycle, which may lengthen further as we seek larger transactions.

Previous report

•We derive a substantial portion of our revenue and backlog from a limited number of customers.

Previous report

•We are subject to laws and regulations, including environmental laws and regulations, regarding our products.

Previous report

•Data security breaches and cyberattacks could compromise our intellectual property or other confidential information and cause significant damage to our business, product performance, brand and reputation.

Previous report

We derive a substantial portion of our revenue and backlog from a limited number of customers, and the loss of or a significant reduction in orders from a large customer could have a material adverse effect on our operating results and other key metrics.

Previous report

In any particular period, a substantial amount of our total revenue has and could continue to come from a relatively small number of customers. As an example, in the year ended December 31, 2024, three customers accounted for approximately 23%, 16% and 14% of our total revenue. The loss of any large customer order or any delays in installations of new products with any large customer would materially and adversely affect our business results.

Previous report

We have, in some instances, entered into long-term supply agreements that could result in excess or, if one or more suppliers do not produce for any reason, insufficient inventory, above market pricing or higher costs, and negatively affect our results of operations.

Previous report

We utilize a sourcing strategy that emphasizes global procurement of materials that have direct or indirect dependencies upon a number of vendors with operations in the Asia Pacific region. Physical, regulatory, technological, market, reputational, and legal risks related to climate change in these regions and globally are increasing in impact and diversity and the magnitude of any short-term or long-term adverse impact on our business or results of operations remains unknown. The physical impacts of climate change, including as a result of certain types of natural disasters occurring more frequently or with more intensity or changing weather patterns, could disrupt our supply chain, result in damage to or closures of our facilities, and could otherwise have an adverse impact on our business, operating results and financial condition. In addition, the war in Ukraine resulted in increased sanctions that affected the price of raw materials used in our products, which had and could continue to have an adverse impact on our operating results.

Previous report

Data security breaches and cyberattacks could compromise our intellectual property or other confidential information and cause significant damage to our business, product performance, brand, and reputation.

Previous report

We maintain information that is confidential, proprietary or otherwise sensitive in nature on our information technology systems, and on the systems of our third-party providers. This information includes intellectual property, financial information and other confidential information related to us and our employees, prospects, customers, suppliers and other business partners. Additionally, our information technology provides us with the ability to remotely control some variables of our products; they are connected to, controlled and monitored by our centralized remote monitoring service. We rely on our internal software applications for many of the functions we use to operate our business generally. Cyberattacks are increasing in frequency and evolving in nature. We and our third-party providers are at risk of attack through the use of increasingly sophisticated methods, including malware, phishing and the deployment of artificial intelligence to find and exploit vulnerabilities.

Previous report

Our information technology systems, and those maintained by our third-party providers, have been in the past, and may be in the future, subjected to attempts to gain unauthorized access, disable, destroy, maliciously control or cause other system disruptions. In some cases, it is difficult to anticipate or to detect immediately such incidents and the damage they caused. While these types of incidents have not had a material effect on our business to date, future incidents involving access to our network or improper use of our systems, or those of our third parties, could compromise confidential, proprietary or otherwise sensitive information, as well as the operation of our products.

Previous report

There is no assurance that any measures we may take to combat known and unknown cybersecurity risks will be sufficient to prevent future security breaches and cyberattacks. The security of our infrastructure, including the network that connects our products to our remote monitoring service, may be vulnerable to breaches, unauthorized access, misuse, computer viruses, or other malicious code and cyberattacks that could have a material adverse impact on our business and our products in the field, and the protective measures we have taken may be insufficient to prevent such events. A breach or failure of our networks or computer or data management systems due to intentional actions such as cyberattacks, including ransomware attacks, phishing or denial-of-service attacks, negligence, or other reasons, whether as a result of actions by third-parties or our employees, could seriously disrupt our operations or could affect our ability to control or to assess the performance in the field of our products and could result in disruption to our business and legal liability.
Reworded paragraphs (98)

Previous wording

•Distributed energy generation and hydrogen production are emerging markets that may not receive widespread acceptance or demand.

Current wording

•Distributed energy generation and hydrogen production are emerging markets that may not receive widespread acceptance or demand may be lower than we expect.

Previous wording

•Possible new trade tariffs could have a material adverse effect on our business.

Current wording

•Trade tariffs could have a material adverse effect on our business.

Previous wording

•We have a limited history of manufacturing new products, such as our Electrolyzers.

Current wording

•We have a limited history of manufacturing new products.

Previous wording

•We are in an unsettled regulatory and legal environment with increasing compliance complexity and costs.

Current wording

•We are in an unsettled regulatory and legal environment with compliance complexity and costs.

Previous wording

•Our failure to effectively protect and enforce our intellectual property rights may undermine our competitive position, and litigation to protect our intellectual property rights may be costly.

Current wording

•Our inability to effectively protect and enforce our intellectual property rights may undermine our competitive position, and litigation to protect our intellectual property rights may be costly.

Previous wording

•We may issue additional shares of our common stock in connection with future conversions of the Green Notes, which may dilute our existing stockholders and potentially adversely affect the market price of our common stock.

Current wording

•We may issue additional shares of our common stock in connection with future conversions of outstanding convertible notes, which may dilute our existing stockholders and potentially adversely affect the market price of our common stock.

Previous wording

•Future sales of our common stock by SK ecoplant Co., Ltd. or its affiliates, or the perception that such sales could occur, may adversely affect the market price of our common stock.

Current wording

•Future sales of our common stock by current or potential future significant holders, or the perception that such sales could occur, may adversely affect the market price of our common stock.

Previous wording

•Provisions in our charter documents and under Delaware law could make an acquisition of us more difficult, limit stockholders’ rights, and limit the market price of our common stock.

Current wording

•Provisions in our charter documents and under Delaware law could make an acquisition of us more difficult, limit stockholders’ rights, and limit the market price of our common stock. In addition, provisions in the convertible notes we have issued could delay or prevent an otherwise beneficial takeover of us.

Previous wording

Distributed energy generation and hydrogen production are still emerging markets. It is uncertain whether potential customers will embrace distributed generation or hydrogen production in general, or our solutions in particular. Enterprises may be unwilling to adopt our solutions over traditional or competing power sources such as distributed solar or electricity from the grid, or alternative means of producing hydrogen. This could be due to the perception that our technology or our company is unproven, lack of confidence in our business model, unavailability of third-party service providers to operate and maintain our solutions, lack of awareness of our products, or their perception of regulatory or political challenges, including challenges pertaining to technologies that use natural gas fuels or have carbon emissions.

Current wording

Distributed energy generation and hydrogen production are still emerging markets. It is uncertain whether potential customers will embrace distributed generation or hydrogen production in general, or our solutions in particular. Enterprises may be unwilling to adopt our solutions over traditional, competing, and/or alternative power sources such as electricity from the grid, nuclear, hydro, coal, geothermal and/or intermittent solar and/or wind power paired with storage, or alternative means of producing hydrogen. This could be due to the perception that our technology or our company is unproven, lack of confidence in our business model, unavailability of third-party service providers to operate and maintain our solutions, lack of awareness of our products, or their perception of regulatory or political challenges, including challenges pertaining to technologies that use natural gas fuels or have carbon emissions.

Previous wording

•the emergence, continuance, or success of, or increased government support for, other alternative energy generation or hydrogen production technologies and products;

Current wording

•the introduction, emergence, continuance, maturation or success of, or increased government support for, other hydrogen production or alternative energy generation technologies and products (including, for example, small scale nuclear and geothermal);

Previous wording

Our sales cycle is typically 12 to 18 months but can vary considerably. To make a sale, we must typically provide a significant level of education to prospective customers regarding the use and benefits of our products and technology. The period between initial discussions with a potential customer and the eventual sale usually depends on a number of factors, including the potential customer’s budget, selection of financing type, and term of the contract. In addition, we have started to focus on larger projects, which tend to have longer sales cycles. Prospective customers often undertake a significant evaluation process that may further extend the sales cycle, and which evaluation may be negatively impacted by general market and economic conditions such as inflation, rising interest rates, availability of capital, a recessionary environment, geopolitical instability, energy availability and costs, and the availability and effects of government initiatives. Once a customer decides to purchase our product, it takes a significant amount of time for us to fulfill the sales order. Generally, it takes between nine to eighteen months or more from the entry into a sales contract until the installation of our products. The lengthy sales and installation cycles are subject to a number of significant risks, some of which are outside of our control. Due to the long sales and installation cycles, we may expend significant resources without being certain of generating a sale.

Current wording

Our sales cycle is typically 8 to 12 months but can vary considerably. To make a sale, we must typically provide a significant level of education to prospective customers regarding the use and benefits of our products and technology. The period between initial discussions with a potential customer and the eventual sale usually depends on a number of factors, including the potential customer’s budget, selection of financing type, and term of the contract. AI and data center customers and other large loads, tend to have longer sales cycles. Prospective customers often undertake a significant evaluation process that may further extend the sales cycle, and which evaluation may be negatively impacted by general market and economic conditions such as inflation, rising interest rates, availability of capital, a recessionary environment, geopolitical instability, energy availability and costs, and the availability and effects of government initiatives. Once a customer decides to purchase our product, it may take a significant amount of time for us to fulfill the sales order, generally due to variables within the customer’s control including permitting, building, availability of gas infrastructure. Generally, it takes between six to twelve months or more from the entry into a sales contract until the installation of our products. The lengthy sales and installation cycles are subject to a number of significant risks, some of which are outside of our control. Due to the long sales and installation cycles, we may expend significant resources without being certain of generating a sale.

Previous wording

Our products have significant upfront costs, and, for some customers, we need to attract investors to help them finance purchases.

Current wording

Our products have significant upfront costs, and, for some customers, we need to attract financiers to help them finance purchases.

Previous wording

Our products have significant upfront costs, which may be a barrier for some customers who may not have the financial capability to purchase our products directly. To address this, we have developed various financing options that allow customers to use our products through third-party financing arrangements. These options enable our customers to access our products without making a direct purchase. For more information on the different financing arrangements available, please see Part II, Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations— Purchase and Financing Options. If in any given quarter we or our customers are not able to secure funding, our financial condition and results of operations would be harmed. To attract new customers, we regularly innovate our customer contracts which may have different terms and financing conditions from prior transactions.

Current wording

Our products have significant upfront costs, which may be a barrier for some customers who may not have the financial capability to purchase our products directly. To address this, we have developed various financing options that allow customers to use our products through third-party financing arrangements. These options enable our customers to access our products without making a direct purchase. For more information on the different financing arrangements available, please see Part II, Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations—Purchase and Financing Options. If in any given quarter we or our customers are not able to secure funding, our financial condition and results of

Previous wording

In the U.S., our capacity to offer our Energy Server systems through financed arrangements depends in large part on the ability of financing parties to optimize the tax benefits associated with the Energy Server systems, such as the recently expired ITC for fuel cells running on a non-zero carbon fuel or accelerated depreciation. Interest rate fluctuations, and internationally, currency exchange rate fluctuations, may also impact the attractiveness of any financing offerings for our customers. Our ability to finance a PPA or a lease is also related to, and may be limited by, the creditworthiness of the customer.

Current wording

In the U.S., our capacity to offer our Energy Server systems through financed arrangements depends in large part on the ability of financing parties to optimize the tax benefits associated with the Energy Server systems. Interest rate fluctuations, and internationally, currency exchange rate fluctuations, may also impact the attractiveness of any financing offerings for our customers. Our ability to finance a PPA or a lease is also related to, and may be limited by, the creditworthiness of the customer.

Previous wording

We believe that the customer’s decision to purchase our Energy Server system is significantly influenced by its price, the price predictability of electricity generated by our Energy Server systems in comparison to the retail price, and the future price outlook of electricity from the local utility grid and other energy sources. These prices are subject to change and may affect the relative benefits of our Energy Server systems. Factors that could influence these prices and are beyond our control include the impact of energy conservation initiatives that reduce electricity consumption; construction of additional power generation plants (including renewables, storage, nuclear, coal or natural gas); technological developments by others in the electric power industry; the imposition of interconnection, “departing load,” “standby,” power factor charges, greenhouse gas emissions charges, or other charges by local electric utility or regulatory authorities; and changes in the rates offered by local electric utilities and/or in the applicability or amounts of charges and other fees imposed or incentives granted by such utilities on customers. In addition, even with available subsidies for our products, in those areas where the current cost of grid electricity is low, including in some states in the U.S. and some foreign countries, our Energy Server systems may not be economically attractive.

Current wording

We believe that the customer’s decision to purchase our Energy Server system is significantly influenced by its price, the price predictability of electricity generated by our Energy Server systems in comparison to the retail price, and the future price outlook of electricity from the local utility grid and other energy sources. These prices are subject to change and may affect the relative benefits of our Energy Server systems. Factors that could influence these prices are beyond our control and include, without limitation, the impact of energy conservation initiatives that reduce electricity consumption; construction of additional power generation plants (including renewables, storage, nuclear, coal or natural gas); technological developments by others in

Previous wording

Furthermore, actual or perceived potential increases in the price of natural gas or other fuels or curtailment of availability (e.g., as a consequence of physical limitations or adverse regulatory conditions for the delivery or production of natural gas or other fuels) or the inability to obtain natural gas or other fuel services could make our Energy Server systems less economically attractive to potential customers and reduce demand. While our Energy Server systems can operate using hydrogen or biofuels, the availability and current high cost of those natural gas alternatives in a particular location may make them less attractive to potential customers, reducing the demand for our products.

Current wording

Furthermore, actual or perceived potential increases in the price of natural gas or other fuels or curtailment of availability (e.g., as a consequence of physical limitations or adverse regulatory conditions for the delivery or production of natural gas or other fuels) or the inability to obtain natural gas or other fuel services could make our Energy Server systems less economically attractive to potential customers and reduce demand. While our Energy Server systems can operate using hydrogen or biofuels, the availability and/or current high cost of those natural gas alternatives in a particular location may make them less attractive to potential customers, reducing the demand for our products.

Previous wording

We need to reduce the manufacturing costs for our products to expand our markets. Additionally, certain of our existing service contracts rely on projections regarding service cost reductions that may not be realized. Increases in component and raw material costs could offset our cost-cutting efforts, slowing our growth and causing our financial results and operational metrics to suffer. In the past, we have experienced price increases in raw materials, which are used in our components and subassemblies for our fuel cell products.

Current wording

We need to reduce the manufacturing costs for our products to expand our markets. Additionally, certain of our existing service contracts rely on projections regarding service cost reductions that may not be realized. Increases in component and raw material costs, including those caused by tariffs and lack of available supply could offset our cost-cutting efforts, slowing our growth and causing our financial results and operational metrics to suffer. In the past, we have experienced price increases in raw materials, which are used in our components and subassemblies for our fuel cell products.

Previous wording

Our expenses have increased and may increase in the future due to factors such as increases in wages or other labor costs, marketing and sales. We need to reduce costs to expand into new markets (in which the price of electricity from the grid is lower) while maintaining our current margins. Any failure to achieve cost reductions could adversely affect our results of operations and financial condition and harm our business and prospects. Our inability to reduce product costs may impact our profitability, which could have a material adverse effect on our business and prospects.

Current wording

Our expenses have increased and may increase in the future due to factors such as increases in wages or other labor costs, marketing and sales. We may need to reduce costs to expand into new markets (in which the price of electricity from the grid is lower) while maintaining our current margins. Any failure to achieve cost reductions could adversely affect our results of operations and financial condition and harm our business and prospects. Our inability to reduce product costs may impact our profitability, which could have a material adverse effect on our business and prospects.

Previous wording

•Deployment of our fuel cell products can be affected by interconnection requirements, export tariff arrangements and utility tariff requirements that are subject to change.

Current wording

Deployment of our fuel cell products can be affected by interconnection requirements, export tariff arrangements and utility tariff requirements that are each subject to change.

Previous wording

are producing more electricity than a customer may require, and such excess electricity can be exported to the local electric utility. Export of customer-generated power from our Energy Server systems is generally provided for in the markets in which we offer our fuel cells pursuant to applicable laws, regulations and tariffs, but not under all circumstances, and may be restricted or made costlier due to interconnection, relevant tariff or other issues. Many, but not all, local electric utilities provide compensation to our customers for such electricity under “fuel cell net metering” (which often differs from solar net metering) or other customer generation programs.

Current wording

Because our fuel cell systems are designed to be able to operate at a constant output 24x7, while our customers’ demand for electricity typically fluctuates over the course of the day or week, there are often periods when our Energy Server systems are producing more electricity than a customer may require, and such excess electricity can be exported to the local electric utility. Export of customer-generated power from our Energy Server systems is generally provided for in the markets in which we offer our fuel cells pursuant to applicable laws, regulations and tariffs, but not under all circumstances, and may be restricted or made costlier due to interconnection, relevant tariff or other issues. Many, but not all, local electric utilities provide compensation to our customers for such electricity under “fuel cell net metering” (which often differs from solar net metering) or other customer generation programs.

Previous wording

Fuel cell net metering can be affected by local utility tariffs and fees, changes to interconnection agreement terms and fuel cell net metering requirements, and some jurisdictions do not allow export of excess electricity. At times in the past, such changes have had the effect of significantly reducing or eliminating the benefits of such programs. Changes in the availability of, or benefits offered by, utility tariffs, the applicable net metering requirements or interconnection agreements could adversely affect the demand for our Energy Server systems. For example, in California, the fuel cell net metering tariff expressly addressing fuel cells and providing certain incentives and export capability (referred to as the “Fuel Cell Net Energy Metering” (“FC NEM”)) expired at the end of 2023 and is no longer available to new customers. Existing customers can remain on the tariff if they comply with greenhouse gas emission standards that are intended to ensure they operate at a rate that is the same or better than the grid resources they are displacing. If at some point fuel cell resources cease to operate at a rate that is the same or better than the grid resources they are displacing, this may result in increased cost. There are also some more generally applicable tariffs available for customers deploying fuel cells, however, they have limitations, and while the loss of FC NEM has not yet impacted our ability to sell our Energy Server systems for use in California, that could change at some point in the future. We cannot predict the outcome of the many regulatory proceedings addressing tariffs that would include customers utilizing fuel cells. If an economical tariff for customers utilizing fuel cells is not available in a given jurisdiction, it may limit or end our ability to sell and install our Energy Server systems in that jurisdiction. Further, permits and other requirements applicable to electric and gas interconnections are subject to change. For example, some jurisdictions are limiting new gas interconnections, although others are allowing new gas interconnections for non-combustion resources like our Energy Server systems.

Current wording

Fuel cell net metering can be affected by local utility tariffs and fees, changes to interconnection agreement terms and fuel cell net metering requirements, and some jurisdictions do not allow the export of excess electricity. At times in the past, such changes have had the effect of significantly reducing or eliminating the benefits of such programs. Changes in the availability of, or benefits offered by, utility tariffs, the applicable net metering requirements or interconnection agreements could adversely affect the demand for our Energy Server systems. For example, in California, the fuel cell net metering tariff expressly addressing fuel cells and providing certain incentives and export capability (referred to as the “Fuel Cell Net Energy Metering” (“FC NEM”)) expired at the end of 2023 and is no longer available to new customers. Existing customers can remain on the tariff if they comply with greenhouse gas emission standards that are intended to ensure they operate at a rate that is the same or better than the grid resources they are displacing. If at some point fuel cell resources cease to operate at a rate that is the same or better than the grid resources they are displacing, this may result in increased cost. There are also some more generally applicable tariffs available for customers deploying fuel cells, however, they have limitations, and while the loss of FC NEM has not yet impacted our ability to sell our Energy Server systems for use in California, that could change at some point in the future. We cannot predict the outcome of the many regulatory proceedings addressing tariffs that would include customers utilizing fuel cells. If an economical tariff for customers utilizing fuel cells is not available in a given jurisdiction, it may limit or end our ability to sell and install our Energy Server systems in that jurisdiction. Further, permits and other requirements applicable to electric and gas interconnections are subject to change. For example, some jurisdictions are limiting new gas interconnections, although others are allowing new gas interconnections for non-combustion resources like our Energy Server

Previous wording

Our Energy Server systems are designed to operate at a constant output 24x7. Therefore, they need a constant source of fuel such as natural gas, biogas, or hydrogen to keep them running. Fuel for our Energy Server systems is typically provided by local gas utilities. Our customers rely on such utilities to provide a constant supply of fuel that meets our specifications. However, if new regulations require a switch to different fuel for which there may be limited availability, such as biogas, it can create challenges for our products and their sales. Adverse fuel supply constraints or fuel outside of our fuel specifications may delay or prevent the deployment of our Energy Server systems.

Current wording

Our Energy Server systems are designed to operate at a constant output 24x7. Therefore, they need a constant source of fuel such as natural gas, biogas, or hydrogen to keep them running. Fuel for our Energy Server systems is typically provided by local gas utilities. Our customers rely on such utilities to provide a constant supply of fuel that meets our specifications. However, if new regulations require a switch to different fuel for which there may be limited availability and/or which may be more costly, such as biogas, it may reduce demand for our products and their sales. Adverse fuel supply constraints or fuel outside of our fuel specifications may delay or prevent the deployment of our Energy Server systems.

Previous wording

We compete for customers, financing partners and incentive dollars from other electric power providers. Our Bloom Energy Server systems compete with a broad range of companies and technologies, including traditional energy suppliers, such as public utilities, and other energy providers utilizing traditional co-generation systems, nuclear, hydro, coal or geothermal power, companies utilizing intermittent solar or wind power paired with storage, and other commercially available fuel cell companies. We also compete with traditional backup energy equipment such as diesel generators. Our Electrolyzers compete with low temperature electrolyzer companies using Alkaline, Proton, PEM or AEM electrolysis.

Current wording

We compete for customers, financing partners and incentive dollars from other electric power providers. Our Bloom Energy Server systems compete with a broad range of companies and technologies, including traditional energy suppliers, such as public utilities, and other energy providers utilizing traditional co-generation systems, nuclear, hydro, coal or geothermal power, companies utilizing intermittent solar or wind power paired with storage, and other commercially available fuel cell companies. We also compete with traditional backup energy equipment such as diesel generators.

Previous wording

Many of our competitors, such as traditional utilities and other companies offering distributed generation products, have longer operating histories, customer incumbency advantages, access to and influence with local and state governments, and access to more capital resources than us. Significant developments in alternative technologies, such as energy storage, wind, solar or hydro power generation, or improvements in the efficiency or cost of traditional energy sources, including coal, oil, natural gas used in combustion, or nuclear power, may materially and adversely affect our business and prospects in ways we cannot anticipate. We may also face new competitors with better technologies, products, or resources. If we fail to adapt to changing market conditions and to compete successfully with grid electricity or new competitors, our growth will be limited, which would adversely affect our business results.

Current wording

Many of our competitors, such as traditional utilities and other companies offering distributed generation products, have longer operating histories, customer incumbency advantages, access to and influence with local and state governments, and access to more capital resources than us. Despite advantages offered by our products, prospective customers may still select such competitors to fulfill their energy needs after weighing all of the foregoing and any other applicable considerations. Significant developments in alternative technologies, such as energy storage, wind, solar or hydro power generation, or improvements in the efficiency or cost of traditional energy sources, including coal, oil, natural gas used in combustion, or nuclear power, may materially and adversely affect our business and prospects in ways we cannot anticipate. We may also face new competitors with better technologies, products, or resources. If we fail to adapt to changing market conditions and to compete successfully with grid electricity or new competitors, our growth will be limited, which would adversely affect our business results.

Previous wording

We plan to enhance our future growth opportunities by expanding our energy and hydrogen solutions. This includes expanding the features of and uses for our Energy Server systems, including providing options for carbon capture and heat output, by expanding our production and sales of our Electrolyzer, and by expanding the markets in which we sell our products. These opportunities will demand our focus, including the allocation of personnel, financial resources, and management oversight. If we fail to effectively allocate our resources or follow through on these opportunities, our business and operational results may be adversely affected.

Current wording

We plan to enhance our future growth opportunities by expanding our energy solutions. This includes expanding the features of and uses for our Energy Server systems, including providing options for carbon capture and heat output, and by expanding the markets in which we sell our products. These opportunities will demand our focus, including the allocation of personnel, financial resources, and management oversight. If we fail to effectively allocate our resources or follow through on these opportunities, our business and operational results may be adversely affected.

Previous wording

To the extent we are successful in growing our business, we may need to increase the production capacity of our products. Our ability to plan, construct and equip additional manufacturing facilities is subject to significant risks and uncertainties, including delays, cost overruns, geopolitical instability, and labor shortages. Expanding manufacturing capacity internationally may also expose us to new laws and regulations and carries risks. There is also a possibility that we may not be able to achieve our production targets for a variety of reasons, including reliance on third parties who do not fulfill their obligations to us.

Current wording

We plan to double our factory capacity from 1 gigawatt to 2 gigawatts by the end of 2026. Our ability to complete this expansion, and any future expansions, is subject to significant risks and uncertainties, including delays, cost overruns, geopolitical instability and labor shortages. We also need to hire, train and retain skilled employees to manage this expansion and operate our facilities effectively. The manufacture of our products is capital-intensive, and equipment, once purchased, may break down or require costly maintenance or may become obsolete due to technological improvements or other factors. We may also experience quality control issues as we implement any production upgrades. Expanding manufacturing capacity internationally may also expose us to new laws and regulations including those pertaining to labor and employment, environmental and export/import and carries risks. There is also a possibility that we may not be able to achieve our production targets for a variety of reasons, including reliance on third parties who do not fulfill their obligations to us.

Previous wording

If we are unable to expand our manufacturing facilities or develop our existing facilities in a timely manner, we may be unable to further scale our business, which would negatively affect our results of operations and financial condition. Conversely, if the demand for our products or our production output does not rise as expected, we may not be able to spread a significant amount of our fixed costs over the production volume, resulting in a greater than expected per unit fixed cost, which would have a negative impact on our financial condition and results of operations.

Current wording

If we are unable to expand our manufacturing facilities or develop our existing facilities to achieve the production throughput necessary to achieve our targeted production rate in a timely manner, we may be unable to further scale our business, which would negatively affect our results of operations and financial condition. Conversely, if the demand for our products or our production output does not rise as expected, we may not be able to spread a significant amount of our fixed costs over the production volume, resulting in a greater than expected per unit fixed cost, which would have a negative impact on our financial condition and results of operations.

Previous wording

Our products are complex, and they may contain undetected or latent errors or defects. We have experienced latent defects that were discovered once the Energy Server system was deployed in the field. Changes in our supply chain or the failure of our suppliers to otherwise provide us with components or materials that meet our specifications could introduce defects in our products. As we grow our manufacturing volume, the chance of manufacturing defects could increase. In addition, new feature launches, product introductions or design changes could introduce new design defects that may impact product performance and life. Any design or manufacturing defects or other failures of our products, including catastrophic or pervasive product failures, could cause us to incur significant costs, a large field recall, divert the attention of our engineering personnel from product development efforts, and significantly and adversely affect customer satisfaction, market acceptance, and our business reputation.

Current wording

Our products are complex, and they may contain undetected or latent errors or defects. We have experienced latent defects that were discovered once the Energy Server system was deployed in the field. Changes in our supply chain or the failure of our suppliers to otherwise provide us with components or materials that meet our specifications could introduce defects in our products. As we grow our manufacturing volume, the chance of manufacturing defects could increase. In addition, new feature launches, product introductions or design changes could introduce new design defects that may impact product performance and life. Any design or manufacturing defects or other failures of our products, including catastrophic or

Previous wording

If any of our solutions are defective or fail because of their design, including those incorporating third party hardware such as CCUS, CHP, microgrids, batteries and other distributed energy resources, or if changes in applicable laws or regulations, or in the enforcement thereof, require us to redesign or recall our products, we may incur additional costs and expenses. The process of identifying and recalling a product may be lengthy and require significant resources, and we may incur significant replacement costs, contract damage claims from our customers, product liability, property damage, personal injury or other claims and liabilities, and brand and reputational harm. In addition, applications such as CCUS may impact the overall risk profile of our solutions, which could impact where our systems can be located to comply with various zoning and permit restrictions. Significant costs or payments made in connection with warranty and product liability claims and product recalls could harm our financial condition and results of operations.

Current wording

If any of our solutions are defective or fail because of their design, including those incorporating third party hardware such as carbon capture, heat capture, microgrids and other distributed energy resources, or if changes in applicable laws or regulations, or in the enforcement thereof, require us to redesign or recall our products, we may incur additional costs and expenses. The process of identifying and recalling a product may be lengthy and require significant resources, and we may incur significant replacement costs, contract damage claims from our customers, product liability, property damage, personal injury or other claims and liabilities, and brand and reputational harm. In addition, applications such as carbon capture may impact the overall risk profile of our solutions, which could impact where our systems can be located to comply with various zoning and permit restrictions. Significant costs or payments made in connection with warranty and product liability claims and product recalls could harm our financial condition and results of operations.

Previous wording

configurations, we encounter new field conditions from time to time (including as a result of climate change). Adverse impacts on performance may require us to incur significant service and re-engineering costs or divert the attention of our engineering personnel from product development efforts. Furthermore, we may be unable to adequately address the impacts of factors outside of our control in a manner satisfactory to our customers. Any of these circumstances could significantly and adversely affect customer satisfaction, market acceptance, and our business reputation.

Current wording

Field conditions, such as the quality of the fuel supply and environmental factors, can impact the performance of our products in unpredictable ways. As we move into new geographies and deploy new features, products and service configurations, we encounter new field conditions from time to time (including as a result of climate change). Adverse impacts on performance may require us to incur significant service and re-engineering costs or divert the attention of our engineering personnel from product development efforts. Furthermore, we may be unable to adequately address the impacts of factors outside of our control in a manner satisfactory to our customers. Any of these circumstances could significantly and adversely affect customer satisfaction, market acceptance, and our business reputation.

Previous wording

We provide performance warranties and guaranties covering the efficiency and output performance of our products. Our pricing of these contracts and our reserves for warranty and replacement are based upon our estimates of the useful life of our products and those components that are replaced as a part of standard maintenance, including assumptions regarding improvements in power module life that may fail to materialize. We do not have a long history at a large scale, and our estimates may prove to be incorrect. Failure to meet these warranty and performance requirements may require us to replace the products or to make cash payments to customers. Actual warranty expenses may exceed estimates. If our estimates are inaccurate or we fail to accrue adequate reserves to make cash payments as required, our business and financial results could be harmed.

Current wording

We provide performance warranties and guaranties covering the efficiency and output performance of our products. Our pricing of these contracts and our reserves for warranty and replacement are based upon our estimates of the useful life of our products and those components that are replaced as a part of standard maintenance, including assumptions regarding improvements in power module life that may fail to materialize. While we continue to make progress in streamlining our installation and maintenance processes, we have in the past experienced certain project‑specific delays. These delays underscored the operational complexities inherent in coordinating large deployments with multiple external stakeholders. If we are delayed in or unable to perform maintenance, our previously installed products would likely experience adverse performance impacts, including reduced output and/or efficiency, which could result in warranty and/or guaranty claims by our customers. In addition, we do not have a long history at a large scale, and our estimates may prove to be incorrect. Failure to meet these warranty and performance requirements may require us to replace the products or to make cash payments to customers. Actual warranty expenses may exceed estimates. If our estimates are inaccurate or we fail to accrue adequate reserves to make cash payments as required, our business and financial results could be harmed.

Previous wording

Our business is subject to risks associated with construction, utility interconnection, fuel supply, cost overruns and delays, including those related to obtaining government permits and other contingencies that may arise in the course of completing installations.

Current wording

Our business is subject to project execution risks, including risks associated with construction, utility interconnection, fuel supply, cost overruns and delays, including those related to obtaining government permits and other contingencies that may arise in the course of completing installations.

Previous wording

Our financial results depend on the timely installation of our products, which may be on a fixed price basis, subjecting us to the risk of cost overruns or other unforeseen expenses in the installation process. Our products are subject to regulation and oversight in compliance with laws and ordinances relating to building codes, safety, environmental protection, and related matters in the jurisdictions where we operate, and typically require various local and other governmental approvals and permits, including environmental approvals and permits. Delays in obtaining these approvals and permits could stall the installation process of our products and adversely affect our revenue. For more information regarding these restrictions, please see the risk factors in the section titled “Risks Related to Legal Matters and Regulations.”

Current wording

Our financial results depend on the execution of customer projects and the timely installation of our products, which may be on a fixed price basis, subjecting us to the risk of cost overruns or other unforeseen expenses in the installation process. Our products are subject to regulation and oversight in compliance with laws and ordinances relating to building codes, safety, environmental protection, and related matters in the jurisdictions where we operate, and typically require various local and other governmental approvals and permits, including environmental approvals and permits. Delays in obtaining these approvals and permits could stall the installation process of our products and adversely affect our revenue. For more information regarding these restrictions, please see the risk factors in the section titled “Risks Related to Legal Matters and Regulations.”

Previous wording

In addition, the completion of some of our installations depends on the availability of and timely connection to the natural gas grid and the local electric grid. In some cases, interconnection may be conditioned on the construction by the local utility company of new transmission and distribution facilities and may also require construction of new natural gas pipelines to connect a project to the interstate pipeline system. Transmission and distribution upgrades found to be required in interconnection studies may cause planned projects to be deemed uneconomic to be constructed or may result in the size of the project itself being reduced in order to avoid significant upgrade costs. In addition, some municipalities have recently adopted restrictions that prohibit the installation of natural gas services to new construction. For more information regarding these restrictions, please see the risk factor titled “With respect to our products that run, in part, on fossil fuel, we may be subject to a heightened risk of regulation, the loss of certain incentives, and to changes in our customers’ energy procurement policies.” Delays in our ability to connect with utilities, delays in the performance of installation-related services, or poor performance of installation-related services by our general contractors or sub-contractors could have a material adverse effect on our results and could cause operating results to vary materially from period to period.

Current wording

utility company of new transmission and distribution facilities and may also require construction of new natural gas pipelines to connect a project to the interstate pipeline system. Transmission and distribution upgrades found to be required in interconnection studies may cause planned projects to be deemed uneconomic to be constructed or may result in the size of the project itself being reduced in order to avoid significant upgrade costs. In addition, some municipalities have recently adopted restrictions that prohibit the installation of natural gas services to new construction. For more information regarding these restrictions, please see the risk factor titled “With respect to our products that run, in part, on fossil fuel, we may be subject to a heightened risk of regulation, the loss of certain incentives, and to changes in our customers’ energy procurement policies.” Delays in our ability to connect with utilities, delays in the performance of installation-related services, or poor performance of installation-related services by our general contractors or sub-contractors could have a material adverse effect on our results and could cause operating results to vary materially from period to period.

Previous wording

Furthermore, we rely on the ability of our third-party contractors to install products at our customers’ sites and to meet our installation requirements. We particularly rely on third-party installation resources and contractors for projects in Asia and Europe. We currently work with a limited number of contractors, which could impact our ability to make installations as planned in the future. Our work with contractors may have the effect of our being required to comply with additional rules unique to our customers, site remediation, and other requirements, which can add costs and complexity to an installation project. The timeliness, thoroughness, and quality of the installation-related services performed by some of our contractors in the past have not always met our expectations or standards and may not meet our expectations and standards in the future.

Current wording

Furthermore, we rely on the ability of our third-party contractors to install products at our customers’ sites and to meet our installation requirements. We rely on third-party installation resources and contractors for projects in both U.S. and international markets. We currently work with a limited number of contractors, which could impact our ability to make installations as planned in the future. The timeliness, thoroughness, and quality of the installation-related services performed by some of our contractors in the past have not always met our expectations or standards and may not meet our expectations and standards in the future.

Previous wording

10% in any given period due to factors outside of our control, such as permitting or regulatory issues, delays or unexpected costs in securing interconnection approvals, utility infrastructure, cost changes, or other reasons unique to each customer. Our operating expenses are based on anticipated sales levels, and many of our expenses are fixed. If we are unsuccessful in closing sales after expending significant resources or if we experience customer disputes, delays or cancellations, our reputation, business, financial condition, results of operations or cash flows could be materially and adversely affected. Additionally, under our revenue recognition policy, we do not recognize revenue on product sales until delivery or complete installation. Therefore, a small fluctuation in the timing of the sales transaction’s completion could cause our operating results to vary materially from period to period.

Current wording

Lengthy sales and installation cycles can increase the risk of customer disputes or delayed or incomplete installations. Sometimes, a customer may cancel an order placed under a definitive agreement but prior to installation (a “post-order cancellation”). We have sought to mitigate risks associated with post-order cancellations through imposing cancellation fees which are sized both to discourage customer cancellations and to defray our costs in the event of a cancellation. However, no assurances can be given that such mitigation measures (if available) will be successful, meaning we may be unable to recover some, or all, of our costs incurred in connection with design, permitting, installation and site preparations. Factors which may affect cancellation rates which are outside of our control include permitting or regulatory issues, delays or unexpected costs in securing interconnection approvals, utility infrastructure, cost changes, or other reasons unique to each customer. Our operating expenses are based on anticipated sales levels, and many of our expenses are fixed. If we are unsuccessful in closing sales after expending significant resources or if we experience customer disputes, delays or cancellations, our reputation, business, financial condition, results of operations or cash flows could be materially and adversely affected. Additionally, under our revenue recognition policy, we do not recognize revenue on product sales until delivery or complete installation. Therefore, a small fluctuation in the timing of the sales transaction’s completion could cause our operating results to vary materially from period to period.

Previous wording

We rely on a limited number of suppliers and other third parties, and in some cases sole suppliers, for some of the raw materials and components used to manufacture our products, including certain rare earth materials and other materials that are in limited supply. If our suppliers provide insufficient inventory to meet customer demand, or such inventory is not at the level of quality required to meet our standards, or if our suppliers are unable or unwilling to provide us with the contracted quantities (as we have limited or in some case no alternatives for supply), our results of operations could be materially and negatively impacted. We are also reliant on other third-party providers of storage equipment, infrastructure equipment and pipelines, and other materials and technologies that work with our products to provide an energy solution for customers. If we fail to develop or maintain our relationships with suppliers or other third party providers, or if there is otherwise a shortage or lack of availability of any required raw materials or components, we may be unable to manufacture our products, or our solutions may be available only at a higher cost or after a long delay.

Current wording

We rely on a limited number of suppliers and other third parties, and in some cases sole suppliers, for some of the raw materials and components used to manufacture our products, including certain materials that are in limited supply. If our suppliers provide insufficient inventory to meet customer demand, or such inventory is not at the level of quality required to meet our standards, or if our suppliers are unable or unwilling to provide us with the contracted quantities (as we have limited or in some case no alternatives for supply), our results of operations could be materially and negatively impacted. We are also reliant on other third-party providers of storage equipment, infrastructure equipment and installations, and other materials and technologies that work with our products to provide an energy solution for customers. If we fail to develop or maintain our relationships with suppliers or other third party providers, or if there is otherwise a shortage or lack of availability of any required raw materials or components, we may be unable to manufacture our products, or our solutions may be available only at a higher cost or after a long delay.

Previous wording

The global supply chain for certain raw materials and components, including semiconductor components and specialty metals, has experienced significant strain in recent years. The macroeconomic environment and geopolitical instability have also contributed to and exacerbated this strain. There can be no assurance that the impact of these issues on the supply chain will not continue, or worsen, in the future. Significant delays and shortages could prevent us from delivering our solutions to customers within the required time frames and cause order cancellations, and could increase our costs, which would adversely impact our cash flows and the results of operations.

Current wording

The global supply chain for certain raw materials and components, including semiconductor components and specialty metals, has experienced significant strain in recent years. The macroeconomic environment, tariff uncertainty and geopolitical instability have also contributed to and exacerbated this strain. There can be no assurance that the impact of these issues on the supply chain will not continue, or worsen, in the future. Significant delays and shortages could prevent us from delivering our solutions to customers within the required time frames and cause order cancellations, and could increase our costs, which would adversely impact our cash flows and the results of operations.

Previous wording

In some cases, we have had to create our own supply chain for some of the components and materials utilized in our fuel cells. We have made significant expenditures to expand and bolster our supply chain. In many cases, we entered into contractual relationships with suppliers to jointly develop the components we needed. These activities are time and capital intensive. In addition, some of our suppliers use proprietary processes to manufacture components. We may be unable to obtain comparable components from alternative suppliers without considerable delay, expense, or at all, as replacing these suppliers could require us either to make significant investments to bring the capability in-house or to invest in a new supply chain partner. Some of our suppliers are smaller, private companies, which are heavily dependent on us as a customer. If our suppliers face difficulties obtaining the credit or capital necessary to expand their operations when needed, they could be unable to supply necessary raw materials and components to meet our requirements, which would negatively impact our sales volumes and cash flows.

Current wording

In some cases, we have had to create our own supply chain for some of the components and materials utilized in our fuel cells. As we have scaled our business, we have made significant expenditures to expand and bolster our supply chain across vendors and geographies. As we sell an innovative fuel cell technology, we historically have and will continue to enter into contractual relationships with suppliers to jointly develop the components we needed. These joint development activities are time and capital intensive and it takes time to develop and qualify multiple suppliers for these unique parts. In addition, some of our suppliers use proprietary processes to manufacture components that adds to the difficulty of developing and qualifying multiple suppliers for certain parts. We may be unable to obtain comparable components from alternative suppliers without considerable delay, expense, or at all, as replacing these suppliers could require us either to make significant investments to bring the capability in-house or to invest in a new supply chain partner. Some of our suppliers are dependent on us as a customer and may be more challenged to scale with our business than our more diversified supplier base. If our suppliers face difficulties obtaining the credit or capital necessary to expand their operations when needed, they could be unable to supply necessary raw materials and components to meet our requirements, which would negatively impact our sales volumes and cash flows, particularly as we grow and need to ramp our business. Although prior disruptions have not been material, the inability of a supplier to deliver, and our inability to secure timely and cost-effective alternatives, could impair our ability to timely provide products to our customers.

Previous wording

The failure by us to obtain raw materials or components in a timely manner or to obtain raw materials or components that meet our requirements could impair our ability to manufacture our products, increase the costs of our products or solutions, or increase the costs of servicing our existing portfolio of products. If we cannot obtain substitute materials or components on a timely basis or on acceptable terms, we could be prevented from delivering our solutions to our customers or service our existing fleet of products, which could result in sales and installation delays, cancellations, penalty payments, warranty breaches, or damage to our brand and reputation, any of which could have a material adverse effect on our business and results of operations. In addition, we rely on our suppliers to meet quality standards, and the failure of our suppliers to meet those quality standards could cause delays in the delivery of our solutions, unanticipated service costs, and damage to our brand and reputation.

Current wording

The failure by us to obtain raw materials or components in a timely manner or to obtain raw materials or components that meet our requirements could impair our ability to manufacture our products, increase the costs of our products or solutions, increase the costs of servicing our existing portfolio of products, or impact our ability to ramp our business at a pace to meet growing demand. If we cannot obtain substitute materials or components on a timely basis or on acceptable terms, we could be prevented from delivering our solutions to our customers or service our existing fleet of products, which could result in sales and installation delays, cancellations, penalty payments, warranty breaches, or damage to our brand and reputation, any of which could have a material adverse effect on our business and results of operations. In addition, we rely on our suppliers to meet quality standards, and the failure of our suppliers to meet those quality standards could cause delays in the delivery of our solutions, unanticipated service costs, and damage to our brand and reputation.

Showing the first 40 of 98 pairs. Open the source sections for the rest.

Rearranged current paragraphs (16)

Current report — wording carried from elsewhere

•Our products involve a lengthy sales and installation cycle, and if we fail to close sales on a regular timely basis, our business could be harmed

Current report — wording carried from elsewhere

•We are subject to laws and regulations that could impose substantial costs upon us and cause delays

Current report — wording carried from elsewhere

operations would be harmed. To attract new customers, we regularly innovate our customer contracts which may have different terms and financing conditions from prior transactions.

Current report — wording carried from elsewhere

the electric power industry; the imposition of interconnection, “departing load,” “standby,” power factor charges, greenhouse gas emissions charges, or other charges by local electric utility or regulatory authorities; and changes in the rates offered by local electric utilities and/or in the applicability or amounts of charges and other fees imposed or incentives granted by such utilities on customers. In addition, even with available subsidies for our products, in those areas where the current cost of grid electricity is low, including in some states in the U.S. and some foreign countries, our Energy Server systems may not be economically attractive.

Current report — wording carried from elsewhere

pervasive product failures, could cause us to incur significant costs, a large field recall, divert the attention of our engineering personnel from product development efforts, and significantly and adversely affect customer satisfaction, market acceptance, and our business reputation.

Current report — wording carried from elsewhere

In addition, the completion of some of our installations depends on the availability of and timely connection to the natural gas grid and the local electric grid. In some cases, interconnection may be conditioned on the construction by the local

Current report — wording carried from elsewhere

contractual liabilities, and the inability to recoup investments, which could adversely affect our financial performance and strategic objectives.

Current report — wording carried from elsewhere

or our customers. Furthermore, unforeseen delays in the review and permitting process could delay the timing of the installation of our products and could therefore adversely affect the timing of the recognition of revenue related to the installation, which could harm our operating results in a particular period. In many cases we contractually commit to performing all necessary installation work on a fixed-price basis, and unanticipated costs associated with approval, permitting or compliance expenses may cause the cost of performing such work to exceed our revenue. In addition, emerging federal and state emissions disclosure requirements may pose a burden to existing or potential customers. The costs of complying with all the various laws, regulations and customer requirements, and any claims concerning non-compliance, could have a material adverse effect on our financial condition or operating results.

Current report — wording carried from elsewhere

uncertainty for companies managing both legacy and emerging energy systems. Trade disputes, sanctions, and conflicts affecting supply chains and resource availability add unpredictability to the global regulatory landscape.

Current report — wording carried from elsewhere

Although we generally are not regulated as a utility, statutes, regulations, tariffs and market rules often relate to electricity and natural gas pricing, net metering, incentives, taxation, and the rules surrounding the interconnection of electricity

Current report — wording carried from elsewhere

Policing unauthorized use of proprietary technology can be difficult and expensive, and the measures we have taken to protect our intellectual property rights, including our trade secrets, may not be sufficient to prevent such use. For example, many of our engineers reside in California where it is not legally permissible to prevent them from leaving employment with us

Current report — wording carried from elsewhere

Companies, organizations, or individuals, including our competitors, may hold or obtain patents, trademarks, or other proprietary rights that they believe are infringed by our products or services. Entities or individuals holding patents or other intellectual property rights could make claims or bring suits alleging infringement, misappropriation, or other violations of such

Current report — wording carried from elsewhere

to prevent or detect material misstatements in our financial statements, in which case investors may lose confidence in the accuracy and completeness of our financial reports. Any failure to maintain effective disclosure controls and procedures or internal control over financial reporting could have a material adverse effect on our business and operating results and cause a decline in the price of our common stock.

Current report — wording carried from elsewhere

Upon the occurrence of certain events to us, including a change in control, a significant asset sale or merger or similar transaction, our liquidation or dissolution or the cessation of our stock exchange listing, each of which may constitute a fundamental change under the outstanding notes, holders of certain of the notes have the right to cause us to repurchase for cash any or all of such outstanding notes. We cannot provide assurance that we would have sufficient liquidity to repurchase such notes. In addition, pursuant to a credit agreement we entered into in December 2025, we provided collateral to secure amounts borrowed thereunder consisting of a lien on substantially all of our tangible and intangible personal property, other than intellectual property, and a pledge of various shares of stock, partnership interests and limited liability company interests of our direct material domestic subsidiaries and first-tier material foreign subsidiaries. We also agreed to various financial covenants, as well as restrictive covenants that, among other things, restrict our and our subsidiaries’ ability to incur additional debt, pay dividends and make distributions, make certain investments and acquisitions, prepay certain indebtedness, incur liens, enter into agreements with affiliates, and merge or consolidate.

Current report — wording carried from elsewhere

their ability to perform under contracts with us, our operations and financial results could be materially adversely affected. Additionally, the costs of complying with these laws (including the costs of investigations, auditing and monitoring) could adversely affect our current or future business.

Current report — wording carried from elsewhere

government enforcement actions and private litigation.
Rearranged previous paragraphs (11)

Previous report — wording carried elsewhere

•Our business is subject to risks associated with construction, utility interconnection study and transmission upgrade delays, cost overruns and delays, including those related to permits, regulatory approvals, and other contingencies.

Previous report — wording carried elsewhere

Because our fuel cell systems are designed to be able to operate at a constant output 24x7, while our customers’ demand for electricity typically fluctuates over the course of the day or week, there are often periods when our Energy Server systems

Previous report — wording carried elsewhere

Field conditions, such as the quality of the fuel supply and environmental factors, can impact the performance of our products in unpredictable ways. As we move into new geographies and deploy new features, products and service

Previous report — wording carried elsewhere

Lengthy sales and installation cycles can increase the risk of customer disputes or delayed or incomplete installations. Sometimes, a customer may cancel an order prior to installation, meaning we may be unable to recover some, or all of our costs incurred in connection with design, permitting, installation and site preparations. Cancellation rates can be as high as 5% to

Previous report — wording carried elsewhere

We have long-term supply agreements with certain suppliers. Some of these supply agreements provide for fixed or inflation-adjusted pricing, substantial prepayment obligations and in a few cases, supplier purchase commitments. These

Previous report — wording carried elsewhere

cannot meet any applicable GHG standards, there are alternative tariffs available for our customers. If the cost to remain on the FC NEM tariffs increase significantly or suitable alternatives are not available, it may negatively impact our existing customer base and future demand for our products. Additionally, the uncertainty regarding requirements for service under any of these tariffs could negatively impact the perceived value of, or risks associated with, our products, which could also negatively impact demand.

Previous report — wording carried elsewhere

In most jurisdictions where air permits and various land use permits are required for installation of larger Energy Server system installations, the length of time to obtain these permits has increased. Moreover, the level of certainty around the

Previous report — wording carried elsewhere

ordinances, or rules applicable to our Energy Server systems, or by our customers’ and potential customers’ energy procurement policies.

Previous report — wording carried elsewhere

our products may outpace our ability to engage sufficient and experienced personnel to manage the higher number of installations and to engage contractors to complete installations on a timely basis and in accordance with our expectations and standards. Any failure to manage our growth effectively could materially and adversely affect our business, prospects, operating results, and financial condition. Our future operating results depend to a large extent on our ability to manage this growth successfully.

Previous report — wording carried elsewhere

Our cross-border transactions and international operations are subject to complex foreign and U.S. laws and regulations, including anti-bribery and corruption laws, antitrust or competition laws, data privacy laws, such as the GDPR, and environmental regulations, among others. In particular, recent years have seen a substantial increase in anti-bribery law enforcement activity by U.S. regulators, and we currently operate and seek to operate in many parts of the world that are

Previous report — wording carried elsewhere

officers and other key management, technical, engineering, finance and sales personnel, could adversely impact our business, our financial condition and our operating results.