Management’s Discussion and AnalysisFor the three months and year ended December 31, 2024
OPERATIONS
Greenstone, Ontario, Canada
Greenstone is an open-pit mine with a 9.8 million tonne per year carbon-in-pulp process plant located in Ontario, Canada. The Company acquired its initial 60% interest in Greenstone in April 2021 and construction was advanced as a joint operation with Orion holding the remaining 40% interest. On May 13, 2024, Equinox Gold acquired Orion’s 40% interest to fully consolidate ownership of Greenstone into Equinox Gold.
| Three months ended · Year ended | |||||
|---|---|---|---|---|---|
| Operating data | Unit | December 31,2024 | September 30,2024 | June 30,2024 | December 31,2024 |
| Ore mined | kt | 3,145 | 2,038 | 1,276 | 7,108 |
| Waste mined | kt | 9,225 | 6,579 | 5,811 | 26,453 |
| Open pit strip ratio | w:o | 2.93 | 3.23 | 4.56 | 3.72 |
| Tonnes processed | kt | 1,643 | 1,319 | 725 | 3,687 |
| Average gold grade processed | g/t | 1.26 | 1.15 | 1.28 | 1.22 |
| Recovery | % | 82.0 | 78.6 | 88.0 | 82.1 |
| Gold produced | oz | 53,022 | 42,448 | 16,247 | 111,717 |
| Gold sold | oz | 56,413 | 43,747 | 10,358 | 110,518 |
| Financial data | |||||
| Revenue(2) | M$ | 148.3 | 106.1 | 23.9 | 278.3 |
| Cash costs(1) | M$ | 58.7 | 40.7 | 7.8 | 107.2 |
| Sustaining capital(1) | M$ | 5.3 | — | — | 5.3 |
| Reclamation expenses | M$ | 0.3 | 0.4 | 0.1 | 0.8 |
| Total AISC(1) | M$ | 64.3 | 41.1 | 7.9 | 113.3 |
| AISC contribution margin(1) | M$ | 83.9 | 65.0 | 16.1 | 165.0 |
| Non-sustaining expenditures | M$ | 21.1 | 65.0 | 74.0 | 212.9 |
| Unit analysis | |||||
| Realized gold price per oz sold | $/oz | 2,629 | 2,425 | 2,312 | 2,518 |
| Cash costs per oz sold(1) | $/oz | 1,041 | 930 | 750 | 970 |
| AISC per oz sold(1) | $/oz | 1,141 | 938 | 762 | 1,025 |
| Mining cost per tonne mined | $/t | 2.66 | 3.09 | 0.91 | 1.97 |
| Processing cost per tonne processed | $/t | 15.68 | 12.03 | 3.84 | 12.05 |
| G&A cost per tonne processed | $/t | 7.04 | 8.80 | 4.88 | 7.24 |
(1)Cash costs, sustaining capital, AISC, AISC contribution margin, mine-site free cash flow, cash costs per oz sold and AISC per oz sold are non-IFRS measures. See Non-IFRS Measures and Cautionary Notes.
Greenstone construction commenced in Q4 2021 and was substantially complete at the end of Q4 2023. Commissioning activities commenced in Q1 2024 and continued through Q3 2024. Ore was introduced into the system on April 6, 2024 and the first gold pour was achieved on schedule on May 22, 2024.
Ramp-up of the mine continued to progress through 2024, and on November 6, 2024, the Company announced Greenstone was in commercial production.
At December 31, 2024, the mine had moved more than 33.6 million tonnes of material and had more than 3.9 million tonnes of ore stockpiled. Plant throughput for the crushing and grinding circuits increased through the Quarter and averaged 20,400 tpd for the month of December 2024, representing 76% of design capacity. The crushing and grinding circuits have demonstrated operation at the full production rate of 27,000 tpd and gold recovery has reached daily highs over 90% and averaged 82% through the Quarter. Changes implemented in Q4 2024 to the cyclone feed pumps, wet screens and other areas are expected to meaningfully reduce plant downtime and increase overall plant availability.
Recoveries in 2024 reflect higher-than-planned solution tails grade, predominantly at higher throughputs, due to ineffective seating of certain valves in the carbon-in-pulp circuit. Greenstone determined that recalibration and replacement with a dart-style valve will be more effective and prevent pregnant solution losses to tailings. Valves were recalibrated in Q4 2024 and
Management’s Discussion and AnalysisFor the three months and year ended December 31, 2024
replacement valves are expected to be installed in H1 2025. With these improvements underway, Greenstone expects to continue its ramp-up to achieve design recovery rates by mid-2025.
On October 1, 2024, Equinox Gold released an updated technical report that provided updated capital and operating costs and outlined a new mine plan with a larger pit, more Mineral Reserves and a longer mine life, producing an estimated 5.2 million ounces over Greenstone’s initial 15-year mine life. Production is expected to average 390,000 ounces per year for the first five years, and approximately 330,000 ounces per year life of mine.
Greenstone production was higher for the three months ended December 31, 2024 compared to the three months ended September 30, 2024 due to the continued ramp up of operations, with 44% more material mined, 25% more ore processed, 9% higher ore grades and 4% higher recovery.
Mining unit costs were lower for the three months ended December 31, 2024 compared to the three months ended September 30, 2024 due to the ongoing ramp up of activities and higher volumes mined. Processing unit costs were higher for the three months ended December 31, 2024 compared to the three months ended September 30, 2024 due to work associated with plant optimizations. General and administrative unit costs were lower for the three months ended December 31, 2024 compared to the three months ended September 30, 2024 due to higher ore tonnes processed.
Cash costs per oz sold were higher for the three months ended December 31, 2024 compared to the three months ended September 30, 2024 due to higher processing costs. AISC per oz soldwas higher for the three months ended December 31, 2024 compared to the previous period due to higher cash costs.
All expenditures prior to achieving commercial production on November 6, 2024 were classified as non-sustaining. As such, there were no sustaining capital expenditures during the first three quarters of the year. Sustaining capital expenditures for the three months ended December 31, 2024 was $5.3 million, primarily related to a TSF raise, buildings and other infrastructure. Non-sustaining expenditures for the three months and year ended December 31, 2024 were $21.1 million and $212.9 million, respectively, primarily related to initial capital, fleet leasing costs, buildings and other infrastructure.
For its first partial year of production, Greenstone achieved 2024 Guidance, with production of 111,717 oz compared to guidance of 110,000 - 130,000 oz of gold. Greenstone’s cash costs of $970 per oz was higher than guidance of $850 - $950 per oz and AISC of $1,025 per oz was lower than guidance of $1,050 - $1,150 per oz of gold sold.
Outlook
Greenstone production guidance for 2025 is 300,000 to 350,000 ounces of gold, with cash costs of $790 to $890 per oz and AISC of $1,045 to $1,145 per oz.
Sustaining expenditures at Greenstone of $116 million in 2025 include $35 million for a TSF raise, $52 million for fleet support, processing improvements and production loaders, and $20 million for a dewatering well, water management pond, waste rock storage areas, and back-up power. Non-sustaining expenditures of $35 million in 2025 relate primarily to purchasing an additional shovel and trucks, completing the relocated community electrical substation, installation of a seventh genset in the power plant, and completing the Ontario Provincial Police detachment construction.
Management’s Discussion and AnalysisFor the three months and year ended December 31, 2024
Mesquite Gold Mine, California, USA
Mesquite is an open pit, run-of-mine (“ROM”) heap leach gold mine located in Imperial County, California. Mesquite has been operating since 1986.
| Three months ended · Year ended | ||||||
|---|---|---|---|---|---|---|
| Operating data | Unit | December 31,2024 | September 30,2024 | December 31,2023 | December 31,2024 | December 31,2023 |
| Ore mined and stacked on leach pad | kt | — | 1,535 | 3,844 | 6,681 | 16,988 |
| Waste mined | kt | 13,348 | 12,198 | 8,067 | 49,076 | 34,119 |
| Open pit strip ratio | w:o | — | 7.95 | 2.10 | 7.35 | 2.01 |
| Average gold grade stacked to leach pad | g/t | — | 0.33 | 0.52 | 0.33 | 0.45 |
| Gold produced | oz | 17,129 | 15,223 | 25,923 | 71,984 | 87,753 |
| Gold sold | oz | 17,273 | 15,018 | 24,190 | 73,664 | 85,987 |
| Financial data | ||||||
| Revenue(2) | M$ | 45.5 | 37.6 | 48.6 | 173.1 | 167.9 |
| Cash costs(1) | M$ | 23.1 | 20.3 | 25.9 | 92.7 | 95.1 |
| Sustaining capital(1) | M$ | 0.2 | 0.4 | 0.1 | 0.6 | 10.7 |
| Reclamation expenses | M$ | 0.7 | 0.6 | (0.1) | 2.8 | 1.8 |
| Total AISC(1) | M$ | 24.0 | 21.3 | 25.9 | 96.1 | 107.6 |
| AISC contribution margin(1) | M$ | 21.4 | 16.3 | 22.7 | 76.9 | 60.4 |
| Non-sustaining expenditures | M$ | 22.7 | 11.2 | 5.9 | 41.1 | 17.2 |
| Unit analysis | ||||||
| Realized gold price per oz sold | $/oz | 2,634 | 2,504 | 2,009 | 2,350 | 1,953 |
| Cash costs per oz sold(1) | $/oz | 1,337 | 1,354 | 1,070 | 1,259 | 1,105 |
| AISC per oz sold(1) | $/oz | 1,392 | 1,421 | 1,068 | 1,306 | 1,251 |
| Mining cost per tonne mined | $/t | 1.71 | 1.49 | 1.91 | 1.47 | 1.66 |
| Processing cost per tonne processed | $/t | — | 7.16 | 3.85 | 6.82 | 3.01 |
| G&A cost per tonne processed | $/t | — | 2.96 | 1.39 | 2.91 | 0.96 |
(1)Cash costs, sustaining capital, AISC, AISC contribution margin, mine-site free cash flow, cash costs per oz sold and AISC per oz sold are non-IFRS measures. See Non-IFRS Measures and Cautionary Notes.
Production was lower in the three months and year ended December 31, 2024 compared to the same periods in 2023 as mining activity in 2024 has been predominantly focused on waste stripping in the Ginger pit, with the majority of ore coming from other mineralized waste and ancillary ore sources, whereas in 2023 significant ore was mined from Vista East pit starting in Q2 2023. The Ginger pit strip program is expected to provide access to ore in H1 2025. Total tonnes mined in Q4 2024 were 12% higher compared to Q4 2023 while no ore tonnes were mined in Q4 2024 due to the phase of mining Ginger pit being entirely waste stripping. Total tonnes mined for the year ended December 31, 2024 were 9% higher compared to the same period in 2023, while ore tonnes mined were 61% lower and the strip ratio was 266% higher, reflecting the waste stripping campaign in the Ginger pit. Waste hauls are generally shorter than ore hauls, enabling more tonnes to be moved.
Mining unit costs were lower for the three months and year ended December 31, 2024 compared to the same periods in 2023 due to lower diesel prices and increased strip ratios, resulting in more waste hauls which are less costly than ore hauls due to the shorter distance required. Processing and general and administration unit costs were higher for the three months and year ended December 31, 2024 compared to the same periods in 2023 due primarily to the impact of fewer tonnes stacked in 2024.
Cash costs per oz sold were higher for the three months and year ended December 31, 2024 compared to the same periods in 2023 due to the impact of fewer recoverable ounces stacked on the heap leach pad in 2024. AISC per oz sold was higher for the three months and year ended December 31, 2024 due to the impact of higher cash costs per oz sold offset partially by lower sustaining capital for 2024, as Ginger capital stripping was classified as non-sustaining.
Management’s Discussion and AnalysisFor the three months and year ended December 31, 2024
Sustaining capital expenditures for the three months and year ended December 31, 2024 were $0.2 million and $0.6 million, respectively, primarily related to infrastructure. Non-sustaining expenditures for the three months and year ended December 31, 2024 were $22.7 million and $41.1 million, respectively, primarily related to capitalized stripping in the Ginger pit and the final lease payments for haul trucks.
For production, Mesquite exceeded 2024 Guidance, with production of 71,984 ounces compared to production guidance of 55,000 to 65,000 ounces of gold. Mesquite’s costs were lower than 2024 Guidance, with cash costs of $1,259 per oz compared to guidance of $1,345 to $1,445 per oz and AISC of $1,306 per oz compared to guidance of $1,410 to $1,510 per oz, driven by additional ore mined due to positive reconciliations and a change in the mine plan which provided access to additional ore and commencement of mining the Ginger pit in Q4 2024.
Mesquite sustaining expenditures were lower than 2024 Guidance due to lower spend on equipment and infrastructure. Non-sustaining expenditures were lower than 2024 Guidance with lower capitalized stripping as the Ginger pit over-reconciled for ore tonnes, meaning lower strip ratios and less capitalized waste tonnes.
No exploration drilling was completed at Mesquite in Q4 2024. Results from the 4,970 metre (“m”) step-out reverse circulation (“RC”) drill program completed in Q2 2024 designed to test for extensions of the Ginger deposit were incorporated into an updated geological model. Geological mapping of the main open pits continues. Exploration expenditures at Mesquite for the year ended December 31, 2024 were $1.2 million.
Outlook
Mesquite production guidance for 2025 is 90,000 to 105,000 ounces of gold, with approximately 70% of production expected in the second half of the year. Cost guidance for 2025 is cash cost of $1,235 to $1,335 per oz and AISC of $1,725 to $1,825 per oz. Sustaining expenditures of $51 million primarily relate to capitalized stripping of the Brownie phase 4 and Big Chief 8 pits. Non-sustaining expenditures of $16 million primarily relate to capitalized waste stripping of the Ginger pit.
Mesquite’s 2025 production is predominantly from accessing the Ginger pit which is expected to yield ore in H1 2025. Brownie phase 4, Rainbow North and Big Chief 8 pits waste stripping campaigns will be performed throughout 2025 to provide ore for 2026.
Management’s Discussion and AnalysisFor the three months and year ended December 31, 2024
Los Filos Gold Mine, Guerrero, Mexico
Los Filos is located in Guerrero State, Mexico, and commenced production in 2008. Mining operations in 2024 involved three open pits (Los Filos, Bermejal and Guadalupe) and one underground mine (Los Filos). Crushed and run-of-mine ore from the various deposits is processed by heap leaching.
| Three months ended · Year ended | ||||||
|---|---|---|---|---|---|---|
| Operating data | Unit | December 31,2024 | September 30,2024 | December 31,2023 | December 31,2024 | December 31,2023 |
| Ore mined - open pit | kt | 3,395 | 3,054 | 1,307 | 9,633 | 9,092 |
| Waste mined - open pit | kt | 7,948 | 8,243 | 7,411 | 35,081 | 39,789 |
| Open pit strip ratio | w:o | 2.34 | 2.70 | 5.67 | 3.64 | 4.38 |
| Average open pit gold grade | g/t | 0.60 | 0.64 | 1.21 | 0.63 | 0.86 |
| Ore mined - underground | kt | 238 | 222 | 125 | 809 | 461 |
| Average underground gold grade | g/t | 2.57 | 3.14 | 3.26 | 2.81 | 3.22 |
| Tonnes processed | kt | 3,812 | 3,253 | 1,488 | 10,566 | 9,702 |
| Gold produced | oz | 60,521 | 48,462 | 42,210 | 170,369 | 159,071 |
| Gold sold | oz | 58,321 | 49,880 | 39,474 | 169,556 | 157,586 |
| Financial data | ||||||
| Revenue(2) | M$ | 153.4 | 122.6 | 78.2 | 410.8 | 305.0 |
| Cash costs(1) | M$ | 112.1 | 98.3 | 65.2 | 325.5 | 260.8 |
| Sustaining capital(1) | M$ | 6.4 | 8.0 | 16.1 | 40.9 | 33.8 |
| Sustaining lease payments | M$ | 0.2 | 0.2 | — | 0.7 | 0.2 |
| Sustaining exploration expenditures | M$ | 0.1 | 0.1 | — | 0.5 | — |
| Reclamation expenses | M$ | 0.8 | 0.7 | 0.7 | 2.9 | 3.0 |
| Total AISC(1) | M$ | 119.6 | 107.4 | 82.0 | 370.5 | 297.9 |
| AISC contribution margin(1) | M$ | 33.8 | 15.2 | (3.8) | 40.4 | 7.1 |
| Care and maintenance | M$ | — | — | — | — | 0.3 |
| Non-sustaining expenditures | M$ | — | — | 0.2 | — | 0.7 |
| Unit analysis | ||||||
| Realized gold price per oz sold | $/oz | 2,630 | 2,458 | 1,982 | 2,423 | 1,935 |
| Cash costs per oz sold(1) | $/oz | 1,922 | 1,972 | 1,651 | 1,920 | 1,655 |
| AISC per oz sold(1) | $/oz | 2,051 | 2,153 | 2,078 | 2,185 | 1,890 |
| Mining cost per tonne mined - open pit | $/t | 1.94 | 1.93 | 2.65 | 1.93 | 2.08 |
| Mining cost per tonne mined - underground | $/t | 110.99 | 105.73 | 110.34 | 103.51 | 117.81 |
| Processing cost per tonne processed | $/t | 7.55 | 7.42 | 17.80 | 7.54 | 10.14 |
| G&A cost per tonne processed | $/t | 2.73 | 2.59 | 7.54 | 2.84 | 4.02 |
(1)Cash costs, sustaining capital, AISC, AISC contribution margin, mine-site free cash flow, cash costs per oz sold, and AISC per oz sold are non-IFRS measures. See Non-IFRS Measures and Cautionary Notes.
Production was higher for the three months and year ended December 31, 2024 compared to the same periods in 2023 due to an increase in ore tonnes mined and a drawdown in 2024 of ounces in heap leach inventory accumulated to the end of 2023.
Open pit mining unit costs for the three months and year ended December 31, 2024 were lower compared to the same periods in 2023 with lower diesel costs and the impact of the weakening MXP compared to the USD, which was 17% and 3% lower for the quarter and year, respectively, compared to the same periods in 2023. Underground mining unit costs were in line for the three months and decreased for the year ended December 31, 2024 compared to the same periods in 2023. In Q1 2023, underground mining unit costs were higher due to the higher-cost of the Bermejal underground mine, while for full-
Management’s Discussion and AnalysisFor the three months and year ended December 31, 2024
year 2024 unit costs decreased due to optimization efforts and an increase in underground ore being mined from the lower-cost Los Filos underground mine.
Processing unit costs decreased for the three months and year ended December 31, 2024 compared to the same periods in 2023 due to the impact of the crusher and conveyor being offline for much of Q1 2024, as planned. As a result of the crusher and conveyor being offline, the site reprocessed 2.9 million tonnes of leach pad material which has a lower unit cost than primary crush and agglomeration. Additionally 9% more ore tonnes were processed in 2024 than the prior year and higher volumes average down the fixed costs of processing. General and administration unit costs decreased for thethree months and year ended December 31, 2024 compared to the same periods in 2023 due to an increase in ore tonnes processed. Total general and administration costs are consistent with prior period costs.
Cash costs per oz sold were higher for the three months and year ended December 31, 2024 compared to the same periods in 2023 due to lower ore grades processed in 2024 and the impact of fewer recoverable ounces stacked in the first half of 2024 (i.e. more tonnes stacked and processed to achieve a similar level of production). For Q4 2024, AISC per oz sold was less than Q4 2023 due to 48% more ounces sold in the period. AISC per oz sold increased for the year ended December 31, 2024 compared to the prior year predominantly due to the higher cash costs per oz sold.
Sustaining capital expenditures for the three months and year ended December 31, 2024 were $6.4 million and $40.9 million, respectively, primarily related to Guadalupe and Los Filos open pit capitalized stripping, Los Filos underground development and processing infrastructure. No non-sustaining expenditures were incurred at Los Filos for 2024.
For production, Los Filos achieved 2024 Guidance, with production of 170,369 ounces of gold compared to production guidance of 155,000 to 175,000 ounces. For costs, Los Filos was marginally over cash costs guidance with cash costs of $1,920 per oz compared to guidance of $1,785 to $1,885 per oz and achieved AISC guidance with AISC of $2,185 per oz compared to guidance of $2,090 to $2,190 per oz.
Exploration drilling at Los Filos was concluded early in Q4 2024 and included 402 m of infill core drilling in the Guadalupe open pit. Drilling for the year totalled 11,300 m representing 105% of the originally planned 2024 drilling. Exploration expenditures at Los Filos for the three months and year ended December 31, 2024 were $0.8 million and $5.6 million, respectively.
Outlook
The Company is not issuing 2025 cost and production guidance for Los Filos. 2025 operations at Los Filos is subject to the successful completion of new long-term agreements with three local communities. These new agreements are necessary to help ensure the long-term economic and investment viability of the mine, including the addition of a new 10,000 tpd CIL processing plant to increase recoveries from higher-grade ore. The Company and the three communities have held a collaborative and open dialogue process and have reached consensus on terms for new agreements. Two communities have ratified and signed new long-term agreements; however, one community remains outstanding. If the Company is unable to satisfactorily complete these agreements with all three communities in the very near term, the Company will suspend operations at Los Filos indefinitely.
Management’s Discussion and AnalysisFor the three months and year ended December 31, 2024
Aurizona Gold Mine, Maranhão, Brazil
Aurizona is an open pit gold mine located in northeastern Brazil that commenced production in Q3 2019. Ore from a number of open pits is processed in an 8,000 tpd CIL plant. The Company is advancing permitting, exploration and studies related to an expansion that is expected to extend the mine life and increase annual gold production with development of an underground mine and satellite open pit deposits that would operate concurrently with the existing open pit mine.
| Three months ended · Year ended | ||||||
|---|---|---|---|---|---|---|
| Operating data | Unit | December 31,2024 | September 30,2024 | December 31,2023 | December 31,2024 | December 31,2023 |
| Ore mined | kt | 1,029 | 798 | 1,453 | 2,039 | 3,750 |
| Waste mined | kt | 11,485 | 7,568 | 5,347 | 25,073 | 20,805 |
| Open pit strip ratio | w:o | 11.16 | 9.48 | 3.68 | 12.30 | 5.55 |
| Tonnes processed | kt | 938 | 690 | 812 | 2,562 | 3,390 |
| Average gold grade processed | g/t | 0.90 | 0.97 | 1.44 | 0.96 | 1.22 |
| Recovery | % | 89.2 | 90.8 | 90.1 | 90.0 | 90.3 |
| Gold produced | oz | 24,277 | 17,181 | 34,104 | 71,624 | 120,626 |
| Gold sold | oz | 24,520 | 16,334 | 33,638 | 72,895 | 120,164 |
| Financial data | ||||||
| Revenue(2) | M$ | 64.8 | 40.7 | 65.9 | 173.8 | 233.3 |
| Cash costs(1) | M$ | 37.4 | 24.6 | 30.7 | 114.2 | 128.3 |
| Sustaining capital(1) | M$ | 16.4 | 9.6 | 11.6 | 45.2 | 41.6 |
| Sustaining lease payments | M$ | 0.3 | 0.4 | 0.5 | 1.6 | 1.9 |
| Reclamation expenses | M$ | 0.5 | 0.4 | 0.4 | 1.7 | 1.3 |
| Total AISC(1) | M$ | 54.6 | 35.0 | 43.2 | 162.7 | 173.1 |
| AISC contribution margin(1) | M$ | 10.1 | 5.6 | 22.8 | 11.0 | 60.2 |
| Non-sustaining expenditures | M$ | 0.9 | 0.9 | 3.5 | 4.6 | 8.3 |
| Unit analysis | ||||||
| Realized gold price per oz sold | $/oz | 2,641 | 2,489 | 1,960 | 2,384 | 1,941 |
| Cash costs per oz sold(1) | $/oz | 1,525 | 1,503 | 913 | 1,567 | 1,068 |
| AISC per oz sold(1) | $/oz | 2,229 | 2,145 | 1,283 | 2,233 | 1,440 |
| Mining cost per tonne mined | $/t | 2.14 | 2.48 | 3.32 | 2.58 | 3.17 |
| Processing cost per tonne processed | $/t | 9.71 | 12.30 | 12.68 | 12.79 | 12.24 |
| G&A cost per tonne processed | $/t | 4.16 | 5.59 | 5.30 | 6.15 | 5.16 |
(1)Cash costs, sustaining capital, AISC, AISC contribution margin, mine-site free cash flow, cash costs per oz sold and AISC per oz sold are non-IFRS measures. See Non-IFRS Measures and Cautionary Notes.
In late March 2024, due to persistent heavy rains in Maranhão, Brazil, there was a displacement of material in two locations in the south wall of the Piaba pit. As a result of this geotechnical event, access to the Piaba pit was restricted and miningof Piabawas suspended while the Company implemented a remediation plan to ensure safe mining of the pit.
After the geotechnical event, milling and gold production continued from the existing ore stockpile until the end of April 2024. During Q2 2024, the plant was idle for eight weeks while mining transitioned to the Tatajuba deposit, from which mining was originally planned for Q4 2024. In May 2024, mining commenced at the Tatajuba open pit and the plant was restarted in July 2024. Tatajuba provided most of the ore feed for the remainder of 2024; mining of the upper portion of the Piaba pit recommenced in November 2024 and ore was also sourced from the smaller Boa Esperança pit.
Production was lower for the three months and year ended December 31, 2024 compared to the same periods in 2023 due to the suspension of mining the Piaba pit, the plant being idle for May and June, and the impact of mining lower grade ore from the Tatajuba and Boa Esperança pits.
Mining unit costs were lower in the three months and year ended December 31, 2024 compared to the same periods in 2023 due to lower diesel prices and lower costs associated with mining in the Tatajuba and Boa Esperança pits due to softer ore
Management’s Discussion and AnalysisFor the three months and year ended December 31, 2024
and easier to mine nature of the ore, higher positions in the pits and lower contractor rates. The weakening of the BRL also contributed to lower mining costs. Processing unit costs were lower for Q4 2024 compared to Q4 2023 principally due to higher volumes of ore processed and softer ore. Processing unit costs increased for the year ended December 31, 2024 compared to the prior year due to lower volumes of ore processed overall. General and administrative unit costs were lower for Q4 2024 compared to Q4 2023, primarily due to higher volumes of ore processed, and higher for the year ended December 31, 2024 compared to the same period in 2023 due to lower volumes of ore processed.
Higher cash costs and AISC per oz sold for the three months and year ended December 31, 2024 compared to the same periods in 2023, were driven by lower gold sales in 2024 which result from the impact of a partial suspension of operations beginning in April 2024. Additionally, cash costs and AISC per oz sold for 2024 were impacted by costs incurred and accrued associated with remediation work associated with the geotechnical event of approximately $70 per ounce and costs incurred while the plant was idle and operating below normal levels of approximately $95 per ounce.
Sustaining capital expenditures for the three months and year ended December 31, 2024 were $16.4 million and $45.2 million, respectively, primarily related to capitalized stripping. Non-sustaining expenditures for the three months and year ended December 31, 2024 were $0.9 million and $4.6 million, respectively, primarily related to engineering studies for the portal and decline for underground development and drilling.
For production, Aurizona achieved 2024 Guidance, with production of 71,624 ounces compared to production guidance of 70,000 to 80,000 ounces of gold. For costs, Aurizona did not achieve 2024 Guidance with cash costs of $1,567 per oz compared to guidance of $1,450 to $1,550 per oz and AISC of $2,233 per oz compared to guidance of $2,175 to $2,275 per oz.
Aurizona sustaining and non-sustaining expenditures were lower than 2024 Guidance due to the postponement of TSF work following the geotechnical event and slower underground engineering and construction spend.
Exploration drilling activities continued in Q4 2024 with the primary focus on high potential regional targets. A total of 3,478 m of core drilling was carried out on regional exploration targets during the Quarter, bringing the 2024 total for regional drilling to 10,049 m. Drilling during Q4 2024 also included 300 m of resource delineation of the western extension of the Tatajuba deposit bringing the year-to-date total to 3,778 m. Exploration expenditures at Aurizona for the three months and year ended December 31, 2024 were $0.3 million and $1.3 million, respectively.
Outlook
The Aurizona mine plan was modified as a result of the geotechnical event, with continued access restrictions to certain areas of the Piaba open pit, during the rainy season. Production guidance for 2025 is 70,000 to 90,000 ounces of gold, with cash costs of $1,205 to $1,305 per oz and AISC of $1,855 to $1,955 per oz.
Sustaining expenditures at Aurizona of $57 million in 2025 include $33 million in capitalized stripping and $16 million for Vene 2 TSF expansion. Non-sustaining expenditures at Aurizona of $29 million in 2025 primarily relate to underground development.
The Company is advancing plans for the development of the Piaba underground portal and ramp in late 2025, as discussed in the Development Projects section.
Management’s Discussion and AnalysisFor the three months and year ended December 31, 2024
Fazenda Gold Mine, Bahia, Brazil
Fazenda is located in Bahia State, Brazil and has been in operation since 1984. Fazenda is primarily an underground operation complemented with production from several small open pits. A new mine plan will see an increased contribution of ore from a larger open pit while underground mining continues.
| Three months ended · Year ended | ||||||
|---|---|---|---|---|---|---|
| Operating data | Unit | December 31,2024 | September 30,2024 | December 31,2023 | December 31,2024 | December 31,2023 |
| Ore mined - open pit | kt | 132 | 141 | 118 | 538 | 554 |
| Waste mined - open pit | kt | 1,960 | 1,701 | 989 | 6,661 | 5,168 |
| Open pit strip ratio | w:o | 14.87 | 12.08 | 8.36 | 12.38 | 9.34 |
| Average open pit gold grade | g/t | 1.30 | 1.14 | 1.18 | 1.20 | 1.37 |
| Ore mined - underground | kt | 257 | 219 | 262 | 780 | 854 |
| Average underground gold grade | g/t | 2.06 | 1.55 | 1.88 | 1.81 | 1.78 |
| Ore mined - total | kt | 389 | 360 | 380 | 1,318 | 1,407 |
| Tonnes processed | kt | 374 | 377 | 369 | 1,477 | 1,429 |
| Average gold grade processed | g/t | 1.80 | 1.37 | 1.68 | 1.47 | 1.61 |
| Recovery | % | 91.1 | 90.3 | 89.7 | 90.6 | 90.2 |
| Gold produced | oz | 18,522 | 15,280 | 17,708 | 62,382 | 66,375 |
| Gold sold | oz | 19,055 | 15,464 | 17,273 | 63,221 | 66,120 |
| Financial data | ||||||
| Revenue(2) | M$ | 50.5 | 38.2 | 34.1 | 152.1 | 127.8 |
| Cash costs(1) | M$ | 19.4 | 23.4 | 21.3 | 86.4 | 81.3 |
| Sustaining capital(1) | M$ | 3.7 | 4.2 | 5.5 | 15.0 | 12.2 |
| Sustaining lease payments | M$ | 0.6 | 0.6 | 0.4 | 2.1 | 1.5 |
| Reclamation expenses | M$ | 0.1 | 0.1 | 0.2 | 0.6 | 0.7 |
| Total AISC(1) | M$ | 23.8 | 28.3 | 27.4 | 104.1 | 95.7 |
| AISC contribution margin(1) | M$ | 26.6 | 9.9 | 6.7 | 48.0 | 32.0 |
| Non-sustaining expenditures | M$ | 3.1 | 2.7 | 2.8 | 10.6 | 10.9 |
| Unit analysis | ||||||
| Realized gold price per oz sold | $/oz | 2,648 | 2,472 | 1,977 | 2,406 | 1,932 |
| Cash costs per oz sold(1) | $/oz | 1,019 | 1,512 | 1,234 | 1,366 | 1,230 |
| AISC per oz sold(1) | $/oz | 1,251 | 1,831 | 1,588 | 1,647 | 1,448 |
| Mining cost per tonne mined - open pit | $/t | 2.11 | 2.22 | 2.39 | 2.26 | 2.45 |
| Mining cost per tonne mined - underground | $/t | 28.06 | 31.79 | 33.58 | 33.81 | 33.41 |
| Processing cost per tonne processed | $/t | 11.62 | 13.63 | 14.06 | 12.76 | 14.49 |
| G&A cost per tonne processed | $/t | 7.99 | 7.96 | 7.69 | 7.55 | 6.75 |
(1)Cash costs, sustaining capital, AISC, AISC contribution margin, mine-site free cash flow, cash costs per oz sold, and AISC per oz sold are non-IFRS measures. See Non-IFRS Measures and Cautionary Notes.
Production was higher in Q4 2024 compared to Q4 2023 with higher grades from open pit and underground mining as ongoing development improved access to higher grade areas. Production was lower for the year ended December 31, 2024 compared to the same period in 2023 mainly due to lower grades from open pit mining driven by mine sequencing, and lower underground tonnes mined as the result of slow development rates. Mine development rates improved in Q4 2024 as a result of additional mining equipment brought onsite at the beginning of Q3 2024.
Open pit mining unit costs for the three months and year ended December 31, 2024 were lower compared to the same periods in 2023 due to higher tonnes moved in 2024. 2024 costs also benefited from the weakening of the BRL against the USD. Underground mining unit costs were lower in the three months ended December 31, 2024 compared to the same
Management’s Discussion and AnalysisFor the three months and year ended December 31, 2024
period in 2023 due to weakening of the BRL and lower maintenance and consumables costs. Underground mining unit costs for the year ended December 31, 2024 were consistent with the same period in 2023 as the impact of increased labour costs and fewer underground ore tonnes mined were offset by the weakening of the BRL against the USD. Additional equipment was brought onsite at the beginning of Q3 2024, which increased underground production volumes. Processing unit costs were lower in the three months and year ended December 31, 2024 compared to the same periods in 2023 primarily due to weakening of the BRL, lower consumables and power costs, and the impact of more ore tonnes processed. General and administration unit costs increased for thethree months and year ended December 31, 2024 compared to the same periods in 2023 due to additional consulting, shared costs and increased labour costs.
Cash costs per oz sold were lower in Q4 2024 compared to Q4 2023 reflecting the benefit of additional mining equipment brought onsite at the beginning of Q3 2024 and the weaker BRL. Cash costs per oz sold were higher for the year ended December 31, 2024 compared with the same period in 2023 due to lower mining rates and lower grades processed in 2024 compared to 2023. AISC per oz sold were lower in Q4 2024 compared to Q4 2023 reflecting the lower cash costs per oz sold. AISC per oz sold were higher for the year ended December 31, 2024 compared to the same period in 2023 due to higher cash costs per oz sold, as well as higher sustaining capital spend.
Sustaining capital expenditures for the three months and year ended December 31, 2024 were $3.7 million and $15.0 million, respectively, primarily related to mobile equipment, underground development, and capital stripping. Non-sustaining expenditures for the three months and year ended December 31, 2024 were $3.1 million and $10.6 million, respectively, primarily related to exploration drilling and underground development.
Fazenda’s production was lower than 2024 Guidance, with production of 62,382 ounces of gold compared to guidance of 65,000 to 70,000 ounces of gold due to lower mining volumes in the first half of the year. Fazenda did not achieve 2024 Guidance for cash costs with a result of $1,366 per oz compared to guidance of $1,195 to $1,295 per oz but achieved 2024 Guidance with AISC of $1,647 per oz compared to guidance of $1,560 to $1,660 per oz.
Fazenda’s sustaining expenditures were lower than 2024 Guidance due to lower sustaining mine development. Non-sustaining expenditures were higher than 2024 Guidance due to additional non-sustaining mine development and exploration.
In February 2025, the Company Issued an updated Mineral Reserve and Resource estimate, effective June 30, 2024, for Fazenda that supports an extension in Fazenda’s mine life to 2033. The updated Mineral Reserve and Resource estimate reflects a 142% increase in Mineral Reserves to 763 thousand ounces of contained gold and a 418% increase in Mineral Resources to 1.524 million ounces of contained gold, exclusive of Mineral Reserves and net of Mineral Resource conversion.
During the Quarter, the Company drilled 17,269 m of core focused on Mineral Reserve replacement in the immediate underground mine area, bringing the year-to-date total to 63,785 m. Surface exploration drilling for the year included 6,896 m of core drilling and was completed during Q3 2024. Exploration expenditures at Fazenda for the three months and year ended December 31, 2024 were $2.2 million and $8.4 million, respectively.
Outlook
In 2025, the focus at Fazenda is on development of the larger, CLX open pit.
Fazenda is part of the Bahia Complex. Bahia Complex production guidance for 2025 is 125,000 to 145,000 ounces of gold, with cash costs of $1,360 to $1,460 per oz and AISC of $1,845 to $1,945 per oz.
Sustaining expenditures at Bahia Complex of $70 million in 2025 primarily relate to $22 million for capitalized stripping, $12 million for the acquisition of equipment and components, $8 million for exploration, $4 million for infrastructure and vegetation clearing, $9 million for a TSF raise, and $4 million for underground development. Non-sustaining expenditures of $12 million in 2025 relate primarily to underground development and exploration.
Sustaining expenditures for 2025 include $8 million for exploration with a focus on reserve replacement. Non-sustaining expenditures include $9 million for step-out and regional exploration.
Management’s Discussion and AnalysisFor the three months and year ended December 31, 2024
Santa Luz Gold Mine, Bahia, Brazil
Santa Luz is an open pit gold mine located in Bahia State, Brazil. Santa Luz uses a resin-in-leach (“RIL”) process to recover gold from carbonaceous ores.
| Three months ended · Year ended | ||||||
|---|---|---|---|---|---|---|
| Operating data | Unit | December 31,2024 | September 30,2024 | December 31,2023 | December 31,2024 | December 31,2023 |
| Ore mined | kt | 877 | 361 | 678 | 2,091 | 2,326 |
| Waste mined | kt | 2,608 | 3,410 | 1,323 | 11,522 | 8,303 |
| Open pit strip ratio | w:o | 2.97 | 9.44 | 1.95 | 5.51 | 3.57 |
| Tonnes processed | kt | 604 | 653 | 536 | 2,301 | 2,200 |
| Average gold grade processed | g/t | 1.27 | 1.29 | 1.17 | 1.27 | 1.25 |
| Recovery | % | 63.5 | 58.3 | 61.7 | 59.2 | 64.7 |
| Gold produced | oz | 14,793 | 16,650 | 12,044 | 56,906 | 57,182 |
| Gold sold | oz | 15,478 | 16,266 | 12,132 | 56,984 | 56,696 |
| Financial data | ||||||
| Revenue(2) | M$ | 41.0 | 40.3 | 24.2 | 137.5 | 110.0 |
| Cash costs(1) | M$ | 28.2 | 31.7 | 25.4 | 111.2 | 95.3 |
| Sustaining capital(1) | M$ | 0.3 | 3.7 | 3.3 | 13.8 | 7.2 |
| Sustaining lease payments | M$ | 0.2 | 0.1 | 0.1 | 0.5 | 0.4 |
| Reclamation expenses | M$ | 0.3 | 0.3 | 0.2 | 1.3 | 1.0 |
| Total AISC(1) | M$ | 29.0 | 35.8 | 29.0 | 126.8 | 103.9 |
| AISC contribution margin(1) | M$ | 12.1 | 4.4 | (4.8) | 10.8 | 6.0 |
| Non-sustaining expenditures | M$ | 0.4 | 0.3 | 0.6 | 3.1 | 3.0 |
| Unit analysis | ||||||
| Realized gold price per oz sold | $/oz | 2,652 | 2,476 | 1,993 | 2,412 | 1,940 |
| Cash costs per oz sold(1) | $/oz | 1,820 | 1,949 | 2,092 | 1,951 | 1,681 |
| AISC per oz sold(1) | $/oz | 1,868 | 2,203 | 2,392 | 2,224 | 1,834 |
| Mining cost per tonne mined | $/t | 2.99 | 3.00 | 3.45 | 3.03 | 3.25 |
| Processing cost per tonne processed | $/t | 21.35 | 22.03 | 25.84 | 23.86 | 23.79 |
| G&A cost per tonne processed | $/t | 5.08 | 5.26 | 5.66 | 4.82 | 5.02 |
(1)Cash costs, sustaining capital, AISC, AISC contribution margin, mine-site free cash flow, cash costs per oz sold and AISC per oz sold are non-IFRS measures. See Non-IFRS Measures and Cautionary Notes.
Production was higher for Q4 2024 compared to Q4 2023 due to higher ore volumes processed and higher grades in Q4 2024. Production for the year ended December 31, 2024 was consistent with the same period in 2023 as the impact of an increase in the volume of ore processed was offset by lower recoveries in 2024. Processing challenges were encountered in 2024 which resulted in an increase in plant downtime related to modifications for the detox, adsorption/desorption/recovery (“ADR”) and electrowinning circuits. The team continues to work through planned optimization initiatives. Installation of a new trunnion on the SAG mill has enabled higher throughput in spite of additional plant downtime in Q3 2024.
Mining unit costs were lower for the three months and year ended December 31, 2024 compared to the same periods in 2023 primarily due to the impact of a weakening of the BRL. Processing unit costs were lower for Q4 2024 compared to Q4 2023 due to the impact of the BRL. Processing unit costs were in line for the year ended December 31, 2024 compared to the same period in 2023 due to an increase in consumables and maintenance costs being offset by a weakening BRL. General and administration unit costs were lower for the three months and year ended December 31, 2024 compared to the same periods in 2023 due to higher tonnes processed.
Cash costs per oz sold were lower for Q4 2024 compared to Q4 2023 due to higher gold production. Cash costs per oz sold were higher for the year ended December 31, 2024 compared to the same period in 2023 principally due to lower recoveries and a higher strip ratio in 2024. AISC per oz sold was lower for Q4 2024 compared to Q4 2023 due to higher gold
Management’s Discussion and AnalysisFor the three months and year ended December 31, 2024
production, andhigher for the year ended December 31, 2024 compared to the same period in 2023 principally due to higher cash costs per oz sold, in addition to higher sustaining capital spend driven by higher capitalized stripping and equipment spend.
Sustaining capital expenditures for the three months and year ended December 31, 2024 were $0.3 million and $13.8 million, respectively, primarily related to capitalized waste stripping, a TSF liner installation and processing equipment for the desliming circuit project. Non-sustaining expenditures for the three months and year ended December 31, 2024 were $0.4 million and $3.1 million, respectively, primarily related to exploration.
For production, Santa Luz did not achieve 2024 Guidance due to lower recoveries, with production of 56,906 ounces compared to production guidance of 70,000 - 80,000 ounces of gold. Santa Luz’s costs were higher than 2024 Guidance with cash costs of $1,951 per oz compared to guidance of $1,495 to $1,595 per oz and AISC of $2,224 per oz compared to guidance of $1,900 to $2,000 per oz.
Santa Luz sustaining expenditures were lower than 2024 Guidance due to the deferral of TSF-related work.
The planned 2024 exploration drilling programs at Santa Luz were completed during Q3 2024. A total of 8,270 m of drilling, including 5,147 m of RC and 3,123 m of core, was carried out focused on several high-priority regional targets. Exploration expenditures at Santa Luz for the three months and the year ended December 31, 2024 were $0.4 million and $3.1 million, respectively.
Outlook
In 2025, the focus at Santa Luz is on improving the steady-state throughput of the plant to achieve and maintain a design capacity of 2.7 million tonnes per annum. Recoveries for 2025 are planned at 64%.
Santa Luz is part of the Bahia Complex. Bahia Complex production guidance for 2025 is 125,000 to 145,000 ounces of gold, with cash costs of $1,360 to $1,460 per oz and AISC of $1,845 to $1,945 per oz.
Sustaining expenditures at Bahia Complex of $70 million in 2025 primarily relate to $22 million for capitalized stripping, $12 million for the acquisition of equipment and components, $8 million for exploration, $4 million for infrastructure and vegetation clearing, $9 million for a TSF raise and $4 million for underground development. Non-sustaining expenditures of $12 million in 2025 relate primarily to underground development and exploration.
Sustaining expenditures for 2025 include $8 million for exploration with a focus on reserve replacement. Non-sustaining expenditures include $9 million for step-out and regional exploration.
Management’s Discussion and AnalysisFor the three months and year ended December 31, 2024
RDM Gold Mine, Minas Gerais, Brazil
RDM is located in Minas Gerais State, Brazil and commenced production in early 2014 as a conventional open-pit operation.
| Three months ended · Year ended | ||||||
|---|---|---|---|---|---|---|
| Operating data | Unit | December 31,2024 | September 30,2024 | December 31,2023 | December 31,2024 | December 31,2023 |
| Ore mined | kt | 1,022 | 738 | 849 | 2,291 | 2,003 |
| Waste mined | kt | 2,662 | 4,295 | 1,891 | 12,052 | 9,197 |
| Open pit strip ratio | w:o | 2.60 | 5.82 | 2.23 | 5.26 | 4.59 |
| Ore rehandled | kt | 0 | 16 | 57 | 380 | 715 |
| Tonnes processed | kt | 728 | 683 | 684 | 2,621 | 2,400 |
| Average gold grade processed | g/t | 0.99 | 0.82 | 0.90 | 0.79 | 0.78 |
| Recovery | % | 87.9 | 84.4 | 88.1 | 86.7 | 87.2 |
| Gold produced | oz | 21,320 | 13,472 | 16,994 | 56,400 | 52,614 |
| Gold sold | oz | 22,240 | 11,998 | 17,177 | 56,232 | 52,092 |
| Financial data | ||||||
| Revenue(2) | M$ | 58.8 | 29.5 | 34.0 | 136.6 | 101.4 |
| Cash costs(1) | M$ | 27.1 | 16.4 | 18.8 | 79.6 | 62.4 |
| Sustaining capital(1) | M$ | 1.6 | 4.9 | 3.3 | 8.7 | 11.2 |
| Sustaining lease payments | M$ | 0.3 | 0.2 | 2.5 | 1.1 | 9.5 |
| Reclamation expenses | M$ | 0.3 | 0.3 | 0.3 | 1.1 | 0.9 |
| Total AISC(1) | M$ | 29.3 | 21.8 | 24.9 | 90.5 | 84.0 |
| AISC contribution margin(1) | M$ | 29.5 | 7.7 | 9.1 | 46.2 | 17.4 |
| Care and maintenance | M$ | — | — | — | — | 1.0 |
| Non-sustaining expenditures | M$ | — | 0.7 | — | 6.9 | — |
| Unit analysis | ||||||
| Realized gold price per oz sold | $/oz | 2,644 | 2,455 | 1,980 | 2,429 | 1,946 |
| Cash costs per oz sold(1) | $/oz | 1,220 | 1,367 | 1,097 | 1,415 | 1,199 |
| AISC per oz sold(1) | $/oz | 1,318 | 1,817 | 1,453 | 1,608 | 1,612 |
| Mining cost per tonne mined | $/t | 3.09 | 2.44 | 2.88 | 2.87 | 2.28 |
| Processing cost per tonne processed | $/t | 14.07 | 11.96 | 12.18 | 12.48 | 12.18 |
| G&A cost per tonne processed | $/t | 3.88 | 3.53 | 3.62 | 3.66 | 3.35 |
(1)Cash costs, sustaining capital, AISC, AISC contribution margin, mine-site free cash flow, cash costs per oz sold, and AISC per oz sold are non-IFRS measures. See Non-IFRS Measures and Cautionary Notes.
Production increased in the three months and year ended December 31, 2024 compared to the same periods in 2023 since a permit required for access to higher grade material for processing was received in early October 2024.
Mining unit costs were higher for the three months and year ended December 31, 2024 compared to the same periods in 2023 due to higher mining equipment rental rates and costs associated with the mobilization of new mining equipment. Total tonnes moved increased 28% in the year ended December 31, 2024 compared to the same period in 2023 driven by higher productivity with the rental of new mining equipment after replacement of the previous rental and owner-operated fleet. Processing unit costs were higher for the three months and year ended December 31, 2024 compared to the same periods in 2023 due to costs associated with the management of dry stack tailings that commenced in 2024. General and administration unit costs were higher for the three months and year ended December 31, 2024 compared to the same periods in 2023 due to higher consulting fees and shared regional costs, which are allocated to Brazilian operations based on revenue.
Cash costs per oz sold were higher for the three months and year ended December 31, 2024 compared to the same periods in 2023 due to the additional cost of tailings haulage to the new dry stack tailings storage facility. AISC per oz sold was lower
Management’s Discussion and AnalysisFor the three months and year ended December 31, 2024
for the three months and year ended December 31, 2024 due to increased gold production, reduced tailings dam related costs and weakening of the BRL compared to the USD.
Sustaining capital expenditures for the three months and year ended December 31, 2024 were $1.6 million and $8.7 million, respectively, primarily related to rental of mining equipment. Non-sustaining expenditures for the year ended December 31, 2024 of $6.9 million primarily related to capitalized stripping.
For production, RDM achieved 2024 Guidance, with production of 56,400 ounces compared to production guidance of 50,000 to 60,000 ounces of gold. RDM’s cash costs were higher than 2024 Guidance with cash costs of $1,415 per oz compared to guidance of $1,260 to $1,360. AISC of $1,608 per oz was lower than 2024 Guidance of $1,800 to $1,900 per oz due to lower equipment spend than planned.
RDM sustaining and non-sustaining expenditures were lower than 2024 Guidance principally due to less non-sustaining capitalized stripping in the open pit with less waste being moved than planned.
No exploration drilling occurred at RDM in 2024. In April 2024, RDM received the permit for construction of a dry stack TSF, which began operating in Q3 2024 and is now in operation.
Outlook
RDM production guidance for 2025 is 50,000 to 60,000 ounces of gold, with cash costs of $1,615 to $1,715 per oz and AISC of $1,880 to $1,980 per oz.
Sustaining expenditures at RDM of $15 million in 2025 include $6 million for the dry tails storage facility costs and $5 million for equipment to haul tails to the storage facility. Non-sustaining expenditures of $10 million in 2025 relate primarily to capitalized stripping.
The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.