TMC the metals Co Inc.
For the period ended Dec 31, 2024. Filed Mar 27, 2025.
View on SEC.govAbout this filing
A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.
FY2024 · Filed Mar 27, 2025
What changed in Risk Factors?
Read the current filingPrevious report: 10-K
Period ended 2023-12-31; filed 2024-03-25.
0001104659-24-038505
Item 1A. Risk FactorsCurrent report: 10-K
Period ended 2024-12-31; filed 2025-03-27.
0001410578-25-000516
Item 1A. Risk FactorsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 191 previous paragraphs and 204 current paragraphs.
136 unchanged; 53 reworded; 9 added; 2 removed; 0 previous and 6 current paragraphs rearranged.
Tables are not compared: 63 previous and 54 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (9)
Current report
We currently hold exclusive exploration rights through our subsidiaries NORI and TOML to two polymetallic nodule areas in the CCZ. The exploration contracts for each of these areas require us to conduct certain activities in accordance with approved plans of work. The suspension or termination of our exploration contract for the NORI area would, and any of our other exploration contracts could, have a material and adverse effect on our future business prospects and financial condition.
Current report
In 2024, the LTC of the ISA established a new process to identify contractors who may be at risk of non-compliance with obligations under their respective exploration contract. In August 2024, as a result of this new process, the ISA sent notifications of such potential risk of non-compliance to TOML. The LTC’s notification to TOML cited concerns, which relate mainly to the failure to conduct planned sampling campaigns, the need to submit digital data in the revised reporting templates, delays in surveys for environmental baseline development, and the delay in submission of its scoping report. TOML responded by the November 30, 2024 deadline and is positioned to take corrective action if necessary. If the LTC deems TOML’s response incomplete or does not effectively address the LTC’s concerns, the LTC, in line with its established process, may report TOML to the ISA Council for further consideration and action. If TOML is deemed to have not remedied all issues raised by the LTC and the ISA then determines that TOML is not in compliance with its obligations under its exploration contract, the ISA could impose monetary sanctions on TOML, suspend some or all rights under the exploration contract, which could include halting exploration activities, or terminate TOML’s exploration contract, any of which could have a material and adverse effect on our future business prospects and financial condition.
Current report
Our efforts to explore a regulatory pathway for deep-sea nodule production under the U.S. Deep Seabed Hard Mineral Resources Act may subject us to conflicting regulatory requirements and other operational risks.
Current report
We recently announced a plan to consider a U.S.-based regulatory pathway with NOAA and the U.S. Department of Commerce under the DSHMRA for the exploration and commercial recovery of deep-sea polymetallic nodules in the CCZ. Pursuing this pathway will likely introduce new uncertainties into our business, such as differing and potentially contradictory environmental, permitting and legal requirements, which could negatively impact our expected timelines, costs, ability to secure commercialization rights and operating results. In addition, reliance on a U.S.-based regulatory regime will require support from U.S. policy makers, which support can change over time, depending on a variety of factors.
Current report
Although we believe the U.S.-based regulatory pathway potentially offers a clear and predictable route to securing an exploration license and a commercial recovery permit for polymetallic nodules found in the CCZ, we are in the initial planning stages of this strategy and there are no assurances that we will be able to secure any exploration license and a commercial recovery permit under the DSHMRA in a timely manner, or at all, or that our ability to secure any such rights will be on economically viable terms. To date, NOAA has not granted any commercialization rights to seafloor nodule production. In addition, although we do not believe there are any provisions under UNCLOS or other ISA regulations that prohibit us from simultaneously seeking rights under this alternative regulatory pathway, the announcement of this strategy may cause additional regulatory and political instability, prolong the ISA’s review and approval of the final Mining Code and negatively impact our interactions with the ISA and ability to secure an exploitation contract from the ISA.
Current report
Technology changes rapidly in the industries and end markets that utilize the four metals contained in polymetallic nodules found in the CCZ, nickel, manganese, cobalt and copper. Some of these changes have resulted, and may continue to result, in decreased use of nickel, manganese, cobalt and/or copper in these industries and end markets. For instance, the adoption of lithium iron phosphate, or LFP, battery chemistries has grown substantially from 4% of the batteries used in passenger EVs in 2015 to an estimated 42% in 2023. The continuation of this trend in the use of LFP battery chemistries will decrease the overall demand for nickel- and cobalt-rich battery chemistries in EV use. Additionally, copper is increasingly being substituted with aluminum or other materials in electrical and infrastructure applications, potentially reducing the overall market demand for copper.
Current report
For example, since 2021, we have continued to define our resource in the NORI area, with the goal to develop project economics to pre-feasibility level and are working towards a pre-feasibility study, which is nearing completion. As part of our ongoing refinement of our business plans and resource definition work, we are now pursuing a low-CAPEX approach to our development and commercialization of operations for our NORI Area D project where we reuse existing production assets opposed to the high-CAPEX approach where the majority of offshore and onshore production assets would be newly built by us as assumed in the 2021 economic analysis included in the NORI Technical Report Summary. As a result of these changes and the general passage of time since the valuation date of January 1, 2021, the 2021 point-in-time economic analysis included in Section 19 of the NORI Technical Report Summary and the estimated capital and operating costs set forth in Section 18 of the NORI Technical Report Summary, including any references thereto throughout the NORI Technical Report Summary, should no longer be relied upon or used by investors for any reason. In addition, as we continue our work towards the completion of a pre-feasibility study, any economic analysis resulting from this work as to the cash flows from or valuation of the potential extraction of nodules form NORI Area D or elsewhere may differ significantly from earlier or current estimates and any resulting analyses that are lower than earlier or current estimates or lower than those expected by investors or other stakeholders could have a material adverse effect on our share and warrant prices and results or operations. The same material adverse effects could occur if we are unable to complete the pre-feasibility study in a timely manner or at all.
Current report
On November 8, 2024, a shareholder filed a putative class action against us and certain executives in federal district court for the Central District of California, captioned Lin v. TMC The Metals Company Inc., Gerard Barron, and Craig Shesky. The complaint alleges that all defendants violated Section 10(b) of the Exchange Act and Rule 10b-5 promulgated thereunder, and Messrs. Barron and Shesky violated Section 20(a) of the Exchange Act, by making false and/or misleading statements and/or failing to disclose information regarding the classification of the non-financial asset received from our partnership with Low Carbon Royalties Inc. and the derecognition of the capitalized exploration contract related to NORI. The alleged misstatements and omissions pertain to our initial classification of this non-financial asset as a gain on disposition (being a sale of future revenue) and subsequent reclassification thereof as a royalty liability (and re-capitalization of the exploration contract) and the restatement of our previously issued financial statements as a result thereof for the three months ended March 31, 2023, the six months ended June 30, 2023 and the nine months ended September 30, 2023 in March 2024. The complaint purports to represent a class of shareholders who acquired our securities between May 12, 2023, and March 25, 2024, and seeks to recover compensable damages caused by the alleged wrongdoings. We intend to defend against the lawsuit. There can be no assurance, however, that we will be successful in our defense, or that insurance will be available or adequate to fund any settlement or judgment or the litigation costs of this action. Due to the early stage of this litigation, such losses or range of possible losses cannot be reliably estimated.
Current report
In addition, although we commenced litigation against two investors who failed to fund their commitment to purchase approximately $220 million in connection with the financing at the close of the Business Combination, we may not recover any amounts from these investors.
Removed paragraphs (2)
Previous report
Limited offshore marine resource definition activities in the Marawa Contract Area, however, have occurred to date and we expect to collaborate with Marawa to assess the viability of any potential project in the Marawa Contract Area, although the timing of such assessment is unclear. Marawa has also delayed certain of its efforts in the Marawa Contract Area while it determines how it will move forward with additional assessment work. There are no assurances that we will be able to come to an agreement with Marawa on the future development of the Marawa Contract Area or that we will be able to keep our rights in the Marawa Contract Area as a result of our efforts there, either of which could have a material and adverse effect on our future business prospects and financial condition.
Previous report
We expected to receive approximately $330 million of proceeds in the private placement that closed on September 9, 2021 in connection with the Closing but only received $110.3 million (net of transactions costs). On September 20, 2021, we commenced litigation in the New York Superior Court, New York County against two investors who failed to fund their commitments pursuant to subscription agreements entered into in connection with the expected financing. These actions are captioned Sustainable Opportunities Acquisition Corp. n/k/a TMC the metals company Inc. v. Ethos Fund I, LP, Ethos GP, LLC, Ethos DeepGreen PIPE, LLC, and Ethos Manager, LLC, Index No. 655527/2021 (N.Y. Sup. Ct.) and Sustainable Opportunities Acquisition Corp. n/k/a TMC the metals company Inc. v. Ramas Capital Management, LLC, Ramas Energy Opportunities I, LP, Ramas Energy Opportunities I GP, LLC, and Ganesh Betanabhatla, Index No. 655528/2021 (N.Y. Sup. Ct.). The operative complaints allege that the investors breached the relevant subscription agreement and that the investors’ affiliates tortiously interfered with the subscription agreements by causing the investor not to fund its contractual obligations. We are seeking compensatory damages (plus interest), expenses, costs, and attorneys’ fees. There can be no assurances, however, that we will be successful in our efforts against these investors.
Reworded paragraphs (53)
Previous wording
To date, no commercial collection (also referred to as “mining,” “exploitation” or “harvesting”) of nodules has occurred on the seafloor in the area of the high seas beyond the limits of national jurisdiction (the “Area”), which includes the CCZ. Moreover, despite the release by the ISA of the Draft Regulations on Exploitation of Mineral Resources (the “Draft Regulations”), finalization of such regulations remains subject to approval and adoption by the ISA. Once adopted, these regulations will add to the legal and technical framework for exploitation of the polymetallic nodules in the NORI, TOML and Marawa contract areas.
Current wording
To date, no commercial collection (also referred to as “mining,” “exploitation” or “harvesting”) of nodules has occurred on the seafloor in the area of the high seas beyond the limits of national jurisdiction (the “Area”), which includes the CCZ. Moreover, despite the release by the ISA of the Draft Regulations on Exploitation of Mineral Resources (the “Draft Regulations”), finalization of such regulations remains subject to approval and adoption by the ISA. Once adopted, these regulations will add to the legal and technical framework for exploitation of the polymetallic nodules in the NORI and TOML contract areas.
Previous wording
Section 1, paragraph 15 of the 1994 Agreement relating to the Implementation of Part XI of UNCLOS allows a member state whose national intends to apply for approval of a plan of work for exploitation to notify the ISA of such intention. This notice obliges the ISA to complete the adoption of exploitation regulations within two years of the request made by the member state.
Current wording
Section 1, paragraph 15 of the 1994 Agreement Relating to the Implementation of Part XI of UNCLOS (the “1994 Agreement”) allows a member state whose national intends to apply for approval of a plan of work for exploitation to notify the ISA of such intention. This notice obliges the ISA to complete the adoption of exploitation regulations within two years of the request made by the member state.
Previous wording
On June 25, 2021, Nauru submitted such a notice, with an effective date of July 9, 2021, to the ISA requesting that it complete the adoption of rules, regulations and procedures (“RRPs” or the “Mining Code”) necessary to facilitate the approval of plans of work for exploitation in the Area. As a result of that notice the ISA was required to adopt the relevant RRPs for exploitation by July 9, 2023. The ISA, however, did not adopt the RRPs for exploitation by the July 9, 2023 deadline. At its July 2023 session, the ISA released a road map for the finalization of the Mining Code, with a view to its adoption during the 30th session of the ISA in 2025, with the potential for earlier adoption during the 29th session of the ISA in 2024 if the Mining Code is ready for adoption by that time. The road map includes three scheduled ISA Council meetings through July 2024 to elaborate the Mining Code. Although we believe the ISA will adopt the Mining Code, there can be no assurances that the Mining Code will be adopted within these timelines, or at all, as a result of actions of ISA member States or otherwise. For example, 21 ISA member States out of the 169 ISA members have expressed reservations about the commercialization of seafloor mineral resources and have called for a ban, moratorium, or precautionary pause on the commercialization of these resources. In addition, although the Draft Regulations and several supporting standards and guidelines are at an advanced stage, there remains uncertainty regarding the final form that these will take, as well as the impact that such regulations, standards and guidelines will have on our ability to meet our objectives.
Current wording
On June 25, 2021, Nauru submitted such a notice, with an effective date of July 9, 2021, to the ISA requesting that it complete the adoption of rules, regulations and procedures (“RRPs” or the “Mining Code”) necessary to facilitate the approval of plans of work for exploitation in the Area. As a result of that notice, the ISA was required to adopt the relevant RRPs for exploitation by July 9, 2023. The ISA, however, did not adopt the RRPs for exploitation by the July 9, 2023 deadline. At its July 2023 session, the ISA released a road map for the finalization of the Mining Code, with a view to its adoption during the 30th Session of the ISA in 2025. The road map included three scheduled ISA Council meetings through July 2024 to elaborate on the Mining Code. The Mining Code was not completed at the July 2024 ISA Council meetings and during these meetings, the ISA agreed to continue the negotiations of the Mining Code with a continued view to its adoption during the 30th Session of the ISA in 2025. The ISA Council has scheduled two ISA Council meetings, one in March 2025 and the other of which is expected to occur in July 2025, to progress the Mining Code. Although we believe the ISA will adopt the Mining Code, there can be no assurances that the Mining Code will be adopted in 2025, or at all, as a result of actions of ISA member States or otherwise. For example, at least 32 ISA member States out of the 170 ISA members have expressed reservations about the timing of commercialization of seafloor mineral resources and have called for a ban, moratorium, or precautionary pause on the commercialization of these resources. In addition, although the Draft Regulations and several supporting standards and guidelines are at an advanced stage, there remains uncertainty regarding the final form that these will take, as well as the impact that such regulations, standards and guidelines will have on our ability to meet our objectives.
Previous wording
As the ISA Council did not complete the adoption and elaboration of the Mining Code by the prescribed deadline of July 9, 2023, pursuant to Section 1, Paragraph 15(c) of the Annex to the 1994 Agreement relating to the implementation of Part XI of UNCLOS, if an application for a plan of work for exploitation is now submitted to the ISA, the ISA is nonetheless required to consider and provisionally approve such a plan of work based on: (i) the provisions of the UNCLOS; (ii) any rules, regulations and procedures that the ISA may have adopted provisionally, (iii) the basis of the norms contained in the UNCLOS and (iv) the terms and principles contained in the 1994 Agreement relating to the Implementation of Part XI, including the principle of non-discrimination among contractors.
Current wording
As the ISA Council did not complete the adoption and elaboration of the Mining Code by the prescribed deadline of July 9, 2023, pursuant to Section 1, Paragraph 15(c) of the Annex to the 1994 Agreement, if an application for a plan of work for exploitation is now submitted to the ISA, the ISA is nonetheless required to consider and provisionally approve such a plan of work based on: (i) the provisions of the UNCLOS; (ii) any rules, regulations and procedures that the ISA may have adopted provisionally, (iii) the basis of the norms contained in the UNCLOS and (iv) the terms and principles contained in the 1994 Agreement, including the principle of non-discrimination among contractors.
Previous wording
NORI intends to submit an application to the ISA for an exploitation contract, which will include a plan of work for exploitation for NORI Area D following the conclusion of the July 2024 meeting of the ISA’s 29th session. If the ISA has not adopted the final Mining Code by the time NORI submits this application, we believe that the ISA will review and provisionally approve the plan of work for exploitation included therein pursuant to Section 1, Paragraph 15(c) of the Annex to the 1994 Agreement relating to the implementation of Part XI of UNCLOS discussed above. The ISA released its road map to finalize the Mining Code at its July 2023 session, however, it also stated that the commercial exploitation of mineral resources in the ISA’s jurisdictional area should not be carried out in the absence of RRPs relating to exploitation. In addition, there can be no assurances that the ISA will come to a consensus as to the interpretation of Section 1, Paragraph 15(c) of the Annex to the 1994 Agreement relating to the implementation of Part XI of UNCLOS. Although we believe the ISA will accept and consider an application for a plan of work for exploitation in the absence of the final Mining Code, there is no consensus within the ISA as to the process to be followed for its consideration of such an application, including the involvement of the ISA’s Legal and Technical Commission and whether and how long the ISA could delay its consideration of an application past the proscribed 60-day period. As a result, and in light of some ISA members States calling for a ban, moratorium or precautionary pause on the commercialization of seafloor mineral resources, there can be no assurance that the ISA will provisionally approve our plan of work for exploitation, within one year from submission thereof, or at all, or that such provisional approval would lead to the issuance of an exploitation contract with the ISA.
Current wording
NORI intends to submit an application to the ISA for an exploitation contract, which will include a plan of work for exploitation for the NORI contract area, expected to be filed on June 27, 2025. If the ISA has not adopted the final Mining Code by the time NORI submits this application, we believe that the ISA will review and provisionally approve the plan of work for exploitation included therein pursuant to Section 1, Paragraph 15(c) of the Annex to the 1994 Agreement discussed above. The ISA released its road map to finalize the Mining Code at its July 2023 session and at its July 2024 session agreed to continue the negotiations of the Mining Code with a continued view to its adoption during the 30th Session of the ISA in 2025, however, it has also stated that the commercial exploitation of mineral resources in the ISA’s jurisdictional area should not be carried out in the absence of RRPs relating to exploitation. In addition, there can be no assurances that the ISA will come to a consensus as to the interpretation of Section 1, Paragraph 15(c) of the Annex to the 1994 Agreement. Although we believe the ISA will accept and consider an application for a plan of work for exploitation in the absence of the final Mining Code, there is no consensus within the ISA as to the process to be followed for its consideration of such an application, including the involvement of the LTC and whether and how long the ISA could delay its consideration of an application past the proscribed 60-day period. As a result, and to provide clarity on the application review process and timeline, the Republic of Nauru, in consultation with NORI, formally requested that this issue be added to the agenda of the Council’s March 2025 meeting. Nauru’s proposed agenda item was strongly opposed by Chile, and it is unlikely for there to be an agreed upon process until after an application is received. In light of some ISA Member States calling for a ban, moratorium or precautionary pause on the commercialization of seafloor mineral resources, there can be no assurance that the ISA will provisionally approve our plan of work for exploitation, within one year from submission thereof, or at all, or that such provisional approval would lead to the issuance of an exploitation contract with the ISA. On August 2, 2024, the ISA Assembly elected Leticia Carvalho of Brazil as the new Secretary-General of the ISA for the period 2025-2028. There can be no assurances that the ISA’s stated target for adoption of the Mining Code of 2025 will be met or that any application for an exploitation contract will be approved before the final Mining Code is adopted.
Previous wording
The collection of polymetallic nodules within the CCZ, where our exploration areas are located, will require approval of an ISA Exploitation Contract (which will authorize commercial collection activities). As part of the application for an ISA Exploitation Contract, all contractors are required to complete baseline studies and an ESIA, culminating in an EIS, prior to collecting nodules at a commercial scale. The EIS would be accompanied by an EMMP which is expected to specify the objectives and purpose of all monitoring requirements, the components to be monitored, frequency of monitoring, methods of monitoring, analysis required in each monitoring component, monitoring data management and reporting.
Current wording
Under UNCLOS, the collection of polymetallic nodules under our ISA exploration contracts, will require approval of an ISA Exploitation Contract (which will authorize commercial collection activities). As part of the application for an ISA Exploitation Contract, all contractors are required to complete baseline studies and an Environment and Social Impact Assessment (ESIA), culminating in an EIS, prior to collecting nodules at a commercial scale. The EIS would be accompanied by an Environmental Monitoring and Management Plan (EMMP) which is expected to specify the objectives and purpose of all monitoring requirements, the components to be monitored, frequency of monitoring, methods of monitoring, analysis required in each monitoring component, monitoring data management and reporting.
Previous wording
In order to move our exploration projects into commercial production, our wholly-owned subsidiaries, NORI and TOML will each need to conclude an exploitation contract with the ISA, as will our partner, Marawa, in addition to obtaining related permits that may be required by our commercial partners. There can be no assurance that the ISA will approve our application for a plan of work for exploitation and issue an exploitation contract to our subsidiaries in a timely manner or at all. Even if the ISA timely evaluates such applications(s), our subsidiaries may be required to submit a supplementary EIS or perform additional studies or campaigns before obtaining approval. As such, there is a risk that an exploitation contract may not be granted by the ISA, may not be granted on a timely basis, thereby delaying our potential timeline for commercial exploitation, or may be granted on uneconomic terms.
Current wording
In order to move our exploration projects into commercial production, our wholly owned subsidiaries, NORI and TOML will each need to receive an exploitation contract with the ISA, in addition to obtaining related permits that may be required by our commercial partners. There can be no assurance that the ISA will approve our application for a plan of work for exploitation and issue an exploitation contract to our subsidiaries in a timely manner or at all. Even if the ISA timely evaluates such applications(s), our subsidiaries may be required to submit a supplementary EIS or perform additional studies or campaigns before obtaining approval. As such, there is a risk that an exploitation contract may not be granted by the ISA, may not be granted on a timely basis, thereby delaying our potential timeline for commercial exploitation, or may be granted on uneconomic terms.
Previous wording
While the rates of payments are yet to be set by the ISA, the 1994 Agreement relating to the Implementation of Part XI of the UNCLOS prescribes a relevant framework that the rates of payments “shall be within the range of those prevailing in respect of land-based mining of the same or similar minerals in order to avoid giving deep seabed miners an artificial competitive advantage or imposing on them a competitive disadvantage.” The ISA has held workshops with stakeholders to discuss and seek comments on the potential financial regime for the collecting of polymetallic nodules in the CCZ. There can be no assurance that the ISA will put in place a Mining Code in a timely manner or at all. Such regulations may also impose burdensome obligations or restrictions on us, and/or may contain terms that do not enable us to develop our projects.
Current wording
While the rates of payments are yet to be set by the ISA, the 1994 Agreement prescribes a relevant framework that the rates of payments “shall be within the range of those prevailing in respect of land-based mining of the same or similar minerals in order to avoid giving deep seabed miners an artificial competitive advantage or imposing on them a competitive disadvantage.” The ISA has held workshops with stakeholders to discuss and seek comments on the potential financial regime for the collecting of polymetallic nodules in the CCZ. There can be no assurance that the ISA will put in place a Mining Code in a timely manner or at all. Such regulations may also impose burdensome obligations or restrictions on us, and/or may contain terms that do not enable us to develop our projects.
Previous wording
Parties carrying out exploration and collection operations in the CCZ must be sponsored by a State that is a member of the ISA. The Sponsoring States of our subsidiaries NORI and TOML are Nauru and Tonga, respectively. In addition, our subsidiary, DGE, has an exclusive contract with Marawa, which is sponsored by Kiribati, that permits DGE to conduct activities in connection with the exploration contract held by Marawa with the ISA. If any of these countries cease such sponsorship, our subsidiaries or their partners (as applicable) would need to seek sponsorship elsewhere, which could impact our operations as a group.
Current wording
Under UNCLOS, parties carrying out exploration and collection operations in the CCZ must be sponsored by a State that is a member of the ISA. The Sponsoring States of our subsidiaries NORI and TOML are Nauru and Tonga, respectively. If Nauru and Tonga cease such sponsorship, our subsidiaries would need to seek sponsorship elsewhere, which could impact our operations as a group.
Previous wording
There is a risk that a State sponsoring activities in a project area ceases to be a sponsor, or is not permitted to be a sponsor, or that NORI and TOML cease to remain as sponsored contractors by such State; and if an agreement cannot be reached with a substitute sponsoring State, or if we are unable to transfer our sponsorship to another State, such subsidiary could be forced to cease activities in the CCZ.
Current wording
There is a risk that a State sponsoring activities in a project area ceases to be a sponsor, or is not permitted to be a sponsor, or that NORI and TOML cease to remain as sponsored contractors by such State; and if an agreement cannot be reached with a substitute sponsoring State, or if we are unable to transfer our sponsorship to another State, such subsidiary could be forced under UNCLOS to cease activities in the CCZ.
Previous wording
All phases of exploring for and collecting and processing polymetallic nodules are subject to environmental regulation in various jurisdictions and under national as well as international laws and conventions. No seafloor polymetallic nodule deposit has been developed commercially, and it is not clear what environmental parameters may need to be measured to satisfy regulatory authorities for an ISA Exploitation Contract to be granted. A full ESIA for deep-sea collecting operations has yet to be completed and approved by the ISA, and the full impact of any polymetallic nodule collecting operation on the environment has yet to be determined. Further, the required standards for an ESIA have not been finalized by the ISA, which could require changes to any submissions made by our subsidiaries in connection with an ISA Exploitation Contract application. Environmental legislation is evolving in a manner which is likely to require strict standards and enforcement, increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects and a heightened degree of responsibility for companies and their officers, directors and employees.
Current wording
All phases of exploring for and collecting and processing polymetallic nodules are subject to environmental regulation in various jurisdictions and under national as well as international laws and conventions. No seafloor polymetallic nodule deposit has been developed commercially to date, and it is not clear what environmental parameters may need to be measured to satisfy regulatory authorities for an ISA Exploitation Contract to be granted. A full ESIA for deep-sea collecting operations has yet to be completed and approved by the ISA, and the full impact of any polymetallic nodule collecting operation on the environment has yet to be determined. Further, the required standards for an ESIA have not been finalized by the ISA, which could require changes to any submissions made by our subsidiaries in connection with an ISA Exploitation Contract application. Environmental legislation is evolving in a manner which is likely to require strict standards and enforcement, increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects and a heightened degree of responsibility for companies and their officers, directors and employees.
Previous wording
Nodule collection operations in the CCZ are certain to disturb wildlife in the operating area and may impact ecosystem function. The nature and severity of these impacts on CCZ wildlife are expected to vary by species and are currently subject to significant uncertainty. Our campaigns to baseline wildlife and ecosystem function, pilot the nodule collection system and monitor impacts arising from the use of this system have been completed. Data processing and analysis is in progress and, similar to studies conducted in respect of land-based mining, may not definitively establish the impacts of activities on the biodiversity in the CCZ. Given the significant volume of deep water and the difficulty of sampling and retrieving biological specimens, a complete biological inventory might never be established. Accordingly, impacts on CCZ biodiversity may never be, completely and definitively known. For the same reasons, it may also not be possible to definitively say whether the impact of nodule collection on global biodiversity will be less significant than those estimated for land-based mining for a similar amount of produced metal.
Current wording
Nodule collection operations in the CCZ are certain to disturb wildlife in the operating area and may impact ecosystem function. The nature and severity of these impacts on CCZ wildlife are expected to vary by species and are currently subject to significant uncertainty. Our campaigns to baseline wildlife and ecosystem function, pilot the nodule collection system and monitor impacts arising from the use of this system have been completed. Data processing and analysis is in progress and, similar to studies conducted in respect of land-based mining, may not definitively establish the impacts of activities on the biodiversity in the CCZ. Given the significant volume of deep water and the difficulty of sampling and retrieving biological specimens, a complete biological inventory might never be established as is the case in terrestrial environments. Accordingly, impacts on CCZ biodiversity may never be, completely and
Previous wording
It is also currently not definitively known whether the risk of biodiversity loss in the CCZ could be eliminated through setting aside large representative areas of CCZ under protection (13 areas currently set aside by ISA covering 43% of the CCZ) or reduced through mitigation strategies inside operating areas or how long it will take for disturbed seabed areas to recover naturally. Prior research indicates that the density, diversity and function of fauna representing most of resident biomass (including mobile, pelagic and microbial life) are expected to recover naturally over years to decades. However, a high level of uncertainty exists around recovery of fauna that requires the hard substrate of nodules for critical life function. The extent to which planned measures, such as leaving behind partial nodule cover and setting aside no-take zones, would aid recruitment and recovery of nodule-dependent species in impacted areas will depend on factors like habitat connectivity, which is an area that is still under study.
Current wording
It is also currently not definitively known whether the risk of biodiversity loss in the CCZ could be eliminated through setting aside large representative areas of CCZ under protection (13 areas currently set aside by the ISA covering 43% of the CCZ) or reduced through mitigation strategies inside operating areas or how long it will take for disturbed seabed areas to recover naturally. Prior research indicates that the density, diversity and function of fauna representing most of resident biomass (including mobile, pelagic and microbial life) are expected to recover naturally over years to decades. However, a high level of uncertainty exists around recovery of fauna that requires the hard substrate of nodules for critical life function. The extent to which planned measures, such as leaving behind partial nodule cover and setting aside no-take zones, would aid recruitment and recovery of any potential nodule-dependent species in impacted areas will depend on factors like habitat connectivity, which is an area that is still under study.
Previous wording
Although the environmental impact review process has not yet been finalized, all contractors have been made aware of the requirement to complete baseline studies and an ESIA, culminating in an EIS, prior to collecting. The EIS would be accompanied by an EMMP, which will be required as part of the application for an ISA Exploitation Contract within the contract areas of NORI, TOML and Marawa. The EMMP is expected to specify the objectives and purpose of all monitoring requirements, the components to be monitored, frequency of monitoring, methods of monitoring, analysis required in each monitoring component, monitoring data management and reporting.
Current wording
Although the environmental impact review process has not yet been finalized, all contractors have been made aware of the requirement to complete baseline studies and an ESIA, culminating in an EIS, prior to collecting. The EIS would be accompanied by an EMMP, which will be required as part of the application for an ISA Exploitation Contract within the NORI and TOML contract areas. The EMMP is expected to specify the objectives and purpose of all monitoring requirements, the components to be monitored, frequency of monitoring, methods of monitoring, analysis required in each monitoring component, monitoring data management and reporting.
Previous wording
The EMMP will also be submitted to the ISA for approval as part of the ISA Exploitation Contract application. There are no guarantees that the ISA will evaluate any exploitation contract application by our subsidiaries in a timely manner, and even if the ISA does timely evaluate such applications(s), such subsidiary may be required to submit a supplementary EIS before being approved. This may result in delays that could impact our projected timeframe. Furthermore, in the event that the ISA evaluates and approves an application in a timely manner, any aspect of such application and approval theoretically could be subject to legal challenges which could result in further delays that could detrimentally impact our business. For example, certain conservation groups have called for a ten-year moratorium on all deep-sea mineral exploration and exploitation activities. While this agenda does not appear to have directly impacted the development of proposed Final Regulations and Standards and Guidelines by the ISA, any such moratorium would have a material adverse effect on our business.
Current wording
The EMMP will also be submitted to the ISA for approval as part of the ISA Exploitation Contract application. There are no guarantees that the ISA will evaluate any exploitation contract application by our subsidiaries in a timely manner, and even if the ISA does timely evaluate such applications(s), our subsidiary may be required to submit a supplementary EIS before being approved. This may result in delays that could impact our projected timeframe. Furthermore, in the event that the ISA evaluates and approves an application in a timely manner, any aspect of such application and approval theoretically could be subject to legal challenges which could result in further delays that could detrimentally impact our business. For example, certain conservation groups have called for a ten-year moratorium on all deep-sea mineral exploration and exploitation activities. While this agenda does not appear to have directly impacted the development of proposed Final Regulations and Standards and Guidelines by the ISA, any such moratorium would have a material adverse effect on our business.
Previous wording
The environmental permitting process, which includes considerations of the impacts of our activities on the biodiversity of the CCZ, is expected to involve a series of checks and balances with reviews being conducted by the ISA, including technical evaluations by the ISA Secretariat and the Legal and Technical Commission (the “LTC”). The recommendations of the LTC will then go before the ISA Council (“Council”), a core policy-making body of the ISA, which will then review and, if it deems appropriate, approve the contractor’s application. It would require a two-thirds majority of the Council to reject a development proposal that is recommended to it by the LTC. There are no assurances that the work our subsidiaries have done to date, or their contemplated future operations will satisfy the final environmental rules and regulations adopted by the ISA, and any future changes could delay the timing of such submissions to the ISA or our subsidiaries operations more generally, which could have a material adverse effect on our business. Sponsoring State approvals and permits are currently and may in future be required in connection with our operations. To the extent such approvals are required and not obtained, our subsidiaries may be curtailed or prohibited from proceeding with planned exploration or development of mineral properties. Failure to comply with applicable laws, regulations, and permitting requirements may result in enforcement actions thereunder, including orders issued by regulatory or judicial authorities causing operations to cease or be curtailed and may include corrective measures requiring capital expenditures, installation of additional equipment, or remedial actions. Parties engaged in collection operations may be required to compensate those suffering loss or damage by reason of the collection activities and may have civil or criminal fines or penalties imposed for violations of applicable laws and regulations.
Current wording
The environmental permitting process, which includes considerations of the impacts of our activities on the biodiversity of the CCZ, is expected to involve a series of checks and balances with reviews being conducted by the ISA, including technical evaluations by the ISA Secretariat and the LTC. The recommendations of the LTC will then go before the ISA Council (“Council”), a core policy-making body of the ISA, which will then review and, if it deems appropriate, approve the contractor’s application. It would require a two-thirds majority of the Council to reject a development proposal that is recommended to it by the LTC. There are no assurances that the work our subsidiaries have done to date, or their contemplated future operations will satisfy the final environmental rules and regulations adopted by the ISA, and any future changes could delay the timing of such submissions to the ISA or our subsidiaries operations more generally, which could have a material adverse effect on our business. Sponsoring State approvals and permits are currently and may in the future be required in connection with our operations. To the extent such approvals are required and not obtained, our subsidiaries may be curtailed or prohibited from proceeding with planned exploration or development of mineral properties. Failure to comply with applicable laws, regulations, and permitting requirements may result in enforcement actions thereunder, including orders issued by regulatory or judicial authorities causing operations to cease or be curtailed and may include corrective measures requiring capital expenditures, installation of additional equipment, or remedial actions. Parties engaged in collection operations may be required to compensate those suffering loss or damage by reason of the collection activities and may have civil or criminal fines or penalties imposed for violations of applicable laws and regulations.
Previous wording
Seafloor polymetallic nodules have never been commercially mined, and there is a risk that our offshore collection and recovery methods and the equipment that we intend to utilize during this process, including transferring nodules to transport vessels and delivering of nodules to port, may not be adequate for the economic development of seafloor polymetallic nodule deposits. The equipment and technology that we intend to utilize has not been fully proven in such subsea conditions and for this specific material and application, and failure to adapt existing equipment or to develop suitable equipment or recovery, transportation and development techniques for the prevailing material and seafloor conditions would have a material adverse effect on the business of our subsidiaries, and the results of their operations and financial condition. As a result, even if the ISA timely reviews and approves our expected application for an exploitation contract, which will include a plan of work for exploitation, for NORI Area D, there are no assurances that we will have successfully completed all development and pre-production work necessary to start commercial production at the end of the first quarter of 2026. We have partnered with Allseas, a leading global offshore contractor, to undertake a pre-production pilot collection system test in which a collector vehicle, a riser and lift system and surface production vessel have been tested. Although the pilot collection system test was successful, there can be no assurance that their technology will eventually be adequate for full scale commercial production.
Current wording
Seafloor polymetallic nodules have never been commercially mined, and there is a risk that our offshore collection and recovery methods and the equipment that we intend to utilize during this process, including transferring nodules to transport vessels and delivering of nodules to port, may not be adequate for the economic development of seafloor polymetallic nodule deposits. The equipment and technology that we intend to utilize has not been fully proven in such subsea conditions and for this specific material and application, and failure to adapt existing equipment or to develop suitable equipment or recovery, transportation and development techniques for the prevailing material and seafloor conditions would have a material adverse effect on the business of our subsidiaries, and the results of their operations and financial condition. As a result, even if the ISA timely reviews and approves our expected application for an exploitation contract, which will include a plan of work for exploitation, for NORI Area D, there are no assurances that we will have successfully completed all development and pre-production work necessary to start commercial production. We have partnered with Allseas, a leading global offshore contractor, to undertake a pre-production pilot collection system test in which a collector vehicle, a riser and lift system and surface production vessel have been tested. Although the pilot collection system test was successful, there can be no assurance that their technology will eventually be adequate for full scale commercial production.
Previous wording
On March 16, 2022, NORI and Allseas entered into a non-binding term sheet for the development and operation of the Project Zero Offshore Nodule Collection System. NORI and Allseas intend to equally finance all costs related to developing and getting Project Zero Offshore Nodule Collection System into production currently. The parties intend to detail and revise these cost estimates in three definitive agreements for the engineering, build and operations phases which the parties expect to enter into before the submission of our exploitation application in 2024. There can be no assurances, however, that we will enter into the binding Heads of Terms and definitive agreements with Allseas in a particular time period, or at all, or on terms similar to those set forth in the non-binding term sheet, or that if such definitive agreements are entered into by us that the proposed commercial systems and second production vessel will be successfully developed or operated in a particular time period, or at all and hence, we may be delayed in obtaining offshore collection equipment in the event we do not reach agreement with Allseas and have to develop such equipment on our own or through new third-party contractual relationships.
Current wording
On March 16, 2022, NORI and Allseas entered into a non-binding term sheet for the development and operation of the Project Zero Offshore Nodule Collection System. NORI and Allseas intend to equally finance all costs related to developing and getting Project Zero Offshore Nodule Collection System into production currently. The parties intend to detail and revise these cost estimates in three definitive agreements for the engineering, build and operations phases which the parties expect to enter into before the submission of our exploitation application on June 27, 2025. There can be no assurances, however, that we will enter into the binding Heads of Terms and definitive agreements with Allseas in a particular time period, or at all, or on terms similar to those set forth in the non-binding term sheet, or that if such definitive agreements are entered into by us that the proposed commercial systems and second production vessel
Previous wording
We rely upon third-party consultants, engineers, analysts, scientists, and others to provide analyses, reviews, reports, advice, and opinions regarding our potential projects. For example, the NORI Initial Assessment and the TOML Mineral Resource Statement, contain mineral resource estimates and other information with respect to our contract areas. There is a risk that such analyses, reviews, reports, advice, opinions, and projects are incorrect, in particular with respect to resource estimation, process development, and recommendations for products to be produced, as well as with respect to economic assessments, including estimating the capital and operating costs of our project and forecasting potential future revenue streams. Uncertainties are also inherent in such estimations.
Current wording
We rely upon third-party consultants, engineers, analysts, scientists, and others to provide analyses, reviews, reports, advice, and opinions regarding our potential projects. For example, the NORI Initial Assessment and the TOML Mineral Resource Statement, contain mineral resource estimates and other information with respect to our contract areas. There is a risk that such analyses, reviews, reports, advice, opinions, and projects are incorrect or become outdated over time or as our plans change, in particular with respect to resource estimation, process development, and recommendations for products to be produced, as well as with respect to economic assessments, including estimating the capital and operating costs of our project and forecasting potential future revenue streams. Uncertainties are also inherent in such estimations.
Previous wording
Estimates of mineral resources from the contract areas of NORI and TOML described in our SEC filings and reported in technical reports prepared by AMC are only estimates and depend on geological interpretation and statistical inferences or assumptions drawn from survey data and recovery and sampling analysis, which might prove to be materially inaccurate. While these reports have been provided by experts, there is a degree of uncertainty attributable to the estimation of mineral resources. Mineral reserves have not been defined and will require completion of further studies. Until mineral resources are actually collected and processed, the quantity of metal and nodule abundance must be considered as estimates only and no assurance can be given that the indicated levels of metals will be produced. In making determinations about whether to advance any of our projects to further development, we must rely upon calculated estimates for the mineral resources and grades of mineralization in our contract areas and estimated equipment production rates, equipment availability and utilization and collection efficiency.
Current wording
Estimates of mineral resources from the contract areas of NORI and TOML described in our SEC filings and reported in technical reports prepared by AMC are only estimates and depend on geological interpretation and statistical inferences or assumptions drawn from survey data and recovery and sampling analysis, which might prove to be materially inaccurate. While these reports have been provided by experts, there is a degree of uncertainty attributable to the estimation of mineral resources. Mineral reserves have not been defined and will require completion of further studies. Until mineral resources are actually collected and processed on a commercial scale, the quantity of metal and nodule abundance must be considered as estimates only and no assurance can be given that the indicated levels of metals will be produced. In making determinations about whether to advance any of our projects to further development, we must rely upon calculated estimates for the mineral resources and grades of mineralization in our contract areas and estimated equipment production rates, equipment availability and utilization and collection efficiency.
Previous wording
While we believe that seafloor polymetallic nodules in the contract areas of our subsidiaries account for some of the world’s largest aggregated estimated deposits of battery metals, no assurance can be given that minerals will be discovered in sufficient grade or quantities to justify commercial operations. Whether an exploration property will be commercially viable depends on a number of factors, including: the particular attributes of the deposit, such as size, grade and proximity to infrastructure; metal prices, which are highly cyclical; availability of and effectiveness of technology to recover, trans-ship, transport and process nodules; government regulations, including regulations relating to prices, taxes, royalties, land tenure, land use, and environmental protection; availability of required personnel, third-party partners and contractors, any required financing and commercial demand in the marketplace for such metals. The precise impact of these factors cannot accurately be predicted, but the combination of these factors may result in the inability of our subsidiaries to operate or generate an adequate return on invested capital.
Current wording
While we believe that seafloor polymetallic nodules in the contract areas of our subsidiaries account for some of the world’s largest aggregated estimated deposits of the four critical metals contained in nodules, no assurance can be given that minerals will be discovered in sufficient grade or quantities to justify commercial operations. Whether an exploration property will be commercially viable depends on a number of factors, including: the particular attributes of the deposit, such as size, grade and proximity to infrastructure; metal prices, which are highly cyclical; availability of and effectiveness of technology to recover, trans-ship, transport and process nodules; government regulations, including regulations relating to prices, taxes, royalties, land tenure, land use, and environmental protection; availability of required personnel, third-party partners and contractors, any required financing and commercial demand in the marketplace for such metals. The precise impact of these factors cannot accurately be predicted, but the combination of these factors may result in the inability of our subsidiaries to operate or generate an adequate return on invested capital.
Previous wording
The battery metals production industry is capital intensive and competitive. Production of battery materials and manganese alloys is largely dominated by Chinese competitors. These competitors may have greater financial resources, as well as other strategic advantages to operate, maintain, improve and possibly expand their facilities. Additionally, domestic Chinese resources firms have historically been able to produce minerals and/or process metals from land-based operations at relatively low costs due to domestic economic and regulatory factors, including less stringent environmental and governmental regulations and lower labor and benefit costs. In addition to three contracts held by our subsidiaries and partners, 16 other entities (ISA Member States and private companies sponsored by ISA Member States) currently hold ISA Exploration Contracts for polymetallic nodules. If and when they move into the exploitation phase, each of these contract-holders could become potential competitors with respect to the collection of polymetallic nodules and the production of nickel, manganese, copper and cobalt products. Some of these contract holders may possess greater financial and/or technical resources. There is increasing competition from new and existing marine mineral players for the availability of marine exploration and support vessels, related marine equipment and specialized personnel, desirable exploration areas, suitable offshore collection and onshore processing equipment, and available capital. There is a risk that competitors may find more promising resources, identify or develop more economic technologies, enter into strategic partnerships that constrain our optionality, or may develop novel methods to collect nodules from the seafloor or process nodules into metals that are more economic than we currently contemplate.
Current wording
The critical metals production industry is capital intensive and competitive. Production of battery materials and manganese alloys is largely dominated by Chinese competitors. These competitors may have greater financial resources, as well as other strategic advantages to operate, maintain, improve and possibly expand their facilities. Additionally, domestic Chinese resources firms have historically been able to produce minerals and/or process metals from land-based operations at relatively low costs due to domestic economic and regulatory factors, including less stringent environmental and governmental regulations and lower labor and benefit costs. In addition to two contracts held by our subsidiaries and partners, 15 other entities (ISA Member States and private companies sponsored by ISA Member States) currently hold ISA Exploration Contracts for polymetallic nodules. If and when they move into the exploitation phase, each of these contract-holders could become potential competitors with respect to the collection of polymetallic nodules and the production of nickel, manganese, copper and cobalt products. Some of these contract holders may possess greater financial and/or technical resources. There is increasing competition from new and existing marine mineral players for the availability of marine exploration and support vessels, related marine equipment and specialized personnel, desirable exploration areas, suitable offshore collection and onshore processing equipment, and available capital. There is a risk that competitors may find more promising resources, identify or develop more economic technologies, enter into strategic partnerships that constrain our optionality, or may develop novel methods to collect nodules from the seafloor or process nodules into metals that are more economic than we currently contemplate.
Previous wording
The profitability of our nodule collection operations is significantly affected by changes in the market price of battery metals (nickel, copper and cobalt) and manganese ores and the cost of power, natural gas, coal, marine fuels, among other commodities and supply requirements. Prices of such metals are affected by numerous factors beyond our control, including: military conflict; prevailing interest rates and returns on other asset classes; expectations regarding inflation, monetary policy and currency values; speculation; governmental and exchange decisions regarding the disposal of metal stockpiles; political and economic conditions; available supplies of battery metals from mine production, inventories and recycled metal; sales by holders and producers of battery metals; and demand for products containing nickel, manganese, copper and cobalt. The price of nickel, manganese, copper, cobalt and other minerals and natural gas has fluctuated widely in recent years. Depending on the prevailing price of nickel, manganese, copper, and cobalt, and the cost of power, natural gas, chemical reagents, marine fuels, cash flow from our metal production operations may not be sufficient to cover our operating costs or the costs to service any outstanding debt. In addition, our proposed full scale production plans would involve placing a large percentage of global manganese production in the market, and we may be constrained in our ability to sell such large volumes, or such production may negatively impact the market price of manganese, which would, in either case, negatively impact our overall economic position.
Current wording
The profitability of our nodule collection operations is significantly affected by changes in the market price of critical metals (nickel, copper and cobalt) and manganese ores and the cost of power, natural gas, coal, marine fuels, among other commodities and supply requirements. Prices of such metals are affected by numerous factors beyond our control, including: military conflict; prevailing interest rates and returns on other asset classes; expectations regarding inflation, monetary policy and currency values; speculation; governmental and exchange decisions regarding the disposal of metal stockpiles; political and economic conditions; available supplies of the four critical metals contained in nodules from mine production, inventories and recycled metal; sales by holders and producers of these critical metals; and demand for products containing nickel, manganese, copper and cobalt. The price of nickel, manganese, copper, cobalt and other minerals and natural gas has fluctuated widely in recent years. Depending on the prevailing price of nickel, manganese, copper, and cobalt, and the cost of power, natural gas, chemical reagents, marine fuels, cash flow from our metal production operations may not be sufficient to cover our operating costs or the costs to service any outstanding debt. In addition, our proposed full scale production plans would involve placing a large percentage of global manganese production in the market, and we may be constrained in our ability to sell such large volumes, or such production may negatively impact the market price of manganese, which would, in either case, negatively impact our overall economic position.
Previous wording
We will be producing a novel manganese silicate product which does not yet have recognition in the marketplace with customers. Metallurgical testwork, market studies by CRU International Limited, value-in-use studies by SINTEF and initial engagement with customers indicate that this manganese silicate product will be a premium product with high value in use as an input into silicomanganese alloy production that we believe will receive strong market acceptance. However, mineral processing industries may be slow to change feed stocks and suppliers, even in the face of potential advantages.
Current wording
We will be producing a novel manganese silicate product which does not yet have recognition in the marketplace with customers. Metallurgical test work, market studies by CRU International Limited, value-in-use studies by SINTEF and initial engagement with customers indicate that this manganese silicate product will be a premium product with high value in use as an input into silicomanganese alloy production that we believe will receive strong market acceptance. However, mineral processing industries may be slow to change feed stocks and suppliers, even in the face of potential advantages.
Previous wording
Our ability to generate revenue will be diminished if we are unable to compete with substitutions for the minerals that we intend to process.
Current wording
Our ability to generate revenue will be diminished if we are unable to compete with substitutions for the minerals that we intend to process or adapt to shifts in end-market demand.
Previous wording
Technology changes rapidly in the industries and end markets that utilize our materials. If these industries shift to new technologies or products (e.g., nickel-rich battery chemistries could be replaced by other battery chemistries that do not use nickel or cobalt such as lithium iron phosphate (LFP), or copper could be increasingly substituted by aluminum) or use less of the metals that we intend to collect and process, or if suitable substitutes become available, it could result in a decline in demand for our metal products. If the demand for our metal products decreases, it will have a material adverse effect on our business and the results of our operations and financial condition.
Current wording
Although we are actively monitoring these technological changes and shifts in end-market demand and taking steps designed to diversify the potential applications and markets for our metals, as these industries shift to new or substitute technologies or products or if these industries and end markets otherwise use less of the metals that we intend to collect and process, and our diversification efforts are not successful, there could be a decline in demand for our metal products. If the demand for our metal products decreases, it will have a material adverse effect on our business and the results of our operations and financial condition.
Previous wording
There exist certain negative perceptions related to acquiring metals produced from deep-sea minerals. Under pressure from non-governmental organizations, some governments and companies in the EV supply chain have expressed reservations about using battery metals derived from deep-sea minerals (including polymetallic nodules), pending more research on the impacts of deep-sea mineral extraction operations on marine biodiversity and ecosystem function. If this position gains broad traction by governments and commercial customers alike in relation to battery metals sourced from polymetallic nodules, it could have a material impact on our business and operations.
Current wording
There exist certain negative perceptions related to acquiring metals produced from deep-sea minerals. Under pressure from non-governmental organizations, some governments and companies in the EV supply chain have expressed reservations about using critical metals derived from deep-sea minerals (including polymetallic nodules), pending more research on the impacts of deep-sea mineral extraction operations on marine biodiversity and ecosystem function. If this position gains broad traction by governments and commercial customers alike in relation to critical metals sourced from polymetallic nodules, it could have a material impact on our business and operations.
Previous wording
Given that we have focused part of our operating plan on the sale of nodule-derived battery metals into the EV supply chain, our growth may be affected by the consumer adoption of EVs. The market for EV is relatively new, rapidly evolving, characterized by rapidly changing technologies, price competition, additional competitors, evolving government regulation and industry standards, frequent new vehicle announcements and changing consumer demands and behaviors. While it has been projected that demand for EVs will surge over time, if the market for EVs does not develop as we expect, or develops more slowly than we expect, our business and operating results may be impacted, as we refocus on other industrial uses of the metals we plan to produce.
Current wording
Given that we have focused part of our operating plan on the sale of nodule-derived critical metals into the EV supply chain, our growth may be affected by the consumer adoption of EVs. The market for EV is relatively new, rapidly evolving, characterized by rapidly changing technologies, price competition, additional competitors, evolving government regulation and industry standards, frequent new vehicle announcements and changing consumer demands and behaviors. While it has been projected that demand for EVs will surge over time, if the market for EVs does not develop as we expect, or develops more slowly than we expect, our business and operating results may be impacted, as we refocus on other industrial uses of the metals we plan to produce.
Previous wording
We have partnered with Allseas, a leading global offshore contractor and significant shareholder in our Company, to undertake the development of many of the offshore systems we expect to utilize in our potential commercialization efforts [(including equipment required for the transfer of nodules to transport vessels and delivery to port)]. We are also in discussions with Allseas to enter into binding agreements with them for the future development and operation of the Project Zero Offshore Nodule Collection System and other services. Allseas also provides us with exclusive access to the earlier of the development of the Project Zero Offshore Nodule Collection System and December 31, 2026 to theHidden Gem, the converted drillship expected to be converted into a production vessel by Allseas for our commercial use. In addition, Allseas has invested $5 million in our August 2022 private placement of Common Shares, $7 million in our August 2023 registered direct offer of our Common Shares and Class A Warrants and entered into an unsecured credit facility with us under an affiliate of Allseas agreed to lend us up to $25 million through August 31, 2025. We cannot provide any assurance with respect to the success of our continued relationship with Allseas, that we will be able to enter into additional binding agreements with Allseas on commercially reasonable terms, or at all, that Allseas will continue to devote its resources to its relationship with us or otherwise perform its obligations under its current and future arrangements with us as expected, as a result of its limited experience in the collection and transportation of seafloor polymetallic nodules or otherwise, the result of any of which would have a material adverse effect on our business, financial condition, liquidity, and results of operations. As a result, we may need to engage and depend on other third parties for the services and funding Allseas currently and is expected to provide us. If these new relationships are not timely entered into or not entered into on commercially reasonable terms, or at all, or if any such relationship is not successful, this would likely have a material adverse effect on our business, financial condition, liquidity, and results of operations.
Current wording
We have partnered with Allseas, a leading global offshore contractor and significant shareholder in our Company, to undertake the development of many of the offshore systems we expect to utilize in our potential commercialization efforts (including equipment required for the transfer of nodules to transport vessels and delivery to port). We are also in discussions with Allseas to enter into binding agreements with them for the future development and operation of the Project Zero Offshore Nodule Collection System and other services. Allseas also provides us with exclusive access to the earlier of the development of the Project Zero Offshore Nodule Collection System and December 31, 2026 to theHidden Gem, the converted drillship expected to be converted into a production vessel by Allseas for our commercial use. In addition, Allseas, and related companies, have provided us financial support through equity investments, unsecured credit facilities and short-term and working capital loans. We cannot provide any assurance with respect to the success of our continued relationship with Allseas, that we will be able to enter into additional binding agreements with Allseas on commercially reasonable terms, or at all, that Allseas will continue to devote its resources to its relationship with us, continue to provide us financial support or otherwise perform its obligations under its current and future arrangements with us as expected, as a result of its limited experience in the collection and transportation of seafloor polymetallic nodules or otherwise, the result of any of which would have a material adverse effect on our business, financial condition, liquidity, and results of operations. As a result, we may need to engage and depend on other third parties for the services and funding Allseas currently provides to us and is expected to continue doing so. If these new relationships are not timely entered into or not entered into on commercially reasonable terms, or at all, or if any such relationship is not successful, this would likely have a material adverse effect on our business, financial condition, liquidity, and results of operations.
Previous wording
Should our offshore nodule collection plans become successful, we intend to partner with existing onshore processing partners to produce and develop new build onshore processing plants as we scale up production. Our future needs with respect to such processing plants have yet to be fully determined, and as such, the capital costs, performance, reliability, and maintenance of such plants is currently uncertain.
Current wording
Should our offshore nodule collection plans become successful, we intend to partner with existing onshore processing partners to produce and develop new build onshore processing plants as we scale up production. Our future needs with respect to such processing plants have yet to be fully determined, and as such, the capital costs, performance, reliability, and maintenance of such plants are currently uncertain.
Previous wording
We have identified potential tolling facilities to process nodules into two products, manganese silicate and copper-nickel-cobalt alloy, or matte and developed a marketing strategy to place the latter products into existing smelting and refining facilities. There is no guarantee that these facilities will be available at the required times or that we would be able to secure them at commercially attractive rates. Additionally, even if we are able to secure appropriate processing facilities (through tolling arrangements), there is no guarantee that we will be able to provide them with the required nodule feedstocks at the required times.
Current wording
We have identified potential tolling facilities to process nodules into two products, manganese silicate and nickel-copper-cobalt alloy, or matte and developed a marketing strategy to place the latter products into existing smelting and refining facilities. There is no guarantee that these facilities will be available at the required times or that we would be able to secure them at commercially attractive rates. Additionally, even if we are able to secure appropriate processing facilities (through tolling arrangements), there is no guarantee that we will be able to provide them with the required nodule feedstocks at the required times.
Previous wording
While we believe that we have identified specific sites for the potential construction of nodule processing plants (based on factors such as proximity to deep-water ports, cost access to renewable electric power and natural gas, and proximity to customers), there is a risk that we will be unable to secure one or more of these sites on suitable terms. For example, having faced significant issues in securing technical service provider capacity with scenario-based capability in 2022, we moved away from developing a new Project Zero Plant in India and instead are now reviewing the feasibility of utilizing existing facilities as an alternative. In the event that we are unable to secure one or more of the sites we have identified, or if modification scope identification, development and associated construction delays of this scope implementation impact our ability to develop one or more of such sites, our ability to process polymetallic nodules would be detrimentally impacted. Additionally, there can be no guarantees that such plants can be developed, or if developed, that such plants will perform in an economically viable manner or provide the projected metal recovery rates at the estimated project capital and operating costs, which could impact projections for our future revenues, cash flows, royalties, and development and operating expenditures.
Current wording
While we believe that we have identified specific sites for the potential construction of nodule processing plants (based on factors such as proximity to deep-water ports, cost of access to renewable electric power and natural gas, and proximity to customers), there is a risk that we will be unable to secure one or more of these sites on suitable terms. In the event that we are unable to secure one or more of the sites we have identified, or if modification scope identification, development and associated construction delays of this scope implementation impact our ability to develop one or more of such sites, our ability to process polymetallic nodules would be detrimentally impacted. Additionally, there can be no guarantees that such plants can be developed, or if developed, that such plants will perform in an economically viable manner or provide the projected metal recovery rates at the estimated project capital and operating costs, which could impact projections for our future revenues, cash flows, royalties, and development and operating expenditures.
Previous wording
The actual operating costs of our subsidiaries to collect polymetallic nodules, transport, process and refine such nodules commercially will depend upon changes in the availability of financing or partners who undertake capital developments in partnership with us, and prices of labor, equipment and infrastructure, shipping costs, variances in ore recovery from those currently assumed, operational risks, changes in governmental regulation, including taxation, environmental, permitting and other regulations and other factors, many of which are beyond our control. Due to any of these or other factors, our capital and operating costs may be significantly higher than those set forth in the NORI Initial Assessment and TOML Mineral Resource Statement prepared by AMC and filed as exhibits to this Annual Report. As a result of higher capital and operating costs, our financing ability may be impacted, and this may be further affected by lower commodity prices in the international markets that could impact production or economic returns which may differ significantly from those set forth in the NORI Initial Assessment and TOML Mineral Resource Statement and there can be no assurance that any of our development activities will result in profitable operations.
Current wording
The actual operating costs of our subsidiaries to collect polymetallic nodules, transport, process and refine such nodules commercially will depend upon changes in the availability of financing or partners who undertake capital developments in partnership with us, and prices of labor, equipment and infrastructure, shipping costs, variances in ore recovery from those currently assumed, operational risks, changes in governmental regulation, including taxation, environmental, permitting and other regulations and other factors, many of which are beyond our control. Due to any of these or other factors, our capital and operating costs may be significantly higher than those set forth in the NORI Initial Assessment and TOML Mineral Resource Statement prepared by AMC and filed as exhibits to this Annual Report or that we otherwise estimate from time to time. As a result of higher capital and operating costs, our financing ability may be impacted, and this may be further affected by lower commodity prices in the international markets that could impact production or economic returns which may differ significantly from those set forth in the NORI Initial Assessment and TOML Mineral Resource Statement or that we otherwise estimate from time to time and there can be no assurance that any of our development activities will result in profitable operations.
Previous wording
We have a limited operating history, and we expect that our losses will continue until we achieve profitable commercial production. NORI currently intends to explore and collect mineral resources in the NORI areas identified in the exploration contract executed by NORI with the ISA, and we hope to expand such operations if viable in certain other parts of the CCZ, including by TOML in the TOML areas identified in the exploration contract executed between TOML and the ISA and DGE in the Marawa areas identified in the exploration contract executed by Marawa with the ISA. Although NORI anticipates that its first production of nodules from NORI Area D could be in the first quarter of 2026 (assuming submission of an application for an exploitation contract, that includes a plan of work for exploitation, for NORI Area D following the July 2024 ISA meeting and the ISA’s timely one-year review and approval thereof), there can be no assurance that it will be able to commercially develop these properties or that it will be able to generate profits in the future.
Current wording
We have a limited operating history, and we expect that our losses will continue until we achieve profitable commercial production. NORI currently intends to explore and collect mineral resources in the NORI areas identified in the exploration contract executed by NORI with the ISA, and we hope to expand such operations if viable in certain other parts of the CCZ, including by TOML in the TOML areas identified in the exploration contract executed between TOML and the ISA. There can be no assurance that we will be able to commercially develop these properties or that it will be able to generate profits in the future.
Previous wording
Our operating expenses and capital expenditures will increase in the future as consultants and new employees are engaged, equipment associated with advancing exploration is leased or purchased, and properties are developed. There can be no assurance that we will generate any revenues or achieve profitability, or that the assumed levels of expense associated with our exploration, development, and commercialization processes will prove to be accurate.
Current wording
Our operating expenses and capital expenditures will increase in the future as consultants and new employees are engaged, equipment associated with advancing exploration is leased or purchased, and properties are developed. There can be no assurance that we will generate any revenues or achieve profitability, or that the assumed level of expenses associated with our exploration, development, and commercialization processes will prove to be accurate.
Previous wording
In light of the significant deficit in expected funding following the closing of the Business Combination in September 2021, we adopted what we call a “capital-light” strategy whereby we removed any allocation of funds to capital expenditures that were not deemed necessary to support the submission of an application for a plan of work for exploitation for NORI Area D, and by negotiating the settlement of program expenditures with our equity whenever possible in order to preserve our cash. The continuing exploration and development of the NORI, TOML and Marawa contract areas, however, will depend upon our ability to obtain dilutive and/or non-dilutive financing through stake sales in our assets, offtakes with prepayments, debt financing, equity financing, joint ventures, project-based or asset-based financing or other means. The actual amount of capital needed or that we raise for our projects, however, may vary materially from our current estimates. We currently expect that we will raise additional funds to finance our operations. There is no assurance that we will be successful in obtaining the required financing for these or other purposes, including for general working capital, or that any funds raised will be sufficient for the purposes contemplated, which could negatively impact our operating plans, financial results and ability to continue as a going concern. We will not initially have any producing properties and will have no source of significant operating cash flow until the end of the first half of 2026 at the earliest. There is no precedent for projects like ours, and therefore, financing may not be available on acceptable terms or at all. Failure to obtain additional financing on a timely basis could cause us to reduce or terminate our operations. Organizations such as the United Nations Environment Programme Finance Initiative, warn against investing in activities focused on exploitation of deep-sea nodules as a result of the potential environmental impact of the activities. The influence of these groups could negatively impact our operations and ability to raise capital on acceptable terms or at all.
Current wording
In light of the significant deficit in expected funding following the closing of the Business Combination in September 2021, we adopted what we call a “capital-light” strategy whereby we removed any allocation of funds to capital expenditures that were not deemed necessary to support the submission of an application for a plan of work for exploitation for NORI Area D, by negotiating the settlement of program expenditures with our equity whenever possible in order to preserve our cash, and by utilizing existing assets for offshore and onshore production. The continuing exploration and development of the NORI and TOML contract areas, however, will depend upon our ability to obtain dilutive and/or non-dilutive financing through stake sales in our assets, offtakes with prepayments, debt financing, equity financing, joint ventures, project-based or asset-based financing or other means. The actual amount of capital needed or that we raise for our projects, however, may vary materially from our current estimates. We currently expect that we will raise additional funds to finance our operations. There is no assurance that we will be successful in obtaining the required financing for these or other purposes, including for general working capital, or that any funds raised will be sufficient for the purposes contemplated, which could negatively impact our operating plans, financial results and ability to continue as a going concern. We will not initially have any producing properties and will have no source of significant operating cash flow until we are granted an exploitation contract and begin commercial production. There is no precedent for projects like ours, and therefore, financing may not be available on acceptable terms or at all. Failure to obtain additional financing on a timely basis could cause us to reduce or terminate our operations. Organizations such as the United Nations Environment Programme Finance Initiative, warn against investing in activities focused on exploitation of deep-sea nodules as a result of the potential environmental impact of the activities. The influence of these groups could negatively impact our operations and ability to raise capital on acceptable terms or at all.
Previous wording
As at December 31, 2023, we had 306,558,710 Common Shares, 15,074,240 Short-Term Incentive Plan (“STIP”) options, 9,783,922 Long-Term Incentive Plan (“LTIP”) options and 24,500,000 warrants to acquire Common Shares issued and outstanding, which does not include the 4,500,000 Common Shares and 2,250,000 Class A warrants issuable in the private placement financing we announced in August 2023. Subject to the requirements of the Business Corporations Act (British Columbia) (“BCBCA”), our Articles authorize us to issue Common Shares and rights relating to our Common Shares for the consideration and on the terms and conditions established by our board of directors in its sole discretion, whether in connection with acquisitions or otherwise. In addition, 56,634,518 Common Shares are reserved for issuance under the TMC Incentive Equity Plan, including 12,262,348 shares added to the plan in January 2024 pursuant to the plan’s evergreen provision, and 10,988,032 Common Shares are reserved for issuance under our 2021 Employee Stock Purchase Plan, in each case (the “ESPP”), including 3,065,587 shares added to the plan in January 2024, pursuant to the plan’s evergreen provision, in each case, subject to adjustment in certain events. In addition, up to 136,239,964 Common Shares, subject to adjustment in certain events, may be issued to the holders of special shares and holders of options underlying special shares upon conversion of special shares if certain common share price thresholds are met (“Special Shares”). Any Common Shares issued, including in connection with the August 2023 registered direct financing, upon exercise of warrants, upon conversion of the Special Shares or under the TMC Incentive Equity Plan, the ESPP or other equity incentive plans that we may adopt in the future, would dilute the percentage ownership held by you.
Current wording
As at December 31, 2024, we had 340,708,460 Common Shares, 14,300,575 Short-Term Incentive Plan (“STIP”) options, 9,644,875 Long-Term Incentive Plan (“LTIP”) options in each case issued under the 2018 Stock Option Plan (“2018 Plan”), 3,940,000 options issued under the 2021 Incentive Equity Plan and 38,180,770 warrants to acquire Common Shares issued and outstanding, which does not include the 5,000,000 Common Shares and 2,500,000 Class B warrants issued after December 31, 2024 as part of the financing we announced in November 2024. Subject to the requirements of the Business Corporations Act (British Columbia) (“BCBCA”), our Articles authorize us to issue Common Shares and rights relating to our Common Shares for the consideration and on the terms and conditions established by our board of directors in its sole discretion, whether in connection with acquisitions or otherwise. In addition, 70,262,856 Common Shares are reserved for issuance under the 2021 Incentive Equity Plan, including 13,628,338 shares added to the plan in January 2025 pursuant to the plan’s evergreen provision, of which 51,090,231 are available for future issuance, and 14,395,117 Common Shares are reserved for issuance under our 2021 Employee Stock Purchase Plan (the “ESPP”), including 3,407,085 shares added to the plan in January 2025, pursuant to the plan’s evergreen provision, of which 14,055,707 are available for future purchase, in each case, subject to adjustment in certain events. In addition, up to 136,239,964 Common Shares, subject to adjustment in certain events, may be issued to the holders of special shares and holders of options underlying special shares upon conversion of special shares if certain common share price thresholds are met (“Special Shares”). Any Common Shares issued upon exercise of warrants, upon conversion of the Special Shares or under the 2018 Plan, 2021 Incentive Equity Plan, the ESPP or other equity incentive plans that we may adopt in the future, would dilute the percentage ownership held by you.
Previous wording
In addition, the contractual lock-up agreements on certain of our securities entered into in connection with the Business Combination have all expired. As a result, all of our public shares are freely transferable. Sales of substantial amounts of our common shares in the public market, or the perception that such sales will occur, could adversely affect the market price of our Common Shares.
Current wording
In addition, sales of substantial amounts of our common shares in the public market, or the perception that such sales will occur, could adversely affect the market price of our Common Shares.
Previous wording
We have 15,000,000 outstanding Public Warrants to purchase 15,000,000 Common Shares and 9,500,000 Private Warrants outstanding exercisable for 9,500,000 shares of our Common Shares at an exercise price of $11.50 per share, which warrants became exercisable beginning on October 9, 2021. In addition, there are 3,980,770 Class A Warrants outstanding to purchase 3,980,770 Common Shares at an exercise price of $3.00 per share, that were issued as part of the August 2023 registered direct offering. In certain circumstances, the Public Warrants, Private Warrants and Class A Warrants may be exercised on a cashless basis and the proceeds from the exercise of such warrants will decrease. To the extent such warrants are exercised, additional shares of our Common Shares will be issued, which will result in dilution to the holders of our Common Shares and increase the number of shares eligible for resale in the public market. Sales of substantial numbers of such shares in the public market could adversely affect the market price of our Common Shares, the impact of which is increased as the value of our stock price increases. Furthermore, if we raise additional funds by issuing additional Common Shares, or securities convertible into or exchangeable or exercisable for common stock, our shareholders will experience additional dilution, and new investors could have rights superior to existing stockholders.
Current wording
We have 15,000,000 outstanding Public Warrants to purchase 15,000,000 Common Shares and 9,500,000 Private Warrants outstanding exercisable for 9,500,000 shares of our Common Shares at an exercise price of $11.50 per share, which warrants became exercisable beginning on October 9, 2021. In addition, there are 6,230,770 Class A Warrants outstanding to purchase 6,230,770 Common Shares, issued as part of the August 2023 registered direct offering, and 7,450,000 Class B Warrants outstanding to purchase 7,450,000 Common Shares, issued as part of the November 2024 registered direct offering. Both Class A Warrants and Class B Warrants have an exercise price of $2.00 per share. In certain circumstances, the Public Warrants, Private Warrants, Class A Warrants and Class B Warrants may be exercised on a cashless basis and the proceeds from the exercise of such warrants will decrease. To the extent such warrants are exercised, additional shares of our Common Shares will be issued, which will result in dilution to the holders of our Common Shares and increase the number of shares eligible for resale in the public market. Sales of substantial numbers of such shares in the public market could adversely affect the market price of our Common Shares, the impact of which is increased as the value of our stock price increases. Furthermore, if we raise additional funds by issuing additional Common Shares, or securities convertible into or
Previous wording
There can be no assurance that the Public Warrants, Private Warrants and Class A Warrants will be in the money, and they may expire worthless.
Current wording
There can be no assurance that the Public Warrants, Private Warrants, Class A Warrants and Class B Warrants will be in the money, and they may expire worthless.
Showing the first 40 of 53 pairs. Open the source sections for the rest.
Rearranged current paragraphs (6)
Current report — wording carried from elsewhere
definitively known. For the same reasons, it may also not be possible to definitively say whether the impact of nodule collection on global biodiversity will be less significant than those estimated for land-based mining for a similar amount of produced metal.
Current report — wording carried from elsewhere
will be successfully developed or operated in a particular time period, or at all and hence, we may be delayed in obtaining offshore collection equipment in the event we do not reach agreement with Allseas and have to develop such equipment on our own or through new third-party contractual relationships.
Current report — wording carried from elsewhere
exchangeable or exercisable for common stock, our shareholders will experience additional dilution, and new investors could have rights superior to existing stockholders.
Current report — wording carried from elsewhere
to generate liquidity, such as selling some or all of our assets. Any such sales could have a material adverse effect on our business, operations and financial results. Moreover, failure to obtain additional financing, if required, on a timely basis, could cause us to reduce or delay our proposed operations.
Current report — wording carried from elsewhere
analyst coverage, if no analysts commence coverage of us, the market price and volume for our Common Shares could be adversely affected.
Current report — wording carried from elsewhere
if a court were to find the choice of forum provision contained in our Notice and Articles to be inapplicable or unenforceable in an action, we may incur additional costs associated with resolving such action in other jurisdictions, which could harm our business, operating results and financial condition.