Skip to main content

Titan Mining Corp

For the period ended Dec 31, 2025. Filed Mar 19, 2026.

View on SEC.gov

About this filing

The yearly report of certain Canadian companies, filed under a joint US and Canadian system. It is the main yearly account these companies give US investors, largely as filed in Canada.

FY2025 · Filed Mar 19, 2026

Use the contents to explore the available documents and sections.

TII$1.93+1.6%Stored close · as of Nov 6, 2026
See the whole filing, with its images and exhibits
Contents

EX-99.1 · PRELIMINARY NOTES

PRELIMINARY NOTES

This Annual Information Form (“AIF”) takes into account information available up to and including December 31, 2025, unless otherwise indicated. Throughout this document the terms “we”, “us”, “our”, the “Company” and “Titan Mining” refer to Titan Mining Corporation.

All financial information in this AIF is prepared in accordance with International Financial Reporting Standards (“IFRS”) as issued by the International Accounting Standards Board. Additional financial information may be found in the Company’s audited consolidated financial statements and management’s discussion and analysis for the year ended December 31, 2025.

Currency

All dollar amounts are expressed in US dollars unless otherwise indicated.

Cautionary Note Regarding Forward-Looking Information

Certain information contained in this document constitutes forward-looking statements. All statements, other than statements of historical facts, are forward looking statements, including but not limited to the Company’s 2026 priorities and planned activities at ESM and the Kilbourne Graphite Project; 2026 production guidance and related expectations; that the Company continues to examine various financing options to expand production and to bolster the Company’s treasury; Mineral Resource estimates; results from economic analyses on ESM; production forecasts; anticipated underground development and access to higher-quality ore bodies at ESM; plans to evaluate and implement operating efficiencies and support future production from existing mining areas, including the #2 and #4 mine complex; exploration, drilling and other work programs across the broader district (including the Company’s expanded mineral tenure) and at the Kilbourne Graphite Project, and the timing and results thereof; the discovery of significant concentrations of germanium and the advancement of test work to evaluate the recovery of germanium identified within existing ESM process streams; the technical and economic viability of recovering germanium as a potential byproduct from zinc operations; advancement of the Kilbourne Graphite Project through feasibility, including anticipated workstreams such as drilling, mine design, metallurgical and process optimization, infrastructure and permitting activities, and customer qualification efforts through the demonstration facility; the continued operation of the Kilbourne Graphite Project demonstration facility and production of natural flake graphite concentrate for customer and government qualification programs; the Company’s expectations regarding downstream process design, partnerships and commercial discussions in support of its integrated U.S. graphite strategy; the timing of any construction decision for the Kilbourne Graphite Project; and the Company’s ability to maintain and enhance financial flexibility through cash flow from ESM, existing financing arrangements and access to capital markets.

The forward-looking statements are based on a number of assumptions which, while considered reasonable by the Company, are subject to risks and uncertainties. The Company cautions readers that forward-looking statements involve and are subject to known and unknown risks, uncertainties and other factors which may cause actual results, performance or achievements to differ materially from those expressed in or implied by such forward-looking statements and forward-looking statements are not guarantees of future results, performance or achievement. The Company has made assumptions based on or related to many of these risks, uncertainties and factors. These risks, uncertainties and factors include general business, economic, competitive, political, regulatory and social uncertainties; actual results of exploration activities and economic evaluations; fluctuations in currency exchange rates; changes in project parameters; changes in costs, including labour, infrastructure, operating and production costs; future prices of zinc, graphite and other minerals; variations of mineral grade or recovery rates; operating or technical difficulties in connection with exploration, development or mining activities, including the failure of plant, equipment or processes to operate as anticipated; delays in completion of exploration, development or construction activities; changes in government legislation and regulation; the ability to maintain and renew existing licenses and permits or obtain required licenses and permits in a timely manner; the ability to obtain financing on acceptable terms in a timely manner; contests over title to properties; employee relations and shortages of skilled personnel and contractors; the speculative nature of, and the risks involved in, the exploration, development and mining business; assumptions as to mining dilution; assumptions as to closure costs and closure requirements; environmental risks; unanticipated reclamation expenses; unexpected variations in quantity of mineralized material, grade or recovery rates; geotechnical or hydrogeological considerations during mining being different from what was assumed; changes to assumptions as to salvage values; ability to maintain the social license to operate; changes to interest rates; changes to tax rates, including federal, state and county income and property tax rates; impact of inflationary pressures, supply chain disruptions, geopolitical conflicts and trade measures such as tariffs; and the factors discussed in the section entitled “Risks Factors” in this document.

Although the Company has attempted to identify important risks, uncertainties and other factors that could cause actual performance, achievements, actions, events, results or conditions to differ materially from those expressed in or implied by the forward-looking information, there may be other risks, uncertainties and other factors that cause performance, achievements, actions, events, results or conditions to differ from those anticipated, estimated or intended. Unless otherwise indicated, forward-looking statements contained herein are as of the date hereof and the Company disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise, except as required by applicable law.

ContentsView on SEC.gov

The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.