The Nichols Ranch Project

The following technical and scientific description of the Nichols Ranch Project is based in part on the report titled “Technical Report on the Nichols Ranch Project, Campbell and Johnson Counties, Wyoming, USA” dated February 22, 2022 and effective December 31, 2021, as amended February 8, 2023, and prepared by Grant A. Malensek, M.Eng., P. Eng., Mark B. Mathisen, C.P.G., Jeremy Scott Collyard, PMP, MMSA QP, each a Qualified Person employed by SLR International Corporation ("SLR"), Jeffrey L. Woods, MMSA QP, a Qualified Person employed by Woods Process Services, and Phillip E. Brown, C.P.G., R.P.G., a Qualified Person employed by Consultants In Hydrogeology (the “Nichols Ranch Technical Report Summary”). The Nichols Ranch Technical Report Summary was prepared in accordance with S-K 1300 and also constitutes a PEA pursuant to NI 43-101. The Nichols Ranch Project does not have known “Mineral Reserves” and is therefore considered under SEC S-K 1300 definitions to be an exploration stage property, despite commercial uranium extraction activities occurring as recently as 2019 (withde minimis levels of extraction more recently).

The Nichols Ranch Uranium Complex (the “Complex”) is an existing ISR mine with associated prospective ISR properties located in Campbell and Johnson Counties, in eastern Wyoming, USA in the Pumpkin Buttes Mining District of the Powder River Basin, 80 miles northeast of the city of Casper, Wyoming. The Complex is located approximately at latitude 43°42' North and longitude 106°01' West. The proposed Nichols Ranch Project will produce approximately 366 pounds of U 3 O 8 annually. The Complex is an ISR project; it is not an underground or open pit project.

Excluding the Jane Dough area in which the Company owns an 81% interest, the Company owns a 100% interest in the remaining areas which comprise the Complex land holdings totaling 10,755 acres.

The Complex is divided into two primary areas, the Nichols Ranch Mining Unit and the Satellite Properties. The Nichols Ranch Mining Unit includes the following:

a. Nichols Ranch Area (approximately 1,120 acres)

b. Jane Dough Area (approximately 3,680 acres)

c. Hank Area (approximately 2,250 acres)

Nichols Ranch and Jane Dough are contiguous, and the Hank area is located approximately six miles north of Nichols Ranch.

The Company currently controls four additional properties (the Satellite Properties) which are known to have significant mineralization, but not currently included in the mine permit. These include:

a. North Rolling Pin (NRP) Area (approximately 1,180 acres)

b. West North Butte (WNB) Area (approximately 2,360 acres)

c. East North Butte (ENB) Area (approximately 325 acres)

d. Willow Creek (WC) Area (approximately 220 acres)

Except where noted in the individual sections below, all mineral rights associated with the Project including claims, surface use agreements, mineral leases, etc. were acquired through the acquisition of Uranerz in 2015. Annual land holding fees associated with the Projects for the year ended December 31, 2025 totaled $0.38 million. Details of property ownership are described below by project area.

Nichols Ranch

The permit boundary for the Nichols Ranch Area, located in Sections 7, 8, 17, and 18, T43N, R76W, encompasses 1,120.00 acres. Within the Nichols Ranch permit boundary, Energy Fuels Resources (USA) Inc. (“EFR”) has 38 unpatented lode-mining claims (totaling approximately 639 acres), two fee mineral leases and three Surface Use Agreements (“SUAs”). The claims and fee leases encompass approximately 920 acres. The mineral fee leases and SUAs have a 10-year primary term that has now been extended indefinitely due to the Project being in production. Provisions are set by the SUAs for reimbursement to the surface owner for damages resulting from operations.

Claims do not have an expiration date, however, affidavits must be filed annually with the BLM and respective county recorder’s offices in order to maintain the claims’ validity. In addition, most of the unpatented lode claims are located on Stock Raising Homestead land where the U.S. government has issued a patent for the surface to an individual and reserved the minerals to the U.S. government subject to the location rights by claimants as set forth in the 1872 Mining Law. The Nichols Ranch lode mining claims are held by Uranerz, which is 100% owned by the Company.

In Section 21, the northern portion of Section 28, eastern portion of Section 20, and northeast quarter of Section 29, unpatented lode mining claims have an overriding royalty interest burden of 6% or 8% depending on the sale price of uranium. In the southern portion of Section 32, 20 of the unpatented lode mining claims have an overriding royalty of 0.25% based on production. In the southern portion of Section 28 where North Jane is located, 14 fee mineral leases have royalties ranging from 2% to 10% depending on the sale price of uranium. In the western half of Section 29 two mineral leases have a royalty of 6% or 8% depending on the sale price of uranium. Surface owners have a set rate for reimbursement of any land taken out of service for mining activities and two of the Surface Owners could receive an extraction fee on production with a burden of 1% or 2% percent depending on the sale price of uranium.

The unpatented lode mining claims will remain the property of EFR provided it adheres to the required filing and annual payment requirements with Campbell County and the BLM. The SUA’s will remain in force so long as the mining claims are maintained. Legal surveys of unpatented lode mining claims are not required and are not known to have been completed.

All of the unpatented lode mining claims have annual filing requirements ($200 per claim) with the BLM, to be paid on or before September 1 of each year.

Jane Dough

The permit boundary for the Jane Dough area encompasses approximately 3,680 acres. Within the Jane Dough permit boundary, EFR controls 117 unpatented lode-mining claims, three SUAs and 16 fee mineral leases. The fee mineral leases and claims encompass approximately 3,121.43 acres. The fee mineral leases and SUAs have terms of 10 years. These leases have expiration dates ranging from 2027 to 2032. They can be extended indefinitely by establishing production on the lease. The SUAs have set provisions for reimbursement to the surface owner for damages resulting from Company operations. In the south half of Section 28, T43N, R76W, the Company controls 57.29% of the fee mineral estate under various fee mineral leases mentioned above.

Portions of the Jane Dough Area were formerly held separately by EFR and the Arkose Project Joint Venture (“JV”). These holdings have been combined. The Company retains 100% of the mineral rights for the portion it originally held and 81% of the mineral rights for the Arkose Project JV portion of Jane Dough. Mineral Resources for Jane Dough reflect this partition of mineral ownership. The Jane Dough lode mining claims are held by Uranerz, which is 100% owned by the Company. In a single instance, in the south half of Section 28, T43N, R76W, the JV only controls 57.29% of a fee mineral lease. The partial ownership of the lease is split along the JV ownership agreement with the Company holding 81%.

In the south portion of Section 32, twenty of the unpatented lode mining claims have an overriding royalty of 0.25% based on production. In the southern half of Section 28 and northern half of section 32, five fee mineral leases have royalties ranging from 2% to 10% depending on the sale price of uranium. In the west half of Section 29, two mineral leases have a royalty of 6% or 8% depending on the sale price of uranium. Surface owners have a set rate for reimbursement of any land taken out of service for mining activities and two of the Surface Owners could receive an extraction fee on production with a burden of 1% or 2%, depending on the sale price of uranium.

The unpatented lode mining claims will remain the property of EFR provided it adheres to required filing and annual payment requirements with Campbell County and the BLM. The SUAs will remain in force so long as the mining claims are maintained. Legal surveys of unpatented lode mining claims are not required and are not known to have been completed.

All of the unpatented lode mining claims have annual filing requirements with the BLM, to be paid on or before September 1 of each year.

Hank

The Hank Area permit boundary encompasses approximately 2,250 acres. Within the permit boundary, the Company has 49 unpatented lode-mining claims (totaling approximately 968 acres), and one SUA covering approximately 1,392.58 acres. The Hank lode mining claims are held by Uranerz, which is 100% owned by the Company. The SUA is in effect as long as the unpatented lode-mining claims are maintained by annual payment.

All claims were located or acquired by EFR and a portion of the claims were subject to a 6% to 8% royalty which has since been extinguished. Four claims may be subject to a 5% overriding royalty vested in Brown Land Company and its successors. The claims will remain the property of EFR provided they adhere to required filing and annual payment requirements with Campbell County and the BLM. All of the unpatented lode claims have annual filing requirements with the BLM, to be paid on or before September 1 of each year.

The SUA will remain in force so long as the terms of the agreements are met. Legal surveys of unpatented claims are not required and are not known to have been completed.

North Rolling Pin

The North Rolling Pin (“NRP”) Area has 54 unpatented lode-mining claims (totaling approximately 1,018 acres) and one SUA. There are no mineral fee leases associated with the NRP Area. There is one SUA that will remain in force so long as the terms of the agreement are met. All of the unpatented lode mining claims have annual filing requirements with the BLM, to be paid on or before September 1 of each year. The claims area encompasses approximately 1,180 acres. The NRP lode mining claims are held by Uranerz, which is 100% owned by the Company.

Lode mining claims in the North Rolling Pin area are not subject to royalties. There are no fee mineral leases.

West North Butte

The West North Butte (“WNB”) Area claims were acquired by Uranerz, which was acquired by the Company in 2015. WNB is held by 109 unpatented lode-mining claims totaling approximately 1,800 acres. There are no fee leases associated with West North Butte. There is one SUA that will remain in force provided the terms of the agreement are met. The WNB lode mining claims are held by Uranerz, which is 100% owned by the Company.

East North Butte

The East North Butte (“ENB”) Area claims were acquired by Uranerz. ENB is held by 16 unpatented lode-mining claims totaling approximately 304 acres. There are no fee leases associated with East North Butte. There is one SUA which will remain in force so long as the terms of the agreement are met. The ENB lode mining claims are held by Uranerz, which is 100% owned by the Company.

None of the unpatented lode claims in the ENB Area are subject to a royalty. There are no fee mineral leases.

Willow Creek

The Willow Creek (“WC”) Area claims were acquired by Uranerz. WC is held by 11 unpatented lode-mining claims totaling approximately 191 acres. There are no fee leases associated with Willow Creek. There is one SUA that will remain in force so long as the terms of the agreement are met. The WC lode mining claims are held by Uranerz, which is 100% owned by the Company.

The claims were acquired by Uranerz and none of the unpatented lode claims in the WC Area are subject to a royalty. There are no fee leases associated with Willow Creek.

Nichols Ranch is located 80 miles northeast of Casper, Wyoming and accessible via two-wheel drive on existing county and/or private gravel and dirt roads by proceeding north approximately 10 mi from Wyoming Highway 387 on the IDT Road and approximately 12 mi northwest of the junction of Wyoming Highway 387 and Wyoming Highway 50.

NRP is accessible via two-wheel drive on existing private gravel and dirt roads, many of which have been improved by coal bed methane (“CBM”) development. The approximate center of the NRP property is approximately nine miles north of Wyoming Highway 387. Some road development and improvements may be required at a later time to facilitate future development of wellfields or satellite facilities.

WNB is accessible via two-wheel drive on existing county and/or private gravel and dirt roads. The approximate center of the Satellite Properties is approximately 8 mi to 11 mi west of Wyoming Highway 50, and the southern edge of the Satellite Properties is approximately 12 mi to 15 mi north of Wyoming Highway 387. Road development and improvements may be required at a later time to facilitate future development of wellfields and processing facilities. The north-northwest half of the WNB Area is located in an area of significant topographical relief and would likely require significant excavation to construct roads to potential wellfields or require the use of directional drilling to develop the resource.

In the vicinity of the Complex, the climate is semi-arid and receives an annual precipitation of approximately 13 in., the majority of which falls from February to April as snow. Cold, wind, and snow/blizzards may occasionally present challenges for winter exploration and construction work in this area however operations can take place year-round. The summer months are typically hot, dry, and clear, except for infrequent high-intensity, short-duration storm events.

The Complex is located in Campbell and Johnson Counties. These counties are generally rural; according to the April 1, 2020 U.S. Census, there were 8,447 people living in Johnson County and 47,026 people living in Campbell County. Most of the workers at the Complex are from the local area and nearby communities such as Casper, Wyoming, approximately 80 mi southwest of the Complex. Casper is the county seat of Natrona County and, as of the 2020 census, has a population of 59,038. Casper has numerous industrial supply and service companies to support mining operations. EFR maintains an office in Casper to support its Wyoming mining operations.

The Company has secured sufficient surface access rights for exploration and development of the Complex. The Nichols Ranch Mining Unit is a fully licensed, operable facility with sufficient sources of power, water, and waste disposal facilities for operations and aquifer restoration.

The basic infrastructure (power, water, and transportation) necessary to support an ISR mining operation has been established at the Nichols Ranch Mining Unit and is located within reasonable proximity of all satellite properties within this report. Existing infrastructure is associated with local oil, gas, and CBM development.

Non-potable water is and/or will be supplied by wells developed at or near the sites. Water extracted as part of ISR operations will be recycled for reinjection. Typical ISR mining operations also require a disposal well for limited quantities of fluids that cannot be returned to the production aquifers. A total of eight deep disposal wells have been permitted at the Nichols Ranch Project. Two of the eight wells have been constructed and are operational at the Nichols Ranch ISR Plant.

The proximity of the Complex to paved roads will facilitate transportation of equipment, supplies, personnel, and product to and from the properties. Although the population within 50 miles of the subject properties consists mainly of rural ranch residences, personnel required for exploration, construction, and operation are available in the nearby towns of Wright, Midwest, Edgerton, Gillette, Buffalo, and Casper, Wyoming.

Power transmission lines are located on or near parts of the property. EFR has secured power from the local electrical service provider to accommodate all operational needs.

Tailing storage areas, waste disposal areas, heap leach pad(s) are not part of the required infrastructure for the Complex, as ISR operations do not require these types of facilities. Waste disposal is accomplished via deep well injection. EFR has two such wells in operation at Nichols Ranch.

The Complex is located within the Wyoming Basin physiographic province in the western portion of the Powder River Basin, within the Pumpkin Buttes Mining District. The Pumpkin Buttes are a series of small buttes rising up to nearly 6,000 feet above sea level (ft ASL) in elevation and approximately 1,000 ft above the surrounding plains. The rock capping the top of the buttes is the Oligocene age White River Formation erosional remnant, which is believed to have overlain the majority of the Powder River Basin. The volcanic tuffs in the White River Formation have been cited as the source of uranium in the basin (Davis, 1969). Historic and current land use in the Pumpkin Buttes Mining District includes livestock grazing, mineral development, and oil and gas development.

Vegetation and wildlife surveys of the Complex area were completed as part of the environmental baseline studies required for permitting and licensing. Vegetation communities consist primarily of sagebrush shrub-land and mixed grasslands, with limited juniper, greasewood, and wetland communities. The Complex area has the potential to provide habitat for mule deer, elk, pronghorn antelope, jackrabbit, cottontail rabbit, coyote, bobcat, mountain lion, red fox, badger, raccoon, skunk, chipmunk, rodents, songbirds, waterfowl, eagles, hawks, owls, sage grouse, chukar, wild turkey, Hungarian partridge, mourning dove, magpie, and crow. Most species are yearlong residents, however, some species such as elk, eagles, songbirds, and waterfowl are more abundant during migration periods.

The Nichols Ranch Mining Unit is situated in a low-lying plain with elevations ranging from approximately 4,600 ft ASL to 4,900 ft ASL. There are two main ephemeral drainages at the site. Both are tributaries of Cottonwood Creek, which drains to the Cheyenne River.

The NRP Area consists of sagebrush and native grasses, covering rolling hills, steep walled gullies, and ephemeral streams. Elevations range from approximately 4,800 ft ASL to 5,180 ft ASL.

The WNB is located on the west flank of the North Pumpkin Butte. This area consists of sagebrush and native grasses, covering rolling hills, steep walled gullies, and flat-topped North Butte. Elevations range from approximately 4,900 ft ASL to 5,800 ft ASL, and generally slope from northeast to southwest.

History

The Complex was originally part of a large exploration area encompassing Townships 33 through 50 North of Ranges 69 through 79 West, on the Sixth Principal Meridian. In 1966, Mountain West Mines Inc. (“MWM”) – now Excalibur Industries) began a drilling exploration program in this area. In 1967, MWM entered into an agreement with Cleveland-Cliffs Iron Company (“CCI”) for further exploration and option if suitable resources were found. CCI exercised its option in 1976 with plans to begin underground mining operations near North Butte, approximately six and a half miles northeast of Nichols Ranch. As economic conditions changed, and with the development of ISR mining technology, CCI’s interest in the area waned. By the late 1980s, it began selling select properties or allowing them to revert back to MWM.

Uranerz acquired six uranium properties in the Powder River Basin from a third party in 2005, including the Complex.

In June 2015, EFR acquired all of the outstanding shares of Uranerz. Under that transaction, EFR acquired the Nichols Ranch Project, the Hank Project, the Reno Creek Property, the West North Butte Property, the North Rolling Pin Property, and the Arkose Project JV (a joint venture of ISR mining properties held 81% by Uranerz and 19% by United Nuclear Corp.), uranium sales contracts, and other assets, as well as the shares of Uranerz, which holds those assets. In May 2018, EFR sold its non-core Reno Creek Property to Uranium Energy Corp. In August 2018, EFR acquired royalties on the Nichols Ranch Project, along with royalties on several operating, standby, and advanced-stage ISR projects in Wyoming owned and operated by Power Resources, Inc., a wholly owned subsidiary of Cameco Corporation.

The Nichols Ranch Mining Unit includes: (i) the Nichols Ranch Plant; (ii) the Nichols Ranch Wellfields; (iii) the Jane Dough Area; and (iv) the Hank Area, which includes the permitted but not constructed Hank Satellite Plant and the Hank Deposit. A portion of the Jane Dough Area is held through the Arkose Project JV, in which the EFR has an 81% interest.

The North Rolling Pin Area is located within a large exploration area encompassing Townships 33 through 50 North of Ranges 69 through 79 West, on the Sixth Principal Meridian. In 1966, MWM (now Excalibur Industries) began a successful drilling exploration program in a portion of the larger area. In 1967, MWM entered into an agreement with CCI for further exploration and option if suitable resources were found. CCI exercised its option in 1976 with plans to begin underground mining operations in the vicinity of North Butte. Changing economic conditions and the development of ISR mining technology reportedly ended much of CCI’s interest in the area.

In addition to CCI, other uranium exploration companies during the last forty years have controlled property either within or near the North Rolling Pin Property. These included Kerr McGee, Conoco, Texaco, American Nuclear, Tennessee Valley Authority, Rio Algom Mining Corporation (Rio Algom), and Uranerz. The mining claims and leases originally controlled by most of these companies were let go over the years due to market conditions. These property abandonments continued into 2004.

In February 2007, Uranerz purchased the North Rolling Pin claims group from Robert Shook as part of a larger 138 Federal mining claims acquisition. Uranerz subsequently expanded the properties by staking additional claims in the immediate area.

The WNB, ENB, and Willow Creek Areas were originally part of a large exploration area encompassing Townships 33 through 50 North of Ranges 69 through 79 West, on the 6th principal meridian. In 1966, MWM (now Excalibur Industries) began a successful drilling exploration program in a portion of this area. In 1967, MWM entered into an agreement with CCI for further exploration and option if suitable resources were found. CCI exercised its option in 1976 with plans to begin underground mining operations in the vicinity of North Butte. Changing economic conditions and the development of ISR mining technology reportedly ended much of CCI’s interest in the area.

In addition to CCI, other uranium exploration companies during the last forty years have controlled property either within or near the Satellite Properties. These included Kerr McGee, Conoco, Texaco, American Nuclear, Tennessee Valley Authority, and Uranerz U.S.A., Inc. Areva NC, via subsidiary Cogema Resources Inc. (Cogema), and Power Resources Inc. (a subsidiary of Cameco Corporation) have retained portions of their original land positions in the area. The mining claims and leases originally controlled by most of these companies were let go over the years due to market conditions. These property abandonments continued into 2004.

WNB, ENB, and WC cover an area of land located on the west, east and south flank of North Butte in Campbell County, Wyoming. Detailed disclosure pertaining to the chain of title of the properties comprising these Areas is not known to the Authors or Uranerz representatives and is beyond the scope of this Technical Report. The following is a brief description of what is known about ownership history of these Areas.

The locators of the claims acquired rights to the properties comprising the WNB Area in 1987. In January 2007, Uranerz completed an acquisition of an undivided one-hundred percent interest in the claims comprising the WNB Area.

The locators of the claims acquired rights to the properties comprising the ENB Area in 1987. In January 2007, Uranerz completed an acquisition of an undivided 100% interest in the claims comprising the East North Butte Area.

The locators of the claims acquired rights to the properties comprising the Willow Creek Area in the 1960s. In December 2005, Uranerz entered into an option agreement to acquire an undivided one-hundred percent interest in the claims comprising the Willow Creek Area. The terms of the option agreement were satisfied in 2007 and the transfer of the claims to Uranerz was completed.

On October 15, 1951, J. D. Love discovered uranium mineralization in the Pumpkin Buttes districts in the Wasatch Formation on the south side of North Pumpkin Butte in the west-central portion of the Powder River Basin. The mineralization was one of eight areas recommended by the U.S. Geologic Survey (USGS) in April 1950 for investigation in the search for uranium bearing lignites and volcanic tuffs. In response to this recommendation, an airborne radiometric reconnaissance of most of these areas was undertaken by the USGS in October 1950. The uranium mineralization discovered by J. D. Love was near an aerial radiometric anomaly identified from this survey (Love, 1952).

Exploration drilling was conducted in the Jane Dough Area, Section 21 and 28, T43N, R76W, between the late 1960s and late 1970s by CCI. Little interest was generated by the completion of 46 holes from this drilling. Between 1968 and 1980 CCI drilled 150 holes and installed 3 water wells on the Nichols Ranch and Jane Dough Areas. Texas Eastern Nuclear Inc. completed limited drilling and exploration on the property in 1985. In the early 1990s, Rio Algom also completed limited drilling in the area. In December 2005, Uranerz purchased the Nichols Ranch, Jane Dough, and Hank claims groups as part of a six-property agreement to option from Excalibur Industries. Uranerz then expanded the properties by staking additional claims in the immediate and surrounding areas.

Uranerz began exploration drilling on the Nichols Ranch Area on July 11, 2006, and continued to June 6, 2015. A total of 1,098 holes (253 exploration holes, 105 monitor wells, and 740 production wells) were drilled during that time. A total of 51 exploration holes were drilled on the Hank Area in 2008.

Uranerz received the Source Material License SUA-1597 in July of 2011. Nichols Ranch ISR operations began on April 15, 2014, after completion of a pre-operational inspection by the NRC Region IV office. There were two planned Production Areas (PA1 and PA2) in the Nichols Ranch Area. Five header houses and their respective wellfields were installed and in operation in June 2015, when EFR acquired Uranerz, in Production Area #1. Header house #6 was commissioned in November 2015. In 2016, the EFR completed drilling 12 delineation holes and drilling and casing of 86 extraction wells in Header Houses #7 and #8 in Production Area #1. Header House #7 was turned on in March 2016 and Header House #8 was turned on in June 2016. In Production Area #2, 133 extraction and injection wells were drilled and cased. Header House #9 was completed and turned on in March 2017. No drilling or other development activities have been performed since 2017.

In January 2008, Uranerz entered into the JV, resulting in an 81% undivided interest in the mineral rights controlled by the JV. Uranerz commenced exploration on the Arkose Project in 2008. A total of 1,971 exploration holes were drilled on the Arkose Project JV from April 2008 to August 2012. A portion of the Arkose Project JV holdings were subsequently incorporated into the Jane Dough portion of the Nichols Ranch Mining Unit and remain subject to the 81% ownership, as discussed in Section 4.0 of this Technical Report.

Mining claims were first staked in the North Rolling Pin Area by MWM sometime before 1968. Exploration drilling was conducted in the North Rolling Pin Area Sections 11, 14 and 15, T43N, R76W, between 1968 and 1982 by CCI. A total of 476 exploration holes were drilled including 10 core holes. CCI was reported to be investigating the NRP Area for open pit mining potential but never carried those plans past the exploration phase. In 2008 and 2009, Uranerz drilled 18 exploration holes in Sections 11 and 14. This drilling was performed to evaluate the potential for mineralization below the zones explored by CCI and for confirmation of the previously identified mineralization in the F Sand.

Between 1968 and 1985, CCI drilled approximately 380 exploratory holes within the West North Butte, East North Butte, and Willow Creek Areas. From 1983 to 1985, Texas Eastern Nuclear drilled approximately 12 exploratory holes in these Areas. From approximately 1990 to 1992, Rio Algom drilled approximately 5 exploratory holes. In 2006, Uranerz completed an acquisition of these Areas, and in 2007 and 2008, drilled approximately 127 exploratory holes.

The Complex is an advanced stage project which is licensed to operate by the NRC and the WDEQ. Construction of the processing facility began in 2011. Plant construction and initial wellfield installation was completed in 2014 and operations were initiated in April 2014. Production of 1,265,805 pounds of uranium oxide has been reported from initiation of production through December 31, 2019, via ISR mining. Since 2019, the Nichols Ranch portion of the Complex has been on standby due to low uranium prices.

Recovered Pounds(1)20252024202320222021
U3O8 (000)0.710.20.50.5

Notes:

(1)Uranium recovery commenced at the Nichols Ranch Project on April 17, 2014. Because the Nichols Ranch Project uses ISR instead of conventional extraction methods, grade and tons of mineralized material are not applicable to the Nichols Ranch Project.

Energy Fuels has received all regulatory approvals necessary to conduct extraction and uranium processing activities at the Nichols Ranch Plant and Nichols Ranch Wellfield. In December 2010, Uranerz received its Permit to Mine for the Nichols Ranch Project from the WDEQ-LQD. In July 2011, Uranerz received a Source Material License from the NRC for the Nichols Ranch Plant and Nichols Ranch Wellfield, and construction of the Nichols Ranch Plant immediately began. Effective September 30, 2018, the State of Wyoming became an Agreement State under the Atomic Energy Act (as amended) for the regulation of uranium mills and uranium ISR facilities, and regulation of the Source Material License was transferred from the NRC to the WDEQ-LQD.

Both the state and federal agencies analyzed all environmental aspects of the Nichols Ranch Project including reclamation of the land surface following extraction operations and restoration of impacted ground water. Workplace safety and the safety of the public are also closely monitored by regulatory agencies. We have posted reclamation bonds in the amounts of $8.9 million through the WDEQ-LQD and $213,750 through the WDEQ-WQD to cover the total estimated cost of reclamation by a third party as a requirement of the licenses.

The various state and federal permits and licenses that were required and have been obtained for the Nichols Ranch Project, exclusive of the expansion to the Jane Dough Property, are summarized below:

Primary Permits and Licenses for the Nichols Ranch Project (Nichols Ranch and Hank Units Only)

Permit, License, or Approval NameAgencyStatus
Source Material LicenseNRC (2011); WDEQ-LQD (2018)Renewed (2025)
Permit to Mine (UIC Permit)WDEQ-LQDObtained
Aquifer ExemptionWDEQ-LQD; EPAObtained
Permit to Appropriate GroundwaterWSEOObtained
Wellfield AuthorizationWDEQ-LQDObtained
Class I UIC Deep Disposal Well PermitsWDEQ-WQDObtained
WYPDESWDEQ-WQDObtained
Plan of Operations (Hank Unit only)BLMObtained
Air Quality PermitWDEQ-AQDObtained

Notes:

(1) NRC - Nuclear Regulatory Commission

(2) EPA - Environmental Protection Agency

(3) UIC - Underground Injection Control

(4) WDEQ-LQD - Wyoming Department of Environmental Quality Land Quality Division

(5) WDEQ-WQD - Wyoming Department of Environmental Quality Water Quality Division

(6) WDEQ-AQD - Wyoming Department of Environmental Quality Air Quality Division

(7) WSEO - Wyoming State Engineer’s Office

(8) WYPDES - Wyoming Pollutant Discharge Elimination System

Under the licensed plan, the Nichols Ranch Plant has been built, and a satellite processing facility is licensed for the Hank Project. In 2017, the NRC approved a source material license amendment to add the Jane Dough Property to the existing license for the Nichols Ranch Project, and the WDEQ approved an amendment to our Permit to Mine to incorporate the Jane Dough Property. The Jane Dough Property is now fully licensed and permitted as part of the Nichols Ranch Project. The Jane Dough Property is adjacent to the Nichols Ranch Wellfield and is expected to share its infrastructure. Uranerz is now able to bring the Jane Dough Property into extraction operations before the Hank Project. Due to its close proximity, extracted solutions from the Jane Dough Property may be delivered directly to our Nichols Ranch Plant by pipeline, thus eliminating the need for a larger capital outlay to construct a satellite plant as is planned for the Hank Project. The Jane Dough Property includes the Doughstick, South Doughstick and North Jane properties. Additional wellfields may be added to the extraction operations plan as the Company continues to assess geological data.

The Complex is located in the Powder River Basin, which is a large structural and topographic depression sub-parallel to the trend of the Rocky Mountains. The Basin is bounded on the south by the Hartville Uplift and the Laramie Range, on the east by the Black Hills, and on the west by the Big Horn Mountains and the Casper Arch. The Miles City Arch in southeastern Montana forms the northern boundary of the Basin.

The Powder River Basin is an asymmetrical syncline with its axis closely paralleling the western basin margin. During sedimentary deposition, the structural axis (the line of greatest material accumulation) shifted westward resulting in the Basin’s asymmetrical shape.

Uranium mineralization at the Complex deposits is hosted by the Eocene Wasatch Formation. The Wasatch Formation was deposited in a multi-channel fluvial and flood plain environment. The climate at the time of deposition was wet tropical to subtropical with medium stream and river sediment load depositing most medium grained materials. The source of the sediments, as evidenced by abundant feldspar grains in the sandstones, was the nearby Laramie and Granite Mountains.

Within the Complex, there is a repetitive transgressive/regressive sequence of sandstones separated by fine-grained horizons composed of siltstone, mudstone, carbonaceous shale, and poorly developed thin coal seams. The fine-grained materials were deposited in flood plain, shallow lake (lacustrine), and swamp environments. Ultimately, deposition of the Wasatch Formation was a function of stream bed load entering the basin and subsidence from within the basin. However, in the central part of the Powder River Basin, long periods of balanced stability occurred. During these periods the stream gradients were relatively low and allowed for development of broad (0.5 mi to 6.0 mi wide) meander belt systems, associated over-bank deposits, and finer grained materials in flood plains, swamps, and shallow bodies of water.

Meander belts in the Wasatch Formation are generally 5 ft to 30 ft thick. The A Sand at Nichols Ranch Area is made up of three to four stacked meander belts and the F Sand at Hank Area has two to three stacked meander belts. Individual meander belt layers will rarely terminate at the same location twice. Meanders have been noted to frequently terminate in the interior of a belt system but are more likely to terminate somewhere closer to the edge of the meander stream valley. The net effect for fluvial sands is to generally thin away from the main axis of the meander belt system. The A Sand meander belt system at Nichols Ranch Area is approximately four miles wide. At Hank, the F Sand meander belt system is smaller than Nichols Ranch at approximately one and a half miles wide.

At the North Rolling Pin Area, the mineralized sand horizon (F Sand) occurs within the Wasatch Formation at an approximate depth from surface ranging from 51 ft to 403 ft and averaging 282 ft to the top of the mineralization. Generally, the depth of mineralization decreases from the northeast to the southwest due mainly to topography along which the surface elevation decreases from approximately 5,180 ft to approximately 4,800 ft. The F Sand primarily consists of two stacked sand sets, termed the Upper and Lower F Sands that each average 20 ft to 25 ft thick.

The mineralized sand horizons occur within the lower part of the Wasatch Formation, at an approximate depth from surface ranging from 482 ft to 1,012 ft at West North Butte, 540 ft to 660 ft at East North Butte, and 172 ft to 567 ft at Willow Creek. The host sands are primarily arkosic in composition, friable, and contain trace carbonaceous material and organic debris. There are local sandy mudstone/siltstone intervals with the sandstones, and the sands may thicken or pinch-out in some locations. Mineral resources are located in the Eocene age Wasatch Formation in what is identified as the A, B, C and F host sand units of the WNB Area, the A and B host sands of the ENB Area and in the A and F host sand units of the WC Area.

The uranium mineralization is composed of amorphous uranium oxide, sooty pitchblende, and coffinite, and is deposited in void spaces between detrital sand grains and within minor authigenic clays. The host sandstone is composed of quartz, feldspar, accessory biotite and muscovite mica, and locally occurring carbon fragments. Grain size ranges from very fine to very coarse sand but is medium grained overall. The sandstones are weakly to moderately cemented and friable. Pyrite and calcite are associated with the sands in the reduced facies. Hematite or limonite stain from pyrite are common oxidation products in the oxidized facies. Montmorillonite and kaolinite clays from oxidized feldspars are also present in the oxidized facies (Uranerz, 2010a). The uranium being extracted is hosted in a sandstone, roll front deposit at a depth ranging from 400 ft to 800 ft.

Wyoming uranium deposits are typically sandstone roll front uranium deposits as defined in the “World Distribution of Uranium Deposits (UDEPO) with Uranium Deposit Classification” (IAEA, 2009). The key components in the formation of roll front type mineralization include:

A permeable host formation:

Sandstone units of the Wasatch Formation.

A source of soluble uranium:

Volcanic ash flows coincidental with Wasatch deposition containing elevated concentration of uranium is the probable source of uranium deposits for the Pumpkin Buttes Uranium District.

Oxidizing groundwaters to leach and transport the uranium:

Groundwaters regionally tend to be oxidizing and slightly alkaline.

Adequate reductant within the host formation:

Conditions resulting from periodic hydrogen sulfide (H 2 S gas) migrating along faults and subsequent iron sulfide (pyrite) precipitation created local reducing conditions.

Time sufficient to concentrate the uranium at the oxidation/reduction interface.

Uranium precipitates from solution at the oxidation/reduction boundary (REDOX) as uraninite (UO 2, Uranium oxide), which is dominant, or coffinite (USiO 4, uranium silicate).

The geohydrologic regime of the region has been stable over millions of years with groundwater movement controlled primarily by high-permeability channels within the predominantly sandstone formations of the Tertiary.

The primary assay data used to calculate the Mineral Resource estimate for the Complex is downhole radiometric log data. Calibration data for both natural gamma and prompt fission neutron (“PFN”) geophysical logging units are available for both historical and recent drilling. When drilling is active, both the natural gamma and PFN logging trucks are calibrated at least every three months. Natural gamma calibration is performed at DOE standard calibration facilities located in Casper, Wyoming. Commercial logging services for both natural gamma and PFN logging are calibrated at the DOE standard facilities located in Casper, Wyoming, and/or Grand Junction, Colorado.

Only natural gamma logs were used for Resource estimation as assay data could lead to an over or under estimation of Mineral Resources due to disequilibrium. Positive disequilibrium occurs when the uranium present has not had enough time to decay and produce daughter isotopes, which are what are actually measured during a natural gamma assay. Under positive disequilibrium a natural gamma assay would indicate lower amounts of uranium than what is present. Negative disequilibrium occurs when uranium has had enough time to decay to produce the daughter radioisotopes but was remobilized and removed from the deposit. This would lead to measuring more uranium than is present. The use of a PFN logging unit, which directly measures uranium content, would remove this risk. The disequilibrium factor applied to the Mineral Resource is 1.0.

Mineral Resources have been estimated using the GT (Grade x Thickness) contour method for each of the mineral sandstone horizons or units identified across the deposits (1, A, B, C, F, G and H). The uranium resource can generally be defined by existing drilling information which is of sufficient density and continuity to identify a meandering discontinuous mineralized trend. The grade and mineralized zone thickness were obtained from historical and recent drilling.

The GT contour method is well suited for estimating tonnage and average grades of relatively planar mineralized bodies. It is a smoothing technique that allows the geologist to apply judgment regarding the variability of the mineralization within the plane of the mineralized body. This technique is particularly effective in generating a realistic landscape of metal values along the plane of the mineralized body and limiting the effect of local high values. The technique is best applied to estimate tonnage and average grade of relatively planar bodies, i.e., where the two dimensions of the mineralized body are much greater than the third dimension (Agnerian and Roscoe, 2001). For these types of deposits, the contour method can provide a clear view of the “mineralization landscape” with “peaks and valleys” along the plane of the mineralization. Due to the two-dimensional nature of the contour method, data from drillhole intersections means the reported averaged assay grade is across the entire thickness of the mineralized body being considered. If necessary, the average intersection value is diluted to a specified minimum thickness.

The rationale for all Mineral Resource estimation methods is that there is continuity of mineralization from one sample point to another, whether they are drillhole pierce points, underground workings, surface trenches, or wellfields. When a mineral deposit has been tested by many drillholes, the estimate of tonnage and average grade by all conventional methods will likely be similar. When a deposit has been tested by a relatively few widely spaced or irregularly spaced drillholes, however, the estimates by various methods may vary greatly and a few high-grade or wide intercepts may have a large influence on the average grade or tonnage of the deposit. The contour method can be effective in reducing the influence of high-grade or wide intersections as well as the effects of widely spaced, irregularly spaced, or clustered drillholes. This is particularly the case for roll front uranium deposits. It can also be applied to estimate Mineral Reserves by deleting certain portions of the Mineral Resources estimated by the same method, such as clipping the edges of the contoured area, deleting certain parts of the tonnage estimate as pillars and sills and/or applying economic factors to the Mineral Resources.

The Mineral Resource estimates were calculated using GT contours with a minimum grade cut-off of 0.02% eU 3 O 8 and a minimum mineralization thickness of 1.0 feet. The GT values of the subject sand intervals for each hole were plotted on a drillhole map and contour lines were drawn along the mineralization trend using ArcGIS software. The contour map was developed from the calculated GTs for various GT ranges. The areas within the GT contour boundaries, up to certain distances from the drillhole and to certain maximum areas of influence, were used for calculating estimates for resources. All resources were limited to the extent of the 0.2 GT boundaries. The contained pounds of uranium were calculated using the following formula:

Mineral Resource, pounds = (Area, ft2) x (GT, %-ft) x (20 pounds) x (DEF) / (RD, ft3/ton)

Area (ft 2) = Area of influence in square feet (measured from contour interval)

GT (percent x feet) = Material grade in percent times feet thickness of mineralization (GT multiplied by 20 pounds to convert from short tons to pounds as 1% of a short ton equals 20 pounds)

DEF (1.00) = Disequilibrium factor (1.00)

RD (15.5) = Rock density (15.5 ft 3/ton)

Tonnage was calculated based on grade, pounds and a tonnage conversion factor for a given GT contour area.

Details regarding the Mineral Resource estimate disclosed herein can be found in Section 14.0, Mineral Resource Estimates of the Nichols Ranch Technical Report Summary.

The table below sets out the Mineral Resources estimates for the Nichols Ranch Project as of December 31, 2025. These estimates are derived from the Nichols Ranch Technical Report Summary, which estimated the Mineral Resources as of December 31, 2021. Daniel Kapostasy, the Company’s non-independent Qualified Person, reviewed and confirmed that the Mineral Resources estimates set forth in the Nichols Ranch Technical Report Summary remained accurate as of December 31, 2025.

Nichols Ranch Remaining Mineral Resources – In Situ Uranium(1)(2)(3)(4)(5)(6)

Classification · Project Area · Cut-off(2)(8) · Tons · Grade · Contained Metal · EFR Basis · EFR Metal · Metallurgical Recovery(9)
(ft-%) · (000s) · (%U3O8) · (000s lb U3O8) · (%) · (000s lb U3O8)
Measured Mineral Resources (M)Nichols Ranch0.2110.187411004171%
Jane Dough0.2—————71%
Hank0.2—————71%
North Rolling Pin0.2—————71%
West North Butte0.2—————71%
Total Measured110.1874110041
Indicated Mineral Resources (I)Nichols Ranch0.23590.1661,1901001,19060.4%
Jane Dough0.21,8920.1124,237813,43260.4%
Hank0.24500.09585510085560.4%
North Rolling Pin0.25820.05766510066560.4%
Total Indicated0.23,2830.1066,94788.46,142
Total Measured + Indicated (M+I)0.23,2940.1066,98888.56,183
Inferred Mineral Resources (I)Nichols Ranch0.2—————60.4%
Jane Dough0.21880.1124208134060.4%
Hank0.24230.09580310080360.4%
North Rolling Pin0.2390.042331003360.4%
Total Inferred0.26500.0971,25693.61,176

Notes:

(1) SEC S-K definitions were followed for all Mineral Resource categories. These definitions are also consistent with CIM (2014) definitions in NI 43-101.

(2) The cut-off grade is calculated using a metal price of $65/pound. U 3 O 8. The long-term uranium price is based on supply and demand projections for the period 2021-2035.

(3) Mineral Resources are based on a tonnage factory of 15.0 ft 3/ton (Bulk density 0.0667 ton/ft 3 or 2.13 t/m 3).

(4) Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

(5) Numbers may not add due to rounding.

(6) Mineral Resources are 100% attributable to EFR for Nichols Ranch, Hank, and North Rolling Pin.

(7) Mineral Resources are 81% attributable to EFR and 19% attributable to United Nuclear Corp. in parts of Jane Dough.

(8) Cut-off grade is a GT cut-off or %U 3 O 8 x thickness (ft).

(9) Metallurgical recoveries for ISR operations represent the percent recovery (71%) for under pattern Mineral Resources. Measured Mineral Resources are 100% under pattern. Indicated and Inferred Mineral Resources assume 85% under pattern and 71% recovery totaling 60.4% overall recovery of the Mineral Resource.

Present Condition of the Property and Current Status of Wellfields

All the currently planned and permitted wellfields are in Production Areas #1 and #2 of the Nichols Ranch Wellfield. The Nichols Ranch Wellfield is expected to have a total of 13 header-houses, with Production Area #1 comprising header-houses 1 through 8, and Production Area #2 comprising header-houses 9 through 13. Each of the two planned Nichols Ranch Wellfield Production Areas will include a number of injection wells, recovery wells, monitoring wells, header houses and associated piping and power supply. Header houses will be located within the Production Areas and will distribute recovered fluids from recovery wells to trunk lines, and injection fluids from the processing facility through the trunk lines to injection wells.

The first five header houses and their respective wellfields in Production Area #1 at the Nichols Ranch Wellfield were installed and extracting uranium at the time the Company acquired Uranerz in June 2015. Header house #6 was commissioned in November 2015. Uranerz placed the 7th and 8th header-houses online in March and July 2016, respectively, thereby completing development of Production Area #1. In February 2017 Uranerz completed construction on the 9th header-house, marking the beginning of development in Production Area #2. Uranium recovery operations from Production Area #2 commenced in March of 2017. Currently, Production Area #1 is in restoration and Production Area #2 is on standby. In order for Nichols Ranch to engage in future uranium production, the Company will need to incur capital expenditures to develop additional wellfields.

In 2025, the Company continued the 2024 delineation drilling program and collected data to update the planning of header houses 11-13 at Nichols Ranch and started an in-fill delineation drilling campaign in the Jane Dough project. A total of 394 holes were drilled during the 2025 drilling campaign, 79 at Nichols Ranch and 315 at Jane Dough. As is typical with drilling for uranium projects in Wyoming, after the holes were drilled they were logged for gamma activity on 0.5 ft intervals using a Company owned Century Geophysical logging truck. The information gathered from down hole logging was then converted to a %eU 3 O 8 grade. The probe truck was calibrated at the DOE test pits in Casper, WY in March and December 2024.

All holes are located in areas where a Mineral Resource has already been declared and these holes should be viewed as confirming the existing resource. Additional work will need to be done following the completion of the drilling campaign to determine how this new data impacts the existing Mineral Resource. A summary of the drilling results for holes are given in the tables below. All holes were drilled in Sections 17, 18, 20 and 29, Township 43 North, Range 76 West, 6th Principal Meridian, Johnson County, Wyoming.

Summary of 2025 Nichols Ranch Drilling Results

Number ofGroupingThickness(1)Average GradeGT
HolesCriteria(ft)% eU3O8Grade x Thickness
39(2)GT >= 1.112.300.1772.1771
1230.25 >= GT < 1.16.400.0880.5632
1160.01 >= GT < 0.252.800.0420.1176
116GT < 0.01Barren - No uranium mineralization

Notes:

(1) Mineralized intercepts used to support data reported in this table are for thickness greater than or equal to one foot. All mineralized intercepts less than one foot in thickness are too thin to be mined.

(2) Details on the 39 drill holes (42 intercepts) greater than or equal to 1.1 GT are given in the table Summary of Nichols Ranch Drilling - Intercepts Greater Than or Equal to 1.1 GT.

Summary of 2025 Nichols Ranch Drilling - Intercepts Greater Than or Equal to 1.1 GT

Hole IDFromToThicknessGradeGT
(ft) · (ft) · (ft) · %eU3O8 · Grade x Thickness
U36-17-747592.0603.011.00.2172.39
U36-17-758525.0529.54.50.3631.63
U36-17-759496.5514.017.50.0681.19
U36-17-766479.5494.515.00.0751.13
U36-17-769484.0494.010.00.2372.37
U36-17-773555.5560.55.00.3291.65
A36-29-457613.0625.012.00.1661.99
A36-29-482578.5588.510.00.1701.70
A36-29-499561.5572.010.50.1591.67
A36-29-506565.5577.512.00.1601.92
A36-29-511557.5566.08.50.1921.63
A36-20-069564.5571.57.00.1851.30
A36-29-298610.0628.518.50.0911.68
A36-29-301608.5618.510.00.1311.31
A36-29-308630.0637.57.50.1651.24
A36-29-313624.0637.013.00.1371.78
650.5655.04.50.2571.16
A36-29-328618.5633.014.50.2713.93
A36-29-332593.0610.517.50.2624.59
A36-29-342624.5637.012.50.1301.63
A36-29-355571.0585.014.00.1051.47
A36-29-370534.0554.020.00.2925.84
A36-29-373620.5634.013.50.0871.17
A36-29-385608.0619.011.00.1331.46
A36-29-395614.5628.013.50.1121.51
A36-29-399620.0629.59.50.1561.48
A36-29-403621.0628.57.50.1951.46
A36-29-415591.5599.58.00.3963.17
A36-29-427583.0598.015.00.0821.23
A36-29-429560.0576.016.00.1091.74
A36-29-430573.5586.012.50.2733.41
A36-29-431544.5568.023.50.1653.88
A36-29-432576.0586.010.00.1351.35
A36-29-433544.0555.011.00.1761.94
A36-29-447579.0595.516.50.0861.42
A36-29-448583.5591.58.00.1421.14
A36-29-452565.5591.526.00.1072.78
A36-29-453556.5565.59.00.1461.31
567.5575.58.00.1671.34
A36-29-455583.5603.520.00.0871.74
A36-29-456523.5538.014.50.2413.49
541.0551.010.00.2792.79

Notes:

(1) All grades reported in this table are "equivalent" eU 3 O 8 grades as they were calculated from calibrated down hole gamma logging of the drill holes. The down hole probe was calibrated at the U.S. Department of Energy test pits located in Casper, Wyoming by Energy Fuels staff and verified on site by Century Geophysical Corporation. All drill holes reported are vertical and were verified as vertical using down hole deviation logging. All thicknesses reported are true thicknesses.

Nichols Ranch Plant

In 2014, construction of the Nichols Ranch Plant was completed. The Nichols Ranch Plant is licensed to produce up to two million pounds of uranium per year through three major processing solution circuits: (i) a recovery and extraction circuit; (ii) an elution circuit; and (iii) a yellowcake production circuit. The Nichols Ranch Plant is currently constructed and operated with the recovery and extraction circuit and the elution circuit installed. The Company retains the ability to construct and operate a yellowcake drying and packaging circuit at the Nichols Ranch Plant at a later date if desired.

Uranerz is still processing uranium-bearing wellfield solutions from Production Areas #1 and #2 of the Nichols Ranch Wellfield for de minimis recoveries of uranium. When not on standby, yellowcake slurry, produced at the Nichols Ranch Plant, is shipped by truck from the Nichols Ranch Project to the White Mesa Mill where it is dried and packaged in drums as uranium concentrate product. Prior to the completion of the elution circuit in February 2016, loaded resin was transported by truck to a third-party facility for elution, drying and packaging, under a toll processing arrangement.

The Nichols Ranch Plant was acquired by the Company on June 18, 2015 through the acquisition of Uranerz. As of December 31, 2025, the total net book value attributable to the Nichols Ranch Plant on the Company’s consolidated financial statements was $19.36 million. The total net book value attributable to the North Rolling Pin and WNB properties was $10.22 million.

Production at Nichols Ranch is currently on standby and restoration, pending market conditions improving sufficiently to resume production. In order for Nichols Ranch to engage in future uranium production, the Company will need to incur capital expenditures to develop additional wellfields, as all existing wellfields are now depleted. While production at the Nichols Ranch Project is currently being maintained on standby, in 2025 the Company conducted delineation drilling at the Nichols Ranch Project in PA2 in order to plan out future wellfields to be ready for potential recommencement of production in the future. In addition, in 2026, the Company will continue conducting additional infill drilling on land associated with the Jane Dough portion of the Nichols Ranch Project held by the Arkose JV.