NOVAGOLD RESOURCES INC
For the period ended Nov 30, 2025. Filed Jan 22, 2026.
View on SEC.govAbout this filing
A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.
FY2025 · Filed Jan 22, 2026
What changed in Risk Factors?
Read the current filingPrevious report: 10-K
Period ended 2024-11-30; filed 2025-01-23.
0001171843-25-000387
Item 1A. Risk FactorsCurrent report: 10-K
Period ended 2025-11-30; filed 2026-01-22.
0001171843-26-000374
Item 1A. Risk FactorsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 92 previous paragraphs and 94 current paragraphs.
69 unchanged; 21 reworded; 4 added; 2 removed; 0 previous and 0 current paragraphs rearranged.
Tables are not compared: 63 previous and 61 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (4)
Current report
Despite our ownership of 60% of the membership interests of Donlin Gold, our voting interests are contractually reduced in the A&R LLC Agreement.
Current report
Consistent with the limited liability company agreement with Barrick Gold U.S. Inc. and Donlin Gold dated December 1, 2007, as amended from time to time, the funding for Donlin Gold is shared by both parties based on their percentage ownership. For example, since NOVAGOLD Resources Alaska, Inc. (“NGRA”) holds 60% of the membership interests of Donlin Gold, it will have the responsibility to fund 60% of the expenses of Donlin Gold; however, even though Paulson holds 40% of Donlin Gold, the parties have equal governance rights. This adjustment to the parties’ voting interests as set forth in the amended and restated limited liability company agreement entered into by NGRA, Donlin Holdings and Donlin Gold means that (i) NGRA’s voting percentage interests are defined as its participating interest from time to time less an absolute 10% and (ii) Paulson’s voting percentage interests are defined as its participating interest from time to time plus an absolute 10%. For this reason, even though NGRA holds 60% of the membership interests of Donlin Gold, the Company has a 50% voting interest at Donlin Gold, not 60%. These reduced voting rights may decrease the value attributed to our interest in Donlin Gold and reduces our ability to assert our proportionate rights at the project.
Current report
We identified a deficiency in our disclosure controls and procedures in the quarter ended August 31, 2025 which has been remediated. If we fail to maintain an effective system of disclosure controls, our ability to produce timely and accurate public disclosure or comply with applicable laws and regulations could be impeded.
Current report
During the quarter ended August 31, 2025, we did not timely file a Current Report on Form 8-K with respect to the resignation of a member of our Board of Directors. During the quarter, the Company took remedial action including (i) revising our written policies with respect to director and named executive officer resignation to require that resignations be tendered to specified personnel and (ii) instituting additional training on disclosure controls and procedures, particularly with respect to Form 8-K compliance, for members of the Board of Directors. We cannot be certain that the measures we have taken to date, and actions we may take in the future, will be sufficient to prevent or avoid potential future disclosure failures. Our current controls and any new controls that we develop may become inadequate because of changes in conditions in our business or otherwise. Further, weaknesses in our disclosure controls may be discovered in the future. Any failure to develop or maintain effective controls or any difficulties encountered in their implementation or improvement could harm our operating results or cause us to fail to meet our reporting obligations and may impact our ability to access capital markets on a timely basis, which may result in investors losing confidence in the accuracy and completeness of our periodic reports and adversely affect the market price of our common shares. As a result of the delinquent filing of the Form 8-K, we will not be eligible to use Form S-3 to register our securities with the SEC until July 2026.
Removed paragraphs (2)
Previous report
We may choose to proceed with a feasibility study for the Donlin Gold project without the participation of the co-owner, which would require significant management time and additional capital resources.
Previous report
Although proposed by NOVAGOLD, currently the owners have not agreed to commence an updated feasibility study. The Company may choose to proceed with a feasibility study for the Donlin Gold project on its own without the participation of the co-owner, although the Company has not yet made a determination to do so. Embarking on a feasibility study is an endeavor requiring significant funding and staffing. We expect a feasibility study would take approximately two years to complete once commenced and would require significant management time and attention. In addition, if the Company ultimately decides to proceed with its own feasibility study for the Donlin Gold project, the Company will be required to raise additional capital through means such as equity and/or debt financing to successfully complete the feasibility study. There can be no assurance that the Company could raise the required capital on terms favorable to it, or at all.
Reworded paragraphs (21)
Previous wording
The Donlin Gold project is not in production or currently under construction, and we have no ongoing mining operations or revenue from mining operations. Mineral exploration and development has a high degree of risk and few properties that are explored are ultimately developed into producing mines. The future development of the Donlin Gold project will require obtaining permits and financing the construction and operation of mines, processing plants and related infrastructure. As a result, we are subject to all of the risks associated with establishing new mining operations and business enterprises, including:
Current wording
The Donlin Gold project is not in production or currently under construction, and we have no ongoing mining operations or revenue from mining operations. Mineral exploration and development has a high degree of risk and few properties that are explored are ultimately developed into producing mines. The future development of the Donlin Gold project will require having the necessary permits and financing in place to support the construction and ongoing operation of mines, processing plants and related infrastructure. As a result, we are subject to all of the risks associated with establishing new mining operations and business enterprises, including:
Previous wording
The costs, timing and complexities of mine construction and development are increased by the remote location of our mineral properties, with additional challenges related thereto, including access, water and power supply, and other support infrastructure. Cost estimates may increase significantly as more detailed engineering work and studies are completed on a project. New mining operations commonly experience unexpected costs, problems and delays during development, construction, and mine start-up. In addition, delays in the commencement of mineral production often occur. Accordingly, there are no assurances that our activities will result in profitable mining operations, or that we will successfully establish mining operations, or profitably produce precious metals at the Donlin Gold project.
Current wording
The costs, timing and complexities of mine construction and development are increased by the remote location of our mineral properties, with additional challenges related thereto, including access, water and power supply, and other support infrastructure. Cost estimates may increase significantly as more detailed engineering work and studies are completed. New mining operations commonly experience unexpected costs, problems and delays during development, construction, and mine start-up. In addition, delays in the commencement of mineral production often occur. Accordingly, there are no assurances that our activities will result in profitable mining operations, or that we will successfully establish mining operations, or profitably produce precious metals at the Donlin Gold project.
Previous wording
Our success with respect to the Donlin Gold project depends on the cooperation of a third party with whom we have an agreement; we hold a 50% interest and the remaining 50% interest is held by the third party that is not under our control or direction. We are dependent on the cooperation of a third party for the progress and development of the Donlin Gold project. The third party may have different priorities which could impact the timing and cost of development of the Donlin Gold project. If the third party defaults on its agreement with us, with or without our knowledge, it may put the mineral property and related assets at risk. The existence or occurrence of one or more of the following circumstances and events could have a material adverse impact on our ability to achieve our business plan, profitability, or the viability of our interests held with the third party, which could have a material adverse impact on our business, future cash flows, earnings, results of operations and financial condition: (i) disagreement with the third party on how to develop and operate the Donlin Gold project efficiently; (ii) inability to exert influence over certain strategic decisions made in respect of the jointly-held Donlin Gold project; (iii) inability of the third party to meet its obligations to the joint business or other parties; and (iv) litigation with the third party regarding joint business matters.
Current wording
Our success with respect to the Donlin Gold project depends on the cooperation of the co-owner of Donlin Gold. We currently hold a 60% economic interest in Donlin Gold and the remaining 40% economic interest is held by a third party that is not under our control or direction. Furthermore, governance of Donlin Gold is shared on an equal basis, so we will continue to be dependent on the cooperation of a third party for the progress and development of the Donlin Gold project. The third party may have different priorities which could impact the timing and cost of development of the Donlin Gold project. If the third party defaults on its agreements with us, with or without our knowledge, it may put the mineral property and related assets at risk. The existence or occurrence of one or more of the following circumstances and events could have a material adverse impact on our ability to achieve our business plan, profitability, or the viability of our interests held with the third party, which could have a material adverse impact on our business, future cash flows, earnings, results of operations and financial condition: (i) disagreement with the third party on how to develop and operate the Donlin Gold project efficiently; (ii) disagreement with the third party on certain strategic decisions in respect of the Donlin Gold project; (iii) inability of the third party to meet their obligations to Donlin Gold or other parties; and (iv) litigation with the third party regarding joint business matters.
Previous wording
Our ability to continue the exploration, permitting, development, and construction of the Donlin Gold project, and to continue as a going concern, will depend in part on our ability to obtain suitable financing.
Current wording
Our ability to continue the exploration, permitting and development of the Donlin Gold project, to complete the Bankable Feasibility Study for the Donlin Gold project, to fund construction of the Donlin Gold project, and to continue as a going concern, will depend in part on our ability to obtain suitable financing.
Previous wording
We have limited financial resources. We will need external financing to develop and construct the Donlin Gold project. According to the S-K 1300 Report (as defined below), the total initial capital cost estimate for the Donlin Gold project is approximately $7,402 million which includes the costs related to the natural gas pipeline (100% basis). These cost estimates may change materially as our studies are updated. Our failure to obtain sufficient financing could result in the delay or indefinite postponement of exploration, development, construction, or production at the Donlin Gold project. The cost and terms of such financing may significantly reduce the expected benefits from development of the Donlin Gold project and/or render such development uneconomic. There can be no assurance that additional capital or other types of financing will be available when needed or that, if available, the terms of such financing will be favorable. Our failure to obtain financing could have a material adverse effect on our growth strategy and results of operations and financial condition.
Current wording
We have limited financial resources. We will need external financing to continue the exploration, permitting, and development of the Donlin Gold project, to complete the Bankable Feasibility Study for the Donlin Gold project and to construct and ultimately operate the Donlin Gold project. In addition, according to the S-K 1300 Report (as defined below), the total initial capital cost estimate for the Donlin Gold project is approximately $9,233 million which includes the costs related to the natural gas pipeline (100% basis). These cost estimates may change materially as our studies are updated. Our failure to obtain sufficient financing could result in the delay or indefinite postponement of the completion of the Bankable Feasibility Study or exploration, development, construction, or production at the Donlin Gold project. The cost and terms of such financing may significantly reduce the expected benefits from development of the Donlin Gold project and/or render such development uneconomic. There can be no assurance that additional capital or other types of financing will be available when needed or that, if available, the terms of such financing will be favorable. Our failure to obtain financing could have a material adverse effect on our growth strategy and results of operations and financial condition.
Previous wording
The capital costs to take the Donlin Gold project into production may be significantly higher than anticipated. As a result of the content updates included in the 2021 Technical Report (as defined below) and S-K 1300 Report, the total initial capital cost estimate for the Donlin Gold project is $7,402 million and the total sustaining capital estimate is $1,723 million.
Current wording
The capital costs to take the Donlin Gold project into production may be significantly higher than anticipated. As a result of the content updates included in the 2025 Technical Report (as defined below) and 2025 Technical Report Summary (as defined below), the total initial capital cost estimate for the Donlin Gold project is $9,233 million and the total sustaining capital estimate is $2,325 million.
Previous wording
Unless otherwise indicated, mineralization quantities presented in this Annual Report on Form 10-K and in our other filings with securities regulatory authorities, press releases and other public statements that may be made from time to time are based upon estimates made by our personnel and independent professionals. In addition, these estimates are imprecise and depend upon geologic interpretation and statistical inferences drawn from drilling and sampling analysis, which may prove to be unreliable. There can be no assurance that:
Current wording
Unless otherwise indicated, mineralization quantities presented in this Annual Report on Form 10-K and in our other filings with securities regulatory authorities, press releases and other public statements that may be made from time to time are based upon estimates made by our personnel and independent professionals. In addition, these estimates depend upon geologic interpretation and statistical inferences drawn from drilling and sampling analysis available at the time of the estimate, and may change with further work.
Previous wording
Because we have not commenced commercial production at the Donlin Gold project, mineralization estimates may require adjustments, including potential downward revisions based upon further exploration or development work, actual production experience, or changes in the price of gold. In addition, the grade of ore ultimately mined, if any, may differ from that indicated by drilling results. There can be no assurance that the percentage of minerals recovered in small-scale tests will be duplicated in large-scale tests under on-site conditions or at production scale.
Current wording
Because we have not commenced commercial production at the Donlin Gold project, mineral resource estimates may require adjustments, including potential downward revisions based upon further exploration or development work, actual production experience, or changes in the price of gold. In addition, the grade of ore ultimately mined, if any, may differ from that indicated by drilling results. There can be no assurance that the percentage of minerals recovered in small-scale tests will be duplicated in large-scale tests under on-site conditions or at production scale.
Previous wording
Mineral resource estimates for mineral properties that have not commenced production are based, in many instances, on limited and widely spaced drill hole information, which is not necessarily indicative of the conditions between and around drill holes. Accordingly, such mineral resource estimates may require revision as more drilling information becomes available or as actual production experience is gained. No assurance can be given that any part or all of our mineral resources constitute or will be converted into reserves.
Current wording
Mineral resource estimates for mineral properties that have not commenced production are based, in many instances, on limited and widely spaced drill hole information, which is not necessarily indicative of the conditions between and around drill holes. Accordingly, such mineral resource estimates may require revision as more drilling information becomes available or as actual production experience is gained.
Previous wording
The estimating of mineral reserves and mineral resources is a subjective process that relies on the judgment and experience of the persons preparing the estimates. The process relies on the quantity and quality of available data and is based on knowledge, mining experience, analysis of drilling results and industry practices. Valid estimates made at a given time may significantly change when new information becomes available. By their nature, mineral resource and reserve estimates are imprecise and depend, to a certain extent, upon analysis of drilling results and statistical inferences that may ultimately prove to be inaccurate. There can be no assurances that actual results will meet the estimates contained in studies.
Current wording
The estimating of mineral reserves and mineral resources is a subjective process that relies on the judgment and experience of the persons preparing the estimates. The process relies on the quantity and quality of available data and is based on knowledge, mining experience, analysis of drilling results and industry practices. Valid estimates made at a given time may significantly change when new information becomes available. There can be no assurances that actual results will meet the estimates contained in studies.
Previous wording
Estimated mineral reserves or mineral resources may have to be recalculated based on changes in metal prices, further exploration or development activity, or actual production experience. In addition, if production costs increase, recovery rates decrease, if applicable laws and regulations are adversely changed, there is no assurance that the anticipated level of recovery will be realized or that mineral reserves or mineral resources as currently reported can be mined or processed profitably. This could materially and adversely affect estimates of the volume or grade of mineralization, estimated recovery rates or other important factors that influence mineral reserve or mineral resource estimates. The extent to which mineral resources may ultimately be reclassified as mineral reserves is dependent upon the demonstration of their profitable recovery. Any material changes in mineral resource estimates and grades of mineralization will affect the economic viability of placing a mineral property into production and a mineral property’s return on capital. We cannot provide assurance that mineralization identified at the Donlin Gold project can or will be mined or processed profitably.
Current wording
Estimated mineral reserves or mineral resources may have to be revised based on changes in metal prices, further exploration or development activity, or actual production experience. In addition, if production costs increase, recovery rates decrease, if applicable laws and regulations are adversely changed, there is no assurance that the anticipated level of recovery will be realized or that mineral reserves or mineral resources as currently reported can be mined or processed profitably. This could materially and adversely affect estimates of the volume or grade of mineralization, estimated recovery rates or other important factors that influence mineral reserve or mineral resource estimates. The extent to which mineral resources may ultimately be reclassified as mineral reserves is dependent upon the demonstration of their profitable recovery. Any material changes in mineral resource estimates and grades of mineralization will affect the economic viability of placing a mineral property into production and a mineral property’s return on capital. We cannot provide assurance that mineral resources identified at the Donlin Gold project can or will be mined or processed profitably.
Previous wording
The mineral resource and mineral reserve estimates contained in this Annual Report on Form 10-K have been determined and valued based on assumed future prices, cut-off grades and operating costs that may prove to be inaccurate. Extended declines in market prices for gold may render portions of our mineralization uneconomic and result in reduced reported mineralization. Any material reductions in estimates of mineralization, or of our ability to extract this mineralization, could have a material adverse effect on our ability to implement our business strategy, the results of operations or our financial condition.
Current wording
The mineral resource and mineral reserve estimates contained in this Annual Report on Form 10-K have been determined and valued based on assumed future prices, cut-off grades and operating costs that may prove to be inaccurate. Extended declines in market prices for gold may render portions of our mineral resource uneconomic and result in reduced reported mineral resources. Any material reductions in estimates of mineral resources, or of our ability to extract these mineral resources, could have a material adverse effect on our ability to implement our business strategy, the results of operations or our financial condition.
Previous wording
We have established the presence of proven and probable mineral reserves at the Donlin Gold project in accordance with the disclosure definition and standards contained in S-K 1300 (as defined below) and in National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”). There can be no assurance that additional mineral resources will ultimately be reclassified as mineral reserves. The failure to increase mineral reserves could restrict our ability to successfully implement our strategies for long-term growth and could impact future cash flows, earnings, results of operation and financial condition.
Current wording
We have established the presence of proven and probable mineral reserves at the Donlin Gold project in accordance with the disclosure definition and standards contained in S-K 1300 and in NI 43-101. There can be no assurance that additional mineral resources will ultimately be reclassified as mineral reserves. The failure to increase mineral reserves could restrict our ability to successfully implement our strategies for long-term growth and could impact future cash flows, earnings, results of operation and financial condition.
Previous wording
Access to the Donlin Gold project is limited and there is no infrastructure that serves the project area. An approximately 507-kilometer natural gas pipeline is needed to supply fuel to the proposed on-site generating plant to provide power for the Donlin Gold project. The proposed pipeline would traverse generally undeveloped areas in Alaska that are difficult to access. Transportation of most of the supplies needed to construct and operate the Donlin Gold project would be accomplished by barging materials on the Kuskokwim River during the annual shipping season which typically occurs from late April to mid-October. Two ports would be needed on the Kuskokwim River, the first located in Bethel, Alaska, where ocean barges would transition materials to river barges; and the second located approximately 320 kilometers upriver from Bethel. A 48-kilometer access road from the upriver port to the project site is needed to deliver the materials. Additionally, a 1,500-meter airstrip would be built to provide year-round access to the project. Terrain, geologic conditions, ground conditions, steep slopes, river levels, ice breakup, weather, climate change impacts and other natural conditions that are beyond our control along the pipeline and transportation routes present design, permitting, construction, and operational challenges for the project. Cost and schedule estimates may increase significantly as more detailed engineering work, geotechnical and geological studies are completed.
Current wording
Access to the Donlin Gold project is limited and there is no infrastructure that serves the project area. An approximately 507-kilometer natural gas pipeline is needed to supply fuel to the proposed on-site generating plant to provide power for the Donlin Gold project. The proposed pipeline would traverse generally undeveloped areas in Alaska that are difficult to access. Transportation of most of the supplies needed to construct and operate the Donlin Gold project would be accomplished by barging materials on the Kuskokwim River during the annual shipping season which typically occurs from late April to mid-October. Two ports would be needed on the Kuskokwim River, the first located in Bethel, Alaska, where ocean barges would transition materials to river barges; and the second located approximately 312 kilometers upriver from Bethel. A 44-kilometer access road from the upriver port to the project site is needed to deliver the materials. Additionally, an airstrip would be built to provide year-round access to the project. Terrain, geologic conditions, ground conditions, steep slopes, river levels, ice breakup, weather, climate change impacts and other natural conditions that are beyond our control along the pipeline and transportation routes present design, permitting, construction, and operational challenges for the project. Cost and schedule estimates may increase significantly as more detailed engineering work, geotechnical and geological studies are completed.
Previous wording
The subsurface mineral and surface rights at the Donlin Gold project are owned by Calista and TKC, respectively, two Native corporations. Donlin Gold operates on these lands pursuant to a Mining Lease with Calista (“Calista Lease”) and a Surface Use Agreement (“SUA”) with TKC. The ability of Donlin Gold to continue to explore and develop the Donlin Gold project depends upon its continued compliance with the terms and conditions of the Calista Lease and SUA. Furthermore, our ability to continue to explore and develop other mineral properties may be subject to agreements with other third parties, including agreements with Native corporations, for instance.
Current wording
The subsurface mineral and surface rights at the Donlin Gold project are owned by Calista and TKC, respectively, two Native corporations. Donlin Gold operates on these lands pursuant to a mining lease with Calista (the “Calista Lease”) and a Surface Use Agreement (“SUA”) with TKC. The ability of Donlin Gold to continue to explore and develop the Donlin Gold project depends upon its continued compliance with the terms and conditions of the Calista Lease and SUA. Furthermore, our ability to continue to explore and develop other mineral properties may be subject to agreements with other third parties, including agreements with Native corporations, for instance.
Previous wording
Electrum Strategic Resources L.P. (“Electrum”) and its affiliate GRAT Holdings LLC hold in the aggregate 25.4% of our issued and outstanding common shares as of January 13, 2025. Accordingly, Electrum and its affiliates will have significant influence in determining the outcome of any corporate transaction or other matter submitted to the shareholders for approval, including mergers, consolidations, and the sale of all or substantially all of our assets and other significant corporate actions. Unless full participation of all shareholders takes place in such shareholder meetings, Electrum and its affiliates may be able to approve such matters itself. The concentration of ownership of the common shares by Electrum and its affiliates may: (i) delay or deter a change of control of the Company; (ii) deprive shareholders of an opportunity to receive a premium for their common shares as part of a sale of the Company; and (iii) affect the market price and liquidity of the common shares. In conjunction with the January 22, 2009 financing, we provided Electrum with the right to designate an observer at all meetings of the Board and any committee thereof so long as Electrum and its affiliates hold not less than 15% of our common shares. In November 2011, Dr. Thomas S. Kaplan, was appointed Chairman of our Board. Dr. Kaplan is also the Chairman, Chief Executive Officer, and Chief Investment Officer of The Electrum Group LLC. As long as Electrum and its affiliates maintain its shareholdings in the Company, Electrum will have significant influence in determining the members of the Board. Without the consent of Electrum, we could be prevented from entering into transactions that are otherwise beneficial to us. The interests of Electrum and its affiliates may differ from or be adverse to the interests of our other shareholders. The effect of these rights and Electrum’s influence may impact the price that investors are willing to pay for our shares. If Electrum or its affiliates sell a substantial number of our common shares in the public market, the market price of the common shares could be adversely impacted. The perception among the public that these sales will occur could also contribute to a decline in the market price of our common shares.
Current wording
Electrum Strategic Resources L.P. (“Electrum”) and its affiliate GRAT Holdings LLC hold in the aggregate 24.1% of our issued and outstanding common shares as of January 16, 2026. Accordingly, Electrum and its affiliates will have significant influence in determining the outcome of any corporate transaction or other matter submitted to the shareholders for approval, including mergers, consolidations, and the sale of all or substantially all of our assets and other significant corporate actions. Unless full participation of all shareholders takes place in such shareholder meetings, Electrum and its affiliates may be able to approve such matters itself. The concentration of ownership of the common shares by Electrum and its affiliates may: (i) delay or deter a change of control of the Company; (ii) deprive shareholders of an opportunity to receive a premium for their common shares as part of a sale of the Company; and (iii) affect the market price and liquidity of the common shares. In conjunction with the January 22, 2009 financing, we provided Electrum with the right to designate an observer at all meetings of the Board and any committee thereof so long as Electrum and its affiliates hold not less than 15% of our common shares. In November 2011, Dr. Thomas S. Kaplan, was appointed Chairman of our Board. Dr. Kaplan is also the Chairman, Chief Executive Officer, and Chief Investment Officer of The Electrum Group LLC. As long as Electrum and its affiliates maintain its shareholdings in the Company, Electrum will have significant influence in determining the members of the Board. Without the consent of Electrum, we could be prevented from entering into transactions that are otherwise beneficial to us. The interests of Electrum and its affiliates may differ from or be adverse to the interests of our other shareholders. The effect of these rights and Electrum’s influence may impact the price that investors are willing to pay for our shares. If Electrum or its affiliates sell a substantial number of our common shares in the public market, the market price of the common shares could be adversely impacted. The perception among the public that these sales will occur could also contribute to a decline in the market price of our common shares.
Previous wording
Land reclamation requirements are generally imposed on mineral exploration companies (as well as companies with mining operations) to minimize long term effects of land disturbance. Reclamation may include requirements to:
Current wording
Land reclamation requirements are generally imposed on mineral exploration companies (as well as companies with mining operations) to minimize long-term effects of land disturbance. Reclamation include requirements to:
Previous wording
Liquidity risk is the risk that we will not be able to meet our financial obligations as they come due. We manage liquidity risk through regular cash flow forecasts to assess our current and future financial position as well as maintaining a prudent capital structure. Accounts payable and accrued liabilities are due within one year from the balance sheet date.
Current wording
Liquidity risk is the risk that we will not be able to meet our financial obligations as they come due. We manage liquidity risk through regular cash flow forecasts to assess our current and future financial position as well as maintaining sufficient capital resources and a prudent capital structure. Accounts payable and accrued liabilities are due within one year from the balance sheet date.
Previous wording
Interest rate risk is the risk that the fair value or future cash flows of a financial instrument will fluctuate because of changes in market interest rates. The risk that we will realize a loss as a result of a decline in the fair value of the term deposit investments is limited because these investments have an original term of less than one year and are generally held to maturity. The promissory note owed to Barrick is variable with the U.S. prime rate. Based on the amount owing on the promissory note as of November 30, 2024, and assuming all other variables remain constant, a 1% change in the U.S. prime rate would result in an increase/decrease of approximately $1.5 million in the interest accrued on the promissory note per annum. For more detail with respect to the promissory note, see sectionItem 2, Properties–* Donlin Gold Project, Alaska*, below.
Current wording
Interest rate risk is the risk that the fair value or future cash flows of a financial instrument will fluctuate because of changes in market interest rates. The risk that we will realize a loss as a result of a decline in the fair value of the term deposit investments is limited because these investments have an original term of less than one year and are generally held to maturity. The promissory note owed to Barrick is variable with the U.S. prime rate. Based on the amount owing on the promissory note as of November 30, 2025, and assuming all other variables remain constant, a 1% change in the U.S. prime rate would result in an increase/decrease of approximately $1.6 million in the interest accrued on the promissory note per annum. For more detail with respect to the promissory note, see sectionItem 2, Properties–* Donlin Gold Project, Alaska*, below.
Previous wording
The Company believes it was a passive foreign investment company (“PFIC”) in 2024 which could have negative tax consequences for U.S. investors.
Current wording
The Company believes it was a passive foreign investment company for its fiscal year ended November 30, 2025 which could have negative tax consequences for U.S. investors.
Previous wording
U.S. Holders (as defined below underItem 5. Market for Registrant’s Common Equity, Related Shareholder Matters and Issuer Purchases of Equity Securities“Certain United States Federal Income Tax Considerations for U.S. Holders–* U.S. Holders*”) should be aware that the Company believes that it was a PFIC for the fiscal year ended November 30, 2024, and based on current business plans and financial expectations, may be a PFIC in the current tax year and future tax years. If the Company is a PFIC for any year during a U.S. Holder’s holding period, then such U.S. Holder generally will be required to treat any gain realized upon a disposition of common shares and any so-called “excess distribution” received on its common shares as ordinary income, and to pay an interest charge on a portion of such gain or distributions, unless the U.S. Holder makes a timely and effective QEF Election or a Mark-to-Market Election (each as defined below underItem 5. Market for Registrant’s Common Equity, Related Shareholder Matters and Issuer Purchases of Equity Securities“Certain United States Federal Income Tax Considerations for U.S. Holders–* Default PFIC Rules under Section 1291 of the Code*”). A U.S. Holder who makes a QEF Election generally must report on a current basis its share of the Company’s net capital gain and ordinary earnings for any year in which the Company is a PFIC, whether or not the Company distributes any amounts to its shareholders. A U.S. Holder who makes the Mark-to-Market Election generally must include as ordinary income each year the excess of the fair market value of the common shares over the U.S. Holder’s tax basis therein. This paragraph is qualified in its entirety by the discussion below underItem 5. Market for Registrant’s Common Equity, Related Shareholder Matters and Issuer Purchases of Equity Securities“Certain United States Federal Income Tax Considerations for U.S. Holders.” Each U.S. Holder should consult its own tax advisor regarding the PFIC rules and the U.S. federal income tax consequences of the acquisition, ownership, and disposition of common shares.
Current wording
U.S. Holders (as defined below underItem 5. Market for Registrant’s Common Equity, Related Shareholder Matters and Issuer Purchases of Equity Securities“Certain United States Federal Income Tax Considerations for U.S. Holders–* U.S. Holders*”) should be aware that the Company believes that it was a PFIC (as defined below underItem 5. Market for Registrant’s Common Equity, Related Shareholder Matters and Issuer Purchases of Equity Securities“Certain United States Federal Income Tax Considerations for U.S. Holders–* Passive Foreign Investment Company Rules*”) for the fiscal year ended November 30, 2025, and based on current business plans and financial expectations, may be a PFIC in the current tax year and future tax years. If the Company is a PFIC for any year during a U.S. Holder’s holding period of common shares, then such U.S. Holder generally will be required to treat any gain realized upon a disposition of the common shares or any so-called “excess distribution” received on its common shares as ordinary income, and to pay an interest charge on a portion of such gain or distribution. In certain circumstances, the sum of the tax and the interest charge may exceed the total amount of proceeds realized on the disposition, or the amount of excess distribution received, by the U.S. Holder. Subject to certain limitations, these tax consequences may be mitigated if a U.S. taxpayer makes a timely and effective QEF Election or Mark-to-Market Election (each as defined below underItem 5. Market for Registrant’s Common Equity, Related Shareholder Matters and Issuer Purchases of Equity Securities“Certain United States Federal Income Tax Considerations for U.S. Holders–* Default PFIC Rules under Section 1291 of the Code*”). A U.S. Holder who makes a timely and effective QEF Election generally must report on a current basis its share of the Company’s net capital gain and ordinary earnings for any year in which the Company is a PFIC, whether or not the Company distributes any amounts to its shareholders. A U.S. Holder who makes a Mark-to-Market Election in respect of its common shares generally must include as ordinary income each year the excess of the fair market value of the common shares over the U.S. Holder’s tax basis therein. This paragraph is qualified in its entirety by the discussion below underItem 5. Market for Registrant’s Common Equity, Related Shareholder Matters and Issuer Purchases of Equity Securities“Certain United States Federal Income Tax Considerations for U.S. Holders.” Each U.S. Holder should consult its own tax advisor regarding the PFIC rules and the U.S. federal income tax consequences of the acquisition, ownership, and disposition of common shares.