UR-ENERGY INC
For the period ended Dec 31, 2024. Filed Apr 11, 2025.
View on SEC.govAbout this filing
A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.
FY2024 · Filed Apr 11, 2025
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-K
Period ended 2023-12-31; filed 2024-03-06.
0001654954-24-002673
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-K
Period ended 2024-12-31; filed 2025-04-11.
0001558370-25-004728
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 161 previous paragraphs and 166 current paragraphs.
42 unchanged; 44 reworded; 79 added; 72 removed; 3 previous and 1 current paragraphs rearranged.
Tables are not compared: 13 previous and 15 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (79)
Current report
In the U.S., the ban on Russian imports of nuclear fuels, signed into law earlier in the year, became effective in August 2024. While allowing certain waivers until January 1, 2028, the prohibitions on imports continue through 2040. The ban will help to secure the U.S. nuclear fuel supply chain and advance domestic uranium recovery operations.
Current report
The nuclear markets have been favorably affected in many ways through greater acceptance of nuclear energy. Recently, technology and other industries operating data centers (in what is now simply being referred to as “big data”) have realized the opportunities which exist to maintain carbon free baseload electricity while supporting the immense electric demand generated by these centers. The Electric Power Research Institute’s May 28, 2024, white paper titled Powering Intelligence, suggests that data centers are expected to consume as much as 9.1% of U.S. electricity generation by 2030 compared with an estimated 4% today. It is further estimated that, globally, data centers will drive electricity demand in many regions. Projections suggest that 2026 electricity consumption for data centers alone will be the equivalent of the electricity consumption of Japan.
Current report
Several significant power purchase agreements have been announced in recent months, including the largest-ever purchase agreement by Constellation Energy to power data centers owned by Microsoft for 835 megawatts of electricity. This agreement will result in the restart of the Three Mile Island Unit 1 nuclear reactor in Pennsylvania. While contributing 835 megawatts of carbon-free electricity to the grid, this historic project will create 3,400 jobs and offset approximately 61 million metric tons of CO 2 emissions over 20 years. Still others in big data, including Google and Amazon, have announced plans to utilize nuclear energy to satisfy these rapidly growing electrical needs.
Current report
The U.S. Department of Energy (DOE) has been progressing its requests for proposals under both its high-assay, low-enriched uranium (HALEU) and low-enriched uranium (LEU) programs for which domestic uranium supply is preferred. In October 2024, the DOE announced it awarded contracts to Centrus Energy Corp., Orano SA, General Matter Inc. and Louisiana Energy Services (a URENCO company) to provide enrichment services to develop HALEU to fuel small modular nuclear reactors. The contracts for enrichment are worth up to $2.7 billion over the next ten years. These programs also reflect efforts by the U.S. to advance energy security; Russia has been the only potential commercial source of HALEU.
Current report
The Trump administration has prioritized several initiatives including Executive Orders to increase domestic energy and critical minerals production and strengthen American leadership in Artificial Intelligence (“AI”). AI infrastructure has energy needs that are multiples of traditional data centers. In addition, the Trump administration has noted that it may implement tariffs on certain countries to strengthen border security and address trade deficits which may be beneficial for U.S. uranium producers that intend to supply U.S. utilities. Recently, U.S. Department of Energy Secretary Wright issued a secretarial order titled “Unleashing the Golden Era of American Energy
Current report
Dominance.” The order states, in part, “[t]he long-awaited American nuclear renaissance must launch during President Trump’s administration. As global energy demand continues to grow, America must lead the commercialization of affordable and abundant nuclear energy.” Also, in February 2025, the Trump administration, through an Executive Order, established the National Energy Dominance Council which has numerous goals including “bringing Small Modular Reactors online.”
Current report
Internationally, support for nuclear power continues to grow with strong support in Spain, Belgium and Switzerland to keep their reactors on-line. There is also a movement within Germany to restart shuttered reactors given the high cost of renewable energy. Many other countries which historically have not been home to nuclear power are considering or moving toward legalizing nuclear power with the goal of building conventional or small modular reactors.
Current report
Conversely, after beginning 2024 at $68 per pound, term market prices gradually increased throughout the year to end at $80.50 per pound U 3 O 8. Term prices thus far in 2025 have remained steady.
Current report
Since commencement of operations at Lost Creek in 2013 through December 31, 2024, we have captured more than 3.0 million pounds of U 3 O 8.
Current report
Ramp up continued at Lost Creek in 2024 with six header houses coming online. Most recently, Header House (HH) 2-12 came online in late January 2025 and HH 2-13 was brought online in late March 2025. The average production solution head grade in Q4 2024 was 66.2 mg/L. We captured approximately 81,771 pounds U 3 O 8 in Q4 2024, and a total of 265,746 pounds U 3 O 8 in 2024. We drummed 74,006 pounds U 3 O 8 in Q4 2024 and a total of 249,209 pounds U 3 O 8 in 2024. Pounds captured increased from 103,487 pounds in 2023 to 265,746 pounds in 2024.
Current report
In 2024, wellfield delineation and development continued in MU2, in what is referred to as Phase 2 within MU1 and, most recently, in MU5. All remaining planned production areas of MU2 are expected to come online during 2025 with HHs 2-12 and 2-13 online in Q1 and HHs 2-14 and 2-15 expected to begin operation in Q2 2025. HH 2-14 is onsite and set on its foundation, with construction underway (basement piping, pipeline, electrical connections, etc.). During the latter half of 2025, we anticipate bringing several header houses online in MU1 Phase 2 as we advance toward full plant capacity production. The first of those header houses (1-14 and 1-15) are awaiting delivery to Lost Creek, and 1-16 is being assembled in our Casper construction facility.
Current report
We completed the additional deep disposal well at Lost Creek in 2024 H1 and, following receipt of all regulatory approvals, began operations of the well in early Q4 2024. The deep well is operating as anticipated to complement the other wastewater disposal systems at Lost Creek.
Current report
Our drill contractors now have 21 drill rigs at Lost Creek, with the most recent addition mobilized in February 2025. We anticipate that this number is sufficient for Lost Creek drill programs in 2025, including our planned exploration program.
Current report
We anticipate the Wyoming Department of Environmental Quality (“WDEQ”), Land Quality Division (“LQD) will approve the LC East and KM horizon amendment during H1 2025. The amendment adds HJ and KM geological horizons within the area that is immediately adjacent to the existing permit and provides for an additional mine unit in the HJ geological horizon for the existing permitted area. Water Quality Division (“WQD”) continues to work with EPA toward the issuance of the required aquifer exemption for the expanded area. We anticipate that all approvals will be received on a timely basis for our current production plans.
Current report
As projected, during 2024, we sold 570,000 pounds U 3 O 8 of which 395,000 pounds U 3 O 8 were sold in Q4 2024. We received sales proceeds of $33.1 million for the 570,000 pounds U 3 O 8 sold.
Current report
To establish a strong product inventory, we purchased 300,000 pounds U 3 O 8 in Q4 2024 at an average cost of $80.61. Additionally, we secured an inventory loan facility under which we borrowed 250,000 pounds U 3 O 8 in December 2024. These transactions facilitated a timely delivery into our sales commitments in Q4 2024. We anticipate that having these pounds in inventory will allow us to cover any further delays in production ramp up and to make deliveries when there is simply a shortfall due to the timing of scheduled delivery dates in a given delivery year.
Current report
We have reached agreement to defer the anticipated 2025 delivery of 300,000 pounds U 3 O 8 into 2026 H1, after which our sales in 2025 are projected to be 440,000 pounds U 3 O 8 into our sales agreements.
Current report
Sales Agreements
Current report
In April 2024, we executed an additional sales agreement which calls for annual delivery commitments of up to 100,000 pounds U 3 O 8 in 2026 through 2029, a portion of which is based upon production milestones. Pricing is a combination of escalated fixed price, well above anticipated all-in costs of production, and a market-related pricing component that is subject to an escalated floor and ceiling. We have provided notice to the buyer of satisfaction of the milestones related to the 2026 and 2027 deliveries.
Current report
In November 2024, we completed an additional sales agreement which calls for deliveries of 100,000 pounds U 3 O 8 in each of 2029, 2032 and 2033, and a delivery of 150,000 pounds U 3 O 8 in 2030. Pricing is a combination of market related pricing subject to floor and ceiling parameters escalated annually, and a base escalated fixed price. Pricing is well above our anticipated all-in costs of production.
Current report
Based on our contract book and the state of the market generally, early in 2024, we announced a “go” decision to begin buildout of our Shirley Basin in situ recovery facility in Carbon County, Wyoming. Thereafter, we initiated several work programs for the year which complemented our initial purchasing plan for long lead-time equipment which began in 2023.
Current report
Installation of 125 monitor wells at Shirley Basin was completed in 2024 including the 98 wells required for the first mine unit at Shirley Basin (SBMU1). Hydrologic testing for the SBMU1 newly installed monitor wells yielded excellent results that are consistent with historic test results. Twenty-five other monitor wells were installed to enhance operational readiness, including seven injection and production pattern test wells. Installation of downhole pumps in the monitor wells will begin in H1 2025 allowing baseline sampling to be completed. Installation of SB MU1 production wells will begin in Q2 2025 utilizing approximately six drill rigs. Construction of SBMU1 wellfield infrastructure (e.g., pipelines, powerlines and field access roads) is expected to begin in Q2 2025. Fabrication of header houses in our Casper construction shop will commence mid-year as well.
Current report
Subsequent to year-end, we initiated production and injection testing of representative wells in Mine Unit 1 to facilitate better engineering of pumping and pipeline systems. The related analyses are ongoing. Tests to date indicate that flow rates are high. We expect flow rates will vary throughout the project but the production rates in the individual test pattern wells are within the range of 70 to 80 gpm. These rates are consistent with the high historic inflow of water into the underground workings at Shirley Basin in the early 1960s that drove innovation toward in situ mining at the project and resulted in the recovery of 1.5 million pounds of U 3 O 8 through ISR, before other mining methods were initiated.
Current report
The existing south access road to the site has been upgraded to an all-season road. Power supply to the satellite plant construction area has been completed and the line is energized. The septic system is installed. Construction of fifteen IX columns remains on target with delivery expected in Q3 2025. Our purchasing program for equipment and long-lead time items such as ion exchange resin continues, with an emphasis on continually reviewing and acting on purchases of long lead-time items such as electronic components. The local power company is upgrading and refurbishing the existing electrical substation with the goal of completing the upgrade in Q4 2025 prior to commencement of production operations. A backup trailer-mounted substation is available if the work is not timely completed.
Current report
Initial plans to construct new offices and shops were revised in favor of installing modular offices and utilizing existing buildings for shops. Renovations of existing site buildings which will be used for construction, maintenance and drill casing facilities are substantially complete. The office building layout has been approved the modular office space will be approximately 2,400 square feet. The building is anticipated to be delivered in Q3 2025. Additional modular office and facility buildings have been purchased and are on site at Shirley Basin.
Current report
Engineering related to the satellite plant, including the wastewater treatment system, is nearing completion and the selection process of construction contractors is well underway. We continue to expect construction at Shirley Basin to be complete in late 2025 with a pre-operation inspection by the State of Wyoming following soon after.
Current report
Drilling and wellfield development is scheduled to begin in Q2 2025, with an anticipated six drill rigs onsite for the 2025 program. Delineation and exploration drilling were completed historically, and initial detailed wellfield, pipeline and header house layouts have been finalized. Procurement of equipment and materials required for trunkline piping from the wellfield to the plant site has begun and staff are installing the necessary monitor well sampling equipment to support that next phase of work.
Current report
We have begun hiring Shirley Basin management and construction and development staff. Additional staff will be hired along a planned schedule throughout the year in order to allow time for task and safety training.
Current report
On July 29, 2024, the Company closed an underwritten public offering of 57,150,000 common shares at a price of $1.05 per common share. The Company also granted the underwriters a 30-day option to purchase up to 8,572,500 additional common shares on the same terms. The option was exercised in full. Including the exercised option, Ur-Energy issued a total of 65,722,500 common shares. The gross proceeds to Ur-Energy from this offering were approximately $69.0 million. After fees and expenses of $3.8 million, net proceeds to the Company were approximately $65.2 million.
Current report
Senior Management and Changes in Board Composition
Current report
In March 2024, we expanded our executive team with the appointment of Ryan Schierman as our Vice President Regulatory Affairs. Prior to joining Ur-Energy, Mr. Schierman held numerous positions in management, most recently at Fluor/Idaho Environmental Coalition, contractors to the U.S. Department of Energy, at the Idaho Cleanup Project. Mr. Schierman has also held several positions in the uranium recovery industry, gaining expertise in regulatory relations and compliance, licensing, and environmental health and safety. As the Wyoming Uranium Recovery Program Manager (2015-2020), Mr. Schierman was critical in assisting Wyoming to become the 38th US Nuclear Regulatory Commission Agreement State. Mr. Schierman earned a B.S. in Environmental Science from Brigham Young University, a M.Sc. in Health Physics from Idaho State University, and is a Certified Health Physicist.
Current report
In April 2024, we announced the appointment of John Paul Pressey and Elmer W. Dyke as new members of the Ur-Energy Board of Directors. And, following the Company’s Annual Meeting of Shareholders, June 6, 2024, founding Director James M. Franklin and Director, and former President and CEO, W. William Boberg both retired.
Current report
John Paul Pressey had a nearly three-decade long career in the assurance practice at PricewaterhouseCoopers LLP, with 16 years as a partner. With a Bachelor of Commerce degree from the University of Alberta, Mr. Pressey is a Chartered Professional Accountant with extensive experience working with U.S. and Canadian publicly traded companies in the mining industry, and other industries including manufacturing, utilities, and alternative energy. His experience includes acquisitions and capital markets transactions, working with clients to identify and implement practical business solutions to accounting, audit and financial issues. Mr. Pressey spent six years at PricewaterhouseCoopers as its Assurance Leader for British Columbia, overseeing all aspects of PricewaterhouseCoopers’s assurance results and operations for that Province.
Current report
Elmer Dyke has over 25 years’ experience in the commercial and government nuclear industry. Mr. Dyke has a Bachelor of Arts Degree in International Political Economy from Davidson College and served as a U.S. Army Officer for 13 years. Mr. Dyke’s professional career includes a tenure with the U.S. Department of State during which he directed international security programs, including nuclear nonproliferation and high technology projects and was detailed to the Departments of Defense and Commerce. Mr. Dyke has worked within global firms NAC International and Booz Allen Hamilton where he served as an expert on nuclear nonproliferation, strategy and
Current report
nuclear fuel cycle. More recently, Mr. Dyke filled senior executive roles at Centrus Energy Corporation, a global nuclear fuel supplier and technical services provider. At Centrus Energy and in prior executive roles, Mr. Dyke led strategic planning and business development, financial performance, and risk management for the businesses. Currently, Mr. Dyke leads New Horizons Nuclear Associates, LLC, a global nuclear consulting firm he formed in 2021.
Current report
U 3 O 8 Price per Pound Sold Calculation
Current report
U 3 O 8 Cost per Pound Sold Calculation
Current report
U 3 O 8 Product Sales
Current report
The following table provides information on our U 3 O 8 product sales.
Current report
The higher 2023 price was influenced by the sale of 100,000 pounds into the U.S. Department of Energy (“DOE”) uranium reserve program at $64.47 per pound sold. The lower 2024 price resulted from making a delivery of 300,000 pounds at $55.00 per pound into a sales contract that was executed in 2022 when the long-term price was between $43 and $52 per pound.
Showing the first 40 of 79 passages. Open the source sections for the rest.
Removed paragraphs (72)
Previous report
Several global factors continue to positively influence the uranium recovery market and the nuclear energy industries. Over the past several years, continued growth in the acceptance of nuclear energy, geopolitics, and production reductions, shortfalls and delays, have each contributed to a stronger uranium market with a more optimistic future. As each of these categories of influence continues to gain momentum and strength, the market has experienced significant impacts.
Previous report
For several years, we and others in our industry have noted the growing acceptance of the necessity of nuclear energy as it relates to concerns over climate change and the determination of nations and multi-national companies to reach decarbonization goals on increasingly aggressive timelines. Most recently, in December, 22 countries including the U.S., pledged at the UN climate summit, COP 28, to triple nuclear energy capacity by 2050. Even prior to this commitment, numerous announcements in 2023 of extended nuclear plant licenses and lifespans, and deferred retirements of reactors, supplemented planned future numbers of reactors with ongoing construction in many countries.
Previous report
Moreover, many nations, including the US, are considering increasing sanctions against Russia in 2024, related to what the Biden Administration most recently labeled Russia’s “aggression abroad and repression at home.” With this public condemnation of Russia’s conduct and the specter of additional sanctions, speculation is strong that the nuclear fuel buyers’ preference to non-Russian contracting will continue, including even a more broadly defined concept of what is considered Russian inventory.
Previous report
As uranium production operations have returned following the pandemic, and with the stronger market indicators in 2022 and 2023, the path forward has not been without challenges. Even for experienced and well financed operators, ramp-up and return to commercial level operations has been impeded by labor, equipment, technical, supply chain and other challenges and delays. Though Kazakh production regained its routine more quickly following the pandemic, it has encountered some of the most significant supply chain disruptions, unable to obtain sufficient sulfuric acid for its recovery processes. The several announcements by Kazatomprom, beginning in December 2023, of substantially reduced production targets (~20% below state-concession required levels) have sent shockwaves through the uranium markets.
Previous report
All the foregoing moved the market in 2023 and continue to do so in early 2024. With earlier increases in uranium market pricing in 2021-2022, spot pricing continued its measured move upward through much of 2023, with significant increases in pricing beginning in late August. After breaking through the $60/pound barrier (August 31) and then the $70/pound barrier in September, the market saw even more dramatic increases in pricing in December when reported spot prices exceeded $90/pound. Overall, this represented a 90% increase in spot price from the year-end 2022 price of $47.68. Increases in December were tied largely to the first Kazakh announcement of projected shortfalls in production.
Previous report
Year-end spot pricing of $91/pound was a milestone not experienced in more than 16 years. And the market movers were not done. Early 2024 has seen pricing jumps due to further production short-fall announcements, anticipated Russian sanctions and other influences. Passing $100 and increasing to as much as $107/pound during January, the spot market has retracted since, while remaining at $95/pound at February 29, 2024.
Previous report
Notably, term market prices increased nearly 40% between year-end 2022 pricing and the January 31, 2024, term price of $72/pound. Even the September milestone of $61/pound term price represented a decade-long high. The determination of utilities in the U.S. and abroad to fill mid-term supply requirements is projected to continue to push the term price. Advantageous to our Company, these contracts are projected to continue to have a distinct focus on secure future deliveries from North American production of proven producers.
Previous report
Ramp-up activities at Lost Creek in 2023 led to operation of the first two new header houses in Mine Unit 2 (MU2). Our Q4 production figures reflect the progress made in wellfield operations: in 2023, we captured approximately 103,487 pounds U 3 O 8, of which 68,448 pounds U 3 O 8 were captured in Q4. The average production grade in Q4 was 93.9 mg/l U 3 O 8.
Previous report
During 2023, we sold 280,000 pounds U 3 O 8 from existing inventory for $17.3 million. Our sales in 2024 are projected at 570,000 pounds U 3 O 8 into contracts that were put in place in 2022 when the long-term price was below $60 per pound.
Previous report
Since commencement of operations in 2013, we have captured approximately 2.838 million pounds of U 3 O 8 at Lost Creek through December 31, 2023. Following our reduction in production operations in 2020 Q3, we maintained controlled, reduced level production operations until the restart of commercial wellfield production in 2023 Q2.
Previous report
Wellfield construction and development continues in all areas of MU2. Subsequent to year-end, we completed all delineation drilling throughout the remaining eight planned production areas in MU2. We have 12 drill rigs onsite with plans to mobilize additional rigs in coming weeks. Production in HH 2-6 came online after year-end, with HH 2-7 anticipated to come online in early March 2024. Construction of HHs 2-8 and 2-9 is nearing completion in our Casper shop. All remaining planned production areas of MU2 are scheduled to be drilled and constructed during 2024. Additionally, we are planning delineation drilling and initial well installation in Phase 2 of Mine Unit 1 (MU1) when drilling is complete in MU2.
Previous report
While the record-setting winter of 2022-2023 is behind us, the ways in which it affected our hiring and restart of operations continue to be felt but are being overcome. More positively, conditions to date this winter have permitted construction and development activities to progress without significant hindrance or weather delay.
Previous report
We began the drilling and construction of an additional deep disposal well at Lost Creek in mid-2023, with the drilling phase completed in July. Preliminary completion and testing continued in 2023 Q4. When regulatory approvals were received, final completion work was initiated in early 2024 and is anticipated to be complete in 2024 Q1. When this work is complete, we will obtain remaining regulatory approvals followed by specification of surface injection equipment. In advance of operation of the deep well, procurement and installation of a powerline was completed enabling anticipated operation in 2024.
Previous report
We await approval by the Wyoming Department of Environmental Quality (“WDEQ”), Land Quality Division (“LQD”) of the amendment to the Lost Creek permit to mine adding HJ and KM horizons at LC East and HJ mine units at Lost Creek. LQD has confirmed that the public comment period has concluded, and the technical review is complete. We anticipate the LQD review will be complete in 2024 H1.
Previous report
In December 2022, we were awarded a contract to sell to the DOE NNSA uranium reserve 100,000 pounds of domestically produced U 3 O 8 at a sales price of $64.47 per pound. That delivery was made in January 2023 and sales proceeds of $6.4 million were received shortly thereafter. Including the DOE NNSA sale, we sold 280,000 pounds at an average price of $61.89 for revenues of $17.3 million in 2023.
Previous report
Beginning in 2022, we have secured several multi-year sales agreements with global nuclear purchasers. The initial agreement calls for the annual delivery of a base amount of 200,000 pounds of uranium concentrates over a six-year period beginning in the second half of 2023. Subsequently, we announced the amendment of this agreement to increase the annual delivery, starting in 2024, by 100,000 pounds U 3 O 8 at the same pricing levels. The sales agreement permits the purchaser the customary election to flex the delivery quantity up or down by as much as ten percent.
Previous report
We completed an additional sales agreement in 2022 Q4 which calls for annual deliveries of 300,000 pounds U 3 O 8 over a five-year period, beginning in 2024, together with the possibility of additional sales of up to 300,000 pounds U 3 O 8 in 2029. Sale prices under both agreements secured in 2022 are anticipated to be profitable on an all-in production cost basis and are escalated annually from initial pricing.
Previous report
We signed a third agreement in 2023, under which we will deliver 100,000 pounds U 3 O 8 in each of 2025, 2026 and 2027, also subject to an election by the purchaser to flex the annual delivery quantity up or down by as much as ten percent. This agreement is also anticipated to be profitable on an all-in production cost basis.
Previous report
Also in February, we signed our fifth U 3 O 8 sales agreement with delivery commitments for five years beginning in 2026, with an initial delivery of 50,000 pounds U 3 O 8 in 2026. In each of 2027- 2030, we will sell 200,000 pounds U 3 O 8 annually under this agreement. All sales will be made at fixed prices, escalated from the base agreed price.
Previous report
Based on our progress in securing further contracts, and the strengthening market, we are proceeding with additional tasks to advance Shirley Basin. This includes advancing procurement of long-lead items for the project, as well as other activities in the field. Although the Wyoming winter of 2023 did not permit us to proceed with the planned drilling at Shirley Basin, we now plan for a 2024 drill program to install the monitor well ring for the first mine unit. We anticipate these advance preparations will shorten the time for construction and ramp up when the “go” decision is made by our Board to proceed with construction.
Previous report
We currently estimate it will take approximately 24 months to complete all procurement, development activities and construction of the satellite facility and associated first mine unit to initiate production. This estimate is based on the long lead times we are seeing for critical equipment; especially for electrical equipment. The decision to proceed with construction of the satellite and first mine unit for production operations is being considered on an ongoing basis as the uranium market and our contract book evolve.
Previous report
Situated in an historic mining district, the project has existing access roads, power, waste disposal facility and shop buildings onsite. Delineation and exploration drilling were completed historically, and initial detailed wellfield, pipeline and header house layouts have been finalized. Additional minor on-the-ground preparations have been completed since the authorizations were received.
Previous report
The tailings facility at the Shirley Basin site is one of the few remaining facilities in the U.S. that is licensed by the NRC to receive and dispose of by-product waste material from other in situ uranium mines. We assumed operation of the byproduct disposal site in 2013 and continue to accept deliveries under several existing contracts.
Previous report
Research and Development
Previous report
As priorities at Lost Creek allow, we will continue to pursue several research and development projects with an objective to introduce new methods of cost-effective technology to our Lost Creek Project, and to Shirley Basin when it is constructed. Our R&D projects are at varying stages of development and include a new material for injection wells and related well installation process, for which we converted our provisional patent application with the U.S. Patent Office to a non-provisional patent application in 2023. Following receipt of WDEQ authorization to proceed with field testing the materials and engineering, Phase One field testing was successfully completed in 2022. Phase Two testing of our new injection well material and well installation technology will continue in 2024.
Previous report
Although the technology will not be used for production wells, if the technology is proven out, it will be used for injection wells which generally represent approximately 65% of the wells throughout wellfields designed with traditional “five-spot” recovery patterns. The proposed method utilizes lower-cost materials which are generally available, even during current supply chain challenges. Field tests demonstrated a reduction in drill rig time on injection wells of approximately 75% compared with conventional methods, which also reduces environmental impacts. It is anticipated that the cost savings from reduced drill rig time will be partially offset by the need for additional in-house labor. Based on testing to date, it is anticipated that as much as a 49% savings on well installation costs may be realized for injection wells.
Previous report
We also continue with work on an advanced water treatment system. Beyond water recycling gains already achieved with our industry-leading Class V circuit, the new system may allow an additional 90% reduction of disposed water as well as providing filtration of incoming production solutions to optimize uranium capture. Detailed engineering design and construction plans are anticipated to be completed in 2024 along with ordering/procurement of all components. Field construction will occur as appropriate based on engineering and delivery of materials.
Previous report
On February 21, 2023, we announced the closing of an underwritten public offering of 39,100,000 common shares and accompanying warrants to purchase up to 19,550,000 common shares, which includes the full exercise of the underwriters’ option to purchase up to 5,100,000 additional common shares and accompanying warrants to purchase up to 2,550,000 common shares, at a combined public offering price of $1.18 per common share and accompanying warrant. The warrants have an exercise price of $1.50 per whole common share and will expire three years from the date of issuance. The gross proceeds to the Company from the offering were approximately $46.1 million, before deducting the underwriting discounts and commissions and other estimated offering expenses payable by Ur-Energy.
Previous report
Casper Operations Headquarters
Previous report
Our new multipurpose central services facility in Casper was completed mid-2023. We now have a fully staffed Casper construction team hard at work constructing, wiring and automating the next header houses for installation at Lost Creek. Most recently, HH 2-7 has been delivered to Lost Creek, and construction of HHs 2-8 and 2-9 is nearly complete. Additionally, our chemistry laboratory is fully commissioned and staffed.
Previous report
Already we are realizing the benefits from our plan for this centralized construction facility to provide numerous safety, environmental and financial advantages to our Lost Creek operation, including a reduction of commuting vehicles and related emissions. This facility will allow us to conduct these functions for Shirley Basin when it becomes our second production site. Fewer miles traveled by our staff and fewer vehicles on the road equates to a significantly lower risk of accident or injury, a smaller carbon footprint for Lost Creek, and considerably lower vehicle and labor costs.
Previous report
U 3 O 8 Price per Pound Sold Reconciliation
Previous report
U 3 O 8 Cost per Pound Sold Reconciliation
Previous report
U 3 O 8 Sales
Previous report
The following table provides information on our U 3 O 8 sales during 2023. There were no spot sales in 2023 and there were no comparable U 3 O 8 sales in 2022.
Previous report
During 2022, we submitted a bid to the U.S. DOE uranium reserve program. In December 2022, we were notified by the DOE that our bid was accepted, and 100,000 pounds U 3 O 8 were delivered to the DOE in 2023 Q1 at an average price per pound sold of $64.47. The delivery included both produced and previously purchased pounds.
Previous report
In 2023 Q3 and 2023 Q4, we delivered a total of 180,000 produced pounds U 3 O 8 into term contracts at a combined average price of $60.45.
Previous report
We sold a total of 280,000 pounds U 3 O 8 in 2023 at an average price per pound sold of $61.89.
Previous report
The following table provides information on our U 3 O 8 cost of sales during 2023. There was no comparable U 3 O 8 cost of sales in 2022.
Previous report
In 2023 Q3 and 2023 Q4, a total of 180,000 produced pounds U 3 O 8 were sold into term contracts. The average cost per produced pound sold was $28.04.
Showing the first 40 of 72 passages. Open the source sections for the rest.
Reworded paragraphs (44)
Previous wording
While the initial invasion of Ukraine in early 2022 focused nuclear and other energy buyers on the risk attendant to dependence on Russian supplies, continuing Russian conduct has only strengthened the resolve of fuel purchasers to reduce that dependence. It has been reported that, throughout 2023, both U.S. and non-U.S. utilities increasingly sought non-Russian supplies when negotiating uranium term sales agreements. This change of supply priority reflects the concern over current and possible future sanctions but also the prospect that Russia of its own volition will refuse to export committed nuclear fuels to the U.S. In either circumstance, the utilities are at significant risk as the West has limited capacity to backfill such supply disruption, regardless of cause.
Current wording
Recognition of the critical role nuclear energy plays in providing baseload power for decarbonization has been complemented more recently as energy security has become a universal priority. Energy security includes not only the heightened concern over Russian supply, but other areas of geopolitical unrest. Throughout 2024, both U.S. and non-U.S. utilities increasingly sought non-Russian supplies when negotiating uranium term sales agreements. This change of supply priority reflects the concern over existing and possible additional sanctions as well as the prospect that Russia of its own volition will refuse to export committed nuclear fuels to the U.S. In either circumstance, the utilities remain at significant risk as the West has limited capacity to backfill such supply disruption, regardless of cause.
Previous wording
Recognition of the critical role nuclear energy plays in providing baseload power for decarbonization has been complemented more recently as energy security has become a universal priority. Energy security includes not only the heightened concern over Russian supply, but other areas of geopolitical unrest. The coup d’état in Niger in mid-2023, for example, threatens the security and stability of 25% of European uranium supply. The true scope and possible long-standing impact of China in the nuclear market remains undefined.
Current wording
The effects of geopolitical tensions beyond Russia will continue to have a role in the nuclear fuel cycle industries. The true scope and possible long-standing impact of China in the nuclear market remains undefined.
Previous wording
U 3 O 8 Cost of Sales
Current wording
The volatility in the spot market continued throughout 2024. Following earlier increases in uranium market pricing in 2022 and 2023, pricing throughout 2024 retracted. After passing the $100 per pound U 3 O 8 milestone in early 2024, the spot price gradually declined throughout the year to end in the low $70s. In early 2025, spot pricing further retracted to the mid-$60s.
Previous wording
As previously disclosed, the restart at Lost Creek has encountered challenges. Commissioning new production areas and recommissioning plant operations, not unexpectedly, come with unique start-up issues. The recovery of U 3 O 8 in MU2 and the restart of plant operations have been no exception. As the plant was being recommissioned, we encountered equipment issues that temporarily reduced plant throughput. The equipment issues have been or are being addressed, and plant operations are returning to anticipated production rates.
Current wording
The restart at Lost Creek has encountered challenges. Commissioning new production areas and recommissioning plant operations, not unexpectedly, come with unique start-up issues. The recovery of U 3 O 8 in MU2 and the restart of plant operations have been no exception. As the plant was being recommissioned, we encountered equipment issues that temporarily stalled plant throughput.
Previous wording
During 2023, we encountered staffing issues with our initial hiring campaign, including lower than preferred retention rates, which affected our ability to thoroughly train our teams. Most recently, staffing of Lost Creek’s current 65+ onsite positions is complete, and we are experiencing greater retention, which fosters more thorough training. We are seeing steady improvement in production activities as our growing core staff have more time on the job. The Wyoming labor market has similarly affected our contractors. Certain labor and contractor/vendor challenges may continue.
Current wording
During 2024, we continued to encounter staffing issues, including lower than preferred retention rates, which affected our ability to thoroughly train our teams. Lost Creek’s staff of approximately 75 onsite and six staff members in Casper, is largely complete, and, more recently, we are experiencing stronger retention, which facilitates more thorough training. As our growing core staff have more time on the job, we are seeing steady improvement in production activities.
Previous wording
For our expanding production, we continue to benefit from our advance ordering and recycling of equipment at Lost Creek while supply chain disruption continues to be a global industry issue. All construction materials have been ordered or received for all planned operations in MU2. Parts and materials are always in various stages of delivery depending on availability. We will continue to supplement purchases with recycled materials as necessary. Key equipment has also been ordered for long-lead items required in 2025 based on vendor projected delivery times. We will continue to order equipment and materials well in advance and remain aware of fluctuating lead times for critical items.
Current wording
We continue to benefit from our advance ordering and recycling of equipment at Lost Creek while supply chain issues continue. All construction materials are ordered for planned operations months in advance. Parts and materials are always in various stages of delivery depending on availability. We will continue to supplement purchases with recycled materials as necessary.
Previous wording
Our request for extension of our Lost Creek source material license was submitted in 2021. The license renewal is in timely review and is proceeding through the technical review with URP.
Current wording
Our request for extension of our Lost Creek source material license was submitted in 2021. The license renewal is in timely review and continues to proceed through the technical review with URP.
Previous wording
Sales of U 3 O 8 and Sales Agreements
Current wording
2024 Purchases and Sales of U 3 O 8 and Sales Projections for 2025
Previous wording
Most recently, we signed two additional agreements, bringing to five the total number of U 3 O 8 sales agreements we have secured with leading nuclear fuel companies. The fourth term sales agreement was signed in February 2024 for annual delivery of between 100,000 and 350,000 pounds U 3 O 8 over a five-year period beginning in 2026. The agreement includes the opportunity for the purchaser to add up to three additional annual deliveries of 300,000 pounds U 3 O 8 beginning in 2031. The pricing for the sales under this agreement is a combination of an escalated fixed price, which is well above the anticipated all-in costs of production, and market related pricing that is subject to an escalated floor and ceiling. The purchaser has the option of a small flex to the annual delivery.
Current wording
Beginning in 2022, we have secured seven multi-year sales agreements with global nuclear purchasers. Of these, we completed three new agreements in 2024, including a sales agreement signed in February 2024 for annual delivery of between 100,000 and 350,000 pounds U 3 O 8 over a five-year period beginning in 2026. The agreement includes the opportunity for the purchaser to add up to three additional annual deliveries of 300,000 pounds U 3 O 8 beginning in 2031. The pricing for the sales under this agreement is a combination of an escalated fixed price, which is well above the anticipated all-in costs of production, and market related pricing that is subject to an escalated floor and ceiling. The purchaser has the option of a small flex to the annual delivery.
Previous wording
As of December 31, 2023, we had multiple off take sales agreements with various global nuclear purchasers. These agreements were completed in 2022 and 2023 and, together with the additional February 2024 agreements, now provide for deliveries between 2024 and 2030 as follows:
Current wording
We have seven off take sales agreements with various global nuclear purchasers which provide for deliveries between 2025 and 2033 as follows:
Previous wording
On February 29, 2024, we provided notice to Sweetwater County, the State Treasurer and the Trustee of our intention to prepay all remaining amounts on the State Bond Loan on April 1, 2024.
Current wording
On February 29, 2024, we provided notice to Sweetwater County, Wyoming, the Wyoming State Treasurer and the Trustee of our intention to prepay all remaining amounts on the State Bond Loan on April 1, 2024. We completed the pre-payment of the remaining $4.4 million on our State Bond Loan on March 27, 2024.
Previous wording
The following tables include measures specific to U 3 O 8 sales, cost of sales, gross profit, pounds sold, price per pound sold, cost per pound sold, and gross profit per pound sold. These measures do not have standardized meanings within US GAAP or a defined basis of calculation. These measures are used by management to assess business performance and determine production and pricing strategies. They may also be used by certain investors to evaluate performance. The following two tables provide a reconciliation of U 3 O 8 price per pound sold and U 3 O 8 cost per pound sold to the consolidated financial statements.
Current wording
The following tables include measures specific to U 3 O 8 sales, product cost, product profit, pounds sold, price per pound sold, cost per pound sold, and product profit per pound sold. These measures do not have standardized meanings within US GAAP or a defined basis of calculation. These measures are used by management to assess business performance and determine production and pricing strategies. They may also be used by certain investors to evaluate performance. The following two tables provide a reconciliation of U 3 O 8 price per pound sold and U 3 O 8 cost per pound sold to the consolidated financial statements.
Previous wording
Sales per financial statements includes U 3 O 8 sales and disposal fees. Disposal fees received at Pathfinder’s Shirley Basin property do not relate to the sale of U 3 O 8 and are excluded from the U 3 O 8 sales and U 3 O 8 price per pound measures.
Current wording
Sales per financial statements includes U 3 O 8 sales and disposal fees. Disposal fees received at Pathfinder’s Shirley Basin facility do not relate to the sale of U 3 O 8 and are excluded from the U 3 O 8 sales and U 3 O 8 price per pound sold measures.
Previous wording
As previously disclosed, the Company made the decision to ramp up operations after securing new term contracts in 2022 with initial deliveries beginning in 2023.
Current wording
The Company made the decision to ramp up operations after securing new term contracts in 2022 with initial deliveries beginning in 2023. In 2023, we delivered 280,000 produced pounds into term contracts at an average price per pound sold of $61.89. In 2024, we delivered 570,000 pounds at an average price per pound sold of $58.15.
Previous wording
In 2023 Q1, the 100,000 pounds U 3 O 8 sold to the DOE consisted of 43,259 produced pounds and 56,741 purchased pounds. During 2022, we purchased 40,000 pounds U 3 O 8 at $49.50 per pound, which increased the average cost per pound purchased to $42.56. The average cost per produced pound sold in Q1 was $28.06, and together with the purchased pounds, the average cost per pound sold was $36.29.
Current wording
The 2023 sales consisted of 223,259 produced pounds and 56,741 non-produced pounds. The average cost per produced pound sold in 2023 was $28.04. The pounds had been produced years earlier at a lower average cost per pound when the mine was operating at higher, pre-ramp up, production levels. The previously produced pounds were carried in inventory until sold in 2023. During 2022, we purchased 40,000 pounds at $49.50 per pound, which increased the average cost per non-produced pound to $42.56 when we sold the pounds in 2023.
Previous wording
The following table provides information on our production and ending inventory of U 3 O 8 pounds during 2023.
Current wording
The following table provides information on our production and ending inventory of U 3 O 8 pounds.
Previous wording
Wellfield production at Lost Creek resumed in 2023 Q2 and 4,392 pounds were captured during the quarter. Pounds captured increased to 30,491 pounds in 2023 Q3 and increased again to 68,448 pounds in 2023 Q4 as mining activities accelerated. Wellfield production totaled 103,487 pounds for the year, including a nominal number of pounds from 2023 Q1 recovered prior to the restart of operations.
Current wording
Wellfield production at Lost Creek resumed in 2023 Q2 and 103,487 pounds were captured during the year. Pounds captured increased to 265,746 pounds in 2024 as mining activities accelerated.
Previous wording
There were no shipments in 2023. The first shipment of U 3 O 8 since the return to commercial operations was completed on February 27, 2024 when 35,445 pounds U 3 O 8 were delivered to the conversion facility.
Current wording
There were no shipments in 2023. The first shipment was completed on February 27, 2024 when 35,445 pounds were delivered to the conversion facility. Pounds shipped increased to 239,849 pounds in 2024.
Previous wording
Because production rates were low during the initial ramp up period, the cost per pound to produce inventory exceeded its NRV. The ending plant inventory value was therefore written down to its NRV, which was approximately $60.28 per pound at year-end. We expect in-process and plant inventory NRV adjustments to decrease and ultimately stop as plant production increases and the related production costs per pound decrease. The cost per produced pound at the conversion facility did not change during the year because there were no shipments to the conversion facility.
Current wording
Because production rates were low during the initial ramp up period, the cost per pound to produce inventory exceeded its NRV. The NRV adjustments to produced inventory decreased from $10.7 million in 2023 to $3.5 million in 2024. Total NRV adjustments in 2024, including $2.5 million of non-produced inventory NRV adjustments, were $6.0 million.
Previous wording
Year Ended December 31, 2023, Compared to Year Ended December 31, 2022
Current wording
Year Ended December 31, 2024, Compared to Year Ended December31, 2023
Previous wording
(expressed in thousands of U.S. dollars)
Current wording
(expressed in thousands of U.S. dollars, except per share and non-GAAP per pound data)
Previous wording
Including NRV cost of sales adjustments, cost of sales was $19.4 million and $6.9 million for the years ended December 31, 2023, and 2022, respectively. Excluding NRV adjustments, cost of sales was $8.7 million and nil for the years ended December 31, 2023, and 2022, respectively. All sales in 2023 were from existing conversion facility inventories that the Company had in place at the end of 2022. We sold 223,259 produced pounds U 3 O 8 with a cost per pound sold of $28.04 and 56,741 purchased pounds at a cost per pound sold of $42.56, which resulted in a total U 3 O 8 cost of sales of $8.7 million in 2023.
Current wording
Cost of sales was $42.7 million and $19.4 million for the years ended December 31, 2024, and 2023, respectively. Excluding NRV adjustments, U 3 O 8 product costs were $36.7 million and $8.7 million for the years ended December 31, 2024, and 2023, respectively. In 2024, we sold 270,000 produced pounds with a cost per pound sold of $51.53 and 300,000 non-produced pounds at a cost per pound sold of $75.87, which resulted in total U 3 O 8 product costs of $36.7 million or $64.34 per pound. All sales in 2023 were from pre-existing conversion facility inventories that the Company had in place at the end of 2022. In 2023, we sold 223,259 produced pounds with a cost per pound sold of $28.04 and 56,741 non-produced pounds at a cost per pound sold of $42.56, which resulted in total U 3 O 8 product costs of $8.7 million or $30.99 per pound.
Previous wording
Cost of sales in 2023 included $10.7 million of NRV adjustments. In 2022, cost of sales included only NRV adjustments as we had no U 3 O 8 sales in 2022. Because of low production rates, inventory valuations, which include production costs, exceeded the inventory’s NRV. As a result, the inventory valuations were reduced to the inventory’s NRV, effectively expensing the production costs to cost of sales during those years. As plant production increases in 2024, we expect the NRV adjustments to decrease and ultimately stop.
Current wording
Cost of sales in 2024 and 2023 included $6.0 million and $10.7 million of NRV adjustments, respectively. Because of low production rates, inventory valuations, which include production costs, exceeded the produced inventory’s NRV. As a result, produced inventory values were reduced to the inventory’s NRV, effectively expensing $3.5 million and $10.7 million of production costs to cost of sales in 2024 and 2023, respectively. The $7.2 million decrease in produced inventory NRV adjustments from 2023 to 2024 was attributable to increased production for the respective periods. As plant production increases in 2025, we expect the produced inventory NRV adjustments to continue to decrease and ultimately stop. In addition, we purchased 300,000 pounds of U 3 O 8 in 2024, of which 50,000 pounds were sold in 2024 Q4. Because of decreases in uranium prices, we recognized $2.5 million in non-produced inventory valuation adjustments, which are included in the 2024 $6.0 million total NRV adjustments.
Previous wording
Total operating costs increased $16.2 million in 2023. The increase was primarily due to development costs, which increased $15.7 million due to ramp up activities at Lost Creek.
Current wording
Total operating costs increased $25.0 million in 2024. The increase was primarily due to development costs, which increased $21.1 million due to ramp up activities at Lost Creek and initial pre-mining development activity at Shirley Basin.
Previous wording
Exploration and evaluation expense consists of labor and the associated costs of the exploration, evaluation, and regulatory departments, as well as land holding and exploration costs on properties that have not reached the development or operations stage. The $0.3 million increase in 2023 was primarily due to higher labor costs.
Current wording
Exploration and evaluation expense consists of labor and the associated costs of the exploration, evaluation, and regulatory departments, as well as land holding and exploration costs on properties that have not reached the development or operations stage. The $1.7 million increase in 2024 was primarily due to additional staffing and outside service costs.
Previous wording
General and administration expenses relate to the administration, finance, investor relations, land, and legal functions, and consist principally of personnel, facility, and support costs. The $0.1 million increase in 2023 was primarily related to higher labor costs that were partially offset by lower non-cash costs.
Current wording
General and administration expenses relate to the administration, finance, investor relations, land, and legal functions, and consist principally of personnel, facility, and support costs. The $1.9 million increase in 2024 was primarily related to higher labor costs, stock based compensation costs, and professional fees.
Previous wording
Net interest increased from interest expense of $0.5 million in 2022 to interest income of $1.5 million in 2023, reflecting higher interest income received on our bank accounts and lower interest expense following the resumption of principal payments on the Company’s state bond loan. The higher interest income was driven by a combination of higher interest rates and higher cash balances.
Current wording
Net interest income increased from $1.5 million in 2023 to $3.3 million in 2024, reflecting higher interest income received on our cash and cash equivalent accounts and lower interest expense following the payoff of the Company’s state bond loan in April 2024. The higher interest income was driven by a combination of higher interest rates and higher cash balances.
Previous wording
For the year ended December 31, 2023, the warrant liability increased significantly due to new warrants issued in February 2023 and changes in the factors associated with the related Black-Scholes calculations used to determine the warrant liability. The warrant liability revaluation resulted in a loss of $1.6 million as compared to a gain of $1.8 million in 2022.
Current wording
Mark-to-market adjustments include revaluations of the Company’s warrant liability and uranium inventory loan. As a part of the February 2021 and February 2023 underwritten public offerings, we issued warrants that were priced in U.S. dollars. For the year ended December 31, 2024, the warrant liability decreased significantly due to the exercise of 2021 warrants and changes in the factors used in the Black-Scholes calculations of the warrant liability, including decreases in the Company’s stock price and changes in exchange rates. The 2024 warrant liability revaluation resulted in a gain of $5.3 million as compared to a loss of $1.6 million in 2023. During 2024, the Company entered into a uranium inventory loan agreement and borrowed 250,000 pounds. The loan valuation, which is based on average spot uranium prices, decreased $1.1 million in 2024, resulting in a gain.
Previous wording
The basic and diluted loss per common share was $0.12 and $0.08 for the years ended December 31, 2023, and 2022, respectively. The diluted loss per common share is equal to the basic loss per common share due to the anti-dilutive effect of all convertible securities in periods of loss.
Current wording
The basic and diluted loss per common share was $0.17 and $0.12 for the years ended December 31, 2024, and 2023, respectively. The diluted loss per common share is equal to the basic loss per common share due to the anti-dilutive effect of all convertible securities in periods of loss.
Previous wording
Investing activities used $2.0 million of cash in 2023. We spent $0.8 million to complete the construction of our new Casper, Wyoming shop and lab building, $0.8 million on plant related equipment at Lost Creek, and $0.4 million on IT and other equipment.
Current wording
Investing activities used $9.0 million of cash in 2024. We spent $3.6 million on operating equipment at Lost Creek, and $5.4 million on construction and other equipment at Shirley Basin.
Previous wording
On October 23, 2013, we closed a $34.0 million Sweetwater County, State of Wyoming, Taxable Industrial Development Revenue Bond financing program loan (“State Bond Loan”). The State Bond Loan calls for payments of interest at a fixed rate of 5.75% per annum on a quarterly basis, which commenced January 1, 2014. The principal was to be payable in 28 quarterly installments, which commenced January 1, 2015. The State Bond Loan is secured by all the assets of the Lost Creek Project. As of December 31, 2023, the balance of the State Bond Loan was $5.7 million.
Current wording
On October 23, 2013, we closed a $34.0 million Sweetwater County, State of Wyoming, Taxable Industrial Development Revenue Bond financing program loan (“State Bond Loan”). The State Bond Loan called for payments of interest at a fixed rate of 5.75% per annum on a quarterly basis, which commenced January 1, 2014. The principal was to be payable in 28 quarterly installments, which commenced January 1, 2015. The State Bond Loan was secured by all the assets of the Lost Creek Project.
Previous wording
On February 29, 2024, we provided notice to Sweetwater County, the State Treasurer and the Trustee of our intention to prepay all remaining amounts on the State Bond Loan on April 1, 2024.
Current wording
On February 29, 2024, we provided notice to Sweetwater County, the State Treasurer and the Trustee of our intention to prepay all remaining amounts on the State Bond Loan on April 1, 2024. The payment was made March 27, 2024, after which the loan was paid in full.
Previous wording
On May 29, 2020, we entered into an At Market Issuance Sales Agreement (the “Sales Agreement”) with B. Riley Securities, Inc. (“B. Riley Securities”), relating to our common shares. On June 7, 2021, we amended and restated the Sales Agreement to include Cantor Fitzgerald & Co. (“Cantor,” and together with B. Riley Securities, the “Agents”) as a co-agent. Under the Sales Agreement, as amended, we may, from time to time, issue and sell common shares at market prices on the NYSE American or other U.S. market through the agents for aggregate sales proceeds of up to $50 million. The Sales Agreement was originally filed in conjunction with a universal shelf registration statement on Form S-3 which had become effective May 27, 2020, and has now expired.
Current wording
On May 29, 2020, we entered into an At Market Issuance Sales Agreement (the “Sales Agreement”) with B. Riley Securities, Inc. (“B. Riley Securities”), relating to our common shares. On June 7, 2021, we amended and restated the Sales Agreement to include Cantor Fitzgerald & Co. (“Cantor,” and together with B. Riley Securities, the “Agents”) as a co-agent. Under the Sales Agreement, as amended, we may, from time to time, issue and sell common shares at market prices on the NYSE American or other U.S. market through the agents for aggregate sales proceeds of up to $50 million. The Sales Agreement was originally filed in conjunction with a then-active universal shelf registration statement on Form S-3.
Previous wording
On December 17, 2021, we entered into an amendment to the Sales Agreement with the Agents to, among other things, reflect the new registration statement under which we may sell up to $50 million from time to time through or to the Agents under the amended Sales Agreement, in addition to amounts previously sold under the Sales Agreement. In February 2023, in conjunction with our underwritten public offering, we filed a prospectus supplement by which we decreased the amount of common stock offered pursuant to the Amended Sales Agreement.
Current wording
On December 17, 2021, we entered into an amendment to the Sales Agreement with the Agents to, among other things, reflect the registration statement on file at the time. In February 2023, in conjunction with our underwritten public offering, we filed a prospectus supplement by which we decreased the amount of common stock offered pursuant to the Amended Sales Agreement.
Previous wording
On July 19, 2023, we entered into a further amendment to the Amended Sales Agreement (“Amendment No. 2” and hereafter the “Amended Sales Agreement”) with the Agents to, among other things, reflect the new registration statement under which we may sell up to $50 million from time to time through or to the Agents under the Amended Sales Agreement, in addition to amounts previously sold under the Sales Agreement.
Current wording
On July 19, 2023, we entered into a further amendment to the Amended Sales Agreement (“Amendment No. 2” and hereafter the “Amended Sales Agreement”) with the Agents to, among other things, reflect the new registration statement under which we may sell up to $50 million from time to time through or to the Agents under the Amended Sales Agreement, in addition to amounts previously sold under the Sales Agreement. Subsequently, we filed a new prospectus supplement in June 2024 under which we may sell up to $100 million from time to time through or to the Agents under the Amended Sales Agreement, including the common shares previously sold under the Sales Agreement.
Previous wording
In 2023, we utilized the Sales Agreement and Amended Sales Agreement for net proceeds of $6.8 million from sales of 4,425,809 common shares.
Current wording
In 2024, we utilized the Amended Sales Agreement for gross proceeds of $28.6 million from sales of 16,939,825 common shares.
Previous wording
As of February 29, 2024, our unrestricted cash position was $66.2 million.
Current wording
As of April 9, 2025, our unrestricted cash position was $71.8 million.
Previous wording
During 2022, we put in place new, multi-year, sales contracts and realized revenues of $17.3 million from the sale of 280,000 pounds of uranium in 2023. We had 43,790 pounds of conversion facility inventory on December 31, 2023. Deliveries into term contracts in 2024 are expected to be made from existing conversion facility inventory and new production from Lost Creek. Subsequent to December 31, 2023, 16,361,500 warrants were exercised for 8,180,750 whole common shares at an average exercise price of $1.35 per share. The Company received proceeds of $11.0 million from the exercises.
Current wording
We have seven multi-year sales contracts in place and realized revenues of $33.1 million from the sale of 570,000 pounds of U 3 O 8 in 2024. We expect to realize revenues of $27.1 million from the sale of 440,000 pounds of uranium in 2025. As of April 9, 2025, we had 368,540 pounds of conversion facility inventory having made three shipments totaling 106,301 pounds to the conversion facility through March 2025. Deliveries into term contracts in 2025 are expected to be made from our existing conversion facility inventory and new production from Lost Creek.
Previous wording
We are pleased to be one of the few publicly traded companies that is commercially recovering uranium and expanding our production capacity to sell into an expanding market. As discussed, stronger prices have already enabled us to secure multi-year sales agreements with leading nuclear companies. We are securing pricing which includes a market-related calculation on recent awards and contracts. We now have five agreements that call for combined annual delivery of a base amount of 550,000 to 1,100,000 pounds of U 3 O 8 over a six-year period, beginning in 2025. Our sales under these agreements began in 2023 and call for an additional 570,000 pounds of U 3 O 8 to be delivered in 2024. Sales prices are anticipated to be profitable on an all-in production cost basis and escalate annually from initial pricing.
Current wording
As discussed, we have secured multi-year sales agreements with leading nuclear companies, including several which include market-related pricing components. We now have seven agreements that call for combined annual delivery of a base amount of 440,000 to 1,300,000 pounds of U 3 O 8 from 2025 through 2030, with additional deliveries of 100,000 called for in 2032 and 2033. Sales prices are anticipated to be profitable on an all-in production cost basis and escalate annually from initial pricing.
Previous wording
Our cash position as of February 29, 2024 was $66.2 million. We look forward to delivering existing and future Lost Creek production inventory into our sales contracts.
Current wording
Our cash position as of April 9, 2025, was $71.8 million.
Showing the first 40 of 44 pairs. Open the source sections for the rest.
Rearranged current paragraphs (1)
Current report — wording carried from elsewhere
Cost of sales per the financial statements includes U 3 O 8 costs of sales and lower of cost or NRV adjustments and consists of the following:
Rearranged previous paragraphs (3)
Previous report — wording carried elsewhere
The following table provides information on our production and ending inventory of U 3 O 8 pounds for the past three years.
Previous report — wording carried elsewhere
On November 23, 2021, we filed a new universal shelf registration statement on Form S-3 with the SEC through which we may offer and sell, from time to time, in one or more offerings, at prices and terms to be determined, up to $100 million of our common shares, warrants to purchase our common shares, our senior and subordinated debt securities, and rights to purchase our common shares and/or senior and subordinated debt securities. The registration statement became effective December 17, 2021, for a three-year period.
Previous report — wording carried elsewhere
(expressed in thousands of U.S. dollars)