Skip to main content

ENERGY FUELS INC

For the period ended Dec 31, 2025. Filed Feb 26, 2026.

View on SEC.gov

About this filing

A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.

FY2025 · Filed Feb 26, 2026

UUUU$6.66+1.1%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-K

Period ended 2024-12-31; filed 2025-02-26.

0001385849-25-000004

ITEM 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

Current report: 10-K

Period ended 2025-12-31; filed 2026-02-26.

0001385849-26-000009

ITEM 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 202 previous paragraphs and 207 current paragraphs.

47 unchanged; 56 reworded; 100 added; 96 removed; 3 previous and 4 current paragraphs rearranged.

Tables are not compared: 9 previous and 8 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (100)

Current report

We produce several of the critical materials essential to U.S. energy security and advanced technologies, including uranium, vanadium, REEs and HMS, strengthening domestic supply chains and reducing reliance on foreign sources. The Company owns uranium, uranium/vanadium and REE/HMS properties and projects in various stages of operation, development, exploration and permitting, as well as fully permitted uranium and uranium/vanadium projects on standby. The Company’s White Mesa Mill, near Blanding, Utah, is the only licensed and operating uranium mill, and the only uranium mill capable of producing separated REE products, in the U.S. The Company is also evaluating the potential to recover radium at the Mill for use in cancer treatments.

Current report

The Mill is our key to building a critical minerals hub in the U.S. because of its ability to process uranium, vanadium, REEs and potentially radium. Uranium is the strategic fuel powering carbon-free, emission-free baseload nuclear energy, and one of the most reliable forms of power supporting U.S. energy independence and decarbonization goals. The REEs we are now producing are essential to manufacture permanent magnets used in EVs, hybrid EVs, defense systems, robotics and other advanced technologies. The titanium and zirconium products derived from our HMS production are used in national security and other key industries. Titanium is used in aircraft engines and airframes, spacecraft components, medical devices and pigments; while zirconium is crucial for fuel rod cladding, reactor components, jet engine parts and advanced ceramics in a wide range of applications in the medical, aerospace and chemical industries. The radium that we are evaluating recovering from our REE and uranium processing streams have the potential to provide materials needed for emerging TAT cancer treatments.

Current report

In addition, Energy Fuels recovers uranium from Alternate Feed Materials at the Mill, thereby recycling valuable resources that would otherwise be discarded and returning them to the fuel cycle to support U.S. nuclear energy and national security objectives.

Current report

The Company has secured its own sources of REE- and uranium-bearing monazite sands in furtherance of a fully integrated U.S.-based REE supply chain. These include the Vara Mada Project in Madagascar, the Donald Project in Australia through the Company’s Donald Project JV, and the Bahia Project in Brazil.

Current report

The Company is currently: mining uranium ore from its Pinyon Plain, La Sal and Pandora mines, located in Arizona and Utah, respectively, and processing and/or stockpiling the mined mineralized material at the Mill; processing stockpiled uranium mineralized material and Alternate Feed Materials at the Mill for the production of finished U 3 O 8 product; completing sales of U 3 O 8 under its portfolio of long-term contracts and on the spot market; negotiating fiscal and stability arrangements, seeking government approvals, and performing permitting and development activities at its Vara Mada HMS and REE project in Madagascar inpreparation for a FID, which the Company expects could be made as early as 2027 if fiscal and stability arrangements are finalized; performing development activities at its Donald Project in Australia in preparation for a FID, which the Company expects could be made as early as Q1 2026; performing various permitting, exploration, and development activities at its uranium and uranium/vanadium properties in the U.S.; and performing reclamation and monitoring activities at its Kwale Project in Kenya.

Current report

We have six long-term uranium contracts with major U.S. utilities at this time. The Company also entered into one uranium ore purchase agreement with a third-party miner in the vicinity of the Mill during 2025 and has the potential to enter into additional agreements as market conditions warrant.

Current report

During 2025, the Mill processed stockpiled conventional mineralized materials and Alternate Feed Materials, which resulted in 1,015,000 pounds of finished U 3 O 8 production. The Company commenced its conventional ore processing campaign at the Mill in Q4 2025 as planned, which is expected to continue through Q2 2026 due to: (i) the previously announced higher mining rate expected at the Pinyon Plain mine in 2025 and in subsequent years; (ii) the desire to produce enough finished U 3 O 8 from this Mill run to allow the Company to fulfill its contract deliveries in 2026 and 2027, along with maintaining the flexibility to complete opportunistic spot sales; and (iii) the desire to allow the Company to allow the Mill to to make its planned expanded Phase 1 Circuit process changes at the Mill in 2026.

Current report

The Company updated its existing feasibility study into an updated S-K 1300 and NI 43-101-compliant pre-feasibility study, which was completed and filed on February 26, 2026. Due to the high grades encountered during mining in the Main Zone that were not included in the original pre-feasibility study, the Mineral Resource model was re-estimated. Additionally, new drilling completed by the Company in the Juniper Zone allowed those Mineral Resources to be converted from inferred to indicated Mineral Resources and then converted to probably Mineral Reserves. As of December 31, 2025, the remaining Mineral Reserves in the Main Zone totaled 2.1 million pounds of U 3 O 8 and the Mineral Reserves for the Juniper Zone totaled 0.5 million pounds of U 3 O 8, acknowledging that further exploration potential exists in the Juniper Zone. The Company intends to continue exploration in the Juniper Zone during 2026.

Current report

Between 2021 and 2023, the Company reconfigured its existing uranium production circuits to be able to crack and leach monazite for the recovery of uranium, which was sold into the U.S. nuclear fuel cycle, and the recovery of MREC from monazite sands at the Mill. The MREC was then sold to Neo Performance Materials (“Neo”) for commercial separation by Neo into NdPr oxide and a mixed heavy rare earth carbonate at its REE separation facility in Silmet Estonia. This marked the first processing of monazite sands for the recovery of a commercial REE product in the U.S. in many years.

Current report

Following its success in producing commercial grade MREC at the Mill and to further its REE initiatives, in late 2023 and early 2024, the Company constructed enhancements and modifications to its existing solvent extraction (“SX”) circuits at the Mill for commercial separation of NdPr at the Mill, while at the same time producing a “heavy” (Sm+) RE Concentrate. The Company completed these modifications in late Q1 2024, fully commissioned the project in Q2 2024 and completed its initial run of separated NdPr commercial production in Q3 2024 under budget, with minimal capital expenditures, and ahead of schedule (the modifications made to the Mill leach circuits to crack and leach monazite together with the modifications to the Mill’s SX circuits to separate NdPr are referred to as the “Phase 1 Circuit”).

Current report

The existing Phase 1 Circuit has the design capacity to process approximately 8,000 to 10,000 tonnes of monazite per year, producing approximately 4,000 to 6,000 tonnes of total rare earth oxides (“TREO”), containing approximately 850 to 1,000 tonnes of recoverable separated NdPr per year. Although the modifications to the Mill’s SX circuit comprised in the Phase 1 Circuit are stand-alone and dedicated to REE production and do not interfere with the Mill’s uranium and vanadium production, the Phase 1 Circuit’s crack and leach circuit shares certain circuits with the Mill’s uranium production and as a result, Phase 1 Circuit REE production and conventional uranium production cannot be run at the same time, as the Phase 1 Circuit is currently configured. It is therefore necessary at this time to switch back and forth between conventional uranium and uranium/vanadium production and Phase 1 Circuit REE production from monazite sands, which can be done with minimal cost and effort.

Current report

The Phase 1 Circuit as currently configured would allow for the processing of the first phase of the Donald Project monazite production, once that project is developed, for the recovery and separation of NdPr and an Sm+ mixed RE concentrate which could be sold on the market or stockpiled for separation of the heavies upon completion of later phases of the Phase 1 Circuit and/or the planned Phase 2 Circuit at the Mill.

Current report

The Company is planning further enhancements to expand its heavy REE production at its Phase 1 Circuit for the planned commercial-level recovery of Dy, Tb, Sm, Eu and Gd, with the ability to separate other heavy REEs such as Y and Lu if market conditions warrant. Subject to receipt of all required regulatory approvals, financing, the successful development of these enhancements and the receipt of sufficient quantities of monazite sand feedstock, the expanded Phase 1 Circuit is expected to be operational in 2027 with planned production recovery of up to approximately 35 tonnes of Dy, 12 tonnes of Tb per year and potentially other heavy REEs, in addition to the 850 – 1,000 tonnes of NdPr, from processing up to approximately 10,000 tonnes of monazite per year. The Company had previously announced its intention to start commercial production of Dy and Tb by the end of 2026, but has changed those plans in order to expand the enhancements to the Mill’s Phase 1 Circuit to allow for the additional production of Sm, Eu and Gd and to provide the ability to separate other heavy REEs in the 2027 time frame.

Current report

At the same time as these enhancements are being made to the Phase 1 Circuit, the Company plans to make further enhancements to the Phase 1 Circuit to allow for the processing of uranium- and REE-bearing MREC or similar intermediary REE products from third-party sources in the Phase 1 Circuit, subject to receipt of all regulatory approvals, financing and the successful development of these further enhancements. As MREC or similar intermediary REE products would not need to utilize the Phase 1 Circuit’s crack and leach circuits it is expected that such products could be separated into NdPr and heavy REEs separately from uranium production, thereby allowing such feedstocks to be separated into REE oxides through the Phase 1 Circuit’s SX circuits without interfering with normal Mill conventional uranium ore processing, which could be run simultaneously with the separation of such feedstocks. These enhancements are expected to be made and the Phase 1 Circuit operational to accept MREC and similar intermediary REE products in 2027.

Current report

The Company also plans to expand its NdPr, Dy and Tb production capability and potentially other REE material production capability through the development of its proposed stand-alone Phase 2 Circuit, subject to the receipt of regulatory approvals, financing, completion of engineering and the receipt of sufficient feed materials.

Current report

In January 2026, the Company announced the results of a new AACE International Class 3 Bankable Feasibility Study (“BFS”) evaluating the planned Phase 2 Circuit expansion of REE processing capabilities at the Mill. The BFS evaluated the construction of a Phase 2 Circuit designed to materially expand the Mill’s ability to process monazite and other REE-bearing feedstocks into separated REE oxides. Upon commissioning, the Phase 2 Circuit is expected to increase the Mill’s REE oxide production capacity from approximately 850 to 1,000 tpa of NdPr oxide from the Phase 1 Circuit, to over 6,000 tpa of NdPr oxide, along with approximately 60 tpa of Tb and 200 tpa of Dy oxides from the combined Phase 1 Circuit and Phase 2 Circuit. This would provide the capability to produce sufficient NdPr up to approximately 7.0 million EVs/hybrid EVs per year. The Phase 2 Circuit would also add a dedicated monazite “crack-and-leach” circuit to the Mill’s existing leach circuits, which would allow the Phase 2 Circuit to be run completely independently of (and simultaneously with) the Mill’s conventional uranium and uranium/vanadium production.

Current report

The BFS estimates initial capital costs of approximately $410.0 million and indicates attractive projected economics, including significant expected annual earnings before interest, taxes, depreciation and amortization (“EBITDA”) over the modeled project life. The Phase 2 Circuit expansion is intended to position the Company as a leading domestic processor of both light and heavy REE oxides, supporting the restoration of a secure U.S.-based REE supply chain. The BFS assumes feedstock supply from the Company’s existing and HMS and monazite projects, as well as third-party sources including MREC and similar feedstocks, subject to permitting, development and market conditions.

Current report

The Company has focused primarily on monazite, as it has superior concentrations of the four critical “magnet” REEs (NdPr, Dy and Tb) compared to many other REE-bearing minerals. Monazite concentrates naturally contain higher concentrations of “heavy” REEs, including Dy and Tb, versus many other REE-bearing ores, mainly due to the presence of xenotime, which is another REE-bearing phosphate mineral that is often found with monazite. The monazite feedstock for the Company’s REE production is expected to be procured through Company-owned mines like the Vara Mada Project and Bahia Project, as well as the Company’s joint venture interest in the Donald Project, along with other potential acquisitions, joint ventures, open market offtake (like the Company’s current arrangement with The Chemours Company), and/or other collaborations, in each case upon successful completion of development of the projects and transactions.

Current report

As mentioned above, the Company plans to expand its capability to accept uranium and REE-bearing MREC and other similar feedstock from third-party sources, as available. This will provide more flexibility to receive other types of feedstocks and to utilize the Phase 1 Circuit for REE production without interfering with conventional uranium and uranium/vanadium production at the Mill. To the extent this MREC and similar feedstock originates from the cracking and leaching of monazite sands at other facilities, the MREC is expected to contain similar favorable distributions of heavy REEs as monazite sands themselves.

Current report

There are a number of risks inherent to the Company’s REE activities. See Part I, Item 1A. Risk Factors.

Current report

On August 21, 2025, the Company announced it successfully completed production of and achieved a purity of 99.9% Dy at pilot scale, which is well in excess of the 99.5% commercial specification, thereby becoming the first U.S. company to publicly report Dy production volumes and purities. Multiple magnet manufacturers and original equipment manufacturers (“OEM”) have expressed strong interest in obtaining Dy samples, further validating the Company’s strategy to establish a fully non-Chinese REE supply chain for commercial and defense applications. Through December 31, 2025, the Mill had produced 29 kg of Dy.

Current report

On August 26, 2025, the Company announced that it signed a Memorandum of Understanding with Vulcan Elements (the “Vulcan MOU”) to create a secure, ex-China supply chain for rare earth permanent magnets (“REPMs”). Under the Vulcan MOU, the Company will supply high-purity NdPr and Dy oxides produced at its White Mesa Mill from U.S.-sourced monazite concentrates for validation in Vulcan’s REPM production processes. Following validation, the parties intend to negotiate long-term supply agreements. This collaboration is expected to support EVs, hybrid EVs, robotics, advanced wind turbines, cell phones, computers, flat panel displays, advanced optics, catalysts, medicine and national defense applications.

Current report

On September 9, 2025, the Company announced that its high-purity NdPr oxide, produced at the White Mesa Mill from monazite concentrates mined in Florida and Georgia, had been successfully manufactured into commercial-scale REPMs by South Korea’s largest manufacturer of EV drive unit motor cores. The REPMs passed all QA/QC benchmarks and are qualified for use in EV and hybrid drive units for major automotive manufacturers in North America, the EU, Japan, and Korea. Approximately 1.2 metric tonnes of NdPr oxide were processed into 3.0 metric tonnes of REPMs, enough to power approximately 1,500 new vehicles, with first installations in the market in Q4 2025.

Current report

Proposed Acquisition of Australia Strategic Materials Limited

Current report

In accordance with its plans to expand its REE production to include metals and alloys, on January 20, 2026, the Company entered into a definitive agreement to acquire 100% of the issued share capital of ASM by way of a scheme of arrangement under Australian law. ASM is an Australian-based critical minerals company with REE mining, processing, and metallization assets, including the Dubbo Project in New South Wales, a metallization and alloying facility in South Korea, and plans to potentially construct a metallization and alloying facility in the U.S. ASM’s Korean metals and alloying plant is one of the few facilities outside of China currently producing REE metals and alloys, including NdPr, Dy and Tb metals and NdFeB and developing FeDy alloy production. Upon closing of this transaction, which is expected as early as June 2026, the Company believes it will be the largest, fully integrated REE “mine-to-metal and alloy” producer outside of China closing a critical strategic gap in global supply chains for magnet applications, including automotive, robotic, energy and defense technologies.

Showing the first 40 of 100 passages. Open the source sections for the rest.

Removed paragraphs (96)

Previous report

In 2022, we entered into three long-term uranium contracts with major U.S. utilities, and in 2024, we entered into a fourth long-term contract with a major U.S. utility. To deliver under these contracts, the Company commenced ore production at three of its permitted and developed conventional uranium mines, Pinyon Plain, La Sal and Pandora, located in Arizona and Utah for uranium production. The Company also expects to enter into a uranium ore purchase agreement with one or more third-party miners in the vicinity of the Mill during 2025. The Company will stockpile ore from production at these three conventional mines, and any ore purchases from third-party miners, at the Mill for processing in 2025 or subsequent years, subject to market conditions, contract requirements and the Mill’s schedule. The Company will also continue to produce uranium from its alternate feed recycling program, and potentially existing ore stockpiles at the Mill.

Previous report

During 2025, the Company expects to mine ore from its Pinyon Plain, La Sal and Pandora mines containing 730,000 to 1,170,000 pounds of U 3 O 8, depending on mining rates, contract requirements, and market conditions, which will be stockpiled at the mines and Mill pending processing at the Mill. In addition, the Company expects to receive additional alternate feed materials, cleanup material and to purchase ore from third-party miners containing approximately 160,000 to 200,000 pounds of U 3 O 8, which when combined with the mined ore is expected to result in an increase in uranium contained in ore inventories and work in process during the year by 890,000 to 1,370,000 pounds of U 3 O 8. Uranium processing activities are expected to result in total finished uranium production of 200,000 to 250,000 pounds of uranium during 2025, which (combined with existing inventories) is expected to be sufficient to complete uranium sales in 2025. The final mix between quantities of U 3 O 8 contained in ore inventories and quantities of U 3 O 8 in finished product inventory at the end of 2025 will depend on the timing of processing stockpiled uranium ore at the Mill (which could occur in 2025 or be deferred to subsequent years), on any additional ore purchases from third-party miners, on any additional alternate feed and cleanup materials received, and on any spot uranium sales or purchases the Company may elect to complete in 2025 in response to uranium prices, market conditions, contract requirements and other factors.

Previous report

The Company’s decision to ramp-up uranium production was driven by several favorable market and policy factors, including strengthening spot and long-term uranium prices in recent years, increased buying interest from U.S. nuclear utilities, U.S. and global government policies supporting nuclear energy to address global climate change, and the need to reduce U.S. reliance on Russian and Russian-controlled uranium and nuclear fuel.

Previous report

The Company has significantly advanced its REE programs, including the commissioning of commercial REE (NdPr) separation capabilities at the Mill, while securing HMS mines that are expected to supply significant quantities of natural monazite sands feedstock to the Mill for processing into separated REE products. This includes the Company’s recent acquisition of Base Resources, which owns the Toliara Project and Kwale Project, and through its recently formed joint venture with Astron to jointly develop the Donald HMS and REE project (in addition to the acquisition of the Bahia Project discussed in Note 7 – Mineral Properties and Property, Plant and Equipment).

Previous report

The Company completed commissioning its Phase 1 REE separation circuit at the Mill during Q2-2024, which is capable of processing 8,000-10,000 tonnes of monazite per year into 850 to 1,000 tonnes of separated NdPr per year plus an Sm+ RE Carbonate, and is advancing engineering and permitting on its Phase 2 separation facilities at the Mill to enable the production of up to 4,000 – 6,000 tonnes of separated NdPr, along with separated Dy, Tb and other REE materials (see “Rare Earth Element Initiatives” below). During the Phase 1 commissioning, the Company produced approximately 38 tonnes of separated NdPr, which is currently being qualified by REE metal and magnet manufacturers to enable future offtake of the Company’s separated REE products produced at the Mill from monazite feedstocks produced at the Toliara, Donald, and Bahia projects, in addition to third-party feedstocks purchased from other parties. The Company also plans to continue to evaluate potential opportunities in REE metal, alloy and magnet-making as they may arise.

Previous report

We continually evaluate the optimal mix of critical mineral products, production, inventory and purchases in order to retain the flexibility to deliver long-term value.

Previous report

During the year ended December 31, 2024, the Mill focused on finalizing the commissioning of its Phase 1 REE separation circuit and producing uranium from stockpiled alternate feed materials and conventional ores. The Mill’s Phase 1 REE separation circuit is currently capable of producing separated NdPr and a “heavy” Sm+ RE Carbonate (see “Rare Earth Element Initiatives” below). In 2024, the Company received 480 tonnes of monazite from Chemours. By Q3-2024, the Mill had produced approximately 38 tonnes of separated NdPr and 10 – 20 tonnes of Sm+ RE Carbonate through successful commissioning, which exceeded the Company's expected recovery of 25 – 35 tonnes of separated NdPr. The Mill focused on processing stockpiled alternate feed materials and conventional ores during Q4-2024, which resulted in production of 158,000 pounds of U 3 O 8. No vanadium production occurred during 2024, though the Company continually monitors its inventory and vanadium markets to guide future potential vanadium production.

Previous report

During 2025, the Company expects to receive additional Alternate Feed Materials, cleanup material and to purchase ore from third-party miners containing approximately 160,000 to 200,000 pounds of U 3 O 8. The Company expects to produce between 200,000 and 250,000 pounds of finished U 3 O 8 during the first half of 2025 from existing conventional ore inventories and Alternate Feed Materials. The amount of finished U 3 O 8 production could exceed these amounts if the Company elects to process additional stockpiled conventional ore inventories at the Mill during 2025, which would depend on market conditions, contract requirements, and the Mill’s schedule.

Previous report

The Company also plans to continue to pursue additional Alternate Feed Materials, third-party processing, ore purchases and other sources of feed for the Mill (including potential material recovered from AUM and other land cleanup work) and, when market conditions warrant, pursue the recovery of uranium and/or vanadium dissolved in the Mill’s tailings pond solutions.

Previous report

During the year ended December 31, 2024, the Company continued ore production at the La Sal mine, Pinyon Plain mine and Pandora mine.

Previous report

In July 2024, the Pinyon Plain Mine commenced uranium ore haulage to the White Mesa Mill on federal and state highways that crossed over the Navajo Nation, in accordance with federal law and the Mine's USFS-approved Mine Plan of Operations.

Previous report

On July 31, 2024, the Navajo Nation’s President expressed that, as a result of the Navajo Nation’s long and troubled history with uranium mining during the cold war era, the Navajo Nation was concerned about the potential effects the transport of uranium ore across the Navajo Nation may have on the health, safety, and welfare of its citizens.

Previous report

Although Energy Fuels believes any attempt by the Navajo Nation to prevent ore transport is preempted under federal laws, Energy Fuels voluntarily decided it was in the long-term interest of the Company to engage in good-faith discussions with the Navajo Nation to address its concerns and potentially seek other areas of mutual agreement and collaboration.

Previous report

As a result, Energy Fuels voluntarily agreed to delay transporting uranium ore across the Navajo Nation for a reasonable time while the parties engaged in good faith discussions aimed at reaching a suitable agreement. Pending the agreement, mining continued at the Pinyon Plain mine, but at a reduced rate with mined ore being stockpiled at the mine site and with other necessary underground mine development activities continuing at an accelerated rate.

Previous report

On January 29, 2025, the Company announced it had signed a landmark agreement with the Navajo Nation governing the transport of uranium ore along federal and state highways crossing the Navajo Nation. Ore transport from the Pinyon Plain mine in northern Arizona to the Mill resumed on February 12, 2025. Upon resolution of this matter, the Company resumed mining at Pinyon Plain at full capacity.

Previous report

As mentioned above, the Company also expects to produce between 200,000 and 250,000 pounds of finished U 3 O 8 during the first half of 2025 from existing conventional ore inventories and Alternate Feed Materials.

Previous report

The Company plans to continue performing exploration activities at its Nichols Ranch Project and further delineation drilling at its Pinyon Plain Project to increase its uranium resource base.

Previous report

The Company has four long term contracts with major U.S. nuclear utilities and entered into spot sale agreements with three customers during the year ended December 31, 2024. Under these contracts, the Company sold 450,000 pounds of U 3 O 8 during the year ended December 31, 2024 with a weighted-average sales price of $84.23 per pound.

Previous report

The Company completed the following sales for the year ended December 31, 2024:

Previous report

•January 2024: sold 200,000 pounds of U 3 O 8 for $15.03 million ($75.13 per pound) into its existing portfolio of long-term contracts;

Previous report

•March 2024: sold 100,000 pounds of U 3 O 8 on the spot market for $10.29 million ($102.88 per pound);

Previous report

•June 2024: sold 100,000 pounds of U 3 O 8 on the spot market for $8.59 million ($85.90 per pound); and

Previous report

•September 2024: sold 50,000 pounds of U 3 O 8 on the spot market for $4.00 million ($80.00 per pound).

Previous report

During the year ended December 31, 2024, the Company did not have any rare earth sales. During 2024, the Company completed the commissioning of the Mill’s newly installed Phase 1 separation circuit, from which it produced approximately 38 tonnes of separated NdPr in 2024 and 9 tonnes of Sm+ RE Carbonate. Additionally, the Company has approximately 28 tonnes of NdPr plus approximately 4 tonnes of Sm+ in solution in its Phase 1 separation circuit. Samples of the Company's NdPr product have been sent to permanent magnet and other companies around the world for product qualification. Initial testing responses have been positive.

Previous report

On October 2, 2024, the Company completed its acquisition of Base Resources. At closing, each holder of ordinary shares of Base Resources received share consideration and AUS$0.065 in cash, paid by way of a special dividend by Base Resources to its shareholders. The total share consideration issued by Energy Fuels was approximately $178 million and the total special dividend value was approximately $55.1 million. See Note 3 – Transactions to the consolidated financial statements for more information.

Previous report

The Company, through its newly acquired subsidiary Base Resources (as of October 2, 2024), owns the Toliara Project. In addition to its stand-alone ilmenite, rutile and zircon production capability, the Toliara Project also contains large quantities of monazite, which is a rich source of the ‘magnetic’ REEs used in EVs, hybrid EVs and a variety of clean energy, defense and advanced technologies, which, upon development, would be shipped to the Mill for the recovery of REEs.

Previous report

Although the Toliara Project holds a mining permit that allows production of Ilmenite, Rutile and Zircon, development at the Project was suspended by the Government of Madagascar in November 2019 pending negotiation of fiscal terms applying to the Project. Based on progress made in the negotiation of fiscal terms, the Government of Madagascar lifted the suspension on November 28, 2024, and on December 5, 2024 the Company entered into a Memorandum of Understanding (the “MOU") with the Government of Madagascar setting forth certain key terms applicable to the Toliara Project. The MOU is the culmination of extensive negotiations over several years with the Malagasy Government on fiscal and other terms applicable to the Toliara Project and a major step forward in advancing the Project. Now that the Government of Madagascar has lifted the suspension, the Company has re-commenced development and investment in the Project, is re-establishing community and social programs, and is advancing the technical, environmental and social activities necessary to achieve a positive Financial Investment Decision (“FID"), which the Company expects to make in early 2026.

Previous report

While the Company is progressing towards an FID, the Company will continue working with the Government of Madagascar to formalize the terms and conditions set out in the MOU through the implementation of a “Stability Mechanism" consisting of one or a combination of the following: (a) submittal of an Investment Agreement to the Madagascar Parliament for approval as law and certification of the Toliara Project (“Project Certification") under existing law establishing a special regime for large scale investments in the Malagasy mining sector (the “LGIM"); (b) promulgation of amendments and revisions to the existing LGIM (the “LGIM Amendment") in a form that provides for the necessary certainty of financial and legal terms, and reasonable financial, operational and legal requirements, for large-scale projects and have Project Certification under the amended LGIM, together with an Investment Agreement (if reasonably required) submitted to Parliament for approval as law; and/or (c) another agreed upon mechanism that achieves the necessary certainty of financial and legal terms, and reasonable financial, operational and legal requirements, applying to large-scale mining projects. The Company and the Government of Madagascar are currently pursuing option (b) by working towards an LGIM Amendment and to have Project Certification under the amended LGIM, together with an Investment Agreement (if reasonably required) submitted to Parliament for approval as law. The Company currently expects that the LGIM Amendment process could be completed in Q2 2025 with the Project Certification and Investment Agreement, if required, approval by the end of Q3 2025. In parallel, the Company and the Government of Madagascar are working through the process for having Monazite added to the Toliara Project’s mining permit. There can be no assurance as to the timing of achieving sufficient legal and fiscal stability or the timing for approval of the addition of Monazite to the mining permit. If such approvals are not obtained, or obtained on terms less favorable than expected, this could delay any final investment decision in relation to the Toliara Project or prevent or otherwise have a significant effect on the development of the Toliara Project or ability to recover Monazite from the Toliara Project. (see “Part I, Item 2. The Toliara Project”)

Previous report

Base Resources also owns the Kwale Project in Kenya, which completed its mine life in December 2024 and has commenced reclamation activities.

Previous report

The Company continues to make progress at the Mill to produce both “light” and “heavy” separated REE products in the coming years. The Company produced a mixed RE Carbonate from monazite sands at the Mill between 2021 and 2024. Energy Fuels recently completed Phase 1 REE Separation circuit, which is now capable of producing commercial quantities of separated NdPr (the Company produced 38 tonnes of high-purity NdPr during commissioning). The Company is also planning its Phase 2 REE separation circuit to increase NdPr separation capacity and to install the capacity to produce separated dysprosium (Dy), terbium (Tb) and to install a dedicated crack-and-leach circuit to enable the simultaneous production of both uranium and REEs. The Company is focused on using monazite feedstock at the current time, as it has superior concentrations of these four critical REEs (NdPr, Dy and Tb) compared to many other REE-bearing minerals. These REEs are used in the powerful neodymium-iron-boron (“NdFeB”) magnets that power the most efficient EVs, along with uses in other clean energy and defense technologies. The uranium contained in the monazite is generally comparable to typical Colorado Plateau uranium deposits.

Previous report

In 2022, the Company began development of its Phase 1 REE separation circuit at the Mill, which was completed in late Q1-2024, fully commissioned in Q2-2024 with the initial run completed in Q3-2024. The Phase 1 REE separation circuit involved modifications and enhancements to the existing SX circuits at the Mill and has the design capacity to process approximately 8,000 to 10,000 tonnes of monazite per year, producing approximately 4,000 to 6,000 tonnes of total rare earth oxides (“TREO”), containing approximately 850 to 1,000 tonnes of separated NdPr per year. Because Energy Fuels utilized existing infrastructure at the Mill, Phase 1 capital including commissioning totaled approximately $19 million (depending on the offset value of NdPr production during the commissioning process, which has yet to be sold). This was favorable to our initial budget by approximately $6 million due to higher than expected quantities of NdPr produced during commissioning.

Previous report

Prior to commissioning of the Phase 1 REE separation circuit, the Mill produced a mixed RE Carbonate that contained all the rare earth elements (light and heavy REEs). With the commissioning of the Phase 1 REE separation circuit, the Mill produces separated NdPr and an Sm+ mixed RE Carbonate that contains only the heavy REEs (including Dy and Tb). The Sm+ mixed RE Carbonate can be sold on the market to other facilities to separate the heavy REEs or stockpiled at the Mill for separation of the heavies upon completion of the Phase 2 REE separation facility. With the Commissioning of the Phase 1 REE separation facility and the planned development of the Phase 2 REE separation facility, the Company does not intend to continue production of a mixed RE Carbonate that contains both light and heavy REEs.

Previous report

On August 16, 2024, the Company acquired RadTran, a private company specializing in the separation of critical radioisotopes, to further the Company’s plans for development and production of medical isotopes used in cancer treatments. RadTran’s expertise includes separation of Ra-226 and Ra-228 from uranium process streams. This strategic acquisition is expected to significantly enhance Energy Fuels’ planned capabilities to address the global shortage of these essential isotopes used in emerging TAT for cancer treatment. See Note 3 – Transactions for more information.

Showing the first 40 of 96 passages. Open the source sections for the rest.

Reworded paragraphs (56)

Previous wording

Refer to "Part I, Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations - Results of Operations" in our Annual Report on Form 10-K for the year ended December 31, 2023 for a discussion on the consolidated results of operations for the year ended December 31, 2023 compared to the year ended December 31, 2022. Due to the reevaluation of its segments as of December 31, 2024, the Company has set forth below its operating results for its reportable segments.

Current wording

ITEM 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS.

Previous wording

The following discussion and analysis should be read in conjunction with our financial statements for the three years ended December 31, 2024 and the related notes thereto. The purpose of this Item 7 is: (i) to provide material relevant to an assessment of the financial condition and results of operations of Energy Fuels Inc., including an evaluation of the amounts and certainty of cash flows from operations and from outside information sources; and (ii) to focus specifically on material events and uncertainties known to management that are reasonably likely to cause reported financial information not necessarily indicative of future operating results or of future financial condition. This Discussion and Analysis contains forward-looking statements that involve risks, uncertainties, and assumptions. Our actual results may differ materially from those anticipated in these forward-looking statements as a result of many factors, including, but not limited to, those set forth in “Part I, Item 1A. Risk Factors” and elsewhere in this Annual Report. See “Item II, Cautionary Statement Regarding Forward-Looking Statements.”

Current wording

The following discussion and analysis should be read in conjunction with our financial statements for the three years ended December 31, 2025, 2024 and 2023 and the related notes thereto. The purpose of this Item 7 is: (i) to provide material relevant to an assessment of the financial condition and results of operations of Energy Fuels Inc., including an evaluation of the amounts and certainty of cash flows from operations and from outside information sources; and (ii) to focus specifically on material events and uncertainties known to management that are reasonably likely to cause reported financial information not necessarily indicative of future operating results or of future financial condition. This Discussion and Analysis contains forward-looking statements that involve risks, uncertainties, and assumptions. Our actual results may differ materially from those anticipated in these forward-looking statements as a result of many factors, including, but not limited to, those set forth in Part I, Item 1A. Risk Factors and elsewhere in this Annual Report. See Item II. Cautionary Statement Regarding Forward-Looking Statements.

Previous wording

All dollar amounts stated herein are in U.S. dollars, except share and per share amounts and currency exchange rates unless specified otherwise. References to “Cdn$” refer to Canadian dollars, “AUS$” refer to Australian dollars and “$” to U.S. dollars.

Current wording

All dollar amounts stated herein are in U.S. dollars, except share amounts and currency exchange rates, unless specified otherwise.

Previous wording

The Company believes that uranium supply pressure and demand fundamentals point to higher sustained uranium prices in the future. The Company believes that the advancement of reliable nuclear energy, fueled by uranium, is experiencing a global resurgence with an increased focus by governments, policymakers, technology companies, and citizens on decarbonization, electrification, and security of energy supply. In addition, a number of factors including restrictions on Russian uranium products in the U.S., transportation challenges, trade policies, and financial entities purchasing uranium on the spot market to hold for the long-term has the potential to result in higher sustained spot and term prices and, induce utilities to enter into more long-term contracts with non-Russian producers, like Energy Fuels, to foster security of supply, avoid transportation and logistics issues, and ensure more certain pricing. Indeed, the past two years have seen the highest levels of long-term contracting by utilities since 2012, according to TradeTech.

Current wording

The Company believes that uranium supply pressure and demand fundamentals point to higher sustained uranium prices in the future and that the advancement of reliable nuclear energy, fueled by uranium, is experiencing a global resurgence with an increased focus by governments, policymakers, technology companies and citizens on decarbonization, electrification and security of energy supply. In addition, a number of factors, including restrictions on Russian uranium products in the U.S., transportation challenges, trade policies, production challenges and financial entities purchasing uranium products to hold for an extended period has the potential to result in higher sustained spot and long-term prices and to potentially induce utilities to enter into additional long-term contracts with non-Russian producers, such as Energy Fuels. These factors additionally have the potential to foster security of supply, the avoidance of transportation and logistics issues and more certain pricing.

Previous wording

Year Ended December 31, 2023 Compared to Year Ended December 31, 2022

Current wording

The Company continued ore production at the Pinyon Plain, La Sal, and Pandora mines in 2025. Production rates at the Pinyon Plain mine steadily increased over the first half of the year as the mine ramped up and remained relatively steady during the second half of the year. During the year ended December 31, 2025, the Company mined ore containing an estimated 1,530,000 pounds of uranium with an average grade of 1.62% eU 3 O 8 at its Pinyon Plain mine, which the Company believes is one of the highest-grade uranium mines in U.S. history. The Company updated its existing pre-feasibility study into an updated S-K 1300 and NI 43-101-compliant pre-feasibility study, which was furnished through a Form 8-K filing on February 26, 2026, and which is incorporated into this Form 10-K by reference as Exhibit 96.2. The Company intends to continue exploration in the Juniper Zone during 2026. Ore from Pinyon Plain continues to be shipped to the Mill stockpile and/or process. See Part I, Item 2. The Pinyon Plain Project.

Previous wording

During 2024, the Company produced approximately 29,800 tons of ore containing approximately 350,000 pounds of U 3 O 8 from the Pinyon Plain mine and La Sal Complex. Subject to market conditions, the Company currently expects to mine 85,000 to 115,000 tons of ore containing approximately 730,000 to 1,170,000 pounds of contained U 3 O 8 from its Pinyon Plain, Pandora and La Sal mines during 2025. Such uranium-bearing ore will be stockpiled at the mines or Mill for processing in 2025 or at a future date, subject to market conditions, contract requirements, and the Mill’s schedule. The Company also expects to purchase uranium ore from third-party miners in the region, and there is the potential to receive additional Alternate Feed Materials and mine cleanup materials, expected to total approximately 160,000 to 200,000 pounds of additional contained uranium in ore inventories, all of which will be processed as market conditions, Mill schedules, and contract requirements may warrant. As the Company currently has sufficient finished U 3 O 8 inventory to meet its 2025 contract delivery requirements and may elect not to sell uranium into the spot market in 2025 at current prices, the Company may decide to defer processing all or a portion of such stockpiled uranium ore inventories until after the end of 2025, thereby freeing up Mill capacity for an REE processing run or other uses during the second half of 2025. In addition, having stockpiled mined ore available at the Mill, which can be processed into finished U 3 O 8 product on relatively short notice, gives the Company more flexibility in securing long-term sales contracts on the most favorable terms when needed, rather than merely accepting contracts at current prices when the fundamentals suggest higher prices in the future may be expected.

Current wording

The Company’s total mined mineralized material in 2025 contained approximately 1,720,000 pounds of U 3 O 8 combined from its Pinyon Plain, La Sal and Pandora mines. Such uranium-bearing mineralized material was processed at the Mill and/or stockpiled at the mines or Mill for future processing. Processing mineralized material at the Mill began in Q4 2025 and is expected to continue through Q2 2026, subject to market conditions, contract requirements and the Mill’s processing schedule. Mineralized material mined during 2025 that was not processed in 2025 as part of the Mill’s conventional ore run, which began in Q4 2025 and is expected to continue through Q2 2026, will remain stockpiled at the Mill and is included in the Company’s inventories of U 3 O 8 contained in stockpiled mineralized materials at the end of 2025. The Company currently expects to process any additional stockpiled and mined mineralized material from its Pinyon Plain, La Sal and Pandora mines with the remainder of the mined mineralized material and Alternate Feed Materials stockpiled at the mines or Mill for processing during 2026 or 2027, subject to market conditions, contract requirements and the Mill’s schedule. Having stockpiled mined mineralized material available at the Mill, which can be processed into finished U 3 O 8 product on relatively short notice, gives the Company more flexibility in securing long-term sales contracts on the most favorable terms when needed, rather than merely accepting contracts at current prices when the fundamentals suggest higher prices in the future may be expected. It also provides more flexibility to make spot sales if market conditions warrant.

Previous wording

The Company plans to continue to maintain projects and facilities in a state of readiness for the purpose of restarting mining activities on an expedited basis, as contract obligations and market conditions may warrant. To this end, the Company expects to continue rehabilitation and development work at its Whirlwind mine in preparation for future production. Although the timing of the Company’s plans to extract and process mineralized materials from the Whirlwind mine will be based on contract requirements, inventory levels, and/or sustained improvements in general market conditions, the Company currently expects the Whirlwind mine, along with the Company’s Nichols Ranch ISR project, to be able to commence uranium production within one (1) year from a “go” decision, which could increase Energy Fuels' uranium production to a run-rate of over two (2) million pounds of U 3 O 8 per year starting as early as 2026, as market conditions may warrant.

Current wording

The Company plans to continue to maintain its other uranium projects and facilities in a state of readiness for the purpose of restarting mining activities on an expedited basis, as contract obligations and market conditions may warrant. To this end, the Company expects to continue rehabilitation and development work at its Whirlwind mine in preparation for future production. Although the timing of the Company’s plans to extract and process mineralized materials from the Whirlwind mine will be based on contract requirements, inventory levels and/or sustained improvements in general market conditions, the Company currently expects the Whirlwind mine, along with the Company’s Nichols Ranch ISR project, to be able to commence uranium production within one (1) year from a “go” decision. With strong market conditions, the Whirlwind and Nichols Ranch mines could potentially increase Energy Fuels’ uranium production by up to approximately 600,000 pounds per year as early as 2027.

Previous wording

In 2025, the Company also plans to continue advancing permitting and development on its Roca Honda Project, a large, high-grade conventional project in New Mexico and its Bullfrog Project in Utah, which together with its Sheep Mountain Project, a large conventional project in Wyoming, could expand the Company’s uranium production to a run-rate of up to five million pounds of U 3 O 8 per year in the coming years. The Company is also continuing to maintain required permits at its other conventional projects, including the Energy Queen mine. All these projects serve as important pipeline assets for the Company’s future conventional production capabilities, as market conditions may warrant.

Current wording

In 2025, the Company also continued advancing permitting and development on its Roca Honda Project, a large, high-grade conventional project in New Mexico, its Bullfrog Project in Utah, and its EZ Project in Arizona, which together with its Sheep Mountain Project (a large conventional project in Wyoming) could expand the Company’s uranium production to a run-rate of up to five million pounds of U 3 O 8 per year in the coming years. The Company is also continuing to maintain required permits at its other conventional projects, including the Energy Queen mine. These projects serve as important pipeline assets for the Company’s future conventional production capabilities, as market conditions may warrant.

Previous wording

The Mill advanced its research and development (“R&D”) activities on medical isotopes throughout 2024, while advancing discussions with buyers interested in offtaking material.

Current wording

The Mill also continues to advance its research and development (“R&D”) activities on radium medical isotopes throughout 2025, while engaging in discussions with buyers interested in off-take agreements for the material. See Recovering Medical Isotopes for Advanced TAT Cancer Treatments below.

Previous wording

The Company producedde minimus quantities of U 3 O 8 at its Nichols Ranch ISR Project during 2024, as the project was maintained on standby. Although the Company does not expect to produce significant quantities of U 3 O 8 in 2025 from Nichols Ranch, the Company is undertaking exploration and development activities in 2025 to expand the resources at the Nichols Ranch Project and to further develop wellfields to be ready for potential recommencement of production within one year from a “go” decision, as market conditions warrant. At Nichols Ranch the Company currently holds 34 fully permitted, undeveloped wellfields, including four additional wellfields at the Nichols Ranch wellfields, 22 wellfields at the adjacent Jane Dough wellfields and eight wellfields at the Hank Project, which is fully permitted to be constructed as a satellite facility to the Nichols Ranch Plant.

Current wording

The Company producedde minimis quantities of U 3 O 8 at its Nichols Ranch ISR Project during 2025, as it remained on standby. Although the Company does not expect to produce significant quantities of U 3 O 8 in 2026 from Nichols Ranch, the Company is undertaking exploration and development activities to expand the resources at the Nichols Ranch Project and to further develop wellfields to be ready for potential recommencement of production within one year from a “go” decision, as market conditions warrant. At Nichols Ranch, the Company currently holds 34 permits, undeveloped wellfields, including four wellfields at the Nichols Ranch wellfields, 22 wellfields at the adjacent Jane Dough wellfields and eight wellfields at the Hank Project, which is fully permitted to be constructed as a satellite facility to the Nichols Ranch Plant.

Previous wording

Additionally, the Company is preparing two additional mines in Colorado and Wyoming (Whirlwind and Nichols Ranch) for expected production within one year from a “go” decision and is advancing several other large-scale U.S. mine projects in order to increase uranium production in the coming years in response to potentially strong uranium market conditions. With strong market conditions, the Whirlwind and Nichols Ranch mines could potentially increase Energy Fuels’ uranium production to a run-rate of over two million pounds of U 3 O 8 per year as early as 2026. The exact timing for resumption of production from each of these projects will be subject to current and future uranium market conditions and/or procurement of additional long-term contracts. In 2025, the Company also plans to continue to advance permitting and development on the Roca Honda and Bullfrog projects, which together with the Company's Sheep Mountain Project, could expand the Company’s uranium production to a run-rate of up to five million pounds of U 3 O 8 per year in the coming years, as market conditions warrant. As the Company is ramping up its commercial uranium production, it can rely on its uranium inventories and potential purchases of uranium on the spot market to supplement its uranium production if necessary to fulfill its contract requirements.

Current wording

The Company continues to prepare two additional mines in Colorado and Wyoming (Whirlwind and Nichols Ranch, respectively) for expected production within one year from a “go” decision and is advancing several other of its large-scale U.S. mine projects in order to increase uranium production in the coming years, as market conditions warrant. With strong market conditions, the Whirlwind and Nichols Ranch mines could potentially increase Energy Fuels’ uranium production by up to 600,000 pounds of U 3 O 8 per year as early as 2027. The exact timing for resumption of production from each of these projects will be subject to current and future uranium market conditions and/or the procurement of additional long-term contracts. In 2026, the Company also plans to continue advancing its permitting and development on the Roca Honda, Bullfrog, and EZ Projects, which together with the Company’s Sheep Mountain Project, could expand the Company’s uranium production by over five million pounds of U 3 O 8 per year in the coming years, as market conditions warrant. As the Company is ramping up its commercial uranium production, it can rely on its uranium inventories and potential purchases of uranium on the spot market to supplement its uranium production if necessary to fulfill existing contract requirements.

Previous wording

The Company continually seeks to maximize capacity utilization at the Mill and new sources of revenue, including through its emerging REE and potential medical isotope businesses, as well as new sources of Alternate Feed Materials and new feed processing opportunities at the Mill, that can be processed without reliance on uranium sales prices. The Company also entered into an agreement with the Navajo Nation in January 2025, which could open the door to the Company assisting in the cleanup of AUM left over from Cold War era government programs, in addition to receiving uranium ore. (See “Part 1. Description of Business – Material Transactions and Corporate Developments – Agreement with Navajo Nation.”)

Current wording

The Company continually seeks to maximize capacity utilization at the Mill and add new sources of revenue, including through its emerging REE/HMS and potential TAT radioisotopes business lines, as well as new sources of Alternate Feed Materials and new feed processing opportunities at the Mill that can be processed without reliance on uranium sales prices. The Company also entered into an agreement with the Navajo Nation in January 2025, which could open the door to the Company assisting in the cleanup of AUM left over from Cold War era government programs predating the Company while recycling uranium from ore historically lost to direct disposal.

Previous wording

The Company is also evaluating the potential to recover radioisotopes from its existing uranium and REE process streams for use in the development of TAT medical isotopes for the treatment of cancer, which is seeing promising results in clinical trials to date. TAT requires reliable and secure supplies of radium, which pharmaceutical companies use to extract other short half-life, alpha-emitting elements for the production of TAT drugs. Currently, there is no domestic supplier of radium. Therefore, Energy Fuels sees a potentially significant opportunity to become the U.S. radium supplier of choice, as TAT treatments advance through clinical trials and later into widespread use.

Current wording

The Company is also evaluating the potential to recover Ra-226 and Ra-228 from its existing uranium and REE process streams for use in the development of TAT medical isotopes for the treatment of cancer, which is seeing promising results in clinical trials to date. TAT requires reliable and secure supplies of radium, which pharmaceutical companies use to extract other short half-life, alpha-emitting elements for production of TAT drugs. Currently, there is no domestic supplier of radium. Therefore,

Previous wording

The Company also believes the long-term fundamentals of the REE sector point to higher sustained pricing over the long-term. According to industry forecaster Adamas Intelligence, the demand for REEs is expected to be primarily driven by increased demand for neodymium-iron-boron (“NdFeB”) magnets used in robotics, advanced air mobility, and electric vehicles (including hybrid electric vehicles). Adamas forecasts demand for separated NdPr, Dy and Tb to grow at a compound annual growth rate (“CAGR”) of 8.7% through 2040, while global production will grow at a slower rate of 5.1%. Robotics are expected to become the largest demand driver for NdFeB magnets through 2040. The Company is also observing significant interest in creating new REE supply chains that are not connected to China, further compounding the REE opportunity for Energy Fuels.

Current wording

The Company also believes the long-term fundamentals of the REE sector point to higher sustained pricing, especially in markets that require or prefer non-Chinese material. According to industry forecaster Adamas Intelligence, the demand for REEs is expected to be primarily driven by increased demand for neodymium-iron-boron (“NdFeB”) magnets used in robotics, advanced air mobility and EVs (including hybrid EVs). Adamas forecasts demand for separated NdPr, Dy and Tb to grow at a compound annual growth rate (“CAGR”) of 8.7% through 2040, while global production is expected to grow at a slower rate of 5.1%. Robotics are expected to become the largest demand driver for NdFeB magnets through 2040. The Company is also observing significant interest in creating new REE supply chains that are not connected to China, further compounding the REE opportunity for Energy Fuels.

Previous wording

The Phase 2 REE separation facility, Energy Fuels is expected to expand its NdPr separation capabilities at the Mill, with an expected capacity to process approximately 40,000 to 60,000 tonnes of monazite per year, containing approximately 20,000 to 30,000 tonnes of TREO, containing approximately 4,000 to 6,000 tonnes of NdPr per year. Phase 2 is also expected to add a dedicated monazite “crack-and-leach” circuit to the Mill’s existing leach circuits, which may be developed as the first stage of Phase 2, prior to construction of the expanded NdPr separation capabilities. During Phase 3, Energy Fuels expects to add “heavy” REE separation capabilities at the Mill, including the production of Dy, Tb, and potentially other separated REE’s and advanced materials. The Company will also evaluate the potential to produce lanthanum (La) and cerium (Ce) products, along with potentially other REE products. The Company expects to complete Phase 2 in 2028, subject to licensing, financing, and receipt of sufficient monazite feed.

Current wording

The Company expects to complete Phase 2 by mid-2029, subject to licensing, financing, and receipt of sufficient feedstock.

Previous wording

The Company made the strategic decision to enter the HMS sector in order to control the Company’s internal costs and supply chains for its primary REE feedstock: monazite. Monazite is a superior REE mineral, as it contains excellent distributions of the “magnet” REEs (NdPr, Dy and Tb), and because monazite can be processed at the Company’s Mill leveraging existing licenses, infrastructure and expertise. HMS mines (titanium and zirconium minerals, including ilmenite, rutile and zircon) also present an attractive future opportunity for the Company, while also producing a potentially low-cost and large-scale monazite feedstock that the Company plans to process into separated REE products at the Mill in the U.S. To date, the Company has acquired 100% interests in the Toliara (Madagascar) and Bahia (Brazil) Projects, and the right to earn into a 49% joint venture interest with Astron Corporation in the Donald Project (Australia), under which Energy Fuels expects to offtake all REE-monazite.

Current wording

The Company made the strategic decision to enter the HMS sector in order to control the Company’s internal costs and supply chains for its primary REE feedstock: monazite (and associated xenotime). Monazite is a superior REE mineral, as it contains excellent distributions of the “magnet” REEs (NdPr, Dy and Tb) and other “heavy” REEs such as Sm, Gd, Lu and Y which are in short supply and used in a number of technological and defense applications. Notably, monazite can be processed at the Company’s Mill by leveraging existing licenses, infrastructure and expertise. HMS mines (titanium and zirconium minerals, including ilmenite, rutile and zircon) present an attractive opportunity for the Company by providing an expected low-cost and large-scale monazite feedstock that the Company may then process into separated REE products at the Mill. To date, the Company has acquired 100% interests in the Vara Mada (Madagascar) and Bahia (Brazil) Projects and has the right to earn up to a 49% joint venture interest with Astron Corporation in the Donald Project (Australia) pursuant to which Energy Fuels expects to offtake all REE-monazite.

Previous wording

On June 3, 2024, the Company executed the JV Agreements with Astron, creating the Donald Project JV to jointly develop and operate the Donald Project in Australia, which is a well-known HMS and REE deposit that the Company believes could provide it with another near-term, low-cost, and large-scale source of monazite sand that, upon development, would be transported to the Mill for the recovery of separated REE products. The Donald Project has most licenses and permits in place (or at an advanced stage of completion) for ilmenite, rutile and zircon production and is in the process of updating those licenses to also include the production of monazite. The JV Agreement provides Energy Fuels the right to invest up to AUS$183 million (approximately $114 million at the December 31, 2024 exchange rates) to earn up to a 49% interest in the Donald Project JV. In addition, the Company would issue Common Shares to Astron having a value of up to $17.5 million, of which $3.5 million of Common Shares were issued on September 24, 2024 and the remainder would be issued upon a positive FID. On September 25, 2024, the Donald Project JV was established and the Company earned an initial 3.21% interest in the Donald Project in exchange for the September 24, 2024 share issuance and for funds invested in the Donald Project to that date. As of December 31, 2024, the Company has a total 4.49% interest for total funds of $12.9 million invested in the Donald Project to date. Astron, through its subsidiary Dickson & Johnson Pty Ltd, holds the remaining 95.51% interest. See Note 3 – Transactions for further information.

Current wording

The Company has a joint venture with Astron Corporation, the Donald Project JV, to jointly develop and operate the Donald Project in Australia, which is a well-known REE and HMS deposit that the Company expects will provide another near-term, low-cost, and large-scale source of monazite sand that, upon development, would be transported to the Mill for the recovery of separated REE products. The Donald Project has in place all major regulatory approvals required to construct and operate the project. The Donald Project is notable in that the monazite concentrates that are expected to be produced at the project contain elevated concentrations of the “heavy” REE oxides, including Dy and Tb.

Previous wording

In addition to the acquisition of Base Resources and the Donald Project JV with Astron described above, the Company completed its purchase of the Bahia Project in Brazil on February 10, 2023. The Bahia Project is a well-known HMS deposit that the Company believes has the potential to supply 3,000 – 10,000 tonnes of natural monazite per year to the Mill for decades for processing into high-purity REE oxides. 3,000 – 10,000 tonnes of monazite contains approximately 1,500 – 5,000 tonnes of TREO, including 300 – 1,000 tonnes of NdPr and significant commercial quantities of Dy and Tb. While Energy Fuels’ primary interest in acquiring the Bahia Project is the REE-bearing monazite, the Bahia Project is also expected to produce large quantities of high-quality ilmenite and rutile and zircon minerals that are also in high demand.

Current wording

The Bahia Project is a REE/HMS deposit that the Company believes has the potential to supply 3,000 to 10,000 tonnes of monazite per year to the Mill for decades for processing into high-purity REE oxides. That amount of monazite contains approximately 1,500 to 5,000 tonnes of TREO, including an estimated 300 to 1,000 tonnes of NdPr per year and significant commercial quantities of Dy and Tb and other “heavy” REEs. While Energy Fuels’ primary interest in acquiring the Bahia Project is the uranium and REE-bearing monazite, the Bahia Project is also expected to produce large quantities of high-quality ilmenite and rutile and zircon minerals also in high demand for the production of the critical minerals, titanium and zirconium.

Previous wording

The acquisition of the Toliara and Bahia Projects, and the Donald Project JV, are a part of the Company’s efforts to build a large and diverse book of monazite supply for its rapidly advancing REE processing business, supplemented by third-party purchases (Chemours).

Current wording

The acquisitions of the Vara Mada and Bahia Projects, and the Donald Project JV, are the culmination of the Company’s efforts to date toward building a significant, secure and diverse book of monazite supply for its rapidly advancing REE processing and critical minerals business, which in the meantime is expected to be supplemented by third-party purchases.

Previous wording

With respect to its HMS activities, the Company plans to continue advancing each of its Donald and Toliara HMS projects to a final investment decision (“FID”) by late-2025 and mid-2026, respectively. The Company also plans to advance its permitting efforts and restart its drilling program at the Bahia Project in 2025 once the appropriate permits and surface access arrangements are in place, with the goal of getting enough information to declare an S-K 1300 compliant initial assessment and NI 43-101 compliant technical report in late 2025 or early 2026.

Current wording

With respect to its HMS activities, the Company plans to continue advancing each of its Donald and Vara Mada Projects to a FID by as early as Q1 2026 and 2027, respectively.

Previous wording

Mining at the Kwale Project commenced in 2013 and recently concluded at the end of December 2024, following depletion of the remaining ore reserves reported in accordance with JORC standards. Processing activities concluded in early January 2025. The sale of all remaining product stockpiles is underway and expected to be completed during the first quarter of 2025. As the costs of winding-down incurred in the fourth quarter of 2024 and early 2025, and the lower mineral grades encountered during the winding-down phase, will be reflected in the costs of goods sold attributable to the sales of remaining stockpiles in the first quarter of 2025, material gross profit margins are not expected in connection with those sales. Reclamation has been ongoing throughout the life of the Kwale Project and will continue until all the mining areas are fully reclaimed. Reclamation of the South Dune mining area was completed in 2024, with the reclamation of the Central Dune, North Dune and Bumamani mining areas scheduled for completion in 2025. Reclamation of the tailings storage facility on site has commenced and is expected to be completed by 2027, with ongoing management and monitoring expected to continue through 2037.

Current wording

Mining at the Kwale Project commenced in 2013 and concluded at the end of December 2024 following depletion of the remaining ore reserves previously reported in accordance with the JORC standards. Processing activities concluded in early January 2025. The sale of all remaining product inventories was completed during 2025. Additional costs of winding-down activities and mining lower mineral grades were incurred during the fourth quarter of 2024 and included in product inventories that were sold during the first quarter of 2025. As a result, the Company incurred a loss in connection with its 2025 sales. Reclamation has been ongoing throughout the life of the Kwale Project and will continue until all mining areas are fully reclaimed in accordance with all applicable legal standards. Reclamation of the South Dune mining area was completed in 2024, with the reclamation of the Central Dune, North Dune and Bumamani mining areas were substantially completed in Q4 2025. Reclamation of the tailings storage facility has commenced and is expected to be completed by 2027, with ongoing management and monitoring expected to continue through 2038.

Previous wording

During the year ended December 31, 2024, the Company sold 200,000 pounds of uranium under one of its term contracts and 250,000 pounds on the spot market. As of December 31, 2024, the Company had approximately 393,000 pounds of finished uranium inventories located at conversion facilities in North America and at the Mill. Additionally, as of December 31, 2024, the Company had approximately 725,000 pounds of additional U 3 O 8 contained in stockpiled Alternate Feed Materials, other ore inventory and work in process at the Mill or nearby mine sites that can potentially be recovered relatively quickly in the future, as market conditions and contract requirements may warrant.

Current wording

As of December 31, 2025, the Company held approximately 810,000 pounds of finished uranium inventories located at the Mill and at conversion facilities in North America as well as approximately 1,370,000 pounds of additional U 3 O 8 contained in stockpiled mineralized material at the Mill or nearby mine sites, Alternate Feed Materials and work-in-process at the Mill that can potentially be processed and recovered expediently in the future, as market conditions and contract requirements may warrant.

Previous wording

The Company expects to sell between 200,000 and 300,000 pounds of uranium during 2025, under the Company's existing long-term contracts with utilities. As a result of these sales, the Company expects that finished U 3 O 8 inventory will be approximately 290,000 to 445,000 pounds U 3 O 8 at the end of 2025 and contained uranium in stockpiled uranium ore inventories will be approximately 1,365,000 to 1,895,000 pounds of U 3 O 8, totaling to 1,655,000 to 2,340,000 pounds of contained uranium in ore inventories plus finished product at the end of 2025. Again, the mix between increased contained uranium in ore inventories and finished U 3 O 8 product inventory at the end of 2025 will depend on the timing of the processing of stockpiled uranium ore at the Mill, which could occur in 2025 or be deferred to subsequent years, and any spot uranium sales or purchases the Company may elect to complete in 2025;

Current wording

The mix between contained uranium in mineralized material inventories and finished U 3 O 8 product inventory depends on the timing of the processing of stockpiled uranium mineralized material at the Mill, any spot uranium sales or purchases the Company may elect to complete in 2026.

Previous wording

As of December 31, 2024, the Company holds approximately 905,000 pounds of finished V 2 O 5 in inventory, and there remains an estimated 1.0 to 3.0 million pounds of additional solubilized recoverable V 2 O 5 remaining in tailings solutions at the Mill awaiting future recovery, as market conditions may warrant.

Current wording

As of December 31, 2025, the Company holds approximately 905,000 pounds of finished V 2 O 5 in inventory, and there remains an estimated 1.0 to 3.0 million pounds of additional solubilized recoverable V 2 O 5 in tailings solutions at the Mill awaiting future recovery, as market conditions may warrant.

Previous wording

The Company sells uranium into its existing long-term contracts and continually evaluates selling a portion of its inventories on the spot market in response to upside uranium or vanadium price movements and other market conditions. The Company also continually evaluates the potential to purchase uranium on the spot market to replace sold inventory, meet contract obligations and gain exposure to future price increases.

Current wording

The Company sells uranium into its existing long-term contracts and continually evaluates selling a portion of its inventories on the spot market or new term contracts in response to future upward uranium price movements. The Company also continually evaluates the potential to purchase uranium on the spot market to replace sold inventory, meet contract obligations and gain exposure to future price increases.

Previous wording

The Company recently entered into a fourth long-term utility contract. The four long-term utility contracts require future deliveries of uranium between 2025 and 2030, with base quantities totaling 2.80 million pounds of uranium sales remaining over the period, and between 2.27 million and 4.15 million pounds of actual deliveries of uranium over that time period based on the exercise of buyer options and quantity flexibility. Having observed a marked uptick in interest from nuclear utilities seeking long-term uranium supply, along with continued strong long-term prices, the Company remains actively engaged in pursuing additional selective long-term uranium sales contracts.

Current wording

The Company’s six long-term utility contracts require future deliveries of uranium between 2026 and 2032, with base quantities totaling 3.21 million pounds of uranium sales remaining over the period, and between 3.71 million and 5.29 million pounds of deliveries of uranium over that time period based on the buyer’s exercise of options and quantity flexibility. Having observed an uptick in interest from nuclear utilities seeking long-term uranium supply, along with continued strong long-term prices, the Company remains actively engaged in pursuing additional selective long-term uranium sales contracts. As of December 31, 2025, contracted quantities are as follows (in pounds):

Previous wording

Under the current portfolio of contracts, the Company expects to sell between 200,000 and 300,000 pounds of uranium during Q2- and Q3- 2025. The Company holds uncommitted inventory and, with the benefit of production in 2025 and beyond, will continue to evaluate additional spot and/or long-term uranium sales opportunities up to 400,000 pounds during 2025 and beyond. The Company may also evaluate the purchase of uranium on the spot market, subject to market conditions, contract requirements and the Mill schedule for processing uranium ore stockpiles at the Mill.

Current wording

The Company holds uncommitted inventory and, with the benefit of production in 2025, continued production in 2026 and planned production in the future, will continue to evaluate additional spot and/or long-term uranium sales opportunities during 2026 and beyond. The Company may also evaluate the purchase of uranium on the spot market, subject to market conditions, contract requirements and the Mill’s schedule for processing uranium ore stockpiles at the Mill.

Previous wording

As mentioned above, the Company expects total inventories of uranium contained in uranium ore inventories together with finished U 3 O 8 product inventories to total between approximately 1,655,000 to 2,340,000 pounds of U 3 O 8 at year-end 2025, subject to 2025 production levels, any ore purchases from 3 rd parties, and uranium sales and purchases. Energy Fuels’ uranium inventory provides the Company with financial flexibility, and the Company believes its existing inventories, purchases and new production will be sufficient to meet contract requirements through 2025 and over the life of the supply contracts, along with discretionary spot sales in 2025 and beyond, as market conditions may warrant.

Current wording

The Company believes its existing inventories, purchases and new production will be sufficient to meet contract requirements through 2026 and over the life of the supply contracts, along with discretionary spot sales in 2026 and beyond, as market conditions may warrant.

Previous wording

The Company did not sell any vanadium during the year ended December 31, 2024. The Company expects to sell its remaining finished vanadium product when justified into the metallurgical industry, as well as other markets that demand a higher purity product, including the aerospace, chemical, and potentially the vanadium battery industries. The Company expects to sell to a diverse group of customers in order to maximize revenues and profits, when market conditions warrant. The vanadium produced in the 2018/19 Pond Return campaign was a high-purity vanadium product of 99.6%-99.7% V 2 O 5. The Company believes there may be opportunities to sell certain quantities of this high-purity material at a premium to reported spot prices, which it has done from time-to-time in the past.

Current wording

The Company expects to sell its remaining finished vanadium product when justified into the metallurgical industry, as well as other markets that demand a higher purity product, including the aerospace, chemical, and potentially the vanadium battery industries. The Company expects to sell to a diverse group of customers in order to maximize revenues and profits, when market conditions warrant. The vanadium produced in the 2018/19 Pond Return campaign was a high-purity vanadium product of 99.6%-99.7% V 2 O 5. The Company believes there may be opportunities to sell certain quantities of this high-purity material at a premium to reported spot prices, which it has done from time-to-time in the past.

Previous wording

While the Company continues to make progress on its separated REE production and additional capital is spent on process enhancements, improving recoveries, product quality and other optimization, profits from this initiative are expected to be minimal until such time when throughput rates are increased and optimized, which is expected in the 2027-2028 time frame assuming completion of development of the Donald Project and/or Toliara Project and the provision of a steady stream of monazite to the Mill. Throughout this process, the Company is gaining important knowledge, experience and technical information, while also having its products qualified by end-users all of which are valuable for current and future production of separated REE oxides and other advanced REE materials at the Mill or elsewhere.

Current wording

While the Company continues to make progress on its separated REE production and additional capital is spent on process enhancements, improving recoveries, product quality and other optimization, profits from this initiative are expected to be minimal until such time when throughput rates are increased and optimized, which is expected in the 2028-2030 timeframe assuming completion of the development of the Donald Project and/or Vara Mada Project and the provision of a steady stream of monazite from these projects to the Mill, or the receipt of MREC or similar feed material from third parties. Throughout this process, the Company is gaining important knowledge, experience and technical information, while also having its products qualified by end-users, all of which are valuable for current and future production of separated REE oxides and other advanced REE materials at the Mill or elsewhere.

Previous wording

The Company has had negative net cash flows from operating activities and net losses in previous years, in part due to depressed uranium and vanadium prices, along with low quantities of monazite to process into salable RE Carbonate or separated NdPr, which has not allowed the Company to realize economies of scale. The Company expects to see improved economies of scale when throughput rates are increased and optimized in the expected 2027-2028 time frame, assuming completion of development of the Donald Project and/or Toliara Project and the provision of a steady stream of monazite to the Mill at that time. We are not aware at this time of any trends or uncertainties that have had or are reasonably likely to have a material impact on revenues or income of the Company, other than: (i) recent activity in uranium markets, which could result in the Company selling inventories and future production at increased prices and/or signing additional contracts with nuclear utilities for the long-term supply of uranium; (ii) U.S. government laws and programs, including the recent ban on Russian uranium imports and efforts to restore domestic nuclear fuel capabilities, which could result in improved uranium sales prices; (iii) volatility in prices of uranium, vanadium, HMS, REEs and our other primary metals; and (iv) the Company’s HMS, REE and TAT radioisotope initiatives, which, if successful, could result in improved results from operations in future years. We are not aware at this time of any events that are reasonably likely to cause a material change in the relationship between costs and revenue of the Company.

Current wording

We are not aware at this time of any trends or uncertainties that have had or are reasonably likely to have a material impact on revenues, income or cash flows of the Company, other than: (i) recent activity in uranium markets, which has resulted in: (a) the Company’s six long-term uranium supply agreements, with 740,000 to 880,000 pounds of deliveries in 2026 depending on customer elections and an average of nearly 760,000 pounds of deliveries per year from 2026 through 2032; (b) the Company continuing mining at three of its uranium mines (Pinyon Plain, La Sal and Pandora); and (c) the Company selling uranium inventories and mined uranium production into its long-term contracts, and potentially on the spot market, thereby generating revenues and expected gross margins; (ii) non-recurring revenues and costs of sales during the fourth quarter of 2024 through the beginning of the second quarter of 2025 for HMS produced at our Kwale Project, which ceased production at the end of 2024 and is currently in reclamation; (iii) U.S. government laws and programs, including the recent tariffs enacted by the President and retaliatory tariffs proposed by other countries, which could result in changes in the cost of production of various of the Company’s products and also in changes in demand and prices received for the Company’s sale of its products, depending on how much tariff and other trade activities settle out, which could result in the development of commercial markets for “heavy” REEs that did not previously exist in the U.S. and U.S. government support for critical minerals, including uranium, production; (iv) volatility in prices of uranium, vanadium, HMS, REEs and our other primary metals; and (v) the Company’s HMS, REE and TAT radioisotope initiatives, which, if successful, could result in improved results from operations in future years. We are not aware at this time of any events that are reasonably likely to cause a material change in the relationship between costs and revenue of the Company.

Previous wording

While we expect exploration and development costs related to our mineral properties to provide future value to the Company, the Company expenses these costs in part due to the fact that the Company has not established Proven Mineral Reserves or Probable Mineral Reserves as defined by S-K 1300 or NI 43-101 through the completion of a feasibility or pre-feasibility study for any of the Company’s projects as of December 31, 2024, with the exception of its Sheep Mountain and Pinyon Plain Projects.

Current wording

While we generally expect exploration and development costs related to our mineral properties to provide future value to the Company, the Company expenses these costs in part due to the fact that the Company has not established Proven Mineral Reserves or Probable Mineral Reserves as defined by S-K 1300 or NI 43-101 through the completion of a feasibility or pre-feasibility study for any of the Company’s projects as of December 31, 2025, with the exception of its Sheep Mountain and Pinyon Plain Projects.

Previous wording

Standby costs are related to the care and maintenance of the standby mines and are expensed as incurred. Standby costs decreased by $0.96 million to $6.52 million for the year ended December 31, 2024 from $7.48 million for the year ended December 31, 2023 primarily due to the Alta Mesa divestiture on February 14, 2023 and the conversion of the La Sal Complex into development status from standby status during the fourth quarter of 2023 and then to production status the first quarter of 2024.

Current wording

Standby costs are related to the care and maintenance of the standby mines and are expensed as incurred. Standby costs increased by $1.45 million to $7.97 million for the year ended December 31, 2025 from $6.52 million for the year ended December 31, 2024 primarily due to advancing permitting and development on its Roca Honda Project in 2025 and higher general maintenance costs as a result of inflation.

Previous wording

Selling, general and administrative expenses (excluding share-based compensation) increased by $7.90 million to $31.19 million for the year ended December 31, 2024 from $23.29 million for the year ended December 31, 2023 primarily due to higher salaries and benefits in connection with additional headcount for legacy Energy Fuels operations and the acquisition of Base Resources.

Current wording

Selling, general and administrative expenses (excluding share-based compensation) increased by $21.89 million to $53.08 million for the year ended December 31, 2025 from $31.19 million for the year ended December 31, 2024 primarily due to higher salaries and benefits in connection with additional headcount, including employees retained from Base Resources following the acquisition on October 2, 2024.

Previous wording

Share-based compensation increased by $0.78 million to $5.41 million for the year ended December 31, 2024 from $4.63 million for the year ended December 31, 2023 primarily due to a higher grant date fair value for the annual 2024 grant of awards as well as additional headcount, which includes awards granted to employees retained from Base Resources, partially offset by the completion of the derived service period for most stock appreciation rights in 2024.

Current wording

Share-based compensation increased by $7.18 million to $12.59 million for the year ended December 31, 2025 from $5.41 million for the year ended December 31, 2024 primarily due to a higher grant date fair value associated with the annual 2025 equity awards, as well as increased headcount, including transition awards granted to employees retained from Base Resources, partially offset by the completion of the derived service period for most stock appreciation rights in 2024.

Previous wording

Transactions and integration related costs are for legal, advisory and accounting fees directly related to the acquisition of Base Resources and the formation of the Donald Project JV. Transactions and integration related costs were $10.34 million for the year ended December 31, 2024. There were no transactions and integration related costs incurred during the year ended December 31, 2023. See Note 3 – Transactions for more information.

Current wording

Transactions and integration related costs are for legal, advisory and accounting fees directly related to the acquisition of Base Resources and the formation of the Donald Project JV. Transactions and integration related costs were $10.34 million for the year ended December 31, 2024. There were no transactions and integration related costs incurred for the year ended December 31, 2025. See Note 3 –Transactions for more information.

Previous wording

Equity in loss of unconsolidated affiliate was $0.18 million for the year ended December 31, 2024 related to the Company's proportionate share of loss in the Donald Project JV, which was formed in 2024. The Company did not have an investment in unconsolidated affiliate during the year ended December 31, 2023.

Current wording

Loss in unconsolidated affiliates was $1.32 million and $0.18 million for the years ended December 31, 2025 and 2024, respectively, related to the Company’s proportionate share of loss in the Donald Project JV, which was formed in September 24, 2024 and Tate, which the Company increased its ownership and obtained a significant influence and applied the equity method of accounting on April 1, 2025.

Previous wording

Other loss, net was $0.60 million, net for the year ended December 31, 2024. Other income, net was $13.14 million for the year ended December 31, 2023. The change between periods was primarily due to market-to-market gains on marketable securities and our Convertible Note during the year ended December 31, 2023, partially offset by realized gains on maturities of marketable securities during the year ended December 31, 2024. See Note 14 – Supplemental Financial Information to the consolidated financial statements for more information.

Current wording

Other income was $10.09 million, net for the year ended December 31, 2025. Other loss, net was $0.60 million for the year ended December 31, 2024. The change was primarily due to higher mark-to-market gains on marketable securities during 2025 compared to mark-to-market losses on marketable securities in 2024, partially offset by foreign currency loss in 2025 and lower interest income, net between periods. See Note 15 –Supplemental Financial Information to the consolidated financial statements for more information.

Previous wording

We have three reportable segments: (i) uranium, (ii) HMS and (iii) REE. The uranium segment engages in conventional andin situ recovery uranium extraction, recovery and sales of uranium from mineral properties and the recycling of uranium-bearing materials generated by third parties along with the exploration, permitting and evaluation of uranium properties in the United States. As part of these activities, the Company also acquires, explores, evaluates and, if warranted, permits uranium properties. The Company's final uranium product is U 3 O 8, which is sold to customers for further processing into fuel for nuclear reactors. The Company also produces vanadium pentoxide, V 2 O 5, as a co-product of uranium at the Mill. In addition to uranium, the Company is also exploring opportunities to separate radium-226 and radium-228 as a byproduct of uranium process streams at the Mill. The HMS segment engages in the exploration, development and recovery of HMS at the Kwale Project, Bahia Project, Toliara Project and includes the Company's equity method investment in the Donald Project JV. The Company recovers stand-alone ilmenite, rutile and zircon to provide sources of Titanium (“TiO 2”) and Zirconium (“ZrO 2”). The REE segment is engaged in the Company's initiatives to progress towards full REE separation capabilities at the Mill to produce both “light” and “heavy” separated REE products in the coming years. During the year ended December 31, 2024, the Company completed the construction and commissioning of Phase 1 of the modification and enhancement of its infrastructure at the Mill. The Company expects to procure monazite through Company-owned mines like the Toliara Project, Bahia Project, its joint venture interest in the Donald Project and other potential joint ventures or other collaborations, and open market purchases.

Current wording

We have three reportable segments: (i) uranium, (ii) REE and (iii) HMS. The uranium segment engages in conventional and ISR uranium extraction, recovery and sales of uranium from mineral properties and the recycling of uranium-bearing materials generated by third parties along with the exploration, permitting and evaluation of uranium properties in the U.S. As part of these activities, the Company also acquires, explores, evaluates and, if warranted, permits uranium properties. The Company’s final uranium product is U 3 O 8, which is sold to customers for further processing into fuel for nuclear reactors. The Company also produces vanadium pentoxide, V 2 O 5, as a co-product of uranium at the Mill, as market conditions warrant. In addition to uranium, the Company is also exploring opportunities to separate Ra-226 and Ra-228 as a co-product of its uranium process streams at the Mill. The REE segment is engaged in the Company’s initiatives to progress towards full REE separation capabilities at the Mill to produce both “light” and “heavy” separated REE products in the coming years. The HMS segment engages in the exploration, development and recovery of HMS at the Kwale Project (now in reclamation), Bahia Project and Vara Mada Project and includes the Company’s equity method investments in the Donald Project JV and Tate. The Company recovers stand-alone ilmenite, rutile and zircon to provide sources of TiO 2 and Zirconium (“ZrO 2”). During the year ended December 31, 2024, the Company completed the construction and commissioning of its Phase 1 Circuit at the Mill. The Company expects to procure monazite through Company-owned mines like the Vara Mada Project, Bahia Project, its JV interest in the Donald Project and other potential joint ventures or other collaborations, as well as open market purchases.

Showing the first 40 of 56 pairs. Open the source sections for the rest.

Rearranged current paragraphs (4)

Current report — wording carried from elsewhere

Energy Fuels sees a potentially significant opportunity to become the U.S. radium supplier of choice, as TAT treatments advance through clinical trials and later into widespread use.

Current report — wording carried from elsewhere

The JV Agreement provides Energy Fuels with the right to invest up to AUD$183.00 million (approximately $122.28 million at December 31, 2025 exchange rates) to earn up to a 49% interest in the Donald Project JV. In addition, the Company has agreed to issue Common Shares to Astron having a value up to $17.50 million. The Company has invested AUD$35.23 million in cash into the Donald Project through December 31, 2025 and issued $3.50 million of Common Shares on September 24, 2024. The remaining $14.00 million of Common Shares will be issued upon a positive FID. As of December 31, 2025, the Company has a 9.48% interest in the Donald Project JV. Astron, through its subsidiary Dickson & Johnson Pty Ltd, holds the remaining 90.52% interest. See Note 3 -Transactionsfor further information.

Current report — wording carried from elsewhere

The Company has had negative net cash flows from operating activities and net losses in previous years and through the year ended December 31, 2025, in part due to generally depressed uranium and vanadium prices up until 2024, along with low quantities of monazite to process into salable RE Carbonate or separated NdPr, which has not allowed the Company to realize economies of scale, as well as, particularly in recent years, expenditures to develop the Company’s growing portfolio projects.

Current report — wording carried from elsewhere

The Company has an ATM in place, which allows the Company to make Common Share distributions to the extent qualified under a U.S. shelf registration statement on Form S-3 (“Shelf Registration Statement”) and one or more prospectus supplements. The Company’s current Shelf Registration Statement was declared effective on March 22, 2024 and permits the
Rearranged previous paragraphs (3)

Previous report — wording carried elsewhere

Recovering Medical Isotopes for Advanced Cancer Therapies

Previous report — wording carried elsewhere

The operating results of our reportable segments were as follows (in thousands):

Previous report — wording carried elsewhere

The following table sets forth selected operating data and financial metrics: