What changed in Risk Factors?

Read the current filing

Previous report: 10-K

Period ended 2024-12-31; filed 2025-02-28.

0001628280-25-008841

Item 1A. Risk Factors

Current report: 10-K

Period ended 2025-12-31; filed 2026-03-02.

0001612720-26-000009

Item 1A. Risk Factors

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 267 previous paragraphs and 268 current paragraphs.

172 unchanged; 83 reworded; 10 added; 11 removed; 1 previous and 3 current paragraphs rearranged.

Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (10)

Current report

We face risks related to the uncertainty regarding the future of international trade agreements and the potential for retaliatory tariffs on LNG.

Current report

The current uncertainty involving international trade measures has created volatility in the LNG markets and may result in higher costs and delays for major industrial projects under development and construction, such as the Rio Grande LNG Facility. We face potential exposure to evolving U.S. tariffs, and potential retaliatory actions that may be imposed by other countries in response to U.S. tariffs, primarily on LNG exports.

Current report

Any future changes to the United States’ trade relationship with major LNG importing nations, including through the imposition of further tariffs, could have an adverse impact on any LNG SPAs entered into with customers based in such countries. If any of our LNG SPAs is terminated for any reason or expires in accordance with its terms, such tariffs could have an adverse impact on our ability to market the available capacity of the Rio Grande Project Entities, by reducing demand from customers for U.S. LNG exports.

Current report

•adverse general political or economic conditions.

Current report

Our LNG marketing strategy depends on the continued effectiveness of Department of Energy authorizations for exports to

Current report

FTA and non-FTA countries. Changes in U.S. policy, delays in processing, or successful legal challenges to export or related approvals

Current report

could reduce our ability to contract volumes at acceptable terms or at all. Any adverse determination, modification, or revocation of

Current report

existing export authorizations could have a material adverse effect on our business, contracts, financial condition, operating results, cash

Current report

flow, liquidity and prospects.

Current report

2025 Warrants were issued on May 14, 2025 for approximately 2.0 million shares of Company common stock exercisable at $9.30 per share. On November 17, 2025, the Corporate Credit Agreement was amended to, in part, upsize the loan by $50 million and recharacterize $50 million of the principal outstanding thereunder as a Series A term loan, the principal of which, including any interest in kind, can be exchanged (the “Exchange Right”) into Company common stock at a price of $9.50 per share.
Removed paragraphs (11)

Previous report

Our wholly owned subsidiary, Rio Grande LNG Super Holdings, LLC ("Super Holdings"), has entered into a credit agreement (the "Corporate Credit Agreement") that provides for a $175 million senior secured loan. The Corporate Credit Agreement includes covenants that, among other things, limit the ability of Super Holdings to incur additional indebtedness, make certain investments or pay dividends or distributions on equity interests or subordinated indebtedness or purchase, redeem, or retire equity interests, sell or transfer assets, incur liens or dissolve, liquidate, consolidate, merge. Upon the occurrence and continuation of an event of default under the Corporate Credit Agreement (and after all applicable cure periods have elapsed), the majority lenders may, by notice to Super Holdings accelerate the loans thereunder, terminate any outstanding loan commitments and exercise all contractual and legal rights in relation to the collateral.

Previous report

•the level of oversight, control and access to management information we are able to exercise with respect to these operations may be lower compared to our wholly-owned businesses, which may increase uncertainty relating to the financial condition of these operations, including the credit risk profile;

Previous report

Tariffs issued by the United States government could have an adverse effect on our future operations.

Previous report

The United States government recently has announced or imposed broad-ranging tariffs. Other countries have announced or imposed counter-tariffs on U.S.-produced items. If these tariffs or counter-tariffs were to take effect and we were unable to pass through the additional costs to us, we could experience materially lower margins, lost sales, and an overall adverse effect on our future results of operations.

Previous report

•synergy benefits associated with the development of multiple phases of the Rio Grande LNG Facility using identical design and construction philosophies.

Previous report

•adverse general economic conditions.

Previous report

The decision by the D.C. Circuit Court of Appeals could impact Rio Grande’s ability to complete Phase 1, the cost to complete Phase 1, the timing of the completion of Phase 1, our ability to take a final investment decision on Trains 4 and 5, our ability to develop additional expansion trains at the Rio Grande LNG Facility, and our ability to achieve expected investment returns.

Previous report

Financial Condition and Results of Operations—Overview of Business and Significant Developments—Significant Recent Events—Regulatory,” on August 6, 2024, the D.C. Circuit Court of Appeals vacated the FERC reauthorization for the siting, construction and operation of the Rio Grande LNG Facility. We intend to pursue available legal remedies against judicial challenges and are engaged in active resolution of the requisite issues to ensure that the affected permit remains in effect; however, there is no guarantee as to how long any agency proceedings and judicial challenges will take to resolve, whether there will be any delays in construction activities or whether Rio Grande will ultimately succeed in maintaining the permit in its issued form or in a suitable replacement form. These uncertainties could cause Phase 1 at the Rio Grande LNG Facility to be subject to increased costs, adverse impacts to completion timing, or adverse impacts to the ability to complete construction of Phase 1. This could adversely affect the ability for Rio Grande and its owners, including us, to successfully implement our business strategy or achieve expected returns. Similarly, these uncertainties could impact the timing of, and our ability to develop and take a final investment decision on, any expansion trains at the Rio Grande LNG Facility. In addition, the bank credit facilities obtained by Rio Grande to finance a substantial portion of Phase 1 costs require maintenance of material governmental approvals. To the extent Rio Grande becomes unable to satisfy such requirement as set forth in the credit agreements or reach other accommodations with its lenders, its ability to continue borrowing under such credit facilities could be negatively impacted, which in turn could adversely affect our business, financial condition, results of operations and liquidity.

Previous report

We may not be able to utilize any future federal income tax credits.

Previous report

Our LNG and CCS activities are in the construction stage and development stage, respectively, and have not historically generated any revenue; consequently, as of December 31, 2024, we had significant deferred tax assets primarily resulting from net operating losses for federal income tax purposes. See Note 12— Income Taxes in Notes to Consolidated Financial Statements. To the extent we are not able to monetize federal income tax credits that we generate under Section 45Q or a successor provision, either by transferring such credit or electing to receive a direct payment equal to such credit, we would have to take such federal income tax credits against our taxable income. There is no assurance that we will be able to transfer these federal income tax credits or generate taxable income or otherwise be able to monetize the value represented by these federal income tax credits.

Previous report

We issued warrants together with the issuances of our Convertible Preferred Stock (the “2022 Warrants”) and the entry into the Corporate Credit Agreement (the “2024 Warrants” and together with the 2022 Warrants, the “Common Stock Warrants”). As of December 31, 2024, the outstanding 2022 Warrants represented the right to acquire in the aggregate a number of shares of our common stock equal to approximately 15 basis points (0.15%) of all outstanding shares of Company common stock, measured on a fully diluted basis, on the applicable exercise date with a strike price of $0.01 per share. The 2022 Warrants have a fixed three-year term that commenced on the closings of the issuances of the associated Convertible Preferred Stock. The 2022 Warrants may only be exercised by holders thereof at the expiration of such three-year term.
Reworded paragraphs (83)

Previous wording

The substantial amount of indebtedness incurred to finance construction of Phase 1 of the Rio Grande LNG Facility may adversely affect Rio Grande’s cash flow and its ability to operate its business, remain in compliance with debt covenants and make payments on its indebtedness.

Current wording

The substantial amount of indebtedness incurred to finance construction of the Rio Grande LNG Facility may adversely affect our subsidiaries' cash flow and the ability to operate their business, remain in compliance with debt covenants and make payments on indebtedness.

Previous wording

Rio Grande has incurred a substantial amount of indebtedness. This substantial level of indebtedness increases the possibility that Rio Grande may be unable to generate cash sufficient to pay, when due, the principal or interest on such indebtedness or to refinance such indebtedness ahead of its scheduled maturity. This indebtedness and obligations thereunder could have other important consequences to you as a stockholder. For example:

Current wording

Our subsidiaries have incurred a substantial amount of indebtedness. This substantial level of indebtedness increases the possibility that they may be unable to generate cash sufficient to pay, when due, the principal or interest on such indebtedness or to refinance such indebtedness ahead of its scheduled maturity. This indebtedness and obligations thereunder could have other important consequences to you as a stockholder. For example:

Previous wording

•any failure to comply with the obligations of any of Rio Grande’s debt instruments, including financial and other restrictive covenants, could result in an event of default under the applicable instrument;

Current wording

•any failure to comply by our subsidiaries, including the Rio Grande Project Entities, with the obligations under their debt instruments, including financial and other restrictive covenants, could result in an event of default under the applicable instrument;

Previous wording

•Rio Grande may be more vulnerable to adverse changes in general economic, industry and competitive conditions and adverse change in government regulation affecting Rio Grande’s ability to pay obligations when due;

Current wording

•we may be more vulnerable to adverse changes in general economic, industry and competitive conditions and adverse change in government regulation affecting our subsidiaries' ability to pay obligations when due;

Previous wording

•Rio Grande may need to dedicate a substantial portion of its future cashflow from operations to payments on indebtedness, thereby reducing the availability of cash flows to fund working capital, capital expenditures, acquisitions, other general corporate purposes and any future dividends or share repurchases;

Current wording

•our subsidiaries may need to dedicate a substantial portion of their future cash flow from operations to payments on indebtedness, thereby reducing the availability of cash flows to fund working capital, capital expenditures, acquisitions, other general corporate purposes and any future dividends or share repurchases;

Previous wording

•the ability to refinance Rio Grande’s indebtedness will depend on the condition of credit markets and capital markets, and its financial condition at such time. Any refinancing could be at higher interest rates and may require compliance with more onerous covenants, which could further restrict business operations;

Current wording

•the ability to refinance indebtedness will depend on the condition of credit markets and capital markets, and our subsidiaries' financial condition at such time. Any refinancing could be at higher interest rates and may require compliance with more onerous covenants, which could further restrict business operations;

Previous wording

•we may have limited flexibility in planning for, or reacting to, changes in Rio Grande’s business and the industry in which it operates; and

Current wording

•we may have limited flexibility in planning for, or reacting to, changes in our business and the industry in which we operate; and

Previous wording

•our indebtedness may place Rio Grande at a competitive disadvantage compared to its competitors that have less debt.

Current wording

•our indebtedness may place us and our subsidiaries, including the Rio Grande Project Entities, at a competitive disadvantage compared to competitors that have less debt.

Previous wording

In addition to restrictions on the ability of Rio Grande to make distributions or incur additional indebtedness, the agreements governing Rio Grande’s indebtedness also contain various other covenants that may prevent it from engaging in beneficial transactions, including limitations on the ability of Rio Grande or certain of its subsidiaries to:

Current wording

In addition to restrictions on the ability of our subsidiaries to make distributions or incur additional indebtedness, the agreements governing our subsidiaries' indebtedness also contain various other covenants that may prevent them from engaging in beneficial transactions, including limitations on the ability of certain of our subsidiaries to:

Previous wording

•consolidate, merge, sell or lease all or substantially all of its assets.

Current wording

•consolidate, merge, sell or lease all or substantially all of their assets.

Previous wording

A breach of the covenants and other restrictions in any of Rio Grande’s indebtedness could result in an event of default thereunder. Such a default may allow the holders of such indebtedness to accelerate the related indebtedness which may result in foreclosure on Rio Grande’s assets or equity interests in Rio Grande.

Current wording

A breach of the covenants and other restrictions in any of our subsidiaries' indebtedness could result in an event of default thereunder. Such a default may allow the holders of such indebtedness to accelerate the related indebtedness, which may result in foreclosure on the assets owned by the applicable subsidiary, which in the case of the Rio Grande Project Entities, includes the equity interests in the Rio Grande Project Entities, and in the case of the ND Finance Subsidiaries, includes the equity interests in the entities that own NextDecade's interests in the Joint Ventures.

Previous wording

We currently operate parts of our business through a joint venture, Rio Grande LNG Intermediate Holdings, LLC (“Intermediate Holdings”) in which we do not have 100% ownership interest, and we may enter into additional joint ventures in the future. Joint ventures and minority investments inherently involve a lesser degree of control over business operations, thereby potentially increasing the financial, legal, operational and/or compliance risks associated with the joint venture or minority investment. For example, except for the Member Reserved Matters (as defined below), the affairs of Intermediate Holdings will otherwise be managed by a board of managers (the “Intermediate Holdings Board”). The Intermediate Holdings Board will be composed of up to four managers appointed by us (the “Class A Managers”), including one Class A Manager designated by Global LNG North America Corp., a subsidiary of TotalEnergies SE, and managers appointed by members holding a minimum percentage of the Class B limited liability company interests in Intermediate Holdings (the “Class B Managers”). Approval of any matter by the Intermediate Holdings Board will require the consent of a majority of the Class A Managers voting on the matter and Class B Managers representing a majority of the Class B limited liability company interests in Intermediate Holdings voting for such matter, as applicable; provided that (i) certain specified “qualified matters,” “supermajority matters,” and “unanimous matters” are reserved to the approval of the members of Intermediate Holdings (the "Member Reserved Matters") holding a requisite percentage of the applicable classes of limited liability company interests in Intermediate Holdings, and (ii) related party transactions will be subject to approval in accordance with the procedures specified in the JV Agreement. Pursuant to the JV Agreement, we will be entitled to receive up to approximately 20.8% of distributions of available cash of Intermediate Holdings to its members during operations; provided, that a majority of the Intermediate Holdings distributions to which we are otherwise entitled will be paid for any distribution period only after the Financial Investors receive an agreed distribution threshold in respect of such distribution period and certain other deficit payments from prior distribution periods, if any, are made. Any such shortfall in distributions that we would otherwise have been entitled to will accrue as an arrearage to be paid out in future periods in which Intermediate Holdings meets the applicable target distribution threshold for the Financial Investors. Challenges and risks presented by joint venture structures not otherwise present with respect to our wholly-owned subsidiaries and direct operations, include:

Current wording

We currently operate parts of our business through the Joint Ventures, in which we do not have 100% ownership interest, and we may enter into additional joint ventures in the future. Joint ventures and minority investments inherently involve a lesser degree of control over business operations, thereby potentially increasing the financial, legal, operational and/or compliance risks associated with the joint venture or minority investment. For example, except for the Member Reserved Matters (as defined below), the affairs of the Joint Ventures will otherwise be managed by their respective boards of managers (the “JV Boards”). The JV Boards are composed of (i) up to four managers appointed by us (the “Class A Managers”), including, in respect of the Phase 1 Holdings board of managers, one Class A Manager designated by Global LNG North America Corp., a subsidiary of TotalEnergies SE, and (ii) managers appointed by members holding a minimum percentage of the Class B limited liability company interests in the respective Joint Venture (the “Class B Managers”). Approval of any matter by a JV Board will require the consent of a majority of the Class A Managers voting on the matter and Class B Managers representing a majority of the Class B limited liability company interests in such Joint Venture voting for such matter, as applicable; provided that (i) certain specified “qualified matters,” “supermajority matters,” and “unanimous matters” are reserved to the approval of the members of the Joint Venture (the "Member Reserved Matters") holding a requisite percentage of the applicable classes of limited liability company interests in such Joint Venture, and (ii) related party transactions will be subject to approval in accordance with the procedures specified in the applicable company agreement of the Joint Venture (the "JV Agreements"). Pursuant to the JV Agreement for Phase 1 Holdings, we will be entitled to receive up to approximately 20.8% of distributions of available cash of Phase 1 Holdings to its members during operations; provided, that a majority of the Phase 1 Holdings distributions to which we are otherwise entitled will be paid for any distribution period only after the financial equity partners receive an agreed distribution threshold in respect of such distribution period and certain other deficit payments from prior distribution periods, if any, are made. Any such shortfall in distributions that we would otherwise have been entitled to will accrue as an arrearage to be paid out in future periods in which Phase 1 Holdings meets the applicable target distribution threshold for the financial equity partners. Pursuant to the JV Agreement for Train 4 Holdings, we will receive 40% of distributions of available cash generated from Train 4 operations, which will increase to 60% when the equity partners receive a certain return on their investments in Train 4 LLC. Pursuant to the JV Agreement for Train 5 Holdings, we will receive 50% of distributions …

Excerpt shortened here; the source contains the full paragraph.

Previous wording

•our joint ventures may fail to generate the expected financial results, and the return may be insufficient to justify our investment of effort and/or funds;

Current wording

•the Joint Ventures may fail to generate the expected financial results, and the return may be insufficient to justify our investment of effort and/or funds;

Previous wording

•our joint venture partners may have business or economic interests that are inconsistent with ours and may take actions contrary to our interests;

Current wording

•our venture partners may have business or economic interests that are inconsistent with ours and may take actions contrary to our interests;

Previous wording

•our joint venture partners may fail to fund capital contributions or fail to fulfill their obligations as partners;

Current wording

•our venture partners may fail to fund capital contributions or fail to fulfill their obligations as partners;

Previous wording

•the arrangements governing our joint ventures may contain restrictions on the conduct of our business and may contain certain conditions or milestone events that may never be satisfied or achieved;

Current wording

•the arrangements governing the Joint Ventures may contain restrictions on the conduct of our business and may contain certain conditions or milestone events that may never be satisfied or achieved;

Previous wording

•we may suffer losses as a result of actions taken by our venture partners with respect to our joint ventures; and

Current wording

•we may suffer losses as a result of actions taken by our venture partners with respect to the Joint Ventures; and

Previous wording

•it may be difficult for us to exit joint ventures if an impasse arises or if we desire to sell our interest for any reason.

Current wording

•it may be difficult for us to exit the Joint Ventures if an impasse arises or if we desire to sell our interest for any reason.

Previous wording

We believe an important element in the success of any joint venture is a solid relationship between the members of that venture. If there is a change in ownership, a change of control, a change in management or management philosophy, a change in business strategy or another event with respect to a member of our joint venture that adversely impacts the relationship between the venture partners, it could adversely impact such venture.

Current wording

We believe an important element in the success of any joint venture is a solid relationship between the members of that venture. If there is a change in ownership, a change of control, a change in management or management philosophy, a change in business strategy or another event with respect to a member of the Joint Ventures that adversely impacts the relationship between the venture partners, it could adversely impact such venture.

Previous wording

If our partners are unable or unwilling to invest in our joint venture in the manner that is anticipated or otherwise fail to meet their contractual obligations, the joint venture may be unable to adequately perform and conduct its respective operations, or may require us to provide, or make other arrangements for additional financing for the joint venture. Such financing may not be available on favorable terms, or at all.

Current wording

If our partners are unable or unwilling to invest in one or more of the Joint Ventures in the manner that is anticipated or otherwise fail to meet their contractual obligations, such Joint Venture may be unable to adequately perform and conduct its respective operations, or may require us to provide, or make other arrangements for additional financing for the Joint Venture. Such financing may not be available on favorable terms, or at all.

Previous wording

Joint venture partners, controlling shareholders, management or other persons or entities who control them may have economic or business interests, strategies or goals that are inconsistent with ours. Business decisions or other actions or omissions of the joint venture partners, controlling shareholders, management or other persons or entities who control them may adversely affect the value of our investment, result in litigation or regulatory action against us and otherwise damage our reputation. Any such circumstance could materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

Current wording

Venture partners, controlling shareholders, management or other persons or entities who control them may have economic or business interests, strategies or goals that are inconsistent with ours. Business decisions or other actions or omissions of the venture partners, controlling shareholders, management or other persons or entities who control them may adversely affect the value of our investment, result in litigation or regulatory action against us and otherwise damage our reputation. Any such circumstance could materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

Previous wording

Our projects are in the development and construction phases, and the success of such projects is unpredictable; as such, positive cash flows and even revenues will be several years away, if they occur at all.

Current wording

Our projects are in the development and construction phases, and the success of such projects is unpredictable.

Previous wording

We are not expected to generate cash flow, or even obtain revenues, from our LNG liquefaction and export activities unless and until the Rio Grande LNG Facility is operational. Additionally, we do not expect to generate cash flow from our CCS projects until such projects are installed and operational. Accordingly, distributions to investors may be limited, delayed, or non-existent.

Current wording

We are not expected to generate cash flow, or even obtain revenues, from our LNG liquefaction and export activities unless and until the Rio Grande LNG Facility is operational. Additionally, we do not expect to generate cash flow from any CCS projects until such projects are installed and operational. Accordingly, distributions to investors may be limited, delayed, or non-existent.

Previous wording

Our cash flow and consequently our ability to distribute earnings will be dependent upon our ability to complete Phase 1 of the Rio Grande LNG Facility and future phases of development and implement CCS systems and thereafter generate cash and net operating income from operations. Rio Grande’s ability to complete the Rio Grande LNG Facility, as discussed further below, is dependent upon, among other things, performance of third-party contractors and customers under their agreements with Rio Grande. NEXT Carbon Solutions’ ability to install CCS systems at third-party industrial facilities, as discussed further below, is dependent on the development of front-end engineering and design (“FEED”) offerings and contracting with third parties to install CCS systems in their industrial facilities. We do not expect Rio Grande to generate any revenue until the completion of construction of Phase 1 of the Rio Grande LNG Facility or NEXT Carbon Solutions to generate any revenue until successful installation of CCS systems at third-party facilities. After Phase 1 of the Rio Grande LNG Facility is completed or our CCS systems are installed in third-party industrial facilities, financing and numerous other factors may reduce our cash flow. As a result, we may not make distributions of any amount or any distributions may be delayed.

Current wording

Our cash flow and consequently our ability to distribute earnings will be dependent upon our ability to complete Phase 1, Train 4 and Train 5 of the Rio Grande LNG Facility and future phases of development, and implement CCS systems and thereafter generate cash and net operating income from operations. The ability to complete the initial phases of development of the Rio Grande LNG Facility, as discussed further below, is dependent upon, among other things, performance of third-party contractors and customers under their agreements with the applicable Rio Grande Project Entity. Our ability to install any CCS systems, as discussed further below, is dependent on the development of front-end engineering and design (“FEED”), commercialization of the CCS systems, and contracting with third parties to install the CCS systems. We do not expect the Rio Grande Project Entities to generate any revenue until the completion of construction of the applicable phase of development of the Rio Grande LNG Facility or to generate any revenue from CCS systems until successful installation, and even after completion of construction or installation, financing and numerous other factors may reduce our cash flow. As a result, we may not make distributions of any amount or any distributions may be delayed.

Previous wording

We will be required to seek additional debt and equity financing in the future to complete future phases of the Rio Grande LNG Facility and the development of CCS projects and may not be able to secure such financing on acceptable terms, or at all.

Current wording

We will be required to seek additional debt and equity financing in the future to complete future phases of the Rio Grande LNG Facility and the development of any CCS projects and may not be able to secure such financing on acceptable terms, or at all.

Previous wording

Since we will be unable to generate any revenue while we are in the development and construction stages, which will be for multiple years with respect to Phase 1 of the Rio Grande LNG Facility, we will need additional financing to provide the capital required to execute our business plan. We will need significant additional funding to develop and construct future phases of the Rio Grande LNG Facility and CCS projects as well as for working capital requirements and other operating and general corporate purposes.

Current wording

Since we will be unable to generate any revenue while we are in the development and construction stages, which will be for multiple years with respect to each phase of construction of the Rio Grande LNG Facility, we will need additional financing to provide the capital required to execute our business plan. We will need significant additional funding to develop and construct future phases of the Rio Grande LNG Facility and any CCS projects as well as for working capital requirements and other operating and general corporate purposes.

Previous wording

•the implementation of tariffs by the U.S. or foreign countries in which we do business;

Current wording

•the implementation of tariffs by the U.S. or foreign countries in which we, our customers or our vendors do business;

Previous wording

As our reporting currency is the U.S. dollar, any operations conducted outside the U.S. or transactions denominated in foreign currencies would face additional risks of fluctuating currency values and exchange rates, hard currency shortages and controls on currency exchange. In addition, we would be subject to the impact of foreign currency fluctuations and exchange rate changes on our financial reports when translating our assets, liabilities, revenues and expenses from operations or transactions outside of the U.S. into U.S. dollars at the then-applicable exchange rates. These translations could result in changes to our results of operations from period to period.

Current wording

As our reporting currency is the U.S. dollar, any operations conducted outside the U.S. or transactions denominated in foreign currencies would face additional risks of fluctuating currency values and exchange rates, hard currency shortages and controls on currency exchange. In addition, we would be subject to the impact of foreign currency fluctuations and exchange rate changes on our financial reports. These translations could result in changes to our results of operations from period to period.

Previous wording

Costs for the Rio Grande LNG Facility and CCS projects are subject to various factors.

Current wording

Costs for the Rio Grande LNG Facility and any CCS projects are subject to various factors.

Previous wording

Construction costs for the Rio Grande LNG Facility and CCS projects will be subject to various factors such as economic and market conditions, government policy, claims and litigation risk, competition, the final terms of any definitive agreement for services with EPC service providers, change orders, delays in construction, legal and regulatory requirements, unanticipated regulatory delays, site issues, increased component and material costs, escalation of labor costs, labor disputes, increased spending to maintain construction schedules and other factors. In particular, costs are expected to be substantially affected by:

Current wording

Construction costs for the Rio Grande LNG Facility and any CCS projects will be subject to various factors such as economic and market conditions, government policy, claims and litigation risk, competition, the final terms of any definitive agreement for services with EPC service providers, change orders, delays in construction, legal and regulatory requirements, unanticipated regulatory delays, site issues, increased component and material costs, escalation of labor costs, labor disputes, increased spending to maintain construction schedules and other factors. In particular, costs are expected to be substantially affected by:

Previous wording

•global prices of nickel, steel, concrete, pipe, aluminum and other component parts of the Rio Grande LNG Facility or CCS projects and the contractual terms upon which our contractors are able to source and procure required materials;

Current wording

•global prices of nickel, steel, concrete, pipe, aluminum and other component parts of the Rio Grande LNG Facility or any CCS projects and the contractual terms upon which our contractors are able to source and procure required materials;

Previous wording

•any U.S. import tariffs or quotas on steel, aluminum, pipe or other component parts of the Rio Grande LNG Facility or CCS projects, which may raise the prices of certain materials used in the Rio Grande LNG Facility;

Current wording

•any U.S. import tariffs or quotas on steel, aluminum, pipe or other component parts of the Rio Grande LNG Facility or any CCS projects, which may raise the prices of certain materials used in the Rio Grande LNG Facility;

Previous wording

Our EPC agreements for Phase 1 allocate certain cost risks to Bechtel; however, events related to the above activities may cause actual costs of the Rio Grande LNG Facility to vary from the range, combination and timing of assumptions used for projected costs of the Rio Grande LNG Facility, in addition to affecting our willingness to make a positive FID on future phases of development at the Rio Grande LNG Facility or on CCS projects. Such variations may be material and adverse, and an investor may lose all or a portion of its investment.

Current wording

Our EPC agreements for Phase 1, Train 4 and Train 5 allocate certain cost risks to Bechtel; however, events related to the above activities may cause actual costs of the Rio Grande LNG Facility to vary from the range, combination and timing of assumptions used for projected costs of the Rio Grande LNG Facility, in addition to affecting our willingness to make a positive FID on future phases of development at the Rio Grande LNG Facility or on any CCS projects. Such variations may be material and adverse, and an investor may lose all or a portion of its investment.

Previous wording

We will be dependent on third-party contractors for the successful completion of the Rio Grande LNG Facility, CCS projects and related infrastructure, and any failure by our contractors to perform their contractual obligations could have a material adverse impact on our projects.

Current wording

We will be dependent on third-party contractors for the successful completion of the Rio Grande LNG Facility, any CCS projects and related infrastructure, and any failure by our contractors to perform their contractual obligations could have a material adverse impact on our projects.

Previous wording

•design, engineer and receive critical components and equipment necessary for the Rio Grande LNG Facility and CCS projects to operate in accordance with specifications and address any start-up and operational issues that may arise in connection with the commencement of commercial operations;

Current wording

•design, engineer and receive critical components and equipment necessary for the Rio Grande LNG Facility and any CCS projects to operate in accordance with specifications and address any start-up and operational issues that may arise in connection with the commencement of commercial operations;

Previous wording

Furthermore, we may have disagreements with our third-party contractors about different elements of the construction process, which could lead to the assertion of rights and remedies under the related contracts, resulting in a contractor’s unwillingness to perform further work on the relevant project. We may also face difficulties in commissioning a newly constructed facility at the Rio Grande LNG Facility. Any of the foregoing issues or significant project delays in the development or construction of the Rio Grande LNG Facility and, to the extent applicable, CCS projects could materially and adversely affect our business, results of operations, financial condition and prospects.

Current wording

Furthermore, we may have disagreements with our third-party contractors about different elements of the construction process, which could lead to the assertion of rights and remedies under the related contracts, resulting in a contractor’s unwillingness to perform further work on the relevant project. We may also face difficulties in commissioning a newly constructed facility at the Rio Grande LNG Facility. Any of the foregoing issues or significant project delays in the development or construction of the Rio Grande LNG Facility and, to the extent applicable, any CCS projects could materially and adversely affect our business, results of operations, financial condition and prospects.

Previous wording

Commissioning and operation of the Rio Grande LNG Facility will also require the ability to deliver natural gas to the Rio Grande LNG Facility via pipelines, certain of which are under development and construction and will require securing rights-of-way along the proposed route. Negotiation to secure these rights-of-way could give rise to recalcitrant landowners or competitive projects, which could result in additional time needed to secure the route and, consequently, delays in, or abandonment of, construction. Pipeline construction could also be delayed or abandoned for any of many other reasons, such as it becoming economically disadvantageous to the owner, a failure to obtain or maintain all necessary permits, approvals and licenses for the construction and operation, mechanical or structural failures, inadvertent damages during construction, natural disasters, or any terrorist attack, including cyberterrorism. Any such delays in pipeline construction could delay the development of the Rio Grande LNG Facility and its becoming operational.

Current wording

Commissioning and operation of the Rio Grande LNG Facility will also require the ability to deliver natural gas to the Rio Grande LNG Facility via pipelines, certain of which are under development and construction and will require securing rights-of-way along the proposed route. Pipeline construction could also be delayed or abandoned for any of many other reasons, such as it becoming economically disadvantageous to the owner, a failure to obtain or maintain all necessary permits, approvals and licenses for the construction and operation, mechanical or structural failures, inadvertent damages during construction, natural disasters, or any terrorist attack, including cyberterrorism. Any such delays in pipeline construction could delay the development of the Rio Grande LNG Facility and its becoming operational.

Previous wording

We have entered into nine commercial arrangements with customers for products and services from the Rio Grande LNG Facility, each of which is subject to preconditions including the Rio Grande LNG Facility becoming operational. We are dependent on each customer’s continued willingness and ability to perform its obligations under its sale and purchase agreement. We are also exposed to the credit risk of any guarantor of these customers’ obligations under their respective sale and purchase agreement in the event that we must seek recourse under a guaranty. If any customer fails to perform its obligations under its sale and purchase agreement, our business, contracts, financial condition, operating results, cash flow, liquidity and prospects could be materially and adversely affected, even if we were ultimately successful in seeking damages from that customer or its guarantor for a breach of the sale and purchase agreement.

Current wording

We have entered into long-term commercial arrangements with customers for products from the Rio Grande LNG Facility, each of which is subject to preconditions, including the Rio Grande LNG Facility becoming operational. We are dependent on each customer’s continued willingness and ability to perform its obligations under its sale and purchase agreement. We are also exposed to the credit risk of any guarantor of these customers’ obligations under their respective sale and purchase agreement in the event that we must seek recourse under a guaranty. If any customer fails to perform its obligations under its sale and purchase agreement, our business, contracts, financial condition, operating results, cash flow, liquidity and prospects could be materially and adversely affected, even if we were ultimately successful in seeking damages from that customer or its guarantor for a breach of the sale and purchase agreement.

Previous wording

We have not yet entered into any definitive commercial arrangements with third parties desiring to install our CCS systems in their industrial facilities. We also have not entered into, and may never be able to enter into, satisfactory commercial arrangements with third-party suppliers of feedstock or other required supplies to the Rio Grande LNG Facility.

Current wording

We have not yet entered into any definitive commercial arrangements to install any CCS systems. We also have not entered into, and may never be able to enter into, satisfactory commercial arrangements with third-party suppliers of feedstock or other required supplies to the Rio Grande LNG Facility.

Previous wording

Our business strategy regarding how and when the Rio Grande LNG Facility’s export capacity or, LNG produced by the Rio Grande LNG Facility, or CCS systems are marketed may change based on market factors. Without limitation, our business strategy may change due to inability to enter into agreements with customers or based on our or market participants’ views regarding future supply and demand of LNG, prices, available worldwide natural gas liquefaction capacity or regasification capacity, the availability and efficiency of a market for carbon capture credits or other factors. If efforts to market LNG produced by the Rio Grande LNG Facility, the Rio Grande LNG Facility’s expansion export capacity, or our CCS systems are not successful, our business, results of operations, financial condition and prospects may be materially and adversely affected.

Current wording

Our business strategy regarding how and when the Rio Grande LNG Facility’s export capacity or, LNG produced by the Rio Grande LNG Facility, or any CCS systems are marketed may change based on market factors. Without limitation, our business strategy may change due to inability to enter into agreements with customers or based on our or market participants’ views regarding future supply and demand of LNG, prices, available worldwide natural gas liquefaction capacity or regasification capacity, the availability and efficiency of a market for carbon capture credits or other factors. If efforts to market LNG produced by the Rio Grande LNG Facility, the Rio Grande LNG Facility’s expansion export capacity, or any CCS systems are not successful, our business, results of operations, financial condition and prospects may be materially and adversely affected.

Showing the first 40 of 83 pairs. Open the source sections for the rest.

Rearranged current paragraphs (3)

Current report — wording carried from elsewhere

Challenges and risks presented by joint venture structures not otherwise present with respect to our wholly owned subsidiaries and direct operations, include:

Current report — wording carried from elsewhere

•the risks referred to below under the caption "Our construction and operations activities will be subject to a number of development risks, operational hazards, regulatory approvals and other risks which may not be fully covered by insurance, and which could cause cost overruns and delays that could have a material adverse effect on our business, results of operations, financial condition, liquidity and prospects."

Current report — wording carried from elsewhere

The laws, rules and regulations applicable to our business, including federal agencies’ interpretations of and policies under such laws rules and regulations, are subject to change, either through new or modified regulations enacted on the federal, state or local level or by a change in policy of the agencies charged with enforcing such regulations. For example, the provisions of the Energy Policy
Rearranged previous paragraphs (1)

Previous report — wording carried elsewhere

We are required to obtain and maintain governmental approvals and authorizations to implement our proposed business strategy, which includes the design, construction and operation of the Rio Grande LNG Facility and the export of LNG from the U.S. to foreign countries. As described in more detail in “Management’s Discussion and Analysis of