TMC the metals Co Inc.
For the period ended Dec 31, 2024. Filed Mar 27, 2025.
View on SEC.govAbout this filing
A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.
FY2024 · Filed Mar 27, 2025
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-K
Period ended 2023-12-31; filed 2024-03-25.
0001104659-24-038505
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-K
Period ended 2024-12-31; filed 2025-03-27.
0001410578-25-000516
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 171 previous paragraphs and 195 current paragraphs.
84 unchanged; 39 reworded; 67 added; 45 removed; 3 previous and 5 current paragraphs rearranged.
Tables are not compared: 13 previous and 7 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (67)
Current report
We are currently focused on preparing our application for a plan of work to the ISA for our first exploitation contract for the NORI contract area. Given that it is unlikely that the ISA Council would consider any application for a plan of work for exploitation before its next session in March 2025 and to ensure clarity on the submission process, consideration of the Application, and timeline, the Republic of Nauru, in consultation with NORI, formally requested that this issue be added to the agenda of the Council’s March 2025 meeting. Nauru’s proposed agenda item was strongly opposed by Chile, and it is unlikely for there to be an agreed upon process until after an application is received. Based on the current timeline in the consolidated draft regulations issued February 2024, the ISA application review and approval process is expected to be approximately one year from the filing date. See “Project and Regulatory Updates - ISA Developments” below for a further discussion on recent developments at the ISA.
Current report
Developments with our Projects
Current report
June 27, 2025 Submission Date for Subsidiary NORI’s ISA Application, and Expanded Company Strategy
Current report
NORI has set the date of June 27, 2025 for its expected submission of its ISA exploitation application. According to the ISA Council’s decisions ISBA/28/C/24 and ISBA/28/C/25, if NORI submits an application for a plan of work for exploitation before the RRPs have been adopted, the ISA Council at its next meeting, as a matter of priority, will consider the process for considering such an application. The ISA Council is not scheduled to meet again until March 2025 and we believe it is unlikely that the ISA Council would consider an application for a plan of work for exploitation before this session. In light of this, Nauru formally requested that the ISA clarify the submission and review process for such an application at the March 2025 meetings before NORI submits the Application and, therefore, has decided to submit the Application after the March 2025 meetings on June 27, 2025. At the March 2025 meetings, Nauru’s proposed agenda item was strongly opposed by Chile, and it is unlikely for there to be an agreed upon process until after an application is received.
Current report
Termination of Marawa Agreement
Current report
On November 14, 2024, DeepGreen Engineering Pte. Ltd. (“DeepGreen”) delivered a formal termination notice to Marawa Research and Exploration Limited, ending the Services Agreement dated October 1, 2013 (the “Agreement”), pursuant to DeepGreen’s right to terminate for convenience under the Agreement. The termination became effective on January 14, 2025, and we no longer have any exploration or other rights to the area of the CCZ that was covered by the Agreement. The termination is not expected to have a material adverse effect on our financial position or operations, with non-material ongoing costs and no termination penalties applicable under the Agreement.
Current report
World-First Production of Nickel Sulfate from Deep-Seafloor Polymetallic Nodules
Current report
In April 2024, we announced that we had successfully produced the world’s first nickel sulfate derived exclusively from seafloor polymetallic nodules during pilot-scale nodule processing. In partnership with SGS Canada Inc, the testing was undertaken on samples of nickel-cobalt-copper matte produced by us in 2021 using our efficient flowsheet to process high-grade nickel matte directly to nickel sulfate without making nickel metal, while producing fertilizer byproducts instead of solid waste or tailings.
Current report
In May 2024, we announced that our subsidiary NORI had made a second submission of key environmental data from all prior environmental baseline campaigns conducted in the NORI Area D exploration area up to January 2022 to DeepData, an open database of contractor data managed by the ISA. The submission of this batch of data includes an extensive set of geochemical and biological samples from across the water column.
Current report
World-First Cobalt Sulfate Produced from Deep-Seafloor Polymetallic Nodules
Current report
On June 12, 2024, we announced that we successfully produced the world’s first cobalt sulfate derived exclusively from seafloor polymetallic nodules. The cobalt sulfate was generated during bench-scale testing of our hydrometallurgical flowsheet design with SGS Canada Inc. Based on samples of nickel-cobalt-copper matte first produced by us in 2021, SGS tested our efficient flowsheet to process high-grade nickel-copper-cobalt matte directly to high-purity cobalt sulfate without making cobalt metal, while producing fertilizer byproducts instead of solid waste or tailings. The milestone followed the news in May 2024 of our successful production of nickel sulfate, a key raw material input used in the production of energy-dense EV batteries.
Current report
Third Annual Impact Report Published
Current report
On July 29, 2024, we published our third annual Impact Report to provide an update on key milestones achieved in our assessment of the environmental impacts of nodule collection including, what we believe, is the successful collection of sufficient quantities of environmental baseline and impact data to develop an Environmental Impact Statement and Environmental Mitigation and Management Plan (EMMP) for the world’s first deep-seafloor nodule collection project.
Current report
TMC and PAMCO Successfully Produce Calcine in Commercial-Scale Processing of Polymetallic Nodules
Current report
In September 2024, we announced that we had successfully produced high temperature material (calcine) during the first phase of a commercial-scale campaign to process a 2,000-tonne sample of deep-seafloor polymetallic nodules at our partner PAMCO’s Hachinohe Rotary Kiln Electric-Arc Furnace facility in Hachinohe, Japan. Approximately 500 tonnes of calcine were produced. On February 18, 2025, we announced that PAMCO had successfully smelted 450 tonnes of calcine into 35 tonnes of NiCuCo alloy and 320 tonnes of Mn silicate products.
Current report
ISA Developments
Current report
ISA Consolidated Draft Regulations
Current report
In February 2024, the ISA released the first consolidated draft regulations on exploitation of Mineral resources in the Area. The revised second consolidated text was released in November 2024. Negotiations on the revised second consolidated text began during part 1 of the ISA’s 30 th Session.
Current report
Industry Developments
Current report
TMC Applauds U.S. Congressional Mandate for 2025 Defense Department Feasibility Study on Nodule Refining
Current report
On December 30, 2024, we welcomed the signing of legislation calling for financial support from the Defense Department’s Industrial Base Policy office to “assess the feasibility of improving domestic capabilities for refining polymetallic nodule-derived intermediates into high-purity nickel, cobalt sulfate, and copper.” The legislation, signed into law by President Biden on December 23, 2024, was led by the HASC and calls for the completion of a feasibility study by the end of 2025 for a nodule-derived intermediate refinery which would bring the U.S. closer to addressing the biggest vulnerability in its domestic battery supply chains – nickel refining – as identified in Executive Order 14017 from 2021. In addition, our U.S. subsidiary has an outstanding application seeking a $9 million grant under the Defense Production Act Title III program for feasibility work on a domestic refinery for nodule-derived intermediate products.
Current report
Responsible Use of Seafloor Resources Act (RUSRA)
Current report
In March 2024, legislation was introduced in the U.S. House of Representatives calling for the U.S. to “support international governance of seafloor resource exploration and responsible polymetallic nodule collection by allied partners”, and to “provide financial, diplomatic, or other forms of support for seafloor nodule collection, processing and refining.”
Current report
TMC CEO Testifies to U.S. House of Representatives on Benefits of Nodules
Current report
In September 2024, our CEO Gerard Barron gave testimony during a meeting of the Critical Mineral Policy Working Group for the House Select Committee on the Chinese Communist Party to discuss the U.S.’ heavy reliance on Chinese imports of critical minerals and policy solutions to incentivize greater cooperation with allies to create alternative supplies. Mr. Barron spoke to the potential of seafloor nodules to secure U.S. supplies of key minerals for the energy transition and defense sectors.
Current report
Rebuttal to Publication
Current report
In July 2024, Nature Geoscience published a paper claiming that seafloor nodules produce oxygen in the absence of sunlight. Since the paper’s publication, multiple rebuttals have been submitted to Nature warning of serious flaws with the paper’s methodology and claims, prompting calls for the paper to be retracted. Researchers at the University of Tokyo and University of Gothenburg are among the experts that have submitted pre-print rebuttals to the article’s author. Our own rebuttal, published September 19, 2024, notes selective reporting of data and omission of key evidence, including experiments that show oxygen levels increasing without nodules, directly contradicting the authors’ claims.
Current report
TMC Announces Registered Direct Offering
Current report
On November 14, 2024, we entered into a securities purchase agreement with certain new and existing institutional investors for the sale of an aggregate of 17,500,000 common shares (the “Shares”) and accompanying Class B warrants (the “Class B Warrants”), in a registered direct offering (the “2024 Registered Direct Offering”). The offering price was $1.00 per Share, resulting in initial gross proceeds of $17.5 million ($16.5 million after associated fees), with each Share including an accompanying Class B Warrant to purchase 0.5 common shares. The Class B Warrants are exercisable immediately upon issuance at a price of $2.00 per share and expire five years from issuance. On November 26, 2024, we entered into the First Amendment to the Securities Purchase Agreement, increasing the offering by an additional 2,400,000 common shares and accompanying Class B Warrants to purchase 1,200,000 common shares on the same terms and conditions. As a result, the total number of Shares and accompanying Class B Warrants issued in the registered direct offering increased to 19,900,000 Shares and Class B Warrants to purchase 9,950,000 common shares, bringing the aggregate gross proceeds to $19.9 million, all of which has been received, before deducting offering expenses. The Class B Warrants include customary anti-dilution protections and a repurchase feature, permitting us to repurchase the warrants for $0.0001 per Common Share underlying the Class B Warrants if the volume-weighted average price of our common shares exceeds $5.00 per share for each trading day in a consecutive 30-trading-day period.
Current report
Amendment to 2023 Credit Facility with Allseas Affiliate
Current report
TMC Board Appointments
Current report
Steve Jurvetson Joins TMC’s Board of Directors as Vice Chairman and Special Advisor to the CEO
Current report
On April 10, 2024, renowned Silicon Valley investor Steve Jurvetson joined our board of directors as Vice Chairman and special advisor to the CEO. Mr. Jurvetson is an investor focused on founder-led, mission-driven companies at the cutting edge of disruptive technology and new industry formation. His investments include pioneering technology companies like Tesla, Planet Labs, SpaceX and Commonwealth Fusion Systems, and represent over $800 billion in aggregate value creation.
Current report
Prominent Sustainability Strategist Brendan May Joins TMC’s Board of Directors
Current report
On June 3, 2024, we announced the appointment of Brendan May to our Board of Directors. As a former Chief Executive of the Marine Stewardship Council (MSC) and European Chairman of the Rainforest Alliance, Mr. May has spent over two decades at the forefront of sustainability challenges in globally significant ecosystems. In 2010, he formed renowned global sustainability consultancy, Robertsbridge, whose counsel has been sought by leading companies and NGOs around the world.
Current report
TMC and PAMCO Achieve Nodule Processing Milestone, Unlocking Critical Battery & Steelmaking Materials at Existing Facilities
Current report
On February 18, 2025, we announced that PAMCO had successfully smelted 450 tonnes of calcine into 35 tonnes of NiCuCo alloy and 320 tonnes of Mn silicate products, during a commercial-scale campaign to process a 2,000-tonne sample of deep-seafloor polymetallic nodules at our partner PAMCO’s Hachinohe Rotary Kiln Electric-Arc Furnace facility in Hachinohe, Japan, demonstrating
Current report
the process at scale. The process data and operational experience gathered during the commercial-scale processing trial will inform expected definitive processing agreements between the parties.
Current report
On March 26, 2025, we entered into the Third Amendment to the 2024 Credit Facility with the 2024 Lenders, to, among other things, increase the borrowing limit to $44 million in the aggregate ($22 million from each of the 2024 Lenders) and extend the maturity of the 2024 Credit Facility to June 30, 2026.
Current report
Extension of Allseas Working Capital Loan Agreement and Termination of Allseas 2023 Credit Facility
Showing the first 40 of 67 passages. Open the source sections for the rest.
Removed paragraphs (45)
Previous report
We are currently focused on preparing to submit our application to the ISA for our first exploitation for the NORI Area D contract area following the July 2024 meeting of the ISA.
Previous report
We now expect to commence production offshore at the end of the first quarter of 2026, assuming an ISA review process of approximately one year on our application for an exploitation contract. This new estimated timeline to first production is based on:
Previous report
NORI Area D Project Advancements
Previous report
Update on Application Timeline and Costs, Increased Production Capacity
Previous report
In August 2023, we provided a corporate update on our expected project development timeline, production capacity and application costs for our NORI Area D Nodule Project following the recent ISA Council decisions on a roadmap to deliver final rules, regulations and procedures, also known as the Mining Code. Our wholly-owned subsidiary NORI intends to submit an application to the ISA for an exploitation contract for NORI Area D following the July 2024 meeting of the ISA. Assuming an approximate one-year review process, NORI expected to be in commercial production at the end of 2025 (now estimated for the end of the first quarter of 2026) if the application is approved. NORI and strategic partner Allseas plan for an increased production capacity for the Project Zero Offshore Nodule Collection System, using theHidden Gem vessel, from an estimated 1.3 million wet tonnes to up to an estimated 3.0 million wet tonnes per annum, a potential increase of 130%.
Previous report
In March 2023, we announced that NORI had begun the process of submitting data collected during 17 offshore resource definition and environmental baseline campaigns in NORI Area D to the DeepData platform, an open database of contractor data managed by the ISA. Collected using a suite of high-tech equipment, the dataset submitted to the ISA includes over 1,400 biological samples from extensive boxcore and multicore sampling, and over 8,000 images analysed for benthic megafauna captured by remotely operated vehicles from two offshore campaigns. This first submission of benthic data, which includes over 270,000 occurrences, will provide a significant expansion to the biological holdings contained within the DeepData platform.
Previous report
Publication of NORI Area D data to Ocean Biodiversity Information System
Previous report
In July 2023, we announced that data from two offshore environmental research campaigns conducted by NORI had been published by the ISA to the Ocean Biodiversity Information System (OBIS), the world’s largest scientific knowledge base on the diversity, distribution and abundance of marine organisms. NORI is now the single largest contributor of biological occurrence data to the OBIS ISA-node, providing approximately 60% of all records. With much more data to be submitted, we expect NORI Area D will be one of the most highly characterized deep-sea areas in the region that hosts approximately 90% of all nodule exploration.
Previous report
Benchmark LCA of NORI Area D Project
Previous report
In March 2023, we announced that leading lithium-ion battery supply chain research firm, Benchmark Mineral Intelligence (“Benchmark”), had completed an independent third-party lifecycle assessment (“LCA”) of the environmental impacts of our NORI Area D project, comparing the production of key energy transition metals (nickel, cobalt and copper) from the NORI Area D project to key land-based production routes for the same metals. Benchmark’s LCA shows the NORI Area D project model performed better in almost every impact category analysed than all the land-based routes chosen by Benchmark for comparison.
Previous report
Forest ecosystems play a critical role in the carbon cycle, yet mining’s impacts on their carbon sequestration services often goes unaccounted for in studies. In 2023, we commissioned Benchmark to address some of these gaps in information in a follow-up study by looking at mining in the top nickel and cobalt producing regions of Sulawesi, Indonesia and Katanga, DRC. When accounting for forest removal, the lifecycle global warming potential (GWP) per kilogram of nickel mined in Indonesia; Benchmark’s earlier LCA would increase by between 7-49% per kilogram of Indonesian nickel (depending on production routes) and by 35% per kilogram of cobalt mined in DRC.
Previous report
Publication of 2022 Impact Report
Previous report
In October 2023, we published our second annual Impact Report which provides an update on key milestones achieved in our assessment of the environmental and social impacts of seafloor nodule collection and those impacts relative to land-based alternatives, and the efforts we are undertaking to eliminate or reduce such impacts. As part of the Impact Report, we also introduced our Sustainability Approach highlighting our thought processes about how we intend to fully align our activities to environmental, social and governance (ESG) principles.
Previous report
NORI Area D Testing and Monitoring
Previous report
NORI Shares Preliminary Findings on Environmental Impacts of Test Mining Campaign
Previous report
In November 2023, our subsidiary NORI began sharing emerging data on the impacts of seafloor sediment plumes which show that the plume forms a gravity-driven turbidity current that hugs the contours of the seafloor and does not loft up into the water column where it could possibly be transported longer distances by ocean currents. A key component to understanding our environmental impacts, the data builds upon earlier laboratory predictions and in-field verifications from prior collector tests.
Previous report
Conclusion of Key Offshore Research Campaign
Previous report
In December 2023, we announced the conclusion of our latest offshore scientific research campaign to assess seafloor impacts and recovery rates twelve months after the pilot nodule collection system test conducted by our NORI subsidiary. NORI’s latest offshore scientific research campaign successfully gathered crucial environmental data on ecosystem recovery and functioning to further support our application for a commercial exploitation contract. The preliminary qualitative assessments are encouraging, and we look forward to sharing the data and results in 2024.
Previous report
Next Phase of Adaptive Management System Development Announced
Previous report
Following the delivery of a prototype Digital Twin from Kongsberg Digital in 2022 and its deployment during the collector tests in 2022, we announced in September 2023 that we had entered into the next phase of our relationship with Kongsberg Digital to further develop the Digital Twin which will integrate multiple data streams from our future production system and is designed to enable 3D visualization of our deep-sea operating environment, providing ‘eyes and ears’ to the regulator and stakeholders. The Digital Twin is a core component of our broader Adaptive Management System (AMS) which is designed to utilise AI and hybrid machine learning capabilities of the Digital Twin with expert analysis to ensure operations remain within environmental impact thresholds, a system with potential applications for resource operations at sea and on land.
Previous report
New Partnerships
Previous report
MoUs with PAMCO to Evaluate Nodule Processing at Existing Facility
Previous report
In March 2023, we announced that we had entered into a non-binding MoU with PAMCO of Japan, to evaluate the toll treatment and conversion of polymetallic nodules into battery metal feedstock at PAMCO’s Hachinohe, Japan smelting facility.
Previous report
This announcement was followed with the signing of a binding MoU with PAMCO in November 2023 for a feasibility study to process 1.3 million tonnes of wet polymetallic nodules per year at their existing smelting facility in Hachinohe, Japan. The agreement underscores our stated capital-light strategy to get into initial commercial production swiftly and with lower upfront capital by re-using existing onshore production assets.
Previous report
Engagement with Bechtel Australia Pty Ltd. to Support NORI’s Commercial Contract Application
Previous report
In March 2023, we announced that our wholly-owned subsidiary DeepGreen Engineering Pty. Ltd. had entered into an agreement with Bechtel Australia Pty Ltd. (“Bechtel”), a global leader in engineering, procurement and construction, to collect and compile the techno-economic studies prepared by various consultants required for NORI to lodge its application for an exploitation contract for its NORI Area D project with the ISA.
Previous report
Investment in Low Carbon Royalties
Previous report
In February 2023, we and our wholly-owned subsidiary, NORI, entered into a strategic partnership with Low Carbon Royalties Inc. (“LCR”), a private corporation formed under the laws of British Columbia, Canada to finance low carbon emitting energy production and technologies (natural gas, nuclear, renewables), transition metals and minerals required for energy storage and electrification (Cu, Li, Ni, Co, Mn), and the evolving environmental markets (the “Partnership”). We agreed with LCR to a purchase and sale agreement whereby LCR acquired a 2.0% gross overriding royalty on our NORI project area in the CCZ of the Pacific Ocean (“NORI Royalty”). In consideration for the NORI Royalty, we received $5,000,000 cash and an initial 35.0% equity interest in LCR. We retain the right to repurchase up to 75% of the NORI royalty at a capped return. If both repurchase transactions are executed, the NORI Royalty will be reduced to 0.5%.
Previous report
Developments with our Allseas Partnership
Previous report
In the fourth quarter of 2022, we successfully tested the pilot nodule collection system in NORI Area D. As a result of lifting to the production vessel, Hidden Gem, of more than 3,000 tonnes of wet nodules during these tests, Allseas and NORI believe that they can upgrade the pilot nodule collection system, including the Hidden Gem, into the first production system, which we refer to as the Project Zero Offshore Nodule Collection System.
Previous report
In August 2023, we announced that Allseas and NORI are now executing on a plan designed to increase the maximum production capacity of the Project Zero Offshore Nodule Collection System from the previous estimate of 1.3 million wet tonnes per annum to up to an estimated 3.0 million wet tonnes per annum in stepped increments based on Allseas’ estimates – a potential increase of 130%. The upgrades are expected to include the addition of a second 15-meter collector vehicle, the use of a wider diameter riser pipe from the seafloor to the surface, implementation of a larger compressor spread and improvements to the system designed to further mitigate its environmental impacts. Capacity is expected to be increased over time as production and experience milestones are met, which we believe will help manage operational risk, minimize up-front capital expenditure requirements and allow for staged increases in capacity as environmental review thresholds are met. Most of these capacity improvements are expected to occur after NORI’s application for an exploitation contract over NORI Area D is ready for submission to the ISA.
Previous report
In furtherance of our non-binding term sheet entered into in March 2022 with Allseas, we continue our discussions with Allseas regarding these upgrades and the development of the Project Zero Offshore Nodule Collection System and anticipate reaching a definitive agreement with Allseas before the end of 2024. The definitive agreement is expected to include further detail on pre-production system development and post-production costs. There can be no assurances, however, that we will enter into a definitive agreement(s) with Allseas in a particular time period, or at all, or on terms similar to those currently expected, or that if such definitive agreement(s) is entered into that the Project Zero Offshore Nodule Collection System will be successfully developed or operated.
Previous report
Registered Direct Offering
Previous report
On August 14, 2023, we entered into a securities purchase agreement with certain investors, pursuant to which we agreed to sell and issue, in a registered direct offering (the “Registered Direct Offering”) 12,461,540 Common Shares and issue Class A Warrants to purchase 6,230,770 Common Shares for expected gross proceeds to us of $24.9 million and expected net proceeds to us of $23.6 million, after deducting underwriting discounts and commissions and other offering expenses payable by us. The Common Share and the accompanying Class A Warrant to purchase 0.5 of a Common Share were sold at a price of $2.00 per unit. The exercise price of the Class A Warrants is $3.00, subject to adjustment as provided in the warrant agreement. The Registered Direct Offering initially closed in August 2023, with the final receipt of gross proceeds received in January 2024.
Previous report
On July 31, 2023, the Company entered into the Amendment to the Unsecured Credit Facility with Argentum Credit Virtuti GCV (the “Lender”), the parent of Allseas Investments S.A. and an affiliate of Allseas, to extend the credit facility to November 30, 2024. The Credit Facility was then further amended in March 2024 as described below.
Previous report
Amendment to Credit Facility with Allseas Affiliate
Previous report
Credit Facility withERAS Capital LLC and Gerard Barron
Previous report
*Marawa.*DGE, our wholly-owned subsidiary, entered into agreements with Marawa and Kiribati which provide DGE with exclusive exploration rights to an area covering 74,990 square kilometers in the CCZ (the “Marawa Contract Area”). The exploration contract between Marawa and the ISA (the “Marawa Exploration Contract”) was signed on January 19, 2015. To date, limited offshore marine resource definition activities in the Marawa Contract Area have occurred. We are collaborating with Marawa to assess the viability of any potential project in the Marawa Contract Area, although the timing of such assessment is uncertain. Marawa has delayed certain of its efforts in the Marawa Contract Area while it determines how it will move forward with additional assessment work.
Previous report
Exploration and evaluation expenses for the year ended December 31, 2023 were $49.8 million, compared to $144.6 million for the same period in 2022. The decrease of $94.8 million was primarily due to the recognition of cost representing the fair value of Allseas Warrant of $69.9 million, a reduction of $21.6 million on environmental studies as the collector test was completed in 2022 partially offset by the monitoring work on the NORI Area D collector test which was carried out in the fourth quarter of 2023, a reduction of $17.8 million on the PMTS and a reduction of $3.5 million in share based compensation cost as the cost of the LTIP options with specific market capitalization vesting conditions was fully amortized in 2022 in addition to the decrease in the amortization cost of STIP sign-up options granted in 2021, and reduced exploration activities in 2023. This was partially offset by an increase in mining, technological and process development of $13.0 million due to engineering work which commenced in the fourth quarter of 2022, an increase of $2.2 million in exploration labor costs mainly attributable to an increase in headcount, an increase of $1.9 million on Sponsorship, Training and Stakeholder Engagement cost and an increase of $1.3 million on prefeasibility work.
Previous report
G&A expenses for the year ended December 31, 2023 were $22.5 million compared to $29.5 million for the same period in 2022. The decrease of $7.0 million in G&A expenses was mainly the result of lower share-based compensation in the 2023 period as the cost of the LTIP options with specific market capitalization vesting conditions was fully amortized in 2022 in addition to the decrease in the amortization cost of STIP sign-up options granted in 2021 and a decrease in communication and investor relations costs incurred during the first quarter of 2023. This decrease was partially offset by higher G&A expenses in the first quarter of 2023, reflecting an increase in personnel, legal, and other expenses.
Showing the first 40 of 45 passages. Open the source sections for the rest.
Reworded paragraphs (39)
Previous wording
The CCZ is a geological submarine fracture zone of abyssal plains and other formations in the Eastern Pacific Ocean, with a length of around 7,240 kilometers (4,500 miles) that spans approximately 4,500,000 square kilometers (1,700,000 square miles). Polymetallic nodules are discrete rocks that sit unattached to the seafloor, occur in significant quantities in the CCZ and have high concentrations of nickel, manganese, cobalt and copper in a single rock. These four metals contained in the polymetallic nodules are critical for the transition to low carbon energy. Our resource definition work to date shows that nodules in our contract areas represent the world’s largest estimated undeveloped source of critical battery metals. If we are able to collect polymetallic nodules from the seafloor on a commercial scale, we plan to use such nodules to produce three types of metal products: (i) feedstock for battery cathode precursors (nickel, and cobalt sulfates, or intermediate nickel-copper-cobalt matte or nickel-copper-cobalt alloy) for EV and renewable energy storage markets, (ii) copper cathode for EV wiring, energy transmission and other applications and (iii) manganese silicate for manganese alloy production required for steel production. Our mission is to build a carefully managed shared stock of metal (a “metal commons”) that can be used, recovered and reused for generations to come. Significant quantities of newly mined metal are required because existing metal stocks are insufficient to meet rapidly rising demand.
Current wording
The CCZ is a geological submarine fracture zone of abyssal plains and other formations in the Eastern Pacific Ocean, with a length of around 7,240 kilometers (4,500 miles) that spans approximately 4,500,000 square kilometers (1,737,000 square miles). Polymetallic nodules are discrete rocks that sit unattached to the seafloor, occur in significant quantities in the CCZ and have high concentrations of nickel, copper, cobalt and manganese in a single rock. These four metals contained in the polymetallic nodules are critical for the transition to low carbon energy. Our resource definition work to date shows that nodules in our contract areas represent the world’s largest estimated undeveloped source of the four critical metals contained in nodules. If we are able to collect polymetallic nodules from the seafloor on a commercial scale, we plan to use such nodules to produce three types of metal products: (i) feedstock for battery cathode precursors (nickel, and cobalt sulfates, or intermediate nickel-copper-cobalt matte or nickel-copper-cobalt alloy) for EV and energy storage markets, (ii) copper cathode for electric wiring, energy transmission and other applications and (iii) manganese silicate for manganese alloy production required for steel production. Our mission is to build a carefully managed shared stock of metal (a “metal commons”) that can be used, recovered and reused for generations to come. Significant quantities of newly mined metal are required because existing metal stocks are insufficient to meet rapidly rising demand.
Previous wording
Exploration and exploitation of seafloor minerals in international waters is regulated by the ISA, an intergovernmental organization established pursuant to the 1994 Agreement Relating to the Implementation of the UNCLOS. The ISA grants contracts to sovereign states or to private contractors who are sponsored by a sovereign state. The ISA requires that a contractor must obtain and maintain sponsorship by a host nation that is a member of the ISA and signatory to UNCLOS, and such nation must maintain effective supervision and regulatory control over such sponsored contractor. The ISA has issued a total of 19 polymetallic nodule exploration contracts covering approximately 1.28 million square kilometers, or 0.4% of the global seafloor, 17 of which are in the CCZ. We hold exclusive exploration and commercial rights to three of the 17 polymetallic nodule contract areas in the CCZ; two based on ISA exploration contracts through our subsidiaries NORI and TOML, sponsored by Nauru and Tonga, respectively, and exclusive commercial rights through our subsidiary, DGE, and its arrangement with Marawa, a company owned and sponsored by Kiribati.
Current wording
Exploration and exploitation of seafloor minerals in international waters is regulated by the ISA, an intergovernmental organization established pursuant to the 1994 Agreement Relating to the Implementation of the UNCLOS. The ISA grants contracts to sovereign states or to private contractors who are sponsored by a sovereign state. The ISA requires that a contractor obtain and maintain sponsorship by a host nation that is a member of the ISA and signatory to UNCLOS, and such nation must maintain effective supervision and regulatory control over such sponsored contractor. The ISA has issued a total of 19 polymetallic nodule exploration contracts covering approximately 1.28 million square kilometers, or 0.4% of the global seafloor, 17 of which are in the CCZ. We hold exclusive exploration and commercial rights to two of the 17 polymetallic nodule contract areas in the CCZ through our subsidiaries NORI and TOML, sponsored by Nauru and Tonga, respectively.
Previous wording
We have key strategic alliances with (i) Allseas, a leading global offshore contractor, which developed and tested a pilot collection system, which is expected to be modified into an initial smaller scale commercial production system and serve as the basis for the design of a full-scale commercial production system and (ii) Glencore which holds offtake rights to 50% of the NORI nickel and copper production. In addition, we have worked with an engineering firm Hatch and consultants KPM to develop a near-zero solid waste flowsheet. The primary processing stages of the flowsheet from nodule to NiCuCo matte intermediate were demonstrated as part of our pilot plant program at FLSmidth and XPS’ facilities. The matte refining stages are being tested at SGS Lakefield. The near-zero solid waste flowsheet provides a design that is expected to serve as the basis for our onshore processing facilities. After several months of pre-feasibility work in 2022 on the possibility of building a processing facility in India for Project Zero, we decided to adopt a capital-light approach and focus on sourcing an existing processing facility requiring lower capital expenditures and which we believe may offer a lower risk solution to get Project Zero into production. In November 2022, we entered into a non-binding MoU with Pacific Metals Co Ltd (PAMCO) of Japan. In November 2023, we entered into a binding MoU with PAMCO whereby they must complete a feasibility study (expected to be completed during the third quarter of 2024) to toll treat 1.3 million tonnes of wet polymetallic nodules per year at its Hachinohe, Japan smelting facility expected to start in the second quarter of 2026, if we timely obtain an exploitation contract from the ISA. The toll treatment is intended to take place on a dedicated RKEF processing line and produce two products: nickel-copper-cobalt alloy, an intermediate product used as feedstock to produce Li-ion battery cathodes, and a manganese silicate product used to make silico-manganese alloy, a critical input into steel manufacturing. We expect this partnership to progress to a strategic alliance before the end of 2024, subject to successful evaluation study outcomes and agreement to mutually acceptable commercial terms. There can be no assurance that we will enter into such definitive strategic alliance in a particular time period, or at all, or on terms similar to those set forth in the binding MoU, or that if such definitive strategic alliance is entered into by us or that the existing facility will be able to successfully process nodules in a particular time period, or at all.
Current wording
We have key strategic alliances with (i) Allseas, a leading global offshore contractor, which developed and tested a pilot collection system, and is now working to modify it into the first commercial production system and (ii) Glencore which holds offtake rights to 50% of the NORI nickel and copper production if produced from a DGE-owned or controlled facility. In addition, we have worked with engineering firm Hatch and consultants KPM to develop a near-zero solid waste flowsheet. The primary processing stages of the flowsheet from nodule to NiCuCo matte intermediate were demonstrated as part of our pilot plant program at FLSmidth and XPS’ facilities. The matte refining stages are being tested at SGS Lakefield. The near-zero solid waste flowsheet provides a design that is expected to serve as the basis for our onshore processing facilities. In November 2022, we entered into a non-binding MoU with Pacific Metals Co Ltd (PAMCO) of Japan pursuant to which PAMCO completed prefeasibility work assessing the prospect of processing nodules using their existing facilities. In November 2023, we entered into a binding MoU with PAMCO whereby they committed to completing a feasibility study (expected to be completed by mid-2025) to toll treat 1.3 million tonnes of wet polymetallic nodules per year at its Hachinohe, Japan smelting facility, provided we obtain an exploitation contract from the ISA. The toll treatment is intended to take place on a dedicated Rotary Kiln Electric Arc Furnace (“RKEF”) processing line and produce two products: nickel-copper-cobalt alloy, an intermediate product used as feedstock to produce lithium-ion battery cathodes, and a manganese silicate product used to make silico-manganese alloy, a critical input into steel manufacturing. We expect this partnership to progress to a definitive tolling agreement in 2025, subject to successful evaluation study outcomes and agreement to mutually acceptable commercial terms. There can be no assurance that we will enter into such definitive strategic alliance in a particular time period, or at all, or on terms similar to those set
Previous wording
To reach our objective and initiate commercial production, we are: (i) defining our resource and project economics, (ii) developing a commercial offshore nodule collection system, (iii) assessing the environmental and social impacts of offshore nodule collection, and (iv) developing onshore technology to process collected polymetallic nodules into a manganese silicate product, and an intermediate nickel-copper-cobalt alloy or matte product and/or end-products like nickel and cobalt sulfates, and copper cathode.
Current wording
To reach our objective and initiate commercial production, we are: (i) defining our resource and project economics, (ii) developing a commercial offshore nodule collection system, (iii) assessing the environmental and social impacts of offshore nodule collection, and (iv) developing onshore technology to process collected polymetallic nodules into a manganese silicate product, and an intermediate nickel-copper-cobalt alloy or matte product and/or end-products like nickel and cobalt sulfates, and copper cathode. In addition, we are also in the initial stages of considering the possibility of a U.S.-based regulatory pathway with the U.S. National Oceanic and Atmospheric Administration (“NOAA”) and the U.S. Department of Commerce under the U.S. Deep Seabed Hard Mineral Resources Act (“DSHMRA”) for the commercial production of deep-sea polymetallic nodules in the CCZ.
Previous wording
Extensive Deep-sea Environmental Data Submission to the ISA
Current wording
Extensive Submission of Deep-Sea Environmental Data to the ISA
Previous wording
On March 22, 2024, we entered into the Second Amendment to the Unsecured Credit Facility with the Lender, an affiliate of Allseas, to further extend the Credit Facility to August 31, 2025 and to provide that the underutilization fee thereunder shall cease to be payable after the date on which we or the Lender gives notice of termination of the agreement (as amended by this amendment and the July 2023 amendment, the “Credit Facility”). Under the Credit Facility, we may borrow from the Lender up to $25,000,000 in the aggregate through August 31, 2025.
Current wording
On March 22, 2023, we entered into a $25 million Unsecured Credit Facility (the “2023 Credit Facility”) with Argentum Cedit Virtuti GCV, the parent of Allseas Investments S.A. (“Allseas Investments”) and an affiliate of Allseas, which was amended on July 31, 2023. On March 22, 2024, we entered into the Second Amendment to the Unsecured Credit Facility with Argentum Cedit Virtuti GCV to further extend the 2023 Credit Facility to August 31, 2025 and to provide that the underutilization fee thereunder shall cease to be payable after the date on which we or the Lender gives notice of termination of the agreement On August 16, 2024, the Company entered into the Third Amendment to the 2023 Credit Facility, to increase the borrowing limit of the 2023 Credit Facility to $27.5 million. On November 14, 2024, as a result of the 2024 Registered Direct Offering the borrowing limit of the 2023 Credit Facility was returned to $25 million.
Previous wording
On March 22, 2024, we entered into an Unsecured Credit Facility (the “2024 Credit Facility”) with Gerard Barron, our Chief Executive Officer and Chairman, and ERAS Capital LLC, the family fund of our director, Andrei Karkar (collectively, the “2024 Lenders”), pursuant to which, we may borrow from the 2024 Lenders up to $20,000,000 in the aggregate ($10,000,000 from each of the 2024 Lenders), from time to time, subject to certain conditions. All amounts drawn under the 2024 Credit Facility will bear interest at the 6-month Secured Overnight Funding Rate (SOFR), 180-day average plus 4.0% per annum payable in cash semi-annually (or plus 5% if paid-in-kind at maturity, at our election) on the first business day of each of June and January. We will pay an underutilization fee equal to 4.0% per annum payable semi-annually for any amounts that remain undrawn under the 2024 Credit Facility. We have the right to pre-pay the entire amount outstanding under the 2024 Credit Facility at any time, before the 2024 Credit Facility’s maturity of September 22, 2025. The 2024 Credit Facility also contains customary events of default. The 2024 Credit Facility will terminate automatically if we or any of our subsidiaries raise at least USD $50,000,000 in the aggregate (i) through the issuance of any of our or our subsidiaries’ debt or equity securities, or (ii) in prepayments under an off-take agreement or similar commercial agreement.
Current wording
On March 22, 2024, we entered into an Unsecured Credit Facility (the “2024 Credit Facility”) with Gerard Barron, our Chief Executive Officer and Chairman, and ERAS Capital LLC, the family fund of our director, Andrei Karkar (collectively, the “2024 Lenders”), pursuant to which, we may borrow from the 2024 Lenders up to $20 million in the aggregate ($10 million from each of the 2024 Lenders), from time to time, subject to certain conditions. All amounts drawn under the 2024 Credit Facility will bear interest at the 6-month Secured Overnight Funding Rate (“SOFR”), 180-day average plus 4.0% per annum payable in cash semi-annually (or plus 5% if paid-in-kind at maturity, at our election) on the first business day of each of June and January. We will pay an underutilization fee equal to 4.0% per annum payable semi-annually for any amounts that remain undrawn under the 2024 Credit Facility. We have the right to pre-pay the entire amount outstanding under the 2024 Credit Facility at any time, before the 2024 Credit Facility’s maturity of September 22, 2025. The 2024 Credit Facility also contains customary events of default. The 2024 Credit Facility will terminate automatically if we or any of our subsidiaries raise at least $50 million in the aggregate (i) through the issuance of any of our or our subsidiaries’ debt or equity securities, or (ii) in prepayments under an off-take agreement or similar commercial agreement. As of the date of this Annual Report, we have drawn $2.5 million from the 2024 Credit Facility. On August 13, 2024, we entered into the First Amendment to the 2024 Credit Facility with the 2024 Lenders to increase the borrowing limit of the 2024 Credit Facility to $25 million in the aggregate ($12.5 million from each of the 2024 Lenders). On November 14, 2024, we entered into the Second Amendment to the 2024 Credit Facility with the 2024 Lenders, to increase the borrowing limit to $38 million in the aggregate ($19 million from each of the 2024 Lenders) and to extend the maturity of the 2024 Credit Facility to December 31, 2025.
Previous wording
Extension of Credit Facility with Allseas Affiliate
Current wording
Extension of Credit Facility with ERAS Capital LLC and Gerard Barron
Previous wording
We currently hold exclusive exploration rights to certain polymetallic nodule areas in the CCZ through our subsidiaries NORI and TOML, sponsored by the Republic of Nauru and the Kingdom of Tonga, respectively, and exclusive commercial rights through our subsidiary’s (DGE), arrangement with Marawa, a company owned and sponsored by the Republic of Kiribati.
Current wording
We currently hold exclusive exploration rights to certain polymetallic nodule areas in the CCZ through our subsidiaries NORI and TOML, sponsored by the Republic of Nauru and the Kingdom of Tonga, respectively.
Previous wording
NORI. NORI our wholly-owned subsidiary, holds exploration rights to four blocks (NORI Area A, B, C, and D, the “NORI Contract Area”) covering 74,830 square kilometers in the CCZ that were granted by the ISA in July 2011. NORI is sponsored by Nauru pursuant to a certificate of sponsorship signed by the Government of Nauru on April 11, 2011. The D block of the NORI area (“NORI Area D”) is the seafloor parcel where we have performed the most resource definition and environmental work to date. NORI commissioned AMC Consulting Ltd, a leading mining consulting firm (AMC), to undertake a preliminary economic assessment (“PEA”) of the mineral resource contained in NORI Area D and to compile a technical report compliant with Canadian National Instrument (NI 43-101), which was completed in March 2021. AMC subsequently compiled the NORI Technical Report Summary, dated March 2021, which included an initial assessment and an economic analysis of NORI Area D prepared in accordance with the SEC’s Modernization of Property Disclosures for Mining Registrants set forth in subpart 1300 of Regulation S-K (the “SEC Mining Rules”). The NORI Technical Report Summary is filed as Exhibit 96.1 to this Annual Report.
Current wording
NORI. NORI our wholly-owned subsidiary, holds exploration rights to four blocks (NORI Area A, B, C, and D, the “NORI Contract Area”) covering 74,830 square kilometers in the CCZ that were granted by the ISA in July 2011. NORI is sponsored by Nauru pursuant to a certificate of sponsorship signed by the Government of Nauru on April 11, 2011. The D block of the NORI area (“NORI Area D”) is the seafloor parcel where we have performed the most resource definition and environmental work to date. NORI commissioned AMC Consulting Ltd, a leading mining consulting firm, to undertake an Initial Economic Assessment of the mineral resource contained in NORI Area D and to compile a technical report compliant with Canadian National Instrument (NI 43-101), which was completed in March 2021. AMC subsequently compiled the NORI Technical Report Summary, dated March 2021, which included an initial assessment and an economic analysis of NORI Area D prepared in accordance with the SEC’s Modernization of Property Disclosures for Mining Registrants set forth in subpart 1300 of Regulation S-K (the “SEC Mining Rules”). The NORI Technical Report Summary is filed as Exhibit 96.1 to this Annual Report. See Item 2 entitled “Properties” included in this Annual Report for additional information about the 2021 economic analysis of NORI Area D.
Previous wording
We are currently a pre-revenue company and we do not anticipate earning revenues until at least 2026 and only if NORI receives an exploitation contract from the ISA and we are able to successfully collect and process polymetallic nodules into saleable products on a commercial scale. We believe that our performance and future success pose risks and challenges, including those related to: finalization of ISA regulations to allow for commercial exploitation, approval of an application for the ISA exploitation contract, development of environmental regulations associated with our business and development of our technologies to collect and process polymetallic nodules. These risks, as well as other risks, are discussed in Item 7A entitled “Quantitative and Qualitative Disclosures About Market Risk” and Item 1A entitled “Risk Factors” included in this Annual Report.
Current wording
We are currently a pre-revenue company, and we do not anticipate earning revenues (other than potential service revenue) until NORI receives an exploitation contract and we are able to successfully collect and process polymetallic nodules into saleable products on a commercial scale. We believe that our performance and future success pose risks and challenges, including those related to finalization of ISA regulations to allow for commercial exploitation, approval of an application for the ISA exploitation contract, development of environmental regulations associated with our business and development of our technologies to collect and process polymetallic nodules. These risks, as well as other risks, are discussed in Item 7A entitled “Quantitative and Qualitative Disclosures About Market Risk” and Item 1A entitled “Risk Factors” included in this Annual Report.
Previous wording
We are committed to adopting the Task Force on Climate-Related Financial Disclosures recommendations. In our inaugural Impact Report published in May 2022, we provided climate-related disclosure and shared how we believe our mission is aligned with supporting the global energy transition and contributing to a circular metals economy. We recognize that climate change may have a meaningful impact on our financial performance over time, and we have begun the process of consolidating key risks and corresponding action plans to mitigate their negative impact of climate change on our operations.
Current wording
We are committed to adopting the Task Force on Climate-Related Financial Disclosures recommendations. In our Impact Report, we provided climate-related disclosure and shared how our vision is aligned with supporting the global energy transition and contributing to a circular metals economy. We recognize that climate change may have a meaningful impact on our financial performance over time, and we continue the process of assessing key risks and corresponding action plans to mitigate their negative impact of climate change on our operations.
Previous wording
To support the EV and battery storage value chain, we are seeking to close the emerging supply gap of critical battery metals needed for the transition to renewable energy and adoption of EVs. We plan to take advantage of this opportunity to supply lower carbon battery metals, avoid deforestation, and help reduce the cost of batteries.
Current wording
To support the EV and battery storage value chain, we are seeking to close the emerging supply gap of the critical metals contained in nodules needed for the transition to renewable energy and adoption of EVs. We plan to take advantage of this opportunity to supply these potentially lower carbon critical metals, avoid deforestation, and help reduce the cost of batteries.
Previous wording
The global inflation rate rose sharply in 2021 and 2022, and though inflation softened in 2023, marine fuel prices and vessel day rates remained high and have increased our exploration expenses beyond what was originally expected. Additionally, we are experiencing higher offshore labor costs through our contractors.
Current wording
The global inflation rate rose sharply in 2022, and stayed relatively high in 2023 and 2024, marine fuel prices and vessel day rates remained high and have increased our exploration expenses beyond what was originally expected. Additionally, we are experiencing higher offshore labor costs through our contractors.
Previous wording
We are an exploration-stage company with no revenue to date and a net loss of $73.8 million for the year ended December 31, 2023, compared to a net loss of $171 million in the prior year. We have an accumulated deficit of approximately $548.9 million from inception through December 31, 2023.
Current wording
We are an exploration-stage company with no revenue to date and a net loss of $81.9 million for the year ended December 31, 2024, compared to a net loss of $73.8 million in the prior year. We have an accumulated deficit of approximately $631.4 million from inception through December 31, 2024.
Previous wording
To date, we have not generated any revenue. We do not expect to generate revenue until at least 2026 and only if NORI receives an exploitation contract from the ISA and we are able to successfully collect and process polymetallic nodules into saleable products on a commercial scale. Any revenue from initial production is difficult to predict.
Current wording
To date, we have not generated any revenue. We do not expect to generate revenue (other than potential service revenue) until NORI receives an exploitation contract and we are able to successfully collect and process polymetallic nodules into saleable products on a commercial scale. Any revenue from initial production is difficult to predict.
Previous wording
The change in fair value of warrants liabilities primarily consists of the change in the fair value of the 9,500,000 warrants issued to Sustainable Opportunities Holdings LLC concurrently with SOAC’s initial public offering (the “Private Warrants”). For accounting purposes, the Company was considered to have issued the Private Warrants as part of the Business Combination, and we are required to re-measure the fair value of our Private Warrants at the end of each reporting period.
Current wording
The change in fair value of warrants liabilities primarily consists of the change in the fair value of the 9,500,000 warrants issued to Sustainable Opportunities Holdings LLC concurrently with SOAC’s initial public offering (the “Private Warrants”). For accounting purposes, we were considered to have issued the Private Warrants as part of the Business Combination, and we are required to re-measure the fair value of our Private Warrants at the end of each reporting period.
Previous wording
During 2023, we earned interest of $1.3 million, as compared to $1.1 million in 2022, mainly from the investment of our cash on hand.
Current wording
During 2024, we earned interest of $0.2 million, as compared to $1.3 million in 2023, mainly from the investment of our cash on hand.
Previous wording
The change in fair value of warrants liability primarily consists of the change in the fair value of the 9,500,000 Private Warrants. The credit recorded in both years reflects the decrease in the market price of our warrants.
Current wording
The change in fair value of warrants liability primarily consists of the change in the fair value of the 9,500,000 Private Warrants. The credit recorded in 2024 reflects the decrease in the market price of our warrants.
Previous wording
Our primary sources of financing have come from private placements and public offerings of Common Shares and warrants, and the issuance of convertible debentures. As of December 31, 2023, we had cash on hand of $6.8 million.
Current wording
Our primary sources of financing have come from private placements and public offerings of Common Shares and warrants, and the issuance of convertible debentures. As of December 31, 2024, we had cash on hand of $3.5 million.
Previous wording
In light of the significant deficit in expected funding following the closing of the Business Combination in September 2021, we adopted what we call a “capital-light” strategy whereby we removed any allocation of funds to capital expenditures that were not deemed necessary to support the submission of an application for an exploitation contract for the NORI Area D, and by negotiating the settlement of program expenditures with our equity whenever possible.
Current wording
In light of the significant deficit in expected funding following the closing of the Business Combination in September 2021, we adopted what we call a “capital-light” strategy whereby we removed any allocation of funds to capital expenditures that were not deemed necessary to support the submission of an application for an exploitation contract for the NORI Area D, and by negotiating the settlement of program expenditures with our equity whenever possible, and by utilizing existing assets for offshore and onshore production.
Previous wording
We have yet to generate any revenue from our business operations. We are an exploration-stage company and the recovery of our investment in mineral exploration contracts and attainment of profitable operations is dependent upon many factors including, among other things, the development of commercial production system for collecting polymetallic nodules from the seafloor as well as the development of our processing technology for the metallurgical treatment of such nodules, the establishment of mineable reserves, the demonstration of commercial and technical feasibility of seafloor polymetallic nodule collection and processing systems, metal prices, and securing ISA exploitation contracts or provisional approvals. While we have obtained financing in the past, there is no assurance that such financing will continue to be available on favorable terms, in sufficient amounts, or at all.
Current wording
We have yet to generate any revenue from our business operations. We are an exploration-stage company and the recovery of our investment in mineral exploration contracts and attainment of profitable operations is dependent upon many factors including, among other things, the development of a commercial production system for collecting polymetallic nodules from the seafloor as well as the development of our processing technology for the metallurgical treatment of such nodules, the establishment of mineable reserves, the demonstration of commercial and technical feasibility of seafloor polymetallic nodule collection and processing systems, metal prices, and securing ISA exploitation contracts or provisional approvals. While we have obtained financing in the past, there is no assurance that such financing will continue to be available on favorable terms, in sufficient amounts, or at all.
Previous wording
We expect to incur significant expenses and operating losses for the foreseeable future, particularly as we advance towards our application to the ISA for an exploitation contract and preparation for potential commercialization. Based on our cash balance and availability of borrowing under our credit facility with Allseas and credit facility with ERAS Capital LLC and Gerard Barron, when compared with our forecasted cash expenditures, we believe we will have sufficient funds to meet our obligations that become due within the next twelve months. Our estimates used in reaching this conclusion are based on information available as at the date of filing this Annual Report. Accordingly, actual results could differ from these estimates and resulting variances may result in our need for additional funding in an amount greater or earlier than expected, due to changes in business conditions or other developments, including, but not limited to, deferral of approvals, capital and operating cost escalation, currently unrecognized technical and development challenges, our ability to pay certain vendors or suppliers in our Common Shares or changes in external business environment.
Current wording
We expect to incur significant expenses and operating losses for the foreseeable future, particularly as we advance towards our application to the ISA for an exploitation contract and preparation for potential commercialization. Based on our cash balance and availability of borrowing under our credit facility with ERAS Capital LLC and Gerard Barron, when compared with our forecasted cash expenditures, we believe we will have sufficient funds to meet our obligations that become due within the next twelve months. Our estimates used in reaching this conclusion are based on information available as at the date of filing this Annual Report. Accordingly, actual results could differ from these estimates and resulting variances may result in our need for additional funding in an amount greater or earlier than expected, due to changes in business conditions or other developments, including, but not limited to, deferral of approvals, capital and operating cost escalation, currently unrecognized technical and development challenges, our ability to pay certain vendors or suppliers in our Common Shares or changes in external business environment.
Previous wording
On December 22, 2022, we entered into an At-the-Market Equity Distribution Agreement (the “Sales Agreement”) with Stifel, Nicolaus & Company, Incorporated (“Stifel”) and Wedbush Securities Inc., as sales agents, allowing us, from time to time, to issue and sell Common Shares with an aggregate offering price of up to $30 million. On December 21, 2023, we amended the Sales Agreement to remove Stifel as a sales agent. The offer and sales of the shares are made under our effective “shelf” registration statement on Form S-3 filed with the SEC on September 16, 2022, which the SEC declared effective on October 14, 2022. As of the date of this Annual Report, no sales of Common Shares have been made under this offering.
Current wording
On December 22, 2022, we entered into an At-the-Market Equity Distribution Agreement (the “Sales Agreement”) with Stifel, Nicolaus & Company, Incorporated (“Stifel”) and Wedbush Securities Inc., as sales agents, allowing us, from time to time, to issue and sell Common Shares with an aggregate offering price of up to $30 million. On December 21, 2023, we amended the Sales Agreement to remove Stifel as a sales agent. The offer and sales of the shares are made under our effective “shelf” registration statement on Form S-3 filed with the SEC on September 16, 2022, which the SEC declared effective on October 14, 2022. No funds were raised from the Sales Agreement in the fourth quarter of 2024, while for the 2024 year, we sold 3,251,590 Common Shares for gross proceeds of $4.9 million under this offering.
Previous wording
On March 22, 2023, we entered into a Credit Facility with Argentum Credit Virtuti GCV, the parent of Allseas Investments S.A. and an affiliate of Allseas, which was amended on July 31, 2023 and March 22, 2024, pursuant to which, we may borrow from the Lender up to $25 million in the aggregate, from time to time, subject to certain conditions. All amounts drawn under the Credit Facility will bear interest at the 6-month Secured Overnight Funding Rate (SOFR), 180-day average plus 4.0% per annum payable in cash semi-annually (or plus 5% if paid-in-kind at maturity, our election) on the first business day of each of June and January. We will pay an underutilization fee equal to 4.0% per annum payable semi-annually for any amounts that remain undrawn under the Credit Facility. We have the right to pre-pay the entire amount outstanding under the Credit Facility at any time, before the Credit Facility’s maturity of August 31, 2025. The Credit Facility also contains customary events of default. As of the date of this Annual Report, no amounts have been drawn under this Credit Facility.
Current wording
On March 22, 2023, we entered into the 2023 Credit Facility with Argentum Cedit Virtuti GCV, the parent of Allseas Investments S.A. and an affiliate of Allseas, which was amended on July 31, 2023 and March 22, 2024, pursuant to which, we were able to borrow from the Lender up to $25 million in the aggregate, from time to time, subject to certain conditions. All amounts drawn under the 2023 Credit Facility bore interest at the 6-month SOFR, 180-day average plus 4.0% per annum payable in cash semi-annually (or plus 5% if paid-in-kind at maturity, our election) on the first business day of each of June and January. We agreed to pay an underutilization fee equal to 4.0% per annum payable semi-annually for any amounts that remain undrawn under the 2023 Credit Facility. We had the right to pre-pay the entire amount outstanding under the 2023 Credit Facility at any time, before the 2023 Credit Facility’s stated maturity of August 31, 2025. The 2023 Credit Facility also contained customary events of default. No amounts had been drawn under the 2023 Credit Facility. Pursuant to the Letter Agreement we entered into on March 24, 2025, we and Argentum Cedit Virtuti GCV agreed to cancel the 2023 Credit Facility with no outstanding amounts remaining, other than our obligation to pay the underutilization fee thereunder.
Previous wording
On August 14, 2023, we entered into a securities purchase agreement for a Registered Direct Offering of our Common Shares and Class A Warrants. The purchase price for each Common Share and Class A Warrant to purchase 0.5 Common Shares was $2.00 per unit. The exercise price to purchase one Common Share under the Class A Warrants is $3.00, subject to adjustment as provided in the warrant agreement. No investor elected to exercise its right to purchase additional Common Shares and accompanying Class A Warrants on or before September 15, 2023 under the terms of the securities purchase agreement. As of December 31, 2023, we had received gross proceeds of $15.9 million (approximately $14.6 million net of transaction fees) in the Registered Direct Offering. We received the remaining $9 million of gross proceeds on January 31, 2024, from an investor affiliated with us.
Current wording
On August 14, 2023, we entered into a securities purchase agreement for a Registered Direct Offering of our Common Shares and Class A Warrants (the “2023 Offering”). The purchase price for each Common Share and Class A Warrant to purchase 0.5 Common Shares was $2.00 per unit. The exercise price to purchase one Common Share under the Class A Warrants is $3.00, subject to adjustment as provided in the warrant agreement. No investor elected to exercise its right to purchase additional Common Shares and accompanying Class A Warrants on or before September 15, 2023 under the terms of the securities purchase agreement. As of December 31, 2023, we had received gross proceeds of $15.9 million (approximately $14.6 million net of transaction fees) in the Registered Direct Offering. We received the remaining $9 million of gross proceeds on January 31, 2024, from an investor affiliated with us. As a result of the 2024 Purchase Agreement (as described below), the exercise price of the Class A Warrants was reset to $2.00 as the down round feature of the Class A Warrants agreement was triggered.
Previous wording
We may receive up to approximately $281.8 million in aggregate gross proceeds from cash exercises of the Public Warrants and the Private Warrants, based on the per share exercise price of such warrants. However, the exercise price for the outstanding Public Warrants and Private Warrants is $11.50 per common share and there can be no assurance that such warrants will be in the money prior to their expiration, and as such, such warrants may expire worthless. Based on the current trading price of our Common Shares we do not expect to receive any proceeds from the exercise of the Public Warrants and Private Warrants unless there is a significant increase in the price of our Common Shares. In certain circumstances, the Public Warrants and Private Warrants may be exercised on a cashless basis and the proceeds from the exercise of such warrants will decrease. Furthermore, even if the warrants will be in the money, the holders of the warrants are not obligated to exercise their warrants, and we cannot predict whether holders of the warrants will choose to exercise all or any of their warrants. In addition, the exercise price to purchase one Common Share under the outstanding Class A Warrants is $3.00 (subject to customary adjustments) and there can be no assurance that such warrants will be exercised prior to their expiration, and as such, such warrants may expire and we will not receive any proceeds from the excise thereof.
Current wording
We may receive up to approximately $309.1 million in aggregate gross proceeds from cash exercises of the Public Warrants, the Private Warrants, the Class A Warrants and the Class B Warrants, based on the per share exercise price of such warrants. However, the exercise price for the outstanding Public Warrants and Private Warrants is $11.50 per common share and there can be no assurance that such warrants will be in the money prior to their expiration, and as such, such warrants may expire worthless. Based on the current trading price of our Common Shares we do not expect to receive any proceeds from the exercise of the Public Warrants and Private Warrants unless there is a significant increase in the price of our Common Shares. In certain circumstances, the Public Warrants and Private Warrants may be exercised on a cashless basis and the proceeds from the exercise of such warrants will decrease. Furthermore,
Previous wording
For the year ended December 31, 2022, operating activities focused mainly on the preparation and execution of the NORI integrated collector test which concluded in November 2022. Net cash used in operating activities in the year ended December 31, 2022 amounted to $66.6 million, consisting mainly of $33.2 million on various environmental work, $10.3 million for work on the PMTS, $8.1 million on personnel costs, $8.5 million on legal costs and other corporate activities, $2.0 million for communication and business development, $1.4 million for sponsorship, training, and stakeholder engagement support and additional payments of $3.1 million for various expenses.
Current wording
For the year ended December 31, 2024, major operating activities over this period involved Campaign 8, as well as advanced work on engineering and pre-feasibility studies as we advance towards our application to the ISA for a NORI exploitation contract and prepare for potential future commercial production. Net cash used in operating activities in the year ended December 31, 2024, amounted to $43.5 million, and consisted mainly of $14.7 million on Campaign 8 and various environmental work, $11.7 million on personnel costs, $9.2 million on legal, advisory and consulting, $2.4 million for sponsorship, training and stakeholder engagement support, $1.9 million spent on engineering and pre-feasibility studies, $1.7 million on communication and business development expenses, $0.9 million on and additional payments of $1.8 million for various expenses.
Previous wording
For the year ended December 31, 2023, major operating activities over this period involved the continuation of environmental work following the NORI integrated collector test which was concluded in November 2022, as well as advanced work on engineering and pre-feasibility studies as we advance towards our application to the ISA for an exploitation contract and prepare for potential future commercial production. Net cash used in operating activities in the year ended December 31, 2023 amounted to $59.6 million, and consisted mainly of $32.2 million on various environmental work, $2.8 million spent on engineering and pre-feasibility studies, $9.3 million on personnel costs, $4.4 million on legal costs, $3.2 million for sponsorship, training, and stakeholder engagement support, $1.9 million on communication and business development and additional payments of $5.8 million for various expenses.
Current wording
For the year ended December 31, 2023, operating activities focused mainly on the continuation of environmental work following the completion of the NORI integrated collector test, as well as progressing on engineering work and pre-feasibility studies on the project. Net cash used in operating activities in the year ended December 31, 2023, amounted to $59.6 million, and consisted mainly of $32.2 million on various environmental work, $9.3 million on personnel costs, $4.4 million on legal costs, $3.2 million for sponsorship, training, and stakeholder engagement support, $2.8 million spent on engineering and pre-feasibility studies, $1.9 million on communication and business development and additional payments of $5.8 million for various expenses.
Previous wording
Net cash used in investing activities in the year ended December 31, 2023 was $0.6 million, representing the purchase of equipment. In the comparative year ended December 31, 2022, cash used in investing activities was $1.2 million for the purchase of equipment.
Current wording
Net cash used in investing activities in the year ended December 31, 2024 was $0.5 million, representing the purchase of equipment. In the comparative year ended December 31, 2023, cash used in investing activities was $0.6 million for the purchase of equipment.
Previous wording
Net cash provided by financing activities in the year ended December 31, 2023 was $20.1 million, compared to $29.7 million in 2022. The results for the year ended December 31, 2023 represent the net proceeds received from the Registered Direct Offering announced in August 2023 and cash received of $5 million on the closing of our investment in Low Carbon Royalties, while the year ended December 31, 2022 results represent the net proceeds from the PIPE financing announced in August 2022.
Current wording
mainly cash received from the Registered Direct Offering of $14.7 million and cash received of $5 million on closing of our investment in Low Carbon Royalties.
Previous wording
As part of the NORI Exploration Contract with the ISA, NORI submitted a periodic review report to the ISA in 2021, covering the 2017-2021 period. The periodic review report, which included a proposed work plan and estimated budget for 2022 to 2026, has been reviewed by and agreed with the ISA, and we are implementing this five-year plan. The cost of NORI’s estimated work plan for 2024 onwards is contingent on the ISA’s approval of the NORI Area D exploitation application. Should the approval of NORI’s exploitation application for NORI Area D be delayed or rejected, NORI intends to revise its estimated future work plan in respect of its NORI Area. Work plans are reviewed annually by us, agreed with the ISA and may be subject to change depending on our progress to date.
Current wording
As part of the NORI Exploration Contract with the ISA, NORI submitted a periodic review report to the ISA which included a five-year plan covering 2022 to 2026: NORI is currently implementing its approved five-year plan. The cost of the estimated work plan for 2025 onwards is dependent on the ISA’s approval of the NORI Area D exploitation application. Should the approval of NORI’s exploitation application for NORI Area D be delayed or rejected, NORI intends to revise its estimated future work plan in respect of its NORI Area. Work plans are reviewed annually by us, agreed with the ISA and may be subject to change depending on our progress to date. NORI’s exploration contract expires on July 21, 2026. NORI is required to submit an application for extension no later than six months before the expiration of the contract. NORI intends to submit an application for a five-year extension in 2025.
Previous wording
As part of the TOML Exploration Contract, TOML submitted a periodic review report to the ISA in 2021, covering the 2017-2021 period. The periodic review report included a summary of work completed over the five-year period and a program of activities and estimated budget for the next five-year period. On December 23, 2022, the ISA accepted TOML’s proposed program of activities for the 2022-2026 five-year period, which included an estimated five-year expenditure of up to $44 million. The five-year estimated expenditure is indicative and subject to change, TOML will review the program regularly and TOML will inform the ISA of any changes through its annual reports.
Current wording
As part of the TOML Exploration Contract with the ISA, TOML submitted a periodic review report to the ISA which included a five-year plan covering 2022 to 2026: TOML is currently implementing its approved plan, which included an estimated five-year expenditure of up to $44 million. The five-year estimated expenditure is indicative and subject to change, TOML will review the program regularly and TOML will inform the ISA of any changes through its annual reports.
Previous wording
On March 29, 2019, we entered into a strategic alliance with Allseas to develop a system to collect, lift and transport nodules from the seafloor to shore and agreed to enter into a nodule collection and shipping agreement whereby Allseas would provide commercial services for the collection of the first 200 million metric tonnes of polymetallic nodules on a cost plus 50% profit basis. In furtherance of this agreement, on July 8, 2019, we entered into a Pilot Mining Test Agreement with Allseas (“PMTA”), which was amended on five occasions through February 2023, to develop and deploy a PMTS, successful completion of which is a prerequisite for our application for an exploitation contract with the ISA. Under the PMTA, Allseas agreed to cover the development cost of the project in exchange for a payment from us upon successful completion of the pilot trial of the PMTS in NORI Area D.
Current wording
On March 29, 2019, we entered into a strategic alliance with Allseas to develop a system to collect, lift and transport nodules from the seafloor to shore and agreed to enter into a nodule collection and shipping agreement whereby Allseas would provide commercial services for the collection of the first 200 million metric tonnes of polymetallic nodules on a cost plus 50% profit basis. In furtherance of this agreement, on July 8, 2019, we entered into a Pilot Mining Test Agreement with Allseas (“PMTA”), which was amended on five
Previous wording
On March 16, 2022, NORI and Allseas entered into a non-binding term sheet for the development and operation of a commercial nodule collection system. The pilot nodule collection system developed and tested by Allseas is expected to be upgraded to a commercial system with an expanded targeted production capacity of up to an estimated 3.0 million tonnes of wet nodules per year, to be delivered in stepped increments, with expected production readiness in the first quarter of 2026. NORI and Allseas intend to equally finance all costs related to developing and getting the first commercial system into production. Once in production, NORI is expected to pay Allseas a nodule collection and transshipment fee and, as Allseas scales up production to up to an estimated 3.0 million wet tonnes of nodules per year, it is expected that unit costs will be reduced. Following the successful completion of the NORI Area D pilot collection system trials in November 2022 and subsequent analysis of pilot data, the parties are reviewing Project Zero Offshore Nodule Collection System production targets, system design and cost estimates and intend to enter into a binding Heads of Terms by the end of 2024. The parties expect to further detail their relationship in three separate definitive agreements for engineering, conversion/build and commercial operations phase, respectively. Subject to the necessary regulatory approvals, Allseas and NORI also intend to investigate acquiring a second production vessel similar to theHidden Gem, another Samsung 10000, with the potential for an additional production rate of three million tonnes of wet nodules per year and lower associated per tonne production cost. There can be no assurances, however, that we will enter into definitive agreements with Allseas contemplated by the non-binding term sheet in a particular time period, or at all, or on terms similar to those set forth in the non-binding term sheet, or that if such definitive agreements are entered into by us that the proposed commercial systems and second production vessel will be successfully developed or operated in a particular time period, or at all.
Current wording
On March 16, 2022, NORI and Allseas entered into a non-binding term sheet for the development and operation of a commercial nodule collection system. The pilot nodule collection system developed and tested by Allseas is expected to be upgraded to a commercial system with an expanded targeted production capacity of up to an estimated 3.0 million tonnes of wet nodules per year, to be delivered in stepped increments. NORI and Allseas intend to equally finance all costs related to developing and getting the first commercial system into production. Once in production, NORI is expected to pay Allseas a nodule collection and transshipment fee and, as Allseas scales up production to up to an estimated 3.0 million wet tonnes of nodules per year, it is expected that unit costs will be reduced. Following the successful completion of the NORI Area D pilot collection system trials in November 2022 and subsequent analysis of pilot data, the parties are reviewing Project Zero Offshore Nodule Collection System production targets, system design and cost estimates and intend to enter into a binding Heads of Terms by the end of 2024. The parties expect to further detail their relationship in three separate definitive agreements for engineering, conversion/build and commercial operations phase, respectively. Subject to the necessary regulatory approvals, Allseas and NORI also intend to investigate acquiring a second production vessel similar to theHidden Gem, another Samsung 10000, with the potential for an additional production rate of three million tonnes of wet nodules per year and lower associated per tonne production cost. There can be no assurances, however, that we will enter into definitive agreements with Allseas contemplated by the non-binding term sheet in a particular time period, or at all, or on terms similar to those set forth in the non-binding term sheet, or that if such definitive agreements are entered into by us that the proposed commercial systems and second production vessel will be successfully developed or operated in a particular time period, or at all.
Previous wording
Through December 31, 2023, we have made the following payments to Allseas under the PMTA: (a) $10 million in cash in February 2020, (b) $10 million through the issuance of 3.2 million Common Shares valued at $3.11 per share in February 2020, (c) issued Allseas a warrant to purchase 11.6 million Common Shares at a nominal exercise price per share in March 2021, (d) $10 million in cash in October 2021, following the closing of the Business Combination and meeting certain progress targets on the PMTS and (e) on February 23, 2023 issued 10.85 million Common Shares to Allseas, as described below. On August 9, 2023, 11,578,620 common shares were issued to Allseas upon the exercise of the warrant that was granted to Allseas in March 2021, and receipt of the exercise fee of $115.8 thousand. The warrant vested and became exercisable on successful completion of the PMTS in November 2022.
Current wording
Through December 31, 2024, we have made the following payments to Allseas under the PMTA: (a) $10 million in cash in February 2020, (b) $10 million through the issuance of 3.2 million Common Shares valued at $3.11 per share in February 2020, (c) issued Allseas a warrant to purchase 11.6 million Common Shares at a nominal exercise price per share in March 2021, (d) $10 million in cash in October 2021, following the closing of the Business Combination and meeting certain progress targets on the PMTS and (e) on February 23, 2023 issued 10.85 million Common Shares to Allseas. On August 9, 2023, 11,578,620 common shares were issued to Allseas upon the exercise of the warrant that was granted to Allseas in March 2021, and receipt of the exercise fee of $115.8 thousand. The warrant vested and became exercisable on successful completion of the PMTS in November 2022.
Previous wording
As described above, on March 22, 2023 we entered into the Credit Facility with Argentum Credit Virtuti GCV, an affiliate of Allseas, under which we may borrow up to $25 million pursuant to the terms and conditions of the Credit Facility, which as amended has a maturity date of August 31, 2025.
Current wording
As described above, on March 22, 2023, we entered into the 2023 Credit Facility with Argentum Cedit Virtuti GCV, an affiliate of Allseas, under which we may borrow up to $25.0 million pursuant to the terms and conditions of the 2023 Credit Facility, as amended, which has a maturity date of August 31, 2025. On August 16, 2024, we entered into the Third Amendment to the 2023 Credit Facility, to increase the borrowing limit of the 2023 Credit Facility to $27.5 million. Under the terms of the Third Amendment, upon closing of
Previous wording
We re-measure the fair value of the Private Warrants at the end of each reporting period. The fair value of the Private Warrants is estimated using a Black-Scholes option pricing model whereby the expected volatility is estimated by using a blended volatility calculated by assigning equal weights to both implied volatility of the Company’s Public Warrants and the historical volatility of the Company’s common share price. The expected volatility was estimated using a binomial model based on consideration of the implied volatility from the Company’s Public Warrants, adjusted to account for the call feature of the Public Warrants at prices above $18.00 during 20 trading days within any 30-trading-day period and historical volatility of the share price of our Common Shares.
Current wording
We re-measure the fair value of the Private Warrants at the end of each reporting period. The fair value of the Private Warrants is estimated using a Black-Scholes option pricing model whereby the expected volatility is estimated by using a blended volatility calculated by assigning equal weights to both implied volatility of our Public Warrants and the historical volatility of our common share price. The expected volatility was estimated using a binomial model based on consideration of the implied volatility from our Public Warrants, adjusted to account for the call feature of the Public Warrants at prices above $18.00 during 20 trading days within any 30-trading-day period and historical volatility of the share price of our Common Shares.
Previous wording
We assess quarterly whether the Company has the ability to meets its committed cash requirements for the next twelve months and continue to operate as a going concern. This assessment requires the use of forecasts of our business activities and related estimates of future cost obligations which can be subject to change. Changes in these assumptions could have a material impact on our assessment and related disclosures.
Current wording
We assess quarterly whether we have the ability to meet its committed cash requirements for the next twelve months and continue to operate as a going concern. This assessment requires the use of forecasts of our business activities and related estimates of future cost obligations which can be subject to change. Changes in these assumptions could have a material impact on our assessment and related disclosures.
Rearranged current paragraphs (5)
Current report — wording carried from elsewhere
forth in the binding MoU, or that if such definitive tolling agreement is entered into by us or that the existing facility will be able to successfully process nodules in a particular time period, or at all.
Current report — wording carried from elsewhere
2024 Credit Facility with ERAS Capital LLC and Gerard Barron
Current report — wording carried from elsewhere
even if the warrants will be in the money, the holders of the warrants are not obligated to exercise their warrants, and we cannot predict whether holders of the warrants will choose to exercise all or any of their warrants. In addition, the exercise price to purchase one Common Share under the outstanding Class A Warrants and Class B Warrants is $2.00 (subject to customary adjustments) and there can be no assurance that such warrants will be exercised prior to their expiration, and as such, such warrants may expire and we will not receive any proceeds from the excise thereof.
Current report — wording carried from elsewhere
occasions through February 2023, to develop and deploy a PMTS, successful completion of which is a prerequisite for our application for an exploitation contract with the ISA. Under the PMTA, Allseas agreed to cover the development cost of the project in exchange for a payment from us upon successful completion of the pilot trial of the PMTS in NORI Area D.
Current report — wording carried from elsewhere
2024 Credit Facility with ERAS Capital LLC and Gerard Barron
Rearranged previous paragraphs (3)
Previous report — wording carried elsewhere
In addition, on August 1, 2023, we entered into an Exclusive Vessel Use Agreement with Allseas pursuant to which Allseas will give exclusive use of theHidden Gem to us in support of the development of the Project Zero Offshore Nodule Collection System until the system is completed or December 31, 2026, whichever is earlier. In consideration of the exclusivity term, we will issue 4.15 million Common Shares to Allseas. We expect that the definitive agreement with Allseas discussed above will extend the exclusive use of the* Hidden Gem*.
Previous report — wording carried elsewhere
On March 22, 2024, we entered into an Unsecured Credit Facility (the “2024 Credit Facility”) with Gerard Barron, our Chief Executive Officer and Chairman, and ERAS Capital LLC, the family fund of our director, Andrei Karkar (collectively, the “2024 Lenders”), pursuant to which, we may borrow from the 2024 Lenders up to $20,000,000 in the aggregate ($10,000,000 from each of the 2024 Lenders), from time to time, subject to certain conditions. All amounts drawn under the 2024 Credit Facility will bear interest at the 6-month Secured Overnight Funding Rate (SOFR), 180-day average plus 4.0% per annum payable in cash semi-annually (or plus 5% if paid-in-kind at maturity, at our election) on the first business day of each of June and January. We will pay an underutilization fee equal to 4.0% per annum payable semi-annually for any amounts that remain undrawn under the 2024 Credit Facility. We have the right to pre-pay the entire amount outstanding under the 2024 Credit Facility at any time, before the 2024 Credit Facility’s maturity of September 22, 2025. The 2024 Credit Facility also contains customary events of default. The 2024 Credit Facility will terminate automatically if we or any of our subsidiaries raise at least USD $50,000,000 in the aggregate (i) through the issuance of any of our or our subsidiaries’ debt or equity securities, or (ii) in prepayments under an off-take agreement or similar commercial agreement.
Previous report — wording carried elsewhere
As described above, on March 22, 2024, we entered into the 2024 Credit Facility with ERAS Capital LLC and Gerard Barron under which we may borrow up to $20 million pursuant to the terms and conditions of the 2024 Credit Facility through its maturity on September 22, 2025.