Skip to main content

Bloom Energy Corp

For the period ended Dec 31, 2025. Filed Feb 9, 2026.

View on SEC.gov

About this filing

A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.

FY2025 · Filed Feb 9, 2026

BE$173.24+3.4%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-K

Period ended 2024-12-31; filed 2025-02-27.

0001628280-25-008747

Item 7. — Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-K

Period ended 2025-12-31; filed 2026-02-09.

0001628280-26-006516

Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 295 previous paragraphs and 288 current paragraphs.

129 unchanged; 52 reworded; 93 added; 108 removed; 6 previous and 14 current paragraphs rearranged.

Tables are not compared: 10 previous and 10 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (93)

Current report

Bloom Energy is a global leader in onsite power generation, delivering a foundational platform purpose-built for the digital era and the global energy transition. We manufacture a versatile fuel cell energy platform, supporting the commercial availability of two primary products: the Bloom Energy Server® fuel cell system for generating electricity and the Bloom Electrolyzer™ for producing hydrogen. Our primary product, the Bloom Energy Server is a proprietary high-temperature solid-oxide fuel cell technology that converts fuels—including natural gas, biogas, and hydrogen—into electricity at high density without combustion or moving parts, achieving lower emissions and higher efficiency than legacy systems.

Current report

We design, manufacture, distribute, and operate the Bloom Energy Server to provide resilient, distributed power for critical operations. Our mission is to make clean, reliable energy affordable, giving enterprises control over cost, resilience, and sustainability. Bloom serves Fortune 500 companies across the data center, semiconductor manufacturing, AI infrastructure, utility, and other industrial sectors.

Current report

Headquartered in Silicon Valley, Bloom Energy employs more than 2,000 people worldwide and manufactures its systems in the United States. Bloom has its Energy Server systems deployed across approximately 1,100 sites in 9 countries, empowering businesses and critical infrastructure worldwide.

Current report

Policy Support has been Increasing for AI leadership and Energy Security. U.S. federal policy discussions increasingly link AI competitiveness with energy availability, emphasizing the importance of reliable near-term power sources. Recent actions recognize natural gas as a practical bridge resource for meeting immediate load growth while longer-term decarbonization pathways evolve. Over the same period, certain renewable incentives have become more time-limited, affecting the pace and predictability of new renewable additions. We believe these shifts are influencing customer planning and procurement decisions as they evaluate firm, rapidly deployable power options.

Current report

Grid Constraints and Permitting Delays are Extending Time to Power for Traditional New Facilities and Expansions. As electricity demand accelerates, grid capacity is not expanding at the same pace. Extended permitting timelines and supply chain constraints dictate that transmission additions remain limited, and generator interconnection queues at the end of 2024 totaled 2,300 gigawatts, with typical timelines extending multiple years and further delays. Even with regulatory reforms, the timelines associated with system upgrades required for reliability and deliverability continue to translate to long lead times. “Time to power” has become a central constraint for organizations planning new facilities or expansions providing an opportunity for power sources like our products that can be co-located on-site where the demand is needed and be grid-independent..

Current report

Shift Toward Onsite Power Generation is Occurring. To address schedule certainty and bypass grid bottlenecks, large-load customers—particularly data center operators—are increasingly evaluating onsite generation as part of their energy strategy. Onsite systems, when islanded, can allow customers to control deployment timelines, secure reliable baseload supply and reduce delays associated with lengthy permitting and interconnection processes. Industry analyses and surveys indicate meaningful growth in distributed and onsite generation through the end of the decade.

Current report

Limitations Among Traditional OEMs and Utilities are Extending Delivery Timelines. Traditional power generation OEMs are experiencing extended delivery timelines as demand for firm power solutions increases across data centers, industrial facilities and utility markets. Lead times for turbines, engines and other conventional equipment have lengthened due to global order volumes, supply chain constraints and component availability. In some cases, delivery windows span multiple years, limiting customers’ ability to add capacity on required schedules. We see these constraints contributing to increased interest in modular, rapidly deployable power solutions.

Current report

Utility Load Growth and Capacity Constraints are Creating Affordability Pressures. Utilities face rising load growth, cost pressures, and heightened scrutiny from both commercial and residential customers. Large users cite higher rates, reliability challenges and extended interconnection timelines, while households face increased affordability concerns as electricity takes a larger share of monthly spending. These dynamics are prompting utilities to explore more flexible and capital-efficient ways to serve load, including behind-the-meter and sleeved on-site generation arrangements that can be deployed more quickly and without extensive grid upgrades.

Current report

The Trump Administration has issued multiple Executive Orders enabling domestic energy production and AI development and is taking further actions to effectuate that intent, including the National Energy Emergency Declaration, Unleashing American Energy, Accelerating Permitting of Datacenter Infrastructure, and the AI Action Plan. In July 2025, the DOE issued a “Report on Evaluating U.S. Grid Reliability and Security,” which found that without intervention, blackouts could increase dramatically due to surging electricity demand and inadequate capacity supply, particularly in parts of the PJM Interconnection (PJM), Southwest Power Pool (SPP), Electric Reliability Council of Texas (ERCOT), and Midcontinent Independent System Operator (MISO) regional markets. In October 2025, the DOE Secretary issued a proposed rulemaking, which if enacted would establish federal standards on customer self-generation and behind-the-meter configurations, creating more uniform pathways for onsite, utility-scale fuel cell deployments.

Current report

During 2025, FERC likewise echoed resource adequacy concerns and began addressing whether existing market rules and tariffs properly address onsite generation in light of the rapid buildout of AI and cloud data centers, and is now addressing substantive issues raised in the DOE proposed rulemaking. The rule changes FERC is considering could significantly affect the speed at which Bloom Energy Server systems interconnect to the transmission grid. We expect substantive findings by FERC during 2026.

Current report

In February 2025, FERC launched a review of whether PJM needs to better address how onsite generation and co-located loads can interconnect and participate in markets. In December 2025, FERC directed comprehensive reforms to establish rates, terms, and conditions for onsite generation and co-located load. The order creates a favorable framework for new onsite generation configurations with co-located load through multiple pathways, including studying only the power a generator and load wishes to inject and withdraw from the transmission system rather than a generator’s gross capacity and maximum load withdrawals, which may reduce network upgrade costs by eliminating unneeded upgrades. In addition, FERC directed PJM to expedite interconnection studies where no network upgrades are required. The order requires PJM to make a number of filings with FERC and many changes may not be in place until later in 2026. The order also remains subject to rehearing and potential appeal, with the potential that FERC may modify or reverse its findings.

Current report

Resource adequacy concerns caused by rapid demand growth have led other regional markets to address rule changes. In October 2025, SPP filed its High Impact Large Load Generation Assessment (HILLGA), which provides an expedited interconnection pathway for generation designated to serve High Impact Large Load, with interconnection studies completed within 90 days. FERC approved SPP’s proposal in January 2026.

Current report

On the national stage, the DOE Secretary issued a proposed rulemaking in October 2025 to standardize procedures for interconnecting large loads directly to the transmission system, including co-located load and generation. More than 150 comments were submitted on the proposal, including by Bloom. Under this proposal, co-located load and generation would be studied based on net injections and withdrawals from the grid, which would reduce study times and upgrade costs, similar to FERC’s PJM order. Bloom submitted comments expanding on several of DOE’s proposals. DOE has requested FERC issue an order in April 2026, with further proceedings likely. These evolving rule changes to expedite the interconnection of large load and co-located generation may further influence customer planning and procurement decisions as they evaluate firm, rapidly deployable on-site power options such as our Energy Server product.

Current report

We continue to see effects from global supply chain tightness due to factors such as trade tensions between the U.S. and China, tariffs the current administration has also implemented on all trade partners, war and armed conflicts in Ukraine and the Middle East, and strain in relationships between the U.S. and Europe as a result of issues such as defense. While we have not experienced any significant component shortages to date, such factors, as well as challenges we face as a result of our need to expand our capacity due to the growth of our business, have placed pressure on our supply chain. Measures we are taking to mitigate these supply chain issues include expanding our supply chain base and reducing where feasible significant dependencies on any singular supply chain vendor. However, these measures may not be successful and dynamics could worsen as a result of continued geopolitical instability or escalation of current military conflicts or trade tensions. Also, additional internal factors such as continual evolution to improve our products which may require changes in the components utilized and pressure to reduce costs of components in efforts to improve margins further complicate the mitigation measures. We are a key customer for several of our suppliers, and are working with them to facilitate the ability to ramp as our own need for supplies from them increase. Our supply chain is not dependent on China. However, China as a country supplies multiple components including rare earth metals and compounds used in electronic and electromechanical components that are part of our tier 2 and

Current report

tier 3 sub-assembly suppliers. The continued escalation of trade tensions between China and the U.S. could impact our ability to source these rare earth metals and components. We have taken measures to try to mitigate these issues, including implementing strategic sourcing strategies, and we do not currently anticipate that the availability of rare earth elements from China will impact our 2026 production forecast; however, we cannot give assurances as to potential future developments or their related impacts. We are also reliant on third party providers of storage equipment, infrastructure equipment and pipelines, and other materials and technologies that work with our products to provide an energy solution for customers. The current administration has also implemented new tariffs on all trade partners and is in the process of negotiating trade deals. Measures we have taken in response, include making efforts to leverage economies of scale as we continue to grow to reduce the relative impact of tariff rates, improving product designs to reduce tariff sensitivity, and improving forecasts and demand planning. We will continue to evaluate and implement additional response and mitigation measures with respect to our supply chain and tariffs. While there have been impacts from tariffs and the situation is expected to remain volatile and subject to changing conditions, for fiscal year 2025 the impact of tariffs on our gross margin was not material and currently we do not believe such impacts will be material for fiscal year 2026. However, we cannot give assurances as to potential future developments or their related impacts.

Current report

We are in the process of expanding our annual production capacity run rate at our Fremont facility from 1 gigawatt to 2 gigawatts and expect to complete the expansion by the end of 2026. While our ability to complete the expansion to 2 gigawatts of annual production capacity run rate (as well as any additional future expansions) is subject to risks and uncertainties, including delays, cost overruns, geopolitical instability and labor shortages, we believe the current expansion remains on schedule and within our planned budget. We have sufficient funds to accommodate the planned expansion for 2026. In the event required, the Fremont facility can accommodate additional capacity expansion of up to approximately 5 gigawatts of annual production capacity run rate. We expect each additional incremental 1 gigawatt increase in our capacity up to 5 gigawatts (if necessary) to require approximately six to nine months to install and capital expenditure of approximately $100 million to $150 million. For additional discussion about risks related to increases in production capacity, please see the risk factors set forth under the caption Part I, Item 1A, Risk Factors—Risks Related to our Products and Manufacturing.

Current report

We have entered various agreements and transactions with SK ecoplant in connection with our strategic partnership, including prior sales to and purchases by SK ecoplant of both zero coupon, non-voting redeemable convertible Series A preferred stock, par value $0.0001 per share (the “Series A RCPS”), and non-voting Series B redeemable convertible preferred stock, par value $0.0001 per share (the “Series B RCPS”). All of such shares of Series A RCPS and Series B RCPS have since been converted into shares of our Class A Common Stock, and, during 2025, SK ecoplant engaged in various sales of such Class A common stock which had been acquired. As a result of such sales, since July 10, 2025, SK ecoplant is not a related party to us. Prior thereto, SK ecoplant had been a related party since September 23, 2023. As of December 31, 2025, SK ecoplant’s ownership interest in us was 2.5%.

Current report

Inflation Reduction Act of 2022 and The One Big Beautiful Bill Act

Current report

In the U.S., the ITC of up to 50% for fuel cells under Section 48(a) of the IRA expired on December 31, 2024. Prior to the expiration, the Company and its customers utilized compliant safe harbor mechanisms to begin construction and thereby still benefit from the ITC of up to 50% under Section 48(a). Under Section 48(a), Bloom fuel cell systems beginning construction prior to December 31, 2024 are eligible for a 30% base credit, a 10% domestic content bonus credit, and in certain cases (depending on location of the project site) a 10% energy communities bonus credit, provided in each case that prevailing wage and apprenticeship requirements are satisfied.

Current report

On July 4, 2025, the OBBBA was enacted into law, extending key provisions of 2017 Tax Act and modifying various federal clean energy tax provisions of the IRA. Under the OBBBA, fuel cell property is now eligible for a 30% ITC under Section 48E without regard to emissions for projects beginning construction after December 31, 2025 (without affecting continued eligibility of certain projects for up to 50% ITC under Section 48(a) as described above). The OBBBA reinstituted accelerated depreciation that will be applicable to property purchased and placed in service after January 19, 2025, including fuel cell property that begins construction after December 31, 2026. The OBBBA also included restrictions on the availability of energy tax credits to U.S. taxpayers owned or controlled by certain countries of concern (i.e., China, Russia, Iran and North Korea). The OBBBA also restored the expensing of domestic research expenditures for years beginning after December 31, 2024. The addition of the 30% ITC for fuel cell projects that begin construction after December 31, 2025, is expected to have a favorable impact on the continued adoption of our Energy Server systems and financial results.

Current report

Additionally, the OBBBA introduces new compliance requirements under the Foreign Entity of Concern (FEOC) provisions for both Section 48E and the Advanced Manufacturing Production Tax Credit (AMPTC) under Section 45X. These provisions limit “material assistance” from FEOCs in the manufacturing of products comprising fuel cell projects otherwise eligible for such tax credits. Although the rules are still being finalized, given the location of our supply chain we don’t expect the FEOC provisions to limit our fuel cell products’ ability to qualify for the tax credit or to otherwise increase our supply chain costs in an attempt to qualify. However, they may affect our future decisions around expansion or domestic supply chain investments. In response, we are working to align our development and sourcing strategies with the new credit framework and actively working with our partners and policymakers to support continued momentum for clean, reliable distributed energy solutions. We believe the long-term clarity and stability of the revised ITC for fuel cell property enhances our competitive

Current report

position, although the phasedown beginning after 2033 and future legislative or regulatory changes could still impact customer economics and our growth.

Current report

Importantly, the OBBBA preserves the utility of the Section 45Q tax credit incentives for carbon capture utilization and storage projects. Historically, the 45Q tax credit has provided differentiated credit levels for carbon management projects depending on the end-use of the captured carbon dioxide or carbon monoxide. The OBBBA modified

Current report

the structure of the credit and 45Q now provides one credit value for projects capturing carbon oxides from industrial

Current report

and power facilities ($85 per metric ton) regardless of the end-use. The updated values and extension of the program through projects that commence construction through 2032 help increase the viability of domestic carbon capture projects.

Current report

On May 16, 2023, we issued the 3.0% Green Notes due June 2028 in an aggregate principal amount of $632.5 million due June 2028, unless earlier repurchased, redeemed or converted, less the initial purchasers’ discount of $15.8 million and other issuance costs of $3.9 million, resulting in net cash proceeds of $612.8 million. On June 1, 2023, we used approximately $60.9 million of the net proceeds from this offering to redeem all of the outstanding principal amount of our 10.25% Senior Secured Notes due March 2027. The redemption price equaled 104% of the principal amount redeemed plus accrued and unpaid interest. We also used approximately $54.5 million of the net proceeds from the offering to purchase the capped call options.

Current report

On May 7, 2025, we entered into privately negotiated exchange agreements (the “Exchange Agreements”) with certain holders of our 2.5% Green Notes. Pursuant to the Exchange Agreements, $112.8 million in aggregate principal amount of the 2.5% Green Notes, and related accrued and unpaid interest of $0.7 million, were exchanged (the “Debt Exchange”) for $115.7 million in aggregate principal amount of the 3.0% Green Notes due June 2029. As a result of the Debt Exchange, we recorded a $32.3 million loss on early extinguishment of debt, included within our consolidated statements of operations for the year ended December 31, 2025. As of August 15, 2025, the maturity date, the remaining $2.2 million aggregate principal amount of our 2.5% Green Notes outstanding following the Debt Exchange, was settled through the issuance of our Class A common stock.

Current report

On November 4, 2025, we issued the 0% Notes in an aggregate principal amount of $2,500.0 million due November 2030, unless earlier repurchased, redeemed or converted, less the initial purchasers’ discount of $50.0 million and other issuance costs of $9.8 million, resulting in net cash proceeds of $2,440.2 million. Concurrently with the issuance of the 0% Notes, we entered into separate, privately negotiated transactions (the “Exchange Transactions”) with a limited number of holders of our existing 3.0% Green Notes due June 2028 and 3.0% Green Notes due June 2029 (collectively, the “Existing Notes”) to exchange (i) $532.8 million principal amount of the 3.0% Green Notes due June 2028 for aggregate consideration consisting of $539.6 million in cash, which includes accrued interest of $6.8 million on such 3.0% Green Notes due June 2028, and 24,302,183 shares of our Class A common stock, and (ii) $443.1 million principal amount of the 3.0% Green Notes due June 2029 for aggregate consideration consisting of $448.8 million in cash, which includes accrued interest of $5.6 million on such 3.0% Green Notes due June 2029, and 18,105,762 shares of our Class A common stock.

Current report

In addition, in October 2025, in connection with our partnership with Oracle to provide on-site solid state power for AI data centers, subject to the negotiation of a warrant mutually acceptable to us and Oracle, we agreed to issue to Oracle a warrant to purchase up to an aggregate of 3,531,073 shares of our common stock, with an exercise price of $113.28 per share, which was the closing market price of our common stock on October 28, 2025. We and Oracle agreed that (i) the expiration date of the Oracle Warrant will be six (6) months from the date of the issuance of the Oracle Warrant, (ii) the Oracle Warrant will include customary anti-dilution adjustments, transfer restrictions and exercise procedures, and (iii) the Oracle Warrant will not entitle the holder to any voting rights, dividends or other rights as a stockholder of the Company prior to the exercise and settlement of the Oracle Warrant. The Oracle Warrant and the shares underlying the Oracle Warrant are expected to be issued in reliance on the exemption from registration pursuant to Section 4(a)(2) of the Securities Act of 1933, as amended. As of February 9, 2026, the closing price of our common stock on the New York Stock Exchange was $155.17 per share.

Current report

On December 19, 2025, we entered into a senior secured multicurrency revolving credit facility (the “Revolving Credit Facility”) in an aggregate available amount of $600.0 million, including a $90.0 million letter of credit sub-facility (the “Credit Agreement”). The facility enhances our liquidity and financial flexibility to support working capital, capital expenditures, permitted acquisitions, and other strategic initiatives. Borrowings under the Revolving Credit Facility are available in U.S. dollars and certain foreign currencies and bear interest at Term SOFR plus an applicable margin (1.50% to 2.25%) or, at our option, at an alternative base rate, which is generally the highest of the prime rate, the federal funds rate plus 0.50%, and Term SOFR plus 1.00%, plus an applicable margin (0.50% to 1.25%), depending on our leverage ratio. The facility matures on December 19, 2030, subject to certain springing maturity provisions.

Current report

We capitalized $3.4 million of upfront fees and issuance costs related to the Revolving Credit Facility, which are being amortized over its term. As of December 31, 2025, no amounts were drawn under the facility. No letters of credit were issued or drawn as of December 31, 2025.

Current report

The Credit Agreement contains financial covenants that require us to maintain a Secured Leverage Ratio of no more than 3.25 to 1.00 and a Consolidated Interest Coverage Ratio of at least 3.00 to 1.00, each tested quarterly. We were in compliance with all covenants as of December 31, 2025, and no springing maturity provisions had been triggered as of the date of this Annual Report on Form 10-K.

Showing the first 40 of 93 passages. Open the source sections for the rest.

Removed paragraphs (108)

Previous report

Our mission is to make clean, reliable energy affordable for everyone in the world. We developed the first large-scale, commercially viable solid oxide fuel cell based power generation platform that empowers businesses, essential services, critical infrastructure and communities to responsibly take charge of their energy.

Previous report

Our technology, invented and manufactured in the U.S., is one of the most advanced electricity and hydrogen producing technologies on the market today. Our fuel-flexible Bloom Energy Server systems can use biogas, hydrogen, natural gas, or a blend of fuels to create resilient, reliable and sustainable power at typically significantly higher efficiencies than traditional, combustion-based resources. In addition, the same fuel cell based platform that powers our Energy Server systems can be used to create hydrogen with our Bloom Electrolyzer. Hydrogen is increasingly recognized as a critically important tool for the decarbonization of the energy economy. Our enterprise customers include some of the largest multinational corporations in the world. We also have relationships with some of the largest utility companies in the U.S. and the Republic of Korea, with a growing presence in various international markets in Europe and Asia.

Previous report

At Bloom Energy, we look forward to a net-zero future. Our technology is designed to help enable this future by delivering reliable, low-carbon electricity in a world facing unacceptable levels of power disruptions. Our resilient solid oxide fuel cell platform has kept electricity available for our customers through hurricanes, earthquakes, typhoons, forest fires, extreme heat and grid failures. Unlike traditional combustion power generation, our platform is community-friendly — emitting no noise, installed on movable skids and designed to significantly reduce emissions of criteria air pollutants. Our Energy Server systems provide electricity using natural gas, biofuels or hydrogen as feedstock and have applications that can provide both heat and power as well as enable carbon capture. We provide energy solutions that help organizations obtain reliable, resilient, lower emissions power today, thereby supporting net-zero objectives.

Previous report

We market and sell our Energy Server systems primarily through our direct sales organization in the U.S. and in certain international markets. We also work with utilities to offer our energy solutions to their end customers, which can be either in front of the meter or on-site. Recognizing that deploying our solutions requires significant financial commitment, we have developed a number of financing options to support sales of our Energy Server systems to customers who may prefer to finance the acquisition using third-party financing and ownership.

Previous report

Our typical target commercial or industrial customer has historically been either an investment-grade entity or a customer with investment-grade attributes such as size, assets and revenue, liquidity, geographically diverse operations and general financial stability. Given that our customers are typically large institutions with multi-level decision-making processes, we generally experience a lengthy sales process. Once the sale is completed, we are able to deploy our Energy Server systems in a matter of months, subject to permitting requirements. We have a large multi-disciplinary team to facilitate the deployment of our projects in a wide variety of locations under a myriad of regulatory environments.

Previous report

We continue to innovate our solid oxide platform to offer energy solutions to our customers. In February 2024, we announced our Be Flexible TM offering which introduced load following capabilities on our Bloom Energy Server system to enable customers and utilities to meet variable electricity load and demand. We believe that our Be Flexible offering is critical for data centers, as their power needs typically vary widely throughout the day. Our products are also designed to work with existing carbon capture utilization and storage (“CCUS”) and combined heat and power (“CHP”) technologies offered by third parties. CCUS can mitigate emissions from natural gas as an Energy Server system generates a relatively pure stream of CO 2 that can be used or sequestered. In our experience, CCUS is an important capability for customers who need reliable power beyond what can be provided by renewable sources, while also reducing their greenhouse gas emissions. CHP allows the exhaust heat generated by an Energy Server system to be channeled and made available for use, including for heating and cooling, further increasing the efficiency of the system. This capability is important to data centers and other large power users seeking to repurpose generated heat to improve efficiency.

Previous report

power solutions. At the same time, ongoing natural gas supply and pricing concerns due to geopolitical stresses, as well as customers’ interest in meeting sustainability targets, have led to increased caution from potential customers in their buying decision for energy solutions. Increasing demand for power has forced utilities, states and countries to revisit less clean sources of baseload and intermediate power, which our technology is designed to replace. This supply and demand mismatch globally has threatened energy security, reliability, and availability.

Previous report

Many data center customers and other large power users have signed exclusivity arrangements with their utilities, and this often creates a more complicated dynamic for them to move to an on-site solution. The rising cost of natural gas in some locations, increases in gas distribution rates, limited availability of natural gas supply, as well as disruptions to the world’s gas markets, has increased the cost of our power solutions for customers and, in certain cases where there is a lack of fuel supply, a complete inability to operate the systems. In the U.S., the lack or slow development of pipeline infrastructure in the past has impacted the timing of customers being able to take advantage of our power solution opportunities. In certain jurisdictions in the U.S. and Europe, natural gas bans have prevented the use of our power solutions unless alternative fuels are available.

Previous report

In addition, many of our potential data center and industrial customers are pursuing greenfield opportunities where the development cycle is long and laden with permitting requirements, and the uncertainty of these factors is leading to a more complex customer decision-making process and longer sales cycles. Data center greenfield projects require significant investments in real estate, facility costs, and technology, among other elements, in addition to the investment in our power solutions, and the timing and sequencing of those investments is largely outside of our control.

Previous report

Demand for power has continued to significantly outpace the available power generation supply from the grid, with the need for power becoming more acute in 2024. Key factors driving the increasing demand include the transition towards the electrification of transportation and buildings, the rapid adoption of AI that has led to the expansion of existing data centers and plans for new greenfield data centers, and Federal incentives for domestic manufacturing, including semiconductor and battery production. These factors along with economic growth have put significant stress on the supply from the grid and has led companies to consider on-site distributed power, including Bloom Energy Server systems, to meet their power needs.

Previous report

Co-locating Large Loads with Distributed Generation Configured as Islanded Microgrids are Gaining in Traction as Energy Solutions to Bypass Long Interconnection Queues and Transmission Upgrades

Previous report

Utilities are Turning to Distributed Energy Solutions to Decrease their Customers’ Time to Power

Previous report

Fuel Flexible Solutions Address Reliability Concerns as well as Near- and Long-term Sustainability Considerations

Previous report

The impacts of climate change, including more severe and unpredictable weather events, have placed further strain on aging utility grids and led to periods of power outages for those reliant on the grid. In addition, the recognition of the threat of climate change has led companies and governments to set ambitious emissions goals to reduce the release of carbon dioxide to the atmosphere. Large increases in demand for power are expected to challenge prevailing carbon reduction trajectories when large power users turn to conventional solutions to meet their needs. The Energy Server system is able to provide highly available power to displace dirtier and less efficient conventional combustion solutions like turbines and engines. Deeper decarbonization potential is enabled through fuel flexibility, CHP offerings and CCUS capability. In addition to natural gas, our non-combustion power solutions are designed to run on biofuels or hydrogen, emit near-zero criteria pollutants, and use no water during steady state operation.

Previous report

In the fourth quarter of 2022, we entered into a Power Purchase Agreement (the “Project PPA”) for the sale of electricity to a customer for three greenfield sites that were at various stages of development (the “Project”). The first site was expected to be operational with power by the third quarter of 2024. We sold 73 megawatts of the Energy Server systems to a distributor with the expectation that the distributor would support installation on the Project and install the Energy Server systems at the three Project sites. For site specific reasons, in the first quarter of 2024, the end customer decided not to deploy the Energy Server systems at the originally selected sites (the “Project Servers”) and commenced exploring alternative sites for deployment of the Energy Server systems. In the interim, the end customer commenced payments under the Project PPA and agreed to continue such payments for the earlier of the full term of the Project PPA or deployment of the Energy Server systems. During the fourth quarter of 2024, the end customer identified an alternative location to deploy the Project Servers (the “Alternative Project”) that is expected to be operational in 2027. Bloom and the end customer have agreed that the payments under the Project PPA will be suspended unless the end customer terminates the Alternative Project prior to it becoming operational in 2027, at which point, all suspended payments will be due and payable to us.

Previous report

In the U.S., the Investment Tax Credit (“ITC”) for fuel cells running on a non-zero carbon fuel expired at the end of fiscal year 2024. Although the Company and its customers utilized compliant safe harbor mechanisms to secure deployment of a certain dollar amount of Energy Server systems through 2028, since the ITC was not extended for fuel cells running on a non-zero carbon fuel, U.S. bookings, revenue and gross margins could be materially impacted in 2025 and beyond. Also, it is possible that the expiration of the ITC increased demand for ITC-compliant sales of our solutions in 2024 due to customer desire to secure ITC for their projects through safe harboring.

Previous report

The Inflation Reduction Act of 2022 (“IRA”) established a new clean electricity production credit and a clean electricity investment credit. Although the U.S. Treasury Department developed rules to implement credits and incentives for clean energy resources under President Biden’s administration, there is considerable uncertainty around whether, or the conditions under which such credits will be available for transactions involving our solutions in the future. In addition, delays in adoption of Renewable Fuel Standard regulations in the U.S. for the use of biogas to generate electricity for electric vehicles, along with minimal governmental focus on utilization of biogas outside of use by methane-fueled vehicles, have created uncertainty in prospects for broader biogas availability for industrial uses, including our power solutions. Furthermore, in most jurisdictions, air permits and various land use permits are required for installation of our solutions over a certain amount of megawatts, and generally the length of time to obtain these permits increased, while the level of certainty of issuance has decreased and if issued, the cost of compliance requirements can be cost prohibitive. We have experienced a reluctance in certain states to issue permits for gas generation equipment. Even if issued, states may require a blend of costly renewable fuels or other measures to advance climate goals.

Previous report

In Ireland, which is a large data center market, a directive from the Minister of the Department of the Environment, Climate and Communications under the former administration to restrict grid connections to data centers and other large power users, along with a halt in high-pressure gas installations has delayed our selling activities. In 2023, the South Korean government moved to a new, government-run bidding process for fuel cell purchases, which has adversely impacted and may continue to impact demand for our power solutions.

Previous report

We continue to see effects from global supply chain tightness due to the current inflationary environment, war in Ukraine, and trade tensions between the U.S. and China. We are not aware of, and do not expect any significant direct impact on our business or supply chain from the armed conflict in Israel and neighboring areas. While we have not experienced any significant component shortages to date, we are facing pressures from inflation. These dynamics could worsen as a result of continued geopolitical instability or escalation of current military conflicts or trade tensions. The new U.S. federal administration has implemented tariffs on steel and aluminum and has discussed implementing a number of other trade tariffs which may impact our operations. Our supply chain does not have significant exposure to China, but significant tariffs on imports from other countries where we do source materials could materially impact our costs. We are also reliant on third party providers of storage equipment, infrastructure equipment and pipelines, and other materials and technologies that work with our products to provide an energy solution for customers. In the event we are unable to mitigate the impacts of delays and/or price increases in raw materials and components, including as a result of new tariffs, it could delay the manufacturing and installation of, and increase the costs of, our products, which would adversely impact our cash flows and results of operations, including our revenues and gross margin. For example, we expect the 25% tariffs imposed on U.S. imports of steel and aluminum to adversely impact our cost of raw materials for our products.

Previous report

As recently as 2022, we experienced impacts from labor shortages and challenges in hiring for our manufacturing facilities. While these constraints have since abated, and we reduced headcount as part of the Restructuring Plan adopted in September 2023, we may still experience difficulties with hiring and retention and may face additional labor shortages in the future. For details on the Restructuring Plan refer to Part II, Item 8, Note 12 —Restructuring. In addition, the current inflationary environment has led to rising wages and labor costs as well as increased competition for labor.

Previous report

On October 23, 2021, we entered into a Securities Purchase Agreement (the “SPA”) with SK ecoplant in connection with our strategic partnership. Pursuant to the SPA, on December 29, 2021, we sold to SK ecoplant 10,000,000 shares of our zero coupon, non-voting redeemable convertible Series A preferred stock, par value $0.0001 per share (the “Series A RCPS”), at a purchase price of $25.50 per share for an aggregate purchase price of $255.0 million (the “Initial Investment”). On November 8, 2022, each share of Series A RCPS was converted into 10,000,000 shares of Class A common stock.

Previous report

Simultaneous with the execution of the SPA, we and SK ecoplant executed an amendment to the Joint Venture Agreement (the “JVA”), an amendment and restatement to our Preferred Distribution Agreement (“PDA Restatement”), and a new Commercial Cooperation Agreement regarding initiatives pertaining to the hydrogen market and general market expansion for Bloom solutions.

Previous report

On March 20, 2023, SK ecoplant entered into an amendment of the SPA (the “Amended SPA”) with us, pursuant to which on March 23, 2023, we issued and sold to SK ecoplant 13,491,701 shares of non-voting Series B redeemable convertible preferred stock, par value $0.0001 per share (the “Series B RCPS”), at a purchase price of $23.05 per share for cash proceeds of $311.0 million, excluding issuance cost of $0.5 million.

Previous report

On March 20, 2023, in connection with the Amended SPA, we also entered into a Shareholders’ Loan Agreement with SK ecoplant (the “Loan Agreement”), pursuant to which we had the option to draw on a loan from SK ecoplant with a maximum principal amount of $311.0 million, a maturity of five years and an interest rate of 4.6%, should SK ecoplant have sent a redemption notice to us under the Amended SPA. As of September 30, 2023, the loan commitment asset from SK ecoplant was derecognized as a result of automatic conversion of all shares of the Series B RCPS into shares of our Class A common stock.

Previous report

On September 23, 2023, all 13,491,701 shares of the Series B RCPS were automatically converted into shares of our Class A common stock pursuant to the Certificate of Designation, dated as of March 20, 2023, setting forth the rights, preferences, privileges, and restrictions of the Series B RCPS, as amended by the Certificate of Amendment to the Certificate of Designation, dated as of April 18, 2023. Upon conversion of all the Series B RCPS into shares of our Class A common stock, SK ecoplant became a related party to us.

Previous report

Pursuant to that certain Investor Agreement, dated as of December 29, 2021, by and between us and SK ecoplant, as amended from time to time (the “Investor Agreement”), SK ecoplant has granted an irrevocable proxy to our Chief Executive Officer and Chief Financial Officer, as our designees, to vote all of SK ecoplant’s shares, in their sole discretion on all matters to be voted upon by stockholders. The proxy will terminate upon the earlier of the expiration or termination of the standstill term and the voting agreement set forth in Section 4.1 of the Investor Agreement. The standstill term continues until the later of (i) March 23, 2025, (ii) the date on which SK ecoplant ceases to have the right to designate a director to our board of directors, and (iii) the date on which SK ecoplant and its subsidiaries beneficially own less than five percent of the shares of our Class A common stock then issued and outstanding.

Previous report

We are committed to the goal of providing consistent returns to our stockholders with a focus on corporate citizenship that places a high value on the environment, the welfare of our employees, the communities in which we operate, and the customers we serve. We believe that effectively managing our sustainability-related risks, opportunities, and programs provides financial and reputational benefits that create long-term value for our investors.

Previous report

We strive to empower businesses and communities to responsibly take charge of their energy while addressing both the causes and consequences of climate change. We aim to serve our customers with products that are resilient, providing uninterrupted power with predictable pricing over the long-term, while developing an increasingly broad portfolio of decarbonized solutions.

Previous report

In April 2024, we released our 2023 Sustainability Report, Transforming Energy for the Digital Age (the “Sustainability Report”), using generally accepted sustainability frameworks and standards, including alignment with Sustainability Accounting Standards Board standards and the Task Force on Climate-related Financial Disclosures recommendations. In addition, the Sustainability Report also utilized certain Global Reporting Initiative Standards and was mapped against the United Nations Sustainable Development Goals. We plan to issue a sustainability report on an annual basis.

Previous report

The Sustainability Report can be found on our website athttps://www.bloomenergy.com/sustainibility. Website references throughout this document are provided for convenience only, and the content on the referenced websites is not incorporated by reference into this report.

Previous report

On August 16, 2022, President Biden signed into law the IRA. It contains provisions that have had a significant impact on the development and financing of clean energy projects in the U.S. However, President Trump has expressed skepticism about the IRA and clean energy projects, thus creating uncertainty about its future. The IRA includes expanded tax credits for projects across the Bloom product portfolio as well as for manufacturing of clean energy equipment. It also introduces new mechanisms for tax credit monetization and transferability. The IRA includes targeted incentives intended to encourage development in low-income communities, the use of domestically produced materials, and compliance with certain labor-related requirements. We believe that the programs and credits included in the IRA align well with our business model and could provide significant benefits for our projects. Some or all of these benefits, however, may be at risk from the new U.S. Congress and federal administration, which have expressed interest in repealing, restricting or clawing back IRA funding and expanded tax credits.

Previous report

The IRA introduces and updates several crediting mechanisms and incentive provisions that are relevant for us including:

Previous report

•Section 48E— Clean Electricity Investment Credit, which starting December 31, 2024, replaces the previous investment tax credit framework for named clean energy technologies with a “tech neutral” framework anchored around the net carbon neutrality of energy generation from qualifying facilities. It provides incentives of up to 50% for qualifying energy property meeting domestic content and labor requirements.

Previous report

•Section 45V— Credit for the Production of Clean Hydrogen, which provides a PTC of up to $3 per kg of qualified clean hydrogen produced at qualified facilities in the US, including Bloom’s Electrolyzer projects.

Showing the first 40 of 108 passages. Open the source sections for the rest.

Reworded paragraphs (52)

Previous wording

The global energy transition towards a net-zero environment has created new challenges and opportunities for utilities, suppliers of energy solutions, and customers. Shifts and uncertainty in market and regulatory dynamics and corporate and governmental policies are currently impacting the selling process and impacting sales cycles and timelines for our products. Increasing electricity rates, decreasing energy security and reliability, and delays in the development of transmission infrastructure and grid interconnection as well as other time-to-power challenges have led to increased customer interest in our

Current wording

The global energy transition has created new challenges and opportunities for the power sector. Shifts and uncertainty in the policy, regulatory, and market environment impact our business. Increasing electricity rates, decreasing energy security and reliability, and delays in the development of transmission infrastructure and grid interconnection as well as other time-to-power challenges have led to increased customer interest in our power solutions. Increasing demand for power has created a mismatch in supply and demand. This supply and demand mismatch globally has threatened energy security, reliability, and availability and forced policymakers, utilities and business alike to reimagine energy generation and procurement strategy.

Previous wording

Bloom enables customers to address these energy market challenges by offering fuel flexible solutions that are designed to provide cost predictable, resilient, and reliable energy in a timely fashion. As customers and utilities navigate the energy transition and evolving landscape, the ability of our power solutions to fit their economic, regulatory, and policy needs depends on a number of factors, including natural gas availability and pricing, electrical interconnection needs and availability, redundant back up power requirements, cost requirements, and sustainability profiles. These factors may impact a customer’s buying decision for an alternative power solution such as ours, even in those situations where the time to power from a utility is measured in years because the total cost to interconnect, including the cost to build out energy transmission infrastructure, is unknown before all interconnection studies are completed.

Current wording

We enable customers to address these energy market challenges by offering flexible solutions designed to provide cost predictable, resilient, and reliable energy in a timely fashion. As customers and utilities navigate the energy transition and evolving landscape, the ability of our power solutions to fit their business, economic, regulatory, and policy needs depends on a number of factors, including natural gas availability and pricing, electrical interconnection costs, availability and timing, redundant back up power requirements, cost requirements, and sustainability profiles. These factors may influence a customer’s decision to pursue an alternative on-site power solution like ours.

Previous wording

Policy changes commencing in 2025 may also affect customers’ demand for power solutions. Changes in permitting rules could boost domestic fossil fuel production and infrastructure, while proposals to limit environmental reviews under the National Environmental Policy Act and other statutes could incentivize investment in, and lower the cost of, fossil fuels, including natural gas. At the same time, proposals to halt new permits for wind projects, particularly offshore wind, could slow renewable energy adoption and the projected available supply of renewable energy. Bloom stands ready to meet these new opportunities with our low-emission Energy Server systems.

Current wording

Proposed and enacted policies that have emerged in 2025 may also affect customer demand for power solutions. For example, changes to permitting rules could accelerate domestic fossil fuel infrastructure production, while proposals to limit environmental reviews under the National Environmental Policy Act and other statutes could incentivize investment in, and reduce the cost of, fossil fuels, including natural gas. FERC is now addressing a DOE proposed rulemaking on large load interconnection that could significantly impact new onsite generation by creating uniform pathways for onsite fuel cell deployment at data centers. At the same time, federal directives and state proposals to halt new permits for wind projects, particularly offshore wind, could slow renewable energy adoption and decrease the projected available supply of renewable energy. Some data center customers and other large power users have signed exclusivity arrangements with their utilities, which can introduce limitations to move to on-site solutions. Rising natural gas costs in some regions, increases in gas distribution rates, limited availability of supply, and disruptions in global gas markets are some of the market challenges we face, and can increase the cost of power solutions for customers. Bloom stands ready to meet these new challenges and opportunities.

Previous wording

Increases in Demand for Power, Driven by Data Centers and Artificial Intelligence (AI)

Current wording

Demand for Power is Increasing, Driven by Data Centers and Artificial Intelligence. U.S. electricity demand has entered a new growth phase after years of limited expansion, driven by a rapid buildout of AI and cloud data centers and renewed investment in domestic manufacturing. AI workloads require significant and continuously available power, while reshoring across sectors such as semiconductors and advanced materials is creating new large loads. Existing electricity customers in states with heavy AI and cloud data center development are also raising concerns over rate increases they attribute to this new demand for power. These developments are reshaping demand patterns and increasing the need for dependable,

Previous wording

In part because of the increases in demand for power, the importance of time to power has increased. According to a study published in April 2024 by the Lawrence Berkeley National Laboratory, the time from initiating a request for interconnection to the grid to the start of commercial operations has more than doubled from less than two years during the period from 2000-2007, to more than four years from 2018-2023. Bloom Energy Server systems can be configured as on-site fully-islanded, microgrid solutions that are not interconnected to the grid, which often can provide a customer power in months instead of years. Many utilities have informed data center and manufacturing customers that they cannot interconnect for a period of years because the utility has no power available to serve a customer’s needs, thus making the Bloom Energy Server system an attractive alternative. In addition, our fully-islanded microgrid solutions can provide power on-site, without the need for costly transmission and distribution system upgrades that often are required before a customer can interconnect to the electrical grid. We are seeing greater interest in fully-islanded, microgrid solutions among data center customers because of these interconnection-related delays. If a customer desires back up power or a “grid parallel” solution in combination with the

Current wording

According to a study published in December 2025 by the Lawrence Berkeley National Laboratory, the time from initiating a request for interconnection to the grid to the start of commercial operations has more than doubled to 55 months in 2024 from less than two years in 2008. Bloom Energy Server systems can be configured as on-site fully-islanded, microgrid solutions that are not interconnected to the grid, which often can provide a customer power in months instead of years. In many markets, utilities have acknowledged delays in serving large load customers, which we believe makes the Bloom Energy Server system an attractive solution.

Previous wording

Our islanded microgrid solution allow data center and other customers the ability to skip the interconnection queue and start construction. A key to this solution is that our Be Flexible TM load following capability allows us to follow a customer’s variable loads without the need to import power from the transmission grid. We believe avoiding lengthy interconnection queues is key to unlocking time to power for our customers. Our islanded microgrid solution also creates ratepayer savings by reducing congestion charges resulting from constraints on the transmission grid and avoiding the need for network transmission investments and upgrades that may be allocated to all ratepayers. In addition to our distributed generation microgrid solution serving a single customer, utility companies can employ it to serve as an energy transmission asset, helping utility companies to serve their customers while avoiding the costs of new transmission and distribution infrastructure.

Current wording

Our islanded microgrid solutions allow data center and other customers the ability to skip the interconnection queue and start construction. A key to this solution is that our load following capability allows us to follow a customer’s variable loads without the need to import power from the transmission grid. We believe avoiding lengthy interconnection queues is key to unlocking time to power for our customers.

Previous wording

Our utility customers are recognizing the challenge of keeping pace with the growing demand for power. Aging infrastructure, coupled with transmission and distribution bottlenecks, are making it more difficult for utilities to integrate additional sources of energy to add capacity. Building new transmission and distribution infrastructure is expensive, takes many years, and would likely cause utility rates to increase. As demand for power continues to grow, utility companies are struggling to meet the soaring demand of data centers, while customers’ time to power becomes increasingly important. Utility companies are exploring alternative means of producing and supplying energy to their end customers, including our Energy Server systems. We entered into multiple agreements with utilities in 2024, including a landmark 1 GW supply agreement with a customer that included a 100 MW order in 2024. We expect more utility customers in the future to supplement their power generation with the Bloom Energy Server system. As we work to reduce our product costs, and with utility rates expected to increase with new significant infrastructure investments projected to be needed over the next five years to meet rapid demand growth, we expect our energy solutions to become more cost competitive in more countries, communities, and industries around the world.

Current wording

Our utility customers are recognizing the challenge of keeping pace with the growing demand for power. Aging infrastructure, coupled with transmission and distribution bottlenecks, are making it more difficult for utilities to integrate additional sources of energy to add capacity. Building new transmission and distribution infrastructure is expensive, takes many years, and would likely cause utility rates to increase. As demand for power continues to grow, utility companies are struggling to meet the soaring demand of data centers, while customers’ time to power becomes increasingly important.

Previous wording

The imbalance between power demand and supply has contributed to utilities seeking alternative sources of power to supply to their end customers. Utilities have been unable to meet this demand through the deployment of renewable sources of energy such as solar and wind power. Bloom Energy Server systems can be installed at the utility’s point of distribution or directly on the customer’s site. The energy produced by our systems can be utilized by utilities to provide power to a specific customer or customers or may be used by customers generally. As demand for power continues to grow, and time to power becomes increasingly important, utilities are exploring alternative means of producing and supplying energy to their end customers, including our Energy Server systems. We entered into multiple agreements with utilities in 2024, including a landmark 1 GW supply agreement with a customer that included a 100 MW order in 2024. We expect more utility customers in the future to supplement their power generation with the Bloom Energy Server system. Increasing the supply of available power can allow utilities to encourage end customers to remain in their current locations rather than relocating to areas where power is more available. In addition, co-locating our Energy Server systems on-site with large loads, can enable a utility to provide power to a large energy user without impacting its rate base and providing the onsite power as an islanded microgrid can avoid interconnection studies and wait times.

Current wording

The imbalance between power demand and supply has contributed to utilities seeking alternative sources of power to supply to their end customers. Utilities have been unable to meet this demand through the deployment of renewable sources of energy such as solar and wind power. Bloom Energy Server systems can be installed at the utility’s point of distribution or directly on the customer’s site. The energy produced by our systems can be utilized by utilities to provide power to a specific customer or customers or may be used by customers generally. As demand for power continues to grow, and time to power becomes increasingly important, utilities are exploring alternative means of producing and supplying energy to their end customers, including our Energy Server systems. We entered into multiple agreements with utilities in 2024, including a landmark 1 GW supply agreement with American Electric Power (AEP) that included a 100 MW order in 2024. In 2025, we began working with AEP to deploy projects across the service territory as well as the project development landscape broadly through their capacity as both a channel and financing partner.

Previous wording

The interest, investment, and stimulation of clean hydrogen in the U.S., Europe and in many other regions across the globe have not yet had significant impacts on the supply of hydrogen. To date, while the number of proposed hydrogen production projects has grown rapidly, only a small fraction has reached the final investment decision stage, and an even smaller fraction has been deployed. In addition, the infrastructure needed to transport hydrogen, whether through pipelines or maritime or land-based tankers, is currently only sufficient for existing uses, and has not begun to be significantly extended for anticipated future uses, with hydrogen blending and other approaches remaining at pilot stages. It remains unclear whether regulators in some jurisdictions will allow hydrogen to be introduced into gas distribution systems, which could limit our customers’ ability to transport hydrogen from the point of production to the point of consumption. Additionally, while U.S. Treasury Department rules regarding the use of market-based renewable energy have been clarified, hurdles remain that could make it more difficult for hydrogen projects to scale significantly, and uncertainty exists as potential changes may be sought by the new U.S. federal administration and U.S. Congress.

Current wording

The timing of the development of hydrogen and the hydrogen market ecosystem is relevant to our business as it is a fuel that can be utilized in our Energy Server systems that support decarbonization efforts and we have an electrolyzer technology to produce hydrogen. The interest, investment, and stimulation of clean hydrogen in the U.S., Europe and in many other regions across the globe have not yet had significant impacts on the supply of hydrogen. To date, while the number of proposed hydrogen production projects has grown rapidly, only a small fraction has reached the final investment decision stage, and an even smaller fraction has been deployed. In addition, the infrastructure needed to transport hydrogen, whether through pipelines or maritime or land-based tankers, is currently only sufficient for existing uses, and has not begun to be significantly extended for anticipated future uses, with hydrogen blending and other approaches remaining at pilot stages. It remains unclear whether regulators in some jurisdictions will allow hydrogen to be introduced into gas distribution systems, which could limit our customers’ ability to transport hydrogen from the point of production to the point of consumption. Additionally, while U.S. Treasury Department rules regarding the use of market-based renewable energy have been clarified, hurdles remain that could hinder the large-scale development of hydrogen projects. Finally, the OBBBA significantly reduces the ITC for hydrogen under Section 45V as it terminates the Section 45V credit for projects that begin construction after December 31, 2027.

Previous wording

Many of the factors discussed above have lengthened the selling cycles for our products and we have experienced delays in our anticipated bookings as a result. Our revenue, margins, and cash flow in any given year are dependent on bookings during previous years in addition to current bookings. Historically, the majority of our bookings occurred in the second half of the year, with a significant portion occurring in the fourth quarter, and this occurred once again in 2024. However, if a substantial portion of our anticipated bookings are delayed beyond our expectations, our revenue, margins, and cash flow in a particular period could be materially adversely impacted.

Current wording

Many of the factors discussed, including the development size, scale and complexity, permitting and financing timelines for many projects and the number of discreet parties involved have lengthened the selling cycles for our products and we have experienced delays in our anticipated bookings as a result. Our revenue, margins, and cash flow in any given year depend on bookings from prior years as well as current-year bookings. Historically, the majority of our bookings have occurred in the second half of the year, with a significant portion in the fourth quarter; however, this historical dynamic could be changing due to the time-to-power needs of our customers and the accelerating buildout of AI data centers driving large deals.

Previous wording

In fiscal year 2024, our installation projects experienced some delays relating to, among other things, permitting, utility delays, and access to customer facilities. However, these delays did not significantly impact our revenue. If we are delayed in or unable to perform maintenance, our previously installed products would likely experience adverse performance impacts, including reduced output and/or efficiency, which could result in warranty and/or guaranty claims by our customers. If we experience a significant increase of product failure in the future, our service expense may increase and we may fail to achieve the performance commitments to our customers, which could result in warranty and/or guaranty claims. Additionally, product failure and service costs may increase as we initially deploy new applications for our Energy Server system, including Be Flexible TM load following, CCUS, and CHP.

Current wording

In previous years, our installation projects experienced delays related to, among other factors, permitting, utility coordination, and access to customer facilities. While we continued to make progress in streamlining our installation and maintenance processes, we did experience certain project‑specific delays during 2025. These delays underscored the operational complexities inherent in coordinating large deployments with multiple external stakeholders. If we are delayed in or unable to perform maintenance, our previously installed products would likely experience adverse performance impacts, including reduced output and/or efficiency, which could result in warranty and/or guaranty claims by our customers. If we experience a significant increase of product failure in the future, our service expense may increase and we may fail to achieve the performance commitments to our customers, which could result in warranty and/or guaranty claims. Additionally, product failure and service costs may increase as we initially deploy new applications for our Energy Server system, including load following, CCUS, and CHP.

Previous wording

As we grow our business globally and increase the size and number of customer orders, we will need to secure new customer financing options, the amount of financing available as well as the number of financing partners. As we offer an innovative new technology solution, obtaining new financing partners and available funds for customer financings often involves a rigorous and timely due diligence process on our technology, manufacturing and service capabilities. If we are unable to obtain adequate financing for our customers who desire to use third-party financing rather than purchasing the Energy Server systems for their own balance sheet, our revenue could be delayed or impacted. In addition, our ability to arrange financing for our products depends partly on the creditworthiness of our customers, and deterioration of our customers’ credit ratings could impact this financing. When interest rates rise, the cost of financing for our customers also increases, and the financiers of our installations demand a higher rate of return, putting pressure on our margins.

Current wording

As we grow our business globally and increase the size and number of customer orders, we will need to secure new customer financing options, and we will need to increase the amount of financing available as well as the number of financing partners. As we offer an innovative new technology solution, obtaining new financing partners and available funds for customer financings often involves a rigorous and timely due diligence process on our technology, manufacturing and service capabilities. While we were successful in securing a new financing arrangement with Brookfield Asset Management (“Brookfield”) in the third quarter of 2025 (refer to Part II, Item 8, Note 7—Investments in Unconsolidated Affiliates), in light of the potential power needs for AI data center sites and resultant mega-watt size, additional financing will be required.

Previous wording

For additional details about the transaction with SK ecoplant, please see Part II, Item 8, Note 17 —SK ecoplant Strategic Investment, and for more information about our joint venture with SK ecoplant, please see Part II, Item 8, Note 11 —Related Party Transactions.

Current wording

For additional details about the transaction with SK ecoplant, please see Part II, Item 8, Note 17—SK ecoplant Strategic Investmentin this Annual Report on Form 10-K, and for more information about our joint venture with SK ecoplant, please see the section International Channel Partners—The Republic of Korea below and Part II, Item 8, Note 12—Related Party Transactionsin this Annual Report on Form 10-K.

Previous wording

On December 21, 2023, we submitted the application for qualifying advanced energy project credit allocation under Internal Revenue Code Section 48C(e) for the manufacturing facility in Fremont, California (the “Facility”). On March 29, 2024, we received notification from the Internal Revenue Service (the “IRS”) of the acceptance of our application for a Qualifying Advanced Energy Project Credit of up to $75.3 million. After a technical review of Bloom’s Section 48C(e) application, the Department of Energy provided a recommendation to the IRS to grant a $75.3 million credit allocation for the Facility. The approval is subject to satisfaction of the underlying certification requirements, including the prevailing wage and apprenticeship requirements, within two years from the date of the application acceptance, and potential clearance by the Office of Management and Budget due to President Trump’s executive order halting the disbursement of funds under the IRA.

Current wording

In addition to the ITC, the IRA authorized a competitive process to apply for credits to expand or enhance manufacturing capacity. On December 21, 2023, we submitted the application for qualifying advanced energy project credit allocation under Internal Revenue Code Section 48C(e) for the manufacturing facility in Fremont, California (the “Facility”). On March 29, 2024, we received notification from the Internal Revenue Service (IRS) of the acceptance of our application for a Qualifying Advanced Energy Project Credit of up to $75.3 million. After a technical review of Bloom’s Section 48C(e) application, the Department of Energy provided a recommendation to the IRS to grant a $75.3 million credit allocation for the Facility. The approval is subject to satisfaction of the underlying certification requirements, including the prevailing wage and apprenticeship requirements, within two years from the date of the application acceptanceand potential clearance by the Office of Management and Budget due to President Trump’s executive order halting the disbursement of funds under the IRA.

Previous wording

In 2021, the OECD announced an Inclusive Framework on Base Erosion and Profit Shifting including Pillar Two Model Rules defining the global minimum tax, which calls for the taxation of large multinational corporations at a minimum rate of 15%. Subsequently multiple sets of administrative guidance have been issued. Many non-US tax jurisdictions have either recently enacted legislation to adopt certain components of the Pillar Two Model Rules beginning in 2024 (including the European Union Member States) with the adoption of additional components in later years or announced their plans to enact legislation in future years. We are continuing to evaluate the impacts of enacted legislation and pending legislation to enact Pillar Two Model Rules in the non-US tax jurisdictions we operate in. However, no material impact to our financial statements is expected due to the relatively small operations outside the U.S.

Current wording

In 2021, the OECD announced an Inclusive Framework on Base Erosion and Profit Shifting including Pillar Two Model Rules defining the global minimum tax, which calls for the taxation of large multinational corporations at a minimum rate of 15%. Subsequently, multiple sets of administrative guidance have been issued. Many non-U.S. tax jurisdictions have either enacted legislation to adopt certain components of the Pillar Two Model Rules beginning in 2024 or 2025 (including the European Union Member States) or announced their plans to enact legislation in future years. We are continuing to evaluate the impacts of enacted legislation and pending legislation to enact Pillar Two Model Rules in the non-U.S. tax jurisdictions we operate in. However, no material impact to our financial statements is expected due to the relatively small operations outside the U.S.

Previous wording

A discussion regarding our liquidity and capital resources for 2024 compared to 2023 is presented in this section. A discussion of our liquidity and capital resources for 2023 compared to 2022 can be found under Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations of Part II of our Annual Report on Form 10-K for the year ended December 31, 2023.

Current wording

A discussion regarding our liquidity and capital resources for 2025 compared to 2024 is presented in this section. For the discussion of 2024 compared to 2023, see Part II, Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations of our Annual Report on Form 10-K for the year ended December 31, 2024, which specific discussion is incorporated herein by reference.

Previous wording

As of December 31, 2024, we had unrestricted cash and cash equivalents of $802.9 million. Our cash and cash equivalents consist of highly liquid investments with maturities of three months or less, including money market funds of $749.4 million. We seek to maintain these balances with high credit quality counterparties, regularly monitor the amount of our credit exposure to any one issuer and diversify our investments in order to minimize our exposure.

Current wording

As of December 31, 2025 and 2024, we had unrestricted cash and cash equivalents of $2,454.1 million and $802.9 million, respectively. Our cash and cash equivalents consist of highly liquid investments with maturities of three months or less, including money market funds of $2,386.6 million and $749.4 million as of December 31, 2025 and 2024, respectively. We seek to maintain these balances with high credit quality counterparties, regularly monitor the amount of our credit exposure to any one issuer and diversify our investments in order to minimize our exposure.

Previous wording

We raised cash and supplemented liquidity by issuing the 3% Green Convertible Senior Notes due June 2029 (the “3% Green Notes due June 2029”) in the second quarter of 2024, as well as through financing activities with SK ecoplant in the first quarter of 2023 and issuing the 3% Green Convertible Senior Notes due June 2028 (the “3% Green Notes due June 2028”) in the second quarter of 2023. We expanded our warehouse space in Delaware and California to store more inventory to meet the anticipated increase in demand. If this increase in demand does not materialize to the degree we anticipated, our liquidity and financial condition may be adversely impacted.

Current wording

We raised cash and supplemented liquidity by issuing the 0% Convertible Senior Notes (the “0% Notes”) in the fourth quarter of fiscal year 2025, the 3.0% Green Convertible Senior Notes due June 2029 (the “3.0% Green Notes due June 2029”) in the second quarter of 2024, as well as through financing activities with SK ecoplant in the first quarter of 2023 and issuing the 3.0% Green Convertible Senior Notes due June 2028 (the “3.0% Green Notes due June 2028”) in the second quarter of 2023. We expanded our warehouse space in Delaware and California to store more inventory and plan to increase our production capacity to meet the anticipated rise in demand. If this increase in demand does not materialize to the degree we anticipated, our liquidity and financial condition may be adversely impacted.

Previous wording

On May 29, 2024, we issued the 3% Green Notes due June 2029 in an aggregate principal amount of $402.5 million due June 2029, unless earlier repurchased, redeemed or converted, less the initial purchasers’ discount of $12.1 million and other issuance costs of $0.7 million, resulting in net cash proceeds of $389.7 million. On May 29, 2024, we used approximately $141.8 million of the net proceeds from this issuance to repurchase $115.0 million, or 50%, of the outstanding principal amount of our 2.5% Green Convertible Senior Notes due August 2025 (the “2.5% Green Notes”) in privately negotiated transactions. The repurchase amount equaled 122.6% of the principal amount repurchased plus related accrued and unpaid interest.

Current wording

On May 29, 2024, we issued the 3.0% Green Notes due June 2029 in an aggregate principal amount of $402.5 million due June 2029, unless earlier repurchased, redeemed or converted, less the initial purchasers’ discount of $12.1 million and other issuance costs of $0.7 million, resulting in net cash proceeds of $389.7 million. On May 29, 2024, we used approximately $141.8 million of the net proceeds from this issuance to repurchase $115.0 million, or 50%, of the outstanding principal amount of our 2.5% Green Convertible Senior Notes due August 2025 (the “2.5% Green Notes”) in privately negotiated transactions.

Previous wording

As of December 31, 2024, we had $1,124.7 million of recourse debt, $4.1 million of non-recourse debt, and $9.2 million of other long-term liabilities. As of December 31, 2024, $114.4 million and $1,014.4 million of our debt were classified as short-term and long-term, respectively. For a complete description of our outstanding debt, please see Part II, Item 8, Note 7 —Outstanding Loans and Security Agreements.

Current wording

As of December 31, 2025 and 2024, we had $2,613.7 million and $1,124.7 million of recourse debt, $4.2 million and $4.1 million of non-recourse debt, and $10.0 million and $9.2 million of other long-term liabilities, respectively. As of December 31, 2025 and 2024, $4.2 million and $114.4 million of our debt were classified as short-term, respectively, and $2,613.7 million and $1,014.4 million of our debt were classified as long-term, respectively. For a complete description of our outstanding debt, please see Part II, Item 8, Note 8—Outstanding Loans and Security Agreementsin this Annual Report on Form 10-K.

Previous wording

debt financings to fund our operations, our manufacturing capacity, product development, and market expansion requirements and to timely respond to competitive market pressures or strategic opportunities, among other things. We may, from time to time, engage in a variety of financing transactions for such purposes, including factoring our accounts receivable. During the year ended December 31, 2024, we factored $184.2 million of accounts receivable. However, we may not be able to secure timely additional financing on favorable terms, or at all. The terms of any additional financing may place limits on our financial and operating flexibility. Although currently we do not have any floating-rate notes on the balance sheet, our overall cost of capital may increase if interest rates rise, if and when we refinance our fixed-rate convertible notes. If we raise additional funds through further issuances of equity or equity-linked securities, our existing stockholders could suffer dilution in their percentage ownership of us, and any new securities we issue could have rights, preferences, and privileges senior to those of holders of our common stock.

Current wording

The combination of our cash and cash equivalents and cash flow expected to be generated by our operations is expected to be sufficient to meet our anticipated cash flow needs for at least the next 12 months. If these sources of cash are insufficient or not received in a timely manner to meet our near-term or future liquidity needs, we may require additional equity or debt financing to fund our operations, manufacturing capacity, product development, and market expansion initiatives, as well as to respond to competitive pressures or strategic opportunities. We may, from time to time, engage in a variety of financing transactions for such purposes, including factoring our accounts receivable. During the year ended December 31, 2024, we factored $184.2 million of accounts receivable. There were no factoring arrangements during the year ended December 31, 2025. We may not be able to secure timely additional financing on favorable terms, or at all. The terms of any additional financing may limit our financial and operational flexibility. Although we currently do not have any floating-rate notes on our balance sheet, our overall cost of capital may increase if interest rates rise and we refinance our fixed-rate convertible notes. If we raise additional funds through the issuance of equity or equity-linked securities, our existing stockholders could experience dilution in their ownership percentage, and any new securities may have rights, preferences, and privileges senior to those of our common stock.

Previous wording

Our future capital requirements depend on many factors, including our rate of revenue growth, the timing and extent of spending on research and development efforts and other business initiatives, the rate of growth in the volume of system builds and the need for additional working capital, the expansion of sales and marketing activities both in domestic and international markets, market acceptance of our products, our ability to secure financing for customer use of our products, the timing of installations and of inventory build in anticipation of future sales and installations, and overall economic conditions. In order to support and achieve our future growth plans, we may need or seek advantageously to obtain additional funding through equity or debt financing. Failure to obtain this financing in future quarters may affect our results of operations, including our revenues and cash flows.

Current wording

Our future capital requirements depend on a variety of factors, including our rate of revenue growth; the timing and extent of spending on research and development and other business initiatives; increases in our manufacturing capacity; the pace and volume of system builds; the need for additional working capital; the expansion of our sales and marketing activities in both domestic and international markets; market acceptance of our products; selling models and vehicles required by customers; our ability to secure financing for customer use of our products; the timing of installations and related inventory build in anticipation of future sales; and overall economic conditions. In order to support and achieve our future growth plans, we may need or seek advantageously to obtain additional funding through equity or debt financing. Failure to obtain this financing in future quarters may affect our results of operations, including our revenues and cash flows.

Previous wording

Our operating activities consisted of net loss adjusted for certain non-cash items plus changes in our operating assets and liabilities or working capital. Net cash provided by operating activities for the year ended December 31, 2024, related primarily to the changes in our working capital of $66.4 million predominantly due to an increase in deferred revenue and customer deposits by $115.9 million driven primarily by receipt of new customer deposits, partially offset by (1) an increase in contract assets by $103.8 million triggered by timing of achieving billing milestones, (2) an increase in inventory levels by $44.5 million to support future demand, (3) an increase in deferred cost of revenue by $12.9 million, and (4) the timing of payments to vendors.

Current wording

Our operating activities consisted of net loss adjusted for certain non-cash items plus changes in our operating assets and liabilities or working capital. Net cash provided by operating activities for the year ended December 31, 2025, was primarily driven by business‑driven changes in working capital totaling $120.9 million. These changes included:

Previous wording

Our investing activities have consisted of capital expenditures, including investments to increase our production capacity. Cash used in investing activities during the year ended December 31, 2024, was $58.8 million, an improvement of $24.9 million compared to the prior year period, and was primarily due to the decrease in expenditures on tenant improvements for a newly leased engineering and manufacturing building in Fremont, California, which opened in July 2022. We expect to continue to make capital investments over the next few quarters to expand production capacity at our new manufacturing facility in Fremont, California, which includes the purchase of new equipment and other tenant improvements. We intend to fund these capital expenditures from cash on hand as well as cash flow to be generated from operations or through equity or debt financing. We may also evaluate and arrange equipment lease financing to fund this capital expenditures.

Current wording

Our investing activities have consisted of capital expenditures, including investments to increase our production capacity, and investments in unconsolidated affiliates. Cash used in investing activities during the year ended December 31, 2025, was $93.1 million, an increase of $34.3 million compared to the prior year period. The increase was primarily due to a $36.5 million investment in the joint ventures between the Company and Brookfield (see Part II, Item 8, Note 7—Investments in Unconsolidated Affiliates in this Annual Report on Form 10-K), partially offset by a $2.1 million decrease in expenditures on tenant improvements for a leased engineering and manufacturing facility in Fremont, California, which opened in July 2022. We expect to continue making substantial capital investments over the next few quarters to expand production capacity at our Fremont, California manufacturing facility. These investments, which include the purchase of new equipment and tenant improvements, are part of our strategic plan to increase capacity to approximately 2 GW by the end of 2026. The magnitude and timing of these capital expenditures will depend on implementation milestones, supplier lead times, and customer demand. We intend to fund these capital expenditures from cash on hand as well as cash flow expected to be generated from operations. We may also evaluate and arrange equipment lease financing to fund these capital expenditures.

Previous wording

Our financing activities consist of borrowings and repayments of debt, proceeds, and repayments of financing obligations, distributions paid to noncontrolling interests, contributions from noncontrolling interests, payments of dividends, proceeds from the issuances of our common stock, and other financing activities. Net cash provided by financing activities during the year ended December 31, 2024, was $175.2 million, a decrease of $508.1 million compared to the prior year period, predominantly due to (1) a decrease in the proceeds from the issuance of redeemable convertible preferred stock of $311.0 million, net of paid issuance costs, as a result of the SK ecoplant Second Tranche Closing in the year ended December 31, 2023, (2) a decrease in proceeds from the issuance of debt by $234.6 million, and (3) an increase in repayment of financing obligations by $71.8 million. The decrease was partially offset by (1) the purchase in fiscal year 2023 of the capped call options of $54.5 million related to the 3% Green Notes due June 2028 issued in the second quarter of fiscal year 2023, and (2) a decrease in the repayment of debt by $50.4 million.

Current wording

Our financing activities consist of proceeds from issuance of debt, repayment of debt and payment of debt issuance costs, proceeds from and repayments of financing obligations, contributions from noncontrolling interests, proceeds from issuance of our common stock, payment of dividends, and other cash flows from financing activities. Net cash provided by financing activities during the year ended December 31, 2025, was $1,508.4 million, an increase of $1,333.2 million compared to the prior year period, predominantly due to (1) an increase in proceeds from issuance of debt of $2,097.5 million as a result of issuance of the 0% Notes in the fourth quarter of the fiscal year 2025, (2) a $78.9 million decrease in repayment of financing obligations, and (3) a $46.8 million increase in proceeds from issuance of common stock, partially offset by (i) an increase in cash outflows of $884.9 million for repayment of debt and debt issuance costs, (ii) a decrease in contributions from noncontrolling interest of $4.0 million, and (iii) a decrease in proceeds from financing obligations of $1.8 million.

Previous wording

We believe we have sufficient capital to operate our business over the next 12 months. Our working capital was strengthened with the supplemented liquidity through issuing the 3% Green Notes due June 2029 and the 3% Green Notes due June 2028 in the second quarter of 2024 and 2023, respectively, as well as financing activities with SK ecoplant in the first quarter of 2023. In addition, we may still enter the equity or debt market as needed to support the expansion of our business. Please refer to Part II, Item 8, Note 7 —Outstanding Loans and Security Agreements, and Part I, Item 1A, Risk Factors— Risks Related to Our Liquidity—Our indebtedness, and restrictions imposed by the agreements governing our outstanding indebtedness, may limit our financial and operating activities and may adversely affect our ability to incur additional debt to fund future needs, for more information regarding the terms of and risks associated with our debt.

Current wording

We believe we have sufficient capital to operate our business over the next 12 months. Our working capital was strengthened with the supplemented liquidity through issuing the 0% Notes, the 3.0% Green Notes due June 2029, and the 3.0% Green Notes due June 2028 in the fourth quarter of fiscal year 2025, the second quarter of fiscal year 2024, and the second quarter of fiscal year 2023, respectively, as well as financing activities with SK ecoplant in the first quarter of 2023. In addition, we may still enter the equity or debt market as needed to support the expansion of our business. Please refer to Part II, Item 8, Note 8—Outstanding Loans and Security Agreements, and Part I, Item 1A, Risk Factors—Risks Related to Our Liquidity—Our indebtedness, and restrictions imposed by the agreements governing our outstanding indebtedness, may limit our financial and

Previous wording

To appeal to a wide range of customers, we arrange several financing options. In the U.S., we also provide access to our Energy Server system through a Power Purchase Agreement, which is the purchase of electricity generated by the Energy Server system in exchange for a scheduled dollars per kilowatt hour rate, through a Capacity Agreement where the customer pays a capacity based flat payment, through a Lease Agreement where the customer pays for a monthly fixed fee for the use of the equipment, and through a Managed Services Agreement, whereby we sell and lease back the Energy Server system to supply energy services to our customers. Each of the foregoing are made possible through third-party financing arrangements by assembling such contracts into portfolios which are sold to investors.

Current wording

–A Power Purchase Agreement (i.e., PPAs), which is the purchase of electricity generated by the Energy Server system in exchange for a scheduled dollars per kilowatt hour rate;

Previous wording

Often our offerings take advantage of local incentives. In the U.S., our financing arrangements are structured to optimize both federal and local incentives, including the ITC (when available) and accelerated depreciation.

Current wording

Often our offerings take advantage of local incentives. In the U.S., our financing arrangements are structured to optimize both federal and local incentives, including the ITC and accelerated depreciation.

Previous wording

Whichever option is selected by a customer in the U.S. or internationally, the contract structure will include obligations (“O&M Obligations”) on our part to operate and maintain our products (“O&M Agreement”). In the U.S., the contract structure often includes obligations on our part to install our products (“Installation Obligations”). Consequently, our transactions may generate revenue from the sale of our products and electricity, the performance of the O&M Obligations, and performance of the Installation Obligations.

Current wording

Whichever option is selected by a customer in the U.S. or internationally, the contract structure typically includes obligations (“O&M Obligations”) on our part to operate and maintain our products (“O&M Agreement”). In the U.S., the contract structure often includes obligations on our part to install our products (“Installation Obligations”). Consequently, our transactions may generate revenue from the sale of our products and electricity, the performance of the O&M Obligations, and performance of the Installation Obligations.

Previous wording

There are customers who purchase our Energy Server systems directly from us pursuant to customary equipment sales contracts. In connection with the purchase of the Energy Server systems, the customers also enter into a contract with us for the O&M Obligations. The customer may elect to engage us to provide the Installation Obligations or engage a third-party provider. Internationally, we are sometimes required to use a local construction company to perform the Installation Obligations, as is the case in the Republic of Korea, and we contract directly with the customer to provide the O&M Obligations.

Current wording

There are customers who purchase our Energy Server systems directly from us pursuant to customary equipment sales contracts. In connection with the purchase of the Energy Server systems, the customers also typically enter into a contract with us for the O&M Obligations. While some customers may have the option to contract with other O&M providers, at present all O&M services for our deployed Energy Server systems are performed by Bloom (either directly or through subcontracted arrangements under Bloom’s oversight). The customer may elect to engage us to provide the Installation Obligations or engage a third-party provider. Internationally, we are sometimes required to use a local construction company to perform the Installation Obligations, as is the case in the Republic of Korea, and we contract directly with the customer to provide the O&M Obligations.

Previous wording

With respect to the third-party financing options in the U.S., a customer may choose to contract for the purchase of electricity generated by the Energy Server systems in exchange for a scheduled dollars per kilowatt hour rate (a “Power Purchase Agreement” or “PPA”), or the use of our Energy Server systems owned by a financing party in exchange for a capacity-based payment (a “Capacity Agreement”) or the use of our Energy Server systems via an equipment lease (a “Lease Agreement”) or energy services provided via a sale-lease back structure (each, a “Managed Services Agreement”).

Current wording

With respect to the third-party financing options in the U.S., a customer may choose to contract for the purchase of electricity generated by the Energy Server systems in exchange for a scheduled dollars per kilowatt hour rate (a “Power Purchase Agreement” or “PPA”), or the use of our Energy Server systems owned by a financing party in exchange for a capacity-based payment (a “Capacity Agreement”) or the use of our Energy Server systems via an equipment lease (a “Lease Agreement”).

Previous wording

PPAs are typically financed on a portfolio basis. In the past, we have financed portfolios through tax equity partnerships, acquisition financings and direct sales to investors (each, a “Portfolio Financing”). Capacity-based payments in a Managed Services Agreement or Capacity Agreement are required regardless of the level of performance of the Energy Server system. Managed Services Agreements are then financed pursuant to a sale-leaseback with a financial institution (a “Managed Services Financing”).

Current wording

PPAs, Capacity Agreements and Lease Agreements are financed on an individual or a portfolio basis. In the past, we have financed these customer agreements through tax equity partnerships, acquisition financings and direct sales to investors (each, a “Portfolio Financing”).

Previous wording

In the U.S., our capacity to offer our Energy Server systems through these financed arrangements depends in large part on the ability of financing parties to optimize the tax benefits associated with the Energy Server systems, such as the ITC (when available) or accelerated depreciation. Interest rate fluctuations, and internationally, currency exchange rate fluctuations, may also impact the attractiveness of any financing offerings for our customers. Our ability to finance a PPA, a Capacity Agreement, or a Managed Services Agreement is also related to, and may be limited by, the creditworthiness of the customer. Additionally, a Capacity Agreement or Managed Services Financing option is limited by a customer’s willingness to commit to making the capacity-based payment to a financing party regardless of performance.

Current wording

In the U.S., our capacity to offer our Energy Server systems through these financed arrangements depends in large part on the ability of financing parties to optimize the tax benefits associated with the Energy Server systems, such as the ITC or accelerated depreciation. Interest rate fluctuations, and internationally, currency exchange rate fluctuations, may also impact the attractiveness of any financing offerings for our customers. Our ability to finance a PPA, a Capacity Agreement, or a Lease Agreement is also related to, and may be limited by, the creditworthiness of the customer. Additionally, a Capacity Agreement, or a Lease Agreement option is limited by a customer’s willingness to commit to making the fixed payment to a financing party regardless of performance.

Previous wording

In the past, we financed the Energy Server systems subject to our PPAs through two types of Portfolio Financings. In one type of transaction, we sold a portfolio of PPAs to a tax equity partnership in which we held a managing member interest (such partnership in which we hold an interest, a “PPA Entity”). In these transactions, we sold the portfolio of the Energy Server systems to a limited liability project company (such portfolio owner, a “Portfolio Company”) of which the PPA Entity was the sole member. Whether an investor, a tax equity partnership, or a single member limited liability company, the Portfolio Company was the entity that directly owned the portfolio. The Portfolio Company sold the electricity generated by the Energy Server systems contemplated by the PPAs to the customers. We recognized revenue as the electricity was produced. Our current practices no longer contemplate these types of transactions. In fiscal year 2023, we completed the process of restructuring our PPA Entities by (i) acquiring the outstanding equity interests of our previous investors and tax equity partners, (ii) selling 100% of the equity interests in the PPA Entities or the Portfolio Companies to new investors or tax equity partnerships in which we do not have an equity interest, and (iii) entering into new equipment supply and installation agreements and related agreements to repower and/or replace the Energy Server systems. In August 2023, we sold our last consolidated PPA Entity, 2015 ESA Project Company, LLC (“PPA V”), in connection with the repowering of its portfolio of the Energy Server systems. For further discussion, see Part II, Item 8, Note 10 —Portfolio Financings. The second type of Portfolio financing and our current practice consists of our selling a portfolio of PPAs, or Capacity Agreements or Managed Service Agreements or some combination thereof to a tax equity partnership in which we hold no interest (a “Third-Party Financing”).

Current wording

Our current practice with respect to third party financing consists of our selling a portfolio of PPAs, or Capacity Agreements or Lease Agreements or some combination thereof (or single customer agreements, particularly when such are very large) to a tax equity partnership in which we hold no or a very limited interest (a “Third-Party Financing”, “Third-Party PPAs”).

Previous wording

Under our Managed Services Financing option, we enter into a Managed Services Agreement with a customer for a certain term. We sell the Energy Server systems to the financier who then leases it back to us pursuant to a sale-leaseback transaction. In the past, certain sale-leaseback transactions failed to achieve all of the criteria for sale accounting and consequently the proceeds from the transaction were recognized as financing obligations within our consolidated balance sheets. For successful sale-and-leaseback transactions, the financier of the Managed Services Agreement typically pays the purchase price for the Energy Server systems at or around acceptance, and we recognize the fair market value of the Energy Server systems sold and respective installation services provided to the financier within product and install revenue, respectively, and recognize an operating lease right-of-use (“ROU”) asset and an operating lease liability on our consolidated balance sheets. Any proceeds in excess of the fair value of the Energy Server systems are recognized as financing obligations.

Current wording

We no longer offer new Managed Services Financings to customers. However, we continue to service a small number of prior third-party financings of this type. Under our Managed Services Financing option, we entered into a Managed Services Agreement with a customer for a certain term. We sold the Energy Server systems to the financier who then leased it back to us pursuant to a sale-and-leaseback transaction. In the past, certain sale-and-leaseback transactions failed to achieve all of the criteria for sale accounting and consequently the proceeds from the transaction were recognized as financing obligations within our consolidated balance sheets. For successful sale-and-leaseback transactions, the financier of the Managed Services Agreement typically paid the purchase price for the Energy Server systems at or around acceptance, and we recognized the fair market value of the Energy Server systems sold and respective installation services provided to the financier within product and install revenue, respectively, and recognized an operating lease right-of-use (“ROU”) asset and an operating lease liability on our consolidated balance sheets. Any proceeds in excess of the fair value of the Energy Server systems were recognized as financing obligations.

Previous wording

The duration of our current Managed Services Agreement offerings is between five and ten years. Under some Managed Services Agreements, we agree to provide remarketing assistance in the event a customer does not renew its agreement. Our Managed Services Agreements typically provide for performance warranties of both the efficiency and output of the Energy Server systems and may include other warranties depending on the type of deployment. We often structure payments from the customer as a dollar per kilowatt flat payment. In some cases, the structure may also include variable payment based on the Energy Server systems’ performance or a performance-related set-off. As of December 31, 2024, we had incurred no liabilities due to failure to repair or replace our Energy Server systems pursuant to these performance warranties.

Current wording

The duration of Managed Services Agreements we offered was between five and ten years. Under some Managed Services Agreements, we agreed to provide remarketing assistance in the event a customer did not renew its agreement. Our Managed Services Agreements typically provided for performance warranties of both the efficiency and output of the Energy Server systems and may have included other warranties depending on the type of deployment. We often structured payments from the customer as a dollar per kilowatt flat payment. In some cases, the structure may have also included variable payment based on the Energy Server systems’ performance or a performance-related set-off. As of December 31, 2025, we had incurred no liabilities due to failure to repair or replace our Energy Server systems pursuant to these performance warranties.

Previous wording

As of December 31, 2024, we had incurred no liabilities due to failure to repair or replace the Energy Server systems pursuant to any performance warranties made under the O&M Agreements.

Current wording

As of December 31, 2025 and 2024, we had incurred no liabilities due to failure to repair or replace the Energy Server systems pursuant to any performance warranties made under the O&M Agreements.

Previous wording

For the O&M Agreements that are subject to renewal, our future service revenue from such agreements are subject to our obligations to make payments for underperformance against the performance guaranties, which are capped at an aggregate total of approximately $587.5 million (including $460.3 million related to portfolio financing entities and $127.2 million related to all other transactions, and include payments for both low output and low efficiency) and our aggregate remaining potential payment related to these underperformance obligations was approximately $489.4 million as of December 31, 2024. For the years ended December 31, 2024, and 2023 we made performance guarantee payments of $21.2 million and $25.9 million, respectively.

Current wording

For the O&M Agreements that are subject to renewal, our future service revenue from such agreements are subject to our obligations to make payments for underperformance against the performance guaranties, which are capped at an aggregate total of approximately $585.4 million (including $463.9 million related to portfolio financing entities and $121.5 million related to all other transactions, and include payments for both low output and low efficiency) and our aggregate remaining potential

Previous wording

As part of our expanded strategic partnership with SK ecoplant, the parties executed the PDA Restatement in October 2021, which incorporates previously amended terms and establishes: (i) SK ecoplant’s purchase commitments of at least 500 megawatts of power for our Energy Server systems between 2022 and 2024 on a take-or-pay basis; (ii) rollover procedures; (iii) premium pricing for product and services; (iv) termination procedures for material breaches; and (v) procedures if there are material changes to the Republic of Korea Hydrogen Portfolio Standard. In December 2023, we further expanded our business partnership with SK ecoplant through the increase of SK ecoplant’s purchase commitments for Bloom Energy products of 250

Current wording

As part of our expanded strategic partnership with SK ecoplant, the parties executed an amendment and restatement to our Preferred Distribution Agreement (“PDA Restatement”), in October 2021, which incorporates previously amended terms and establishes: (i) SK ecoplant’s purchase commitments of at least 500 megawatts of power for our Energy Server systems between 2022 and 2024 on a take-or-pay basis; (ii) rollover procedures; (iii) premium pricing for product and services; (iv) termination procedures for material breaches; and (v) procedures if there are material changes to the Republic of Korea Hydrogen Portfolio Standard. In December 2023, we further expanded our business partnership with SK ecoplant through the increase of SK ecoplant’s purchase commitments for Bloom Energy products of 250 megawatts through 2027 and extended the timing of delivery of the remaining take-or-pay commitment under the original agreement. For additional information, please see Part II, Item 8, Note 17—SK ecoplant Strategic Investment in this Annual Report on Form 10-K.

Previous wording

Total revenue increased by $140.4 million, or 10.5%, for the year ended December 31, 2024, as compared to the prior year period. This increase was driven by a $109.9 million increase in product revenue, a $30.5 million increase in service revenue and a $29.5 million increase in installation revenue, partially offset by a $29.5 million decrease in electricity revenue.

Current wording

Total revenue increased by $550.1 million, or 37.3%, for the year ended December 31, 2025, compared to the prior year period. This increase was driven by a $446.1 million increase in product revenue, a $81.8 million increase in installation revenue, a $14.8 million increase in service revenue, and a $7.5 million increase in electricity revenue.

Showing the first 40 of 52 pairs. Open the source sections for the rest.

Rearranged current paragraphs (14)

Current report — wording carried from elsewhere

In addition, our fully-islanded microgrid solutions can provide power on-site, without the need for transmission and distribution system upgrades that often are required before a customer can interconnect to the electrical grid. We are seeing greater interest in fully-islanded, microgrid solutions among data center customers because of these interconnection-related delays. If a customer desires a “grid parallel” solution, where it can withdraw system power in combination with the Bloom Energy Server system, required interconnection studies and lengthy interconnection queues may remain, eroding the time to power value proposition, though ongoing regional and national policy developments may significantly reduce these queues, increasing the value of onsite generation solutions.

Current report — wording carried from elsewhere

Utility companies are exploring alternative means of producing and supplying energy to their end customers, including our Energy Server systems. We entered into agreements with utilities in 2024, including a landmark 1 GW supply framework agreement with a customer and began executing on the order in 2024.

Current report — wording carried from elsewhere

Our islanded microgrid solution also creates benefits for consumers by reducing congestion charges resulting from constraints on the transmission grid and avoiding the need for network transmission investments and upgrades. In addition to our distributed generation microgrid solution serving a single customer, utility companies can employ it to serve as an energy transmission asset, helping them avoid the costs of new transmission and distribution infrastructure.

Current report — wording carried from elsewhere

We expect more utility customers in the future to supplement their power generation with the Bloom Energy Server system. Increasing the supply of available power can allow utilities to encourage end customers to remain in their current locations rather than relocating to areas where power is more available. In addition, co-locating our Energy Server systems on-site with large loads, can enable a utility to provide power to a large energy user with reduced impact on its rate base and providing the onsite power as an islanded microgrid can avoid interconnection studies and wait times.

Current report — wording carried from elsewhere

The repurchase amount equaled 122.6% of the principal amount repurchased plus related accrued and unpaid interest.

Current report — wording carried from elsewhere

operating activities and may adversely affect our ability to incur additional debt to fund future needs, for more information regarding the terms of and risks associated with our debt.

Current report — wording carried from elsewhere

–A Capacity Agreement where the customer pays a capacity-based periodic fixed payment; or

Current report — wording carried from elsewhere

–a Lease Agreement where the customer pays a periodic fixed payment for the use of the equipment.

Current report — wording carried from elsewhere

Although currently not offered, we have also previously offered access to our Energy Server system through a Managed Services Agreement, whereby we sold and leased back the Energy Server system to supply energy services to our customers. Each of the foregoing alternatives are made possible through third-party financing arrangements in which such agreements are sold individually or in portfolios to investors.

Current report — wording carried from elsewhere

In the past, in addition to financing Energy Server systems subject to our PPAs through Third Party Financings, we had sold portfolios of PPAs to tax equity partnerships in which we had a managing member interest (such partnership in which we held an interest, a “PPA Entity”). In theses transactions, we sold the portfolio of the Energy Server systems to a limited liability project company (such portfolio owner, a “Portfolio Company”) of which the PPA entity was the sole member. Whether an investor, a tax equity partnership, or a single member limited liability company, the Portfolio Company was the entity that

Current report — wording carried from elsewhere

directly owned the portfolio. The Portfolio Company sold the electricity generated by the Energy Server systems contemplated by the PPAs to the customers. We recognized revenue as the electricity was produced.

Current report — wording carried from elsewhere

In fiscal year 2023, we completed the process of restructuring our PPA Entities by (i) acquiring the outstanding equity interests of our previous investors and tax equity partners, (ii) selling 100% of the equity interests in the PPA Entities or the Portfolio Companies to new investors or tax equity partnerships in which we do not have an equity interest, and (iii) entering into new equipment supply and installation agreements and related agreements to repower and/or replace the Energy Server systems. In August 2023, we had sold our last consolidated PPA Entity. For further information, see Part II, Item 8, Note 11—Portfolio Financings.

Current report — wording carried from elsewhere

payment related to these underperformance obligations was approximately $480.7 million as of December 31, 2025. For the years ended December 31, 2025 and 2024, we made performance guarantee payments of $18.0 million and $21.2 million, respectively.

Current report — wording carried from elsewhere

recognition threshold has been met. We have provided a full valuation allowance on our domestic deferred tax assets because we believe it is more likely than not that our deferred tax assets will not be realized.
Rearranged previous paragraphs (6)

Previous report — wording carried elsewhere

Bloom Energy Server system, required interconnection studies and lengthy interconnection queues may remain, eroding the time to power value proposition.

Previous report — wording carried elsewhere

The combination of our cash and cash equivalents and cash flow to be generated by our operations is expected to be sufficient to meet our anticipated cash flow needs for at least the next 12 months. If these sources of cash are insufficient or are not received in a timely manner to satisfy our near-term or future cash needs, we may require additional capital from equity or

Previous report — wording carried elsewhere

megawatts through 2027 and extended the timing of delivery of the remaining take-or-pay commitment under the original agreement. For additional information, please see Part II, Item 8, Note 17 —SK ecoplant Strategic Investment.

Previous report — wording carried elsewhere

On September 15, 2023, we entered into the Amended and Restated JVA and the Share Purchase Agreement (together, the “Amended JV Agreements”) with SK ecoplant which allowed SK ecoplant to increase its share of the voting rights in the Korean JV to 60% and increased the scope of assembly done by the joint venture facility in the Republic of Korea to full assembly. In January 2024, according to the Amended JV Agreements SK ecoplant made a capital contribution to Korean JV of $4.0 million.

Previous report — wording carried elsewhere

input measure of progress to determine the amount of revenue to recognize during each reporting period when such revenue is recognized over time, based on the costs incurred to satisfy the performance obligation.

Previous report — wording carried elsewhere

For additional details about the transaction with SK ecoplant, please refer to Part II, Item 8, Note 17 —SK ecoplant Strategic Investment.