ENERGY FUELS INC

For the period ended Dec 31, 2025. Filed Feb 26, 2026.

View on SEC.gov

About this filing

A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.

FY2025 · Filed Feb 26, 2026

UUUU$6.66+1.1%Stored close · as of Nov 6, 2026

What changed in Risk Factors?

Read the current filing

Previous report: 10-K

Period ended 2024-12-31; filed 2025-02-26.

0001385849-25-000004

ITEM 1A. RISK FACTORS

Current report: 10-K

Period ended 2025-12-31; filed 2026-02-26.

0001385849-26-000009

ITEM 1A. RISK FACTORS

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 281 previous paragraphs and 322 current paragraphs.

187 unchanged; 84 reworded; 49 added; 5 removed; 5 previous and 2 current paragraphs rearranged.

Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (49)

Current report

ITEM 1A. RISK FACTORS

Current report

•wild/bushfires, floods, earthquakes, tornados, tropical cyclones, droughts, landslides and other natural disasters;

Current report

◦risks associated with difficulties obtaining or maintaining safe, secure and reliable access to properties in project areas to conduct data collection and other activities, including but not limited to access needed to support the collection of baseline, geotechnical or other data, due to crime, community unrest or opposition to the Company’s projects;

Current report

Risks Associated with our New Metals and Alloys Initiatives

Current report

There are a number of risks related to our new metals and alloys initiatives, including:

Current report

•The risk that our Scheme of Arrangement with ASM will not be completed on the terms previously announced or at all;

Current report

•The risk that we are not able to successfully become the largest, fully-integrated "mine-to-metal and alloy" producer outside of China;

Current report

•The risk that we are unable to close a critical strategic gap in global supply chains for magnet applications;

Current report

•The risk that the Mill proves incapable of separating monazite into REE oxides for use in ASM’s metallization facilities;

Current report

•The risk that we are not able to enhance vertical integration, margin capture, and/or market share across the REE value chain;

Current report

•The risk that we are unable to sell REE products to end-users at multiple stages;

Current report

•The risk that we are unsuccessful at addressing a lack of downstream REE refining and conversion capability;

Current report

•The risk that ASM’s Dubbo Rare Earth Project (if successfully acquired) does not strengthen our pipeline of REE development projects;

Current report

•The risk that our projects do not sufficiently supply the planned expansion of the White Mesa Mill;

Current report

•The risk that ASM’s American Metals Plant does not provide Energy Fuels with a de-risked plan to construct a metals and alloys facility in the United States, whether capable of producing 2,000 tpa of alloy or at all;

Current report

•The risk that we are unable to become the largest fully integrated producer of REE material outside of China, including for any or all of REE oxides, metals and alloys;

Current report

•The risk that the ASM acquisition (if successful) does not benefit our shareholders, ASM’s shareholders and/or our collective valued customers;

Current report

•The risk that we are unable to deliver an expanded suite of REE products;

Current report

•The risk that we are unable to expand metal and alloy making in the U.S.;

Current report

•The risk that ASM’s Dubbo project does not provide additional long-term REE development and growth opportunities to our existing mineral resource portfolio;

Current report

•The risk that we are unable to capture accretive opportunities, differentiate ourself amongst our peers and/or ultimately provide unique value to customers in the ex-China rare earth supply chain;

Current report

•The risk that our actions do not translate into increased margins, cash flows, or market share for the Company and our shareholders;

Current report

•The risk that our exploration, permitting and/or development projects cannot be brought into commercial production; and

Current report

•The risk that our investment in developing ASM’s Australian projects does not create skilled local jobs and/or boost the critical resources sector.

Current report

•potential failure of long-term structures, such as tailings dams or other facilities;

Current report

•the project being fully permitted;

Current report

•securing requisite and timely land access for the Vara Mada Project area and its associated infrastructure areas to support additional baseline studies, hydrogeological studies, permitting activities, development activities, geotechnical work, construction and mining operations;

Current report

•completion of updates to the project Environmental and Social Impact Assessment (“ESIA”) and receipt of related Project approvals;

Current report

Artificial intelligence presents risks and challenges that can impact our business by posing security risks to our confidential information, proprietary information and personal data.

Current report

Issues in the development and use of AI, combined with an uncertain regulatory environment, may result in reputational harm, liability or other adverse consequences to our business operations. We have adopted and at some levels integrated, and intend to continue utilizing and potentially expanding in the future, certain AI tools into our systems for specific use cases. In addition, our vendors and other service providers may incorporate generative AI tools into their offerings without disclosing or fully clarifying this use to us, and the providers of these generative AI tools may not meet existing or rapidly evolving regulatory or industry standards with respect to privacy and data protection, which may inhibit us or our vendors’ and other service providers’ ability to maintain an adequate level of service and security. If we or others with whom we work experience an actual or perceived breach of privacy or security incident because of the use of generative AI, we may lose valuable intellectual property and confidential information and our reputation and the public perception of the effectiveness of our security measures could be harmed. Further, bad actors around the world use increasingly sophisticated methods, including the use of AI, to engage in illegal activities involving the theft and misuse of personal information, confidential information and intellectual property. Any of these outcomes could damage our reputation, cause us to incur significant liability and have a material adverse effect on our business, financial condition and results of operations.

Current report

•the Company may inadvertently violate the intellectual property rights of others, which could result in the loss of intellectual property the Company had believed it had developed or acquired, and/or damages payable to others.

Current report

Servicing the Notes or future debt will require a significant amount of cash, and we may not have sufficient cash flow from our business to pay for the Notes or other future debt.

Current report

Our ability to make scheduled payments of the principal of, to pay interest on or to refinance the Notes, depends on our future performance, which is subject to economic, financial, competitive and other factors beyond our control, as well as the ability of our subsidiaries to pay dividends or make loans or other distributions to us. Our business may not continue to generate cash flow from operations in the future sufficient to service our debt and make necessary capital expenditures. If we are unable to generate such cash flows, we may be required to adopt one or more alternatives, such as selling assets, restructuring debt or obtaining additional debt or equity capital on terms that may be onerous or highly dilutive. Our ability to refinance our indebtedness will depend on the capital markets and our financial condition at such time. We may not be able to engage in any of these activities or engage in these activities on desirable terms, which could result in a default on our debt obligations.

Current report

We and our subsidiaries may be able to incur substantial additional debt in the future, subject to restrictions contained in any future debt instruments, some of which may be secured debt. We are not restricted under the terms of the indenture governing the Notes from incurring additional debt, securing existing or future debt, recapitalizing our debt or taking a number of other actions that are not limited by the terms of the indenture governing the Notes that could have the effect of diminishing our ability to make payments on our debt, including future debt and the Notes, when due.

Current report

We may not have the ability to raise the funds necessary to settle conversions of the Notes in cash or to repurchase the Notes upon a fundamental change, and our future debt may contain limitations on our ability to pay cash upon conversion or repurchase of the Notes.

Current report

Upon the occurrence of a fundamental change (as defined in the indenture governing the Notes), subject to certain conditions and limited exceptions, we will be required to offer to repurchase from holders all or a portion of their Notes at a fundamental change repurchase price equal to 100% of the principal amount of the Notes to be repurchased, plus accrued and unpaid interest, if any, to, but excluding, the fundamental change repurchase date. In addition, upon conversion of the Notes, unless we elect to deliver solely Common Shares to settle such conversion (other than paying cash in lieu of delivering any fractional share), we will be required to make cash payments in respect of the Notes being converted. However, we may not have enough available cash or be able to obtain financing at the time we are required to make repurchases of Notes surrendered or pay cash with respect to Notes being converted. In addition, our ability to repurchase the Notes or to pay cash upon conversions of the Notes may be limited by law, by regulatory authority or by agreements governing our future indebtedness. Our failure to make an offer to repurchase Notes at a time when the offer to repurchase is required by the indenture governing the Notes or to pay any cash payable on future conversions of the Notes as required by the indenture governing the Notes would constitute a default under the indenture governing the Notes. A default under the indenture governing the Notes or the fundamental change itself could also lead to a default under agreements governing our future indebtedness. If the repayment of the related indebtedness were to be accelerated after any applicable notice or grace periods, we may not have sufficient funds to repay the indebtedness and repurchase the Notes or make cash payments upon conversions thereof.

Current report

In the event the conditional conversion feature of the Notes is triggered, holders of Notes will be entitled to convert their Notes at any time during specified periods at their option. If one or more holders elect to convert their Notes, unless we elect to satisfy our conversion obligation by delivering solely Common Shares (other than paying cash in lieu of delivering any fractional share), we would be required to settle a portion or all of our conversion obligation through the payment of cash, which could adversely affect our liquidity. In addition, even if holders do not elect to convert their Notes, we could be required under applicable accounting rules to reclassify all or a portion of the outstanding principal of the Notes as a current rather than long-term liability, which would result in a material reduction of our net working capital.

Current report

Conversion of the Notes may dilute the ownership interest of our shareholders or may otherwise depress the price of our Common Shares.

Current report

The conversion of some or all of the Notes may dilute the ownership interests of our shareholders. Upon conversion of the Notes, we have the option to pay or deliver, as the case may be, cash, Common Shares, or a combination of cash and Common Shares. If we elect to settle our conversion obligation in Common Shares or a combination of cash and Common Shares, any sales in the public market of our Common Shares issuable upon such conversion could adversely affect prevailing market prices of our Common Shares. In addition, the existence of the Notes may encourage short selling by market participants because the conversion of the Notes could be used to satisfy short positions, or anticipated conversion of the Notes into our Common Shares could depress the price of our Common Shares.

Current report

Certain provisions in the indenture governing the Notes may delay or prevent an otherwise beneficial takeover attempt of us.

Showing the first 40 of 49 passages. Open the source sections for the rest.

Removed paragraphs (5)

Previous report

•accidental fires, floods, earthquakes, volcanic eruptions and other natural disasters;

Previous report

•the project being fully permitted, including receiving approval of the work authority for the phase 1 mine plan and additional regulatory approvals required for the mining, transport and export of REE concentrate;

Previous report

•securing requisite land access for the Toliara exploitation permit and the Toliara Project’s associated infrastructure;

Previous report

In addition, the Company is evaluating potentially recovering copper at the Mill as a byproduct with uranium from its Pinyon Plain Project. There can be no assurance that this evaluation will result in the Mill being able to recover copper at the Mill as a byproduct on an economic basis.

Previous report

To date, no changes in the Company’s internal control over financial reporting resulting from the Russian invasion of Ukraine and/or supply chain disruptions have been deemed necessary.
Reworded paragraphs (84)

Previous wording

•the discovery of unusual or unexpected geological formations;

Current wording

•the discovery of unusual or unexpected geological formations, and variations in ore radiation levels;

Previous wording

•unplanned power outages and water shortages;

Current wording

•accidental fires, unplanned power outages and water shortages;

Previous wording

•controlling water and other similar mining hazards;

Current wording

•controlling water, emissions and other similar mining hazards;

Previous wording

•the ability to obtain suitable or adequate machinery, equipment or labor;

Current wording

•the ability to obtain and maintain suitable or adequate machinery, equipment or labor;

Previous wording

•our liability for potential pollution or other hazards; and

Current wording

•our liability for potential or existing pollution or other hazards; and

Previous wording

•other known and unknown risks involved in the conduct of exploration, development and operation of mines, extraction and recovery facilities and mills, along with the markets for uranium, rare earths, vanadium and heavy mineral sands.

Current wording

•other known and unknown risks involved in the conduct of exploration, development and operation of mines, E&R facilities and mills, and metals and alloys plants (pending the successful acquisition of ASM), along with the markets for uranium, rare earths, vanadium, HMS and metals and alloys.

Previous wording

Our earnings and operating cash flow are and will be particularly sensitive to the long- and short-term changes in the market prices of uranium, vanadium and REEs, as well as HMS and their components, including the prices for ilmenite, rutile and zircon, which could impact planned production levels or the feasibility of production of HMC and monazite from our Bahia Project, Toliara Project, the Donald Project and any other HMS projects and which could impact monazite supply for our RE Carbonate and separated REE production. Among other factors, these prices also affect the value of our resources, reserves and inventories, as well as the market price of our Common Shares.

Current wording

Our earnings and operating cash flow are and will be particularly sensitive to the long- and short-term changes in the market prices of uranium, vanadium, REEs, metals and alloys, and HMS and their components, including the prices for ilmenite, rutile and zircon, which could impact planned production levels or the feasibility of production of HMC and monazite from our Bahia Project, Vara Mada Project, the Donald Project and any other HMS projects, and which could impact monazite supply for our RE Carbonate and separated REE production. Among other factors, these prices also affect the value of our Mineral Resources, Mineral Reserves and inventories, as well as the market price of our Common Shares.

Previous wording

Market prices are affected by numerous factors beyond our control. With respect to uranium, such factors include, among others: demand for nuclear power; political and economic conditions in uranium producing and consuming countries; public and political response to a nuclear incident or fear of a nuclear incident; reprocessing of used reactor fuel, the re-enrichment of depleted uranium tails and the enricher practice of underfeeding; sales of excess civilian and military inventories (including from the dismantling of nuclear weapons; the premature decommissioning of nuclear power plants; and from the build-up of Japanese utility uranium inventories as a result of the Fukushima incident) by governments and industry participants; uranium supply, including the supply from other secondary sources; production levels and costs of production, and government actions such as, for instance, any plans included in a President’s fiscal budget and those taken pursuant to the U.S. Uranium Reserve Program. With respect to vanadium, such factors include, among others: demand for steel; the potential for vanadium to be used in advanced battery technologies; political and economic conditions in vanadium producing and consuming countries; world production levels; and costs of production. With respect to REEs, such factors include, among others: demand for REEs; political and economic conditions in REE producing and consuming countries; REE-bearing ore supply from secondary sources; international interest in the purchase of RE Carbonate, separated REE oxides and other REE products, absent a U.S.-based separation facility; public and political response to REE initiatives at the Mill; governmental investment in domestic REE infrastructure; world production levels; costs of production; risks associated with foreign governmental actions, policies, laws, rules, regulations and foreign state subsidized enterprises, with respect to REE production and sales, which could impact REE prices available to the Company and impact our access to world and domestic markets for the supply of REE-bearing ores and the sale of RE Carbonate, REE oxides, and other REE products and services to world and domestic markets; and other government actions, including licensing and import requirements. With respect to HMS, such factors include, among others: demand for titanium minerals and zircon; political and economic conditions in HMS producing and consuming countries; other government actions, including licensing and import requirements; geopolitical factors; world production levels; exploration, mining, processing, refining and other costs of production; grades of HMS ore bodies being mined; scale of mining method; growth in end-use demand for titanium minerals and zircon, including GDP growth in consuming countries; available mineable deposits and upgrading facilities; currency fluctuations; and other market demand and supply dynamics.

Current wording

Market prices are affected by numerous factors beyond our control. With respect to uranium, such factors include, among others: demand for nuclear power; political and economic conditions in uranium producing and consuming countries; public and political response to a nuclear incident or fear of a nuclear incident; reprocessing of used reactor fuel, the re-enrichment of depleted uranium tails and the enricher practice of underfeeding; sales of excess civilian and military inventories (including from the dismantling of nuclear weapons; the premature decommissioning of nuclear power plants; and from the build-up of Japanese utility uranium inventories as a result of the Fukushima incident) by governments and industry participants; uranium supply, including the supply from other secondary sources; production levels and costs of production, and government actions such as, for instance, any plans included in a U.S. president’s fiscal budget and those taken pursuant to the U.S. Uranium Reserve Program, as defined below under “Risks Relating to Our Regulatory Environment.” With respect to vanadium, such factors include, among others: demand for steel; the potential for vanadium to be used in advanced battery technologies; political and economic conditions in vanadium producing and consuming countries; world production levels; and costs of production. With respect to REEs, such factors include, among others: demand for REEs; political and economic conditions in REE producing and consuming countries; REE-bearing ore supply from secondary sources; international interest in the purchase of RE Carbonate, separated REE oxides and other REE products, absent a U.S.-based separation facility; public and political response to REE initiatives at the Mill; governmental investment in domestic REE infrastructure; world production levels; costs of production; risks associated with foreign governmental actions, policies, laws, rules, regulations and foreign state subsidized enterprises, with respect to REE production and sales, which could impact REE prices available to the Company and impact our access to world and domestic markets for the supply of REE-bearing ores and the sale of RE Carbonate, REE oxides, and other REE products and services to world and domestic markets; and other government actions, including licensing and import requirements. With respect to HMS, such factors include, among others: demand for titanium minerals and zircon; political and economic conditions in HMS producing and consuming countries; other government actions, including licensing and import requirements; geopolitical factors; world production levels; exploration, mining, processing, refining and other costs of production; grades of HMS ore bodies being mined; scale of mining method; growth in end-use demand for titanium minerals and zircon, including GDP growth in consuming countries; available mineable deposits and upgrading facilities; currency fluctuations; and other market demand a…

Excerpt shortened here; the source contains the full paragraph.

Previous wording

Other factors relating to the prices of uranium, vanadium, REEs, HMC and HMS products include: levels of supply and demand for a broad range of industrial products; substitution of new or different products in critical applications for our existing products; expectations with respect to the rate of inflation; the relative strength of the U.S. dollar and of certain other currencies; tariffs, subsidies or other trade barriers; interest rates; global or regional political or economic crises; regional and global economic conditions; and sales of uranium, vanadium, RE Carbonate, REE oxides and other REE products and services, and HMC and HMS products by holders in response to such factors. If prices are below our cash costs of extraction or recovery and remain at such levels for any sustained period, we may determine that it is not economically feasible to continue commercial extraction, recovery or processing at any or all of our projects or other facilities and may also be required to look for alternatives other than cash flow to maintain our liquidity until prices recover. Our expected levels of uranium, vanadium, REE, HMC and HMS product recovery and other business activity are dependent on our expectation and the industry’s expectations of uranium, vanadium, REE, HMC and HMS product prices, which may not be realized or may change. In the event we conclude that a significant deterioration in expected future uranium, vanadium, REE, HMC or HMS product prices has occurred, we will assess whether an impairment allowance is necessary which, if required, could be material.

Current wording

Other factors relating to the prices of uranium, vanadium, REEs, HMC, HMS products and metals and alloys include: levels of supply and demand for a broad range of industrial products; substitution of new or different products in critical applications for our existing products; expectations with respect to the rate of inflation; the relative strength of the U.S. dollar and of certain other currencies; tariffs, subsidies or other trade barriers; interest rates; global or regional political or economic crises; regional and global economic conditions; and sales of our Goods and services, and HMC, HMS and metals and alloys products by holders in response to such factors. If prices are below our cash costs of extraction or recovery and remain at such levels for any sustained period, we may determine that it is not economically feasible to continue commercial extraction, recovery or processing at any or all of our projects or other facilities and may also be required to look for alternatives other than cash flow to maintain our liquidity until prices recover. Our expected levels of uranium, vanadium, REE, HMC and HMS product recovery, metals and alloys production (pending the successful acquisition of ASM) and other business activity are dependent on our expectation and the industry’s expectations of product prices of our Goods, which may not be realized or may change. In the event we conclude that a significant deterioration in our expected future Goods prices has occurred, we will assess whether an impairment allowance is necessary which, if required, could be material.

Previous wording

Our profitability is directly related to the market prices of uranium, vanadium, REEs, HMC and HMS products recovered. We may, from time to time, undertake commodity and currency hedging programs with the intention of maintaining adequate cash flows and profitability to contribute to the long-term viability of the business. We anticipate selling forward in the ordinary course of business if, and when, we have sufficient assets and recovery to support forward sale arrangements and forward sale arrangements are available on suitable terms. There are, however, risks associated with forward sale programs. If we do not have sufficient recovered product to meet our forward sale commitments, we may have to buy or borrow (for later delivery back from recovered product) sufficient product in the spot market to deliver under the forward sales contracts, possibly at higher prices than provided for in the forward sales contracts, or potentially default on such deliveries. In addition, under forward contracts, we may be forced to sell at prices that are lower than the prices that may be available on the spot market when such deliveries are completed. Although we may employ various pricing mechanisms within our sales contracts to manage our exposure to price fluctuations, there can be no assurance that such mechanisms will be successful. There can also be no assurance that we will be able to enter into additional term contracts for future sales of uranium, vanadium or RE Carbonate at prices or in quantities that would allow us to successfully manage our exposure to price fluctuations.

Current wording

Our profitability is directly related to the market prices of Goods recovered. We may, from time to time, undertake commodity and currency hedging programs with the intention of maintaining adequate cash flows and profitability to contribute to the long-term viability of the business. We anticipate selling forward in the ordinary course of business if, and when, we have sufficient assets and recovery to support forward sale arrangements and forward sale arrangements are available on suitable terms. There are, however, risks associated with forward sale programs. If we do not have sufficient recovered product to meet our forward sale commitments, we may have to buy or borrow (for later delivery back from recovered product) sufficient product in the spot market to deliver under the forward sales contracts, possibly at higher prices than provided for in the forward sales contracts, or potentially default on such deliveries. In addition, under forward contracts, we may be forced to sell at prices that are lower than the prices that may be available on the spot market when such deliveries are completed. Although we may employ various pricing mechanisms within our sales contracts to manage our exposure to price fluctuations, there can be no assurance that such mechanisms will be successful. There can also be no assurance that we will be able to enter into additional term contracts for future sales of Goods at prices or in quantities that would allow us to successfully manage our exposure to price fluctuations.

Previous wording

Only two of our properties – the Sheep Mountain and Pinyon Plain mines – contain Mineral Reserves under SEC S-K 1300 and NI 43-101 (see “Item II, Cautionary Note to Investors Concerning Disclosure of Mineral Resources and Reserves”). Depending on uranium, vanadium, REE, HMC and HMS product prices, some or all of our properties, projects and facilities may not be economic for uranium, vanadium, REE or HMC or HMS product extraction, recovery or processing at any point in time. Generally, we intend to continue to hold, and in certain cases advance, properties, projects and facilities which may not be economic at any point in time in anticipation of possible future increases in the prices of uranium, vanadium, REEs, HMC and/or HMS products, as the case may be. However, in those circumstances, there can be no assurance at any time that such prices will ever, or within a reasonable time period, increase to the levels required to advance those properties or, in the case of projects or facilities on standby, to resume exploration, extraction, recovery or processing activities at those projects or facilities. In the event of depressed commodity prices, we would continue to hold our standby properties, projects and facilities because we believe that prices are likely to rise, to such levels within a reasonable time period to justify future production. This ability to maintain scalability as commodity prices increase is a key component of our business strategy. However, as there is a cost associated with holding and, in some cases, maintaining such properties, projects and facilities on standby during periods of depressed commodity prices, in those circumstances we continuously evaluate, on a case-by-case basis, such costs against the prospects for price increases, and may from time to time sell, drop or reclaim any such properties, projects or facilities.

Current wording

Only three of our properties – the Vara Mada, Pinyon Plain and Sheep Mountain Projects – contain Mineral Reserves under SEC S-K 1300 and NI 43-101 as well as the Donald Project, in which we own a 9.48% interest as of December 31, 2025. See Item II. Cautionary Note to Investors Concerning Disclosure of Mineral Resources and Reserves. Depending on the price(s) of Goods, some or all of our properties, projects and facilities may not be economic for uranium, vanadium, REE or HMC or HMS product extraction or recovery or for the processing of Goods (including metals and alloys) at any point in time. Generally, we intend to continue to hold, and in certain cases advance, properties, projects and facilities which may not be economic at any point in time in anticipation of possible future increases in the prices of our Goods, as the case may be. However, in those circumstances, there can be no assurance at any time that such prices will ever, or within a reasonable time period, increase to the levels required to advance those properties or, in the case of projects or facilities on standby, to resume exploration, extraction, recovery or processing activities at those projects or facilities. In the event of depressed commodity prices, we would continue to hold our standby properties, projects and facilities because we believe that prices are likely to rise, to such levels within a reasonable time period to justify future production. This ability to maintain scalability as commodity prices increase is a key component of our business strategy. However, as there is a cost associated with holding and, in some cases, maintaining such properties, projects and facilities on standby during periods of depressed commodity prices, in those circumstances we continuously evaluate, on a case-by-case basis, such costs against the prospects for price increases, and may from time to time sell, drop or reclaim any such properties, projects or facilities.

Previous wording

Mining is an inherently speculative business. Some of the properties on which we have the right to mine are not known to have any Mineral Reserves or Mineral Resources. There is a possibility that we will not discover uranium, vanadium, REEs and/or HMS, or potentially copper, on any or all of our properties which can be mined or extracted at a profit at any point in time or at all. Even if we do discover and mine such minerals, the deposits may not be of the quality or size necessary for us or a potential purchaser of the property to make a profit from mining it. Few properties that are explored are ultimately developed into producing mines, and mines that are developed may not be profitable. Unusual or unexpected geological formations, geological formation pressures, fires, power outages, labor disruptions, flooding, explosions, cave-ins, landslides and the inability to obtain suitable or adequate machinery, equipment or labor, as well as all necessary licenses and permits, are just some of the many risks involved in mineral exploration programs and their subsequent development. However, we may elect, now or in the future, to proceed with the extraction of minerals on one or more of those projects without having completed the technical work required to declare a Mineral Reserve. If we are then unable to extract uranium, vanadium, REEs, HMC and/or HMS products, or potentially copper, in commercially viable quantities, the capital investment of mining such properties may be lost and could materially impact our business.

Current wording

Mining is an inherently speculative business. Some of the properties on which we have the right to mine are not known to have any Mineral Reserves or Mineral Resources. There is a possibility that we will not discover uranium, vanadium, REEs and/or HMS, on any or all of our properties which can be mined or extracted at a profit at any point in time or at all. Even if we do discover and mine such minerals, the deposits may not be of the quality or size necessary for us or a potential purchaser of the property to make a profit from mining it. Few properties that are explored are ultimately developed into producing mines, and mines that are developed may not be profitable. Unusual or unexpected geological formations, geological formation pressures, fires, power outages, labor disruptions, flooding, explosions, cave-ins, landslides and the inability to obtain suitable or adequate machinery, equipment or labor, as well as all necessary licenses and permits, are just some of the many risks involved in mineral exploration programs and their subsequent development. However, we may elect, now or in the future, to proceed with the extraction of minerals on one or more of those projects without having completed the technical work required to declare a Mineral Reserve. If we are then unable to extract uranium, vanadium, REEs, HMC and/or HMS products, in commercially viable quantities, the capital investment of mining such properties may be lost and could materially impact our business.

Previous wording

There is a risk that current and future government administrations will not support mining, uranium mining, nuclear energy or other aspects of our business and may limit, restrict or prevent the use of public lands for mining and other activities.

Current wording

There is a risk that current and future government administrations will not support mining, uranium mining, metals and alloys production, nuclear energy or other aspects of our business and may limit, restrict or prevent the use of public lands for mining, milling, processing/production and other activities.

Previous wording

The development of mineral properties and related facilities is contingent upon governmental approvals that are complex and time consuming to obtain and that, depending upon the location of the project, involve multiple governmental agencies. The duration and success of such approvals are subject to many variables outside of our control. Any significant delays in obtaining or renewing permits or licenses in the future could have a material adverse effect on us.

Current wording

The development of mineral properties and related facilities (including downstream facilities) is contingent upon governmental approvals that are complex and time consuming to obtain and that, depending upon the location of the project, involve multiple governmental agencies. The duration and success of such approvals are subject to many variables outside of our control. Any significant delays in obtaining or renewing permits or licenses in the future could have a material adverse effect on us.

Previous wording

The Company is subject to media coverage relating to mining and the production of uranium and other forms of nuclear energy, as well as the production of RE Carbonate, separated REEs and other REE products, HMC, HMS products and the extraction and concentration of radioisotopes for use in TAT medical treatments, some of which can be inaccurate, non-objective or politically motivated. As a result, the Company is frequently required to address or respond to such media coverage, which can be costly and time-consuming for the Company. Such inaccurate and non-objective media coverage can also negatively impact public perception of the Company’s activities, the market for the Company’s securities, government relations, permitting activities and legal challenges.

Current wording

The Company is subject to media coverage relating to mining and the production of uranium and other forms of nuclear energy, as well as the production of RE Carbonate, separated REEs and other REE products, HMC, HMS and metal and alloy products and the extraction and concentration of radioisotopes for use in TAT medical treatments, some of which can be inaccurate, non-objective or politically motivated. As a result, the Company is frequently required to address or respond to such media coverage, which can be costly and time-consuming for the Company. Such inaccurate and non-objective media coverage can also negatively impact public perception of the Company’s activities, the market for the Company’s securities, government relations, permitting activities and legal challenges.

Previous wording

The REE industry is competitive, particularly to the extent it is dominated by China, which produces nearly 90% of refined REE products according to the International Energy Agency. Many Chinese companies are state-supported or subsidized, and Chinese companies bid aggressively to acquire monazite to feed this production. The Company competes with Chinese companies, and companies from other countries that are in or trying to break into the REE market, for sources of monazite, and will be expected to compete with Chinese companies and companies from other countries as they develop production capacity at the RE Carbonate crack and leach, REE separation, REE metal and alloy making, REE magnet making, and REE product marketing and sales stages of the REE supply chain, as well as for the acquisition of monazite and other mineral properties, for mining and exploration on such properties, and for the procurement of equipment, materials and personnel necessary to explore, develop and extract monazite from such properties. There is competition for a limited number of monazite acquisition opportunities, including competition with other companies having substantially greater financial resources, staff and facilities than the Company. As a result, the Company may encounter challenges in acquiring attractive properties and exploring and advancing properties currently in the Company’s portfolio. The Company believes that competition for acquiring monazite prospects, production of REE products and completing REE product sales will continue to be intense in the future.

Current wording

The REE industry is competitive, particularly to the extent it is dominated by China, which produces nearly 90% of refined REE products according to the International Energy Agency. Many Chinese companies are state-supported or subsidized, and Chinese companies bid aggressively to acquire monazite to feed this production. The Company competes with Chinese companies, and companies from other countries that are in or trying to break into the REE market, for sources of monazite, and will be expected to compete with Chinese companies and companies from other countries as they develop production capacity at the RE Carbonate crack and leach, REE separation, REE metal and alloy making, REE magnet making, and REE product marketing and sales stages of the REE supply chain, as well as for the acquisition of monazite and other mineral properties, for mining and exploration on such properties, and for the procurement of equipment, materials and personnel necessary to explore, develop and extract monazite from such properties. There is competition for a limited number of monazite and other REE feed acquisition opportunities, including competition with other companies having substantially greater financial resources, staff and facilities than the Company. As a result, the Company may encounter challenges in acquiring attractive properties and exploring and advancing properties currently in the Company’s portfolio. The Company believes that competition for acquiring monazite prospects and other REE feed materials, production of REE products and completing REE product sales will continue to be intense in the future.

Previous wording

Only two of our properties – the Sheep Mountain and Pinyon Plain mines – contain Mineral Reserves as defined under S-K 1300 and NI 43-101. See “Item II, Cautionary Note to Investors Concerning Disclosure of Mineral Resources and Reserves.”

Current wording

Only three of our properties – the Vara Mada, Pinyon Plain and Sheep Mountain mines – contain Mineral Reserves as defined under S-K 1300 and NI 43-101 as well as the Donald Project, in which we own a 9.48% interest as of December 31, 2025. See Item II. Cautionary Note to Investors Concerning Disclosure of Mineral Resources and Reserves.

Previous wording

Reliable roads, bridges, power sources and water supply are important determinants affecting capital and operating costs for existing and planned operations. For the Toliara Project, the Donald Project and the Bahia Project, new infrastructure will need to be built to support activities. However, unusual or infrequent weather phenomena, including drought, flooding, sabotage, government and/or other interference in the maintenance or provision of such infrastructure could adversely affect our operations and activities, financial condition and results of operations.

Current wording

Reliable roads, bridges, power sources and water supply are important determinants affecting capital and operating costs for existing and planned operations. For the Vara Mada Project, the Donald Project and the Bahia Project, new infrastructure will need to be built to support activities. However, unusual or infrequent weather phenomena, including drought, flooding, sabotage, government and/or other interference in the maintenance or provision of such infrastructure could adversely affect our operations and activities, financial condition and results of operations.

Previous wording

Our operations and activities are subject to all the hazards and risks normally incidental to exploration, construction, development, extraction and mining of mineral properties, and recovery, processing and milling, including: environmental hazards; industrial accidents; labor disputes, disturbances and unavailability of skilled labor; encountering unusual or unexpected geologic formations; rock bursts, pressures, cave-ins and flooding; periodic interruptions due to inclement or hazardous weather conditions; technological and processing problems, including unanticipated metallurgical difficulties, ground control problems, process upsets and equipment malfunctions; the availability and/or fluctuations in the costs of raw materials and consumables used in our production and recovery processes; the ability to procure mining and other equipment and operating and other supplies in sufficient quantities and on a timely basis; and other extraction, mining, recovery, milling and processing risks, as well as risks associated with our dependence on third parties in the provision of transportation and other critical services. Many of the foregoing risks and hazards could result in damage to, or destruction of, our mineral properties or processing or recovery facilities, personal injury or death, environmental damage, delays in or interruption of or cessation of extraction, mining, production and recovery from our mines or processing facilities or in our exploration, construction or development activities, delay in or inability to receive regulatory approvals to transport our uranium, vanadium, REE, HMC or HMS products, and costs, monetary losses and potential legal liability and adverse governmental action. In addition, due to the radioactive nature of the materials handled in uranium and monazite extraction, mining, recovery, processing and transportation (both trucking and shipping), additional costs and risks are incurred by us on a regular and ongoing basis.

Current wording

Our operations and activities are subject to all the hazards and risks normally incidental to exploration, construction, development, extraction and mining of mineral properties, and recovery, processing and milling, including: environmental hazards; industrial accidents; labor disputes, disturbances and unavailability of skilled labor; encountering unusual or unexpected geologic formations; rock bursts, pressures, cave-ins and flooding; periodic interruptions due to inclement or hazardous weather conditions; technological and processing problems, including unanticipated metallurgical difficulties, ground control problems, process upsets and equipment malfunctions; tailings dam failures; the availability and/or fluctuations in the costs of raw materials and consumables used in our production and recovery processes; the ability to procure mining and other equipment and operating and other supplies in sufficient quantities and on a timely basis; and other extraction, mining, recovery, milling and processing risks, as well as risks associated with our dependence on third parties in the provision of transportation and other critical services. Many of the foregoing risks and hazards could result in damage to, or destruction of, our mineral properties or processing or recovery facilities, personal injury or death, environmental damage, delays in or interruption of or cessation of extraction, mining, production and recovery from our mines or processing facilities or in our exploration, construction or development activities, delay in or inability to receive regulatory approvals to transport our uranium, vanadium, REE, HMC or HMS products, and costs, monetary losses and potential legal liability and adverse governmental action. In addition, due to the radioactive nature of the materials handled in uranium and monazite extraction, mining, recovery, processing and transportation (both trucking and shipping), additional costs and risks are incurred by us on a regular and ongoing basis.

Previous wording

•The risk of achieving and maintaining an adequate supply of monazite feed for processing at the Mill. Although the Company has acquired the Bahia Project, it is currently at the exploration and permitting stage and is not an operating mine. The same consideration applies to the Toliara Project and the Donald Project, although both the Toliara Project and the Donald Project are at a more advanced stage, they are not operating mines at this time. As a result, the Company does not currently own its own operating monazite-bearing mine(s) and is completely dependent on contractual arrangements for its REE feed sources at this time. There can be no guarantee that the Company will be able to secure adequate monazite supply over the long-term at suitable prices or that the Bahia Project, Toliara Project or the Donald Project will be developed into operating monazite-producing mines. In addition, the price the Company may be required to pay for monazite sands is subject not only to commercial factors but also to the risk of influence by foreign policy and/or foreign state-owned enterprises. We will evaluate potential acquisitions of additional mines or resource properties and joint ventures with mine or resource property owners, but there can be no guarantee that any such acquisitions or joint ventures can be realized on acceptable terms. Further, to the extent the Company is required to purchase monazite ore sources, we may be at a transportation cost disadvantage compared to processing facilities in China or elsewhere that may be closer to potential ore sources;

Current wording

Company will be able to secure adequate monazite supply or other REE feed sources over the long-term at suitable prices or that the Bahia Project, Vara Mada Project or the Donald Project will be developed into operating monazite-producing mines. In addition, the price the Company may be required to pay for monazite sands and other REE feedstocks is subject not only to commercial factors but also to the risk of influence by foreign policy and/or foreign state-owned enterprises. We will evaluate potential acquisitions of additional mines or resource properties and joint ventures with mine or resource property owners, but there can be no guarantee that any such acquisitions or joint ventures can be realized on acceptable terms. Further, to the extent the Company is required to purchase monazite ore or other REE feed sources, we may be at a transportation cost disadvantage compared to processing facilities in China or elsewhere that may be closer to potential ore sources;

Previous wording

•The risk that we may not be able to increase our sources of natural monazite sands or other ores in amounts sufficient to sustain cost-competitive production of separated NdPr, REE oxides or other REE products at the Mill or elsewhere;

Current wording

•The risk that we may not be able to increase our sources of natural monazite sands or other ores or feedstocks in amounts sufficient to sustain cost-competitive production of separated NdPr, REE oxides or other REE products at the Mill or elsewhere;

Previous wording

•The inability of the Company to successfully or cost-competitively process other types of REEs and uranium-bearing ores and materials at the Mill, such as those produced from coal-based resources or Alternate Feed Materials;

Current wording

•The inability of the Company to successfully or cost-competitively process other types of REEs and uranium-bearing ores and materials at the Mill, such as MREC or those produced from coal-based resources or Alternate Feed Materials;

Previous wording

•The inability of the Company to successfully enhance and modify existing Mill facilities to commission or otherwise construct and operate its planned Phase 2 REE separation circuit at the Mill, and potentially other downstream REE activities, including metal-making and alloying, in the future at the Mill or elsewhere, at acceptable costs or at all;

Current wording

•The inability of the Company to successfully enhance and modify existing Mill facilities to commission or otherwise construct and operate its planned expansion of its Phase 1 Circuit and/or its Phase 2 Circuit at the Mill, and potentially other downstream REE activities, including metal-making and alloying, in the future at the Mill or elsewhere, at acceptable costs or at all;

Previous wording

•The risk of: permit and license challenges, the failure to obtain or retain any needed permit or license amendments, or changes in regulatory attitudes or interpretations. The Mill can produce RE Carbonate and/or separated NdPr, from uranium- ore and REE-bearing monazite sand ores, but additional permitting or licensing will be required to develop the Company’s planned Phase 2 REE separation circuit and facilities at the Mill and and may be required to develop potential REE metal and metal alloy facilities at the Mill or elsewhere. The existing licensing regime and any new or existing permits or licenses or amendments that may be required are subject to challenge, which could delay or prevent existing production or any new construction, as well as any separation and other activities;

Current wording

•The risk of: permit and license challenges, the failure to obtain or retain any needed permit or license amendments, or changes in regulatory attitudes or interpretations. The Mill can produce RE Carbonate and/or separated NdPr, from uranium- ore and REE-bearing monazite sand ores, but additional permitting or licensing will be required to develop the Company’s planned Phase 1 Circuit expansion and Phase 2 Circuit and may be required to develop potential REE metal and metal alloy facilities at the Mill or elsewhere. The existing licensing regime and any new or existing permits or licenses or amendments that may be required are subject to challenge, which could delay or prevent existing production or any new construction, as well as any separation and other activities;

Previous wording

•The risk that further exploration, permitting and development work on the Bahia Project, Toliara Project and Donald Project may result in a determination by the Company that developing a mine on any of those properties is not feasible;

Current wording

•The risk that further exploration, permitting and development work on the Bahia Project, Vara Mada Project and Donald Project may result in a determination by the Company that developing a mine on any of those properties is not feasible;

Previous wording

•The risks associated with HMC or HMS product production at the Company’s Bahia Project, Toliara Project, Donald Project or any other HMS project acquired by the Company in the future, and the risks associated with HMC and HMS product pricing could impact the profitability of mining any of the Company’s Bahia Project, Toliara Project and Donald Project or any such other HMS projects, which could impact the supply of monazite available to the Company from such projects;

Current wording

•The risks associated with HMC or HMS product production at the Company’s Bahia Project, Vara Mada Project, Donald Project or any other HMS project acquired by the Company in the future, and the risks associated with HMC and HMS product pricing could impact the profitability of mining any of the Company’s Bahia Project, Vara Mada Project and Donald Project or any such other HMS projects, which could impact the supply of monazite available to the Company from such projects;

Previous wording

•The risk of conducting exploration and mining activities in Brazil, Madagascar or any other developing or less-developed country, including: the need to rely on English/Foreign Language translations provided by third parties; variations in laws, labor practices, and social norms that could impact the Company’s ability to conduct business in a timely and effective manner; and delays caused by cross-border logistics, such as import and export processes; and

Current wording

variations in laws, labor practices, and social norms that could impact the Company’s ability to conduct business in a timely and effective manner; and delays caused by cross-border logistics, such as import and export processes; and

Previous wording

•Failure to integrate acquisitions, including the Bahia Project, Toliara Project, Kwale Project and the Company’s interest in the Donald Project, and/or incorrectly assess the value or risks associated with such and other potential acquisitions;

Current wording

•Failure to integrate acquisitions, including the Bahia Project, Vara Mada Project, Kwale Project and the Company’s interest in the Donald Project, and/or incorrectly assess the value or risks associated with such and other potential acquisitions;

Previous wording

•The risk that the Company will not be successful in working with the Government of Madagascar to formalize fiscal and other terms applicable to the Toliara Project through an investment agreement, amendments to existing laws or other mechanisms as appropriate, andrisks associated with the ability of the Company to maintain suitable fiscal terms with the Madagascar government over time;

Current wording

•The risk that the Company will not be successful in working with the Government of Madagascar to agree upon and finalize fiscal and other terms applicable to the Vara Mada Project through an investment agreement, amendments to existing laws or other mechanisms as appropriate, and risks associated with the ability of the Company to maintain suitable fiscal terms or enforce any agreements with the Madagascar government over time;

Previous wording

•The risk that monazite will not be added to the Toliara Project’s mining permit on a timely basis, or at all;

Current wording

•The risk that monazite will not be added to the Vara Mada Project’s mining permit on a timely basis, or at all or that all permits or required updates to any permits are not obtained on a timely basis, or at all;

Previous wording

•Risks associated with the reclamation and closure of the Kwale Project;

Current wording

•Risks associated with the reclamation and closure of the Kwale Project, including risks associated with the stability of tailings dams and other facilities;

Previous wording

•Risks of challenges by special interest groups and other parties relating to our Bahia Project, Toliara Project, Kwale Project, Donald Project or any other HMS projects the Company may acquire or be associated with;

Current wording

•Risks of challenges by special interest groups, political figures and other parties relating to our Bahia Project, Vara Mada Project, Kwale Project, Donald Project or any other HMS projects the Company may acquire or be associated with;

Previous wording

•The risk that a positive FID will not be made for the Toliara Project, Donald Project or Bahia Project on a timely basis or at all, and that any or all of the Toliara Project, Donald Project and/or Bahia Project will not be developed;

Current wording

•The risk that a positive FID will not be made for the Vara Mada Project, Donald Project or Bahia Project on a timely basis or at all, and that any or all of the Vara Mada Project, Donald Project and/or Bahia Project will not be developed;

Previous wording

◦heightened risks of: expropriation of assets; business interruption; increased taxation; import/export controls; unilateral modification of concessions and contracts; changes in laws and regulations; and negotiating and maintaining satisfactory fiscal and stability arrangements and obtaining foreign country government approvals on a timely basis or at all;

Current wording

◦heightened risks of: expropriation of assets; business interruption; increased taxation; import/export controls; unilateral modification of concessions and contracts; changes in laws and regulations; changes in interpretations and/or the application of laws and regulations; and negotiating and maintaining satisfactory fiscal stability and other material arrangements and obtaining foreign country government approvals on a timely basis or at all;

Previous wording

◦human rights-related risks associated with the conduct of business in foreign countries, including risks associated with potential occurrences of forced labor, child labor and sex trafficking, that the Company may not be able to identify and address; and

Current wording

◦human rights-related risks associated with the conduct of business in foreign countries, including risks associated with potential occurrences of forced labor, child labor, sex trafficking and other human rights abuses that the Company may not be able to identify and address; and

Previous wording

We are required to comply with environmental protection laws and regulations and permitting requirements promulgated by federal agencies and various states, provinces, counties and local governments in the countries in which we operate and conduct our activities in connection with extraction, mining, recovery and milling operations. The uranium industry, including concentrating, handling and processing monazite, is subject not only to the worker health and safety and environmental risks associated with all mining activities, but also to additional risks uniquely associated with uranium extraction, mining, recovery and milling. We expend significant resources, both financial and managerial, to comply with these laws and regulations. The possibility of more stringent regulations exists in the areas of worker health and safety, storage of hazardous materials, standards for heavy equipment used in extraction, mining, recovery or milling, the disposition of wastes, the decommissioning and reclamation of exploration, extraction, mining, recovery, milling andin-situ sites, climate change and other environmental matters, each of which could have a material adverse effect on the cost or the viability of a particular project.

Current wording

We are required to comply with environmental protection laws and regulations and permitting requirements promulgated by federal agencies and various states, provinces, counties and local governments in the countries in which we operate and conduct our activities in connection with extraction, mining, recovery and milling operations. The uranium industry, including concentrating, handling and processing monazite, is subject not only to the worker health and safety and environmental risks associated with all mining activities, but also to additional risks uniquely associated with uranium extraction, mining, recovery and milling. We expend significant resources, both financial and managerial, to comply with these laws and regulations. The possibility of more stringent regulations exists in the areas of worker health and safety, storage of hazardous materials, standards for heavy equipment used in extraction, mining, recovery or milling, the disposition of wastes, the decommissioning and reclamation of exploration, extraction, mining, recovery, milling and in-situ sites, climate change and other environmental matters, each of which could have a material adverse effect on the cost or the viability of a particular project.

Previous wording

We cannot predict what environmental legislation, regulations or policies will be enacted or adopted in the future or how future laws and regulations will be administered or interpreted in the countries we operate. The recent trend in environmental legislation and regulation is generally toward stricter standards, and this trend is likely to continue in the future. This recent trend includes, without limitation, laws and regulations relating to air and water quality, mine and other facility reclamation, waste handling and disposal, the protection of certain species and the preservation of certain lands and cultural resources. These regulations may require the acquisition of permits or other authorizations for certain activities. These laws and regulations may also limit or prohibit activities on certain lands. Compliance with more stringent laws and regulations, changes in regulatory attitudes and approaches, as well as potentially more vigorous enforcement policies, stricter interpretation of existing laws and stricter permit and license conditions may necessitate significant capital outlays, may materially affect our results of operations and business or may cause material changes or delays in our intended activities. There can be no assurance of our continued compliance or ability to meet stricter environmental laws and regulations and permit or license conditions or changes in attitudes or interpretations relating thereto. Delays in obtaining permits and licenses could impact expected production levels or increases in expected uranium, vanadium, REE, HMC and/or HMS product extraction levels.

Current wording

We cannot predict what environmental legislation, regulations or policies will be enacted or adopted in the future or how future laws and regulations will be administered or interpreted in the countries we operate. The recent trend in environmental legislation and regulation is generally toward stricter standards, and this trend is likely to continue in the future. This recent trend includes, without limitation, laws and regulations relating to air and water quality, mine and other facility reclamation, waste handling and disposal, the protection of certain species and the preservation of certain lands and cultural resources. These regulations may require the acquisition of permits or other authorizations for certain activities. These laws and regulations may also limit or prohibit activities on certain lands. Compliance with more stringent laws and regulations, changes in regulatory attitudes and approaches, as well as potentially more vigorous enforcement policies, stricter interpretation of existing laws and stricter permit and license conditions may necessitate significant capital outlays, may materially affect our results of operations and business or may cause material changes or delays in our intended activities. There can be no assurance of our continued compliance or ability to meet stricter environmental laws and regulations and permit or license conditions or changes in attitudes or interpretations relating thereto. Delays in obtaining permits and licenses could impact expected Goods’ production levels or increases in expected uranium, vanadium, REE, HMC and/or HMS product extraction or production levels.

Previous wording

Our operations may require additional analyses in the future, including environmental, cultural, and social impact and other related studies. Certain activities require the submission and approval of environmental assessments or the more comprehensive environmental impact statements, and the like. We cannot provide assurance that we will be able to obtain or maintain all necessary permits that may be required to continue operations or exploration and development of our properties or, if feasible, to commence construction, development, operation or other activities relating to mining facilities at such properties on terms that enable operations or activities to be conducted at economically justifiable costs. If we are unable to obtain or maintain licenses, permits or other rights for construction, development and operation of our properties, or otherwise fail to manage adequately future environmental issues, our uranium, vanadium, REE, HMC and/or HMS product recovery operations and mining activities could be materially and adversely affected.

Current wording

Our operations may require additional analyses in the future, including environmental, cultural, and social impact and other related studies. Certain activities require the submission and approval of environmental assessments or the more comprehensive environmental impact statements, and the like. We cannot provide assurance that we will be able to obtain or maintain all necessary permits that may be required to continue operations or exploration and development of our properties or, if feasible, to commence construction, development, operation or other activities relating to mining facilities at such properties on terms that enable operations or activities to be conducted at economically justifiable costs. If we are unable to obtain or maintain licenses, permits or other rights for construction, development and operation of our properties, or otherwise fail to manage adequately future environmental issues, our uranium, vanadium, REE, HMC and/or HMS product recovery operations and metals and alloys production and mining activities could be materially and adversely affected.

Previous wording

On December 27, 2020, the COVID-Relief and Omnibus Spending Bill, which included $75 million for the proposed establishment of a strategic U.S. uranium reserve, was signed into law. While the now established U.S. Uranium Reserve Program has made a number of appropriations, with the Company having sold some of its uranium inventory into the U.S. Uranium Reserve Program in 2023, there remains a risk that, if any future required appropriations passed by the U.S. Congress are deferred, or if they are implemented in a way that does not provide the required support for the Company’s activities, and uranium and vanadium markets do not support production activities and/or the Company’s REE and TAT initiatives are not adequate to otherwise sustain the Company’s other business activities, we may reduce our operational activities, including potentially monetizing certain non-core assets as required in order to minimize our cash expenditures while preserving our core asset base for increased production in the future as market conditions may warrant.

Current wording

On December 27, 2020, the COVID-Relief and Omnibus Spending Bill, which included $75 million for the proposed establishment of a strategic U.S. uranium reserve, was signed into law (the “U.S. Uranium Reserve Program”). While the U.S. Uranium Reserve Program has made a number of appropriations, with the Company having sold some of its uranium inventory into the U.S. Uranium Reserve Program in 2023, there remains a risk that, if any future required appropriations passed by the U.S. Congress are deferred, or if they are implemented in a way that does not provide the required support for the Company’s activities, and uranium and vanadium markets do not support production activities and/or the Company’s REE and TAT initiatives are not adequate to otherwise sustain the Company’s other business activities, we may reduce our operational activities, including potentially monetizing certain non-core assets as required in order to minimize our cash expenditures while preserving our core asset base for increased production in the future as market conditions may warrant.

Previous wording

Although our primary trading market is the NYSE American, a majority of our outstanding voting securities are held by U.S. residents, we are a U.S. domestic issuer for SEC reporting purposes, and the Company’s head office is located in the U.S., the Company is incorporated in Ontario, Canada. On September 30, 2018, trade representatives acting on behalf of the U.S., Mexico and Canada renegotiated the terms of the North American Free Trade Agreement (“NAFTA”) in what is known as the United States-Mexico-Canada Agreement (“USMCA”), which entered into force on July 1, 2020 after being approved by the U.S. Congress. At this time, the new or lasting impacts of the USMCA on the Company remain unclear. In addition, if the President of the United States takes action to withdraw from or materially modify certain other international trade agreements, and such actions depend on the jurisdiction of our incorporation, then our business, financial condition and results of operations could possibly be adversely affected, depending on the nature of the action.

Current wording

Although our primary trading market is the NYSE American, a majority of our outstanding voting securities are held by U.S. residents, we are a U.S. domestic issuer for SEC reporting purposes, and the Company’s head office is located in the U.S., the Company is incorporated in Ontario, Canada. On September 30, 2018, trade representatives acting on behalf of the U.S., Mexico and Canada renegotiated the terms of the North American Free Trade Agreement (“NAFTA”) in what is known as the United States-Mexico-Canada Agreement (“USMCA”), which entered into force on July 1, 2020 after being approved by the U.S. Congress. At this time, the new or lasting impacts of the USMCA on the Company remain unclear. In addition, if the President of the U.S. takes action to withdraw from or materially modify certain other international trade agreements, and such actions depend on the jurisdiction of our incorporation, then our business, financial condition and results of operations could possibly be adversely affected, depending on the nature of the action.

Showing the first 40 of 84 pairs. Open the source sections for the rest.

Rearranged current paragraphs (2)

Current report — wording carried from elsewhere

•The risk of achieving and maintaining an adequate supply of monazite and/or other REE feed for processing at the Mill. Although the Company has acquired the Bahia Project, it is currently at the exploration and permitting stage and is not an operating mine. The same consideration applies to the Vara Mada Project and the Donald Project, although both the Vara Mada Project and the Donald Project are at a more advanced stage, they are not operating mines at this time. As a result, the Company does not currently own its own operating monazite-bearing mine(s) and is completely dependent on contractual arrangements for its REE feed sources at this time. There can be no guarantee that the

Current report — wording carried from elsewhere

•The risk of conducting exploration and mining activities in Brazil, Madagascar or any other developing or less-developed country, including: the need to rely on English/Foreign Language translations provided by third parties;
Rearranged previous paragraphs (5)

Previous report — wording carried elsewhere

which could have a material and adverse effect on our financial position.

Previous report — wording carried elsewhere

sudden tax changes. Taxation laws in these jurisdictions are complex, subject to varying interpretations and applications by the

Previous report — wording carried elsewhere

relevant tax authorities and subject to changes and revisions in the ordinary course. Any unexpected taxes imposed on us could

Previous report — wording carried elsewhere

have a material and adverse impact on our financial position.

Previous report — wording carried elsewhere

Russia’s February 2022 invasion of Ukraine continues to severely impact global energy markets and supply chains by causing economic uncertainty, price volatility, supply shortages and national security concerns to such a degree that the International