The Kwale Project

The Company, through its wholly owned subsidiary, Base Titanium, holds the Kwale Project. The Kwale Project is located in Kwale County in southern Kenya. Mining at the Kwale Project commenced in 2013 and concluded at the end of December 2024, following depletion of the remaining ore reserves reported in accordance with JORC standards. Processing activities concluded in early January 2025 and all remaining product stockpiles were sold during the first quarter of 2025.

Reclamation has been ongoing throughout the life of the Kwale Project. As of December, 31 2025, all disturbed areas had been reclaimed with the exception of the processing facility platform. Demolition of the processing facilities is currently underway. Reclamation of the tailings storage facility (“TSF”) continued with the planting of water hungry eucalyptus species. Planting is now complete, with over 250,000 Eucalypts planted. Ongoing growth management and monitoring will be maintained for the disturbed areas until sign-off by Kenya’s National Environment Management Authority and, in the case of the tailings storage facility, this will be maintained until attainment of an average moisture content <40% and a maximum of 50% in the basin of the tailings storage facility, which is currently expected to be achieved by 2038.

Note that that map represents the extent of the mining lease during mining. As the Project is currently in reclamation SML 23 is currently expired.

Internal Controls Relating to Exploration, Mineral Resource and Mineral Reserve Estimation Efforts

The primary exploration tool used for uranium projects is a downhole gamma probe. The gamma probe provides an equivalent %U 3 O 8 grade by measuring decay products of U-238. The Company regularly calibrates its gamma probe during drilling programs at one of a number of DOE test-pits. This is standard procedure in the uranium industry. To verify gamma probe readings, the Company will either collect core and send that material to a 3 rd party lab for assay or use a prompt fission neutron (“PFN”) probe that directly measures the downhole uranium concentrations. Similar to the gamma probe the PFN probe, when in operation, is regularly calibrated at the DOE test-pit.

To verify uranium grades or to assay for other metals, such as vanadium, core is collected during drilling, logged, sampled and sent out for assay either at the Company’s Mill or at 3 rd party labs. Assaying of the materials includes the submission of standards and blanks and assay verification by other laboratories.

The primary risk associated with a Mineral Resource or Mineral Reserve estimate on a uranium project is disequilibrium. As stated above, a gamma probe measures the decay products of U-238. It is possible that, under the correct conditions, the uranium could have produced decay products but, later, the uranium is dissolved by oxidized groundwater and moved out of the system (negative disequilibrium) so that the measured value is overestimating the amount of uranium present. The opposite can also be true, uranium could have moved into the system and not decayed long enough to produce the decay products to calculate the uranium present (positive disequilibrium). Both situations can be quantified by either collecting core and assaying for uranium directly or measuring uranium in the ground with a PFN tool.

Exploration for HMS employs different procedures than those noted for uranium exploration and quantification. The Company utilizes a sonic drill rig for HMS exploration as this type of rig is able to collect relatively undisturbed cores of loose sediment. Following retrieval of the core (typically in 2 meter intervals), the core is logged by the onsite geologist and a sample of each meter is collected and panned (similar to gold panning) to get a visual estimate of HMS concentration. The samples are then taken back to the field office where they are split, dried and analyzed for grain size, utilizing a standard set of wire mesh sieves. A second fraction of the split is then sent to a 3 rd party analytical lab for heavy liquid separation, elemental analysis and mineralogical characterization (XRD or QEMSCAN). Elements of interest include Ti, Fe, Zr, the REEs, uranium and thorium. Standards and blanks will be submitted to the lab as part of the quality assurance/quality control program. Samples will also be sent to other third-party labs to verify the analyses by the primary lab.