Montauk Renewables, Inc.
For the period ended Dec 31, 2025. Filed Mar 11, 2026.
View on SEC.govAbout this filing
A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.
FY2025 · Filed Mar 11, 2026
What changed in Risk Factors?
Read the current filingPrevious report: 10-K
Period ended 2024-12-31; filed 2025-03-14.
0000950170-25-039495
Item 1A. RISK FACTORSCurrent report: 10-K
Period ended 2025-12-31; filed 2026-03-11.
0001193125-26-102364
Item 1A. RISK FACTORSThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 195 previous paragraphs and 172 current paragraphs.
103 unchanged; 54 reworded; 8 added; 29 removed; 9 previous and 7 current paragraphs rearranged.
Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (8)
Current report
While our Montauk AG swine manure facility in Turkey, North Carolina is scheduled to begin commercial operations in April 2026, we have experienced delays due to inclement weather, construction delays, mechanical breakdowns and failure of technology to perform as expected. As of December 31, 2025, we have spent approximately $142 million to develop the facility and expect that total capital investment will be approximately $200 million. There can be no assurances that the facility will produce the projected amount of renewable electricity and swine RECs or that the project will not need additional capital investment to become fully operational. Furthermore, while we are contracted to sell a portion of the swine RECs produced, we do not have a contract to sell all projected swine RECs we produce. There is no established market for swine RECs so we are unsure at what price we will be able to sell them, if we are able to sell them at all.
Current report
A RIN is separated by dispensing RNG through permitted channels. If we are unable to dispense RNG through such permitted channels because of a lack of demand, we are unable to separate RINs. Furthermore, if the supply of RNG to be separated through the permitted channels is greater than the demand for the RNG, the price we pay to separate the RIN could be higher.
Current report
On January 20, 2025, Executive Order 14154 was signed and directed agencies to review agency actions that may “impose an undue burden” on domestic energy resources. In particular, President Trump directed the EPA to make a recommendation within 30 days regarding the legality and continuing applicability of the 2009 Endangerment Finding for greenhouse gas emissions under the Clean Air Act.
Current report
On March 12, 2025, the EPA Administrator Zeldin announced that the EPA would reconsider the 2009 Endangerment Finding, as well as “regulations and actions that rely on that Finding,” which likely include EPA’s 2024 GHG performance standards for the electric utility sector, the 2024 methane performance standards for the refining sector, and various light-, medium-, and heavy-duty vehicle emission standards, among other actions. On June 11, 2025, Zeldin proposed to repeal all “greenhouse gas” emissions standards for fossil fuel-fired power plants. On February 12, 2026, the EPA formally repealed the 2009 Greenhouse Gas Endangerment Finding, a foundational policy that determined carbon dioxide and other greenhouse gases pose a threat to public health and welfare. This action, described by officials as the largest deregulatory move in U.S. history, removes the legal basis for federal regulation of greenhouse gas emissions from vehicles, power plants, and oil and gas operations. While these policies aim to boost fossil fuels, economic trends suggest that clean energy is increasingly competitive, leading some to view this approach as a temporary obstacle rather than a permanent halt to the energy transition.
Current report
minimum Liquidity (as defined in the Credit Agreement) of at least $10.0 million, and
Current report
minimum Consolidated EBITDA (as defined in the Credit Agreement) of at least $10.0 million.
Current report
As a public company, we are subject to the reporting requirements of the Exchange Act, the Sarbanes-Oxley Act of 2002, the Dodd-Frank Act, the listing requirements of The Nasdaq Stock Market LLC, and other applicable securities rules and regulations. Despite reforms made possible by the JOBS Act, compliance with these rules and regulations have nonetheless increased our legal and financial compliance costs, made some activities more difficult, time-consuming or costly, and increased demand on our systems and resources, and such compliance costs will be exacerbated after we are no longer an emerging growth company.
Current report
Compiling the system and processing documentation necessary to perform the evaluation needed to comply with Section 404 is costly and challenging. Our compliance with Section 404 requires that we incur substantial accounting expense and expend significant management efforts. We have hired and may need to continue to hire additional accounting and financial staff with appropriate public company experience and technical accounting knowledge and compile the system and process documentation necessary to maintain effective internal control over financial reporting.
Removed paragraphs (29)
Previous report
Any future acquisitions, investments or other strategic relationships that we make could disrupt our business, cause dilution to our stockholders or harm our business, financial condition or operating results.
Previous report
We expect future acquisitions of companies, purchases of assets and other strategic relationships to be an important part of our growth strategy. We plan to use acquisitions to expand our capabilities, expand our geographic markets, add experienced management and add to our project portfolio. However, we may not be able to identify suitable acquisition or investment candidates, reach agreements with acquisition targets on acceptable terms or arrange for any required financing for an acquisition on acceptable terms, any of which would materially impact our present strategy. While we perform due diligence on prospective acquisitions, we may not be able to discover all potential operational deficiencies in such projects. Further, if we are successful in consummating acquisitions, those acquisitions could subject us to a number of risks, including:
Previous report
the purchase prices we pay could significantly deplete our cash reserves or result in dilution to our existing stockholders;
Previous report
we may find that the acquired companies or assets do not improve our customer offerings or market position as planned;
Previous report
we may have difficulty integrating the operations and personnel of the acquired companies;
Previous report
key personnel and customers of the acquired companies may terminate their relationships with the acquired companies as a result of or following the acquisition;
Previous report
we may experience additional financial and accounting challenges and complexities in areas such as tax planning and financial reporting;
Previous report
we may experience delays in construction and development or regulatory approvals impacting, among other projects, the Pico, Apex or Montauk Ag development cycle;
Previous report
we may incur additional costs and expenses related to inflation and complying with additional laws, rules or regulations in new jurisdictions;
Previous report
we may assume or be held liable for risks and liabilities (including for environmental-related costs) as a result of our acquisitions, some of which we may not discover during our due diligence or adequately adjust for in our acquisition arrangements;
Previous report
our ongoing business and management’s attention may be disrupted or diverted by transition or integration issues and the complexity of managing geographically diverse enterprises;
Previous report
we may incur one-time write-offs or restructuring charges in connection with an acquisition;
Previous report
we may acquire goodwill and other intangible assets that are subject to amortization or impairment tests, which could result in future charges to earnings; and
Previous report
we may not be able to realize the cost savings or other modeled financial benefits we anticipated.
Previous report
Any of these factors could adversely affect our business, financial condition and operating results.
Previous report
We are subject to volatility in prices of RINs and other Environmental Attributes.
Previous report
Volatility of commodity prices creates volatility in the price of Environmental Attributes. The value of RINs is inversely proportionate to the wholesale price of unleaded gasoline. Further, the production of RINs significantly in excess of the RVOs set by the EPA for a calendar year could adversely affect the market price of RINs, particularly towards the end of the year, if refiners and other RFS obligated parties have satisfied their RVOs for the year. A significant decline in the price of RINs and price of LCFS credits for a prolonged period could adversely affect our business, financial condition and results of operations, and could require us to take an impairment charge relating to one or more of our projects.
Previous report
The failure of our hedge counterparties or significant customers to meet their obligations to us may adversely affect our financial results.
Previous report
To the extent we hedge our RNG revenues, our hedging transactions expose us to the risk that a counterparty fails to perform under a derivative contract. Volatility in the market index to which we hedge our RNG revenues could expose us to variability in our commodity based revenues. Disruptions in the financial markets could lead to sudden decreases in a counterparty’s liquidity, which could make them unable to perform under the terms of the derivative contract and we may not be able to realize the benefit of the derivative contract. Any default by the counterparty to these derivative contracts could adversely affect our business, financial condition and results of operations.
Previous report
We also face credit risk because we sell our RNG to a limited number of significant customers who do not post collateral. The inability or failure of our significant customers to meet their obligations to us or their insolvency or liquidation may adversely affect our financial results.
Previous report
Since 2015, EPA has been attempting to regulate carbon dioxide (CO 2) emissions from existing fossil-fuel fired electric power generation facilities under section 111(d) of the Clean Air Act. Depending on how these regulations are structured, they could result in favorable treatment for renewable energy, as happened with the 2015 Clean Power Plan, which allowed facility owners to reduce emissions with “outside the fence” measures, including those associated with renewable energy projects. EPA’s first two efforts to regulate these emissions from power generation facilities, including the Clean Power Plan and the later Affordable Clean Energy Rule, have been struck down through a combination of changes in administration and judicial review. EPA’s most recent regulation is the 2024 Power Plant GHG Rule, which was published on May 9, 2024. The Power Plant GHG Rule rule includes performance-based mechanisms for EGUs burning coal and incentivizes the early retirement of coal-fired plants by having less stringent (or no) emission limits for plants that agree to retire by certain dates. States are required to submit their individual compliance plans by May 11, 2026. State plans could include compliance flexibilities such as emission trading. However, the Power Plant GHG Rule has been heavily litigated, and EPA recently filed a motion that was granted to hold the case in abeyance so that new leadership at EPA can review the rule and consider next steps. Given the emphasis in President Trump’s executive orders regarding favoring fossil fuel production and rescinding the Biden administration’s executive orders on climate change, it is expected that EPA will reconsider this rule. In addition, in the Unleashing American Energy executive order, President Trump also directed the EPA Administrator to submit a report on the “legality and continuing applicability” of its 2009 endangerment finding for GHGs under the CAA. Revoking this finding would undermine the EPA’s regulations covering CO 2 and other GHG emissions from power plants and its climate regulatory authority in general.
Previous report
Our business is subject to risks arising out of climate change, which could result in increased operating costs.
Previous report
Numerous proposals have been made and are likely to continue to be made at the international, national, regional and state levels of government to monitor and limit existing emissions of GHGs and eliminate future GHG emissions. Governmental and public concern arising from GHG emissions has resulted in increasing regulatory, political, financial and litigation risks in the United States and globally that target predominantly fossil fuel-related energy entities or their operations, which may have indirect effects on other companies or industries, including the renewable energy industry.
Previous report
The United States has not implemented comprehensive federal climate change legislation. Furthermore, the new presidential administration froze all funding provided by the Bipartisan Infrastructure Law (“Infrastructure Investment and Jobs Act”) and Section 7 of the IRA. However, various states and groups of states have adopted or are considering adopting legislation, regulations or other regulatory initiatives that are focused on such areas as GHG cap and trade programs, carbon taxes, reporting and tracking programs, and restriction of emissions.
Previous report
We will remain an emerging growth company for up to five years after January 22, 2021, the date of the IPO, although we will lose that status sooner if we have more than $1.07 billion of revenues in a fiscal year, have more than $700.0 million in market value of our common stock held by non-affiliates, or issue more than $1.0 billion of non-convertible debt over a three-year period.
Previous report
Our issuance of additional capital stock in connection with financings, acquisitions, investments, our equity incentive plans or otherwise will dilute stockholders.
Previous report
We expect to issue additional capital stock in the future that will result in dilution to stockholders. We expect to grant equity awards to employees, directors and consultants under our equity incentive plans. We may also raise capital through equity financings in the future. As part of our business strategy, we may acquire or make investments in companies and issue equity securities to pay for any such acquisition or investment. Any such issuances of additional capital stock may cause stockholders to experience significant dilution of their ownership interests and the per share value of our common stock to decline.
Previous report
Our ability to pay regular dividends on our common stock is subject to the discretion of our Board of Directors.
Previous report
Our common stock will have no contractual or other legal right to dividends. The payment of future dividends on our common stock will be at the discretion of our Board of Directors and will depend on, among other things, our earnings, financial condition, capital requirements, level of indebtedness, statutory and contractual restrictions applying to the payment of dividends and other considerations that our Board of Directors deems relevant. Accordingly, we may not make, or may have to reduce or eliminate, the payment of dividends on our common stock, which could adversely affect the market price of our common stock.
Reworded paragraphs (54)
Previous wording
Landfills contain organic material whose decomposition causes the generation of gas consisting primarily of methane, which our RNG projects use to generate power or renewable natural gas, and carbon dioxide. The estimation of landfill gas production volume is an inexact process and dependent on many site-specific conditions, including the estimated annual waste volume, composition of waste, regional climate and the capacity and construction of the landfill. Production levels are subject to a number of additional risks, including a failure or wearing out of our or our landfill operators’, customers’ or utilities’ equipment; an inability to find suitable replacement equipment or parts; less than expected supply or quality of the project’s source of biogas and faster than expected diminishment of such biogas supply; or volume disruption in our fuel supply collection system. Any extended interruption and/or volume disruption in the project’s operation, or failure of the project for any reason to generate the expected amount of output, could adversely affect our business and operating results. For example, certain of our Houston-based operating sites were impacted by severe weather events during the first nine month of 2024 including multiple day extended outages from Hurricane Beryl in July 2024. Furthermore, we produced fewer MMBTu and MWh in the third quarter of 2023 compared with the third quarter of 2022 due to dry weather conditions and higher ambient temperatures. In addition, we have in the past, and may in the future, incur material asset impairment charges if any of our renewable energy projects incurs operational issues that indicate our expected future cash flows from the project are less than the project’s carrying value. Any such impairment charge could adversely affect our operating results in the period in which the charge is recorded.
Current wording
Landfills contain organic material whose decomposition causes the generation of gas consisting primarily of methane, which our RNG projects use to generate power or renewable natural gas, and carbon dioxide. The estimation of landfill gas production volume is an inexact process and dependent on many site-specific conditions, including the estimated annual waste volume, composition of waste, regional climate and the capacity and construction of the landfill. Production levels are subject to a number of additional risks, including a failure or wearing out of our or our landfill operators’, customers’ or utilities’ equipment; an inability to find suitable replacement equipment or parts; less than expected supply or quality of the project’s source of biogas and faster than expected diminishment of such biogas supply; or volume disruption in our fuel supply collection system. Any extended interruption and/or volume disruption in the project’s operation, or failure of the project for any reason to generate the expected amount of output, could adversely affect our business and operating results. For example, certain of our Houston-based operating sites were impacted by severe weather events during the first nine month of 2024 including multiple day extended outages from Hurricane Beryl in July 2024. Furthermore, we produced fewer MMBtu and MWh in the third quarter of 2023 compared with the third quarter of 2022 due to dry weather conditions and higher ambient temperatures. In addition, we have in the past, and may in the future, incur material asset impairment charges if any of our renewable energy projects has operational issues that indicate our expected future cash flows from the project are less than the project’s carrying value. Any such impairment charge could adversely affect our operating results in the period in which the charge is recorded.
Previous wording
In addition, in order to maximize collection of LFG, we will need to take various measures, such as drilling additional gas wells in the landfill to increase LFG collection, balancing the pressure on the gas field based on the data collected by the landfill operator from the gas wells to ensure optimum landfill gas utilization and ensuring that we match availability of engines and related equipment to availability of LFG. There can be no guarantee that we will be able to take all necessary measures to maximize collection. In addition, the LFG available to our projects is dependent in part on the actions of other persons, such as landfill operators. We may not be able to ensure the responsible management of the landfill site by owners and operators, which may result in less than optimal gas generation or increase the likelihood of “hot spots” occurring. Hot spots can temporarily reduce the volume of gas which may be collected from a landfill site, resulting in a lower gas yield. Other events that can result in a reduction in LFG output include: extreme hot or cold temperatures or excessive rainfall; liquid levels within a landfill increasing; oxidation within a landfill, which can kill the anaerobic microbes that produce landfill gas; and the buildup of sludge. The occurrence of these or any other changes within any of the landfills where our projects operate could lead to a reduction in the amount of LFG available to operate our projects, which could have a material adverse effect on our business, financial condition and results of operations.
Current wording
In addition, to maximize collection of LFG, we need to take various measures, such as drilling additional gas wells in the landfill to increase LFG collection, balancing the pressure on the gas field based on the data collected by the landfill operator from the gas wells to ensure optimum landfill gas utilization and ensuring that we match availability of engines and related equipment to availability of LFG. There can be no guarantee that we will be able to take all necessary measures to maximize collection. For example, we do not operate the wellfields at all sites. In addition, the LFG available to our projects is dependent in part on the actions of other persons, such as landfill operators. We may not be able to ensure responsible management of the landfill site by owners and operators or there could be a change in operations and maintenance providers that results in less effective operations. This could result in less-than-optimal gas generation or increase the likelihood of “hot spots” occurring. Hot spots can temporarily reduce the volume of gas which may be collected from a landfill site, resulting in a lower gas yield. Landfill owner negligence such as covering gas wells with landfill material and breaking gas lines could also result in decreased output. Other events that result in a reduction in LFG output include: extreme hot or cold temperatures or drought or excessive rainfall; liquid levels within a landfill increasing; oxidation within a landfill, which can kill the anaerobic microbes that produce landfill gas; and the buildup of sludge or inorganic materials (such as construction materials) that do not produce gases as they decompose.
Previous wording
A substantial portion of our revenues are generated from five project sites. For the years ended December 31, 2024 and 2023, excluding the effect of derivative instruments, approximately 69.1% and 68.4%, respectively, of operating revenues were derived from these locations. During 2024, RNG production at our Atascocita, Rumpke, McCarty and Galveston facilities accounted for approximately 20.3%, 18.9%, 16.4% and 11.0% of our RNG revenues, respectively, and 18.7%, 21.4%, 15.0% and 8.7% of the RNG we produced, respectively. During 2024, Renewable Electricity production at our Bowerman Power LFG, LLC (“Bowerman”) facility accounted for approximately 92.2% of our Renewable Electricity Generation revenues and 82.6% of the Renewable Electricity we produced during 2024. A lengthy interruption of production or transmission of renewable energy from one or more of these projects, as a result of a severe weather event, failure or degradation of our or a landfill operator’s equipment or interconnection transmission problems could have a disproportionate effect on our revenues and cash flow.
Current wording
A substantial portion of our revenues are generated from five project sites. For the years ended December 31, 2025 and 2024, excluding the effect of derivative instruments, approximately 67.7% and 69.1%, respectively, of operating revenues derived from these locations. During 2025, RNG production at our Rumpke, Atascocita, McCarty and Apex facilities accounted for approximately 20.7%, 20.3%, 16.0% and 7.7% of our RNG revenues, respectively, and 20.7%, 20.3%, 16.0% and 7.7% of the RNG we produced, respectively. During 2025, Renewable Electricity production at our Bowerman facility accounted for approximately 94.9% of our Renewable Electricity Generation revenues and 85.5% of the Renewable Electricity we produced during 2025. A lengthy interruption of production or transmission of renewable energy from one or more of these projects, due to a severe weather event, failure or degradation of our or a landfill operator’s equipment or interconnection transmission problems could have a disproportionate effect on our revenues and cash flow.
Previous wording
Our Atascocita, McCarty, Galveston and Coastal Plains projects are located within 20 miles of each other near Houston, Texas and six of our other RNG projects are located in relatively close proximity to each other in Pennsylvania and Ohio. Regional events, such as gas transmission interruptions, regional availability of replacement parts and service in the event of equipment failures and severe weather events in either of those geographic regions have previously adversely affected, and if the future could adversely
Current wording
Our Atascocita, McCarty, Galveston and Coastal Plains projects are located within 20 miles of each other near Houston, Texas and six of our other RNG projects are in relatively close proximity to each other in Pennsylvania and Ohio. Regional events, such as gas transmission interruptions, regional availability of replacement parts and service in the event of equipment failures and severe weather events in either of those geographic regions have previously adversely affected, and if the future could adversely affect, our RNG production and transmission. These impacts are greater than would be if our business was more geographically diverse.
Previous wording
In 2024, sales to Valero, GE Warren, ExxonMobil and Mercuria represented approximately 17.6%, 15.7%, 13.8 and 11.8%, respectively of our operating revenue. In 2023, sales to Valero, GE Warren and HF Sinclair represented approximately 22.0%, 11.7% and 11.7%, respectively of our operating revenue. Five customers made up approximately 68.2% and 70.7% of our accounts receivable as of December 31, 2024 and 2023, respectively. Revenues from our largest customers may fluctuate from time to time based on our customers’ business needs, market conditions or other factors outside of our control. If any of our largest customers terminates its relationship with us, such termination could adversely affect our revenues and results of operations.
Current wording
In 2025, RIN sales to Valero and ExxonMobil represented approximately 17.4% and 11.3%, respectively, of our operating revenue. In 2024, RIN sales to Valero, GE Warren, ExxonMobil and Mercuria represented approximately 17.6%, 15.7%, 13.8 and 11.8%, respectively, of our operating revenue. Five customers made up approximately 68.2% of our accounts receivable as of December 31, 2025 and December 31, 2024. Revenues from our largest customers may fluctuate from time to time based on our customers’ business needs, market conditions or other factors outside of our control. If any of our largest customers terminates its relationship with us, such termination could adversely affect our revenues and results of operations.
Previous wording
We have insurance policies covering certain risks associated with our business. Our insurance policies do not, however, cover all losses, including, in some situations, those as a result of force majeure, which is generally defined as events that are beyond the control of the parties. For example, we did not receive any insurance recovery from the shutdowns in Houston in February 2021 due to the extreme cold or from the Bowerman shutdown in October 2020 due to wildfires. Even if insurance policies for some of our projects cover losses as a result of certain types of force majeure events, such coverage is subject to important limitations. Furthermore, insurance liabilities are difficult to assess and quantify due to unknown factors, including the severity of an injury, the determination of our liability in proportion to other parties, the number of incidents not reported and the effectiveness of our safety program. Insurance coverage is not always available on commercially reasonable terms (if at all) and is often capped at predetermined limits. In addition, our insurance policies are subject to annual review by our insurers and may not be renewed on similar or favorable terms or at all. A serious uninsured loss or a loss significantly exceeding the limits of our insurance policies could adversely affect our business, financial condition and results of operations.
Current wording
We have insurance policies covering certain risks associated with our business. Our insurance policies do not, however, cover all losses, including, in some situations, those because of force majeure, which is generally defined as events that are beyond the control of the parties. Even if insurance policies for some of our projects cover losses as a result of certain types of force majeure events, such coverage is subject to important limitations. Furthermore, insurance liabilities are difficult to assess and quantify due to unknown factors, including the severity of an injury, the determination of our liability in proportion to other parties, the number of incidents not reported and the effectiveness of our safety program. Insurance coverage is not always available on commercially reasonable terms (if at all) and is often capped at predetermined limits. In addition, our insurance policies are subject to annual review by our insurers and may not be renewed on similar or favorable terms or at all. A serious uninsured loss or a loss significantly exceeding the limits of our insurance policies could adversely affect our business, financial condition and results of operations.
Previous wording
Our success will depend on our ability to create and maintain a competitive position in the renewable energy industry. Other than the patented technology acquired through the Montauk Ag Renewables Acquisition, our internally developed condensate neutralization technology and an RNG processing skid we developed, we do not have any exclusive rights to any of the technologies that we utilize, and our competitors may currently use and may be planning to use identical, similar or superior technologies. While significant to the development associated with our emerging North Carolina Montauk Ag Renewables business, we do not currently consider patented technology material to the total business. In addition, the technologies that we use may be rendered obsolete or uneconomical by technological advances, more efficient and cost-effective processes or entirely different approaches developed by one or more of our competitors or others.
Current wording
Our success depends on our ability to create and maintain a competitive position in the renewable energy industry. We do not have exclusive rights to many of the technologies that we utilize, and our competitors may currently use and may be planning to use identical, similar or superior technologies. In addition, our technologies may ultimately prove ineffective, may be hampered by frequent mechanical breakdowns, or rendered obsolete or uneconomical by technological advances, more efficient and cost-effective processes or entirely different approaches developed by one or more of our competitors or others.
Previous wording
We may also face competition based on technological developments that reduce demand for electricity, increase power supplies through existing infrastructure or that otherwise compete with our projects. We also encounter competition in the form of potential customers electing to develop solutions or perform services internally rather than engaging an outside provider such as us.
Current wording
We may also face competition based on technological developments that reduce demand for electricity, increase power supplies through existing infrastructure or otherwise compete with our projects. We also encounter competition in the form of potential customers electing to develop solutions or perform services internally rather than engaging an outside provider such as us.
Previous wording
(such as leases of oil or mineral rights) that were created prior to our projects’ easements, leases and rights-of-way. As a result, certain of our projects’ rights under these easements, leases or rights-of-way may be subject, and subordinate, to the rights of those third parties. We may not be able to protect our operating projects against all risks of loss of our rights to use the land on which our projects are located, and any such loss or curtailment of our rights to use the land on which our projects are located and any increase in rent due on such lands could adversely affect our business, financial condition and results of operations.
Current wording
Our projects generally are, and any of our future projects are likely to be, located on land occupied pursuant to long-term easements, leases and rights of way. The ownership interests in the land subject to these easements, leases and rights-of-way may be subject to mortgages securing loans or other liens (such as tax liens) and other easements, lease rights and rights-of-way of third parties (such as leases of oil or mineral rights) that were created prior to our projects’ easements, leases and rights-of-way. As a result, certain of our projects’ rights under these easements, leases or rights-of-way may be subject, and subordinate, to the rights of those third parties. In the future, our existing projects may need new easements or rights-of-way and there is no guaranty that we will be able to secure these. For example, our Shade facility in Johnstown needs a change in the easement due to road construction. We may not be able to protect our operating projects against all risks of loss of our rights to use the land on which our projects are located, and any such loss or curtailment of our rights to use the land on which our projects are located and any increase in rent due on such lands could adversely affect our business, financial condition and results of operations.
Previous wording
We aim to maintain and grow our position as a leading producer of RNG in the United States. Our specific focus on the renewable energy sector exposes us to risks related to the supply of, demand for and the ultimate price of energy commodities and Environmental Attributes, inflation, taxes, tariffs, duties or other assessments on necessary equipment, the cost of capital expenditures, government regulation, world and regional events and economic conditions, and the acceptance of alternative power sources. As a renewable energy producer, we may also be negatively affected by lower energy output resulting from variable inputs, mechanical breakdowns, faulty technology, competitive electricity markets or changes to the laws and regulations that mandate the use of renewable energy sources by refiners and importers of gasoline and diesel fuel and electric utilities.
Current wording
We aim to maintain and grow our position as a leading producer of RNG in the United States. Our specific focus on the renewable energy sector exposes us to risks related to the supply of, demand for and the ultimate price of energy commodities and Environmental Attributes, inflation, taxes, tariffs, duties, or other assessments on necessary equipment, the cost of capital expenditures, government regulation, world and regional events and economic conditions, labor market conditions and the acceptance of alternative power sources. As a renewable energy producer, we may also be negatively affected by lower energy output resulting from variable inputs, mechanical breakdowns, faulty technology, competitive electricity markets or changes to the laws and regulations that mandate the use of renewable energy sources by refiners and importers of gasoline and diesel fuel and electric utilities.
Previous wording
regulatory changes, whether as a result of the new presidential administration or otherwise, that affect the demand for or supply of Environmental Attributes and the prices thereof, which could have a significant effect on the financial performance of our projects and the number of potential projects with attractive economics;
Current wording
regulatory changes and statements and policies of the current presidential administration that make it more difficult and expensive for us to borrow and raise capital, reduce investment in the infrastructure we rely on and affect the demand for and supply of our RNG, REG, and the Environmental Attributes and the prices thereof, which have a significant effect on the financial performance of our projects and the number of potential projects with attractive economics;
Previous wording
substantial construction risks, including the risk of delay, that may arise due to forces outside of our control, including those related to engineering and environmental problems, as a result of inclement weather or labor disruptions;
Current wording
substantial construction risks, including the risk of delay that may arise due to forces outside of our control, including those related to reduced parts supply, delays in parts supply, increased costs of parts, engineering and environmental problems, labor shortages and disruptions and adverse weather conditions;
Previous wording
a decrease in the availability and timeliness of delivery of raw materials and components necessary for the projects to function or an increase in the costs of raw materials and components due to, among other reasons, inflation, tariffs, duties, taxes or assessments;
Current wording
a decrease in the availability and timeliness of delivery of raw materials and components necessary for the projects to develop and function, such as our collaboration with European Energy which relies on parts from Denmark, or an increase in the costs of raw materials and components due to, among other reasons, inflation, tariffs, duties, taxes or assessments;
Previous wording
penalties, including potential termination, under short-term and long-term contracts for failing to deliver RNG in accordance with our contractual obligations;
Current wording
penalties, including potential termination, under short-term and long-term contracts for failing to deliver RNG, RECs, or REG in accordance with our contractual obligations;
Previous wording
unknown regulatory changes RNG which may increase the transportation cost for delivering under contracts in place;
Current wording
unknown regulatory changes with respect to RECs, RINs, REG, or RNG which may increase the transportation cost for delivering under contracts in place;
Previous wording
In addition, new projects have no operating history and may employ recently developed technology and equipment. A new project may be unable to fund principal and interest payments under its debt service obligations or may operate at a loss, which may adversely affect our business, financial condition or results of operations.
Current wording
In addition, new projects have no operating history and may employ recently developed technology and equipment. The technology may not be successful or our use of intellectual property may be challenged for infringement. A new project may be unable to fund principal and interest payments under its debt service obligations or may operate at a loss, which may adversely affect our business, financial condition or results of operations. This may also make it more difficult to obtain capital for new projects.
Previous wording
If there is not sufficient demand for renewable energy, or if renewable energy projects do not develop or take longer to develop than we anticipate, we may be unable to achieve our investment objectives.
Current wording
If there is not sufficient demand for renewable energy, or the associated Environmental Attributes, or if renewable energy projects do not develop or take longer to develop than we anticipate, we may be unable to achieve our investment objectives.
Previous wording
If demand for renewable energy fails to grow sufficiently, we may be unable to achieve our business objectives. In addition, demand for renewable energy projects in the markets and geographic regions that we target may not develop or may develop more slowly than we anticipate. Many factors will influence the widespread adoption of renewable energy and demand for renewable energy projects, including:
Current wording
If demand for renewable energy or Environmental Attributes fails to grow sufficiently, we may be unable to achieve our business objectives. In addition, demand for renewable energy projects and Environmental Attributes in the markets and geographic regions that we target may not develop or may develop more slowly than we anticipate. Many factors will influence the widespread adoption of renewable energy and demand for renewable energy projects, including:
Previous wording
We plan to expand our business in part through developing RNG recovery projects at landfills and livestock farms, but we may not be able to identify suitable locations or complete development of new projects.
Current wording
We plan to expand our business in part through developing RNG recovery projects at landfills and livestock farms, including our Turkey, North Carolina location, but we may not be successful.
Previous wording
We plan to continue to develop new RNG projects at landfills and livestock farms but we may be unable to implement this growth strategy if we cannot identify suitable landfills and livestock farms on which to develop projects, reach agreements with landfill or livestock farm owners to develop RNG projects or arrange required financing for new projects. While the EPA has identified an additional 463 landfills as candidates for biogas projects, we believe that approximately 38 of these sites produce sufficient quantities of LFG to support commercial-scale projects, with 25 of the approximately 38 sites being operated by Waste Management or Republic Waste, with whom we would need to negotiate with to secure sufficient LFG rights to support an RNG project. In the future, additional candidate landfills may become economically viable as their growth increases LFG production and requires installation of LFG collection systems. However, the time and effort involved in attempting to identify suitable sites and development of new projects may divert members of our management from our operations.
Current wording
We plan to continue to develop new RNG projects at landfills and livestock farms but we may be unable to implement this growth strategy. We may not be able to identify suitable landfills and livestock farms on which to develop projects, reach agreements with landfill or livestock farm owners to develop RNG projects or arrange required financing for new projects. While the EPA has identified an additional 444 landfills as candidates for biogas projects, we believe that approximately 32 of these sites produce sufficient quantities of LFG to support commercial-scale projects, with 24 of the approximately 32 sites being operated by Waste Management or Republic Waste, with whom we would need to negotiate with to secure sufficient LFG rights to support an RNG project. In the future, additional candidate landfills may become economically viable as their growth increases LFG production and requires installation of LFG collection systems. However, the time and effort involved in attempting to identify suitable sites and development of new projects may divert members of our management from our operations.
Previous wording
Our dairy farm project produces significantly less RNG than our landfill facilities. As a result, we will be even more dependent on the LCFS credits and RINs produced at our dairy farm project than on the RINs produced at our landfill facilities for the project’s commercial viability. In the event that CARB worsens the CI score that it applies to waste conversion projects, such as dairy digesters, the number of LCFS credits for RNG generated at our dairy farm project will decline. Additionally, revenue from LCFS credits also depends on the price per LCFS credit, which is driven by various market forces, including the supply of and demand for LCFS credits, which in turn depends on the demand for traditional transportation fuel and the supply of renewable fuel from other renewable energy sources, and mandated CI targets, which determine the number of LCFS credits required to offset LCFS deficits, and which increase over time. Fluctuations in the price of LCFS credits or the number of LCFS credits assigned will have a significantly greater impact on the success of our dairy farm project than the value that RINs have on our landfill facilities. A significant decline in the value of LCFS credits could require us to incur an impairment charge on our dairy farm project and could adversely affect our business, financial condition and results of operations.
Current wording
Our Pico dairy farm project produces significantly less RNG than our landfill facilities. As a result, we are even more dependent on the LCFS credits and RINs produced at our dairy farm project than on the RINs produced at our landfill facilities for the project’s commercial viability. As a result of the 2025 AFPR review, our CI score worsened. The worsening CI score is primarily due to increased biogas upgrading and fugitive emissions from the biogas upgrading process. We are currently conducting an analysis to determine the benefit of installing a combustion device to eliminate fugitive emissions. As a result of this, we may be subject to a claw back of LCFS credits related to the overgeneration of LCFS credits using the old CI Score. While we do not believe the penalty applies to us, the legislation does allow for a penalty of four times the number of LCFS credits to be taken away from a producer as a penalty if its score is lowered. As a result, the number of LCFS credits for RNG generated at our dairy farm project will decline. Additionally, revenue from LCFS credits also depends on the price per LCFS credit, which is driven by various market forces, including the supply of and demand for LCFS credits, which in turn depends on the demand for traditional transportation fuel and the supply of renewable fuel from other renewable energy sources, and mandated CI targets, which determine the number of LCFS credits required to offset LCFS deficits, and which increase over time. Fluctuations in the price of LCFS credits or the number of LCFS credits assigned will have a significantly greater impact on the success of our dairy farm project than the value that RINs have on our landfill facilities. A significant decline in the value of LCFS credits could require us to incur an impairment charge on our dairy farm project and could adversely affect our business, financial condition and results of operations.
Previous wording
-20- developed, such projects will operate profitably. In addition, these projects could expose us to increased operating costs, unforeseen liabilities or risks, and regulatory and environmental concerns associated with entering into new sectors of the energy industry, including requiring a disproportionate amount of our management’s attention and resources, which could adversely affect our business, as well as place us at a competitive disadvantage relative to more established market participants. A failure to successfully integrate such new projects into our existing project portfolio as a result of unforeseen operational difficulties or otherwise, could adversely affect our business, financial condition and results of operations.
Current wording
Our business is currently focused on converting methane into renewable energy. In the future, we may expand our strategy to include other types of projects. We cannot assure you that we will be able to identify attractive opportunities outside of our current area of focus or acquire or develop such projects at a price and on terms that are attractive or that, once acquired or developed, such projects will operate profitably. Risks include a lack of supply offtake, lower than expected prices for generated supplies, malfunctioning equipment, unsuccessful new technologies, and intellectual property challenges. In addition, these projects could expose us to increased operating costs, unforeseen liabilities or risks, and regulatory and environmental concerns associated with entering into new sectors of the energy industry, including requiring a disproportionate amount of our management’s attention and resources, which could adversely affect our business, as well as place us at a competitive disadvantage relative to more established market participants. A failure to successfully integrate such new projects into our existing project portfolio as a result of unforeseen operational difficulties or otherwise, could adversely affect our business, financial condition and results of operations.
Previous wording
Our renewable fuel projects may be exposed to the volatility of the price of RINs.
Current wording
The profitability of our renewable fuel projects may be limited by our ability to dispense fuel to separate RINs and the volatility of the price of RINs.
Previous wording
The price of RINs is driven by various market forces, including regulatory action, gasoline prices and the availability of renewable fuel from other renewable energy sources and conventional energy sources. For example, following the EPAs release of the 2023 RVO in December 2022, the market price of a D3 RIN declined from $2.43 on the date of the release to $1.88 in February 2023. Furthermore, refiners are permitted to carry-over up to 20% RINs generated for one calendar year after the RINs are generated to satisfy their RVOs. As a result, we are only able to sell RINs on a forward basis for the year in which the RINs are generated and the following year. We may be unable to manage the risk of volatility in RIN pricing for all or a portion of our revenues from RINs, which would expose us to the volatility of commodity prices with respect to all or the portion of RINs that we are unable to sell through forward contracts, including risks resulting from changes in regulations, general economic conditions and changes in the level of renewable energy generation. We expect to have quarterly variations in the revenues from the projects in which we generate revenue from the sale of RINs that we are unable to sell through forward contracts.
Current wording
We may be unable to manage the risk of volatility in RIN pricing for all or a portion of our revenues from RINs, which would expose us to the volatility of commodity prices with respect to all or the portion of RINs that we are unable to sell through forward contracts, including risks resulting from changes in regulations, general economic conditions and changes in the level of renewable energy generation. We expect quarterly variations in the revenues from the projects in which we generate revenue from the sale of RINs that we are unable to sell through forward contracts and may experience reduced revenues if we are unable to separate RINs through the dispensing of produced RNG through permitted channels or reduced net income if we must pay a higher price to separate such RINs due to excess supply.
Previous wording
The operations and financial performance of projects in the renewable energy sectors may be affected by the prices of energy commodities, such as natural gas, wholesale electricity and other energy-related products. For example, the price of renewable energy resources changes in relation to the market prices of natural gas and electricity. The market price for natural gas is sensitive to cyclical demand and capacity supply, changes in weather patterns, natural gas storage levels, natural gas production levels, general economic and geopolitical conditions (including the current conflicts in the Middle East and Ukraine) and the volume of natural gas imports and exports. The market price of electricity is sensitive to cyclical changes in demand and capacity supply, and in the economy and geopolitical conditions (including the current conflicts in the Middle East and Ukraine), as well as to regulatory trends and developments impacting electricity market rules and pricing, transmission development and investment to power markets within the United States and in other jurisdictions through interconnects and other external factors outside of the control of renewable energy power-producing projects. Volatility of commodity prices also creates volatility in the prices of Environmental Attributes, which are inversely related to the wholesale price of unleaded gasoline. In addition, volatility of commodity prices, such as the market price of gas and electricity, may also make it more difficult for us to raise any additional capital for our renewable energy projects that may be necessary to operate, to the extent that market participants perceive that a project’s performance may be tied directly or indirectly to commodity prices. Accordingly, the potential revenues and cash flows of these projects may be volatile and adversely affect the value of our investments.
Current wording
The operations and financial performance of projects in the renewable energy sectors may be affected by the prices of energy commodities, such as natural gas, wholesale electricity and other energy-related products. For example, the price of renewable energy resources changes in relation to the market prices of natural gas and electricity. The market price for natural gas is sensitive to cyclical demand and capacity supply, changes in weather patterns (including extreme temperatures spells), natural gas storage levels, natural gas production levels, general economic and geopolitical conditions (including the current conflict in the Middle East) and the volume of natural gas imports and exports. The market price of electricity is sensitive to changes in demand and capacity supply (including both cyclical demand and increased long term demand due to, among others, data storage centers and artificial intelligence), and in the economy and geopolitical conditions, as well as to regulatory trends and developments impacting electricity market rules and pricing, transmission development and investment to power markets within the United States and in other jurisdictions through interconnects and other external factors outside of the control of renewable energy power-producing projects. Volatility of commodity prices also creates volatility in the prices of Environmental Attributes, which are inversely related to the wholesale price of unleaded gasoline. In addition, volatility of commodity prices, such as the market price of gas and electricity, may also make it more difficult for us to raise any additional capital for our renewable energy projects that may be necessary to operate, to the extent that market participants perceive that a project’s performance may be tied directly or indirectly to commodity prices. Accordingly, the potential revenues and cash flows of these projects may be volatile and adversely affect the value of our investments.
Previous wording
We depend on Environmental Attributes, which are federal, state and local government incentives in the United States, provided in the form of RINs, RECs, LCFS credits, rebates, tax credits and other incentives to end users, distributors, system integrators and manufacturers of renewable energy projects, that promote the use of renewable energy. RINs are created through the RFS program administered by the EPA, which requires transportation fuel sold in the United States to contain a minimum volume of renewable fuel and has historically permitted refineries and importers of transportation fuel to satisfy their RVOs by purchasing either (i) D5 RINs and cellulosic waiver credits (“CWCs”) or (ii) D3 RINs. In a December 1, 2022 proposed rule, EPA proposed to not utilize its cellulosic waiver authority for the years 2023-2025. However, if actual production is lower than the RVO, the EPA will have discretion to utilize CWC. This rule was finalized in July 2023. On December 12, 2024, EPA proposed a partial waiver of 2024 Cellulosic Biofuel Volume Requirements due to the projected shortfall of D3 RINs available to meet the 2024 RVO. This proposal is still pending and, with a new presidential administration, it is unknown when this proposed rule will be finalized (if at all) in 2025. In addition, under the RFS, EPA was required to finalize RVO volumes for 2026 by November 1, 2024 but did not meet that deadline. According to the White House Office of Management and Budget’s Fall Unified Agenda and Regulatory Plan, published on December 13, 2024, EPA indicates that it expects in March 2025 to (i) publish a rule finalizing its December 12, 2024 proposed partial waiver of 2024 Cellulosic Biofuel Volume Requirements and (ii) propose RVO volumes for 2026 (which EPA expects to finalize in December 2025). There can be no assurance that EPA will meet its proposed timelines for these actions. RECs are created through state law requirements for utilities to purchase a portion of their energy from renewable energy sources. 74% and 76% of our operating revenues for 2024 and 2023, respectively, were generated from the sale of Environmental Attributes. These government economic incentives could be reduced or eliminated altogether, or the categories of renewable energy qualifying for such government economic incentives could be changed. These renewable energy program incentives are subject to regulatory oversight and could be administratively or legislatively changed in a manner that could adversely affect our operations. Further, the generation of LCFS credits on our dairy farm project is expected to increase the percentage of our revenues generated from Environmental Attributes. Reductions in, changes to, or eliminations or expirations of governmental incentives could result in decreased demand for, and lower revenues from, our projects. Changes in the level or structure of the RPS of a state for electricity could also result in a decline in our revenues or decreased dem…
Excerpt shortened here; the source contains the full paragraph.
Current wording
We depend on Environmental Attributes, which are federal, state and local government incentives in the United States, provided in the form of RINs, RECs, LCFS credits, rebates, tax credits and other incentives to end users, distributors, system integrators and manufacturers of renewable energy projects, that promote the use of renewable energy. RINs are created through the RFS program administered by the EPA, which requires transportation fuel sold in the United States to contain a minimum volume of renewable fuel and has historically permitted refineries and importers of transportation fuel to satisfy their RVOs by purchasing either (i) D5 RINs and cellulosic waiver credits (“CWCs”) or (ii) D3 RINs. In a December 1, 2022 proposed rule, EPA proposed to not utilize its cellulosic waiver authority for the years 2023-2025. However, if actual production is lower than the RVO, the EPA will have discretion to utilize CWC. This rule was finalized on July 12, 2023. On December 12, 2024, EPA proposed a partial waiver of 2024 Cellulosic Biofuel Volume Requirements due to the projected shortfall of D3 RINs available to meet the 2024 RVO. This rule was finalized on July 7, 2025. EPA made CWCs available for purchase under the final rule along with the partial waiver of the 2024 cellulosic biofuel volume requirement. The final rule also requires the use of a new data source for the average wholesale price of gasoline to be used in the calculation of the CWC price. The EPA proposed the 2026 and 2027 RVOs and a Partial Waiver of the 2025 Cellulosic Biofuel Volume Requirement on June 17, 2025. On August 22, 2025, the EPA issued decisions on 175 Small Refinery Exemptions (SREs) for the years 2023-2025. EPA subsequently proposed a Supplemental Rule (referred to as the SRE reallocation volume) on September 18, 2025, which would account for the for 2023-2025 exempted RVOs. EPA co-proposed SRE reallocation volumes that would account for 100 percent or 50 percent of the exemptions granted for the 2023-2025 compliance years. EPA is aiming to finalize new biofuel mandates for 2025, 2026 and 2027 along with the Supplemental Rule in late March 2026. RECs are created through state law requirements for utilities to purchase a portion of their energy from renewable energy sources. Approximately, 67% and 74% of our operating revenues for 2025 and 2024, respectively, were generated from the sale of Environmental Attributes. These government economic incentives could be reduced or eliminated altogether or interpretations of existing regulations or the categories of renewable energy qualifying for such government economic incentives could be changed. These renewable energy program incentives are subject to regulatory oversight and could be administratively or legislatively changed
Previous wording
Our operations inherently risk incurring significant environmental costs and liabilities due to the need to manage waste from our processing facilities. Spills or other releases of regulated substances, including spills and releases that occur in the future, could expose us to material losses, expenditures and liabilities under applicable environmental laws, rules and regulations. Under certain of such laws and regulations, we could be held strictly liable for the removal or remediation of previously released materials or property contamination, regardless of whether we were responsible for the release or contamination and even if our operations met previous standards in the industry at the time they were conducted. In connection with certain acquisitions, we could acquire, or be required to
Current wording
Our operations inherently risk incurring significant environmental costs and liabilities due to the need to manage waste from our processing facilities. Spills or other releases of regulated substances, including spills and releases that occur in the future, could expose us to material losses, expenditures and liabilities under applicable environmental laws, rules and regulations. Under certain such laws and regulations, we could be held strictly liable for the removal or remediation of previously released materials or property contamination, regardless of whether we were responsible for the release or contamination and even if our operations met previous standards in the industry at the time they were conducted. In connection with certain acquisitions, we could acquire, or be required to provide indemnification against, environmental liabilities that could expose us to material losses. In addition, claims for damage to persons or property, including natural resources, may result from the EHS impacts of our operations. Our insurance may not cover all environmental risks and costs or may not provide sufficient coverage if an environmental claim is made against us.
Previous wording
New laws, changes to existing laws, new interpretations of existing laws, increased governmental enforcement of environmental laws or other developments could require us to make significant additional expenditures. Continued government and public emphasis on environmental issues can be expected to result in increased future investments for environmental controls at our plants under federal or state law. Present and future federal and state environmental laws and regulations, and interpretations of those laws and regulations, applicable to our operations, more vigorous enforcement policies and discovery of currently unknown conditions may require substantial expenditures that could have a material adverse effect on our results of operations and financial condition. In January 2025, President Trump’s Putting America First in International Environmental Agreements executive order withdrew the United States from the United Nations Framework Convention on Climate Change’s (UNFCCC) Paris Agreement, which aims to reduce net greenhouse gas emissions by 61% below 2005 levels by 2030. This order also withdrew the United States from any similar climate-related agreements made under the UNFCCC. The stated purpose of Trump’s Initial Rescissions of Harmful Executive Orders and Actions executive order is to retract certain practices of President Biden, including those addressing public health and the environment, the climate crisis and climate-related financial risks. The order rescinds identified initiatives related to environmental justice, clean energy and electric vehicles, and energy and infrastructure. These executive orders present risks to federal incentives available to promote renewable energy, as can be seen in the Unleashing American Energy executive order signed by President Trump that explicitly calls for an immediate pause of the disbursement of funds under the IRA and the Infrastructure Investment and Jobs Act, both of which contain renewable energy incentives.
Current wording
New laws, changes to existing laws, new interpretations of existing laws, increased governmental enforcement of environmental laws or other developments could require us to make significant additional expenditures and these additional expenditures may result in us terminating new projects or ceasing operations of existing projects. Present and future federal and state environmental laws and regulations, and interpretations of those laws and regulations, applicable to our operations, more vigorous enforcement policies and discovery of currently unknown conditions may require substantial expenditures that could have a material adverse effect on our results of operations and financial condition. On January 7, 2026, President Trump signed a presidential memorandum to exit the United Nations Framework Convention on Climate Change (UNFCCC) along with the Intergovernmental Panel on Climate Change (IPCC) and over 60 other international organizations, arguing they did not serve U.S. interests. While federal support for renewable projects may decline, states and the private sector are expected to continue driving development.
Previous wording
Our ability to generate revenue from sales of RINs and LCFS credits depends on our strict compliance with these federal and state programs, which are complex and can involve a significant degree of judgment. If the agencies that administer and enforce these programs disagree with our judgments, otherwise determine that we are not in compliance, conduct reviews of our activities or make changes to the programs, then our ability to generate or sell these credits could be temporarily restricted pending completion of reviews or as a penalty, permanently limited or lost entirely, and we could also be subject to fines or other sanctions. Moreover, the inability to sell RINs and LCFS credits could adversely affect our business.
Current wording
Our ability to generate revenue from sales of RECs, RINs and LCFS credits depends on our strict compliance with these federal and state programs, which are complex and can involve a significant degree of judgment. If the agencies that administer and enforce these programs disagree with our judgments, otherwise determine that we are not in compliance, conduct reviews of our activities or make changes to the programs, then our ability to generate or sell these credits could be temporarily restricted pending completion of reviews or as a penalty, permanently limited or lost entirely, and we could also be subject to fines or other sanctions. Moreover, the inability to sell RINs and LCFS credits could adversely affect our business.
Previous wording
In order to construct, modify and operate our projects, we will need to obtain or may need to modify numerous environmental and other regulatory permits, approvals and consents from federal, state and local governmental entities, including air permits, wastewater discharge permits, stormwater permits, permits or consents related to the management of municipal solid waste landfills and permits or consents related to the management and disposal of waste. A number of these permits, approvals and consents must be obtained prior to the start of development of a project. Other permits, approvals and consents are required to be obtained at, or prior to, the time of first commercial operation or within prescribed time frames following commencement of commercial operations. Any failure to successfully obtain or modify the necessary environmental and other regulatory permits, approvals and consents on a timely basis could delay the construction, modification or commencement of commercial operation of our projects. In addition, once a permit, approval or consent has been issued or acquired for a project, we must take steps to comply with the conditions of each permit, approval or consent conditions, including conditions requiring timely development and commencement of the project. Failure to comply with certain conditions within a permit, approval or consent could result in the revocation or suspension of such permit, approval or consent; the imposition of penalties; or other enforcement action by governmental entities. We also may need to modify permits, consents or approvals we have already obtained to reflect changes in project design or requirements, which could trigger a legal or regulatory review under a standard more stringent than the standard under which the permits, approvals or consents were originally issued.
Current wording
-22- the time of first commercial operation or within prescribed time frames following commencement of commercial operations. Any failure to successfully obtain or modify the necessary environmental and other regulatory permits, approvals and consents on a timely basis could delay the construction, modification or commencement of commercial operation of our projects. In addition, once a permit, approval or consent has been issued or acquired for a project, we must take steps to comply with the conditions of each permit, approval or consent conditions, including conditions requiring timely development and commencement of the project. Failure to comply with certain conditions within a permit, approval or consent could result in the revocation or suspension of such permit, approval or consent; the imposition of penalties; or other enforcement action by governmental entities. We also may need to modify permits, consents or approvals we have already obtained to reflect changes in project design or requirements, which could trigger a legal or regulatory review under a standard more stringent than the standard under which the permits, approvals or consents were originally issued.
Previous wording
Parties with an interest in other energy sources, including lawmakers, regulators, policymakers, environmental and advocacy organizations or other activists may invest significant time and money in efforts to delay, repeal or otherwise negatively influence regulations and programs that promote renewable energy. Many of these parties have substantially greater resources and influence than we have. Further, changes in U.S. federal, state or local political, social or economic conditions, including a lack of legislative focus on these programs and regulations, could result in their modification, delayed adoption or repeal. Any failure to adopt, delay in implementing, expiration, repeal or modification of these programs and regulations, or the adoption of any programs or regulations
Current wording
Parties with an interest in other energy sources, including lawmakers, regulators, policymakers, environmental and advocacy organizations or other activists may invest significant time and money in efforts to delay, repeal or otherwise negatively influence regulations and programs that promote renewable energy. Many of these parties have substantially greater resources and influence than we have. Further, changes in U.S. federal, state or local political, social or economic conditions, including a lack of legislative focus on these programs and regulations, could result in their modification, delayed adoption or repeal. Any failure to adopt, delay in implementing, expiration, repeal or modification of these programs and regulations, or the adoption of any programs or regulations that encourage the use of other energy sources (such as coal) over renewable energy, could adversely affect our business, financial condition and results of operations. The current presidential administration’s focus on maximizing coal, oil, and gas production primarily hurts the renewable energy sector by reducing and eliminating financial incentives, pausing wind/solar projects on public lands, and creating regulatory uncertainty. Policies aimed at reversing climate change progress and prioritizing fossil fuels have slowed investment, though market forces and state-level actions continue to drive clean energy growth.
Previous wording
Certain persons, associations and groups could oppose renewable energy projects in general or our projects specifically, citing, for example, misuse of water resources, landscape degradation, land use, food scarcity or price increase and harm to the environment. Moreover, regulation may restrict the development of renewable energy plants in certain areas. In order to develop a renewable energy project, we are typically required to obtain, among other things, environmental impact permits or other authorizations and building permits, which in turn require environmental impact studies to be undertaken and public hearings and comment periods to be held during which any person, association or group may oppose a project. Any such opposition may be considered by government officials responsible for granting the relevant permits, which could result in the permits being delayed or not being granted or being granted solely on the condition that we carry out certain corrective measures to the proposed project. Opposition to our projects’ requests for permits or successful challenges or appeals to permits issued for our projects could adversely affect our operating plans.
Current wording
Certain persons, associations and groups could oppose renewable energy projects in general or our projects specifically, citing, for example, misuse of water resources, landscape degradation, land use, food scarcity or price increase and harm to the environment. Moreover, regulation may restrict the development of renewable energy plants in certain areas. In order to develop a renewable energy project, we are typically required to obtain, among other things, environmental impact permits or other authorizations and building permits, which in turn require environmental impact studies to be undertaken and public hearings and comment periods to be held during which any person, association or group may oppose a project. Any such opposition may be considered by government officials responsible for granting the relevant permits, which could result in the permits being delayed or not being granted or being granted
Previous wording
A decrease in acceptance of renewable energy plants by local populations, an increase in the number of legal challenges, or an unfavorable outcome of such legal challenges could adversely affect our business, financial condition and results of operations. We may also be subject to labor unavailability due to multiple simultaneous projects in a geographic region. If we are unable to grow and
Current wording
A decrease in acceptance of renewable energy plants by local populations, an increase in the number of legal challenges, or an unfavorable outcome of such legal challenges could adversely affect our business, financial condition and results of operations. We may also be subject to labor unavailability due to multiple simultaneous projects in a geographic region. If we are unable to grow and manage the capacity that we expect from our projects in our anticipated timeframes, it could adversely affect our business, financial condition and results of operations.
Previous wording
The market for renewable energy is influenced by U.S. federal, state and local government regulations and policies concerning renewable energy. These regulations and policies are continuously being modified, which could result in a significant future reduction in the potential demand for renewable energy, including RINs, RECs and LCFS credits, renewable energy project development and investments. For example, on December 12, 2024, EPA proposed a partial waiver of 2024 Cellulosic Biofuel Volume Requirements due to the projected shortfall of D3 RINs available to meet the 2024 RVO. This proposal is still pending, and, with a new presidential administration, it is unknown when this proposed rule will be finalized (if at all) in 2025. Any new government regulations applicable to our renewable energy projects or markets for renewable energy may result in significant additional expenses or related development costs and, as a result, could cause a significant reduction in demand for our renewable energy. For additional information on regulatory developments, see “Item 7A.—Management’s Discussion and Analysis of Financial Condition and Results of Operations —Key Trends—Regulatory, Environmental and Social Trends.”
Current wording
The market for renewable energy is influenced by U.S. federal, state and local government regulations and policies concerning renewable energy. These regulations and policies are continuously being modified, which could result in a significant future reduction in the potential demand for renewable energy, including RINs, RECs and LCFS credits, renewable energy project development and investments. For example, on December 12, 2024, EPA proposed a partial waiver of 2024 Cellulosic Biofuel Volume Requirements due to the projected shortfall of D3 RINs available to meet the 2024 RVO. This rule was finalized on July 7, 2025. EPA made CWCs available for purchase under the final rule along with the partial waiver of the 2024 cellulosic biofuel volume requirement. Any new government regulations applicable to our renewable energy projects or markets for renewable energy may result in significant additional expenses or related development costs and, as a result, could cause a significant reduction in demand for our renewable energy. For additional information on regulatory developments, see “Item 7A.—Management’s Discussion and Analysis of Financial Condition and Results of Operations —Key Trends—Regulatory, Environmental and Social Trends.”
Previous wording
We are required to register an RNG project with the EPA and relevant state regulatory agencies to generate Environmental Attributes. As a participant of the EPA's RFS program, we qualify our RINs through a voluntary Quality Assurance Plan, which typically takes from three to five months from first injection of RNG into the commercial pipeline system. The Biogas Regulatory Reform Rule ("BRRR") implemented changes to the RFS program effective January 1, 2025. The BRRR requires that all unseparated K3 RINs generated by the RNG producer on RNG volumes injected into the commercial pipeline distribution system only become valid for sale once they are separated with the support of dispensing statements by a registered dispenser or RIN separator. This process could result in delays to the RNG producer's receipt of the separated K2 RINs from the dispenser. This rule change could also result in a RNG producer's failure to generate K3 RINs for a given gas flow month if the registered biogas producer negligently fails to generate the necessary biogas tokens before the end of the subsequent gas flow month. Furthermore, although no similar qualification process currently exists for LCFS credits, we expect such a process to be implemented and would expect to seek qualification on a state-by-state basis under such future programs. Changes to the LCFS program require annual verification of the CI score assigned to a project. Annual verification could significantly affect the profitability of a project, particularly in the case of a livestock farm project. Delays in obtaining registration, RIN qualification, and any future LCFS credit qualification, or CI rescoring through CARB annual audits, of a new project could delay future revenues from the project and could adversely affect our cash flow. Further, we typically make a large investment in the project prior to receiving the regulatory approval and RIN qualification. BRRR now requires that all RNG producers register their projects and use a Quality Assurance Plan (QAP). QAPs required third-party audits and semi-annual on-site visits of projects to validate generated RINs and overall compliance with the RFS program. We are also subject to a separate third party’s annual attestation review. The QAP provides a process for RIN owners to follow, for an affirmative defense to civil liability, if used or transferred QAP verified RINs were invalidly generated. A project’s failure to comply could result in remedial action by the EPA, including penalties, fines, retirement of RINs, or termination of the project’s registration, any of which could adversely affect our business, financial condition and results of operations. For additional information on recent developments in this area, including the Pico facility’s CI score, see “Item 7A.—Management’s Discussion and Analysis of Financial Condition and Results of Operations—Key Trends—Regulatory, Environmental and Social Trends.”
Current wording
-24- score assigned to a project. Annual verification could significantly affect the profitability of a project, particularly in the case of a livestock farm project. Delays in obtaining registration, RIN qualification, and any future LCFS credit qualification, or change in CI scores through CARB annual audits, of a new project could delay future revenues from the project and could adversely affect our cash flow. Further, we typically make a large investment in the project prior to receiving the regulatory approval and RIN qualification. BRRR now requires that all RNG producers register their projects and use a Quality Assurance Plan (QAP). QAPs required third-party audits and semi-annual on-site visits of projects to validate generated RINs and overall compliance with the RFS program. We are also subject to a separate third party’s annual attestation review. The QAP provides a process for RIN owners to follow, for an affirmative defense to civil liability, if used or transferred QAP verified RINs were invalidly generated. A project’s failure to comply could result in remedial action by the EPA, including penalties, fines, retirement of RINs, or termination of the project’s registration, any of which could adversely affect our business, financial condition and results of operations. For additional information on recent developments in this area, including the Pico facility’s CI score, see “Item 7A.—Management’s Discussion and Analysis of Financial Condition and Results of Operations—Key Trends—Regulatory, Environmental and Social Trends.”
Previous wording
Furthermore, extreme weather events, such as lightning strikes, ice storms, tornados, extreme wind, hurricanes and other severe storms, wildfires and other unfavorable weather conditions or natural disasters, such as floods, fires, earthquakes, and rising sea-levels, could adversely affect the input and output commodities associated with the renewable energy sector. Such weather events or natural disasters could also require us to temporarily or permanently shut down the equipment associated with our renewable energy projects, such as our access to power and our power to biogas collection, separation and transmission systems, which would impede the ability of our projects to operate and decrease production levels and our revenue. Operational problems, such as degradation of our project’s equipment due to wear or weather or capacity limitations or outages on the electrical transmission network, could also affect
Current wording
Furthermore, extreme weather events, such as lightning strikes, ice storms, tornados, extreme wind, hurricanes and other severe storms, wildfires and other unfavorable weather conditions or natural disasters, such as droughts, floods, fires, earthquakes, and rising sea-levels, could adversely affect the input and output commodities associated with the renewable energy sector. Such weather events or natural disasters could also require us to temporarily or permanently shut down the equipment associated with our renewable energy projects, such as our access to power and our power to biogas collection, separation and transmission systems, which would impede the ability of our projects to operate and decrease production levels and our revenue. Operational problems, such as degradation of our project’s equipment due to wear or weather or capacity limitations or outages on the electrical transmission network, could also affect the amount of energy that our projects are able to deliver. Any of these events, to the extent not fully covered by insurance, could adversely affect our business, financial condition and results of operations.
Previous wording
We and some of our third-party vendors receive and store personal information in connection with our human resources operations and other aspects of our business. Our IT systems and those of our third-party vendors, are vulnerable to damages from computer viruses, natural disasters, fire, power loss, telecommunications failures, personnel misconduct, human error, unauthorized access, physical or electronic security breaches, cyber-attacks (including malicious and destructive code, phishing attacks, ransomware, and denial of service attacks), and other similar disruptions. We continue to develop our processes relating to identification, mitigation and response to potential cybersecurity threats, and such processes may prove to be inadequate. Such attacks or security breaches may be perpetrated by bad actors internally or externally (including computer hackers, persons involved with organized crime, or foreign state or foreign state-supported actors). Cybersecurity threat actors employ a wide variety of methods and techniques that are constantly evolving, increasingly sophisticated, and difficult to detect and successfully defend against. Cybersecurity incidents involving our IT systems or those of our third-party vendors could expose us to claims, litigation, regulatory or other governmental investigations, administrative fines and potential liability. Any system failure, accident or security breach could result in disruptions to our operations. A material network breach in the security of our IT systems or those of our third-party vendors could include the theft of our trade secrets, customer information, human resources information or other confidential data, including but not limited to personally identifiable information, that could have a material adverse effect on our business, financial condition, or results of operations. To the extent that any material disruptions or security breaches result in a loss or damage to our data, or an inappropriate disclosure of confidential, proprietary or customer information, it could materially cause damage to our reputation, affect our relationships with our customers and strategic partners, lead to claims against us from governments and private plaintiffs, and ultimately have a material adverse effect on our business. While we have been the previous target of cyberattacks and security breaches, none of these attacks or breaches to date have had a material adverse effect on us. We cannot guarantee that future cyberattacks, if successful, will not have a material effect on our business or financial results.
Current wording
We and some of our third-party vendors receive and store personal information in connection with our human resources operations and other aspects of our business. Our IT systems and those of our third-party vendors, are vulnerable to damages from computer viruses, natural disasters, fire, power loss, telecommunications failures, personnel misconduct, human error, unauthorized access, physical or electronic security breaches, cyber-attacks (including malicious and destructive code, phishing attacks, ransomware, and denial of service attacks), and other similar disruptions. We continue to develop our processes relating to identification, mitigation and response to potential cybersecurity threats, and such processes may prove to be inadequate. Such attacks or security breaches may be perpetrated by bad actors internally or externally (including computer hackers, persons involved with organized crime, or foreign state or foreign state-supported actors). Cybersecurity threat actors employ a wide variety of methods and techniques that are constantly evolving, increasingly sophisticated, and difficult to detect and successfully defend against. Cybersecurity incidents involving our IT systems or those of our third-party vendors could expose us to claims, litigation, regulatory or other governmental investigations, administrative fines and potential liability. Any system failure, accident or security breach could result in disruptions to our operations. A material network breach in the security of our IT systems or those of our third-party vendors could include the theft of our trade secrets, customer information, human resources information or other confidential data, including but not limited to personally identifiable information, that could have a material adverse effect on our business, financial condition, or results of operations. To the extent that any material disruptions or security breaches result in a loss or damage to our data, or an inappropriate disclosure of confidential, proprietary or customer information, it could materially cause damage to our reputation,
Previous wording
We rely on the technology, infrastructure, and software applications of certain third parties in order to host or operate some of our business. Additionally, we rely on computer hardware purchased in order to operate our business. We do not have control over the operations of the facilities of the third parties that we use. In addition, as of the date of this Report, we have not implemented formal processes to oversee and identify risks from cybersecurity threats associated with our use of third parties. If any of these third-party services experience errors, disruptions, security issues, or other performance deficiencies, if these services, software, or hardware fail or become unavailable due to extended outages, interruptions, defects, or otherwise, or if they are no longer available on commercially reasonable terms or prices (or at all), these issues could result in material errors or defects in our platforms (including causing our platforms to fail), our revenue and margins could materially decline, or our reputation and brand to be materially damaged. Additionally, we could be exposed to material legal or contractual liability, our expenses could materially increase, our ability to manage our operations could be materially interrupted, and our processes for servicing our customers could be materially impaired until equivalent services or technology, if available, are identified, procured, and implemented, all of which may take significant time and resources, increase our costs, and could materially and adversely affect our business. Many of these third-party providers attempt to impose limitations on their liability for such errors, disruptions, defects, performance deficiencies, or failures, and if such limitations are enforceable, we may have additional liability to our customers or third-party providers that could have a material adverse effect on our business. A failure to maintain our relationships with our third-party providers (or obtain adequate replacements), and to receive services from such providers that do not contain any material errors or defects, could adversely affect our ability to deliver effective products and solutions to our customers and adversely affect our business and results of operations.
Current wording
We rely on the technology, infrastructure, and software applications of certain third parties in order to host or operate some of our business. Additionally, we rely on computer hardware purchased in order to operate our business. We do not have control over the operations of the facilities of the third parties that we use. However, our recent adoption of a governance, risk and compliance platform to manage third party risk will help us establish and maintain a formalized program. If any of these third-party services experience errors, disruptions, security issues, or other performance deficiencies, if these services, software, or hardware fail or become unavailable due to extended outages, interruptions, defects, or otherwise, or if they are no longer available on commercially reasonable terms or prices (or at all), these issues could result in material errors or defects in our platforms (including causing our platforms to fail), our revenue and margins could materially decline, or our reputation and brand to be materially damaged. Additionally, we could be exposed to material legal or contractual liability, our expenses could materially increase, our ability to manage our operations could be materially interrupted, and our processes for servicing our customers could be materially impaired until equivalent services or technology, if available, are identified, procured, and implemented, all of which may take significant time and resources, increase our costs, and could materially and adversely affect our business. Many of these third-party providers attempt to impose limitations on their liability for such errors, disruptions, defects, performance deficiencies, or failures, and if such limitations are enforceable, we may have additional liability to our customers or third-party providers that could have a material adverse effect on our business. A failure to maintain our relationships with our third-party providers (or obtain adequate replacements), and to receive services from such providers that do not contain any material errors or defects, could adversely affect our ability to deliver effective products and solutions to our customers and adversely affect our business and results of operations.
Previous wording
As cyber incidents become more frequent and the sophistication of threat actors increases, our associated cybersecurity costs have and are expected to continue to increase. Specifically, we expect to implement several incremental cybersecurity improvements over the next 18 to 36 months to enhance our defensive capabilities and resilience. Despite our ongoing and anticipated cybersecurity efforts, a successful cybersecurity incident could lead to additional material costs, including those related to the loss of sensitive information, repairs to infrastructure or capabilities essential to our operations, responding to litigation or regulatory investigations, and those related to a material and adverse impact on our reputation, financial position, results of operations, or cash flows.
Current wording
As cyber incidents become more frequent and the sophistication of threat actors increases, our associated cybersecurity costs have and are expected to continue to increase. Recent advancements in our cybersecurity program, such as the adoption of a governance, risk, and compliance platform, provide us with more information to manage and report on our technical controls environment, maintain a functional cyber risk register, evaluate third party risk and measure our cyber initiatives against standard industry frameworks. Despite our ongoing and anticipated cybersecurity efforts, a successful cybersecurity incident could lead to additional material costs, including those related to the loss of sensitive information, repairs to infrastructure or capabilities essential to our operations, responding to litigation or regulatory investigations, and those related to a material and adverse impact on our reputation, financial position, results of operations, or cash flows.
Previous wording
If any of our subcontractors are unable to provide services that meet or exceed our customers’ expectations or satisfy our contractual commitments, our reputation, business and operating results could be harmed. In addition, if we are unable to avail ourselves of warranties and other contractual protections with providers of products and services, we may incur liability to our customers or additional costs related to the affected products and services, which could adversely affect our business, financial condition and results of operations. Moreover, any delays, malfunctions, inefficiencies or interruptions in these products or services could adversely affect the quality and performance of our projects and require considerable expense to maintain and repair our projects. This could cause us to experience interruption in our production and distribution of renewable energy and generation of related Environmental Attributes, difficulty retaining current relationships and attracting new relationships, or harm our brand, reputation or growth.
Current wording
If any of our subcontractors are unable to provide services that meet or exceed our customers’ expectations or satisfy our contractual commitments, our reputation, business and operating results could be harmed. For example, our development of the Montauk AG project in Turkey, North Carolina has been delayed due to the inability of the construction company to meet agreed upon deadlines. Furthermore, suppliers for this project have been unable to provide need materials to complete construction in a timely manner. In addition, if we are unable to avail ourselves of warranties and other contractual protections with providers of products and services, we may incur liability to our customers or additional costs related to the affected products and services, which could adversely affect our business, financial condition and results of operations. Moreover, any delays, malfunctions, inefficiencies or interruptions in these products or services could adversely affect the quality and performance of our projects and require considerable expense to maintain and repair our projects. This could cause us to experience interruption in our production and distribution of renewable energy and generation of related Environmental Attributes, difficulty retaining current relationships and attracting new relationships, or harm our brand, reputation or growth.
Showing the first 40 of 54 pairs. Open the source sections for the rest.
Rearranged current paragraphs (7)
Current report — wording carried from elsewhere
The occurrence of these or any other changes within any of the landfills where our projects operate could lead to a reduction in the amount of LFG available to operate our projects, which could have a material adverse effect on our business, financial condition and results of operations.
Current report — wording carried from elsewhere
Furthermore, the price of Environmental Attributes, including RINs, is driven by various market forces, including regulatory action, gasoline prices and the availability of renewable fuel from other renewable energy sources and conventional energy sources. For example, following the EPA’s issuance of annual Renewable Volume Obligations in recent years, market prices for certain RIN categories have experienced significant volatility in response to changes in mandated volumes, compliance flexibility, and market expectations. In addition, refiners are permitted to carry over up to 20% of RINs generated for one calendar year to satisfy their RVOs for the following year. As a result, we are generally only able to sell RINs on a forward basis for the year in which the RINs are generated and the subsequent year.
Current report — wording carried from elsewhere
-21- in a manner that could adversely affect our operations. Reductions in, changes to, or eliminations or expirations of governmental incentives could result in decreased demand for, and lower revenues from, our projects. Changes in the level or structure of the RPS of a state for electricity could also result in a decline in our revenues or decreased demand for, and lower revenues from, our electricity projects.
Current report — wording carried from elsewhere
In order to construct, modify and operate our projects, we will need to obtain or may need to modify numerous environmental and other regulatory permits, approvals and consents from federal, state and local governmental entities, including air permits, wastewater discharge permits, stormwater permits, permits or consents related to the management of municipal solid waste landfills and permits or consents related to the management and disposal of waste. A number of these permits, approvals and consents must be obtained prior to the start of development of a project. Other permits, approvals and consents are required to be obtained at, or prior to,
Current report — wording carried from elsewhere
-23- solely on the condition that we carry out certain corrective measures to the proposed project. Opposition to our projects’ requests for permits or successful challenges or appeals to permits issued for our projects could adversely affect our operating plans.
Current report — wording carried from elsewhere
We are required to register an RNG project with the EPA and relevant state regulatory agencies to generate Environmental Attributes. As a participant of the EPA's RFS program, we qualify our RINs through a voluntary Quality Assurance Plan, which typically takes from three to five months from first injection of RNG into the commercial pipeline system. The Biogas Regulatory Reform Rule ("BRRR") implemented changes to the RFS program effective January 1, 2025. The BRRR requires that all unseparated K3 RINs generated by the RNG producer on RNG volumes injected into the commercial pipeline distribution system only become valid for sale once they are separated with the support of dispensing statements by a registered dispenser or RIN separator. This process has proven to result in delays to the RNG producer's receipt of the separated K2 RINs from the dispenser. This rule change could also result in a RNG producer's failure to generate K3 RINs for a given gas flow month if the registered biogas producer negligently fails to generate the necessary biogas tokens before the end of the subsequent gas flow month. Furthermore, although no similar qualification process currently exists for LCFS credits, we expect such a process to be implemented and would expect to seek qualification on a state-by-state basis under such future programs. Changes to the LCFS program require annual verification of the CI
Current report — wording carried from elsewhere
-25- affect our relationships with our customers and strategic partners, lead to claims against us from governments and private plaintiffs, and ultimately have a material adverse effect on our business. While we have been the previous target of cyberattacks and security breaches, none of these attacks or breaches to date have had a material adverse effect on us. We cannot guarantee that future cyberattacks, if successful, will not have a material effect on our business or financial results.
Rearranged previous paragraphs (9)
Previous report — wording carried elsewhere
-16- affect, our RNG production and transmission. These impacts are greater than would be if our business was more geographically diverse.
Previous report — wording carried elsewhere
Our projects generally are, and any of our future projects are likely to be, located on land occupied pursuant to long-term easements, leases and rights of way. The ownership interests in the land subject to these easements, leases and rights-of-way may be subject to mortgages securing loans or other liens (such as tax liens) and other easement, lease rights and rights-of-way of third parties
Previous report — wording carried elsewhere
Our business is currently focused on converting methane into renewable energy. In the future, we may expand our strategy to include other types of projects. For example, we have entered into an agreement with European Energy North America under which we supply biogenic carbon dioxide for the creation of e-methanol and have announced a pilot project with Emvolon in which we will recover and convert biogas into green methanol. We cannot assure you that we will be able to identify attractive opportunities outside of our current area of focus or acquire or develop such projects at a price and on terms that are attractive or that, once acquired or
Previous report — wording carried elsewhere
-23- provide indemnification against, environmental liabilities that could expose us to material losses. In addition, claims for damages to persons or property, including natural resources, may result from the EHS impacts of our operations. Our insurance may not cover all environmental risks and costs or may not provide sufficient coverage if an environmental claim is made against us.
Previous report — wording carried elsewhere
-24- that encourage the use of other energy sources over renewable energy, could adversely affect our business, financial condition and results of operations.
Previous report — wording carried elsewhere
-25- manage the capacity that we expect from our projects in our anticipated timeframes, it could adversely affect our business, financial condition and results of operations.
Previous report — wording carried elsewhere
-26- the amount of energy that our projects are able to deliver. Any of these events, to the extent not fully covered by insurance, could adversely affect our business, financial condition and results of operations.
Previous report — wording carried elsewhere
-29- in Item 7 “Management’s Discussion and Analysis of Financial Condition and Results of Operations—Liquidity and Capital Resources.”
Previous report — wording carried elsewhere
-32- not carry key personnel insurance for any of our management executives, and the loss of any key employee or our inability to recruit, develop and retain these individuals as needed, could adversely affect our business, financial condition and results of operations.