A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.

FY2025 · Filed Mar 11, 2026

MNTK$2.72+12.9%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-K

Period ended 2024-12-31; filed 2025-03-14.

0000950170-25-039495

Item 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

Current report: 10-K

Period ended 2025-12-31; filed 2026-03-11.

0001193125-26-102364

Item 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 214 previous paragraphs and 231 current paragraphs.

111 unchanged; 63 reworded; 43 added; 34 removed; 6 previous and 14 current paragraphs rearranged.

Tables are not compared: 7 previous and 7 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (43)

Current report

-37- which could impact capacity utilization. In connection with the commissioning of the second facility, we produced approximately 7.8% more MMBtu during 2025 as compared to 2024.

Current report

In 2025, through our wholly-owned subsidiary Pesta Energy, LLC, we entered into an agreement with Pioneer Renewables Energy Marketing, LLC to form a joint venture, GreenWave Energy Partners, LLC (“Greenwave”). The primary goal of the joint venture is to help address the limited capacity of RNG utilization for transportation by offering third party RNG volumes access to exclusive unique and proprietary pathways. In the third quarter of 2025, Greenwave began matching available RNG volumes to dispensing opportunities through Greenwaves's transportation pathways. The joint venture has matched available dispensing capacity with available third party RNG volumes to separate RINs. We recorded income from Greenwave of $1,485 in 2025. Our capital investment in the joint venture is estimated to be up to approximately $4,500, subject to various and certain requirements as defined in the underlying agreements.

Current report

In 2024, the North Carolina Utilities Commission ("NCUC") approved our Turkey, North Carolina location for a New Renewable Energy Facility (“NREF”) designation and Certificate of Public Convenience and Necessity. In October 2024, our amended NREF application was approved. In 2024, the North Carolina legislature approved a statutory change to its Clean Energy and Energy Efficiency Portfolio Standards ("CEPS") governing the generation of RECs from swine waste that established a REC multiplier for swine waste produced in a Tier 1 county, which includes Sampson County, the location of our Turkey facility. For

Current report

-38- qualifying projects, for each swine REC generated, 2 enhanced RECs will be credited for a total three RECs for a period of 8 years, followed by one enhanced REC for a total two RECs for a period of 6 years and a credit of one REC thereafter. There is a limit of 80 enhanced RECs in a year.

Current report

In September 2025, a joint motion was filed with the NCUC by various entities seeking to modify and delay certain aspects of the CEPS, specifically, the portfolio standards relating to swine RECs. In October 2025, we filed response comments to the joint motion with the NCUC requesting they grant modifications or delays only to individual power supplies that have demonstrated need, require power suppliers that have not achieved 100% compliance in 2025 to apply any cumulatively acquired swine RECs to the suppliers unsatisfied 2025 pro rata obligation, and modify the swine REC set-aside for 2026 and beyond to match the requirement originally set by North Carolina in 2018. In January 2026, the NCUC denied the request for waivers and determined that parties must use banked RECs to meet 2025 compliance targets with the ability to use solar RECs to fill any compliance shortage. The compliance obligations for those utilities filing the September 2025 joint motion continue to increase through 2029.

Current report

We have entered into a ten-year agreement to sell all of the renewable electricity generated by the project. Furthermore, we expect the annual REC capacity of the Turkey location to be approximately 120 RECs and have signed a REC agreement with Duke Energy for 47 RECs. We continue to optimize our monetization strategies for the currently uncontracted portion of annually generated RECs and are in various stages of negotiation and responses to requests from obligated purchasers. Many of these agreements contain competitive details and, while there remains a limited active swine REC market in North Carolina, we believe the prices we are negotiating will be market based. We believe the price per swine REC could fall within the range of $200 to $400 per REC.

Current report

Capital Investment and Progress towards Commercial Operation Date (COD)

Current report

We currently expect the first phase capital investment to be approximately $200,000 and have spent approximately $140,000 as of December 31, 2025. Winter storms in the Carolinas early 2026 and project deliveries have caused only nominal project delays. We have begun to commission the facility and expect our production and revenue generation activities to commence in April 2026.

Current report

We estimate our Montauk Ag Renewables project to potentially generate tax attributes once placed into service consisting mainly of a mix of federal investment tax and production tax credits and North Carolina state tax attributes. Based on our Pico digestion expansion project experience, for other large and qualifying projects we believe that 50-75% of project capital will quality for IRC code section 48 investment tax credits and, depending on a variety of factors for projects started within various safe harbor guidelines, the tax benefits could be up to 30%. For qualifying projects which do not meet the various safe harbor guidelines, we expect the tax benefits to range between 6-12% for qualifying assets. As it relates to our capital expenditures and future electric power production, we estimate IRC code section 48 investment tax credits and production tax credits could range between $6,000 - $20,000. We give no assurances that our estimates on tax attributes for our Montauk Ag Renewables project will meet these expectations.

Current report

-39- approximately 4,100 scfm of averaged unprocessed gas which is more than the anticipated inlet of the RNG facility currently under development.

Current report

In connection with our gas rights agreement with our landfill host at our Rumpke RNG location, in 2025, we began the process of relocating our existing Rumpke RNG facility. The timing of this project and requirement to relocate the facility coincides with the landfill's filling practices moving into the existing area of our Rumpke RNG facility and is contractually obligated. We expect facility commissioning in 2028 and the capital expenditures to range between $70,000 - $90,000, which is dependent on the timing of capital expenditures and potential other production capabilities requested by the landfill host. We continue to incur capital expenditures for this project. Additionally, the landfill host has requested a modification of our current development design to accommodate a large CNG filling station for their fleet.

Current report

On June 13, 2025, the EPA released both the Partial Waiver of the 2024 Cellulosic Biofuel Volume Requirement (Final Rule) and RFS Standards for 2026 and 2027, Partial Waiver of 2025 Cellulosic Biofuel Volume Requirement, and Other Changes (Proposed Rule). The final 2024 cellulosic biofuel volume requirement was reduced from 1,090 to 1,010 million D3 RINs. This reduction was based on actual volumes of D3 RINs generated in 2024. In addition, the EPA is making Cellulosic Waiver Credits ("CWCs") available for 2024 as an additional compliance flexibility for obligated parties.

Current report

In the EPA’s proposed rule released on June 13, 2025, the cellulosic biofuel volumes for 2025 were proposed to be reduced

Current report

from 1,376 to 1,190 RINs and make CWCs available for 2025. The proposed cellulosic biofuel volume requirements for 2026 and

Current report

2027 are 1,300 and 1,360 D3 RINs, respectively. These volumes are less than the EPA had previously finalized for 2025 and are

Current report

based on their belief that cellulosic RIN generation from biogas-derived CNG/LNG during 2026-2030 will be constrained by the total

Current report

usage capacity of CNG/LNG as transportation fuel. These proposed rules are subject to comment periods prior to finalization.

Current report

On August 22, 2025, EPA issued decisions on 175 Small Refinery Exemption (SRE) petitions. EPA granted full exemption (100%) to 63 petitions and partial exemptions (50%) to 77 petitions. The SRE decisions exempted corresponding volumes of gasoline and diesel for the 2023 and 2024 compliance years, and increased the number of RINs available for obligated parties to use for compliance with their RFS obligations. Taking into consideration the expected impacts of the SRE decisions on the RFS market, on September 16, 2025, EPA co-proposed a Supplemental Rule that provides additional volumes in 2026 and 2027 RVOs that will represent complete (100%) reallocation or partial (50%) reallocation for SREs granted in full or in part, respectively, for 2023 and 2024, as well as those projected to be granted for 2025.

Current report

EPA has indicated an intention to finalize the Supplemental Rule & the RVOs for 2025, 2026 and 2027 by the end of 2025, however, the duration of the US federal government shut down and any residual impacts on EPA staffing after the shutdown concludes may extend finalization of these items into 2026.

Current report

On March 15, 2025, the Full-Year Continuing Appropriations and Extensions Act, 2025 was signed into law. In May 2025, we

Current report

were informed that the law eliminated the United States Department of Agriculture Advanced Biofuel Payment Program. We

Current report

received approximately $200 annually since 2021 under this program. In November 2025, we received notice that the program was reinstated and that retroactive payments would be issued for the missed quarters while the program was closed.

Current report

The BRRR requires that all unseparated K3 RINs generated by the RNG producer on RNG volumes injected into the commercial pipeline distribution system only become valid for sale once they are separated with the support of dispensing statements by a registered dispenser or RIN separator. This process could result in delays to the RNG producer's receipt of the separated K2 RINs from the dispenser. This rule change could also result in a RNG producer's failure to generate K3 RINs for a given gas flow month if the registered biogas producer negligently fails to generate the necessary biogas tokens before the end of the subsequent gas flow month.

Current report

We produced 5,644 MMBtu of RNG during 2025, an increase of 57 MMBtu (1.0%) compared to 5,587 MMBtu in 2024. We increased our production when considering our 2024 fourth quarter sale of our Southern facility which produced 85 MMBtu in 2024. Our Rumpke facility produced 218 MMBtu more in 2025 compared to 2024 as a result of increased volumes of feedstock gas. Our McCarty facility produced 76 MMBtu less in 2025 compared to 2024. The decrease is related to the landfill host wellfield bifurcation and changes to the wellfield collection system.

Current report

We recorded approximately $3,415 in Environmental Attribute revenues from RINs distributed from GreenWave. We sold approximately 1,483 RINs distributed from GreenWave, which are not included within our operating metrics table. As a result of the services performed by GreenWave, we recorded income from GreenWave of $1,485.

Current report

We recorded approximately $3,428 in environmental attribute expense related to the cost of RINs distributed from GreenWave and the costs related to pathway dispensing associated with our dispensing RNG in exclusive unique and proprietary pathways, which are not included within our operating metrics table. There were no such expenses incurred during 2024.

Current report

Depreciation, depletion and amortization in 2025 was $29,972, an increase of $6,457 (27.5%) compared to $23,515 in 2024. The increase was primarily driven by the timing of wellfield and maintenance capital investments and our Second Apex RNG Facility project being placed into service.

Current report

requires that MEH provide additional financial information and analysis to the lenders within fifteen business days of the end of each month

Current report

On March 9, 2026, we entered into a new five year senior credit facility ("New Senior Credit Facility") with CCH1 MEH Lender LLC (a wholly owned subsidiary of Hannon Armstong Capital LLC) ("HASI") that provides up to $200,000 in senior indebtedness. The New Senior Credit Facility has a 24 month availability period during which only interest is payable quarterly. After the availability period, we will be subject to quarterly principal payments equal to 1.25% of the total outstanding principal balance. The New Senior Credit Facility has an interest rate of 10.25% and matures in 2031.

Current report

The New Senior Credit Facility is subject to customary financial covenants. The New Senior Credit Facility is subject to customary events of default and contemplates that we would be in default if, for any fiscal quarter (x) the average monthly D3 RIN price is less than $1.00 per RIN and (y) the consolidated average quarterly trailing EBITDA over the previous four quarters is less than $10,000. The New Senior Credit Facility includes various affirmative and negative covenants that require us to meet specified financial ratios and financial tests, as defined in the underlying agreement.

Current report

Under the New Senior Credit Facility, we are required to maintain the following, which became applicable upon entry into the new facility on March 9, 2026:

Showing the first 40 of 43 passages. Open the source sections for the rest.

Removed paragraphs (34)

Previous report

In 2024, a collaboration with Emvolon was announced to transform methane emissions from waste stream biogas into high-value carbon negative fuel. Leveraging Emvolon's patented technology, the initial pilot at our Atascocita facility in Houston, Texas is a small-scale demonstration of recovering and converting biogas into green methanol. The pilot is designed to provide proof of concept and we may eventually move to a commercial facility capable of producing up to 15 thousand gallons of green methanol per year. The ultimate goal is to lead to a full-scale, commercial system capable of producing up to 2,400 gallons of methanol annually at the same or similar sites. We do not expect any short term financial benefits from this demonstration nor a disruption to our operations.

Previous report

In 2024, we reached an agreement with the site host to sell the gas rights ahead of the fuel supply expiration of one of our existing REG operating facilities. We received proceeds of $1,000 and no longer have obligations to decommission or remove any machinery or equipment at the site. The proceeds received were in excess of the carrying value of the site. The PPA at this site expired during 2024 at which time we estimated that the revenues from this site would significantly decrease adversely impacting this sites future cash flows from operations. The effective date of the sale was October 1, 2024. In connection with the sale, we secured fuel supply agreement amendments to extend the terms of our existing RNG operating facilities, Atascocita and Coastal Plains.

Previous report

In December 2024, we entered into an asset purchase agreement to sell an RNG site for a purchase price of $1,000. We entered into the agreement regarding this immaterial site in advance of the expiration of the gas rights agreement at this site. The proceeds received were in excess of the carrying value of the site.

Previous report

We expect the capital investment to range from approximately $25,000 to $35,000 and be commissioned during the first quarter of 2027.

Previous report

Our progress with regulatory agencies in North Carolina related to the resulting power generation derived from swine waste to confirm its eligibility for RECs under North Carolina’s Renewable Energy Portfolio Standards in anticipation of commercial production remains ongoing. The Turkey location was approved to participate in the Piedmont Natural Gas Renewable Gas Pilot Program which is a step towards obtaining the NREF designation under the NCUC. In January 2024, we received notification from the NCUC that the Turkey, NC location was approved for an NREF and Certificate of Public Convenience and Necessity. In October 2024, our amended NREF application was approved. In December 2024, as part of a broader North Carolina omnibus bill package, the State of North Carolina approved a change in the laws governing the generation of RECs from swine waste under its renewable energy portfolio standards. For qualifying projects in qualifying locations, qualifying swine REC generators have the ability to generate 3:1 RECs for a period of 8 years, followed by 2:1 RECs for a period of 6 years, with normal 1:1 REC generation thereafter. The implementation of this law is ongoing with the NCUC and is subject to limitations, including but not limited to, the annual generation of swine RECs under the change in law.

Previous report

In July 2023 we signed a REC agreement with Duke Energy (“Duke”). At full first phase capacity, we anticipate the ability to process feedstock from over 200 hog spaces per day, which equates to over two hundred tons of daily waste collection. We currently estimate the first phase of the project will annually produce approximately 45 to 50 MWh equivalents through the combination of 190 to 200 MMBtu and 25 to 30 MWh. We also estimate that at full processing capabilities, the first phase of the project will additionally produce annually 17 to 20 tons of organic fertilizer alternatives. Once the first phase and the facility has been fully commissioned, the project will provide sufficient capacity to satisfy the Duke REC agreement through the deployment of up to eight operational processing lines at the Turkey Creek facility.

Previous report

With the change in REC generation passed by the state of North Carolina, we are in various other negotiations with other utility users to provide swine RECs from our expected first phase production of MWh.

Previous report

We continue to test the most efficient methods of transporting the swine feedstock from the collection farms to the centralized process location. Currently, we are testing a waste palletization process on the mobile equipment. This palletization will capture the energy content in the waste preventing energy decay from time as well as enabling more efficient processing through the reactor. We currently estimate that each mobile collection and transportation unit could range up to approximately $300.

Previous report

Our electricity interconnection is ongoing and expected to be completed in the fourth quarter of 2025. This timeline meets our expectations for the commissioning of our reactors and to begin revenue generating activities. Additionally, and to provide future optionality, the gas interconnection is expected to be commissioned in the second quarter of 2025. While the production of RNG is currently secondary to the generation of MWh and swine RECs, this gas interconnection could provide future revenue opportunities to the Turkey, NC location through either production on site or through the injection of gas from other providers.

Previous report

Including the original equipment acquired in the Montauk Ag Renewables Acquisition, the Turkey, North Carolina asset acquisition, and the relocation of the Magnolia, NC site reactor to Turkey, NC, we currently expect the first phase capital investment to range between $140,000 and $160,000. We continue to use the pilot reactor that was relocated in 2023 and previously operated prior to the 2021 Montauk Ag Renewables Acquisition. The pilot reactor testing includes refining feedstock conveyance, equipment processing, product gas composition, and the composition of the solid output. We have processed and tested both the biogas and micronutrient organic fertilizer alternatives. We are also continuing to staff the Turkey, North Carolina location. With the engineering of the Turkey, NC location being substantively completed, we have finalized an EPC contract to complete the site construction.

Previous report

Excluding capital expenditures related to feedstock processing but including the original 2021 Montauk Ag Asset Acquisition, we have incurred the following significant capital expenditures at the Turkey, NC site:

Previous report

$16,856 related to the site including land and improvements

Previous report

$15,891 associated with electrical and engineering related matters

Previous report

We continue to develop the opportunities with Montauk Ag Renewables and can give no assurances that our plans related to this acquisition will meet our expectations. Utility interconnection, both inbound to and outbound from our centralized Turkey, NC processing facility is dependent on factors outside of our control. Regulatory development and offtake negotiations could delay our ability to fully optimize or meet the timing expectations related to revenue producing activities. Our current construction timeline and costs are subject to delays or costs increases, respectively. We continue to design and plan for the development of the Turkey, NC facility to be used for commercial production. We expect the Magnolia, NC location to be used for various feedstock processing needs. Based on our current development timeline expectations, we expect to commence significant revenue generating activities in 2026. We intend to contract with additional farms to secure feedstock sources for future production processes.

Previous report

In 2023, we announced the planned entrance into South Carolina with the development of a new landfill gas-to-RNG facility. The planned project was expected to contribute approximately 900 MMBtu per day of production capacity upon commissioning.

Previous report

We continue to evaluate opportunities to convert existing facilities from Renewable Electricity to RNG production. These opportunities tend to be most attractive for any merchant electricity facilities given the favorable economics for the sale of RNG plus RINs relative to the sale of market rate electricity plus RECs. This strategy has been an increasingly attractive avenue for growth since 2014 when RNG from landfills became eligible for D3 RINs. However, during the conversion of a project, there is a gap in production while the electricity project is offline until it commences operation as an RNG facility, which can adversely affect us. This timing effect may adversely affect our operating results as a result of our potential conversion of Renewable Electricity projects. Upon completion of a conversion, we expect that the increase in revenue upon commencement of RNG production will more than offset the loss of revenue from Renewable Electricity production. Historically, we have taken advantage of these opportunities on a gradual basis at our merchant electricity facilities, such as Atascocita and Coastal Plains.

Previous report

The EPA did not meet the statutorily required deadline of November 2024 to finalize 2026 obligations under the RFS. The EPA is still expected to target March 2025 to propose RFS obligations for 2026 unless the EPA is directed otherwise by the Trump administration.

Previous report

Despite collaboration with the landfill host at our Rumpke facility on our gas collection efforts, wellfield extraction environmental factors continue to impact gas extraction at the site. While the landfill continues to expand its waste intake and we continue to expand wellfield collection, our volumes have been impacted during 2024. Mitigation efforts related to wellfield environmental factors will continue into 2025 as the benefits from 2024 efforts have not achieved anticipated results.

Previous report

We produced 5,587 MMBtu of RNG during 2024, an increase of 88 MMBtu (1.6%) compared to 5,499 MMBtus in 2023. Wellfield optimization operational enhancements as well as plant processing equipment improvements contributed to the increase, notably with our Coastal facility producing 111 MMBtu more in 2024 compared to 2023. Our Pico facility produced 76 MMBtu more in 2024 compared to 2023 as a result of commissioning our dairy digestion expansion project. Our Galveston facility produced 59 MMBtu more in 2024 compared to 2023 as a result of previously disclosed 2023 dry weather conditions impacting gas feedstock availability. Offsetting these improvements were unrelated wellfield quality issues and weather anomalies which lowered production, led by our Rumpke facility producing 159 fewer MMBtu in 2024 compared to 2023.

Previous report

Depreciation, depletion and amortization in 2024 was $23,515, an increase of $2,357 (11.1%) compared to $21,158 in 2023 . The increase is associated with the timing of capital investments placed into service in 2024, specifically our Pico digestion capacity increase and Raeger capital improvement projects.

Previous report

December 31, 2023, we recorded an impairment of $902 for specifically identified RNG machinery and feedstock processing equipment that were no longer in operational use.
Reworded paragraphs (63)

Previous wording

The following discussion and analysis of our financial condition and results of operations should be read in conjunction with our financial statements and the related notes to those statements included elsewhere in this Annual Report on Form 10-K.

Current wording

The following discussion and analysis of our financial condition and results of operations should be read in conjunction with our financial statements and the related notes to those statements included elsewhere in this Annual Report on Form 10-K. Amounts are in thousands unless indicated otherwise.

Previous wording

Our profitability is highly dependent on the market price of Environmental Attributes, including the market price for RINs. As we self-market a significant portion of our RINs, a decision not to commit to transfer available RINs during a period will impact our revenue and operating profit. We decided to not transfer all available D3 RINs generated and available for transfer during the fourth quarter of 2024. As a result, in the first quarter of 2025, we had approximately 9,885 RINs in inventory related to 2024 RNG production. We have entered into commitments to transfer all RINs generated and available for sale from 2024 RNG production. We have not entered into commitments to transfer future RINs generated from forecasted future 2025 RNG production. The average D3 RIN index price for the fourth quarter of 2024 and January 2025 through February 28, 2025 was approximately $2.80 and $2.42, respectively.

Current wording

Our profitability is highly dependent on the market price of Environmental Attributes, including the market price for RINs. As we self-market a significant portion of our RINs, a decision not to commit to transfer available RINs during a period will impact our revenue and operating profit. We expect the timing between RINs generated and unseparated and RINs available for sale to only impact 2025 which is the year BRRR became effective. We have entered into commitments to transfer all RINs generated and available for sale from 2025 RNG production. We had approximately 190 RINs generated and unseparated at December 31, 2025. We have entered into commitments to transfer approximately 2,500 RINs generated and available for sale from 2026 RNG production. The average D3 RIN index price for the fourth quarter of 2025 and January 2026 through February 28, 2026 was approximately $2.39 and $2.41, respectively. The following table summarizes select historical data related to RINs generated, RINs sold, and RINs generated but unsold. As we self-market a significant portion of our RINs and as the RFS is based on annual compliance, any strategic decision to not monetize available RINs in a quarter could impact the timing of operating revenues recognized during a fiscal year. Realized prices for Environmental Attributes monetized in a year may not correspond directly to index prices due to the forward selling of commitments. The timing of RIN transfers can vary year over year and by period within a year and is contingent on various factors including, but not limited to: (a) the Company’s expectations on RIN index price, (b) operational needs of the Company, (c) obligated parties’ purchase needs, or (d) the type of customer among other matters.

Previous wording

The following summarizes our ongoing development growth plans expected capacity contribution, anticipated commencement of operations, and capital expenditure estimate, respectively, excluding Montauk Ag Renewables Development project:

Current wording

The following summarizes our ongoing development growth plans, expected capacity contribution, anticipated commencement of operations, and capital expenditure estimate, excluding the Montauk Ag Renewables Development project:

Previous wording

In 2024, we successfully commissioned the expansion of our digestion capacity which is necessary to process the final tranche of increased feedstock expected to be received in the second quarter of 2025. Upon receipt of the final tranche, we will make the final contractual payment to the dairy host. As a result of the increased digestion capacity, we produced approximately 73.4% more MMBtu during 2024 as compared to 2023.

Current wording

In 2025, we began processing the final tranche of increased feedstock. Upon receipt of the final tranche, we made the final contractual payment to the dairy host. As a result of the increased digestion capacity, we produced approximately 31.8% more MMBtu during 2025 as compared to 2024. During 2025, our digestion inlet feedstock averaged approximately 458 gallons per day, approximately 17% in excess of our contracted minimums of 390 gallons per day. We are currently evaluating additional development expansion opportunities to ensure beneficial processing of all available feedstock volumes.

Previous wording

In 2022, we announced the planned construction of a second RNG processing facility at the Apex landfill. The construction of a second facility under our existing fuel supply agreement was triggered by biogas feedstock volumes exceeding production capabilities discussions with the landfill host, and the host's waste intake forecasted projections. As the landfill host increases waste intake, we believe the additional 2,100 MMBtu per day of production capacity will enable us to process the forecasted increase in biogas feedstock volumes. We continue to expect there will be a period where we have excess availability capacity after the second facility is commissioned while the landfill host increases their waste intake. We are incurring capital expenditures for the project and expect commercial operations in the second quarter of 2025.

Current wording

In 2025, we successfully completed the construction and commissioning of a second RNG processing facility at the Apex landfill. The construction of a second facility under our existing fuel supply agreement was triggered by biogas feedstock volumes exceeding production capabilities, discussions with the landfill host, and the host's waste intake forecasted projections. We continue to expect there will be a period where we have excess availability capacity after the second facility is commissioned while the landfill host increases its waste intake. We continue to collaborate with the landfill host to mitigate impacts from wellfield extraction factors

Previous wording

We experienced delays with our interconnection, most recently due to the utility informing us of their near-term prioritization of remediation efforts from the impacts of Hurricane Helene. In February 2025, we received notice from the utility that it will no longer be honoring a letter of intent secured when we won the development rights to this location and will no longer accept RNG into its distribution system. We continue to review various alternatives related to interconnection opportunities as part of our considerations for offtake options with the understanding those alternatives may differ from initial development project assumptions, included but not limited to physical and virtual and fixed interconnections. We are also reviewing alternatives for this site around producing energy other than RNG. We have paused further capital expenditures related to this site while we consider all alternatives.

Current wording

In 2025, we received notice from the utility that it will no longer accept RNG into its distribution system, which was in opposition of the letter of intent that was issued when we were awarded the gas rights to the site. As a result, we impaired the capital associated with the interconnection and equipment. We continue to have $1,000 recorded associated with the payment upon award of the gas rights agreement. We continue to review various alternatives related to interconnection opportunities as part of our considerations for offtake options with the understanding those alternatives may differ from initial development project assumptions, including physical and virtual and fixed interconnections. We are also reviewing alternatives for this site around producing energy other than RNG. We have paused capital expenditures related to this site while we consider all alternatives and continue discussions with the landfill host.

Previous wording

In 2025, we began an initiative to convert our Tulsa, Oklahoma Renewable Electric Generation facility project through the design and construction of an RNG facility. The project will offer a variable inlet capacity providing production capacity of approximately 1,500 MMBtu per day and designed to beneficially process all of the available inlet gas feedstock from its landfill host.

Current wording

In 2025, we announced the conversion of our Tulsa, Oklahoma Renewable Electric Generation facility to RNG project. The project will offer a variable inlet capacity, ranging from 550 scfm to 2,250 scfm per day, providing average production capacity we target to be approximately 1,500 MMBtu per day and designed to beneficially process all of available inlet gas feedstock from its landfill host. We expect commissioning in 2027 and to continue incurring capital expenditures for long lead items. For the second half of 2025, our wellfield development initiatives have yielded increased feedstock totaling an overage of 1200 scfm per day.

Previous wording

In 2024, we signed a contract for the delivery of 140 thousand tons per year of biogenic carbon dioxide (“CO2”) from our four Texas facilities. We intend to capture, clean and liquefy CO2 at select Texas facilities, at which point it will be transported to EE North America (“EENA”), a Texas-based e-methanol facility. The delivery term is expected to last at least 15 years with first delivery expected to begin in 2027. During 2024, we completed the initial site surveys related to locating the CO2 processing equipment, evaluated equipment suppliers, and started engineering design. We continue to target a commissioning start in 2027 and currently expect the capital investment to begin in the second quarter of 2025 for long lead equipment and design engineering.

Current wording

In 2024, we signed a contract for the delivery of 140 thousand tons per year of biogenic carbon dioxide (“CO2”) from our four Texas facilities. We intend to capture, clean and liquefy CO2 at select Texas facilities, at which point it will be transported to EE North America (“EENA”), a Texas-based e-methanol facility. The delivery term is expected to last at least 15 years with first delivery expected to begin in 2027. In 2025, we have been recognizing an exclusivity fee related to the minimum tons of CO2. The annual price per ton under the contract is adjusted annually by the U.S. consumer price index. The agreement with EENA includes a 50% sharing component of any available tax attributes generated by us under code section 45Q, Carbon dioxide sequestration credit, in the Inflation Reduction Act, as applicable. We have completed the initial site surveys related to location of the CO2 processing equipment, evaluated equipment suppliers, and started engineering design. We believe that we can fulfill the contracted volumes with the development of CO2 at two of our Texas facilities. We continue to match our capital investment in these project opportunities with the development timeline of EENA’s facility.

Previous wording

In 2021, through a wholly-owned subsidiary Montauk Ag Renewables, we completed an asset purchase related to developing technology and a centralized processing location to recover residual natural resources from the waste streams of modern agriculture and to refine and recycle such waste products through proprietary and other processes in order to produce high quality renewable natural gas and recapture nitrogen, phosphorus, and micronutrient organic fertilizer alternatives (the “Montauk Ag Renewables Acquisition”).

Current wording

In 2021, Montauk Ag Renewables purchased technology and assets (the “Montauk Ag Renewables Acquisition”) to recover residual natural resources from swine waste and to refine and recycle such waste products through proprietary and other processes to produce high quality renewable electricity, North Carolina swine RECs, and micronutrient organic fertilizer alternatives. Upon completion of the first phase of the project, we expect that it will annually produce 41 MWh of electric power, approximately 121 RECs and 8.7 tons of organic fertilizer alternative.

Previous wording

We have entered into agreements with over forty separate farming locations to provide access to waste from at least 200 thousand hog spaces to support our expected processing needs under our first phase for the Turkey, NC location. We continue to install collection equipment at these separate farms to access the waste. We currently estimate capital investment of up to approximately $250 at each farm related to the installed collection equipment.

Current wording

At full first phase capacity, we anticipate the ability to process feedstock from approximately 400 to 450 hog spaces per day, which equates to approximately 35 tons of annual waste collection. We have entered into long term agreements with over forty separate farming locations to provide access to waste from at least 300 hog spaces to support our expected processing needs under our first phase for the Turkey location. We continue to install collection equipment at these separate farms to access the waste. We currently estimate capital investment of approximately $250 at each farm related to the installed collection equipment. We intend to contract with additional farms to secure feedstock sources for future production processes. In advance of commercial operation date, feedstock collection has begun with collecting the dewatered feedstock from each farm and transporting to the project site for pelletization and storage.

Previous wording

In 2023, we announced a planned development of a renewable natural gas landfill project in Irvine, CA at the Frank R. Bowerman Landfill to process the large and growing volumes of biogas in excess of the existing capacity of the REG facility. We expect facility commissioning in 2027 and expect the capital investment to range between $85,000 - $95,000. As part of the agreement to develop the RNG plant, we agreed to work with the landfill host on the landfill's management of its wellfield and flare facility permit requirements. The landfill has proposed corresponding changes to our agreement, which could impact our existing commissioning schedule. We continue to work with the landfill on these proposed changes to assess what, if any, impacts these changes could have on receipt of required regional regulatory construction permits. The project is anticipated to have production nameplate capacity of approximately 3,600 MMBtu per day, assuming currently forecasted biogas feedstock volumes projected to be available from the host landfill at the time of commissioning. We continue to incur capital expenditures for this project.

Current wording

In 2023, we announced a planned development of a renewable natural gas landfill project in Irvine, CA at the Frank R. Bowerman Landfill to process the large and growing volumes of biogas in excess of the existing capacity of the REG facility. We expect facility commissioning in 2027 and the capital investment to range between $85,000 - $95,000. As part of the agreement to develop the RNG plant, we agreed to work with the landfill host on the landfill's management of its wellfield and flare facility permit requirements and this work remains ongoing. The project is anticipated to have production nameplate capacity of approximately 3,600 MMBtu per day, assuming currently forecasted biogas feedstock volumes projected to be available from the host landfill at the time of commissioning. We continue to incur capital expenditures for this project. During 2025, wellfield initiatives have resulted in

Previous wording

Impact of Higher Selling, General and Administrative Expenses Prior to the Commencement of a Project’s Operation: We incur significant expenses in the development of new RNG projects. Under the Biogas Regulatory Reform Rule, effective July 1, 2024, theoretical storage of RNG for future RIN generation prior to receiving EPA registration is no longer permitted and the receipt of RINs will no longer be delayed after injecting into a pipeline. We expect the elimination of theoretical storage, when combined with more timely EPA registration, to not materially impact the commencement of RIN revenue generation after pipeline injection.

Current wording

Impact of Higher Selling, General and Administrative Expenses Prior to the Commencement of a Project’s Operation: We incur significant expenses in the development of new RNG projects.

Previous wording

Regulatory, environmental and social factors are key drivers that incentivize the development of RNG and Renewable Electricity projects and influence the economics of these projects. We are subject to the possibility of legislative and regulatory changes to certain incentives, such as RINs, RECs and GHG initiatives. On July 12, 2023, the EPA issued final rules in the Federal Register for the RFS volume requirements for 2023-2025. Final volumes for cellulosic biofuel were set at 838, 1,090 and 1,376 million RINs for the three years 2023, 2024 and 2025, respectively. The EPA did not finalize the eRIN program in this ruling, however, it indicated that it will continue to work on potential paths forward for the eRIN program. However, the EPA did not set a new date for a revised eRIN program. The cellulosic biofuel volumes in the final rule for 2024 and 2025 are lower than the proposed volume as they do not include cellulosic biofuel from eRINs. The final rule also included significant changes to the existing RFS

Current wording

Regulatory, environmental and social factors are key drivers that incentivize the development of RNG and Renewable

Previous wording

-42- program, referred to as BRRR, that will require the RNG industry to modify how all RINs are generated. On January 1, 2025, all RFS participants must comply with BRRR provisions. We have registered all of our facilities under the BRRR provisions and have obtained Q-RIN status for RIN generation starting January 1, 2025. Under the BRRR provisions, the EPA finalized a limitation that biogas from one facility has a single use under the RFS as proposed (i.e., biointermediate, RNG or CNG/LNG via biogas closed distribution system). The EPA clarified that this does not preclude non-RFS uses at same facility.

Current wording

referred to as BRRR, that required the RNG industry to modify how all RINs are generated as of January 1, 2025. We have registered

Previous wording

In December 2023, CARB released the formal proposal for new LCFS rules. The proposed rules will increase the stringency of CI reduction targets from 20% to 30% in 2030 and create a 2045 target of 90%. This reduction would have the potential impact of reducing the number of net credits in the program. CARB approved these new rules in November 2024, however in February 2025, the California Office of Administrative Law disapproved the changes because the regulations were not written in a way that persons directly affected by them could easily understand. CARB believes this disapproval to be routine and indicated its intention to resubmit the rules, which it has until June 2025 to do. Any substantive changes would be subject to a public comment period. The industry may see pricing volatility including potential decreases to LCFS credit prices whereas the amendments as originally approved were expected to increase LCFS credit prices. Also in the rules is a phase out of avoided methane crediting for dairy and swine manure pathways by 2040 for CNG usage and through 2045 for RNG used to produce hydrogen. The RNG deliverability/book and claim provisions for out-of-region projects will be eliminated for all projects that break ground after 2030. These projects will be required to demonstrate physical deliverability requirements beginning in 2041.

Current wording

In December 2023, CARB released the formal proposal for new LCFS rules. The proposed rules will increase the stringency of CI reduction targets from 20% to 30% in 2030 and 90% by 2045. This reduction would have the potential impact of reducing the number of net credits in the program. On July 1, 2025, CARB’s amended LCFS rules officially took effect setting the aggressive

Previous wording

We report revenues from two operating segments: Renewable Natural Gas and Renewable Electricity Generation. Corporate relates to additional discrete financial information for the corporate function; primarily used as a shared service center for maintaining functions such as executive, accounting, treasury, legal, human resources, tax, environmental, engineering, and other operations functions not otherwise allocated to a segment. As such, the corporate entity is not determined to be an operating segment but is discretely disclosed for purposes of reconciliation to the Company’s consolidated financial statements.

Current wording

-41- functions such as executive, accounting, treasury, legal, human resources, tax, environmental, engineering, and other operations functions not otherwise allocated to a segment. As such, the corporate entity is not determined to be an operating segment but is discretely disclosed for purposes of reconciliation to the Company’s consolidated financial statements.

Previous wording

Renewable Natural Gas Revenues: We record revenues from the production and sale of RNG and the generation and sale of the Environmental Attributes derived from RNG, such as RINs and LCFS credits. Our RNG revenues from Environmental Attributes are recorded net of a portion of Environmental Attributes shared with off-take counterparties as consideration for such counterparties using the RNG as a transportation fuel. We had certain pathway provider sharing arrangements expiring throughout 2024. While we did not experience a significant increase in Environmental Attributes shared with pathway providers in our 2024 renewals, our most recent pathway renewals have been at higher percentages than our historical percentages and the currently proposed pathway renewals are for percentages significantly higher than our historical arrangements. Historically, we have monetized less than 25% of our RNG volumes under these fixed-price agreements. We are considering entry into multiple short term contracts throughout 2025, some potentially increasing our historical percentage of volumes monetized under fixed-price arrangements., to provide time for mitigation of these recent market trends.

Current wording

Renewable Natural Gas Revenues: We record revenues from the production and sale of RNG and the generation and sale of the Environmental Attributes derived from RNG, such as RINs and LCFS credits. Our RNG revenues from Environmental Attributes are recorded net of a portion of Environmental Attributes shared with off-take counterparties as consideration for such counterparties using the RNG as a transportation fuel. We had certain pathway provider sharing arrangements expiring throughout 2024 and 2025. We have entered into pathway renewals in the third quarter of 2025 for certain volumes at percentages consistent with our historical percentages. Historically, we have monetized less than 25% of our RNG volumes under these fixed-price agreements.

Previous wording

Corporate Revenues: Corporate reports realized and unrealized gains or losses under our gas hedge programs. We do not have any active gas hedge programs. Corporate also relates to additional discrete financial information for the corporate function; primarily used as a shared service center for maintaining functions such as executive, accounting, treasury, legal, human resources, tax, environmental, engineering and other operations functions not otherwise allocated to a segment.

Current wording

Corporate Revenues: Corporate reports realized and unrealized gains or losses under our gas hedge programs. We do not have any active gas hedge programs. Corporate also relates to additional discrete financial information for the corporate function; primarily used as a shared service center for maintaining functions such as executive, accounting, treasury, legal, human resources, tax, environmental, engineering and other operations functions not otherwise allocated to a segment. Revenues from RINs distributed from GreenWave, not included in our operating metrics table.

Previous wording

In the third quarter of 2024, we began to experience trends with several of our landfill hosts delaying their installation of or delaying our ability to install wellfield collection infrastructure in active waste placement areas, a practice historically common and critical to our projections of feedstock gas and, therefore, production. These landfill-driven delays impact the timing of collection system enhancement installations and the resulting timing of our production increases. We expect these trends to continue through 2025.

Current wording

In 2024, we began to experience trends with several of our landfill hosts delaying their installation of or delaying our ability to install wellfield collection infrastructure in active waste placement areas, a practice historically common and critical to our projections of feedstock gas and, therefore, production. These landfill-driven delays impact the timing of collection system enhancement installations and the resulting timing of our production increases. We expect these trends to continue throughout 2026.

Previous wording

Similar wellfield extraction environmental factors continue to impact gas extraction at our Apex site. We are collaborating with the landfill to mitigate these impacts and expect these mitigation efforts to continue into 2025.

Current wording

Similar wellfield extraction environmental factors continue to impact gas extraction at our Apex site. We are collaborating with the landfill to mitigate these impacts and these mitigation efforts have continued in 2025. These wellfield extraction environmental factors could impact and lengthen the period during which we have excess available combined production capacity at our Apex site.

Previous wording

Changes made by the landfill host to the wellfield collection system at the McCarty facility have contributed to elevated nitrogen in the feedstock received by our facility. Additionally, the landfill host modified the wellfield bifurcation approach which has reduced the quantity of feedstock received at our facility. We are working with the landfill host but continue to have lower volumes of feedstock available to be processed at the McCarty facility.

Current wording

Changes made by the landfill host to the wellfield collection system at the McCarty facility have contributed to elevated nitrogen in the feedstock received by our facility. Additionally, the landfill host modified the wellfield bifurcation approach which has reduced the quantity of feedstock received at our facility. We are working with the landfill host but continue to have lower volumes of feedstock available to be processed at the McCarty facility. We expect these trends to continue through 2026.

Previous wording

Quality of Biogas: We are reliant upon the quality and availability of biogas from our site partners. The quality of the waste at our landfill project sites is subject to change based on the volume and type of waste accepted. Variations in the quality of the biogas could affect our RNG production levels. At three of our projects, we operate the wellfield collection system, which allows greater control over the quality and consistency of the collected biogas. At two of our projects, McCarty and Galveston, we have operating and management agreements by which we earn revenue for managing the wellfield collection systems. Additionally, our dairy farm project benefits from the consistency of feedstock and controlled environment of collection of waste to improve biogas quality.

Current wording

Quality of Biogas: We are reliant upon the quality and availability of biogas from our site partners. The quality of the waste at our landfill project sites is subject to change based on the volume and type of waste accepted. Variations in the quality of the biogas could affect our RNG production levels. At three of our projects, we operate the wellfield collection system, which allows greater control over the quality and consistency of the collected biogas. At our McCarty projects, we have operating and management agreements by which we earn revenue for managing the wellfield collection systems. Additionally, our dairy farm project benefits from the consistency of feedstock and controlled environment of collection of waste to improve biogas quality.

Previous wording

RNG Production from Our Growth Projects: We anticipate increased production at certain of our existing projects as open landfills continue to take in additional waste and the amount of gas available for collection increases. Delays in commencement of production or extended commissioning issues at a new project or a conversion project, such as those we are currently experiencing at Blue Granite as described above, would delay any realization of production from that project.

Current wording

RNG Production from Our Growth Projects: We anticipate increased production at certain of our existing projects as open landfills continue to take in additional waste and the amount of gas available for collection increases. Delays in commencement of production or extended commissioning issues at a new project or a conversion project, such as those

Previous wording

The sale of RINs, which is subject to market price fluctuations, accounts for a substantial portion of our revenues. We manage against the risk of these fluctuations through forward sales of RINs, although currently we only sell RINs in the calendar year they are generated. We have not entered into commitments to transfer significant RINs generated from 2025 production. Realized prices for Environmental Attributes monetized in a year may not correspond directly to index prices due to the forward selling of commitments.

Current wording

The sale of RINs, which is subject to market price fluctuations, accounts for a substantial portion of our revenues. We manage against the risk of these fluctuations through forward sales of RINs, although currently we only sell RINs in the calendar year they are generated. We have entered into commitments to transfer approximately 2,500 RINs generated and available for sale from 2026 RNG production at an average price of $2.42. Realized prices for Environmental Attributes monetized in a year may not correspond directly to index prices due to the forward selling of commitments.

Previous wording

Operating and Maintenance Expenses: Operating and maintenance expenses primarily consist of expenses related to the collection and processing of biogas, including biogas collection system operating and maintenance expenses, biogas processing, operating and maintenance expenses, and related labor and overhead expenses. At the project level, this includes all labor and benefit costs, ongoing corrective and proactive maintenance, project level utility charges, rent, health and safety, employee communication, and other general project level expenses. Unanticipated feedstock processing or gas conditioning equipment failures occurring outside our planned preventative maintenance program can increase project operating and maintenance expenses and reduce production volumes. The timing of gas conditioning and process equipment preventative maintenance intervals could impact the timing and amount of our operating and maintenance expenses within a given quarter.

Current wording

Operating and Maintenance Expenses: Operating and maintenance expenses primarily consist of expenses related to the collection and processing of biogas, including biogas collection system operating and maintenance expenses, biogas processing, operating and maintenance expenses, and related labor and overhead expenses. At the project level, this includes all labor and benefit costs, ongoing corrective and proactive maintenance, project level utility charges, rent, health and safety, employee communication, and other general project level expenses. Unanticipated feedstock processing or gas conditioning equipment failures occurring outside our planned preventative maintenance program can increase project operating and maintenance expenses and reduce production volumes. The timing of gas conditioning and process equipment preventative maintenance intervals could impact the timing and amount of our operating and maintenance expenses within a given quarter. Expenses from RINs distributed from GreenWave and the costs related to pathway dispensing are not included in our operating metrics table.

Previous wording

General and Administrative Expenses: General and administrative expenses primarily consist of corporate expenses and unallocated support functions for our operating facilities, including personnel costs for executive, finance, accounting, investor relations, legal, human resources, operations, engineering, environmental registration and reporting, health and safety, IT and other administrative personnel and professional fees and general corporate expenses. From time to time, we may be parties to legal proceedings arising in the normal course of business which could increase our legal expenses. We continue to expect increased general and administrative expenses associated with our ongoing development of Montauk Ag Renewables in 2025. The Company accounts for stock-based compensation related to grants made through its equity and incentive compensation plan under FASB ASC 718. For more information, see Note 15 to our audited consolidated financial statements.

Current wording

General and Administrative Expenses: General and administrative expenses primarily consist of corporate expenses and unallocated support functions for our operating facilities, including personnel costs for executive, finance, accounting, investor relations, legal, human resources, operations, engineering, environmental registration and reporting, health and safety, IT and other administrative personnel and professional fees and general corporate expenses. From time to time, we may be parties to legal proceedings arising in the normal course of business which could increase our legal expenses. We continue to see increased general and administrative expenses associated with our ongoing development of Montauk Ag Renewables in 2025. We account for share-based compensation related to grants made through our equity and incentive compensation plan under FASB ASC 718. In 2025, we recognized $1,550 of onetime non-cash stock compensation expense within general and administration expenses as a result of the termination which we do not anticipate will recur in 2026. For more information, see Note 15 to our audited consolidated financial statements.

Previous wording

Production of Environmental Attributes: We monetize Environmental Attributes derived from our production of RNG and Renewable Electricity. We carry-over a portion of the RINs generated from RNG production to the following year and monetize the carried over RINs in such following calendar year. A majority of our Renewable Natural Gas segment Environmental Attributes are self-monetized, though a portion are generated and monetized by third parties under counterparty sharing agreements. A majority of our Renewable Electricity Generation segment Environmental Attributes are monetized as a component of our fixed-price PPAs.

Current wording

Production of Environmental Attributes: We monetize Environmental Attributes derived from our production of RNG and Renewable Electricity. We may carry-over a portion of the RINs generated from RNG production to the following year and monetize the carried over RINs in such following calendar year. A majority of our Renewable Natural Gas segment Environmental Attributes are self-monetized. A majority of our Renewable Electricity Generation segment Environmental Attributes are monetized as a component of our fixed-price PPAs.

Previous wording

Environmental Attributes monetized in a year may not correspond directly with that year’s production as attributes may be carried over and subsequently monetized. We may elect to not commit to transfer all available RINs in a given period which could impact our revenue and operating profit. Realized prices for Environmental Attributes monetized in a year may not correspond directly to index prices due to the forward selling of commitments.

Current wording

Average realized price per unit of production: Our profitability is highly dependent on the commodity prices for natural gas and electricity, and the Environmental Attribute prices for RINs, LCFS credits, and RECs. Realized prices for Environmental Attributes monetized in a year may not correspond directly with that year’s production as attributes may be carried over and subsequently monetized. We may elect to not commit to transfer all available RINs in a given period which could impact our revenue and operating profit. Realized prices for Environmental Attributes monetized in a year may not correspond directly to index prices due to the forward selling of commitments.

Previous wording

RINs are generated the month following the month gas is produced and dispensed. Volumes under fixed/floor arrangements generate RINs which we do not self-market.

Current wording

RINs are generated in the month that the gas is dispensed to generate RINs, which occurs the month after the gas is produced. Volumes under fixed/floor-price arrangements generate RINs which we do not self-market. K3 RIN separation occurs after the gas is dispensed (RINs generated but unseparated).

Previous wording

One MMBtu of RNG has the same energy content as 11.727 gallons of ethanol, and thus may generate 11.727 RINs under the RFS program.

Current wording

One MMBtu of RNG has the same energy content as 11.6935 gallons of ethanol, and thus may generate 11.6935 RINs under the RFS program.

Previous wording

Total revenues in 2024 were $175,736, an increase of $832 (0.5%) compared to $174,904 in 2023. The 2024 average realized RIN price of $3.28 increased approximately 21.0% compared to $2.71 in 2023. The natural gas index price decreased approximately 17.2% from $2.74 in 2023 to $2.27 in 2024. Also, there was a decrease in the number of RINs we self-marketed during 2024 due to a strategic decision to not self-market 6,822 RINs in the fourth quarter of 2024. We entered into margin sharing arrangements in 2024 which increased margin share revenues approximately $770 as compared to none in 2023. Offsetting this increase was a reduction of $1,758 in LCFS credit revenues primary related to 2022 RNG production volumes being released from storage and generating LCFS credit revenues in 2023.

Current wording

Total revenues in 2025 were $176,382, an increase of $646 (0.4%) compared to $175,736 in 2024. The increase is driven by the number of RINs we self-marketed during 2025 due to a strategic decision to not self-market 6,822 RINs in the fourth quarter of 2024. Offsetting the increase, is a decrease in the 2025 average realized RIN price of $2.33, which decreased approximately 29.0% compared to $3.28 in 2024, and an increase in our current period RNG volumes sold under fixed/floor-price contracts. Our margin sharing revenues increased approximately $1,016 in 2025 as compared to 2024. The natural gas index price increased approximately 51.1% from $2.27 in 2024 to $3.43 in 2025.

Previous wording

Revenues from the Renewable Natural Gas segment in 2024 were $157,983, an increase of $1,528 (1.0%) compared to $156,455 in 2023. Average commodity pricing for natural gas for 2024 was 17.2% lower than the prior year. During 2024, we self-marketed 36,639 RINs, representing an 8,297 decrease (18.5%) compared to 44,936 in 2023. The decrease was primarily related to the decision to not self-market a significant amount of RINs in inventory in the fourth quarter of 2024. Average pricing realized on RIN sales during 2024 was $3.28 as compared to $2.71 in 2023, an increase of 21.0%. This compares to the average D3 RIN index price for 2024 of $3.12 being approximately 18.6% higher than the average D3 RIN index price in 2023 of $2.63. At December 31, 2024, we had approximately 291 MMBtus available for RIN generation and had approximately 6,822 RINs generated and unsold. We had approximately 358 MMBtus available for RIN generation and approximately 108 RINs generated and unsold at December 31, 2023. We have entered into commitments and transferred all of our RINs in inventory related to our 2024 RNG production.

Current wording

Revenues from the Renewable Natural Gas segment in 2025 were $155,736, a decrease of $2,247 (1.4%) compared to $157,983 in 2024. Average commodity pricing for natural gas for 2025 was 51.1% higher than the prior year. During 2025, we self-marketed 44,132 RINs, representing an 7,493 increase (20.5%) compared to 36,639 in 2024. The increase was primarily related to the decision to not self-market a significant amount of RINs in inventory in the fourth quarter of 2024. Average pricing realized on RIN sales during 2025 was $2.33 as compared to $3.28 in 2024, a decrease of 29.0%. This compares to the average D3 RIN index price for 2025 of $2.34 being approximately 25.0% lower than the average D3 RIN index price in 2024 of $3.12. At December 31, 2025, we had approximately 354 MMBtu available for RIN generation, 190 RINs generated and unseparated, and no RINs generated and unsold. At December 31, 2024,we had approximately 291 MMBtus available for RIN generation and had approximately 6,822 RINs generated and unsold. We have entered into commitments and transferred all of our RINs related to our 2025 RNG production.

Previous wording

We produced 186 MWh in Renewable Electricity in 2024, a decrease of approximately 8 MWh (4.1%) compared to 194 MWh in 2023. Our Security facility produced 9 MWh less in 2024 compared to 2023 as a result of us ceasing operations in connection with the first quarter of 2024 sale of the gas rights back to the landfill host.

Current wording

We produced 177 MWh in Renewable Electricity in 2025, a decrease of approximately 9 MWh (4.8%) compared to 186 MWh in 2024. Our Security facility produced 6 MWh less in 2025 compared to 2024 as a result of us ceasing operations in connection with the 2024 sale of the gas rights back to the landfill host. Our Bowerman facility produced approximately 2 fewer MWh in 2025 compared to 2024 primarily related to the planned preventative engine maintenance that was completed in 2025.

Previous wording

Revenues from Renewable Electricity facilities in 2024 were $17,753, a decrease of $696 (3.8%) compared to $18,449 in 2023. The decrease is primarily driven by the decrease in our Security facility production volumes.

Current wording

Revenues from Renewable Electricity facilities in 2025 were $17,231, a decrease of $522 (2.9%) compared to $17,753 in 2024. The decrease is primarily driven by the decrease in our Security facility production volumes.

Previous wording

Total general and administrative expenses were $36,286 in 2024, an increase of $1,883 (5.5%) compared to $34,403 in 2023. Employee related costs, including stock-based compensation costs were $23,099 in 2024, an increase of $3,366 (17.1%) compared to $19,733 in 2023. The increase was primarily related to the accelerated vesting of certain restricted share awards as a result of the termination of an employee. Our professional fees decreased approximately $1,628 (35.3%) in 2024 compared to 2023.

Current wording

Total general and administrative expenses were $31,736 in 2025, a decrease of $4,550 (12.5%) compared to $36,286 in 2024. Employee related costs, including stock-based compensation costs were $18,356 in 2025, a decrease of $4,743 (20.5%) compared to $23,099 in 2024. The decrease was primarily related to the accelerated vesting of certain restricted share awards as a result of the termination of an employee in 2024. Our corporate insurance fees decreased approximately $843 (15.4%) in 2025 compared to 2024.

Previous wording

Operating and maintenance expenses for our RNG facilities in 2024 were $53,387, an increase of $5,501 (11.5%) compared to $47,886 in 2023. Our Rumpke facility operating and maintenance expenses increased approximately $1,839 as a result of increased media change outs and gas processing equipment maintenance costs. Our McCarty facility operating and maintenance expenses increased approximately $1,212 as a result of a wellfield operational enhancement program and increased gas compression system maintenance costs. Our Pico facility operating and maintenance expenses increased approximately $927 as a result of non-capitalizable costs associated with the digestion capacity increase project and efficiency improvements with the existing digestion capacity. Our Atascocita facility operating and maintenance expenses increased approximately $632 primarily driven by increased utility expense. Our Apex facility operating and maintenance expenses increased approximately $291 primarily related to increased gas processing equipment maintenance costs.

Current wording

Operating and maintenance expenses for our RNG facilities in 2025 were $59,108, an increase of $5,721 (10.7%) compared to $53,387 in 2024. Our Apex facility operating and maintenance expenses increased approximately $2,258 primarily driven by increased utility expense, the timing of maintenance related to gas processing equipment, increased media change outs and disposal costs, as well as a wellfield operational enhancement program. Our Atascocita facility operating and maintenance expenses increased approximately $1,450 primarily driven by gas processing equipment maintenance, a wellfield operational enhancement program, media change outs, and utility expense. Our Rumpke facility operating and maintenance expenses increased approximately $1,348 as a result of a wellfield operational enhancement program and increased utility expense. Our Raeger facility operating and maintenance expenses increased approximately $917 as a result of a wellfield operational enhancement program and increased media change outs and disposal costs.

Previous wording

Royalties, transportation, gathering and production fuel expenses for our RNG facilities in 2024 were $29,529, a decrease of $3,347 (10.2%) compared to $32,876 in 2023. Our Pico facility earnout decreased approximately 33.3% during 2024 compared to 2023 based on our current estimate of the present value of the earnout. Royalties, transportation, gathering and production fuel expenses decreased as a percentage of RNG revenues to 18.7% for 2024 from 21.0% in 2023.

Current wording

Royalties, transportation, gathering and production fuel expenses for our RNG facilities in 2025 were $30,986, an increase of $1,457 (4.9%) compared to $29,529 in 2024. Our Pico facility earnout expense increased approximately 22.6% during 2025 compared to 2024. We settled the Pico earnout obligation in 2025 resulting in a payment of $4,176. Royalties, transportation, gathering and production fuel expenses increased as a percentage of RNG revenues to 19.9% for 2025 from 18.7% in 2024.

Previous wording

Operating and maintenance expenses for our Renewable Electricity facilities in 2024 were $12,760, an increase of $1,015 (8.6%) compared to $11,745 in 2023. The primary driver of the increase were operating and maintenance expenses at our Magnolia facility, associated with feedstock collection for Montauk Ag Renewables, which increased approximately $1,136 as a result of non-capitalizable costs.

Current wording

Operating and maintenance expenses for our Renewable Electricity facilities in 2025 were $14,711, an increase of $1,951 (15.3%) compared to $12,760 in 2024. The primary driver of the increase was operating and maintenance expenses at our Montauk Ag Renewables project which increased approximately $1,708 as a result of non-capitalizable costs.

Previous wording

Royalties, transportation, gathering and production fuel expenses for our Renewable Electricity facilities for 2024 were $1,973, a decrease of $12 (0.6%) compared to $1,985 in 2023, and as a percentage of Renewable Electricity Generation segment revenues increased from 10.8% for 2023 to 11.1% for 2024.

Current wording

Royalties, transportation, gathering and production fuel expenses for our Renewable Electricity facilities for 2025 were $1,959, a decrease of $14 (0.7%) compared to $1,973 in 2024, and as a percentage of Renewable Electricity Generation segment revenues increased from 11.1% for 2024 to 11.4% for 2025.

Previous wording

Royalties, transportation, gathering, and production fuel expenses in 2024 were $31,502, a decrease of 3,359 (9.6%) compared to $34,861 in 2023. We make royalty payments to our fuel supply site partners on the commodities we produce and the associated Environmental Attributes. These royalty payments are typically structured as a percentage of revenue subject to a cap, with fixed minimum payments when Environmental Attribute prices fall below a defined threshold. To the extent commodity and Environmental Attributes’ prices fluctuate, our royalty payments may fluctuate upon renewal or extension of a fuel supply agreement or in connection with new projects. Our fuel supply agreements are typically structured as 20-year contracts, providing long-term visibility into the margin impact of future royalty payments.

Current wording

Royalties, transportation, gathering, and production fuel expenses in 2025 were $32,945, an increase of $1,443 (4.6%) compared to $31,502 in 2024. We make royalty payments to our fuel supply site partners on the commodities we produce and the associated Environmental Attributes. These royalty payments are typically structured as a percentage of revenue subject to a cap, with fixed minimum payments when Environmental Attribute prices fall below a defined threshold. To the extent commodity and Environmental Attributes’ prices fluctuate, our royalty payments may fluctuate upon renewal or extension of a fuel supply agreement or in connection with new projects. Our fuel supply agreements are typically structured as 20-year contracts, providing long-term visibility into the margin impact of future royalty payments.

Showing the first 40 of 63 pairs. Open the source sections for the rest.

Rearranged current paragraphs (14)

Current report — wording carried from elsewhere

Electricity projects and influence the economics of these projects. We are subject to the possibility of legislative and regulatory

Current report — wording carried from elsewhere

changes to certain incentives, such as RINs, RECs and GHG initiatives. On July 12, 2023, the EPA issued final rules in the Federal

Current report — wording carried from elsewhere

Register for the RFS volume requirements for 2023-2025. Final volumes for cellulosic biofuel were set at 838, 1,090 and 1,376 RINs

Current report — wording carried from elsewhere

for the three years 2023, 2024 and 2025, respectively. The final rule also included significant changes to the existing RFS program,

Current report — wording carried from elsewhere

all of our facilities under the BRRR provisions and have obtained Q-RIN status for RIN generation starting January 1, 2025. Under the

Current report — wording carried from elsewhere

BRRR provisions, the EPA finalized a limitation that biogas from one facility has a single use under the RFS as proposed (i.e.,

Current report — wording carried from elsewhere

biointermediate, RNG or CNG/LNG via biogas closed distribution system). The EPA clarified that this does not preclude non-RFS

Current report — wording carried from elsewhere

carbon intensity reduction targets listed above. The industry may see3 gradual increases in LCFS credit prices over the next year. The rules also phase out avoided methane crediting for dairy and swine manure pathways by 2040 for CNG usage and through 2045 for RNG used to produce hydrogen. The RNG deliverability/book and claim provisions for out-of-region projects are eliminated for all projects that break ground after 2030. These projects will be required to demonstrate physical deliverability requirements beginning in 2041. Changes to the LCFS program require annual verification of the CI score assigned to a project. Annual verification could significantly affect the profitability of a project, particularly in the case of a livestock farm project. In June 2025, California lawmakers introduced California Senate Bill SB-237, which includes a potential cap on LCFS credit prices of approximately $75/ton.

Current report — wording carried from elsewhere

We report revenues from two operating segments: Renewable Natural Gas and Renewable Electricity Generation. Corporate relates to additional discrete financial information for the corporate function; primarily used as a shared service center for maintaining

Current report — wording carried from elsewhere

-42- we are currently experiencing at Blue Granite as described above, would delay any realization of production from that project.

Current report — wording carried from elsewhere

We calculated and recorded impairment losses of $3,231 for 2025, an increase of $1,645 (103.7%) compared to $1,586 for 2024. The impairment losses in 2025 primarily relate to an RNG development project for which the local utility is no longer accepting RNG into its distribution system. The impairment losses in 2024 primarily relate to the remaining book value of assets at the Security facility, various RNG equipment that was deemed obsolete for current operations, and REG assets that were impacted under initial startup testing for one of our REG construction work-in-progress sites.

Current report — wording carried from elsewhere

As of the end of each fiscal quarter, a Fixed Charge Coverage Ratio of not less than 1.20 to 1.00, and

Current report — wording carried from elsewhere

-50- equivalents, cash generated from operations, and credit availability under our Senior Credit Facility will meet our debt service obligations and anticipated required capital expenditures (including for projects under development) for the next 12 to 24 months.

Current report — wording carried from elsewhere

-51- repayment of the RP47 Loan under the TIA and on March 5, 2025 we repaid the RP47 loan as required under the TIA. The amount repaid is included in the principal balance of the Fifth Amended Promissory Note described above.
Rearranged previous paragraphs (6)

Previous report — wording carried elsewhere

Changes to the LCFS program require annual verification of the CI score assigned to a project. Annual verification could significantly affect the profitability of a project, particularly in the case of a livestock farm project.

Previous report — wording carried elsewhere

Average realized price per unit of production: Our profitability is highly dependent on the commodity prices for natural gas and electricity, and the Environmental Attribute prices for RINs, LCFS credits, and RECs. Realized prices for

Previous report — wording carried elsewhere

We calculated and recorded impairment losses of $1,586 for 2024, an increase of $684 (75.8%) compared to $902 for 2023. The impairment losses in 2024 primarily relate to the remaining book value of assets at the Security facility, various RNG equipment that

Previous report — wording carried elsewhere

-49- was deemed obsolete for current operations, and REG assets that were impacted under initial startup testing for one of our REG construction work-in-progress sites. The 2023 impairment losses relate to specifically identified RNG machinery and feedstock processing equipment that were no longer in operational use.

Previous report — wording carried elsewhere

In December 2021, Rivetprops 47 Proprietary Limited (“RP47”) entered into an agreement to loan MNK up to 10,000 South African Rand (the “RP47 Loan”). The current principal balance and accrued interest is 11,713 Rand or approximately $650 US Dollars. There was no collateral pledged for this loan. This loan became due on December 31, 2024 (“Maturity Date”) when MNK

Previous report — wording carried elsewhere

Our revenues are comprised of renewable energy and the related Environmental Attribute sales provided under a variety of short-term and medium-term agreements with our customers. All revenue is recognized when we satisfy our performance obligation(s)