NOVAGOLD RESOURCES INC
For the period ended Nov 30, 2025. Filed Jan 22, 2026.
View on SEC.govAbout this filing
A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.
FY2025 · Filed Jan 22, 2026
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-K
Period ended 2024-11-30; filed 2025-01-23.
0001171843-25-000387
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations (U.S. dollars in thousands, except per share amounts)Current report: 10-K
Period ended 2025-11-30; filed 2026-01-22.
0001171843-26-000374
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 61 previous paragraphs and 94 current paragraphs.
18 unchanged; 20 reworded; 56 added; 23 removed; 0 previous and 0 current paragraphs rearranged.
Tables are not compared: 4 previous and 10 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (56)
Current report
Paulson Advantage Plus Master Ltd. and Paulson Partners LP (together, “Paulson”) are investment funds managed by Paulson Advisers LLC.
Current report
Paul Chilson, P.E., who is the Manager, Mine Engineering for NOVAGOLD and a “qualified person” under National Instrument 43-101 –Standards of Disclosure for Mineral Projects (“NI 43-101”) and the Securities and Exchange Commission’s (“SEC”) current mining disclosure rules has approved the scientific and technical information contained herein.
Current report
Highlights
Current report
On June 3, 2025, NOVAGOLD and Paulson, through wholly-owned subsidiaries, completed the $1 billion acquisition of Barrick’s 50% interest in Donlin Gold (the “Donlin Gold Transaction”), increasing NOVAGOLD’s economic stake in Donlin Gold LLC (“Donlin Gold”) to 60%. Paulson’s subsidiary acquired the remaining 40% of Donlin Gold. Both owners have equal governance rights in Donlin Gold. The Donlin Gold Transaction marks a significant milestone in a long-term strategy to advance Donlin Gold. NOVAGOLD’s portion of the acquisition was funded through a combination of a public equity offering and a concurrent private placement.
Current report
NOVAGOLD closed a $195.2 million underwritten public offering (issuing approximately 48 million common shares in the second quarter and approximately 7.2 million common shares as part of the exercise of the overallotment option early in the third quarter), and a $64.4 million private placement (issuing approximately 17.2 million common shares in the second quarter), representing a total of $260.4 million (an aggregate of approximately 72.2 million common shares). NOVAGOLD purchased the additional 10% interest in Donlin Gold LLC with proceeds from the offerings and will use the balance of the funds from the offerings for general corporate purposes, including its share of expenses associated with advancing the Donlin Gold Bankable Feasibility Study (the “BFS”).
Current report
Company Overview
Current report
Overview of Donlin Gold Transaction and Financing Activities During 2025
Current report
As noted above, on June 3, 2025, the Company and Paulson, through wholly-owned subsidiaries, completed the Donlin Gold Transaction pursuant to the terms of the membership interest purchase agreement dated April 22, 2025 (the “MIPA”) among Barrick Gold U.S. Inc (“Barrick Gold”), Barrick, Paulson, Donlin Gold Holdings LLC, a subsidiary of Paulson (“Donlin Holdings”), and NOVAGOLD Resources Alaska, Inc. (“NGRA”), a subsidiary of the Company. NOVAGOLD, through NGRA, acquired an additional 10% interest in Donlin Gold for $200 million, increasing its stake to 60% of Donlin Gold, while Paulson, through Donlin Holdings, acquired the remaining 40% interest for $800 million.
Current report
Amended and Restated Limited Liability Company Agreement for Donlin Gold LLC
Current report
In connection with the closing of the Donlin Gold Transaction, NGRA, Donlin Holdings and Donlin Gold entered into an amended and restated limited liability company agreement (the “A&R LLC Agreement”) governing Donlin Gold, pursuant to which the Company and Paulson have equal governance rights. NGRA had previously entered into a limited liability company agreement with Barrick Gold and Donlin Gold (the “Prior LLC Agreement”) dated December 1, 2007, as amended from time to time. Pursuant to the terms of the A&R LLC Agreement, the primary amendments to the Prior LLC Agreement consist of the following:
Current report
Amended and Restated Promissory Note
Current report
Pursuant to the Prior LLC Agreement for Donlin Gold, the Company issued a promissory note to Barrick Gold to repay Barrick out of future mine production cash flow for a portion of Barrick’s prior expenditures on the Donlin Gold project. Concurrent with the Donlin Gold Transaction announcement on April 22, 2025, NOVAGOLD entered into a prepayment option agreement with Barrick, which provided the Company with an option to prepay the promissory note in full for $90 million prior to the closing of the Donlin Gold Transaction. The $90 million prepayment option was not exercised prior to closing. In connection with the closing of the Donlin Gold Transaction, on June 3, 2025 NGRA and Barrick Gold amended and restated the promissory note primarily to (i) modify the security package in order to exclude any property held by Donlin Gold or membership interest in Donlin Gold held by NGRA, but ensure it remains secured by NGRA’s right, title and interest to proceeds from Donlin Gold and (ii) provide the ability for NGRA to prepay and retire the promissory note for an aggregate of $100 million until December 3, 2026. In connection with the amended and restated promissory note, NGRA has made an irrevocable direction to Donlin Gold whereby Donlin Gold shall distribute to Barrick Gold, until the promissory note is fully repaid, 85% of distributed processed products, cash and other assets, and payments of 5% of certain net proceeds specified in the promissory note. As per the amended and restated promissory note, the principal amount owed is $158.9 million.
Current report
Backstop Agreement
Current report
In order to ensure available financing for the Company’s $200 million obligation under the MIPA, funding commitments of up to $170 million were obtained from Electrum Strategic Resources L.P. (“Electrum”), Paulson, and Kopernik Global Investors, LLC, on behalf of investment funds and accounts managed by them (“Kopernik”, together with Electrum and Paulson, the “Investors”) pursuant to a backstop agreement dated April 22, 2025 (“Backstop Agreement”). Pursuant to the Backstop Agreement, the Investors agreed to purchase, on a non-brokered, private placement basis, up to $170 million in the Company’s common shares at $3.00 per share, representing up to 56,666,667 common shares in the aggregate.
Current report
While the Company did not exercise its rights provided by the Backstop Agreement, in consideration for entering into the Backstop Agreement, the Company issued an aggregate of 25,500,000 warrants to purchase the Company’s common shares (the “Warrants”), with each Warrant entitling the holder thereof to purchase one common share (a “Warrant Share”) at an exercise price of $3.00 per Warrant Share for a period of five years from the date of issuance. The Warrants contain a “cashless exercise” feature, such that, in lieu of making the cash payment otherwise contemplated to be made to us upon such exercise of the Warrant, the holder may elect instead to receive upon such exercise (either in whole or in part) the net number of common shares determined according to a formula set forth in the Warrants. The Warrants were issued in the following amounts: (i) 12,750,000 Warrants to Paulson; (ii) 6,375,000 Warrants to Electrum; and (iii) 6,375,000 Warrants to Kopernik.
Current report
The Backstop Agreement further provided the Investors with registration rights, pursuant to which the Company had agreed to, among other things, file a registration statement with the SEC registering the resale of the Warrant Shares and to cause such registration statement to remain effective until the earlier of (a) three years from the issuance of the Subscribed Shares (which were not issued), (b) the date on which all of the Subscribed Shares and Warrant Shares shall have been sold, or (c) on the first date on which each Investor can sell all of its Subscribed Shares and/or Warrant Shares (or shares received in exchange therefor) under Rule 144 of the Securities Act without limitation as to the manner of sale or the amount of such securities that may be sold. The Backstop Agreement also contained customary indemnification and other provisions customary for registration rights of this type. Pursuant to discussions with the Investors and the Placement Investors (as defined below), the Company may file a resale registration statement in the future upon request of such investors with respect to the Warrant Shares or common shares issued pursuant to the Subscription Agreement (as defined below).
Current report
Public Offering and Concurrent Private Placement
Current report
On May 7, 2025, the Company entered into an underwriting agreement related to a public offering of 47,850,000 of the Company’s common shares at a public offering price of $3.75 per share (the “Underwriting Agreement”). In addition, the Company granted the underwriters an option exercisable for 30 days from the date of the Underwriting Agreement to purchase up to 7,177,500 of additional common shares of the Company (the “Overallotment Option”). The net proceeds from the public offering were approximately $169.7 million. The Overallotment Option was exercised in full on June 5, 2025, bringing the total net proceeds to the Company for the public offering and the Overallotment Option to approximately $195.2 million after deducting the underwriting discount and offering expenses. The Company made certain customary representations, warranties and covenants concerning the Company and the registration statement in the Underwriting Agreement and also agreed to indemnify the underwriters against certain liabilities, including liabilities under the Securities Act of 1933, as amended (the “Securities Act”).
Current report
Concurrently with the public offering announced in May 2025, the Company completed a private placement offering on May 9, 2025 of 17,173,853 common shares at a price equal to the public offering price for aggregate gross proceeds of approximately $64.4 million with Electrum and investments funds and accounts managed by Kopernik Global Investors, LLC (each a “Placement Investor”). The Company entered into a Subscription Agreement dated May 7, 2025 (the “Subscription Agreement”) with each of the Placement Investors setting out the terms of the concurrent private placement, which included similar resale registration rights as contained in the Backstop Agreement. The concurrent private placement closed on May 9, 2025.
Current report
NOVAGOLD and Donlin Gold advanced key activities in 2025 to position the project to update technical work and cost estimates. Primary activities included 1) issuing a Request for Proposals (RFP) for its Bankable Feasibility Study (BFS) to top-tier engineering firms with the expertise to design what is expected to be the largest single gold mine in the United States. Proposals were received in October, and the Prime Contractor is expected to be selected in the first quarter of 2026. RFPs were also issued in the fourth quarter of 2025 for specialist contractors for the power plant, pipeline, and pressure oxidation and oxygen plant scopes of work; and 2) mine planning and resource conversion advanced through the completion of an 18,454-meter 2025 drill program. The work targeted three core objectives: grid drilling to refine mine planning parameters, in-pit exploration to strengthen geological modelling and resource conversion, and geotechnical drilling to inform the updated resource model, mine planning and assess sites for the planned port access road. The program was successfully executed by a site team of approximately 80 locally hired staff and external contractors, with results providing critical inputs for engineering, mine planning, and resource modelling.
Current report
To support the advancement of the BFS and move the project toward development, management has identified key project requirements and commenced recruiting for critical positions. Donlin Gold hired Frank Arcese as Project Director. Frank brings more than four decades of global project leadership to Donlin Gold and has deep experience in the execution of large-scale mining capital projects in both the U.S. and international jurisdictions. Most recently, he served as Capital Projects Business Leader for North and South American mining operations at WSP Global Inc., and Engineering, Procurement and Construction Management (EPCM) firm. Prior to that, he acted as Project Director on multiple large mining and power plant project for Rio Tinto across the U.S., Mongolia, China, Australia, and Argentina, and brings extensive expertise in managing projects in remote environments, such as Teck Resource’s original Quebrada Blanca in Chile, BHP’s Escondida Phase 3 and SX-EW Plant in Chile, and recently Rio Tinto’s Rincon 3000 Lithium Project in Argentina.
Current report
In collaboration with Calista Corporation (“Calista”) and The Kuskokwim Corporation (TKC), Donlin Gold LLC had engagement with local communities, stakeholders, and government representatives across the Y-K region, Alaska, and Washington, D.C., advancing project development and permitting. Our longstanding outreach efforts — includes decades of work with 62 Y-K region communities and has strengthened relationships, created knowledge-sharing opportunities, reinforced the project’s social license, and built considerable trust. The company and the Donlin Gold team remain committed to advancing the project responsibly through transparent, respectful, and lasting partnerships and engagement with both community and government entities.
Current report
To support these efforts, Donlin Gold maintained frequent engagement with numerous stakeholders throughout the Y-K region, Alaska, and Washington D.C. In 2025, NOVAGOLD and Donlin Gold staff traveled to Juneau and Washington, D.C., to meet with Alaska’s state legislators, the U.S. congressional delegations and staff, Federal officials, the Federal Permitting Council, and the National Security Council to provide project updates and its importance to Alaska and the Y-K region, discuss energy needs, and highlight the State’s environmental standards. Donlin Gold’s new General Manager and other team members also met with Governor Mike Dunleavy, Department of Interior representatives, Karen Kelleher, Alaska’s Bureau of Land Management acting Director, and other industry officials for an introduction and project update. Meetings also took place with former Alaska state legislators Senator Hughes, Representative Kopp, Representative Coulombe, and Representative Jimmie during the Donlin Gold’s Alaska Federation of Natives reception.
Current report
Donlin Gold hosted the fourth and fifth Subsistence Community Advisory Committee meetings in Anchorage and at the project site, offering a deep dive in different areas of the project’s development and operations, including camp and facility tours, as well as aquatic resources monitoring, and Snow Gulch restoration work.
Current report
Additionally, site tours were held with stakeholders, investors, and analysts, followed by the owners’ tour which included meetings with principal stakeholders, including Alaska Native landowners, government agencies, engineering firms, and logistics providers and other pivotal parties with the capacity and experience to support critical project infrastructure as Donlin Gold advances the BFS and development activities that follow its construction decision.
Current report
Donlin Gold and NOVAGOLD staff traveled to Crooked Creek on several occasions to meet with community members to share information and answer questions from attendees about the Donlin Gold project. Additionally, Donlin Gold and Calista traveled to Crooked Creek and Aniak to provide project updates.
Current report
As part of the owners’ site tour last summer, meetings were held with key Alaska government officials – including Governor Mike Dunleavy, former Department of Natural Resources Commissioner John Boyle, and former Revenue Commissioner Adam Crum among others – to introduce the new Donlin Gold ownership and to discuss shared priorities between the State of Alaska and the project. In addition, a series of discussions were held with natural gas pipeline developers to explore opportunities benefiting the project and its stakeholders.
Current report
Additionally, Donlin Gold hosted a site tour for State of Alaska representatives, state directors for all three U.S. delegation offices, and RDC staff. Donlin Gold also hosted an additional tour including staff from the offices of Senator Lisa Murkowski, Senator Dan Sullivan, and Representative Senator Nick Begich, as well as a Calista intern. The Donlin Gold team met with Representative Begich in Aniak, followed by the Director of the Bureau of Land Management and his staff in Alaska.
Current report
Representatives from Donlin Gold, Paulson and NOVAGOLD, as well as Alaska Gov. Mike Dunleavy participated in a keynote luncheon panel on the Donlin Gold project during the Alaska Miners Association Convention. Panelists discussed the project’s ongoing development, its importance to Alaska and the Y-K region, and how close collaboration among partners and stakeholders is advancing the project responsibly. During the Alaska Miners Association Convention, Donlin Gold’s Permitting and Environmental Manager Enric Fernandez was awarded the Alaska Miners Association Environmental Stewardship Award while the Donlin Gold team received the Alaska Miners Association Hard Hat Safety award – recognizing the team’s outstanding dedication to safety, teamwork and care for one another.
Current report
NOVAGOLD is committed to education, community wellness, cultural preservation, ecological stewardship, and best practices that enhance the economic, health, and social well-being of our employees, the people of the Y-K region, and surrounding communities. Donlin Gold supports these efforts through fisheries studies, environmental activities, subsistence initiatives, and grants, while recognizing the importance of the region’s traditions and subsistence way of life, where environmental health is paramount.
Current report
Meaningful collaboration was deepened with the Native Village of Napaimute, with Donlin Gold extending financial assistance to maintain the Kuskokwim River Ice Road — a pivotal winter infrastructure that ensures the safe transport of residents to community events and serves as a conduit of economic activity for the Kuskokwim River communities. Additionally, Donlin Gold pursued its support of and participation in the Alaska Safe Riders initiative, which promotes the secure use of snowmachines, all-terrain vehicles, and recreational off-road vehicles. Financial assistance was also provided to Camp Fire Alaska, an organization dedicated to offering summer camps and programs to youth in rural communities across Alaska. Activities included music, sports, science, field trips, and numerous outdoor recreation opportunities.
Current report
Donlin Gold continued its participation and support of the Kuskokwim River summer safety Program with NOVAGOLD team members, traveling with 2019 Iditarod champion and Donlin Gold employee, Pete Kaiser. Together, they visited seven villages in the Y-K region to distribute life jackets and promote water safety among local residents. That same month, Donlin Gold extended its support to 47 communities for the annual “Clean-up Greenup” program.
Current report
NOVAGOLD and Donlin Gold also provided financial support to the Alaska Community Foundation to aid community recovery efforts in the region following Typhoon Halong. They also partnered with the AVCP Regional Housing Authority to provide generators and insulation.
Current report
Over the year, Donlin Gold further engaged in a variety of community events and initiatives that celebrate cultural preservation, strengthen stakeholder relationships, and promote the economic and social well-being of the Y-K region. These included Calista’s Shareholder Relations Committee meetings, the Alaska Federation of Natives convention, village gatherings such as Napaimute’s annual event, Nikolai Elder Food Program and School Carnival, RuralCap McGrath’s Bluegrass Festival, the Alaska Native Heritage Center’s 2025 Garden Party, the Aniak Traditional Council Annual Fair, Kalskag’s Culture Camp, Calista’s Golf Tournament, the Kwethluk Church Event, and the Napaskiak Summer Festival.
Current report
Donlin Gold continues to support a range of educational programs, including Crooked Creek’s Traditional Council Summer Youth Employment Program, Alaska Resource Education, collaborating with the Lower Kuskokwim School District to host an annual College & Career Fair, EXCEL Alaska, and Covenant House Alaska’s Bethel Jobs for American Graduates program, which helps high school graduates transition to postsecondary education and employment.
Current report
Throughout the year, Donlin Gold supported local sports initiatives, including the Alaska School Activities Association, Special Olympics Alaska, the Donlin Gold Invitational Basketball Tournament at Bethel Regional High School, The Iditarod Sled Dog Trail Race, Iron Dog Race and Y-K mushers Isaac Underwood, Mike Williams Jr., and Pete Kaiser.
Current report
Donlin Gold also continued to build on the progress of its aquatic habitat restoration project at Snow Gulch, which began in 2021 and is improving access and habitat for resident fish in areas affected by historic placer mining. Further development and restoration of the inlet channel were carried out in 2025 to help restore natural habitat conditions in support of aquatic life.
Current report
Donlin Gold is a federally permitted project on private land designated for mining activities by Calista Corporation, owner of the mineral rights, and The Kuskokwim Corporation (TKC) owner of the surface estate. Permitting in Alaska is a substantial undertaking supported by a diligent, thorough, transparent, and inclusive process for all involved, including stakeholders from the Y-K region.
Current report
NOVAGOLD continues to support the State of Alaska in defending the Department of Environmental Conservation’s (“ADEC”) Clean Water Act Section 401 Water Quality Certification (“401 Certification”), which is the only remaining challenge to Donlin Gold’s permits in state court. On May 6, 2025, the Alaska Superior Court upheld ADEC’s issuance of the 401 Certification. Earthjustice filed an appeal in the Alaska Supreme Court and filed their opening brief on September 16, 2025. Donlin Gold’s and the State of Alaska’s briefs were filed on November 25, 2025, and Earthjustice’s reply brief was filed on January 9, 2026.
Current report
Functional Currency Change
Showing the first 40 of 56 passages. Open the source sections for the rest.
Removed paragraphs (23)
Previous report
Overview
Previous report
Donlin Gold advanced key activities in 2024 to position the project to update technical work and cost estimates. Principal activities included the substantial completion of metallurgical test work at a pilot plant in Ontario, Canada to confirm proposed optimizations to the flowsheet, field and geochemical data collection to continue updating source characteristics for groundwater and surface water models for both operational and closure planning, as well as advancement of the Donlin Gold resource model. Results derived from the considerable technical work performed over these past twelve months will serve as inputs into updated feasibility work.
Previous report
In collaboration with Calista and TKC, Donlin Gold actively engages stakeholders and governments in the Y-K region, Alaska and Washington, D.C. The project’s location on private lands selected under the 1971 Alaska Native Claims Settlement Act is a significant feature, setting it apart from most other mining assets in Alaska and guiding our outreach efforts. Donlin Gold’s enduring partnerships with Calista and TKC are pivotal in facilitating comprehensive outreach throughout the Y-K region.
Previous report
Our outreach in Alaska, particularly in the Y-K region, and in Washington, D.C., has strengthened community engagement and reinforces the project’s social license. The Company appreciates the diligent contributions of the Donlin Gold team, partners, and stakeholders, and remains dedicated to developing the project to its full potential. In collaboration with Calista and TKC, the mineral and surface rights holders, Donlin Gold LLC has made significant strides in local community and government engagement across the Y-K region, Alaska, and Washington, D.C., including advancing the project’s development and permitting efforts. Over decades, our commitment to engaging with the 62 stakeholder communities in the Y-K region has built meaningful relationships, enhanced investment, and reinforced our social license. This longstanding dedication underscores the approach of the Donlin Gold project and its partners, Calista and TKC, to foster robust relationships with both local communities and governmental entities built on trust, transparency, respect and partnership.
Previous report
To that end, Donlin Gold led numerous projects and activities in 2024. Calista, TKC, and Donlin Gold hosted public Open Houses in Anchorage, Bethel, and Crooked Creek providing Alaskans and local residents with the opportunity to learn more about the project and to engage in open and transparent discussions. Donlin Gold hosted a project site tour for a group of residents from Crooked Creek and Georgetown which are the project’s closest neighboring villages.
Previous report
NOVAGOLD remains committed to stakeholder engagement and community development working closely with Tribal communities and Alaska Native Corporations to identify needs and collaboratively develop solutions that enhance and uplift communities, fostering sustainable growth and shared prosperity for future generations. To that end, NOVAGOLD representatives were on the ground in Alaska providing extensive support to the Donlin Gold team in their outreach efforts. Donlin Gold established three additional Shared Values Statements for a total of 18, which formalize Donlin Gold’s ongoing engagement with local communities, reinforce existing long-term relationships, and address specific community needs. In 2024, over 12,000 direct engagements were conducted with key stakeholders.
Previous report
Donlin Gold, Calista, and TKC held two Subsistence Community Advisory Committee ("SCAC") meetings in 2024, the first in Aniak and second in Anchorage. This committee, which is composed of people from the Y-K region, reflects the ongoing commitment to establishing a structured process for communication, dialogue, problem-solving, and gathering input from the broader community on subsistence matters throughout the life of the project. The SCAC committee provides a forum for sharing information, questions and ideas from the communities in the Y-K region with Donlin Gold, Calista and TKC, as well as bringing information about the project back to their respective communities.
Previous report
Recognizing the importance of ecological stewardship in the Y-K region, since mid-2023, Donlin Gold has intensified efforts with our Alaska Native Corporation partners to monitor, survey and engage in the dialogue on salmon fisheries in the Kuskokwim and Yukon River watersheds. In 2024, Donlin Gold launched a salmon smolt monitoring program on the George River, a tributary of the Kuskokwim River, in partnership with the Native Village of Napaimute to assess smolt health and migration patterns — an initiative that will continue into 2025. Restoration of a portion of the historic Lyman placer site, which included significant stream and pond habitat creation, including aquatic life access and use, was completed in 2024. Aquatic restoration work on a reach of Snow Gulch previously disturbed by historic mining will start in 2025.
Previous report
In addition, Donlin Gold’s “In It for The Long Haul” Backhaul Program, a long-standing initiative to collect and safely dispose of hazardous household electronic waste, including appliances, from Y-K villages, recycled approximately 140,000 pounds of material in 2024, for an impressive total of approximately 803,000 pounds of hazardous materials removed from the Y-K region since the program began in 2018.
Previous report
Donlin Gold’s partnership with the Crooked Creek Traditional Council has supported the Summer Youth Employment program, providing local youth with hands-on experience in various work environments while also assisting Elders. The Donlin Gold project continued sponsoring the RurAL CAP Elder Mentor Program, which connects youth with Elders to foster intergenerational knowledge and support academic engagement and school readiness across the State. Donlin Gold also shipped dictionaries to all school districts in the Y-K region for third graders as part of The Dictionary Project, a national effort to promote literacy and creative thinkers, a project they have participated in annually since 2012.
Previous report
Donlin Gold has also reaffirmed its commitment to the Alaska School Activities Association, supporting high school-level athletic, academic, and fine arts programs statewide. Donlin Gold’s ongoing financial contributions highlight our steadfast dedication to enhancing educational and extracurricular opportunities for students throughout Alaska.
Previous report
The Alaska Pollutant Discharge Elimination System permit, which was originally set to expire in 2023, as well as the Waste Management Permit, which was set to expire in January 2024, are administratively extended by the Alaska Department of Environmental Conservation until renewed. The Reclamation Plan, which was also set to expire in 2024, is administratively extended until 2027.
Previous report
Donlin Gold applied for and received an 18-month extension of the construction deadline on its air quality permit through July 2026.
Previous report
In September 2022, thirteen tribes sent letters to the Corps and the EPA. The letter to the Corps requests that it consider requiring an EIS on the Donlin Gold project and revoke the Clean Water Act Section 404 permit (the “404 permit”) in light of what the tribes consider “new information” since the final EIS was issued in 2018. Additionally, the EPA letter requested that it initiate a Clean Water Act Section 404(c) veto process for the Donlin Gold project. In early January 2023, Donlin Gold and Calista both submitted responses to the Corps on why the requests to prepare a supplemental EIS or revoke the 404 permit should not be granted. In January 2023, Donlin Gold also provided a response to the EPA describing why the agency should not initiate a 404(c) process. To date, neither the Corps nor EPA has responded to the tribes’ letters.
Previous report
On June 28, 2021, Earthjustice representing Orutsararmiut Native Council (“ONC”) filed an appeal of the ADEC Commissioner’s decision upholding the ADEC’s Clean Water Act Section 401 water quality certification in Alaska Superior Court. In December 2021, at the request of the State of Alaska and Donlin Gold, the Alaska Superior Court suspended the case and remanded it to ADEC to allow for consideration of additional technical materials on mercury and temperature. After an administrative process, the Commissioner reaffirmed ADEC’s issuance of the 401 Certification on August 18, 2023. The suspension of the previously filed Alaska Superior Court case was then lifted and Earthjustice filed its opening brief with the Alaska Superior Court in January 2024. Briefing is complete and oral arguments were held on August 30, 2024. A decision is anticipated from the Alaska Superior Court in 2025.
Previous report
Consolidated Financial Results
Previous report
Net lossdecreased by $1,182 from 2023, primarily due to lower field expenses at Donlin Gold, partially offset by higher corporate general and administrative expenses, increased interest expense on the promissory note, lower interest income on cash and term deposits and other income related to a gain in the fair market value of marketable securities and proceeds received for the 2021 sale of the Company’s interest in the San Roque mineral property. Donlin Gold expenses were lower with reduced site activity in 2024, compared to fieldwork and geotechnical drilling for the Alaska Dam Safety certificates and hydrological drilling to support mine planning and design in 2023. General and administrative costs increased primarily due to higher professional fees and employee compensation partially offset by lower stock-based compensation expense related to forfeiture of options and performance share units due to the departure of certain former employees.
Previous report
Professional fees increased due to consulting fees primarily related to ongoing efforts to enhance the value of the Donlin Gold project by evaluating alternatives to further advance the project. Salaries and benefits increased primarily due to hiring of additional staff. Income tax expense relates to passive income taxable in Canada on a portion of interest income earned by U.S. subsidiaries, and for withholding taxes on the sale proceeds received during the first quarter of 2024 related to the 2021 sale of the Company’s interest in the San Roque mineral property in Argentina.
Previous report
In 2024, cash and cash equivalents decreased by $3,525, mainly to fund our share of Donlin Gold, corporate administrative expenses partially offset by a net reduction of term deposits held.
Previous report
Spending on operating activities in 2024 increased by $4,856 compared to the prior year primarily due to increased corporate general and administrative expenses, lower interest income on cash and term deposits and higher income tax withholding related to passive income taxable in Canada on a portion of interest income earned by U.S. subsidiaries. Cash provided from investing activities in 2024 increased by $19,683 compared to the prior year primarily due to a net reduction of term deposits held in 2024 and lower Donlin Gold funding requirements. Financing activities reflect $174 of withholding tax on PSUs (as defined below) that vested at 100% during the year and settled with the issuance of net common shares. The PSU awards that matured and vested in December 2024 at 25% of the grant amount were also settled with the issuance of net common shares.
Previous report
As of November 30, 2024, the Company has accounts receivable from Donlin Gold of $212 (November 30, 2023: $203) included inOther current assets for third party study costs contracted for by the Company on behalf of Donlin Gold.
Previous report
Fourth quarter results
Previous report
During the fourth quarter of 2024 we incurred a net loss of $10,860 compared to a net loss of $10,421 in the fourth quarter of 2023. The increase in net loss primarily resulted from higher corporate general and administrative expenses, increased interest on the promissory note, lower interest income, partially offset by reduced activity at Donlin Gold.
Reworded paragraphs (20)
Previous wording
The following Management’s Discussion and Analysis (“MD&A”) provides information that management believes is relevant to an assessment and understanding of the consolidated financial condition and results of operations of NOVAGOLD RESOURCES INC., incorporated in British Columbia, Canada, and its subsidiaries (collectively, “NOVAGOLD,” the “Company,” “our” and “we”). This item should be read in conjunction with our Consolidated Financial Statements and the notes thereto included in this annual report.
Current wording
The following Management’s Discussion and Analysis (“MD&A”) provides information that management believes is relevant to an assessment and understanding of the consolidated financial condition and results of operations of NOVAGOLD RESOURCES INC., incorporated in British Columbia, Canada, and its subsidiaries (collectively, “NOVAGOLD,” the “Company,” “our” and “we”). This item should be read in conjunction with our Consolidated Financial Statements and the notes thereto included in this annual report. References herein to $ refer to United States dollars and C$ to Canadian dollars, except as otherwise specified.
Previous wording
We operate in the gold mining industry, primarily focused on advancing the Donlin Gold project in Alaska. The Donlin Gold project is held by Donlin Gold LLC (“Donlin Gold”), a limited liability company owned equally by wholly-owned subsidiaries of NOVAGOLD and Barrick. We record our interest in the Donlin Gold project as an equity investment, which results in our 50% share of Donlin Gold’s expenses being recorded in the income statement as an operating loss. The investment amount recorded on the balance sheet primarily represents unused funds advanced to Donlin Gold.
Current wording
We operate in the gold mining industry, primarily focused on advancing the Donlin Gold project in Alaska. The Donlin Gold project is held by Donlin Gold, a limited liability company which, following the closing of the Donlin Gold Transaction on June 3, 2025, is owned 60% by a wholly-owned subsidiary of NOVAGOLD and 40% by a wholly-owned subsidiary of Paulson. While NOVAGOLD has a 60% economic interest in Donlin Gold, governance of Donlin Gold is shared equally by NOVAGOLD and Paulson. We record our interest in the Donlin Gold project as an equity investment, which results in our 60% share of Donlin Gold’s expenses being recorded in the income statement as an operating loss.
Previous wording
Our corporate goals include continuing to advance the Donlin Gold project toward a construction decision; maintaining support for Donlin Gold among the project’s stakeholders; promoting a strong safety, sustainability, and environmental culture; maintaining a favorable reputation of NOVAGOLD; and preserving a healthy balance sheet. Our operations primarily relate to the delivery of project milestones, including the achievement of various technical, environmental, sustainable development, economic and legal objectives, obtaining necessary permits, completion of feasibility studies, preparation of engineering designs and the financing to fund these objectives.
Current wording
Our corporate goals include completing the BFS and moving to a subsequent construction decision; maintaining a favorable reputation of NOVAGOLD and the Donlin Gold project among shareholders; promoting strong community outreach and a sustainability culture; maintaining strong safety and environmental performance; and managing the Company’s treasury effectively and efficiently. Our operations primarily relate to the delivery of project milestones, including the achievement of various technical, environmental, sustainable development, economic and legal objectives, obtaining necessary permits and maintaining those received in good standing, advancement to a BFS, preparation of engineering designs and maintaining sufficient capital resources to fund these objectives.
Previous wording
The Donlin Gold board must approve an updated feasibility study, construction program and budget before the Donlin Gold project can be developed. The timing of the required engineering work and the Donlin Gold board’s approval of an updated feasibility study, construction program and budget, the receipt of all required governmental permits and approvals, and the availability of financing, commodity price fluctuations, risks related to market events and general economic conditions among other factors, will affect the timing of and whether to develop the Donlin Gold project. Among other reasons, project delays could occur due to public opposition, litigation challenging permit decisions, requests for additional information or analysis, limitations in agency staff resources during regulatory review and permitting, or project changes made by Donlin Gold.
Current wording
The Donlin Gold board must approve the BFS, construction program and budget before the Donlin Gold project can be developed. The timing of the required engineering work and the Donlin Gold board’s approval of an updated feasibility study, construction program and budget, the receipt of all required governmental permits and approvals, and the availability of financing, commodity price fluctuations, risks related to market events and general economic conditions among other factors, will affect the timing of and whether to develop the Donlin Gold project. Among other reasons, project delays could occur due to public opposition, litigation challenging permit decisions, requests for additional information or analysis, limitations in agency staff resources during regulatory review and permitting, or project changes made by Donlin Gold.
Previous wording
The preliminary design packages for Dam Safety Certification were submitted to the ADNR in 2024. Comments from the ADNR on the Dam Safety Certification preliminary design packages are anticipated in 2025 with potential issuance of the Certification in 2026/2027.
Current wording
Comments from ADNR on the preliminary design packages are anticipated in 2026. BGC Engineering has been appointed as the contractor for the Detailed Design Packages. The Detailed Design Packages are anticipated to be completed by the end of 2026/early 2027 with potential issuance of the Dam Safety Certificates in 2028.
Previous wording
On September 20, 2021, Earthjustice, representing ONC, Cook Inletkeeper, and three Y-K villages, filed an appeal of the State pipeline ROW authorization in Alaska Superior Court. On April 12, 2023, the Alaska Superior Court affirmed ADNR’s issuance of the ROW lease in the Earthjustice case. Earthjustice appealed the Superior Court’s decision to the Alaska Supreme Court. On May 25, 2022, Earthjustice, representing ONC and five Y-K villages, filed an appeal of ADNR’s issuance of certain water rights permits to Donlin Gold in Alaska Superior Court. After briefing and oral argument, on September 1, 2023, the Alaska Superior Court affirmed ADNR’s decision on Donlin Gold’s water rights permits. On October 2, 2023, Earthjustice appealed the Superior Court’s decision to the Alaska Supreme Court. Earthjustice’s opening brief was submitted to the Alaska Supreme Court on January 4, 2024. Response briefs from the State of Alaska and Donlin Gold were completed in April 2024, and Earthjustice subsequently filed their reply brief in May 2024. Briefing on Earthjustice’s appeal of the Alaska Superior Court affirmation of ADNR’s issuance of the State pipeline ROW lease to the Alaska Supreme Court was completed in February 2024. Oral arguments for both the water rights permits and the State pipeline ROW were held November 12, 2024, and a decision is anticipated in 2025.
Current wording
On September 20, 2021, Earthjustice, representing ONC, Cook Inletkeeper, and three Y-K villages, filed an appeal of the State pipeline ROW authorization in Alaska Superior Court. On April 12, 2023, the Alaska Superior Court affirmed the Alaska Department of Natural Resources’ (“ADNR”) issuance of the ROW lease in the Earthjustice case. Earthjustice appealed the Superior Court’s decision to the Alaska Supreme Court. On May 25, 2022, Earthjustice, representing ONC and five Y-K villages, filed an appeal of ADNR’s issuance of certain water rights permits to Donlin Gold in Alaska Superior Court. After briefing and oral argument, on September 1, 2023, the Alaska Superior Court affirmed ADNR’s decision on Donlin Gold’s water rights permits. On October 2, 2023, Earthjustice appealed the Superior Court’s decision to the Alaska Supreme Court. Earthjustice’s opening brief was submitted to the Alaska Supreme Court on January 4, 2024. Response briefs from the State of Alaska and Donlin Gold were completed in April 2024, and Earthjustice subsequently filed their reply brief in May 2024. Briefing on Earthjustice’s appeal of the Alaska Superior Court affirmation of ADNR’s issuance of the State pipeline ROW lease to the Alaska Supreme Court was completed in February 2024. On November 14, 2025, Donlin Gold welcomed the Alaska Supreme Court’s decision affirming both the project’s water rights permits for the mine and the Department of Natural Resources’ approval of the State’s ROW for the state-owned lands portion of the proposed 316-mile natural gas pipeline. The ruling validates the State of Alaska’s thorough review process and reinforces that the project can move forward in a manner that safeguards the lands, waters, and communities of the Yukon-Kuskokwim and southcentral regions.
Previous wording
On April 5, 2023, Earthjustice representing ONC and six Y-K villages filed suit against the U.S. government in Anchorage Federal District Court (the “Federal District Court”) asking the Federal District Court to invalidate the Donlin Gold Joint Record of Decision, which included the U.S. Army Corps’ of Engineers’ issuance of the 404 permit and the Department of Interior, Bureau of Land Management’s issuance of the ROW lease for the portions of the pipeline on Federal lands. The U.S. Department of Justice (“DOJ”) is defending the issuance of the permits by those Federal agencies. The State of Alaska, Donlin Gold, and Calista were granted intervenor status in this case. The DOJ filed their brief supporting the issuance of the JROD and the sufficiency of the environmental analysis in the Final Environmental Impact Statement on April 2, 2024. Amicus briefs supporting the project were filed by the village of Crooked Creek and the Alaska federal Congressional delegation. Oral arguments were held on June 24, 2024, and the Federal District Court issued a decision on September 30, 2024. The decision rejected the plaintiffs’ arguments on two of the three issues raised in the litigation but agreed with plaintiffs that the federal agencies took too narrow of a view in analyzing the impact of a theoretical release from the TSF. The Federal District Court requested supplemental briefing on the appropriate remedy for addressing this issue. On October 7, 2024, the plaintiffs filed a request for reconsideration on one of the issues on which the Federal District Court had ruled against the plaintiffs and, at DOJ’s request, the Federal District Court suspended the schedule for briefing on the appropriate remedy until after the Federal District Court ruled on plaintiffs’ motion for reconsideration. On December 23, 2024, the Federal District Court denied plaintiffs’ request for reconsideration. The Court reestablished the remedy briefing schedule with initial briefs from all parties now due on January 31, 2025, and response briefs from all parties due on February 14, 2025.
Current wording
On April 5, 2023, Earthjustice representing ONC and six Y-K villages filed suit against the U.S. government in the U.S. District Court for Alaska (the “Federal District Court”) asking the Federal District Court to invalidate the Donlin Gold JROD, which included the Corps’ issuance of the 404 permit and the Department of Interior, Bureau of Land Management’s issuance of the ROW lease for the portions of the pipeline on Federal lands. The U.S. Department of Justice (“DOJ”) is defending the issuance of the permits by those Federal agencies. The State of Alaska, Donlin Gold, and Calista were granted intervenor status in this case. The DOJ filed their brief supporting the issuance of the JROD and the sufficiency of the environmental analysis in the Final Environmental Impact Statement on April 2, 2024. Amicus briefs supporting the project were filed by the village of Crooked Creek and the Alaska federal Congressional delegation. Oral arguments were held on June 24, 2024, and the Federal District Court issued a decision on September 30, 2024. The decision rejected the plaintiffs’ arguments on two of the three issues raised in the litigation but agreed with plaintiffs that the federal agencies took too narrow of a view in analyzing the impact of a theoretical release from the tailings’ storage facility. The Federal District Court requested supplemental briefing on the appropriate remedy for addressing this issue. On October 7, 2024, the plaintiffs filed a request for reconsideration on one of the issues on which the Federal District Court had ruled against the plaintiffs and, at DOJ’s request, the Federal District Court suspended the schedule for briefing on the appropriate remedy until after the Federal District Court ruled on plaintiffs’ motion for reconsideration. On December 23, 2024, the Federal District Court denied plaintiffs’ request for reconsideration. Remedy briefing was completed in March 2025 and oral argument on remedy was held May 9, 2025. On June 10, 2025, the Federal District Court issued an order denying Earthjustice’s request to vacate the permits and remanding the case to the agencies to supplement the NEPA analysis on the narrow issue regarding the analysis of a potential larger release from the tailings storage facility. The Court retained jurisdiction over the case during the remand and ordered the agencies to file periodic status updates with the court. USACE, in consultation with BLM and other federal agencies, will be the lead agency for this Supplemental Environmental Impact Statement (“SEIS”) process to ensure a transparent, science-based review that provides the public and decision-makers with complete and accurate information. On October 27, 2025, Donlin Gold was also formally accepted into the FAST-41 program, a federal initiative that increases transparency, accountability, and predictability in permitting, and the project is now listed on the Federal Permitting Dashboard in connection with the SEIS. The USACE has submitt…
Excerpt shortened here; the source contains the full paragraph.
Previous wording
To date, all permits and approvals granted to Donlin Gold by federal and state agencies remain issued and in place while the legal challenges described above proceed. We recognize the importance of preparedness and organization in these matters. With the unwavering support of Donlin Gold and its owners, we will continue to back the state and federal agencies in defending their thorough and diligent permitting processes and are committed to working with the federal agencies and all stakeholders on an appropriate remedy to address the Federal District Court’s decision.
Current wording
To date, all permits and approvals granted to Donlin Gold by federal and state agencies remain in place while the legal challenges described above proceed. We recognize the importance of preparedness and organization on these matters. Donlin Gold and its owners continue their unwavering support of the state and federal agencies in defending their thorough and diligent permitting processes, including working with the federal agencies and all stakeholders on an appropriate remedy to address the Federal District Court’s remand decision.
Previous wording
During 2024, $157 in remediation expenditures were incurred for fieldwork at the historic former New Gold House property in Nome, Alaska, including re-seeding. Monitoring, sampling and maintenance work (as needed, based on monitoring results) is planned for the 2025 field season.
Current wording
During 2025, $219,524 in remediation expenditures were incurred for fieldwork at the historic former New Gold House property in Nome, Alaska, including re-seeding, sampling and monitoring. Monitoring, sampling and maintenance work (as needed, based on monitoring results) is planned for the 2026 field season.
Previous wording
With total cash and term deposits of $101,224, the Company has sufficient working capital available to cover anticipated funding of the Donlin Gold project and corporate general and administrative costs for at least the next two years at current spending levels. Additional capital may be required to complete an updated Donlin Gold feasibility study. Considerable additional capital will be required if a decision to commence engineering and construction is reached by Donlin Gold. Future financing to fund construction is anticipated through debt and equity offerings, project specific debt, and/or other means. Our continued operations are dependent on our ability to obtain additional funding or to generate future cash flows. However, there is no assurance that we will be successful in our efforts to raise additional capital on terms favorable to us, or at all. For further information, see sectionItem 1A, Risk Factors–* Our ability to continue the exploration, permitting, development, and construction of the Donlin Gold project, and to continue as a going concern, will depend in part on our ability to obtain suitable financing*.
Current wording
Future funding to support fully developing the Donlin Gold project is anticipated to include, among of things, a combination of corporate debt and equity, project specific debt, and potentially a royalty, stream and government support. NOVAGOLD’s continued operations, in the longer term, are dependent on its ability to generate future cash flows and maintain sufficient capital resources. There is no assurance that the Company will be successful in its efforts to raise additional capital on favorable terms, or at all. For further information, see sectionItem 1A. Risk Factors–* Our ability to continue the exploration, permitting, and development of the Donlin Gold project, to complete the Bankable Feasibility Study for the Donlin Gold project, to fund construction of the Donlin Gold project, and to continue as a going concern, will depend in part on our ability to obtain suitable financing*.
Previous wording
Our anticipated expenditures in fiscal year 2025 are approximately $37,500, including $21,500 to fund the Donlin Gold project, and $16,000 for corporate general and administrative costs.
Current wording
NOVAGOLD’s anticipated expenditures in fiscal year 2026 are approximately $98.5 million, including $78.8 million to fund the Donlin Gold project, and $19.7 million for corporate general and administrative costs.
Previous wording
Our financial position includes the following as of November 30, 2024:
Current wording
The Company’s financial position includes the following as of November 30, 2025:
Previous wording
As of January 13, 2025, the Company had 334,646,571 common shares issued and outstanding. Also, as of January 13, 2025, the Company had: i) a total of 8,838,001 stock options outstanding; 7,816,967 of those stock options with a weighted-average exercise price of $6.21 and the remaining 1,021,034 with a weighted-average exercise price of C$7.62; and ii) 1,225,100 performance shares units (“PSUs”) and 284,378 deferred share units (“DSUs”) outstanding. Upon exercise of the foregoing convertible securities, the Company would be required to issue a maximum of 10,960,029 common shares.
Current wording
As of January 16, 2026, the Company had 406,994,531 common shares issued and outstanding. Also, as of January 16, 2026, the Company had: i) a total of 25,500,000 warrants outstanding with an exercise price of $3.00 per share; ii) a total of 9,504,633 stock options outstanding; 8,237,633 with a weighted-average exercise price of $5.36 per share and the remaining 1,267,000 of those stock options with a weighted-average exercise price of C$6.97 per share; and iii) 1,578,800 PSUs; and iv) 315,953 deferred share units outstanding. Upon exercise or pay out, as applicable, of the foregoing convertible securities, the Company would be required to issue a maximum of 37,688,786 common shares.
Previous wording
A portion of the proceeds on the sale of the Company’s 50% interest in the Galore Creek project to Newmont, included a contingent note for $75,000 receivable upon the approval of a Galore Creek project construction plan by the owner(s). The Company has assigned no value to the contingent note receivable as management determined that approval of Galore Creek project construction was not probable as of the closing of the Galore Creek sale, and management’s assessment did not change as of November 30, 2024. The contingent note will be recognized only when, in management’s judgement, payment is probable, and the amount recorded will not reverse in future periods.
Current wording
A portion of the consideration from the Company’s 2018 sale of Galore Creek to a subsidiary of Newmont Corporation (“Newmont”) included a $75,000 note receivable, contingent upon the approval of a Galore Creek project construction plan by the owner(s) (see Note 4 to the financial statements). The Company has not assigned a value to the contingent note receivable as management determined that the approval of the Galore Creek project construction was not probable as of the closing of the Galore Creek sale or in subsequent periods. The contingent note will be recognized when, in management’s judgement, it is probable that the payment will occur, and that the amount recorded will not reverse in subsequent periods.
Previous wording
Investments in unconsolidated ventures over which the Company can exercise significant influence, but does not control, are accounted for under the equity method and include the Company’s investment in the Donlin Gold project. Donlin Gold LLC is a non-publicly traded equity investee holding the Donlin Gold project. We identified Donlin Gold as a Variable Interest Entity (“VIE”) as the entity is dependent on funding from its owners. All funding, ownership, voting rights and power to exercise control is shared equally on a 50/50 basis between the owners of the VIE. Therefore, the Company has determined that it is not the primary beneficiary of the VIE.
Current wording
Investments in unconsolidated ventures over which the Company has the ability to exercise significant influence, but does not control, are accounted for under the equity method and include the Company’s investment in the Donlin Gold project. The Company identified Donlin Gold as a Variable Interest Entity (“VIE”) as it is dependent on funding from its owners. Historically, all funding, ownership, voting rights, and power was shared equally on a 50/50 basis between the owners of the VIE. On June 3, 2025, the Company increased its ownership interest in Donlin Gold to 60% (see Note 5 to the financial statements) resulting in the funding and ownership being shared on a 60/40 basis between the Company and its new Donlin Gold partner. However, the power to exercise control and direct the activities of Donlin Gold continues to be shared equally on a 50/50 basis between the Company and its new Donlin Gold partner. As such, the Company has determined it continues to not be the primary beneficiary of the VIE.
Previous wording
The Company’s maximum exposure to loss is its investment in Donlin Gold of $2,597 as of November 30, 2024. The Company reviews and evaluates its investment in the Donlin Gold project for other than temporary impairment when events or changes in circumstances indicate that the related carrying amounts may not be recoverable. Events that could indicate impairment of an investment in an affiliate include a significant decrease in long-term expected gold price, a significant increase in expected operating or capital costs, unfavorable exploration results or technical studies, a significant decrease in reserves, a loss of significant mineral claims, or a change in the development plan or strategy for the project. Management reviewed potential impairment indicators and determined that there were none as of November 30, 2024.
Current wording
The Company’s maximum exposure to loss is its investment in Donlin Gold of $213.2 million as of November 30, 2025. The Company reviews and evaluates its investment in the Donlin Gold project for other than temporary impairment when events or changes in circumstances indicate that the related carrying amounts may not be recoverable. Events that could indicate impairment of an investment in an affiliate include a significant decrease in long-term expected gold price, a significant increase in expected operating or capital costs, unfavorable exploration results or technical studies, a significant decrease in reserves, a loss of significant mineral claims, or a change in the development plan or strategy for the project. Management reviewed potential impairment indicators and determined that there were none as of November 30, 2025.
Previous wording
We grant share-based compensation awards in exchange for employee services, including a stock option plan and a PSU plan. The fair value of awards granted under the plans are recognized in theConsolidated Statements of Loss over the related service period. The fair values of stock options are estimated at the time of each grant using a Black‐Scholes option pricing model, and the fair values of PSUs are measured at each grant date using a Monte Carlo valuation model. The fair value estimates may be impacted by certain variables including, but not limited to, stock price volatility, employee stock option exercise behaviors, additional stock option and PSU grants, estimates of forfeitures, the Company’s performance, and the Company’s performance in relation to its peers.
Current wording
We grant share-based compensation awards in exchange for employee services, including a stock option plan and a performance share unit (“PSU”) plan. The fair value of awards granted under the plans are recognized in theConsolidated Statements of Loss over the related service period. The fair values of stock options are estimated at the time of each grant using a Black‐Scholes option pricing model, and the fair values of PSUs are measured at each grant date using a Monte Carlo valuation model. The fair value estimates may be impacted by certain variables including, but not limited to, stock price volatility, employee stock option exercise behaviors, additional stock option and PSU grants, estimates of forfeitures, the Company’s performance, and the Company’s performance in relation to its peers.
Previous wording
We grant members of the Board DSUs whereby each DSU entitles the directors to receive one common share of the Company or the market value thereof in cash, at the Company’s option, when they retire from service with the Company. The fair value of the DSUs is measured at the date of the grant in amounts ranging from 50% to 100% of directors’ annual retainers at the election of the directors. The fair value is recognized in theConsolidated Statements of Loss over the related service period.
Current wording
We grant members of the Board deferred share units (“DSUs”) whereby each DSU entitles the directors to receive one common share of the Company or the market value thereof in cash, at the Company’s option, when they retire from service with the Company. The fair value of the DSUs is measured at the date of the grant in amounts ranging from 50% to 100% of directors’ annual retainers at the election of the directors. The fair value is recognized in theConsolidated Statements of Loss at the time of grant over the related service period.
Previous wording
In 2024, we incurred $7,237 in share-based compensation costs, a decrease of $1,494 over the prior year primarily due to the forfeiture of options and performance share units following the departure of the former Chief Financial Officer and other personnel during the year.
Current wording
In 2025, we incurred $6.7 million in share-based compensation costs, a decrease of $0.5 million from the prior year primarily due to the timing of share-based compensation issuance and the forfeiture of options and performance share units following the departure of certain employees during the prior year.
Previous wording
During 2024, we had 149,000 PSU awards that vested at 100% and 47,000 DSU awards that vested and were settled with the issuance of common shares. As of November 30, 2024, we had $2,348 of unrecognized compensation cost related to 4,361,486 non-vested stock options expected to be expensed and vest over a period of approximately two years. Also, as of November 30, 2024, we had 1,633,500 non-vested PSU awards outstanding of which 408,400 were fully expensed and vested in December 2024 at 25% of the grant amount, which were subsequently settled with the issuance of common shares. The remaining 1,225,100 non-vested PSU awards with $3,715] of unrecognized compensation cost will be expensed over a period of approximately two years.
Current wording
During 2025, we had 408,400 PSU awards that vested at 25% of the grant amount and 79,065 DSU awards that vested and were settled with the issuance of common shares. As of November 30, 2025, we had $4.4 million of unrecognized compensation cost related to 5,308,654 non-vested stock options expected to be expensed and vest over a period of approximately 2.7 years. Also, as of November 30, 2025, we had 2,074,300 non-vested PSU awards outstanding of which 495,500 were fully expensed and vested in December 2025 without meeting the performance payout criteria. The remaining 1,578,800 non-vested PSU awards with $4.0 million of unrecognized compensation cost will be expensed over a period of approximately 2.4 years.