Item 1. Business
Bit Digital, Inc. (“BTBT” or the “Company” or “We”), is a holding company incorporated on February 17, 2017, under the laws of the Cayman Islands. The Company is a strategic asset company focused on active participation in Ethereum (ETH)-native treasury, staking strategies. Through our majority equity stake in WhiteFiber Inc. (Nasdaq: WYFI), the Company also engages in high performance computing (“HPC”) business, including cloud services and HPC data center services.
On August 8, 2025, WhiteFiber completed its initial public offering (“IPO”) of its ordinary shares. Prior to the consummation of the IPO, the Company entered into a contribution agreement (the “Contribution Agreement”) with WhiteFiber, pursuant to which the Company contributed (the “Contribution”) its HPC business through the transfer of 100% of the capital shares of its cloud services subsidiary, WhiteFiber AI, Inc. and its wholly-owned subsidiaries WhiteFiber HPC, Inc., WhiteFiber Canada, Inc., WhiteFiber Japan G.K. and WhiteFiber Iceland, ehf, to WhiteFiber in exchange for 27,043,749 ordinary shares of WhiteFiber (the “Reorganization”). Pursuant to the Contribution Agreement, the transfer was be accounted for as a common control transaction immediately prior to the IPO. The Contribution became effective on August 6, 2025, when the registration statement on Form S-1, as amended (File No. 333-288650), of WhiteFiber was declared effective by the SEC. WhiteFiber AI became a wholly-owned subsidiary of WhiteFiber and the Company became the direct shareholder of WhiteFiber after the Reorganization. As of the date of this Form 10-K, the Company owns approximately 70.5% of WhiteFiber.
On August 17, 2023, WhiteFiber Iceland ehf (f/k/a Bit Digital Iceland ehf) was incorporated by a third party on August 17, 2023 under the name Bit Digital Iceland ehf. WhiteFiber Iceland’s directly and wholly-owned by WhiteFiber AI, is classified as a “controlled foreign corporation” for U.S. Federal Income tax purposes and is engaged in cloud services at the data center in Blönduόs Iceland.
On October 19, 2023, the Company incorporated WhiteFiber AI, Inc. (f/k/a Bit Digital AI, Inc) to engage in cloud services for AI applications through its wholly-owned subsidiaries.
On June 27, 2024, WhiteFiber HPC, Inc. (f/k/a Bit Digital HPC, Inc.) (“WF HPC”) was incorporated to support the Company’s cloud services in the United States. WhiteFiber HPC, Inc. is 100% owned by WhiteFiber AI, Inc. which is 100% owned by White Fiber, Inc.
On August 15, 2024, WhiteFiber, Inc. (f/k/a Celer, Inc.) (“WhiteFiber”) was incorporated by Bit Digital to support the Company’s HPC business. WhiteFiber was 100% owned by the Company until August 6, 2025 when the Contribution Agreement became effective.
On October 11, 2024, the Company completed the acquisition of Enovum Data Centers Corp (“Enovum”), a Montreal-based owner, operator, and developer of HPC data centers incorporated on July 13, 2023. Enovum is 100% owned by WhiteFiber through a general partner and a limited partner in a Delaware operating partnership.
On March 11, 2025, WhiteFiber Canada, Inc. (“WF Canada”) was incorporated to support the Company’s generative AI workstreams in Canada. WF Canada is 100% owned by WhiteFiber AI, Inc., which is 100% owned by WhiteFiber.
On May 7, 2025, Enovum NC-1 BIDCO, LLC (“Enovum NC”) was incorporated to support the HPC data centers workstreams in North Carolina. Enovum NC is 100% owned by WhiteFiber.
On May 22, 2025, WhiteFiber Japan GK (“WF Japan”) was incorporated to support the Company’s generative AI workstreams in Japan. WF Japan is 100% owned by WhiteFiber AI, Inc., which is 100% owned by WhiteFiber.
Our core focus is on driving scalable growth through a diverse range of business streams leveraging and built on top of our core and proven blockchain infrastructure operations. Bit Digital’s operations are that of a strategic asset company, focused on two systems that underpin this shift: economic infrastructure through Ethereum, and intelligence infrastructure through AI compute.
Our Business
Bit Digital is a strategy asset company (SAC) focused on owning productive infrastructure that generates yield, usage and participation, and building operating capabilities around those assets as they compound over time. The Company operates its Ethereum infrastructure through staking and network participation. The Company treats ETH as a productive economic infrastructure, rather than as passive inventory. We actively allocate capital across productive strategic assets. Through our majority ownership in WhiteFiber, we engage in AI compute and data center infrastructure. WhiteFiber provides scalable energy and dense capacity for AI and HPC workloads. Our strategic priority is to build a leading ETH treasury and network participation while integrating AI intelligence infrastructure exposure to position Bit Digital as a premier SAC.
The digital asset business is comprised primarily of two distinct but highly complementary operations: (i) ETH staking (the “ETH Staking Operations”) and (ii) digital asset mining (the “Digital Asset Mining Operations”). In the fourth quarter of 2022, we formally commenced Ethereum staking operations. We purchase and stake ETH to generate protocol-native yield and participate directly in the Ethereum network. Bit Digital allocates capital with a focus on long-duration, foundational infrastructure and disciplined balance sheet management.
In June 2025, the Company announced that it had initiated a strategic transition to become a pure play ETH staking and treasury company. In connection with the transition, the Company has been converting its bitcoin (BTC) holdings into ETH over time and has undertaken a strategic alternatives process for its bitcoin mining operations, which is expected to result in a sale or wind-down, with any net proceeds to be re-deployed into ETH.
Consequently, management reoriented the business to prioritize (i) ETH treasury operations; and (ii) disciplined BTC treasury management while winding down proprietary self-mining exposure and deferring new site buildouts.
Our business integrates (i) a digital asset treasury anchored in ETH with (ii) an operating platform historically focused on BTC mining and hosting and (iii) HPC infostructure operated by White Fiber. We seek to accumulate and hold ETH on a long-term basis within a disciplined treasury framework, and we may participate in staking or staking-adjacent activities where risk-adjusted returns, liquidity and regulatory considerations are acceptable. We maintain flexibility to mine or hold BTC when market economics are attractive. We prioritize robust custody, cybersecurity, segregation of duties and counterparty oversight, and we evaluate opportunities in ETH-adjacent services—including advisory—consistent with an asset-light operating model**.**
ETH Treasury Strategy
Starting in 2022, the Company has accumulated and held ETH on a long-term basis, implementing controls over custody, counterparty exposure, and liquidity. Our strategy focuses on pursuing opportunities to increase the amount of ETH in the treasury, including through staking, restaking, liquid staking and other decentralized finance activities. The Company may deploy ETH into staking or other yield-generative protocols where risk-adjusted returns, liquidity and regulatory considerations are acceptable. We believe ETH’s role as a programmable settlement asset and its network-driven cash flows create a compelling long-term investment thesis. Over the course of 2025, we accumulated ETH at a measured cost basis and built operational capabilities around staking and network participation. As of December 31, 2025, Bit Digital held over 150,000 ETH, the majority of which is staked, generating protocol-native rewards while maintaining liquidity and institutional custody standards.
The key drivers of our results include (i) ETH market conditions, which affect the value of our holdings and the economics of any staking or staking-adjacent activities; (ii) client demand for Ethereum-adjacent services, including advisory; (iii) security, custody and compliance expenditures necessary to support institutional-grade treasury operations; and (iv) access to capital to opportunistically acquire ETH and invest in enabling infrastructure.
Treasury and yield framework. Our objective is to grow our net ETH position over time, subject to risk and liquidity constraints. We evaluate staking and related mechanisms based on security, liquidity, counterparty and regulatory profiles. We expect staking yields to evolve with validator participation rates, protocol parameters and market conditions. Where we deploy ETH to staking or analogous activities, we intend to size exposures conservatively, prioritize best-in-class custody and validator operations (including multi-client diversity and performance monitoring), and maintain appropriate unencumbered liquidity to meet corporate needs. We may rebalance or unwind positions in response to changes in risk, reward, or regulatory context.
Operating expenditures and investment priorities. As an ETH-focused company, we have experienced a mix shift in operating expenses toward cybersecurity, custody, treasury operations, compliance and technology enablement for advisory and analytics. Capital expenditures have been modest relative to our prior mining-centric model. We intend to maintain a flexible cost structure aligned with services activity and treasury scale.
Key trends and uncertainties. We are monitoring (i) protocol upgrades on Ethereum’s roadmap and their implications for staking yields, fee markets and network security; (ii) growth in L2 activity and cross-chain interoperability; (iii) institutional adoption trends, including tokenization initiatives and regulated market-structure developments; (iv) availability and terms of regulated custodial services; and (v) evolving U.S. and non-U.S. regulatory frameworks applicable to digital assets and staking.
Liquidity considerations. Our liquidity planning considers ETH price volatility, potential impairment charges under applicable accounting policies, the liquidity profile of any staked positions and our ability to access capital markets through our shelf registration and at-the-market program. We intend to maintain sufficient liquidity to support operations, regulatory compliance, and security investments, while seeking opportunities to increase ETH holdings when market conditions are attractive.
Known events reasonably likely to affect future results. Our future results may be materially affected by changes in ETH prices and staking economics; regulatory developments pertaining to ETH, staking and custody; counterparty or custodian developments; cybersecurity investments and events; and market structure changes affecting liquidity and capital access for digital-asset issuers.
ETH Staking Operations
The Company commenced Ethereum staking activities in the fourth quarter of 2022. Through these activities, the Company participates in the Ethereum proof-of-stake (“PoS”) network by staking its own ETH holdings through third-party validator operators.
Under the Ethereum PoS consensus mechanism, participants may commit ETH to validator nodes in order to support the validation of transactions and the addition of new blocks to the Ethereum blockchain. In return for participating in this validation process, participants may earn protocol-based staking rewards.
The Company does not operate its own validator nodes. Instead, the Company delegates its ETH to independent third-party validators who operate the infrastructure required to participate in the Ethereum network. These validator operators perform the technical validation functions required by the protocol, including transaction verification and block proposal and attestation.
Delegation of ETH for staking purposes is a non-custodial process in which the Company retains ownership of its ETH while the validator operator performs the validation services. The Ethereum protocol automatically distributes staking rewards generated from validated blocks in accordance with the network rules.
Through this model, the Company is able to participate in network validation and earn staking rewards on its ETH holdings without directly operating validator infrastructure.
Beginning in January 2024, the Company transitioned its native Ethereum staking operations to Figment, an institutional-grade staking infrastructure provider with a strong institutional client base, established operating track record, and a focus on security and validator performance. As of December 31, 2025, the Company conducted its staking operations exclusively on the Ethereum network through Figment. The Company’s staking strategy is focused solely on native Ethereum staking and does not include staking activities on other blockchain networks or participation in liquid staking arrangements. As of December 31, 2025, the Company had approximately 138,263 ETH actively staked through Figment. Cumulative staking rewards were approximately 2,442.9 ETH, of which approximately 2,366.8 ETH had been paid and approximately 76.1 ETH remained pending. The Company believes this operating model streamlines staking operations, enhances operational oversight, and provides direct exposure to Ethereum staking rewards through a single institutional service provider.
We started participating in liquid staking via Liquid Collective protocol on the Coinbase platform in the first quarter of 2023. Liquid staking allows participants to achieve greater capital efficiency by utilizing their staked ETH as collateral and trading their staked ETH tokens on the secondary market. In the first quarter of 2024, we reclaimed all the liquid staked ETH from Liquid Collective protocol. In July 2025, we resumed liquid staking through the Liquid Collective protocol with 5,120 ETH. This approach provides flexibility to engage in both staking and restaking through a broader range of strategies and platforms. Subsequently, we ceased our liquid staking activities with Liquid Collective protocol in October 2025.
ETH and the ETH Ecosystem
Ethereum is a decentralized, open-source blockchain network enabling programmable smart contracts and decentralized applications. ETH is the native digital asset of the Ethereum network and is used as the unit of account to pay for transaction fees (“gas”), validator rewards, and computation. Since its launch in 2015, Ethereum has become the leading programmable settlement layer for decentralized finance, tokenization, and digital assets infrastructure, and it is the second-largest blockchain by market capitalization. Following Ethereum’s transition to proof-of-stake consensus in September 2022, the network’s energy consumption declined materially and a validator-based system for securing the network and earning staking rewards was introduced.
BTBT believes that the growth and maturation of the Ethereum ecosystem has direct implications for our business model, which integrates (i) an ETH-anchored corporate treasury focused on disciplined accumulation and risk-managed yield generation, and (ii) a capital-light operating platform providing Ethereum-adjacent services. BTBT views the following Ethereum ecosystem developments as particularly relevant to our long-term strategy:
| ● | Network scale and usage. Ethereum’s utility as a programmable settlement layer supports a broad and diversifying set of use cases, including decentralized exchanges, lending/borrowing protocols, payment rails, identity and credentialing systems, gaming, real-world asset tokenization, and enterprise blockchain initiatives. We believe continued growth in on-chain activity, measured by transactions, users, total value locked, active addresses, and L2 throughput, contributes to Ethereum’s network effects and long-term demand for ETH as a utility asset. In our view, higher ETH usage over the long term may correlate with increased demand for ETH balances to pay for gas, provide liquidity, and post collateral. |
| ● | Proof-of-stake economics and validator infrastructure. Under proof-of-stake, ETH can be staked to help secure the network and earn protocol rewards, subject to slashing and other performance risks. As staking participation, validator efficiency, and protocol parameters evolve, we expect market yields to adjust. We believe disciplined, security-first staking and custody practices are a core competency for an institutional ETH treasury. We may also selectively participate in risk-adjusted yield opportunities that are consistent with our liquidity, compliance, and counterparty frameworks. |
| ● | Scaling via rollups and Layer 2 networks. The Ethereum roadmap contemplates scaling through rollups and Layer 2 (“L2”) solutions that bundle transactions and settle them on ETH. Increased throughput at lower per-transaction costs may broaden addressable use cases and drive user adoption. We expect L2 growth to expand the universe of Ethereum-adjacent services—such as tooling, analytics, governance advisory, and treasuries—that are relevant to our advisory and services offerings. |
| ● | Tokenization and institutional adoption. Financial institutions and enterprises continue to explore or pilot tokenization of traditional instruments (such as funds, treasuries, credit, and private assets) and on-chain settlement workflows. We believe tokenization and related market-structure innovations could increase institutional engagement with ETH, deepen liquidity, and broaden opportunities for regulated custody, treasury operations, and compliance-aligned yield solutions. |
| ● | Security, client protection, and compliance infrastructure. Institutional adoption requires robust custody, cybersecurity, and compliance controls. Our treasury operations prioritize multi-layer key management, segregation of duties, and independent oversight of custodians and counterparties. We believe investments in cybersecurity and governance are essential to supporting our ETH strategy and services. |
| ● | Alignment with our ETH Treasury Strategy. We seek to grow total ETH holdings over time and to manage our treasury to balance security, liquidity, and risk-adjusted returns. We may stake ETH to earn rewards and, as appropriate, evaluate participation in related mechanisms (including liquid staking, restaking, or validator strategies) where we determine the risk-return and liquidity align with our policies and applicable law. We expect our ETH focus to influence capital allocation, risk management, product development, and service offerings across our business (the “ETH Treasury Strategy”) |
It is our belief that our public-company governance**,**treasury discipline, and operating experience in digital asset infrastructure position us to benefit from long-term Ethereum ecosystem growth. However, ETH prices, staking economics, protocol changes, regulatory developments, market structure conditions, and security risks are volatile and uncertain and could materially affect our strategy and results of operations.
Blockchain Infrastructure
Our blockchain infrastructure entails operating validator nodes (on various PoS and dPoS-based blockchain networks. In connection with the validation of transactions occurring on those blockchain networks, BTBT stakes (or “delegates”) blockchain-based crypto assets native to those blockchains networks (“native crypto assets”) to earn staking rewards.
PoS blockchain infrastructure is akin to Bitcoin’s proof-of-work (“PoW”) mining consensus mechanism but differs in a few key ways. PoW is a consensus mechanism that requires nodes to dedicate computational resources to validate transactions on a blockchain. In PoW, miners use energy-consuming computers to do “work,” and they are rewarded with crypto assets for validating transactions on the blockchain. The reward is comprised of transaction fees and crypto assets. Conversely, PoS is a consensus mechanism that requires validator nodes to dedicate financial resources in the form of crypto assets, which are staked to participate in the consensus algorithm. Validators, the equivalent of miners in PoW networks, operate nodes and validate transactions on the blockchain. Validators are rewarded in crypto assets for aligning behavior with the rules of the algorithm.
We primarily earn crypto assets through the operation of our non-custodial validator nodes, with the intention of enhancing our production of crypto assets in various blockchain networks. While we have no formal policy, our primary objective is to hold and re-stake these earned crypto assets for network security and additional production opportunities, we may, on occasion, sell a portion for cash to meet operational needs. Our primary cryptocurrency exchange is Coinbase; however, we also have basic accounts with multiple alternative cryptocurrency exchanges and OTC desks. As of the filing date, we have no exclusive agreements with any cryptocurrency exchanges, nor do we maintain margin or other type accounts that could create additional liability for the Company. Our approach to our crypto asset holdings remains adaptable to evolving market conditions and operational requirements.
Custody and Key Storage
We safeguard and keep private our digital assets, including the ETH that we stake, by utilizing custodian solutions provided by Cactus Custody and Fireblocks, which requires multi-factor authentication. While we are confident in the security of our digital assets held by Cactus Custody and Fireblocks, given the broader market conditions, there can be no assurances that other digital asset market participants, including Cactus Custody and Fireblocks as our custodian, will not ultimately be impacted. We continue to monitor the digital assets industry as a whole, although it is not possible at this time to predict all of the risks stemming from these events that may result to us, our services providers, our counterparties, and the broader industry as a whole.
The Company currently does not maintain any insurance policies that provide coverage for potential losses of crypto assets in cases of theft, lost keys, or any other events that might lead to the loss of private keys or crypto assets held within our secure digital wallets.
As of December 31, 2025, our combined digital asset holdings totaled approximately $415 million, consisting primarily of ETH, along with a smaller BTC position, and cash totaled $118 million.
BTC Exposure
While the Company is converting its BTC holdings into ETH over time, it has commenced a strategic alternatives process for its bitcoin mining operations during 2025, with any net proceeds to be re-deployed into ETH, the Company also intends to maintain flexibility to mine or hold BTC when market economics and risk-reward profiles are attractive. Our management has not set a specific target for the amount of BTC we seek to hold and will continue to monitor market conditions to determine whether to engage in additional financings to purchase more BTC.
Digital Asset Mining Operations
We commenced our bitcoin (“BTC”) mining business in February 2020. We initiated limited Ethereum mining operations in January 2022, however discontinued the operations by September 2022 due to Ethereum blockchain switching from proof-of-work (“PoW”) consensus mechanism to proof-of-stake (“PoS”) validation. Our mining operations, hosted by third-party providers, use specialized computers, known as miners, to generate digital assets. Our miners use application specific integrated circuit (“ASIC”) chips. These chips enable the miners to apply high computational power, expressed as “hash rate”, to provide transaction verification services (generally known as “solving a block”) which helps support the blockchain. For every block added, the blockchain provides an award equal to a set number of digital assets per block. Miners with a greater hash rate generally have a higher chance of solving a block and receiving an award.
We operate our mining assets with the primary intent of accumulating digital assets which we may sell for fiat currency from time to time depending on market conditions and management’s determination of our cash flow needs, and/or exchange into ETH or USD Coin (“USDC”). Our mining strategy was to mine bitcoins as quickly and as many as possible given the fixed supply of bitcoins. In view of historically long delivery lead times to purchase miners from manufacturers like Bitmain Technologies Limited (“Bitmain”) and MicroBT Electronics Technology Co., Ltd (“MicroBT”), and other considerations, we have chosen to acquire miners on the spot market, which can typically result in delivery within a relatively short time.
We have signed service agreements with third-party hosting partners in North America and Iceland. These partners operate specialized mining data centers, where they install and operate the miners and provide IT consulting, maintenance, and repair work on site for us. Our mining facilities in New York are maintained by Digihost Technologies Inc. (“Digihost”). Our mining facilities in Texas are maintained by Dory Creek, LLC, a subsidiary of Bitdeer Technologies Group (“Bitdeer”) and Digital Energy Partner LLC (“DEP”), which was formerly known as A.R.T Digital. Soluna Computing, Inc. and DVSL ComputeCo, LLC (collectively, “Soluna”) previously maintained our mining facilities in Kentucky and Texas, and GreenBlocks ehf, an Icelandic private limited company (“GreenBlocks”), previously maintained our mining facility in Iceland. The Company’s service agreements partnership with Soluna and GreenBlocks concluded at the end of February 2026.
From time to time, the Company may change partnerships with hosting facilities to recalibrate its bitcoin mining operations. These terminations are strategic, targeting reduced operational costs, enhanced energy efficiency for a smaller carbon footprint, increased flexibility in operational control, and minimized geopolitical risks. While a short-term decrease in mining output might occur, we expect these changes to yield long-term operational improvements.
We are a sustainability-focused digital asset mining company. On June 24, 2021, we signed the Crypto Climate Accord, a private sector-led initiative that aims to decarbonize the crypto and blockchain sectors. On December 7, 2021, we became a member of the Bitcoin Mining Council (“BMC”), joining MicroStrategy and other founding members to promote transparency, share best practices, and educate the public on the benefits of bitcoin and bitcoin mining.
Market Cyclicality
Our results are influenced by digital asset price volatility and transaction activity, all of which fluctuate materially with macroeconomic and regulatory developments. Historically, our business has not exhibited predictable seasonal trends.
Miner Deployments
During the year ended December 31, 2025, we continued to work with our hosting partners to deploy our miners in North America and Iceland.
As of December 31, 2025, the Company’s active hash rate totals approximately 1.5 EH/s, with operations in North America and Iceland.
Power and Hosting Overview
The Company’s subsidiary, Bit Digital Canada, Inc., entered into a Master Mining Services Agreement (MMSA), effective September 1, 2022, for Blockbreakers, Inc. to provide five MW of incremental hosting capacity at its facility in Canada. The facility utilizes an energy source that is primarily hydroelectric.
On April 5, 2023, the Company entered into a letter agreement and MMSA Amendment with Coinmint pursuant to which Coinmint agreed to provide the Company with up to ten (10) MW of additional mining capacity to energize the Company’s mining equipment at Coinmint’s hosting facility in Plattsburgh, New York. The agreement was for two years automatically renewing for three (3) months unless terminated by either party on at least ninety (90) days prior written notice. The performance fees under this letter agreement range from 30% to 33% of the net profit. This agreement brought the Company’s total contracted hosting capacity with Coinmint to approximately 30 MW at this facility. On January 3, 2025, the Company received an additional 90-days notice of non-renewal of colocation mining services agreement from Coinmint, which informed the Company of its intent not to renew the 10 MW total contracted capacity at its Plattsburgh, New York site, effective April 5, 2025. After the contracts with Coinmint expired, a portion of the miners were transferred to other hosting facilities, and the inefficient units were sold.
On April 27, 2023, the Company entered into a letter agreement and MMSA Amendment with Coinmint pursuant to which Coinmint agreed to provide the Company with up to 10 MW of additional mining capacity to energize the Company’s mining equipment at Coinmint’s hosting facility in Massena, New York. The agreement was for one year automatically renewing for three (3) months unless terminated by either party on at least 90 days prior written notice. The performance fees under this letter agreement are 33% of the net profit. This new agreement brought the Company’s total contracted hosting capacity with Coinmint to approximately 40 MW.
On January 26, 2024, the Company entered into a letter agreement and MMSA Amendment with Coinmint pursuant to which Coinmint agreed to provide the Company with up to six MW of additional mining capacity to energize the Company’s mining equipment at Coinmint’s hosting facility in Massena, New York. The agreement was for one year automatically renewing for three months unless terminated by either party on at least 90 days prior written notice. The performance fees under this letter agreement are 28% of the net profit. This agreement brought the Company’s total contracted hosting capacity with Coinmint to approximately 46 MW. On September 5, 2024, the Company received a 90-days notice of non-renewal of colocation mining services agreement from Coinmint, which informed the Company of its intent not to renew 27 MW of the 36 MW total contracted capacity at its Massena, New York site, effective December 7, 2024. Subsequently, on October 29, 2024, the Company received an additional 90-days notice of non-renewal of colocation mining services agreement from Coinmint, which informed the Company of its intent to not renew the remaining 9 MW of the 36 MW total contracted capacity at its Massena, New York site, effective January 28, 2024.
In April 2023, we renewed the co-mining agreement with Digihost, previously executed in June 2021. Pursuant to the terms of the new agreement, Digihost provides certain premises to Bit Digital for the purpose of the operation and storage of an up to 20 MW bitcoin mining system to be delivered by Bit Digital. Digihost also provides services to maintain the premises for a term of two years, automatically renewing for a period of one (1) year. Digihost shall also be entitled to 30% of the net profit generated by the miners. As of December 31, 2025, Digihost provided approximately 6.0 MW of capacity for our miners at their facility.
On May 9, 2023 (“Effective Date”), the Company entered into a Term Loan Facility and Security Agreement (the “Loan Agreement”) with GreenBlocks. Pursuant to the Loan Agreement, GreenBlocks has requested the Company to extend one or more loans (“Advances”) under a senior secured term loan facility in an aggregate outstanding principal amount not to exceed $5 million. The interest rate of the Loan Agreement is 0% and Advances are to be repaid on the maturity date, which is the thirty-nine-month anniversary of the Effective Date. GreenBlocks will exclusively use the Advances to buy miners that will be operated for the benefit of the Company at a facility in Iceland, with an overall capacity of 8.25 MW. To secure the prompt payment of Advances, the Company has been granted a continuing first priority lien and security interest in all of GreenBlocks’s rights, title and interest to the financed miners. The miners are the sole property of GreenBlocks, of which they are responsible for the purchase, installation, operation, and maintenance.
On May 9, 2023, the Company entered into a Computation Capacity Services Agreement (the “Services Agreement”) with GreenBlocks. Pursuant to the Agreement, GreenBlocks will provide computational capacity services and other necessary ancillary services, such as operation, management, and maintenance, at the facility in Iceland for a term of two years. GreenBlocks will own and operate the miners financed through the Loan Agreement for the purpose of providing computational capacity of up to 8.25 MW. The Company will pay power costs of $0.05 per kilowatt hour, a pod fee of $22,000 per pod per month, and a depreciation fee equal to 1/36 of the facility size per month. The performance fees under this agreement are 20% of the net profit. The Company submitted to Greenblocks a deposit in the amount of $1,052,100, which was exclusively for the purpose of paying the landlord of the facility for hosting space.
On June 1, 2023, the Company and GreenBlocks entered into the Omnibus Amendment to Loan Documents and Other Agreements (“Omnibus Amendment”). This amendment revised both the Loan Agreement and the Services Agreement previously entered on May 9, 2023. While the core terms remained consistent, notable modifications pertained to the facility size and contracted capacity. Specifically, the facility size was increased from $5 million to $6.7 million. Moreover, GreenBlocks agreed to expand the computation capacity to approximately 10.7 MW. Advances of $6.4 million have been financed by the Company to GreenBlocks.
In May 2025, we amended the Services Agreement with Greenblocks, originally executed in May 2023 and previously amended in June 2023. Pursuant to the terms of the amended agreement, Greenblocks shall provide services to support 8.9 MW of power capacity from March 1, 2025 through April 30, 2025 and 5 MW of computational capacity starting May 1, 2025 through December 31, 2025. The Company will pay power costs of $0.067 per kilowatt hour and a pod fee of $10,000 per pod per month, subject to pro rata adjustment if usage falls below 2 MW. All other provisions of the original agreement and previous appendices remain in effect. The amended terms may be modified by mutual agreement, and either party may terminate with one month’s notice. As of December 31, 2025, GreenBlocks provided approximately 9.1 MW of capacity for our miners at their facility. The Company’s services agreement with GreenBlocks expired in February 2026, and the Company is currently evaluating alternative hosting arrangements for the miners previously deployed at the GreenBlocks facility. As of the date of this report, such miners are in storage.
In October 2024, we entered into a co-location agreement with Soluna SW, Inc. to continue our business relationship. Under this agreement, Soluna provides certain required mining colocation services to the Company at their hosting facility in Murray, Kentucky for the purpose of the operation and storage of bitcoin mining system to be delivered by the Company up to 6.6 MW (3.3 MW for terms of nine months and 3.3 MW for terms of one (1) year), automatically renewing on a month-to-month basis unless terminated by either party. Soluna shall also be entitled to 35% of the net profit generated by the miners.
In December 2024, we entered into two additional co-location agreements with Soluna DVSL ComputerCo, LLC. pursuant to which Soluna agreed to provide the Company with up to 11 MW (5.5 MW and 5.5 MW, respectively) at their hosting facility in Silverton, Texas. Both agreements are for one (1) year automatically renewing on a month-to-month basis unless terminated by either party on at least 60 days prior written notice. Soluna shall also be entitled to 35% and 27.5%, respectively, of the net profit generated by the miners. These new agreements bring the Company’s total contracted hosting capacity with Soluna to approximately 17.6 MW. As of December 31, 2025, Soluna provided approximately 10.0 MW of capacity for our miners at their facility. The Company’s services agreements with Soluna expired in February 2026. Following the expiration, the Company relocated approximately 2,050 miners to a third-party hosting facility, and the Company is currently evaluating alternative deployment options for the remaining miners previously hosted by Soluna, which are currently in storage.
In November 2023, we entered into a hosting services agreement, which was amended on March 7, 2024, with Dory Creek, LLC, a subsidiary of Bitdeer Technologies Group (“Bitdeer”), for a term of one year automatically renewing on an annual basis unless terminated by either party by giving a 30-day prior notice to the other Party in writing. Pursuant to the terms of the agreement, Bitdeer provides maintenance and operation services to the Company to support 17.5 MW of capacity. Bitdeer shall also be entitled to 30% of the net profit generated by the miners. the Company shall have the first right, but not obligation, to accept services for any extra capacity under the terms of this Agreement. As of December 31, 2025, Bitdeer provided approximately 15.5 MW of capacity for our miners at their facility.
In February 2025, we entered into two hosting services agreements with A.R.T. Digital Holdings Corp (“KaboomRacks”) for terms of nine (9) months and three years automatically renewing on an annual basis unless terminated by either party. Pursuant to the terms of the agreements, KaboomRacks provides maintenance and operation services to Bit Digital to support 6 MW and 13 MW of capacity. In accordance with the agreements, we paid a refundable advance of $1.3 million, which will be applied against monthly hosting charges over an 18-month period.
On July 1, 2025, we entered into the first amendment to the hosting service agreement for 13 MW of capacity. The amendment modified the existing agreement, identifying the two facilities that will provide maintenance and operations service to Bit Digital to support 5 MW and 8 MW of capacity. KaboomRacks shall also be entitled to respective 40%, 14.75% and 22.5% of the net profit generated by the miners. As of December 31, 2025, DEP provided approximately 17.1 MW of capacity for our miners at their facility. On November 12, 2025, we received communication regarding a change in the contracting entity under its existing hosting arrangements. Effective immediately, Digital Energy Partners LLC (“DEP”) replaced KaboomRacks as the sole contracting counterparty. Under the updated terms, KaboomRacks will return all deposits previously held by it, and we will remit a one-month deposit related to electricity costs to DEP. In connection with the transition, DEP assumed the remaining portion of the $1.3 million loan, with an outstanding balance of approximately $1.0 million as of December 31, 2025.
In May 2022, our hosting partner Blockfusion advised us that the substation at its Niagara Falls, New York facility was damaged by an explosion and fire, and power was cut off to approximately 2,515 of the Company’s bitcoin miners and approximately 710 ETH miners that had been operating at the site immediately prior to the incident. Prior to the incident, our facility with Blockfusion in Niagara Falls, provided approximately 9.4 MW to power our miners. Power was restored to the facility in September 2022. However, we received a notice dated October 4, 2022 (the “Notice”), from the City of Niagara Falls, which ordered the cease and desist from any cryptocurrency mining or related operations at the facility until such time as Blockfusion complies with Section 1303.2.8 of the City of Niagara Falls Zoning Ordinance (the “Ordinance”), in addition to all other City ordinances and codes. Our service agreement with Blockfusion ended in September 2021. On June 3, 2024, the Company filed suit in Delaware Superior Court against Blockfusion alleging claims for breach of contract, conversion, and related claims in connection with, among other things, certain deposits and advances paid to Blockfusion, the return of which is owed to the Company. The Company is seeking in excess of $4.3 million. On October 22, 2024, Blockfusion denied the Company’s claims and brought reciprocal breach of contract and related counterclaims. Blockfusion filed a motion to dismiss the Company’s Second Amended Complaint. A hearing on the motion was held on January 6, 2026 and the Court granted Blockfusion’s motion to dismiss. The Court dismissed the claims against the individual defendant without prejudice on the ground that it lacked personal jurisdiction, and did not reach the merits of certain substantive issues raised in the motion. The Company’s contract-based claims and related claims for contractual recovery against Blockfusion were not dismissed and remain pending. Refer to Note 21.Commitments and Contingencies for further details.
Miner Fleet Update and Overview
As of December 31, 2024, we had 24,239 miners owned or operating (in Iceland) for bitcoin mining with a total maximum hash rate of 2.6 EH/s.
For the year ended December 31, 2025, the Company disposed of approximately 7,900 bitcoin miners and wrote off 3 bitcoin miners.
As of December 31, 2025, we had 21,354 miners owned or operating (in Iceland) for bitcoin mining with a total maximum hash rate of 2.8 EH/s.
Bitcoin Production
From the inception of our bitcoin mining business in February 2020 to December 31, 2025, we earned an aggregate of 7,550.8 bitcoins.
The following table presents our bitcoin mining activities for the year ended December 31, 2025:
| Number of bitcoins | Amount (1) | |
|---|---|---|
| Balance at December 31, 2024 | 741.9 | $69,319,731 |
| Receipt of BTC from mining services | 270.7 | 27,349,798 |
| Exchange of BTC into ETH | (347.7) | (37,199,886) |
| Exchange of BTC into USDC | (25.0) | (2,321,750) |
| Sales of and payments made in BTC | (635.9) | (59,295,475) |
| Change in fair value of BTC | - | 2,497,608 |
| Balance at December 31, 2025 | 4.0 | $350,026 |
| 1 | Receipt of digital assets from mining services are the product of the number of bitcoins received multiplied by the bitcoin price obtained from Coinbase, calculated on a daily basis. Sales of bitcoin represent the carrying value of bitcoin at the time of sale. |
We believe that the bitcoin network and the mining that powers it are important inventions in human progress. The process of problem-solving and verifying bitcoin transactions using advanced computers is energy intensive, and scrutiny has been applied to the industry for this reason. It follows that the environmental costs of mining bitcoin should be surveyed and mitigated by every company in our sector. We aim to contribute to the acceleration of bitcoin’s decarbonization and act as a role model in our industry, responsibly stewarding digital assets.
We worked with Apex Group Ltd, an independent ESG consultancy, to become one the first publicly-listed bitcoin miners to receive an independent ESG rating on our operations, which provides transparency on the environmental sustainability of our operations, as well as other metrics. Apex’s ESG Ratings & Advisory tools allow us to benchmark our ESG performance against international standards and our peers to identify opportunities for improvement and progress over time. We believe this is an integral approach to our sustainability practices and mitigating our environmental impact. By measuring the sustainability and footprint of Bit Digital’s mining, we are able to develop targets to continuously improve as we shift towards our goal of 100% clean energy usage.
Business Profile and Risks
The decision to pursue blockchain and crypto asset businesses exposes BTBT to risks associated with an untested strategic direction. The prices of crypto assets have experienced substantial volatility, which may reflect “bubble” type volatility, meaning that high or low prices may have little or no merit, are subject to rapidly changing investor sentiment, and may be influenced by factors such as technology, regulatory void or changes, fraudulent actors, manipulation, and media reporting.
Government Oversight
Blockchain networks are a relatively new technological innovation and the regulatory schemes to which crypto assets and their blockchain networks are or may be subject, including both the interpretation and applicability of existing laws and regulations and the potential establishment of new laws and regulations, have not been fully explored or developed.
Actions taken by the SEC, including enforcement actions brought against crypto asset companies with a focus on custodial staking, are more particularly described under certain “Risk Factors”, demonstrate the SEC’s historical position that many, if not most, crypto assets may be securities and therefore reflect the reality that we will likely face increased government regulation and oversight as our industry and government treatment of the crypto assets on which our operations are based continue to evolve. These developments follow the SEC’s July 25, 2017, DAO Report, wherein its Chairman expressed concerns about the “Wild West” nature of the cryptocurrency market. More recently, the SEC Enforcement Division has taken action against crypto asset focused enterprises, and if the interpretations of federal securities laws are further expanded to apply to the Company, it would adversely affect the Company’s future acquisition of crypto assets by limiting the amount of crypto asset securities (“Digital Securities”) it may acquire, potentially limiting or precluding the use of its blockchain infrastructure and other operations, and creating increased compliance and legal costs. In October 2020 the U.S. Department of Justice (“DOJ”) published a report entitled “Cryptocurrency: An Enforcement Framework” that detailed the DOJ’s strategies and abilities to handle the threats posed by digital assets. In January 2023, the House of Representatives created the Financial Services Subcommittee on Digital Assets with the goal to develop rules and policies covering digital assets. In addition, each state has its own securities laws and regulations with varying provisions and effects, any of which may require us to alter or reduce our current or planned operations in the future.
On January 23, 2025, President Trump issued Executive Order14178 “Strengthening American Leadership in Digital Financial Technology.” This order revoked previous Biden-era frameworks and established five core policy pillars: protecting self-custody and mining, promoting dollar-backed stablecoins, ensuring fair banking access for crypto firms, providing regulatory clarity, and explicitly prohibiting the creation of a Central Bank Digital Currency (CBDC). In addition, the Guiding and Establishing National Innovation for U.S. Stablecoins of 2025 (the GENIUS Act) was signed into law on July 18, 2025, creating the first comprehensive federal framework for payment stablecoins. The US Senate is also presently considering the Digital Asset Market Clarity Act (the CLARITY Act). This legislation aims to define jurisdictional boundaries between the SEC and CFTC, potentially reclassifying many digital assets from securities to commodities based on network decentralization.
Under the leadership of SEC Chairman Paul Atkins and CFTC Chairman Michael Selig, the agencies launched “Project Crypto” in late 2025. This joint initiative aims to harmonize federal oversight, moving away from “regulation by enforcement.” Consequently, in 2025, the SEC dropped or froze approximately 89 high-profile cryptocurrency enforcement cases, signaling a reset in how the agency polices the market. In addition, in 2026, the SEC is expected to release a formal “token taxonomy” and a package of exemptions to streamline capital formation for digital asset issuers. We continue to monitor legislative matters related to our industry.
Because of the foregoing or other regulatory developments, in the future, before we acquire or transact in crypto assets, we may be required to examine how they were originally offered to determine if they were offered as an investment contract or other type of security. Because of legal uncertainties, careful examination of the results of our compliance review will be required by experienced securities counsel. Because we must stay under the requirement under Investment Company Act of 1940 (the “1940 Act”) that no more than 40% of our assets (excluding cash items) constitute investment securities to avoid being deemed an investment company, we will limit the amount of Digital Securities we acquire. Further, while we believe our operations and platform are meaningfully different than Kraken’s and Coinbase’s custodial staking platforms that were subject to SEC enforcement proceedings in 2023, that development or future positions the SEC may take, including potentially against us and our business, may demonstrate a differing view and require us to adjust, reduce, limit or even cease some or all of our operations or business plans. If our compliance procedures and legal reviews prove to be incorrect, we may incur the likelihood of prohibitive SEC penalties and/or private lawsuit defense costs and adverse rulings.
The Company may acquire additional crypto assets and continues to develop and expand upon its platform to enable it to offer a wider range of functions and availability for use with a greater variety of crypto assets. The Company currently owns and plans to expand its crypto asset holdings, both through staking its existing crypto asset holdings on PoS blockchain networks and potentially through other means. To avoid being inadvertently classified as an investment company under the 1940 Act, we actively focus, in consultation with legal counsel, on ensuring that our ownership of assets that are not considered securities under the 1940 Act always exceed 60% of our total assets, excluding cash items. In separate SEC complaints, the SEC identified Cardano, Tezos, Solana, Cosmos, Polygon, Axie Infinity, and NEAR Protocol crypto assets as securities. As a matter of practice, the Company typically targets keeping in excess of 60% of the Company’s total assets (excluding cash and government securities) in Ethereum. Therefore, to the extent the SEC identified all other crypto assets held by the Company excluding Ethereum as securities, the Company would still not meet the definition of an “investment company” under Section 3(a)(1)(C) of the 1940 Act. By doing so, we can avoid being subject to the regulatory requirements and oversight that apply to investment companies.
The Company has conducted a detailed legal analysis which has led us to determine that certain crypto assets that are identified as securities by the SEC should not impact our business, financial condition, and results of operations. Provided, however, if over 40% of our assets are considered securities, excluding cash, we may be considered a 1940 Act company (see the risk factor on page 25 herein). Further, the aforementioned assessments are risk-based judgments and not a legal standard or determination binding on any regulatory body or court. To the extent a regulatory body or court finds that our conclusions are incorrect, we may seek to cease certain of our operations. Any such action may adversely affect an investment in us.
In addition to the securities laws and investment company considerations, as our business model and operations continue to evolve, we may become subject to additional laws and regulations. For example, to the extent we collect, analyze, distribute, or otherwise use data concerning individuals or entities and their holdings and transactions, we may become subject to the ever-growing number of data privacy and security laws within and without the U.S. which often have far-reaching implications for businesses. In general these laws require disclosure and preventative measures designed to protect users from unauthorized access or disclosure of their personal information, and impose fines and sanctions for failure to comply with their requirements. On the other hand, because transactions in crypto assets often provide a reasonable degree of anonymity, they are susceptible to misuse for criminal activities, such as money laundering. This misuse, or the perception of such misuse (even if untrue), could lead to greater regulatory oversight of crypto platforms and operations such as ours, and there is the possibility that regulators could close crypto platforms or other crypto asset-related technology and infrastructure with little or no notice or opportunity for challenge, and prevent users of custodial platforms from accessing or retrieving crypto assets held on or connected to such platforms or infrastructure. For example, lawmakers and regulators have in recent years expressed views that government oversight is needed, including with a view to curtailing the use of crypto asset use for malign and illegal activities.
Many PoW crypto assets have also been subject to skepticism due to concerns about the high energy consumption used in mining on blockchain networks. In the U.S., in March 2022 President Biden issued Executive Order 14067 on Ensuring the Responsible Development of Digital Assets, which prioritized the responsible development of crypto assets in a manner which includes reducing negative climate impacts and environmental pollution. However, as noted above, President Trump issued a new Executive Order 14178 on Strengthening American Leadership in Digital Financial Technology, expressly revoking Executive Order 14067. In November 2022, the Governor of New York signed a law banning certain bitcoin mining operations that run on carbon-based power sources for two years. While our focus is currently on PoS blockchain networks which use significantly lower amounts of energy when compared to PoW, future regulations may arise in response to these concerns that could apply to us and the cryptocurrency industry as a whole.
On the basis of the afore-mentioned developments, we believe that both our current and planned operations, and the cryptocurrency industry in general, will continue to be subject to expanding, complex and uncertain government oversight. See “Risk Factors” beginning on page 25 for more information.
As both the regulatory landscape develops and journalistic familiarity with crypto assets increases, mainstream media’s understanding of them and the regulation thereof may improve. Regulation of crypto assets varies from country to country as well as within countries. An increase in the regulation of crypto assets may affect our proposed business by increasing compliance costs or prohibiting certain or all of our proposed activities.
Competition
Our current and future competition is centered on the following areas:
| ● | Exchange-Based Companies: Companies in the exchange industry that offer both custodial and non-custodial staking solutions as well as other blockchain infrastructure and data analytics pose a significant competitive challenge. These exchanges often boast substantial customer bases, making it easier for them to attract those looking for integrated staking services, portfolio tracking, and position them well to enter blockchain infrastructure operations. Additionally, they may possess greater resources, allowing them to enhance their custodial or non-custodial staking offerings and other offerings in the future. |
| ● | Crypto Asset-Focused Companies and Node Operators: Numerous companies and node operators specializing in crypto assets compete with our non-custodial crypto asset staking services and validator node operation. Key competitors in this space include companies such as Blockdaemon, Allnodes, Everstake, Figment, P2P, Foundry, Stakin, and Stakefish. |
| ● | Analytic Services Providers: Various mobile applications, websites, and niche aggregation sites, such as CoinTracker, Koinly, CoinLedger, and Rotki, offer similar analytic services. These competitors provide tools and insights that may overlap with StakeSeeker’s offerings. |
| ● | Secure Storage Solution Providers: Providers of mobile applications and websites that offer secure storage solutions for crypto assets represent another category of competition. |
| ● | Traditional Financial Service and Data Analytics Firms: Established financial service firms and data analytics companies serving traditional asset markets may choose to enter the market by offering data analytic solutions as well as their own custodial or non-custodial staking for crypto assets. These entities can leverage their extensive resources, market presence, and expertise to enter the market. |
| ● | Cryptocurrency-Focused Companies: Companies specializing in cryptocurrency-related services, including exchanges, payment processing, and financial services, are formidable competitors in the crypto asset space. |
| ● | On-Chain Blockchain Data Providers: Companies offering data analytics and insights services, with accessible on-chain blockchain data and user-friendly interfaces, like Chainalysis and Elliptic, pose competition in providing vital data and insights for crypto assets. |
Many of our current and potential competitors enjoy advantages such as greater financial resources, longer operational histories, larger user bases, bigger teams, and stronger brand recognition. Most are also not burdened with the additional costs and time commitments required of being an exchange-listed public company. These competitors may allocate more substantial resources to technology development, infrastructure enhancement, and marketing efforts.
In addition to existing competitors, the Company must contend with the potential of new entrants to the industry and the possibility of industry consolidation through business combinations and alliances, which could further strengthen the competitive positions of our rivals. Given our small team and relative lack of capital to many peers, we acknowledge that we face a competitive disadvantage in this landscape.
Intellectual Property and Trade Secrets
Our business depends in large part on our proprietary technology, the operation of validator nodes as part of our blockchain infrastructure, our efforts and development with respect to our initiatives, and our brand. We rely on, and expect to continue to rely on, a combination of trademark, domain name, and trade secret laws, as well as confidentiality and license agreements with our employees, contractors, consultants, and third parties with whom we have relationships, to establish and protect our brand and intellectual property rights.
Environmental, Social and Governance
Sustainability is a major strategic focus for us. Several of our mining locations provide access to partially carbon-free energy and other sustainability-related solutions, in varying amounts depending on location, including components of hydroelectric, solar, wind, nuclear and other carbon-free generation sources, based on information provided by our hosts and publicly available data, which we believe helps mitigate the environmental impact of our operations. We work with an independent ESG (Environmental, Social and Governance) consultant to self-monitor and adopt an environmental policy to help us to improve our percentage of green electricity and other sustainability initiatives. As we continue to align ourselves with the future of technology and business, we are dedicated to continuously enhancing sustainability, which we believe future-proofs our operations and the larger bitcoin network. On December 7, 2021, the Company became a member of the Bitcoin Mining Council (“BMC”), joining MicroStrategy and other founding members to promote transparency, share best practices, and educate the public on the benefits of bitcoin and bitcoin mining
WhiteFiber Operations
WhiteFiber believes it is a leading provider of artificial intelligence (“AI”) infrastructure solutions. WhiteFiber owns high-performance computing (“HPC”) data centers and provides cloud-based HPC graphics processing units (“GPU”) services, which it terms cloud services, for customers such as AI application and machine learning (“ML”) developers (the “HPC Business”). Its Tier-3 data centers provide hosting and colocation services. WhiteFiber cloud services support generative AI workstreams, especially training and inference.
WhiteFiber’s business model integrates its data center infrastructure and cloud services to provide scalable, high-performance computing solutions for enterprises, research institutions, and AI and ML driven businesses. Its integrated approach aligns specialized data center operations with GPU-focused cloud services, addressing the unique requirements of AI and ML workloads. These workloads demand greater power density, advanced cooling solutions, and robust bandwidth to handle large-scale data transfers. By operating its data centers, it is able to provide the power to support its cloud services and WhiteFiber believes it can better meet the needs of AI and ML workloads and reduce the complexity associated with procuring power and connectivity from external vendors. WhiteFiber can also design its facilities to accommodate the higher heat loads generated by modern GPUs, potentially shortening deployment timelines for customers who require rapid expansion of their computing infrastructure. From a financial standpoint, WhiteFiber’s vertically integrated solution allows it to capture additional margin for both its data center and cloud services businesses, avoiding expenses that would otherwise be due to third-party providers.
Colocation/Data center services
WhiteFiber designs, develops, and operates data centers, through which it offers its hosting and colocation services. WhiteFiber’s operational data centers meet the requirements of the Tier-3 standard, including N+1 redundancy architecture, concurrent maintainability, uninterruptible power supply, advanced and highly reliable cooling systems, strict monitoring and management systems, 99.982% uptime and no more than 1.6 hours of downtime annually, service organization control, SOC 2 Type 2, differentiated software supporting AI workloads, high density and robust bandwidth, and infrastructure to support AI workloads.
Based on their collective industry experience, WhiteFiber’s data center team is adept at bringing new sites online on an accelerated timeline. WhiteFiber is aggressively pursuing its development pipeline and intends to achieve an estimated 76 MW (gross) of total data center capacity by the end of the fourth quarter of 2026, a target that is underpinned by assets including its MTL-2, MTL-3, and NC-1 facilities. As of December 31, 2025, its pipeline of potential data center projects represents approximately 1,500 MW (gross) under management review. WhiteFiber follows a disciplined process prioritizing projects that are backed by customer lease commitments. In select cases, WhiteFiber may pursue early-stage acquisitions based on strong customer demand signals and defined commercialization pathways. Accordingly, the foregoing timelines and capacities are subject to change based on many factors, many of which are outside of WhiteFiber’s control.
WhiteFiber uses a well-defined set of criteria to select its data center sites. WhiteFiber typically targets sites with proximity to metro areas and partial infrastructure in place, where it is retrofitting rather than developing greenfield projects. Metropolitan areas are positioned for low-latency to address long-term, specialized AI computer inference needs, and smaller sites reduce risks. A retrofit entails sourcing and acquiring an existing industrial building with underutilized, in-place power connectivity. The period of time from when a site is purchased until construction can begin varies from location to location depending upon, among other things, obtaining required permits and the availability of construction supplies and contractors. Average build time for retrofits is intended to be approximately six months from commencement of construction, which we believe is approximately one-third to one-half of the industry average development timeline for greenfield projects. This average building time is based upon senior management’s experience at Enovum prior to its acquisition by WhiteFiber, as well as their experience prior to Enovum. WhiteFiber also prioritizes sites offering opportunities to increase site power over time, enabling its data centers to grow with customer demand. In addition, WhiteFiber selectively targets certain larger opportunities with 50 MW (gross) of power or more, subject to customer demand, to drive AI-driven compute super-clusters. Finally, WhiteFiber prioritizes sites powered by sustainable, green energy sources and locked-in power when available. Additionally, to enhance sustainability of certain WhiteFiber data center projects, WhiteFiber is undertaking heat repurposing projects in connection with sustainability and commercial and residential projects.
On October 11, 2024, WhiteFiber acquired Enovum Data Centers Corp (“Enovum”). The transaction included the lease of MTL-1, our 4 MW (gross) Tier-3 high-performance computing (“HPC”) data center in Montreal, Canada, which was fully operational and fully leased to customers at the time of acquisition.
On December 27, 2024, WhiteFiber acquired the real estate and building for a build-to-suit 5 MW (gross) Tier-3 data center expansion project near Montreal, Canada, which it refers to as “MTL-2”. MTL-2, a 160,000 square foot site that was previously used as an encapsulation manufacturing facility, is located in Pointe-Claire, Quebec. WhiteFiber initially funded the purchase of CAD 33.5 million (approximately $23.3 million) with cash on hand. WhiteFiber expected to invest approximately $23.6 million to develop the site to Tier-3 standards with an initial load of 5 MW (gross). However, WhiteFiber has prioritized other builds and preserved capital for more time sensitive projects.
On April 11, 2025, WhiteFiber entered into a lease for a new data center site in Saint-Jerome, Quebec, a suburb of Montreal, which it refers to as “MTL-3”. The MTL-3 facility spans approximately 202,000 square feet on 7.7 acres and is being developed to as a 7 MW (gross) Tier-3 data center. It will support current contracted capacity, with Cerebras (5 MW IT Load), with future expansion potential subject to utility approvals. The transaction was executed under a lease-to-own structure, which includes a fixed-price purchase option of CAD 24.2 million (approximately $17.3 million) exercisable by December 2025. The lease term is 20 years, with two 5-year extensions at WhiteFiber’s option. In December 2025, WhiteFiber became reasonably certain to exercise the purchase option and notified the lessor of its intent to exercise the purchase option. WhiteFiber had 90 days to complete the purchase, after which the purchase option would expire. The option was exercised on January 14, 2026 and the purchase of MTL-3 is expected to close during the second quarter of 2026. The facility has been retrofitted to Tier-3 standards and was completed and operational in November 2025. The site has commenced billing Cerebras as of November 1, 2025, in the amount of CAD 1.4 million (approximately 979 thousand USD) monthly for the duration of the five-year contract.
On May 20, 2025, WhiteFiber completed the purchase of a former industrial/manufacturing building from Unifi Manufacturing, Inc. (“UMI”). Pursuant to the Purchase Agreement WhiteFiber agreed to purchase from UMI, an industrial/manufacturing building together with the underlying land located in Madison, North Carolina, which WhiteFiber refers to as “NC-1”, as well as certain machinery and equipment located thereon for a cash purchase price of $45 million. The purchase price will increase by (i) $8 million, if Duke Energy actually provides, or provides an Electric Services Agreement providing for, at least 99 MW (gross) within two years of May 20, 2025, or (ii) $5 million, if Duke Energy actually provides, or provides an Electric Services Agreement providing for, at least 99 MW (gross) more than two years but less than three years after May 20, 2025. Additionally, the purchase price will increase by an additional $200,000 per MW over 99 MW (gross) up to a maximum of $5 million if at least 99 MW (gross) are actually delivered, or Duke Energy provides an Electric Services Agreement for the provision of at least 99 MW (gross), within four years of May 20, 2025. Separately, WhiteFiber entered into a Capacity Agreement with Duke Energy pursuant to which Duke Energy agreed to use commercially reasonable efforts to achieve 24 MW (gross) of service to NC-1 by September 1, 2025, 40 MW (gross) by April 1, 2026, and 99 MW (gross) within four years of May 16, 2025. Management believes based upon its review of the site and a Duke Energy preliminary transmission study, that NC-1 may receive and support up to 200 MW (gross) of total electrical supply over an extended period of time, subject to infrastructure upgrades, such as developing new substations and other conditions. On August 4, 2025, Enovum NC-1 Bidco, LLC, a subsidiary of WhiteFiber, entered into an Assignment and Assumption Agreement with Unifi Manufacturing and Duke Energy Carolinas, LLC, pursuant to which Enovum assumed Unifi’s rights and obligations under certain electric service agreements for facilities located in North Carolina. Duke Energy consented to the assignment. Refer to Note 21.Commitments and contingencies for further detail.
RBC Facility Agreement Executed on June 18, 2025
On June 18, 2025, WhiteFiber entered into the Credit Facility with RBC. The Credit Facility provides for an aggregate of up to approximately CAD 60 million (approximately $43.8 million) of financing. The proceeds are to be used primarily to refinance the buildout of MTL-2 as well as $5.8 million of revolving term financing (the “Revolver”). The Credit Facility is non-recourse to the Company. WhiteFiber entered into a three-year USD $18.5 million non-revolving lease facility to finance equipment costs and building improvements to build out the site. The lease facility provides for straight-line amortization of six years and capital moratorium of six months after disbursement is complete. RBC may cancel any unutilized portion of the Credit Facility after March 31, 2026. The interest rate is fixed based on the rental rate determined by RBC for the three-year term of the lease.
As part of the Credit Facility, WhiteFiber entered into a three-year $19.6 million non-revolving real estate term loan facility. The purpose of this facility is to refinance the Company’s purchase of MTL-2. The interest rate of the real estate term loan facility will be determined at the time of borrowing, or a floating interest rate ranging from RBP plus 0.75% to CORRA (“Canadian Overnight Repo Rate Average”) plus 250 bps. Payment of principal and interest is due 30 days after drawdown and is repayable in full on the last day of the three-year term.
The Revolver is being provided by RBC by way of Letters of Credit and Letters of Guaranty with fees to be determined on a transaction by transaction basis. This facility will be available for the 36 month term subject to the issuance of the EDC (Export and Development Canada) Performance Security Guaranty in the amount of $5.8 million and other related supporting documents. WhiteFiber agreed to certain financial covenants included maintaining on a combined basis between MTL-1 and MTL-2: fixed charge coverage of not less than 1.20:1 and a ratio of Net Funded Debt to EBITDA of not greater than 4.25:1 and decreasing to 3.50:1 from December 31, 2027.
In November 2025, our wholly owned subsidiary, Enovum NC-1 Bidco, LLC, entered into the Services Agreement with Nscale Services US Inc. and Nscale Global Holdings Limited (collectively, “Nscale”) for the provision of colocation and related services at our NC-1 facility. The agreement represents a significant commercial milestone for our high-density data center platform and provides long-term contracted revenue visibility. The initial Service Order pursuant to the Services Agreement represents approximately $865 million in total contracted revenue over a 10-year term, inclusive of contractual annual rate escalators and non-recurring installation services (“NRCs”). Electricity and certain other operating costs are structured as pass-through charges to Nscale. Billing for the first 20 MW phase is expected to commence in June 2026, subject to completion of construction and commissioning. As a result, we expect revenue contribution from this agreement to begin in the second quarter of 2026 as the facility reaches full contractual capacity.
WhiteFiber provides specialized cloud services to support generative AI workstreams, especially training and inference, emphasizing cost-effective utility and tailor-made solutions for each client. WhiteFiber is an authorized NVIDIA Preferred Partner through the NVIDIA Partner Network (“NPN”), an authorized partner with SuperMicro Computer Inc.®, an authorized Communications Service Provider (“CSP”) with Dell (through Dell’s exclusive distributor in Iceland, Advania), an official partnership with Hewlett Packard Enterprise and a commercial relationship with Quanta Computer Inc. (“QCT”). Based on management’s knowledge of the industry, WhiteFiber is proud to be among the first service providers to offer H200, B200, and GB200 servers. We provide a high-standard service lease with an Uptime percentage > 99.5%.
WhiteFiber expects to leverage a global network of data centers for hosting capacity for its GPU business, in many instances, by negotiating with third-party providers to seamlessly integrate its cloud services at data centers across key regions in Europe, North America and Asia. WhiteFiber’s initial data center partnership through which it leases capacity is at Blönduós Campus, Iceland, offering a world-class operations team with certified technicians and reliable engineers. The facility has a 45 kW rack density and 6 MW (gross) total capacity. WhiteFiber has executed contracts for 5.5 MW IT load at the data center. The center’s energy source is 100% renewable energy, mainly from Blanda Hydro PowerStation, the winner of an IHA Blue Planet Award in 2017. In addition, WhiteFiber have leased additional capacity to install our data center in Atlanta, Georgia, USA to expand our cloud services offering. The capacity leases commenced in February 2026. We also intend to lease additional capacity to expand our cloud services offering.
In April 2025, WhiteFiber received its first shipment of NVIDIA GB200 NVL72 GPU server powered NVIDIA GB200 Grace Blackwell Superchips from Quanta Cloud Technology, a global leading Original Design Manufacturer (ODM). WhiteFiber believes that support with proof of concept (POC) access from Quanta will enable it to meet and exceed expectations around delivery and timeline, performance and reliability.
The following summaries reflect selected GPU cloud service agreements that we consider to be material or representative. We have entered into additional agreements that are not individually material and are not included below.
On October 23, 2023, Bit Digital announced that it had commenced AI operations by signing a binding term sheet with a customer (the “Initial Customer”) to support the customer’s GPU workloads. On December 12, 2023, we finalized a Master Services and Lease Agreement (“MSA”), as amended, with our Initial Customer for the provision of cloud services from a total of 2,048 GPUs over a three-year period. To finance this operation, we entered into a sale-leaseback agreement with a third party, selling 96 AI servers (equivalent to 768 GPUs) and leasing them back for three years. The total contract value with the Initial Customer for the aggregated 2,048 GPUs was estimated to be worth more than $50 million of annualized revenue. On January 22, 2024, approximately 192 servers (equivalent to 1,536 GPUs) were deployed at a specialized data center and began generating revenue, and subsequently on February 2, 2024, approximately an additional 64 servers (equivalent to 512 GPUs) also started to generate revenue.
In the second quarter of 2024, we finalized an agreement to supply our Initial Customer with an additional 2,048 GPUs over a three-year period. To finance this operation, we entered into a sale-leaseback agreement with a third party, agreeing to sell 128 AI servers (equivalent to 1,024 GPUs) and leasing them back for three years. In late July, at the customer’s request, we agreed with the customer to temporarily delay the purchase order so the customer could evaluate an upgrade to newer generation Nvidia GPUs. Consequently, the Company and manufacturer postponed the purchase order. In early August, the customer made a non-refundable prepayment of $30.0 million for the services to be rendered under this agreement.
In January 2025, the Company entered into a new agreement to supply its Initial Customer with an additional 464 GPUs for a period of 18 months. This new agreement replaces the prior agreement whereby the Company was to provide the customer with an incremental 2,048 H100 GPUs. The contract represents approximately $15 million of annualized revenue and features a two-month prepayment from the customer. The customer elected to defer the commencement date until August 20, 2025, which is the latest allowable date under the agreement. Deployment commenced on August 20, 2025, using the Company’s inventory of B200 GPUs.
In October 2025, Bit Digital’s existing guaranty arrangement with the Initial Customer was scheduled to expire. Beginning in November 2025, the customer will provide a service deposit to WhiteFiber in lieu of the Bit Digital parent guaranty. The deposit will be funded through fifteen consecutive monthly payments of approximately $0.24 million each, totaling $3.6 million, payable from November 2025 through January 2027. The deposit will serve as security for the customer’s performance obligations under the amended service agreements. Each monthly payment is expected to be invoiced on the first day of the month and paid within thirty days. The Company will be required to return the deposit in cash upon termination or expiration of the service agreements, provided that all obligations have been fully satisfied and no payment defaults or material breaches exist.
As of the report date, WHiteFiber and the Initial Customer are engaged in discussions regarding a potential resolution of the existing service agreements following the agreed pause of services. No definitive termination or settlement agreement has been executed. In connection with these discussions, the parties are negotiating the treatment of the remaining non-refundable prepayment, service deposit, outstanding receivables, and a potential early termination fee, which the Company believes would be equal to 40% of the fees that would have accrued for services during the remainder of the term of the MSA and applicable purchase orders. Following the service pause, WhiteFiber has redeployed the GPUs previously allocated to the Initial Customer to three other customers and continues to evaluate the related financial and operational implications. There can be no assurance as to the timing, terms, or final outcome of these discussions.
On November 6, 2024, we entered into a Master Services Agreement (“MSA”) with a minimum purchase commitment of 16 GPUs, along with an associated purchase order, from a new customer. The purchase order provides for services utilizing a total of 16 H200 GPUs over a minimum of a six-month period, representing total contracted value of approximately $160,000 for the term. The deployment commenced on November 7, 2024, using the Company’s existing inventory of H200 GPUs. The service under the purchase order concluded in May 2025. Between May 2025 and September 2025, the Company signed six additional agreements on a month-to-month basis for a total of 88 H200 GPUs, of which 80 remained in deployment as of the date of this report.
In February 2026, WhiteFiber entered into another service order with the customer to provide services utilizing a total of 10 H200 GPU servers. The service order has an initial term of 14 months beginning on the services commencement date. The service order represents an aggregate revenue opportunity of approximately $1.3 million. The deployment and revenue generation began in March 2026.
In March 2026, WhiteFiber entered into another service order with the customer to provide services utilizing a total of 256 H100 GPU servers. The service order has an initial term of 24 months beginning on the services commencement date, with an option to renew for an additional twelve months. The service order represents an aggregate revenue opportunity of approximately $50.2 million. The deployment and revenue generation is expected to begin during the second quarter of 2026.
On November 14, 2024, we entered into a Terms of Supply and Service Level Agreement (together, the “Agreement”) and an Order Form with a new customer. The order form provides for services utilizing a total of 64 H200 GPUs on a month-to-month basis, which either party may terminate upon at least 14 days’ written notice prior to any renewal date. It represents annual revenue of approximately $1.2 million. The deployment commenced and revenue generation began on November 15, 2024, using the Company’s existing inventory of H200 GPUs. The service under the purchase order concluded in December 2024.
On December 30, 2024, we entered into a Master Services Agreement (“MSA”) with an AI Compute Fund managed by DNA Holdings Venture Inc. (“DNA Fund”). The MSA had a minimum purchase commitment of 32 GPUs, along with an associated purchase order. The purchase order provides for services utilizing a total of 576 H200 GPUs over a 25-month period and terminable by either party upon at least 90 days’ written notice prior to any renewal date. Concurrently, we placed a purchase order for 130 H200 servers for approximately $30 million. The deployment commenced in February 2025.
In April 2025, we signed two additional cloud services agreements with DNA Fund. The first agreement includes 104 NVIDIA H200 GPUs under a 23-month term and was deployed in May 2025. The second agreement includes 512 H200 GPUs under a 24-month term and was deployed in July 2025. With these additions, DNA Fund’s total contracted deployment increased to 1,192 GPUs.
In November 2025, we terminated the MSA and all related purchase orders with DNA Fund in accordance with the terms of the contract. At the time of termination, we had approximately $7.3 million in outstanding accounts receivable. Pursuant to the termination agreement, the customer agreed to repay the outstanding balance. As of the date of this report, we have collected $2.1 million of the outstanding amount.
On January 6, 2025, we entered into a Master Services Agreement (“MSA”) with a minimum purchase commitment of 32 GPUs, along with an associated purchase order, from a new customer. The purchase order provided for services utilizing a total of 32 H200 GPUs over a minimum of six-month period, representing total revenue of approximately $300,000 for the term. The deployment commenced and revenue generation began on January 8, 2025, using the Company’s existing inventory of H200 GPUs. The service under the purchase order concluded in April 2025 following a change in the customer’s ownership, and the customer paid the remaining contract value as an early termination penalty.
In January 2025, we entered into a Master Services Agreement (“MSA”), along with two associated purchase orders, from a new customer. The purchase orders provide for services utilizing a total of 24 H200 GPUs over a minimum 12-month period, representing total revenue of approximately $450,000 for the term. The deployment commenced and revenue generation began on January 27, 2025, using the Company’s existing inventory of H200 GPUs. The service under the purchase order concluded in March 2025 after the customer ceased operations.
On January 30, 2025, we entered into a Master Services Agreement (“MSA”) with a minimum purchase commitment of 40 GPUs, along with an associated purchase order, from a new customer. The purchase orders provide for services utilizing a total of 40 H200 GPUs over a minimum of 12 month period, representing total revenue of approximately $750,000 for the term. The deployment commenced and revenue generation began on January 24, 2025, using the Company’s existing inventory of H200 GPUs. In October 2025, the purchase order was amended to reduce the number of H200 GPUs from 40 to 8 and to extend the term of service through May 2027. Between April and July 2025, the Company signed four additional agreements on a month-to-month basis for a total of 184 H200 GPUs, which were terminated in August 2025.
In March 2025, we entered a strategic partnership with Shadeform, Inc., the premier multi-cloud GPU marketplaces, to bring on-demand NVIDIA B200 GPUs to customers beginning in May 2025.
In August and September 2025, WhiteFiber entered into three service orders with a new customer. Each order form provides for services utilizing a total of 64 B200 GPUs on a weekly basis, which either party may terminate by not extending it with mutual written agreement. In September, the customer renewed one order form for an additional week for services utilizing a total of 64 B200 GPUs. As of the reporting date, no additional renewals have occurred.
In September 2025, WhiteFiber entered into a service order with a new customer, which provides services utilizing a total of 16 B200 GPUs on a monthly basis, automatically renewing for an additional one month period unless and until otherwise terminated upon at least seven days’ prior written notice. The deployment commenced and revenue generation began on September 23, 2025. The agreement was not renewed after the initial term.
In October 2025, WhiteFiber entered into a service order with a new customer to provide services utilizing a total of 48 H200 GPUs. The service order had an initial term of 36 months. The deployment commenced and revenue generation began on October 21, 2025. The contract was terminated in December 2025.
In October 2025, WhiteFiber entered into a two-week service order with a new customer to provide services utilizing a total of 72 B200 GPUs. In January 2026, WhiteFiber entered into an additional two-week service order with this customer for 72 B200 GPUs.
In February 2026, WhiteFiber entered into a further service order with this customer to provide services utilizing a total of 384 B200 GPUs. This service order has an initial term of 24 months commencing on the service commencement date, after which it will automatically renew for successive one-month periods unless terminated by either party. The service order represents an aggregate revenue opportunity of approximately $18.1 million. Deployment and revenue generation commenced on January 27, 2026.
In November 2025, WhiteFiber entered into a service order with a new customer to provide services utilizing a total of 128 B200 GPUs. The service order has an initial term of 12 months, representing total contracted value of approximately $3.0 million, after which it automatically renews for successive one-month periods unless terminated by either party. Deployment and revenue generation began on December 1, 2025.
In February 2026, WhiteFiber entered into a service order with a new customer to provide services utilizing a total of 256 GPUs. The service order has an initial term of 12 months beginning on the services commencement date, after which it automatically renews for successive one-month periods unless terminated by either party. The deployment and revenue generation began on February 1, 2026.
In March 2026, WhiteFiber entered into a service order with a new customer to provide services utilizing a total of 72 GB200 GPUs. The service order has an initial term of 12 months beginning on the services commencement date, after which it automatically renews for successive one-month periods unless terminated by either party. The deployment and revenue generation began on March 7, 2026.
In August 2024, WhiteFiber executed a binding term sheet with Boosteroid Inc. (“Boosteroid”), a global cloud gaming provider pursuant to which, we finalized initial orders of 489 GPUs, projected to generate approximately $7.9 million in contracted value in the aggregate through November 2029. The GPUs were delivered to respective data centers across the U.S. and Europe and began earning fees in November 2024. On October 9, 2024, WhiteFiber executed a Master Services and Lease Agreement (the “MSA”) with Boosteroid, pursuant to which Boosteroid may, from time to time, lease certain equipment, including GPUs, from WhiteFiber upon delivery of a purchase order. The MSA provides the general terms and conditions for such equipment leases. Pursuant to the MSA, we are granted a right of first refusal with respect to the next 5,000 servers that Boosteroid leases during the term of the MSA. The MSA provides Boosteroid with the option to expand in increments of 100 servers, up to 50,000 servers, representing a potential contract value of approximately $700 million over the five-year term assuming Boosteroid utilizes the GPUs and services at full capacity for the duration of the contract. Expansion depends upon the internal development roadmap of Boosteroid. Boosteroid has full discretion to decide when and the quantity to pursue separate source orders (for GPU servers) under the MSA. In the third quarter of 2025, the Company finalized additional purchase orders for 302, 120, and 279 GPUs, totaling approximately $10.4 million in contracted value over a five-year term.
WhiteFiber was incorporated by Bit Digital as a Cayman Islands exempted company on August 15, 2024 under the name Celer, Inc., as a holding company for the HPC Business. It changed its name to WhiteFiber, Inc. on October 17, 2024.
On August 6, 2025, WhiteFiber issued 27,043,749 ordinary shares, par value $0.01 per share (our “Ordinary Shares”, and such shares, the “Contribution Shares”), to Bit Digital pursuant to the terms of a Section 351 Contribution Agreement (the “Contribution Agreement”) entered into with Bit Digital on July 30, 2025. Pursuant to the Contribution Agreement, Bit Digital contributed its HPC Business through the transfer of 100% of the capital shares of its cloud services subsidiary, WhiteFiber AI, Inc. and its wholly-owned subsidiaries WhiteFiber HPC, Inc., WhiteFiber Canada, Inc., WhiteFiber Japan G.K. and WhiteFiber Iceland, ehf, WhiteFiber, upon the effectiveness of the registration statement filed in connection with its IPO and prior to the consummation of the IPO, in exchange for the Contribution Shares. WhiteFiber refers to this transaction as the “Reorganization”. WhiteFiber AI became a wholly-owned subsidiary of WhiteFiber, Inc. and Bit Digital became the direct shareholder of WhiteFiber after the Reorganization.
On August 8, 2025, WhiteFiber completed its initial public offering (our “IPO”) of 9,375,000 Ordinary Shares, at a public offering price of $17.00 per share. The gross proceeds to WhiteFiber from the IPO were approximately $159.4 million, before deducting underwriting discounts and commissions and offering expenses. On September 2, 2025, B. Riley Securities, Inc. and Needham & Company, LLC, as representatives of the several underwriters of the IPO, fully exercised their option to purchase an additional 1,406,250 Ordinary Shares at the public offering price of $17.00 per share, resulting in additional gross proceeds to WhiteFiber of approximately $23.9 million. After giving effect to the IPO and the full exercise by the underwriters of their over-allotment option, Bit Digital held approximately 71.5% of WhiteFiber’s issued and outstanding Ordinary Shares.
Following WhiteFiber’s IPO, certain of its directors, executive officers and other members of senior management continue to serve as directors, officers and employees of Bit Digital. WhiteFiber has added additional executive officers and senior management to its senior executive team apart from those serving as officers and employees of Bit Digital. WhiteFiber has assembled a senior operating team with approximately 15 years of experience on average for each individual in the data center and cloud services industries. WhiteFiber also appointed additional independent directors upon the commencement of trading of its Ordinary Shares on Nasdaq.
Industry Overview
WhiteFiber competes in the large and rapidly growing data center and cloud services markets. The data center market refers to the industry dedicated to designing, building, and managing data centers, essential for storing, processing, and managing vast amounts of digital information, including for AI and ML applications. These centers house servers, networking equipment, power and cooling and storage systems, ensuring seamless and secure data operation.
The cloud services market represents the transmission of computer services, including storage, analytics, databases, networking, and intelligence, via the internet (referred to as “the cloud”). WhiteFiber’s cloud services business is a NeoCloud provider, with differentiated services supporting AI workloads and specializing in deploying optimized infrastructures that include not just GPU fleets but also network accelerators, high-speed storage, software solutions, advanced orchestration tools, high-performance interconnects, edge computing capabilities, innovative cooling solutions, security and compliance features, 24/7 managed services, and hybrid cloud integrations. This infrastructure is essential for managing the massive data and computing demands of AI and ML training and inference tasks.
It is standard for GPU hardware clusters, used in the rendering of cloud services, to be remotely housed in data centers, making these two segments highly related and synergistic. Specially designed data centers host the hardware needed to provide HPC cloud services, and these are commonly referred to as HPC data centers. According to experts at Schneider Electric, the industry is shifting away from traditional data centers that typically hosted 10kW racks to newer 100kW racks that support HPC needs. WhiteFiber only designs and develops HPC data centers, giving us a competitive advantage over operators of traditional data center capacity.
Colocation/Data Center Services
According to McKinsey & Company, power demand for data centers in the U.S. — driven by the need for digital and AI capabilities — is expected to reach 298 gigawatts by 2030, up from 60 gigawatts in 2024. McKinsey estimates that data centers will amount to 11.7% of total U.S. power demand in 2030. Based on WhiteFiber’s knowledge of the industry, it believes it is a leader in the markets that are critical for these capabilities, and, as a result, it believes it is well positioned to benefit from the growth of this sector.
According to Prescient and Strategic Intelligence, Data-Center Market Size and Analysis, Trends, Drivers, Competitive Landscape and Forecast (2024-2030), the global data center market was valued at $342 billion in 2023 and is anticipated to reach $622.4 billion by 2030, expanding at a CAGR of 10.5% during 2024-2030. As of 2023, the data center services segment, which provides a range of offerings including consulting, maintenance, and management to optimize the performance and reliability of data center infrastructure, represented about 34.2% of the industry. The solutions segment, which refers to the technological offerings that fulfill key functions within data center infrastructure, comprised about 65.8% of the industry. The solutions segment represents both hardware and software elements, encompassing servers, storage systems, advanced power systems, infrastructure networking equipment, and management software.
The data center market is propelled by growing demands for cloud computing services, big data analytics, and digital transformation. According to McKinsey & Company, by 2030, 70% of data centers expected to be developed will be for advanced AI, and 92% of companies plan to increase AI investments across the board. Key contributors to this dynamic landscape are technology firms, real estate developers, and service providers. Together, they play a vital role in the ongoing evolution of data center infrastructure, adapting to meet the expanding requirements of the digital era and ensuring the seamless operation of critical digital services across various industries. The increasing global demand for cloud computing, where WhiteFiber competes as a cloud services provider, is a major driver of data centers, underlining the inherent synergies between its businesses.
The global cloud AI infrastructure market is forecasted to grow from $60.5 billion in 2024 to $363.4 billion in 2030, a compound annual growth rate of approximately 35%, according to research published by Mordor Intelligence. The major factors driving cloud services market growth are increasing digital transformation across businesses, growing internet and mobile device adoption across the globe, and, most notably, increasing usage of large data sets. Moreover, cloud services are favored by customers due to low capital investment, resource scalability, and a high degree of accessibility. The rise of the system of connected devices, edge computing, 5G, and real-time analytics driven by AI and ML is anticipated to increase the market value of cloud technology across different businesses.
Sustainability
Sustainability and energy efficiency are increasingly important considerations for the data center and cloud services markets due to high energy consumption and carbon emissions. The sustainability movement for data centers is driven by organizations’ environmental, social and governance commitments and the rise of laws and regulations supporting sustainability. For example, the Paris Accord, which was entered into force on November 4, 2016, is currently in effect across 174 countries apart from the United States and aims to curb long-term global warming. WhiteFiber’s facilities in Quebec and Iceland benefit from clean, hydroelectric power generation, and WhiteFiber will seek to offer comprehensive HPC data center and cloud services solutions while prioritizing sustainability and energy efficiency.
Strategic Relationships
Financing
Based on WhiteFiber’s knowledge of the industry, we believe that there is market demand from institutional private equity investors for exposure to the types of projects in our data center pipeline and our capability to develop them. We believe that we are well positioned to capitalize on this demand by forming one or more equity joint ventures. Doing so would provide us access to a differentiated and non-dilutive source of private equity capital to fund our projects, and deliver a durable stream of cash flows in the form of management fee income for our services.
In June 2025 we entered into the Credit Facility with RBC, which provides for up to a CAD $60 million (approximately USD $43.8 million, based on the CAD/U.S. $ rate of exchange of CAD 1.00/U.S. $0.7308, as reported by Bloomberg on June 18, 2025) RBC and the Company have since entered into discussions to amend the Credit Facility to utilize the proceeds CAD $24.5 million (approximately USD $17.9 million) from the mortgage loan to purchase the MTL-3 facility, however, we cannot assure you that the parties will reach an agreement that is acceptable to the Company or at all. See “Management’s Discussion and Analysis of Financial Condition and Results of Operations – Overview” for more information.
On January 26, 2026, we completed a private offering of $230.0 million aggregate principal amount of 4.500% Convertible Senior Notes due 2031 (the “Notes”), including the exercise in full of the initial purchasers’ option to purchase an additional $20.0 million aggregate principal amount of Notes. We used approximately $120.0 million of the net proceeds from the Notes offering to pay the cost of the zero-strike call option transaction we entered into simultaneously with such option, and the remaining net proceeds of the offering primarily for data center expansion, including to partially fund the lease or purchase of additional property or properties on which to build additional data centers, to construct those facilities, to enter into additional energy service agreements for each additional site, to purchase related equipment, and for potential acquisitions, partnerships and joint ventures related thereto, and for working capital and general corporate purposes. WhiteFiber will require additional project financing (e.g., construction loans) in order to fully accomplish such initiatives. WhiteFiber also may elect to raise additional capital opportunistically.
On March 25, 2026, WhiteFiber Iceland ehf. (the “Borrower”), a subsidiary of WhiteFiber, entered into a secured term loan facility agreement (the “Facility”) with Landsbankinn hf, which provides for borrowings of up to $20 million. Borrowings under the Facility bear interest at a floating rate per annum equal to the sum of (i) three month CME Term SOFR (or any successor benchmark), and (ii) an applicable margin of 4.25% per annum. The Facility is secured by first-ranking security over (i) 100% of the WhiteFiber’s shareholding in WhiteFiber Iceland ehf., (ii) designated assets (including GPU servers, CPU servers, IB switches and equipment accessories) at the date of the agreement, and (iii) material assets acquired thereafter (to be secured within 60 days), in each case until all obligations are fully satisfied.
See “Management’s Discussion and Analysis of Financial Condition and Results of Operations — Liquidity and Capital Resources”.
Technology
WhiteFiber has established formal relationships with leading technology providers, including NVIDIA, Super Micro, Dell, Hewlett Packard Enterprise, Super Micro and Quanta Computing. These partnerships enable WhiteFiber to access and deploy the most advanced computing hardware, ensuring that its clients benefit from cutting-edge technology and optimized performance. WhiteFiber’s collaboration with these industry leaders allows it to stay at the forefront of high-performance computing and AI infrastructure.
In addition, WhiteFiber has a formal agreement with Shadeform to offer on-demand compute services powered by NVIDIA B200 GPUs. This partnership enhances our ability to provide scalable, high-performance AI and HPC solutions to enterprise customers, enabling them to access state-of-the-art computing resources without the need for upfront infrastructure investment.
WhiteFiber’s data center business leverages a diverse mix of vendors across multiple geographies to source equipment cost-effectively while mitigating supply chain disruptions. By maintaining a broad supplier network, WhiteFiber reduces reliance on any single vendor and enhance its ability to procure best-in-class solutions at competitive prices. This approach strengthens its operational resilience and supports its ability to scale efficiently.
Competition
WhiteFiber faces significant competition from various data center and cloud services providers. WhiteFiber competes with several prominent data center providers, including Digital Realty, Equinix, Inc., NTT, Cyrus One, Inc., STACK Infrastructure, Inc., Aligned Data Centers, LLC, Iron Mountain and various private operators in the U.S. WhiteFiber’s primary competitors in the cloud service business are CoreWeave, Crusoe Energy, Nebius, and Lambda Labs.
Many of WhiteFiber’s competitors offer locations worldwide and have well-established international operations. WhiteFiber’s competitors may also have significant advantages over WhiteFiber, including greater name recognition, longer operating histories, pre-existing relationships with global developers, utilities and local authorities, which may give them an advantage in securing real estate or power for new sites, particularly in constrained regions, the capacity to provide the same or additional products and services, more significant marketing budgets and other financial and operational resources, more robust internal controls and systems, and better established, more extensive scale and lower cost suppliers sand supplier relationships. In addition, as WhiteFiber develops proprietary technology and software solutions to support AI and HPC workloads, it faces competitive risks from larger incumbents with greater R&D resources and established ecosystems. The competitors may bring similar offerings to market faster or with deeper integration into existing platforms, potentially limiting our market share or pricing power.
Materials and Suppliers
Maintaining key supplier relationships is crucial to WhiteFiber’s business operations, as it relies on these relationships, such as with Dell, NVIDIA, Hewlett Packard Enterprise, Super Micro and Quanta Computing, to secure GPUs, servers, essential computing hardware, infrastructure components, and other materials. The complexity of developing cloud service hardware at scale limits the number of suppliers capable of meeting WhiteFiber’s requirements. The development of new data center capacity is subject to supply chain constraints and long lead times for critical infrastructure components such as power distribution equipment, generators, and cooling systems. WhiteFiber works with experienced vendors and maintains forward-looking procurement plans to mitigate these risks, but delays could still impact project timelines. Consequently, WhiteFiber has established purchase orders with leading hardware manufacturers that include extended delivery schedules spanning several months before the hardware is delivered to its facilities. These fluctuations in delivery timelines necessitate careful planning and advanced purchasing strategies to ensure WhiteFiber can acquire hardware well before their anticipated deployment.
WhiteFiber proactively procures these materials from its suppliers in sufficient quantities to facilitate hardware deployment at scale and on accelerated timelines. To mitigate potential supply chain disruptions and ensure the smooth operation of its facilities, WhiteFiber has established long-term contracts and agreements with key suppliers. This includes multi-quarter purchase commitments for critical hardware such as GPUs, power distribution units, and networking equipment, as well as ongoing service agreements with construction, electrical, and facility operations vendors. These relationships help secure allocation priority, stabilize pricing, and reduce lead-time risk for both cloud infrastructure and data center development. These arrangements give WhiteFiber greater certainty regarding the availability and pricing of essential components and materials. Furthermore, WhiteFiber continuously monitors market trends and maintains open lines of communication with its suppliers to anticipate and address potential supply chain challenges.
By proactively managing its supplier relationships, securing necessary materials in advance, and closely monitoring market conditions, WhiteFiber aims to minimize the impact of supply chain fluctuations on its operations. This approach enables WhiteFiber to maintain a steady pace of hardware deployments and facility development, ultimately supporting WhiteFiber’s goal of expanding its HPC data center and cloud service capabilities and maximizing shareholder value. However, WhiteFiber relies on a limited number of vendors for certain products and services for WhiteFiber’s data center facilities, and some of its contracts provide a single source of materials. If any of its key suppliers cannot perform under their contracts or satisfy its orders, it could significantly delay its data center development and operations. While WhiteFiber may be able to engage replacement suppliers, this would likely lead to operational delays and increased costs.
Power Supply
In the province of Quebec where MTL-1, MTL-2, and MTL-3 are located, all of the hydroelectric power is provided by a crown corporation, Hydro Quebec, which has predetermined rates depending on the customers’ industry and based on the power demand.
As set forth above, WhiteFiber has entered into a Capacity Agreement with Duke Energy for it to receive 24 MW of service to NC-1 by September 1, 2025, an additional 40 MW by April 1, 2026 and an additional 99 MW within four years of May 16, 2025. The actual rates will be determined when the facilities are turned on.
Customers
WhiteFiber generates a large portion of its revenue from a small number of customers. There are inherent risks whenever a large percentage of total revenue is concentrated with a limited number of customers. If WhiteFiber were to lose one or more of its customers, its operating results could be materially adversely affected.
WhiteFiber data centers
WhiteFiber’s HPC data center customer base consists of two primary types of customers:
Enterprise clients — current and prospective enterprise clients are active in multiple industries, including healthcare, finance, and various technologies that rely on computers or models. These customers benefit from WhiteFiber’s high-density solutions, reaching upwards of 50kW per cabinet, to accommodate their workloads and data generation.
GPU cloud — WhiteFiber’s GPU cloud customers offer on demand access to their GPUs for tasks like AI, VFX rendering and scientific computing.
Currently, WhiteFiber provides HPC data center services at its leased MTL-1 and MTL-3 facilities, although its customers are based across Canada and Europe. As of December 31, 2025, WhiteFiber’s leased MTL-1 and MTL-3 facilities served fifteen customers. No one customer accounted for in excess of 50% of data center revenue in the 12 months ended December 31, 2025 or 2024.
WhiteFiber’s cloud services customer base also is comprised of two primary types of customers:
| ● | Direct end users — these customers primarily leverage WhiteFiber’s computing power for model training and inference. |
| ● | GPU marketplaces — these platforms resell WhiteFiber’s computing power to their own end users. Since WhiteFiber does not have direct visibility into their end-user base, there may be some overlap among end users across different marketplaces. |
WhiteFiber currently provides cloud services at Blönduos Campus, Iceland, where it leases capacity to house its GPUs. During 2025, our HPC data center in Iceland had contracts with 21 customers. DNA Fund accounted for approximately 11.5% of our revenue during the 12 months ended December 31, 2025. We did not generate any revenue from DNA Fund in 2024.
Our Initial Customer accounted for approximately 70.7% of its revenue during the 12 months ended December 31, 2025 and 96.6% of its revenues through December 31, 2024. As of the report date, WhiteFiber and the Initial Customer are engaged in ongoing discussions regarding a potential resolution of the existing service agreements following the agreed pause of services. No definitive agreement has been reached. Following the service pause, WhiteFiber has redeployed the GPUs previously allocated to the Initial Customer to three other customers. Based on WhiteFiber’s current customer mix and contracted capacity for 2026, a limited number of customers are expected to represent a significant portion of WhiteFiber’s cloud services revenue. While WhiteFiber is actively expanding and diversifying it’s customer base, WhiteFiber’s results may continue to be influenced by the performance and contractual arrangements of these customers.
WhiteFiber has leased additional capacity to install our data center in Atlanta, Georgia, USA to expand our cloud services offering. The capacity leases commenced in February 2026. WhiteFiber also intends to lease additional capacity to expand our cloud services offering
Global Logistics and Tariffs
Global supply logistics have caused delays across all distribution channels, impacting the HPC, AI and ML markets. Delivery schedules for specialized equipment, such as high-performance computing systems, AI hardware, and necessary infrastructure components, have been affected due to constraints on globalized supply chains. These constraints extend to procuring construction materials and specialized electricity distribution equipment required to develop HPC, AI and ML facilities. Efforts to mitigate delivery delays are ongoing to avoid materially impacting deployment schedules; however, there are no assurances that such mitigation efforts will continue to be successful. To help address global supply logistics and pricing concerns, WhiteFiber has implemented proactive measures such as procuring and holding required materials. WhiteFiber continuously monitors developments in the global supply chain which is necessary to assess their potential impact on its expansion plans within the HPC, AI and ML markets. This monitoring includes evaluating the impact of international trade policies and tariffs, which may affect the cost or availability of key components source from abroad and, in turn, impact its expansion timelines or capital expenditure.
Data center construction relies heavily on steel, copper, aluminum, electrical components and HVAC systems, some of which WhiteFiber is sourcing from Mexico and Canada. The tariffs the U.S. has imposed, or has considered imposing, on Canadian steel, aluminum and copper imports, are expected to increase the cost of WhiteFiber’s potential projects in the U.S. Similarly, reciprocal tariffs imposed by Canada on WhiteFiber’s projects in Canada on U.S. exports could see cost increases for imported power infrastructure, networking hardware, and construction equipment.
Regulatory Landscape
The regulatory landscape surrounding WhiteFiber data centers and cloud services is evolving rapidly, and WhiteFiber anticipates increased scrutiny and potential regulation in the near- and long-term. These developments may have a material adverse effect on WhiteFiber’s business and financial condition.
WhiteFiber is subject to the laws and regulations of various jurisdictions and governmental agencies affecting its operations and the sale of its infrastructure and services in areas including, but not limited to: AI, intellectual property; tax; import and export requirements; anti-corruption; economic and trade sanctions; national security and foreign investment; foreign exchange controls and cash repatriation restrictions; data privacy and security requirements; competition; advertising; employment; product regulations; environment, health and safety requirements; and consumer laws.
Although there is no assurance that existing or future governmental laws and regulations applicable to its operations and the sale of its infrastructure services will not have a material adverse effect on WhiteFiber’s capital expenditures operating results and competitive position, it does not currently anticipate material expenditures for complying with government regulations. Nevertheless, WhiteFiber believes that global trade regulations could potentially have a material impact on its business.
As a global company, the import and export of WhiteFiber’s infrastructure services and technology are subject to laws and regulations including international treaties, U.S. export controls and sanctions laws, customs regulations, and local trade rules around the world. For example, all acquisitions of control (whether direct or indirect) of Canadian businesses by non-Canadians may be subject to review on grounds that the investment could be injurious to national security. Following the filing of the required Investment Canada Act notification in respect of WhiteFiber’s acquisition of Enovum, WhiteFiber received written notification from the Minister of Innovation, Science and Industry of Canada (the “Minister”), that the acquisition may be subject to a national security review. Following review of information we provided, Bit Digital executed a “Commitment Letter” to the Minister which provides for the following: (i) commitment to maintain one Canadian on the board of Enovum Inc.; (ii) commitment to maintain or improve Enovum’s security controls for personnel, physical security and the internal network, the terms of the Commitment Letter the Company is complying with (iii) commitment to send a list of Enovum’s current clients to office of the Minister of Innovation, Science and Industry on an annual basis. The Company is complying with the terms of the Commitment Letter.
The scope, nature, and severity of such controls varies widely across different countries and may change frequently over time. Such laws, rules, and regulations may delay the introduction of WhiteFiber’s infrastructure and services or impact its competitiveness through restricting its ability to do business in certain places or with certain entities and individuals. For example, the U.S. Department of Commerce continues to add firms to the Entity List. These export restrictions, which would require that WhiteFiber obtain licenses from the U.S. Department of Commerce to allow it to export infrastructure services to such listed firms, which could limit or prevent it from doing business with certain potential customers or potential suppliers. Additionally, although the U.S. Department of Commerce has withdrawn its AI diffusion rules, which would have imposed worldwide limits on AI chip exports used to create computer clusters, it plans to issue a replacement rule in the future and continues to strengthen other existing export controls on advanced AI chips. These restrictive governmental actions, and any similar measures that may be imposed on U.S. companies by other governments, could limit its ability to conduct business globally.
Additionally, there are growing concerns about the ethical implications and potential misuse of AI and machine learning. Governments and regulatory bodies are considering measures to ensure the responsible development and deployment of AI systems, including transparency, accountability, and fairness guidelines. WhiteFiber is closely monitoring these developments and will dedicate its best efforts to adhere to any upcoming regulations or industry best practices.
As a company operating at the intersection of data center, cloud and HPC hosting services, WhiteFiber is committed to maintaining a proactive and adaptive approach to regulatory compliance. WhiteFiber closely monitors legislative and regulatory developments and engages in dialogue with relevant stakeholders to ensure its business practices align with the evolving legal and regulatory framework. Despite the uncertainties posed by the changing regulatory landscape, WhiteFiber remains committed to delivering innovative and responsible solutions in the data center, cloud and HPC hosting markets while prioritizing compliance and risk management. However, if WhiteFiber fails to comply with applicable laws and regulations, it may be subject to significant liabilities, including fines and penalties, and its business, financial condition, or results of operations could be adversely affected.
Human Capital / Employees
As of December 31, 2025, we and our subsidiaries collectively employed 104 full-time employees, across our entire organization. All employees work full-time, none of whom are covered by a collective bargaining agreement. We engage third-party contractors and consultants on an as-needed basis. At the parent company level, our management includes our CEO, Samir Tabar, our CFO, Erke Huang, and our CAO, Justin Zhu with 21 employees. WhiteFiber employed 83 full-time employees who support cloud and data center operations, infrastructure development, and corporate functions. The Company also engages consultants for advisory services to support our business activities. We focus on attracting and retaining skilled technical and operational personnel through competitive compensation, benefits, and performance-based incentives aligned with our business objectives. Management oversees human capital matters, with an emphasis on workforce safety, operational reliability, and compliance with applicable labor and employment laws. We also engage consultants and other third-party providers to support our business activities.
We are a remote-first Company. We believe that allowing our employees to work in the location that best suits them provides us access to a larger talent pool and a sustained advantage in hiring and retaining employees and consultants in the United States and worldwide.
Human capital management is critical to our ongoing business success, which requires investing in our people. Our aim is to create a highly engaged and motivated workforce where employees are inspired by leadership, engaged in purpose-driven, meaningful work, and have opportunities for growth and development. We are committed to creating and maintaining a work environment in which employees are treated with respect and dignity. We value our diverse employees, and provide career and professional development opportunities that foster the success of our Company.
We are committed to the principles of equal employment and complying with all federal, state, and local laws providing equal employment opportunities, and all other employment laws and regulations. It is our intent to maintain a work environment that is free of harassment, discrimination, or retaliation because of age, race, color, national origin, ancestry, religion, sex, sexual orientation (including transgender status, gender identity or expression), pregnancy (including childbirth, lactation, and related medical conditions), physical or mental disability, genetic information (including testing and characteristics), veteran status, uniformed servicemember status, or any other status protected by federal, state, or local laws. We are dedicated to the fulfillment of this policy in regard to all aspects of employment, including but not limited to recruiting, hiring, placement, transfer, training, promotion, rates of pay, and other compensation, termination, and all other terms, conditions, and privileges of employment.
Our Compensation Committee is also actively involved in reviewing and approving executive compensation, and succession plans so that we have leadership in place with the requisite skills and experience to deliver results the right way. We offer fair, competitive compensation and benefits appropriate for a company of our size that supports our employees. While we do not offer health benefits, we do offer 401(k) plans with 100% matching of employees’ contributions subject to IRS limitations.
Available Information
Our Annual Reports on Form 10-K, Quarterly Reports on Form 10-Q, Current Reports on Form 8-K, and amendments to reports filed pursuant to Section 13(a) or 15(d) of the Exchange Act, are filed with the U.S. Securities and Exchange Commission (the “SEC”). We are subject to the informational requirements of the Exchange Act and file or furnish reports, proxy statements, and other information with the SEC. Such reports and other information filed by us with the SEC are available free of charge on our website at www.bit-digital.com when such reports are available on the SEC’s website at www.sec.gov.
We announce material information to the public through filings with the SEC, the investor relations page on our website at www.bit-digital.com, press releases, public conference calls and public webcasts. The information disclosed through the foregoing channels are intended to be sources of material information about the Company. As such, we encourage investors, the media and others to follow the channels listed above and to review the information disclosed through such channels. Any updates to the list of disclosure channels through which we will announce information will be posted on the investor relations page on our website.
The information contained on, or accessible through, our website is not a part of, and is not incorporated into, this Annual Report. We have included our website address only as an inactive textual reference and do not intend it to be an active link to our website. You should not rely on our website or any such information in making your decision whether to purchase our Ordinary Shares.