UR-ENERGY INC
For the period ended Dec 31, 2024. Filed Apr 11, 2025.
View on SEC.govAbout this filing
A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.
FY2024 · Filed Apr 11, 2025
What changed in Risk Factors?
Read the current filingPrevious report: 10-K
Period ended 2023-12-31; filed 2024-03-06.
0001654954-24-002673
Item 1A. Risk FactorsCurrent report: 10-K
Period ended 2024-12-31; filed 2025-04-11.
0001558370-25-004728
Item 1A. Risk FactorsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 87 previous paragraphs and 90 current paragraphs.
44 unchanged; 36 reworded; 4 added; 7 removed; 0 previous and 6 current paragraphs rearranged.
Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (4)
Current report
Operational and related challenges may continue as we return to steady-state commercial operations at Lost Creek and build out Shirley Basin for production operations.
Current report
Challenges have been encountered in our return to commercial production operations at Lost Creek. The extended time the site was maintained on reduced production operation, the required operational refinements and maintenance as operations were restarted, and other commissioning issues have caused delays in achieving production rates on the planned schedule. Challenges with recruitment, training and retention of staff were also experienced. These challenges may continue at Lost Creek until steady-state full rates of production are reached and maintained. As we build out Shirley Basin, we may encounter delays in construction, availability of materials and equipment, labor and contractor availability on a timely basis and other construction and ramp-up challenges. Continuing challenges in operations at Lost Creek and delays, cost overruns or operational challenges at Shirley Basin could affect our ability to achieve our production plans, and timely deliveries of contractual commitments to our customers, thereby negatively affecting our business, financial condition, results of operations and cash flow.
Current report
Changing global and regional political and economic conditions could adversely impact our business.
Current report
Recent political and economic shifts, both domestic and international, may create uncertainty and pose risks to our operations and business. Government policies related to protectionism, economic nationalism and attitudes toward multinational corporations could result in regulatory changes, trade barriers, or investment restrictions. Additionally, international trade disputes – including tariffs, counter-tariffs, export controls, sanctions and currency regulations – may increase costs, further disrupt supply chains, and have other negative impacts on our business and operating models. Furthermore, market volatility, driven by shifts in US and foreign trade policies, fluctuating interest rates or currency controls, may affect commodity prices, capital availability and investor confidence. Even the perception of these risks could lead to reduced investment, higher production and operating costs, and other operational challenges. If such trends continue, they may have a material adverse effect on our business and financial performance; it is difficult to estimate the impact on our business. To the extent these conditions adversely affect our business as discussed, they may also have the effect of heightening many of the other risks described in this Item 1A such as those relating to cyber-security, supply chain, inflationary and
Removed paragraphs (7)
Previous report
Imports from state-owned enterprises may continue to challenge the U.S. uranium industry.
Previous report
Notwithstanding other recent favorable market events and pricing, the global uranium market continues to be characterized by production levels and sales priced in and for countries such as Russia, Kazakhstan and Uzbekistan which adversely affect the U.S. uranium production industry. China continues to expand its role in the global uranium mining markets and in the rest of the nuclear fuel cycle, including with effects felt in the U.S. Additionally, the extent of foreign inventories in some instances remains uncertain. If U.S. imports from government-subsidized production sites resume beyond demand capacity, there could be a significant negative impact to the uranium market which could adversely impact the Company’s future profitability.
Previous report
With current market and labor conditions, including availability of contractors and equipment, influencing our recommissioning and return to commercial production at Lost Creek, we face risks of delays in production which could affect our ability to timely deliver into our sales commitments. Similarly, if/as we build out and begin operations at Shirley Basin, delays resulting from supply chain disruption, and availability of labor and contractors, as well as first-time production challenges may affect timely deliveries and sales.
Previous report
The SEC’s adoption of S-K 1300 results in changes to our technical reports and will continue to result in increased compliance costs and uncertainty of interpretation.
Previous report
S-K 1300 requires us to disclose specific information related to our material mining operations, including concerning our reported mineral resources at Lost Creek and Shirley Basin. We conformed our technical reports to comply with both S-K 1300 and NI 43-101. Disclosures under S-K 1300 continue to be subject to largely unknown interpretations. We are unable to predict the nature of any future enforcement, interpretation, or application of S-K 1300 by the SEC. Any additional revisions to, or interpretations of, S-K 1300 could also result in additional time and possibly unforeseen compliance costs.
Previous report
If we are unable to service our debt, we could lose the assets securing our indebtedness.
Previous report
At the date of this report, we continue to owe approximately $4.3 million in principal under our State Bond Loan. Our ability to make scheduled payments under the State Bond Loan depends on our financial condition and operating performance, which may be subject to conditions beyond our control. If we do not make the remaining payments on our debt, we will be in default which, if not addressed or waived, could require accelerated repayment and enforcement by the lender against the assets securing the loan. The secured collateral includes the Lost Creek Project and other projects and assets of the Lost Creek Property, which are key assets on which our business is substantially dependent. Enforcement against these assets would have a material adverse effect on our operations and financial condition.
Reworded paragraphs (36)
Previous wording
We have entered into term sales contracts for a portion of our Lost Creek production, however, we may be unable to enter into additional term sales contracts in the future on suitable terms and conditions.
Current wording
We have entered into term sales contracts for a portion of our Lost Creek and Shirley Basin production; however, we may be unable to enter into additional term sales contracts in the future on suitable terms and conditions.
Previous wording
We have secured term sales contracts for the sale of 570,000 pounds U 3 O 8 in 2024 and annual base commitments between 550,000 and 1,100,000 pounds U 3 O 8 annually beginning in 2025 and continuing through 2030. We are advancing negotiations of additional contracts for sales through at least 2030. While we continue to respond to requests for proposals from nuclear fuel purchasers, there is no certainty that we will be able enter additional term sales agreements at suitable pricing and other terms to support longer-term production at Lost Creek and/or the construction and operation of Shirley Basin. The failure to complete additional term sales contracts on suitable terms may further delay decisions to maximize production at Lost Creek and to construct and begin operations at our Shirley Basin Project and could otherwise adversely impact our operations and resulting cash flows and income.
Current wording
We have secured term sales contracts for annual base commitments between 440,000 and 1,300,000 pounds U 3 O 8 annually between 2025 and 2030, with at least 100,000 pounds U 3 O 8 committed in each of 2032 and 2033. While we continue to respond to requests for proposals from nuclear fuel purchasers, there is no certainty that we will be able enter additional term sales agreements at suitable pricing and other terms to support longer-term production at Lost Creek and Shirley Basin. The failure to complete additional term sales contracts on suitable terms could adversely impact our operations and resulting cash flows and income.
Previous wording
The uranium market is volatile and has limited customers.
Current wording
The uranium market, including the price of U 3 O 8, is volatile and has limited customers.
Previous wording
The price of uranium is volatile, has experienced and may continue to experience significant price movements over short periods of time. Spot pricing reached lows at or below $20 per pound U 3 O 8 in recent years. Although current spot pricing is vastly improved from those recent lows, pricing continues to demonstrate volatility: at December 31, 2022, the price of U 3 O 8 was $47.68 per pound and at December 31, 2023, the price was $91.00 per pound U 3 O 8. Factors beyond our control affect the market, including demand for nuclear power; changes in public acceptance of nuclear energy; political and economic conditions in uranium mining, producing and consuming countries; costs and availability of financing of nuclear plants; changes in governmental regulations; global or regional consumption patterns; speculative activities and increased production due to new extraction developments and improved production methods; the future viability and acceptance of small modular reactors or micro-reactors and the related fuel requirements for this new technology; reprocessing of spent fuel and the re-enrichment of depleted uranium tails or waste; and global economics, including currency exchange rates, interest rates and expectations of inflation. Any future accidents, or threats of or incidents of war, civil unrest or terrorism, at nuclear facilities are likely to also impact the conditions of uranium mining and the use and acceptance of nuclear energy. The effect of these factors on the price of uranium, and therefore on the economic viability of our properties, cannot accurately be predicted.
Current wording
The price of uranium is volatile and has experienced and may continue to experience significant price movements over short periods of time. Spot pricing reached lows at or below $20 per pound U 3 O 8 in recent years. Although current spot pricing remains significantly improved from those recent lows, pricing continues to demonstrate volatility: at December 31, 2023, the price of U 3 O 8 was $91.00 per pound and at December 31, 2024, the price was $72.63 per pound U 3 O 8. Factors beyond our control affect the market, including demand for nuclear power; changes in public acceptance of nuclear energy; political and economic conditions in uranium mining, producing and consuming countries; costs and availability of financing of nuclear plants; changes in governmental regulations; global or regional consumption patterns; speculative activities and increased production due to new extraction developments and improved production methods; the future viability and acceptance of small modular reactors or micro-reactors and the related fuel requirements for this new technology; reprocessing of spent fuel and the re-enrichment of depleted uranium tails or waste; and global economics, including currency exchange rates, interest rates and expectations of inflation. Any future accidents, or threats of or incidents of war, civil unrest or terrorism, at nuclear facilities are likely to also impact the conditions of uranium mining and the use and acceptance of nuclear energy. The effect of these factors on the price of uranium, and therefore on the economic viability of our properties, cannot accurately be predicted.
Previous wording
The national and international uranium industry is small and highly competitive. Our activities are directed toward the exploration for, evaluation, acquisition and development of uranium deposits into production operations. There is no certainty that any expenditures we made will result in discoveries of commercial quantities of uranium production. There is aggressive competition within the uranium mining industry for the discovery, acquisition and development of properties considered to have commercial potential. We compete with other companies for the opportunity to participate in promising projects, and many of those competing entities have greater financial resources than we have and/or are state-sponsored entities. Similarly, we market our product to a limited number of purchasers in competition with supplies from a very limited number of competitors, most of whom currently are state-sponsored operations producing at lower, subsidized costs.
Current wording
The national and international uranium industry is small and highly competitive. Our activities are directed toward the exploration for, and evaluation, acquisition and development of uranium deposits into production operations. There is no certainty that any expenditures we made will result in discoveries of commercial quantities of uranium production. There is aggressive competition within the uranium mining industry for the discovery, acquisition and development of properties considered to have commercial potential. We compete with other companies for the opportunity to participate in promising projects, and many of those competing entities have greater financial resources than we have and/or are state-sponsored entities. Similarly, we market our product to a limited number of purchasers in competition with supplies from a very limited number of competitors, most of whom currently are state-sponsored operations producing at lower, subsidized costs.
Previous wording
The mining industry is subject to extensive environmental and other laws and regulations, which may change at any time. Environmental legislation and regulation continue to evolve in ways which may require stricter standards and enforcement, increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects, increased reclamation obligations and attendant costs (and costs of bonding), and a heightened degree of responsibility for companies and their officers, directors and employees. Various regulatory actions related to the protection of the greater sage grouse, for example, are ongoing. Recurring consideration of additional EPA rulemakings, CERCLA revisions and other changes and further restrictions, including within the regulations promulgated pursuant to the General Mining Law, could have significant impact on our projects. Moreover, compliance with environmental quality requirements, reclamation laws and other restrictions imposed by federal, state and local authorities may require significant capital outlays and consume additional staff and management time, materially affect the economics of a given property, cause material changes or delays in intended activities, and potentially expose us to litigation and other legal or administrative proceedings. We cannot accurately predict or estimate the impact of any such future laws or regulations, or future interpretations of existing laws and regulations, on our operations. Historic exploration activities have occurred on many of our properties, and mining and energy production activities have occurred on or near certain of our properties. If such historic activities have resulted in releases or threatened releases of regulated substances to the environment, or historic activities require remediation, potential liability may exist under federal or state remediation statutes for which we may be inadequately bonded or insured.
Current wording
The mining industry is subject to extensive environmental and other laws and regulations, which may change at any time. Environmental legislation and regulation continue to evolve in ways which may require stricter standards and enforcement, increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects, increased reclamation obligations and attendant costs (and costs of bonding), and a heightened degree of responsibility for companies and their officers, directors and employees. Various regulatory actions related to the protection of the greater sage grouse, for example, are ongoing. Recurring consideration of additional EPA rulemakings, CERCLA revisions and other changes and further restrictions, including within the regulations promulgated pursuant to the General Mining Law, could have significant impact on our operations and other mineral projects. Moreover, compliance with environmental quality requirements, reclamation laws and other restrictions imposed by federal, state and local authorities may require significant capital outlays and consume additional staff and management time, materially affect the economics of a given property, cause material changes or delays in intended activities, and potentially expose us to litigation and other legal or administrative proceedings. We cannot accurately predict or estimate the impact of any such future laws or regulations, or future interpretations of existing laws and regulations, on our operations. Historic exploration activities have occurred on many of our properties, and mining and energy production activities have occurred on or near certain of our properties. If such historic activities have resulted in releases or threatened releases of regulated substances to the environment, or historic activities require remediation, potential liability may exist under federal or state remediation statutes for which we may be inadequately bonded or insured.
Previous wording
Mining operations generally involve a high degree of risk. We continue operations at our first and, currently, only, uranium in situ recovery facility at Lost Creek, where production activities commenced in 2013, though we reduced production significantly for several years before returning to commercial operations in 2023. Lost Creek is a remote site in south-central Wyoming. Lost Creek and our other projects as they continue in development, will be subject to all the hazards and risks normally encountered at remote sites in Wyoming, including safety in commuting and severe weather which can affect such commutes and may slow operations, particularly during adverse winter weather and road conditions. Additionally, these operations are subject to perceived risks, and the hazards and risks normally encountered in the production of uranium by in situ methods of recovery, such as water management and treatment, including wastewater disposal capacity (deep wells, Class V wells, ponds or other methods; each of which requires regulatory authorizations and varying levels of expense to install and operate), unusual and unexpected geological formations, unanticipated metallurgical difficulties, equipment malfunctions and availability of materials and parts for operations and construction, interruptions of electrical power and communications, other conditions involved in the drilling and removal of material through pressurized injection and production wells, radiation safety, transportation and industrial accidents, and natural disaster (e.g., fire, tornado), any of which could result in damage to, or destruction of, production facilities, damage to life or property, environmental damage and possible legal liability. We may also not be insured against all interruptions to our operations. Losses from these or other events may cause us to incur significant costs which could materially adversely affect our financial condition and our ability to fund activities on our properties. A significant loss could force us to reduce or suspend our operations and development. Adverse effects on operations and/or further development of our projects could also adversely affect our business, financial condition, results of operations and cash flow.
Current wording
south-central Wyoming. Lost Creek, Shirley Basin, and our other projects as they continue in development, will be subject to all the hazards and risks normally encountered at remote mining and work sites in Wyoming, including safety in commuting and severe weather which can affect such commutes and may slow operations, particularly during adverse winter weather and road conditions. Additionally, these operations are subject to perceived risks, and the hazards and risks normally encountered in the production of uranium by in situ methods of recovery, such as water management and treatment, including wastewater disposal capacity (deep wells, Class V wells, ponds or other methods; each of which requires regulatory authorizations and varying levels of expense to install and operate), unusual and unexpected geological formations, unanticipated metallurgical difficulties, equipment malfunctions and availability of materials and parts for operations and construction, interruptions of electrical power and communications, other conditions involved in the drilling and removal of material through pressurized injection and production wells, radiation safety, transportation and industrial accidents, and natural disasters (e.g., fire, tornado), any of which could result in damage to, or destruction of, production facilities, or other property, personal injury or death, environmental damage and possible legal liability. We may also not be insured against all interruptions to our operations. Losses from these or other events may cause us to incur significant costs which could materially adversely affect our financial condition and our ability to fund activities on our properties. A significant loss could force us to reduce or suspend our operations and development. Adverse effects on operations and/or further development of our projects could also adversely affect our business, financial condition, results of operations and cash flow.
Previous wording
Our properties do not contain mineral reserves as defined under SEC Subpart 1300 of Regulation S-K (“S‑K 1300”) or Canadian National Instrument 43-101 (“NI 43-101”). See*“Cautionary Note Concerning Disclosure of Mineral Resources,”*above. Until mineral reserves or mineral resources are mined and processed, the quantity of mineral resources and grades must be considered as estimates only and may be inaccurate. We have established the existence of uranium resources for certain uranium projects, including at the Lost Creek Property. We have not established proven or probable reserves, as defined under S-K 1300 or NI 43-101, through the completion of a feasibility study, for any of our uranium projects, including the operating Lost Creek Property. Furthermore, we currently have no plans to establish proven or probable reserves for any of our uranium projects for which we plan to utilize ISR methods, such as the Lost Creek Property or the Shirley Basin Project. As a result, and despite the fact that we have produced U 3 O 8 at the Lost Creek Project since 2013, there is increased uncertainty and risk that may result in economic and technical failure which may adversely impact our future profitability.
Current wording
Our properties do not contain mineral reserves as defined under SEC Subpart 1300 of Regulation S-K (“S-K 1300”) or Canadian National Instrument 43-101 (“NI 43-101”). See*“Cautionary Note Concerning Disclosure of Mineral Resources,”*above. Until mineral reserves or mineral resources are mined and processed, the quantity of mineral resources and grades must be considered as estimates only and may be inaccurate. We have established the existence of uranium resources for certain uranium projects, including at the Lost Creek Property. We have not established proven or probable reserves, as defined under S-K 1300 or NI 43-101, through the completion of a feasibility study for any of our uranium projects, including the operating Lost Creek Project. Furthermore, we currently have no plans to establish proven or probable reserves for any of our uranium projects for which we plan to utilize ISR methods, such as Lost Creek and Shirley Basin. As a result, and despite the fact that we have produced U 3 O 8 at the Lost Creek Project since 2013, there is increased uncertainty and risk that may result in economic and technical failure which may adversely impact our future profitability.
Previous wording
We have been in production operations for more than a decade and are depleting the estimated mineral resource at Lost Creek, which remains our only uranium recovery operation. As a result, we must be able to continue to conduct exploration and develop additional mineral resources. While there remain large areas of our Lost Creek Project which require additional exploration, we will need to continue to explore all project areas of the Lost Creek Property and our other mineral properties in Wyoming, or acquire additional, known mineral resource properties to replenish our mineral resources and sustain continued operations. We estimate life of mine when we prepare our mineral resource estimates, but such estimates may not be correct.
Current wording
We have been in production operations for more than a decade and are depleting the estimated mineral resource at Lost Creek, which remains our only uranium recovery operation until we bring Shirley Basin online. As a result, we must be able to continue to conduct exploration and develop additional mineral resources. During the extended downturn in the uranium market, resulting in our reduced operations at Lost Creek and related conservative preservation of our treasury, we did not pursue exploration for additional mineral resources. Although we intend to reinvigorate those programs, there can be no assurance we will discover additional economic uranium mineral resources to sustain and extend our operations. While there remain large areas of our Lost Creek Project which require additional exploration, we will need to continue to explore all project areas of the Lost Creek Property and our other mineral properties in Wyoming, or acquire additional, known mineral resource properties to replenish our mineral resources and sustain continued operations. We estimate life of mine when we prepare our mineral resource estimates, but such estimates may not be correct.
Previous wording
Although we have obtained title opinions with respect to certain of our properties, there is no guarantee that title to any of our properties will not be challenged or impugned. Third parties may have valid claims underlying portions of our interests. Our mineral properties in the U.S. consist of leases covering state lands, unpatented mining claims and millsite claims, and patented mining claims and lands. Many of our mining properties in the U.S. are unpatented mining claims to which we have only possessory title. Because title to unpatented mining claims is subject to inherent uncertainties, it is difficult to determine conclusively ownership of such claims. These uncertainties relate to such things as sufficiency of mineral discovery, proper posting and marking of boundaries and possible conflicts with other claims not determinable from descriptions of record. The present status of our unpatented mining claims located on public lands allows us the exclusive right to mine and remove valuable minerals. We are allowed to use the surface of the public lands solely for purposes related to mining and processing the mineral-bearing ores. However, legal ownership of the land remains with the U.S. We remain at risk that the mining claims may be forfeited either to the U.S. or to rival private claimants due to failure to comply with statutory requirements. Certain of the changes which have been proposed in recent years to amend or replace the General Mining Law, could also have an impact on the rights we currently have in our patented and unpatented mining and millsite claims. Similarly, we believe that we have necessary rights to surface use and access in areas for which we have mineral rights other than pursuant to a federal unpatented mining claim. Those rights may also be challenged, resulting in delay or additional cost to assert and confirm our rights. We have taken or will take appropriate curative measures to ensure proper title to our mineral properties and rights in surface use or access, where necessary and where possible. Additionally, our state leases have fixed terms and, while renewals have historically been granted upon timely application, there is no certainty there will not be changes to rights granted and/or the state lands procedures, either of which could negatively affect our mineral projects.
Current wording
Although we have obtained title opinions with respect to certain of our properties, there is no guarantee that title to any of our properties will not be challenged or impugned. Third parties may have valid claims underlying portions of our interests. Our mineral properties in the U.S. consist of leases covering state lands, unpatented mining claims and millsite claims, and patented mining claims and lands. Many of our mining properties in the U.S. are unpatented mining claims to which we have only possessory title. Because title to unpatented mining claims is subject to inherent uncertainties, it is difficult to determine conclusively ownership of such claims. These uncertainties relate to such things as sufficiency of mineral discovery, proper posting and marking of boundaries and possible conflicts with other claims not determinable from descriptions of record. The present status of our unpatented mining claims located on public lands allows us the exclusive right to mine and remove valuable minerals. We are allowed to use the surface of the public lands solely for purposes related to mining and processing the mineral-bearing ores. However, legal ownership of the land remains with the U.S. We remain at risk that the mining claims may be forfeited either to the U.S. or to rival private claimants due to failure to comply with statutory and regulatory requirements. Certain of the changes which have been proposed in recent years to amend or replace the General Mining Law, could have an impact on the rights we currently have in our patented and unpatented mining and millsite claims. Similarly, we believe that we have the necessary rights to surface use and access in areas for which we have mineral rights other than pursuant to a federal unpatented mining claim. Those rights may also be challenged, resulting in delay or additional cost to assert and confirm our rights. We have taken or will take appropriate curative measures to ensure proper title to our mineral properties and rights in surface use or access, where necessary and where possible. Additionally, our state leases have fixed terms and, while renewals have historically been granted upon timely application, there is no certainty there will not be changes to rights granted and/or the state lands procedures, either of which could negatively affect our mineral projects.
Previous wording
Our business is subject to extensive federal, state and local laws governing all stages of exploration, development and operations at our mineral properties, taxes, labor standards and occupational health, mine and radiation safety, toxic substances, endangered species protections, and other matters. Exploration, development, and production operations are also subject to various federal, state and local laws and regulations relating to the protection of the environment. These laws impose high standards on the mining industry, particularly with respect to uranium recovery, to monitor the discharge of wastewater and report the results of such monitoring to regulatory authorities, to reduce or eliminate certain effects on or into land, groundwater, water or air, to progressively restore mine properties, to manage hazardous wastes and materials and to reduce the risk of worker accidents. A violation of any of these laws may result in the imposition of substantial fines and other penalties and potentially expose us to operational restrictions, suspension, administrative proceedings or litigation. Many of these laws and regulations have tended to become more stringent over time, which appears will continue to be the trend in coming years. Any change in such laws or imposition of fines or restrictions in operations as a result of violations could have a material adverse effect on our financial condition, cash flow or results of operations. There can be no assurance that we will be able to meet all the regulatory requirements in a timely manner or without significant expense or that the regulatory requirements will not change to delay or prohibit us from proceeding with certain exploration, development or operations. Further, there is no assurance that we will not face new challenges by third parties to regulatory decisions when made, which may cause additional delay and substantial expense, or may cause a project to be permanently halted.
Current wording
Our business is subject to extensive federal, state and local laws governing all stages of exploration, development and operations at our mineral properties, taxes, labor standards and occupational health, mine and radiation safety, toxic substances, endangered species protections, and numerous other matters. Exploration, development, and production operations are also subject to various federal, state and local laws and regulations relating to the protection of the environment. These laws impose high standards on the mining industry, particularly with respect to uranium recovery, to monitor the discharge of wastewater and report the results of such monitoring to regulatory authorities, to reduce or eliminate certain effects on or into land, groundwater, water or air, to progressively restore mine properties, to manage hazardous wastes and materials and to reduce the risk of worker accidents. A violation of any of these laws may result in the imposition of substantial fines and other penalties and potentially expose us to operational restrictions, suspension, administrative proceedings or litigation. Many of these laws and regulations have tended to become more stringent over time, which appears will continue to be the trend in coming years. Any change in such laws or imposition of fines or restrictions in operations as a result of violations could have a material adverse effect on our financial condition, cash flow or results of operations. There can be no assurance that we will be able to meet all the regulatory requirements in a timely manner or without significant expense or that the regulatory requirements will not change to delay or prohibit us from proceeding with certain exploration, development or operations. There is no assurance that we will not face new challenges by third parties to regulatory decisions when made, which may cause additional delay and substantial expense, or may cause a project to be permanently halted. Certain recent judicial decisions affecting agency decisions and Administrative Procedures Act precedents, as well as recent agency actions and the significant restrictions proposed by the current U.S. federal administration related to agency staffing and permitting procedures and timelines all are an evolving landscape and create uncertainty and possible additional cost, delays, litigation and negative effects for our business and operations.
Previous wording
Our operations require licenses and permits from various governmental authorities. We believe we hold all necessary licenses and permits to carry on the activities which we are currently conducting or currently propose to conduct under applicable laws and regulations. Such licenses and permits are subject to changes in regulations and changes in various operating circumstances. There can be no guarantee that we will be able to obtain all necessary licenses and permits that may be required to maintain our exploration and mining activities (or amendments to expand or alter existing operations), including constructing mines, milling or processing facilities and commencing or continuing exploration or mining activities or operations at any of our properties. In addition, if we proceed to production on any other property or new geologic horizon, we must obtain and comply with permits and licenses which will contain specific operating conditions. There can be no assurance that we will be able to obtain such permits and licenses or that we will be able to comply with any and all such conditions. The ability to timely obtain all required authorizations may become more of an issue with regulatory agencies facing staffing challenges similar to those our industry is encountering, as experienced staff retire or leave government, including those with highly specialized knowledge specific to uranium recovery and radiation safety.
Current wording
Our operations require licenses and permits from various governmental authorities. We believe we hold all necessary licenses and permits under applicable laws and regulations to carry on the activities which we are currently conducting and hold or are pursuing such licenses and permits for activities which are currently proposed, with reasonable expectations of timely receipt. Such licenses and permits are subject to changes in regulations and changes in various operating circumstances. There can be no guarantee that we will be able to timely obtain all necessary licenses and permits that may be required to maintain our exploration and mining activities (or amendments to extend, expand or alter existing operations), including constructing mines, milling or processing facilities and commencing or continuing exploration or mining activities or operations at any of our properties. The uncertainty of the time for and outcome of regulatory processes has grown substantially as the new administration’s Department of Government Efficiency has begun to eliminate jobs, funding and other resources. In addition, if we proceed to production on any other property or new geologic horizon, we must obtain and comply with permits and licenses which will contain specific operating conditions. There can be no assurance that we will be able to obtain such permits and licenses or that we will be able to comply with any and all such conditions. The ability to timely obtain all required authorizations may become more of an issue with regulatory agencies facing staffing challenges similar to those our
Previous wording
If enacted, such legislation could, among other effects, change the cost of holding unpatented mining claims or leases or the duration for which the claims or leases could be held without development, and could significantly impact our ability to develop locatable mineral resources on our patented and unpatented mining claims. Although it is impossible to predict what any legislated royalties might be, implementation could adversely affect the potential for development of mineral properties, as well as the economics of existing operating mines. Passage of such legislation could adversely affect our financial performance, including proposals imposing a royalty or otherwise impacting holding and operational costs of mining claims, if passed, could render mineral projects or existing mines uneconomic. Although certain of the proposed amendments have included provisions to ‘grandfather’ permitted projects, there is no assurance that any new legislation will necessarily contain such provisions or that such legislation will not otherwise have a significant financial impact on our operations and business.
Current wording
If enacted, such legislation could, among other effects, change the cost of holding unpatented mining claims or leases or the duration for which the claims or leases could be held without development, and could significantly impact our ability to develop locatable mineral resources on our patented and unpatented mining claims. Although it is impossible to predict what any legislated royalties might be, implementation could adversely affect the potential for development of mineral properties, as well as the economics of existing operating mines. Passage of such legislation could adversely affect our financial performance, if passed, including proposals imposing a royalty or otherwise impacting holding and operational costs of mining claims could render mineral projects or existing mines uneconomic. Although certain of the proposed amendments have included provisions to ‘grandfather’ permitted projects, there is no assurance that any new legislation will contain such provisions or that such legislation will not otherwise have a significant financial impact on our operations and business.
Previous wording
We depend on services of our management, and key personnel, contractors and service providers, and the timely availability of such individuals and providers cannot be assured during ramp-up or into the future.
Current wording
We depend on services of our management and key personnel, contractors and service providers, and the timely availability of such individuals and providers cannot be assured.
Previous wording
Successful implementation of our business plan and operations is dependent upon our management team and experienced staff, some of whom are approaching retirement age. From time to time, we may need to recruit additional qualified employees, contractors and service providers to supplement existing management and personnel. We continue to hire and train employees for Lost Creek’s renewed operation and we will need to hire additional staff as we develop and construct the Shirley Basin Project. Timely availability and training, strong retention rates of staffing and timely retention of contractors cannot be assured in our industry, many aspects of which are highly specialized. This is particularly true in the current labor markets in which we recruit our employees and contractors, including where we compete with higher paying energy jobs, and because of the remote locations for which employees and contractors are needed. As well, the skilled professionals with expertise in geologic, engineering and process aspects of uranium in situ recovery, radiation safety and other facets of our business are currently in high demand, as there are relatively few professionals with both expertise and experience. The sustained downturn of the uranium production industry in recent years makes these challenges even more pronounced. Even with return to higher levels of production operations, we will be dependent on the continued service of a relatively small number of key persons, including key contractors, the loss of any one or several of whom could have an adverse effect on our business and operations. We do not hold key man insurance in respect of any of our executive officers.
Current wording
Successful implementation of our business plan and operations is dependent upon our management team and experienced staff, some of whom are approaching retirement age. From time to time, we may need to recruit additional qualified employees, contractors and service providers to supplement existing management and personnel and to implement various aspects of our succession planning. We continue to hire and train employees for Lost Creek’s renewed operation and we have begun to hire staff for Shirley Basin. Timely availability and training, strong retention rates of staffing and timely retention of contractors cannot be assured in our industry, many aspects of which are highly specialized. This is particularly true in the current labor markets in which we recruit our employees and contractors, including where we compete with higher paying energy jobs, and because of the remote locations for which employees and contractors are needed. As well, the skilled professionals with expertise in geologic, engineering and process aspects of uranium in situ recovery, radiation safety and other facets of our business are currently in high demand, as there are relatively few professionals with both expertise and experience. The sustained downturn of the uranium production industry in recent years makes these challenges even more pronounced. Even with the return to higher levels of production operations, we will be dependent on the continued service of a relatively small number of key persons, including management, senior professionals and key contractors, the loss of any one or several of whom could have an adverse effect on our business and operations. We do not hold key man insurance in respect of any of our executive officers.
Previous wording
Our proprietary data, technology and intellectual property may be compromised or lost, which could result in decreased competitive advantage and/or loss to the value of such assets.
Current wording
Our proprietary data, technology and intellectual property may be compromised or lost, which could result in a decreased competitive advantage and/or loss to the value of such assets.
Previous wording
With the ever-increasing reliance on technology throughout our operations, including developments of proprietary technology and intellectual property by the Company and/or it consultants, risks of theft, appropriation or other loss of such technology and assets and/or our proprietary data pose a risk to our competitive advantage and business and financial results. We take what we believe to be reasonable steps to protect these proprietary technologies and intellectual property, including contractually and by efforts to obtain patents or trade rights where possible. but there can be no assurance that all such measures will be sufficient or successful.
Current wording
With the ever-increasing reliance on technology throughout our operations, including developments of proprietary technology and intellectual property by the Company and/or its consultants, risks of theft, appropriation or other loss of such technology and assets and/or our proprietary data pose a risk to our competitive advantage and business and financial results. We take what we believe to be reasonable steps to protect these proprietary technologies and intellectual property, including contractually and by efforts to obtain patents or trade rights where possible, but there can be no assurance that all such measures will be sufficient or successful.
Previous wording
Although we play an important role in addressing climate change with our production of uranium to fuel carbon-free nuclear power, we, too, may be subject to risks associated with climate change which could harm our results of operations and increase our costs and expenses. The occurrence of severe adverse weather conditions may have a potentially serious impact on our operations. Adverse weather may result in physical damage to our operations, instability of our infrastructure and equipment, or alter the supply of electricity to our Lost Creek Property or Shirley Basin when it is constructed. Impacts of such events may affect worker productivity at our projects. Should any impacts of climate change be material in nature or occur for lengthy periods of time, our financial condition or results of operations would be adversely affected.
Current wording
Although we play an important role in addressing climate change with our production of uranium to fuel carbon-free nuclear power, we, too, may be subject to risks associated with climate change which could harm our results of operations and increase our costs and expenses. The occurrence of severe adverse weather conditions may have a potentially serious impact on our operations. Adverse weather may result in physical damage to our operations, instability of our infrastructure and equipment, or alter the supply of electricity to Lost Creek or Shirley Basin. Impacts of such events may affect worker productivity at our projects. Should any impacts of climate change be material in nature or occur for lengthy periods of time, our financial condition or results of operations would be adversely affected.
Previous wording
Additional funds will be required for working capital and exploration and development activities at our properties including Lost Creek Property and for the construction and development of our Shirley Basin Project. Potential sources of future funds available to us, in addition to the proceeds from sales of inventory and future production, include the sale of additional equity capital, proceeds from the exercise of outstanding convertible equity instruments, borrowing of funds or other debt structure, project financing, or the sale of our interests in assets. Continued volatility in the equity markets, particularly the commodities and energy markets, as well as current interest rates, may increase the costs attendant to either equity or debt financing. There is no assurance that such funding will be available to us to fund continued development or future exploration at Lost Creek or the construction and ramp up of Shirley Basin. Further, even if such financing is successfully completed, there can be no assurance that it will be obtained on terms favorable to us or will provide us with sufficient funds to meet our objectives, which may adversely affect our business and financial position.
Current wording
Although we currently have substantial funds on hand, additional funds may be required for working capital and exploration and development activities at our properties including Lost Creek and for the construction and development of Shirley Basin. Potential sources of future funds available to us, in addition to the proceeds from sales of existing inventory and future production, include the sale of additional equity capital, proceeds from the exercise of outstanding convertible equity instruments, borrowing of funds or other debt structures, project financing, or the sale of our interests in assets. Continued volatility in the equity markets, particularly the commodities and energy markets, as well as current interest rates, may increase the costs attendant to either equity or debt financing. There is no assurance that such funding will be available to us to fund continued development or future exploration at Lost Creek or the construction and ramp-up of Shirley Basin. Further, even if such financing is secured, there can be no assurance that it will be obtained on terms favorable to us or will provide us with sufficient funds to meet our objectives, which may adversely affect our business and financial position.
Previous wording
Production, capital and operating cost estimates may be inaccurate.
Current wording
Production, operating and capital cost estimates may be inaccurate.
Previous wording
We prepare estimates of annual and future production, the attendant production and operational costs and required working capital for such levels of production, but there is no assurance that we will achieve those estimates. Additionally, we have and continue to estimate the costs of construction for Shirley Basin, in the current market. These types of estimates are inherently uncertain and may change materially over time. Operational cost estimates are affected by changes in production levels and may be affected by continuing inflation and cost-of-goods due to supply chain issues as well as the possible need to utilize a greater level of contractor services if required staffing is unavailable or cannot timely be hired and trained. Availability and consistent pricing of materials necessary in the installation of wells, surface production equipment, associated infrastructure, chemicals for processing and, expendable materials related to operations, can be variable depending on economic conditions locally and worldwide and may force changes in operations and timing of resource production. Under current supply chain circumstances, this is particularly true. In addition, we rely on certain contractors related to the installation of wells and technical services associated with that installation. Their availability or cost of service can change depending on other local market conditions and may therefore affect the installation and production rates of mining.
Current wording
We prepare estimates of annual and future production, the attendant production and operational costs and required working capital for such levels of production, but there is no assurance that we will achieve those estimates. Additionally, we have estimated and continue to estimate the costs of construction for Shirley Basin, in the current market. These types of estimates are inherently uncertain and may change materially over time. Production and operational cost estimates are affected by changes in production levels and may be affected by continuing inflation and cost-of-goods due to supply chain issues as well as the possible need to utilize a greater level of contractor services if required staffing is unavailable or cannot timely be hired and trained. Availability and consistent pricing of materials
Previous wording
We have never paid dividends and do not currently expect to do so in the near future. Therefore, if our share price does not appreciate, our investors may not gain and could potentially lose on their investment in our shares.
Current wording
We have never paid dividends and do not currently expect to do so in the near future. Therefore, if our share price does not appreciate, our investors may not realize gains and could potentially lose on their investment in our shares.
Previous wording
Failure to meet the listing maintenance criteria of the NYSE American may result in the delisting of our common shares, which could result in lower trading volumes and liquidity, lower prices of our common shares and make it more difficult for us to raise capital.
Current wording
Failure to meet the listing maintenance criteria of the NYSE American or the TSX may result in the delisting of our common shares, which could result in lower trading volumes and liquidity, lower prices of our common shares and make it more difficult for us to raise capital.
Previous wording
Our common shares are listed on the NYSE American and we are subject to its continued listing requirements, including maintaining certain share prices and a minimum level of shareholder equity. The market price of our common shares has been and may continue to be subject to significant fluctuation. If we are unable to comply with the NYSE American continued listing requirements, including its trading price requirements, our common shares may be suspended from trading on and/or delisted from the NYSE American. Although we have not been notified of any delisting proceedings, there is no assurance that we will not receive such notice in the future or that we will be able to then comply with NYSE American listing standards. The delisting of our common shares from the NYSE American may materially impair our shareholders’ ability to buy and sell our common shares and could have an adverse effect on the market price of, and the efficiency of the trading market for, our common shares. In addition, the delisting of our common shares could significantly impair our ability to raise capital.
Current wording
Our common shares are listed on the NYSE American and the TSX, and we are subject to the continued listing requirements of each exchange, including maintaining certain share prices and a minimum level of shareholder equity. The market price of our common shares has been and may continue to be subject to significant fluctuation. If we are unable to comply with the NYSE American or the TSX continued listing requirements, including the trading price requirements, our common shares may be suspended from trading on and/or delisted from the NYSE American or the TSX, respectively. Although we have not been notified of any delisting proceedings, there is no assurance that we will not receive such notice in the future or that we will be able to then comply with NYSE American and TSX listing requirements. The delisting of our common shares from the NYSE American or the TSX may materially impair our shareholders’ ability to buy and sell our common shares and could have an adverse effect on the market price of, and the efficiency of the trading market for, our common shares. In addition, the delisting of our common shares could significantly impair our ability to raise capital.
Previous wording
To raise additional capital, we may in the future offer additional common shares or other securities convertible into or exchangeable for our common shares at prices that may not be the same as the price per share as the shares an investor has previously purchased, and investors purchasing shares or other securities in the future could have rights superior to existing shareholders.
Current wording
To raise additional capital, we may in the future offer additional common shares or other securities convertible into or exchangeable for our common shares at prices that may not be the same as the price per share as the shares an investor has previously purchased, and investors purchasing shares or other securities in the future could have rights superior to those of existing shareholders.
Previous wording
Certain impacts to the economy and supply chain disruption resulting initially from the COVID pandemic are likely to continue for the foreseeable future.
Current wording
Inflation and supply chain challenges are likely to continue for the foreseeable future.
Previous wording
The COVID pandemic has had a significant negative impact generally on the global economy and commodity and equity markets. While many of the direct impacts to our business arising during the pandemic have decreased substantially, direct and indirect effects continue to be experienced particularly in supply chain and available labor and contractors. These impacts are likely to continue to pose risk to our operations, particularly at our renewed production operations at Lost Creek and if/as we proceed to construct and operate Shirley Basin.
Current wording
While many of the direct impacts to our business arising during the COVID pandemic have decreased substantially, direct and indirect effects continue to be experienced, particularly in supply chain and available labor and contractors. Following the pandemic, the inflationary impacts to the economy have been substantial. These impacts are likely to continue to pose risk to our operations, particularly at our renewed production operations at Lost Creek and as we proceed to construct and operate Shirley Basin.
Previous wording
Additionally, we utilize a bonding surety program for our regulatory, reclamation and restoration obligations at Lost Creek and Shirley Basin. Availability of and terms for such surety arrangements may change in the future, resulting in adverse effects to our financial condition. Also, we have contractual arrangements with the licensed uranium conversion facility for weighing and storage of our product inventory. Possible loss of or damage to our inventory may not be fully covered by our agreements, indemnification obligations or insurance. And, with relation to the conversion facility, the storage arrangements may not be extended indefinitely, creating greater costs or other impact to our product inventory. Any loss or damage of the uranium may not be fully covered or absolved by contractual arrangements with the conversion facility.
Current wording
Additionally, we utilize a bonding surety program for our regulatory, reclamation and restoration obligations at Lost Creek and Shirley Basin. Availability of and terms for such surety arrangements may change in the future, resulting in adverse effects to our financial condition. Also, we have contractual arrangements with the licensed uranium conversion facility for weighing and storage of our product inventory. Possible loss of or damage to our inventory may not be fully covered by our agreements, indemnification obligations or
Previous wording
We are dependent on information technology systems, which are subject to certain risks, including cybersecurity risks and data leakage risk associated with implementation and integration.
Current wording
We are dependent on information technology systems, which are subject to certain risks, including cybersecurity risks and data leakage risks associated with implementation and integration.
Previous wording
We depend upon information technology systems in a variety of ways throughout our operations. While we have not experienced any material incident, any significant breakdown of those systems, whether through virus, cyber-attack, security breach, theft, or other destruction, invasion or interruption, or unauthorized access to our systems, by employees, others with authorized access to our systems or unauthorized persons, could negatively impact our business and operations. These threats are increasing in number and severity and broadening in type of risk, including most recently with the Russian declaration of war against the Ukraine and cyber attacks ongoing in that context, which may broaden. To the extent that such invasion, cyber-attack or similar security breach results in disruption to our operations, loss or disclosure of, or damage to, our data and particularly our confidential or proprietary information, our reputation, business, results of operations and financial condition could be materially adversely affected. We have implemented various measures to manage our risks related to information technology systems and network disruptions. However, given the unpredictability of the timing, nature and scope of information technology disruptions, we potentially could be subject to production downtimes, operational delays, the compromising of confidential or otherwise protected information, destruction or corruption of data, security breaches, other manipulation or improper use of our systems and networks or financial losses from remedial actions, any of which could have a material adverse effect on our cash flows, competitive position, financial condition or results of operations. Our systems, internal controls and insurance for protecting against such cyber security risks may be insufficient and it is increasingly difficult to fully mitigate against these threats as they are ever changing. Additionally, we assess possible threats to our third-party providers when they may be provided confidential and proprietary information to complete work in our behalf. While we seek assurances from those parties that they will maintain such confidential and proprietary information in confidence, including by virtue of having systems and processes in place to protect such data, those service providers may also be subject to data compromise. Any compromise of our confidential data or that of our customers, suppliers, employees or others with whom we do business, whether in our possession or that of our service providers, could substantially disrupt our operations, harm our customers, suppliers, employees and others with whom we do business, damage our reputation, violate applicable law, subject us to potentially significant cost and liabilities which could be material. Although to date we have experienced no such attack resulting in material losses, we may suffer such losses at any time in the future. We may be required to expend significant additional resourc…
Excerpt shortened here; the source contains the full paragraph.
Current wording
We depend upon information technology systems in a variety of ways throughout our operations. While we have not experienced any material incident, any significant breakdown of those systems, whether through virus, cyber-attack, security breach, theft, or other destruction, invasion or interruption, or unauthorized access to our systems, by employees, others with authorized access to our systems or unauthorized persons, could negatively impact our business and operations. These threats are increasing in number and severity and broadening in type of risk, including recently with the war in Ukraine, the war in the Middle East and other geopolitical tensions and the cyber attacks ongoing in those contexts, which may continue to broaden. To the extent that any cyber-attack or similar security breach results in disruption to our operations, loss or disclosure of, or damage to, our data and particularly our confidential or proprietary information, our reputation, business, results of operations and financial condition could be materially adversely affected. We have implemented various measures to manage our risks related to information technology systems and network disruptions. However, given the unpredictability of the timing, nature and scope of information technology disruptions, we potentially could be subject to production downtimes, operational delays, the compromising of confidential or otherwise protected information, destruction or corruption of data, security breaches, other manipulation or improper use of our systems and networks or financial losses from remedial actions, any of which could have a material adverse effect on our cash flows, competitive position, financial condition or results of operations. Our systems and internal controls for protecting against such cyber security risks may be insufficient and it is increasingly difficult to fully mitigate against these threats as they are ever changing. Additionally, we assess possible threats to our third-party providers when they may be provided confidential and proprietary information to complete work in our behalf. While we seek assurances from those parties that they will maintain such confidential and proprietary information in confidence, including by virtue of having systems and processes in place to protect such data, those service providers may also be subject to data compromise. Any compromise of our confidential data or that of our customers, suppliers, employees or others with whom we do business, whether in our possession or that of our service providers, could substantially disrupt our operations, harm our customers, suppliers, employees and others with whom we do business, damage our reputation, violate applicable law, subject us to potentially significant costs and liabilities which could be material. Although to date we have experienced no such attack resulting in material losses, we may suffer such losses at any time in the future. We may be required to expend significan…
Excerpt shortened here; the source contains the full paragraph.
Previous wording
Defense and settlement costs of legal claims can be substantial, even with respect to claims that have no merit. From time to time, we may be involved in disputes with other parties which may result in litigation, arbitration, or other proceedings. Additionally, it is possible that the Company may become involved directly or indirectly in legal proceedings, in the form of governmental or regulatory investigations, administrative proceedings or litigation, arising from challenges to regulatory actions. Such investigations, administrative proceedings and litigation related to regulatory matters may delay or halt exploration, development or even operations at our projects. The results of litigation or any other proceedings cannot be predicted with certainty. If we are unable to resolve any such disputes favorably, it could have a material adverse effect on our financial position, results of operations or our property development.
Current wording
Defense and settlement costs of legal claims can be substantial, even with respect to claims that have no merit. From time to time, we may be involved in disputes with other parties which may result in litigation, arbitration, or other proceedings. Additionally, it is possible that the Company may become involved directly or indirectly in legal proceedings, in the form of governmental or regulatory investigations, administrative proceedings or litigation, arising from challenges to regulatory actions. Such investigations, administrative proceedings and litigation related to regulatory matters may delay or halt exploration, development or even operations at our projects. The results of litigation or any other proceedings cannot be predicted with certainty. If we are unable to resolve any such dispute favorably, it could have a material adverse effect on our financial position, results of operations or our property development.
Previous wording
Certain of our directors are also directors of other companies that are engaged in similar mining or natural resources businesses, namely the acquisition, exploration, and development of mineral properties. Such other associations may give rise to conflicts of interest from time to time. One of the possible consequences will be that corporate opportunities presented to a director may be offered to another company with which the director is associated and may not be made available to us. Conflicts of interest may also include decisions on how much time to devote to the business of our company. Our Code of Conduct provides guidance on conflicts of interest and our directors are required to act in good faith, to make certain disclosures and to abstain from voting on decisions in which they may have a conflict of interest.
Current wording
time to time. One of the possible consequences will be that corporate opportunities presented to a director may be offered to another company with which the director is associated and may not be made available to us. Conflicts of interest may also include decisions on how much time to devote to the business of our company. Our Code of Business Conduct and Ethics provides guidance on conflicts of interest and our directors are required to act in good faith, to make certain disclosures and to abstain from voting on decisions in which they may have a conflict of interest.
Previous wording
From time to time, we examine opportunities to acquire additional mining assets and businesses. Any acquisition that we may choose to complete may be of significant size, may change the scale of our business and operations, and/or may expose us to new geographic, political, operating, financial and geological risks. Any acquisition would be accompanied by risks, including a significant change in commodity prices after we commit to complete a transaction and establish the purchase price or share exchange ratio; a material mineral deposit may prove to be below expectations; difficulty integrating and assimilating the operations and personnel of an acquired company, realizing anticipated synergies and maximizing the financial and strategic position of the combined enterprise, and maintaining uniform standards, policies and controls across the organization; the integration of the acquired business or assets may disrupt our ongoing business and relationships with employees, customers, suppliers and contractors; and the acquired business or assets may have unknown liabilities which may be significant. There can be no assurance that we would be able to conclude any acquisition successfully, or that we would be successful in overcoming these risks or other problems encountered in connection with such an acquisition.
Current wording
From time to time, we examine opportunities to acquire additional mining assets and businesses. Any acquisition that we may choose to complete may be of significant size, may change the scale of our business and operations, and/or may expose us to new geographic, political, operating, financial and geological risks. Any acquisition would be accompanied by risks, including (i) a significant change in commodity prices after we commit to complete a transaction and establish the purchase price or share exchange ratio; (ii) a material mineral deposit may prove to be below expectations; (iii) difficulty integrating and assimilating the operations and personnel of an acquired company, realizing anticipated synergies and maximizing the financial and strategic position of the combined enterprise, and maintaining uniform standards, policies and controls across the organization; (iv) the integration of the acquired business or assets may disrupt our ongoing business and relationships with employees, customers, suppliers and contractors; and (v) the acquired business or assets may have unknown liabilities which may be significant. There can be no assurance that we would be able to conclude any acquisition successfully, or that we would be successful in overcoming these risks or other problems encountered in connection with such an acquisition.
Previous wording
The war in Ukraine and other global conflicts and tensions continue to have implications to the global economy and energy supplies; as a result, the impact to the nuclear fuel market remains uncertain.
Current wording
Global conflicts and geopolitics continue to have implications to the global economy and energy supplies; as a result, the impact to the nuclear fuel market remains uncertain.
Previous wording
The conflicts in the Middle East, and other geopolitical tensions, including between the U.S. and China, also make it difficult to assess and predict the impact to the economy, supply disruption and increased prices of materials, and cyber-security threats. While we do not currently purchase goods and materials directly from China for our Lost Creek operations, our suppliers of electronics and instrumentation components may purchase necessary materials from China, and we may be indirectly affected if the market for Chinese products is further disrupted by sanctions, countersanctions or other events. If/as a decision is made to construct and develop Shirley Basin, the direct or indirect exposure to these market uncertainties may be greater or more direct.
Current wording
The conflicts in the Middle East, and other geopolitical tensions, including between the U.S. and China, also make it difficult to assess and predict the impact to the economy, supply and trade disruption and increased prices of materials, and cyber-security threats. While we do not currently purchase goods and materials directly from China for our Lost Creek operations, our suppliers of electronics and instrumentation components may purchase necessary materials from China, and we may be indirectly affected if the market for Chinese products is further disrupted by sanctions, countersanctions or other events. As we continue with the construction and development of Shirley Basin, the direct or indirect exposure to these market uncertainties may be greater or more direct. Recent international trade issues, including tariffs and counter tariffs, if continued, may also have a negative impact on our operations, construction of Shirley Basin and on our business generally.
Previous wording
To the extent these conflicts and geopolitical situations may adversely affect our business as discussed, they may also have the effect of heightening many of the other risks described in this Item 1A such as those relating to cyber-security, supply chain, inflationary and other volatility in prices of goods and materials, and the condition of the markets including as related to our ability to access additional capital, any of which could negatively affect our business. Because of the highly uncertain and dynamic nature of the war, global conflicts and related geopolitics, it remains difficult to estimate the impact on our business.
Current wording
To the extent these conflicts and geopolitical situations adversely affect our business as discussed, they may also have the effect of heightening many of the other risks described in this Item 1A such as those relating to cyber-security, supply chain, inflationary and other volatility in prices of goods and materials, and the condition of the markets including as related to our ability to access additional capital, any of which could negatively affect our business. Because of the highly uncertain and dynamic nature of the wars in Ukraine and the Middle East, global conflicts and related geopolitics, it remains difficult to estimate the impact on our business.
Rearranged current paragraphs (6)
Current report — wording carried from elsewhere
Mining operations generally involve a high degree of risk. We continue operations at our first and, currently, only, uranium in situ recovery facility at Lost Creek, where we began ramp-up to renewed commercial operations in 2023. Lost Creek is a remote site in
Current report — wording carried from elsewhere
industry is encountering, as experienced staff retire or leave government, including those with highly specialized knowledge specific to uranium recovery and radiation safety.
Current report — wording carried from elsewhere
necessary in the installation of wells, surface production equipment, associated infrastructure, chemicals for processing and, expendable materials related to operations can be variable depending on economic conditions locally and worldwide and may force changes in operations and timing of resource production. Under prevailing supply chain and market conditions, this is particularly true. In addition, we rely on certain contractors related to the installation of wells and technical services associated with that installation. Their availability or cost of service can change depending on other local market conditions and may therefore affect the installation and production rates of mining.
Current report — wording carried from elsewhere
insurance. And, with relation to the conversion facility, the storage arrangements may not be extended indefinitely, creating greater costs or other impact to our product inventory. Any loss or damage of the uranium may not be fully covered or absolved by contractual arrangements with the conversion facility.
Current report — wording carried from elsewhere
Certain of our directors are also directors of other companies that are engaged in similar mining or natural resources businesses, namely the acquisition, exploration, and development of mineral properties. Such other associations may give rise to conflicts of interest from
Current report — wording carried from elsewhere
other volatility in prices of goods and materials, and the condition of the markets including as related to our ability to access additional capital, any of which could negatively affect our business.