What changed in Management’s Discussion and Analysis?

Read the current filing

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 139 previous paragraphs and 137 current paragraphs.

60 unchanged; 51 reworded; 24 added; 28 removed; 0 previous and 2 current paragraphs rearranged.

Tables are not compared: 16 previous and 15 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (24)

Current report

Data Center Contracts and Strategy: NIPSCO recently entered into a data center contract with a new customer and entered into amendments to its ADS Contract. Set forth below is a discussion of recent developments relating to our data center contracts and strategy. This discussion is supplemental to, and should be read in conjunction with, our Annual Report on Form 10-K for the fiscal year ended December 31, 2025, in particular Part I, Item 1A, "Risk Factors—Data Center Operations and Strategy Risk" and Part II, Item 7, "Management’s Discussion and Analysis of Financial Condition and Results of Operations—Executive Summary—ADS Contract and Data Center Strategy."

Current report

In March 2026, NIPSCO entered into an agreement with a wholly owned subsidiary of Alphabet, under which NIPSCO will provide electricity to the subsidiary’s data center(the “Alphabet Contract”). Under the Alphabet Contract, which is pending IURC approval, NIPSCO will provide service to Alphabet’s subsidiary pursuant to a capacity commitment beginning in summer 2026 and increasing to 300 MW commencing in 2030. The initial term of the Alphabet Contract is 15 years. Prior to receipt of applicable regulatory approvals from the IURC and FERC, NIPSCO will bill the customer for electric service under its base tariff. Following receipt of regulatory approvals, the customer will pay monthly capacity charges that are based on negotiated rates and actual consumption (subject to certain minimums), together with certain pass-through charges and an existing system charge which will be used to pass savings back to existing customers. The amounts we are entitled to receive from the customer are subject to adjustments including but not limited to resulting from tariff events or MISO accreditation changes. The customer's parent will provide credit support for the customer's payment obligations. Either party may terminate the Alphabet Contract upon certain defaults or failure to obtain necessary related approvals from the IURC and FERC. The Alphabet Contract contains other termination provisions which may be exercised following certain notice periods. If the customer terminates the Alphabet Contract, it is required to make certain termination payments that we believe will be sufficient to reimburse us for our investment costs and NIPSCO has certain obligations to mitigate.

Current report

The customer's electricity supply under the Alphabet Contract will be provided through a portfolio of electric generation assets and related assets owned or contracted for by NIPSCO and/or its affiliates (primarily including GenCo) and designed to serve the needs of the customer under the Alphabet Contract and other data center customers (the "Pool Resource Assets"). See “Data Center Strategy & Pool Resource Assets” below for additional information on the Pool Resource Assets. NIPSCO has entered into a PPA with GenCo in connection with the Alphabet Contract, which is pending IURC approval.

Current report

Amendments to ADS Contract

Current report

In March 2026, NIPSCO entered into an amendment to its ADS Contract to accelerate the delivery of capacity to ADS, resulting in increased committed capacity in the years 2027 through 2031. The amendment does not increase NIPSCO’s 2,400 MW maximum capacity commitment to ADS under the original ADS Contract but increases the amounts of power to be delivered before the maximum commitment is reached. The amendment is pending IURC approval. Pursuant to the amendment, ADS will regularly pay NIPSCO a fixed capacity charge (not subject to adjustment) from 2027 through 2031, regardless of any termination of the ADS Contract or reduction of capacity. The payment structure under this amendment is distinct from and does not alter the payment structure or the payments NIPSCO will receive under the original ADS Contract. Demand under this amendment is expected to be served through Pool Resource Assets (rather than Contract Assets under the ADS Contract).

Current report

In addition, in March and May of 2026, NIPSCO entered into amendments to the ADS Contract, subject to IURC and FERC approval, to increase the committed capacity that NIPSCO will provide beginning in 2029 and increasing to a total capacity commitment of 2,800 MW by the end of 2032 and through the end of the initial term of the ADS Contract. ADS will pay NIPSCO both a fixed capacity charge and an existing system charge designed to pass savings back to existing customers, for the increased capacity. Demand under these amendments is expected to be served through Pool Resource Assets (rather than Contract Assets under the ADS Contract).

Current report

GenCo continues to advance development of its new combined‑cycle natural gas‑fired generation facility to support the ADS Contract. During the period, the EPC contractor progressed engineering, procurement, and planning activities in support of construction mobilization currently anticipated in mid‑2026. The equipment supply contract for the CCGT units is progressing in accordance with planned delivery schedules.

Current report

GenCo is also advancing the development of a combined 400 MW and 100MW BESS installation. The battery equipment supply contract was awarded in February 2026, and the EPC contractor continues engineering, procurement, and planning activities to support the anticipated start of on-site construction in mid‑2026.

Current report

Data Center Strategy & Pool Resource Assets

Current report

With respect to customers to be served by Pool Resource Assets, NIPSCO will retain discretion to select and dispatch Pool Resource Assets to meet committed customer demand in a way that maintains reliability and efficiency without direct involvement or approval from specific customers. We believe this model will enable us to allocate generation resources more efficiently and provide us with greater flexibility to serve a broader range of potential customers.

Current report

We evaluate potential transactions with Pool Resource Asset customers in the context of existing demand and resources within the pool in order to promote a sustainable alignment between committed customer demand within the pool and capacity available from Pool Resource Assets. We will add capacity resources to the Pool Resource Assets to maintain resource adequacy requirements and promote efficient resource utilization based on contracts with customers (subject to IURC approval). We anticipate that the total accredited capacity from the pool will be large enough to support the total load requirements of our data center customers taking into consideration MISO requirements. Pool Resource Assets may include generation assets that we develop or contract for (for example, via a BTA), as well as capacity agreements, ESAs, market capacity purchases or other similar agreements. In order to provide initial Pool Resource Assets to serve contracted demand, GenCo plans to construct new battery storage with 100MW nameplate capacity, which is expected to be completed in 2028, and has entered into a number of ESA contracts (including with respect to the Tipton BESS Project, which we intend to convert into a BTA) and other capacity purchase agreements. For more information on these agreements, see Note 13, "Other Commitments and Contingencies - D. Other Matters" – Pool Resource Asset Agreements.” We expect that the capacity provided by these initial Pool Resource Assets will suffice to meet substantially all contracted demand from the second half of 2028 through the expiration of the initial terms of our existing data center contracts.

Current report

Our ability to recover our investments and earn a return under our contracts with customers served by Pool Resource Assets will be driven by, among other factors, the terms of our contracts with these customers (including the charges we receive from customers and any potential adjustments to such charges), our ability to construct or procure sufficient Pool Resource Assets in a timely and cost-effective manner, and the performance by us and our customers under the contracts, rather than a traditional rate-making process.

Current report

NIPSCO Union Contract Negotiations: On April 2, 2026, NIPSCO initiated a lockout of employees represented by the United Steelworkers following months of extensive negotiations to produce successor collective bargaining agreements by the contract expiration date of March 31, 2026. Agreements were reached and subsequently ratified by the physical and clerical bargaining units on April 24, 2026, and May 1, 2026, respectively, ending the lockout. During the lockout period, we incurred incremental costs to support our work continuity plans.

Current report

The change in volumes for the three months ended March 31, 2026 compared to 2025 was a result of decreased usage from residential customers offset by increases in residential and commercial customer count.

Current report

NIPSCO continues to execute on an electric generation transition consistent with the 2018 Plan and 2021 Plan and maintained in the 2024 Plan. Before the planned retirement of the R.M. Schahfer coal facility at the end of December 2025, NIPSCO received the first of successive emergency orders under section 202(c) of the Federal Power Act, to continue operating in 90-day increments, currently through June 21, 2026. The orders stated that continued operation of R.M. Schahfer is required to meet an energy emergency across MISO’s North and Central regions. Consistent with the Federal Power Act and the U.S. Department of Energy regulations, the order authorizes NIPSCO to obtain cost recovery pursuant to 16 U.S.C. § 824a(c). As directed, NIPSCO continued to make R.M. Schahfer available in the MISO market. We had forced outages on units 17 and 18 to support ongoing compliance with the 202(c) orders, during the period ended March 31, 2026. Following receipt of the emergency order, NIPSCO filed a complaint at FERC seeking a modification of the MISO tariff to establish a mechanism for recovery and allocation of the cost to comply with this order. NIPSCO made two filings with the IURC related to the emergency order. The first filing is to confirm accounting treatment of current electric rate order, and the second is a filing for recovery of federally mandated expenses related to the emergency order, which will be utilized in the event that any costs of complying with the emergency order fall outside of the MISO tariff recovery. For additional information, see Note 8, Regulatory Matters.

Current report

In March 2026, we experienced damage to our solar generation facilities at Dunn's Bridge I due to an extreme weather event. Based on preliminary estimates of the damages, we expect most, if not all, of the total loss will be covered by insurance proceeds less the applicable deductible.

Current report

Details of our ATM program activity are summarized below:

Current report

•In February 2026, we executed a forward sale agreement, which allows us to issue a fixed number of shares at a price to be settled in the future. The forward purchaser under our forward sale agreement borrowed 2,200,000 shares from third parties, which the forward purchaser sold, through its affiliated agent, at a weighted average price of $45.63 per share. We may settle the forward sale agreement in shares, cash or net shares by December 2026.

Current report

•As of March 31, 2026, the ATM program inclusive of the outstanding forward sale agreements had approximately $1.25 billion of equity capacity available. The ATM program expires in December 2028.

Current report

We expect to make capital investments of approximately $600 million in connection with Pool Resource Assets initially being developed in connection with contracted demand from data center customers. These capital expenditures are incremental to the estimates of capital investments relating to data center contracts described in our Annual Report on Form 10-K for the year ended December 31, 2025 and are included in the forecasted capital investment table below.

Current report

Columbia of Ohio filed an application in December 2025 to seek continuation of its PHMSA IRP Rider for calendar year 2027. The request includes recovery of $404.3 million of capital to reconfirm maximum allowable operating pressure of transmission class pipe to meet federal rule requirements.

Current report

NIPSCO filed a Gas TDSIC Plan (2026 - 2030) in December 2025. The petition is seeking recovery of new or replacement projects undertaken for the purpose of safety, reliability, system modernization, or economic development. The request includes $741.0 million of estimated capital, including indirect costs and AFUDC. There is a hearing scheduled for May 2026 with the final order expected in July 2026.
Removed paragraphs (28)

Previous report

Data Center Contract and Strategy:

Previous report

On September 18, 2025, NIPSCO entered into an agreement (the “Data Center Contract”) with a wholly-owned subsidiary of a large publicly traded company (the “Customer”), under which NIPSCO will provide electricity to Customer’s data centers. Under the Data Center Contract, which is subject to IURC approval, NIPSCO will provide electric service to the Customer pursuant to a capacity commitment beginning in 2027 and increasing annually to 2,400 MW by the end of 2032 and will construct up to 3,000 MW of dispatchable generation to provide such electric service. The Data Center Contract’s initial term ends 15 years after the initial energization of Customer’s initial data center. Starting January 1, 2027, Customer will regularly pay NIPSCO a fixed capacity charge and certain pass-through charges. The Customer’s publicly traded, investment-grade parent company has guaranteed the Customer’s payment obligations. These charges are structured to provide us with a return of our invested capital over the fifteen-year initial term. In addition, the Data Center Contract contains provisions for adjustment of the charges designed to provide us with an unlevered internal rate of return on our invested capital over the initial term within a defined range, which we expect over the life of the Data Center Contract to result in an overall realized return greater than that of NIPSCO’s current electric operations, driven by execution and financing. Our realized return may be impacted by factors such as construction costs, operating performance, financing costs and other variables. NIPSCO will also propose to the IURC a mechanism to pass savings back to retail customer for use of the existing system which is expected to begin in 2027. Refer to Part II, Item 1A, “Risk Factors” for a discussion of certain of these factors and other risks relating to the Data Center Contract.

Previous report

In order to meet demand under the Data Center Contract, NIPSCO plans to enter into a PPA with GenCo, which is subject to IURC approval and which is expected to contain terms and provisions substantially similar to the Data Center Contract, such that economic benefits (except savings that are expected to be passed to retail customers as described above) and obligations of the Data Center Contract as they relate to the Generation Assets (as defined below) are expected to be borne by GenCo and NiSource, as GenCo’s ultimate parent company, rather than NIPSCO.

Previous report

GenCo plans to construct 400 MW of new battery storage and a new power generation facility consisting of two 1,300 MW combined-cycle, natural gas-fired turbines, which are expected to reach commercial operation between 2028 and 2032 (such assets, collectively, the “Generation Assets”). GenCo has entered into engineering, procurement and construction contracts (the “EPC Contracts”), and certain equipment supply contracts, including a contract to acquire turbines, with respect to the construction of the Generation Assets. The aggregate cost of the Generation Assets, together with the cost to develop related transmission infrastructure (collectively, the “Contract Assets”), is currently estimated to be approximately $7 billion. The EPC Contracts provide certain protections against cost overruns, and any excess costs with respect to the EPC Contracts beyond those protections, or arising apart from the EPC Contracts are, unless otherwise agreed by the parties, shared by Customer and NIPSCO (for transmission) and GenCo (for generation). If the Contract Assets are delivered into service late or do not achieve certain performance-related milestones, Customer is entitled to liquidated damages, subject to a cap and offset against the regular charges paid by the Customer.

Previous report

Either party may terminate the Data Center Contract upon certain defaults or failure to obtain necessary related approvals from the IURC and FERC. Customer may terminate the Data Center Contract for convenience following certain notice periods and also has a one-time option (exercisable no later than March 31, 2029) to halve the committed capacity under the Data Center Contract to 1,200 MW commencing January 31, 2032. If Customer terminates for convenience, exercises its reduction option or defaults, NIPSCO or its affiliates will be reimbursed for investment costs, subject to agreed caps based on cost estimates by year as of signing. NIPSCO’s aggregate liability, including liquidated damages, is subject to a cap.

Previous report

NIPSCO’s and GenCo’s operations under the Data Center Contract will be regulated by the IURC in a different way from the regulatory mechanisms applicable to NIPSCO’s historical operations. The terms of the Data Center Contract were determined by commercial negotiation with the Customer. These terms include the charges we receive from the Customer and provisions that may result in adjustments to such charges, including those relating to certain liquidated damages that we may owe Customer in the event of construction delays or capacity shortfalls, the parties’ responsibility to share cost overruns, certain changes in law and force majeure events. The IURC will not regulate the commercial terms of the Data Center Contract; however, the IURC will maintain oversight under the Data Center Contract to ensure NIPSCO provides reliable service to the Customer at just and reasonable rates. In order to recover our investment costs and earn our return under the Data Center Contract, our subsidiaries must efficiently perform their own obligations and must look to the Customer (or its parent guarantor) to perform its obligations, rather than the IURC making use of its traditional rate-making process. In addition, under the Data Center Contract, NIPSCO has direct contractual obligations to the Customer to, among other things, construct the Contract Assets and deliver committed electric capacity in fixed amounts by certain dates.

Previous report

We are faced with increased competition for employee and contractor talent in the current labor market which has resulted in increased costs to attract and retain talent. We are ensuring that we use all internal human capital programs (development, leadership enablement programs, succession, performance management) to promote retention of our current employees along with having a competitive and attractive appeal for potential recruits. Our flexible work arrangements, where possible, support a broader talent footprint for sourcing talent needed and for remaining competitive.

Previous report

We continue to evaluate our financing plan to manage interest expense and exposure to rates. For more information on interest rate risk, see "Market Risk Disclosures".

Previous report

The increase in total volumes for the nine months ended September 30, 2025, compared to the same period in 2024, is primarily attributable to increased usage by residential and commercial customers as a result of colder weather.

Previous report

NIPSCO continues to execute on an electric generation transition consistent with the 2018 Plan and 2021 Plan and maintained in the 2024 Plan. The 2024 Plan outlines the path to retire the remaining two coal units at R.M. Schahfer by the end of 2025 and the remaining coal-fired generation at Michigan City by the end of 2028, to be replaced by lower-cost, reliable and cleaner options. NIPSCO is continuing to evaluate the development of federal and state executive orders, or other regulatory actions, with respect to its generation transition plans. Absent a directive to remain open, NIPSCO remain on track to retire R.M. Schahfer's remaining two coal units by the end of 2025. NIPSCO is taking steps to be prepared to respond to any executive order or regulatory action to the contrary.

Previous report

•In February 2025, we executed a forward sale agreement, which allowed us to issue a fixed number of shares at a price to be settled in the future. The forward purchaser under our forward sale agreement borrowed 2,000,000 shares from third parties, which the forward purchaser sold, through its affiliated agent, at a weighted average price of $40.10 per share. In September 2025 we settled the forward sale agreement in shares for $80.0 million, based on a net price of $40.02 per share.

Previous report

•In March 2025, we executed a forward sale agreement, which allowed us to issue a fixed number of shares at a price to be settled in the future. The forward purchaser under our forward sale agreement borrowed 1,707,320 shares from third parties, which the forward purchaser sold, through its affiliated agent, at a weighted average price of $41.00 per share. In September 2025 we settled the forward sale agreement in shares for $69.9 million, based on a net price of $40.92 per share.

Previous report

•In June 2025, we executed a forward sale agreement, which allowed us to issue a fixed number of shares at a price to be settled in the future. The forward purchaser under our forward sale agreement borrowed 2,518,393 shares from third parties, which the forward purchaser sold, through its affiliated agent, at a weighted average price of $39.71 per share. In September 2025 we settled the forward sale agreement in shares for $99.1 million, based on a net price of $39.36 per share.

Previous report

•As of September 30, 2025, the ATM program had approximately $47.5 million of capacity available.

Previous report

•On March 27, 2025 we completed the issuance and sale of $750.0 million of 5.850% senior unsecured notes maturing in 2055, which resulted in approximately $739.6 million of net proceeds after discount and debt issuance costs.

Previous report

•On June 27, 2025, we completed the issuance and sale of an additional $750.0 million of 5.850% senior unsecured notes maturing in 2055 (the "2055 Notes"). The terms of the 2055 Notes, other than the issue date and the price to the public, are identical to the terms of, and constitute a reopening of, our 5.850% senior unsecured notes maturing in 2055 issued on March 27, 2025. With the incremental issuance, we now have $1.5 billion of 5.850% senior unsecured notes maturing in 2055. On June 27, 2025, we also completed the issuance and sale of $900.0 million of 5.350% senior unsecured notes maturing in 2035 (the "2035 Notes"). These issuances of the additional 2055 Notes and the 2035 Notes resulted in approximately $1.616 billion of total net proceeds after discount and debt issuance costs.

Previous report

•On August 15, 2025, we repaid $1,250.0 million of 0.95% senior unsecured notes at maturity.

Previous report

We expect to make capital investments totaling $4.0 billion to $4.3 billion during the 2025 period. In addition to ongoing capital expenditures, these capital investments include advanced deposits for project costs as well as milestone payments to the renewable generation asset developers and excludes $400 million to $500 million of capital investments relating to the Data Center Contract. We also expect to invest approximately $21.0 billion during the 2026-2030 period to support our base business (exclusive of investments relating to the Data Center Contract), including capital investments to support our generation transition strategy, and to invest approximately $6.4 billion during that period to develop the Contract Assets in connection with the Data Center Contract, as set forth in the table below. These forecasted capital investments are subject to continuing review and adjustment. Actual capital investments may vary from these estimates.

Previous report

NIPSCO Gas filed an FMCA CPCN on April 21, 2025. The petition is seeking recovery of spend incurred related to certain federally mandated Pipeline Safety IV Compliance Plan costs. The request includes $244.1 million of estimated capital, including indirect costs and AFUDC. An order was received on October 22, 2025 granting the CPCN requested.

Previous report

Long-Term Debt. Refer to Note 8, "Long-Term Debt," in the Notes to the Condensed Consolidated Financial Statements (unaudited) for information on long-term debt activity.

Previous report

(1)No approved ROE is identified for this matter since the approved revenue increase is the result of a black box settlement under which parties agree upon the amount of increase.

Previous report

(5)In October 2025, a Recommended Decision (RD) was issued by the Administrative Law Judges (ALJs) for the PUC to deny the request of Columbia Gas to increase base rates. Alternatively, the ALJs recommended that Columbia Gas be granted a $66.4 million revenue increase, effective for service rendered on and after January 1, 2026. Columbia Gas filed Exceptions to the ALJs’ RD, proposing an increase of at least $74.2 million, effective on and after December 19, 2025. A Final Order from the PUC is expected in the fourth quarter of 2025.

Previous report

In May 2023, PHMSA proposed regulatory revisions under the PIPES Act of 2020 to minimize methane emissions and improve public safety. Under these proposed revisions, our subsidiaries would be required to detect and repair an increased number of gas leaks, reduce the time to repair leaks, increase leak survey, and expand our existing advanced leak detection program. In January 2025, PHMSA withdrew the final LDAR rule and it has not gone into effect.

Previous report

In September 2023, PHMSA proposed additional regulatory revisions under the PIPES Act of 2020 to enhance distribution system safety through equipment and procedural expectations in the form of the SGDP rule. Operators will be required to incorporate additional protections for low pressure distribution systems that prevent over-pressurization, amend construction procedures designed to minimize the risk of incidents caused by system over-pressurization, and update distribution integrity management programs to cover and prepare for over-pressurization incidents. PHMSA did not progress the SGDP rulemaking in 2024.
Reworded paragraphs (51)

Previous wording

We are an energy holding company under the Public Utility Holding Company Act of 2005 whose utility subsidiaries are fully regulated natural gas and electric utility companies serving customers in six states. We generate substantially all of our operating income through these rate regulated businesses. Our businesses are summarized for financial reporting purposes into two primary reportable segments: Columbia Operations and NIPSCO Operations. Refer to ''Note 16, "Business Segment Information," in the Notes to the Condensed Consolidated Financial Statements (unaudited) for further discussion of our business segments.

Current wording

We are an energy holding company under the Public Utility Holding Company Act of 2005 whose primary subsidiaries are fully regulated natural gas and electric utility companies serving customers in six states. We generate substantially all of our operating income through these rate-regulated businesses, which are summarized for financial reporting purposes into two primary reportable segments: Columbia Operations and NIPSCO Operations. Refer to ''Note 15, "Business Segment Information," in the Notes to the Condensed Consolidated Financial Statements (unaudited) for further discussion of our business segments.

Previous wording

Our vision is to be a premier, innovative and trusted energy partner. We exist to deliver safe, reliable energy that drives value to our customers. In order to achieve this goal, we seek to develop strategies that benefit all stakeholders as we (i) support long-term infrastructure investment and safety programs to better serve our customers, (ii) align our tariff structures with our cost structure, and (iii) drive value and enable growth in an evolving energy ecosystem. These strategies focus on improving safety and reliability, enhancing customer experience, pursuing regulatory and legislative initiatives to increase accessibility for customers currently not on our gas and electric service, ensuring customer affordability and reducing emissions while generating sustainable returns. The safety of our customers, communities and employees remains our focus. Serving as a guiding practice for our SMS, NiSource is certified in conformance to the American Petroleum Institute Recommended Practice 1173, which is the foundation to our journey towards operational excellence.

Current wording

Our vision is to be a premier, innovative and trusted energy partner. We exist to deliver safe, reliable and competitive energy that drives value to our customers. In order to achieve this goal, we seek to develop strategies that benefit all stakeholders as we (i) support long-term infrastructure investment and safety programs to better serve our customers, (ii) align our tariff structures and regulatory programs with our cost structure, and (iii) create value and enable growth in an evolving energy ecosystem. These strategies focus on improving safety and reliability, enhancing customer experience, pursuing regulatory and legislative initiatives to increase accessibility for customers currently not on our gas and electric service, ensuring customer value and reducing emissions while generating sustainable returns. The safety of our customers, communities and employees remains our focus. Serving as a guiding practice for our SMS, NiSource is certified in conformance to the American Petroleum Institute Recommended Practice 1173, which is the foundation to our journey towards operational excellence.

Previous wording

We continue to experience strong demand from potential data center customers in our northern Indiana service territory and are engaged in negotiations with potential counterparties. Through certain of our subsidiaries, we have entered into certain construction and equipment supply contracts in relation to additional generation and transmission assets that may be used to serve potential future data center customers. As we continue to evaluate our potential data center opportunities, we will continue to focus on the community, financial, operational and regulatory factors that must be managed effectively in order to succeed with our data center strategy. We believe data center development can enhance our local tax base, diversify the employment base across the state of Indiana, and provide greater value to existing customers and shareholders. We continually evaluate ways to effectively manage the potential power demand, generation sources, and transmission capabilities to meet potential further load growth from additional data center customers, while at the same time focusing on our environmental goals.

Current wording

Through certain of our subsidiaries, we have entered into certain construction and equipment supply contracts in relation to additional generation and transmission assets that may be used to serve potential future data center customers. As we continue to evaluate our potential data center opportunities, we will continue to focus on the community, financial, operational and regulatory factors that must be managed effectively in order to succeed with our data center strategy. We believe data center development can enhance our local tax base, diversify the employment base across the state of Indiana, and provide greater value to existing customers and shareholders. We continually evaluate ways to effectively manage the potential power demand, generation sources, and transmission capabilities to meet potential further load growth from additional data center customers, while at the same time focusing on our environmental goals.

Previous wording

In order to perform under any further data center contracts, we expect that we would need to develop additional generation and transmission assets and obtain additional financing in connection with such development. For these and other reasons, our ability to successfully execute our data strategy is subject to a number of risks and uncertainties. Refer to Part II, Item 1A, “Risk Factors” for a discussion of certain risks relating to our data center strategy.

Current wording

In order to perform under any further data center contracts, we expect that we would need to develop additional generation and transmission assets, which may be significant, and obtain additional financing in connection with such development. For these and other reasons, our ability to successfully execute our data center strategy is subject to a number of risks and uncertainties. Refer to Part I, Item 1A, “Risk Factors” in our Annual Report on Form 10-K for the fiscal year ended December 31, 2025.

Previous wording

Energy Transition: We continue to advance our energy transition strategy, primarily through the continuation and enhancement of existing programs, such as implementing our plan to retire and replace remaining coal-fired electric generation by 2028 with a balanced mix of low- or zero-emission electric generation, ongoing pipe replacement and modernization programs, and deployment of advanced leak detection and repair. Our electric generation transition, initiated through our 2018 Integrated Resource Plan ("2018 Plan") is well underway, and we are continually adjusting to the dynamic energy landscape. As of September 30, 2025, we have placed in service owned renewable and storage projects with combined nameplate capacities of 1,950 MW and 101 MW respectively. Renewable PPA projects with a combined nameplate capacity of 1,000 MW have also been placed in service. In addition, a renewable BTA project with a nameplate capacity of 200 MW, and a renewable PPA project with a nameplate capacity of 195 MW were under development as of September 30, 2025, all of which have received IURC approval. For additional information, see Note 14, "Other Commitments and Contingencies - D. Other Matters". We are continuing to evaluate the development of federal and state executive orders, or other regulatory actions, with respect to our generation transition plans. Absent a directive to remain open, we remain on track to retire R.M. Schahfer's remaining two coal units by the end of 2025. We are taking steps to be prepared to respond to any executive order or regulatory action to the contrary. For additional information, see "Results and Discussion of Operations - NIPSCO Operations," in this Management's Discussion, and see Part I, Item 1A. "Risk Factors" in our Annual Report on Form 10-K for the fiscal year ended December 31, 2024.

Current wording

Energy Transition: We continue to advance our energy transition strategy, primarily through the continuation and enhancement of existing programs, such as implementing our plan to retire and replace remaining coal-fired electric generation by 2028 with a balanced mix of low- or zero-emission electric generation, ongoing pipe replacement and modernization programs, and deployment of advanced leak detection and repair. We continue to make progress on our electric generation transition, initiated through our 2018 Plan, and we are continually adjusting to the dynamic energy landscape. Before the planned retirement of the R.M. Schahfer coal facility at the end of December 2025, NIPSCO received the first of successive emergency orders under section 202(c) of the Federal Power Act, to continue operating in 90-day increments, currently through June 21, 2026. The orders stated that continued operation of R.M. Schahfer is required to meet an energy emergency across MISO’s North and Central regions. Consistent with the Federal Power Act and the U.S. Department of Energy regulations, the order authorizes NIPSCO to obtain cost recovery pursuant to 16 U.S.C. § 824a(c). For additional information, see Note 8, "Regulatory Matters," and see Part I, Item 1A. "Risk Factors" in our Annual Report on Form 10-K for the fiscal year ended December 31, 2025.

Previous wording

NIPSCO's 2021 Integrated Resource Plan ("2021 Plan") lays out a timeline to retire the Michigan City Generating Station by the end of 2028. The 2021 Plan calls for the replacement of the retiring units with a diverse portfolio of resources including demand side management resources, incremental solar, stand-alone energy storage and upgrades to existing facilities at the Sugar Creek Generating Station, among other steps. Additionally, the 2021 Plan calls for a new natural gas peaking facility to replace existing vintage gas peaking facilities at the R.M. Schahfer Generating Station to support system reliability and resiliency, and upgrades to the electric transmission system. Following approval by the IURC in October 2024, the construction of a new 400 MW natural gas peaking generation facility is underway, which is expected to support the planned retirement of the existing vintage gas peaking facilities by the end of 2028. Final retirement dates for these units, as well as Michigan City, will be subject to MISO approval.

Current wording

NIPSCO's 2021 Plan calls for a new natural gas peaking facility to replace existing vintage gas peaking facilities at the R.M. Schahfer Generating Station to support system reliability and resiliency, and upgrades to the electric transmission system. Following approval by the IURC in October 2024, the construction of a new 400 MW natural gas peaking generation facility is underway, which is expected to support the planned retirement of the existing vintage gas peaking facilities by the end of 2028. The 2021 Plan affirms the retirement of the Michigan City Generating Station by 2028 and calls for new natural gas peaking facilities. Final retirement dates for these units will be subject to MISO approval.

Previous wording

NIPSCO's 2024 Integrated Resource Plan ("2024 Plan") was submitted to the IURC on December 9, 2024. The 2024 Plan maintains the retirement decisions and capacity additions identified in the 2018 and 2021 Integrated Resource Plans and calls for additional generation resources through 2029 to support capacity requirements. The 2024 Plan informs future generation investments required to ensure reliability for NIPSCO’s customers and incorporates factors such as anticipated load growth from data centers and other economic development opportunities, EPA emissions rules, and evolving MISO resource accreditation rules. We plan to move as efficiently as possible while maintaining the integrity of our commercial, planning, regulatory, procurement and operational execution processes.

Current wording

NIPSCO's 2024 Plan was submitted to the IURC on December 9, 2024. The 2024 Plan maintains the retirement decisions and capacity additions identified in the 2018 and 2021 Integrated Resource Plans and calls for additional generation resources through 2029 to support capacity requirements. The 2024 Plan informs future generation investments required to ensure reliability for NIPSCO’s customers and incorporates factors such as anticipated load growth from data centers and other economic development opportunities, EPA emissions rules, and evolving MISO resource accreditation rules. Given that the 90-day 202(c) order could continue to be issued every 90 days to keep R.M. Schahfer open for the foreseeable future, and given that MISO's resource accreditations for renewables and storage remain uncertain, it may be necessary to evaluate changes to our previously communicated resource timelines and alternative resource decisions. We plan to move as efficiently as possible while maintaining the integrity of our commercial, planning, regulatory, procurement and operational execution processes.

Previous wording

Transformation: Our enterprise-wide transformation roadmap focuses on operational excellence, safety, operation and maintenance management, and unlocking efficiencies. We are committed to identifying and implementing initiatives that will enable us to streamline work and improve logistics company-wide. These efforts include investments in proven technologies backed with standardized processes that will change the way we plan, schedule, and execute work in the field and how we engage and provide service to our customers. Taken together, all of our optimization initiatives will prioritize safety and continue to optimize our long-term growth profile. Completing the first major milestone of our enterprise-wide transformation roadmap, we concluded all three phases of a WAM ERP program. Phase one of the program implemented the solution within our electric and transmission operations, while the second phase of the program included all gas distribution operations across our operating territories. The third and final phase incorporated our generation assets. This ERP system optimizes the scheduling, dispatch, and execution of our field operations. We will now proceed as planned with our enterprise transformation roadmap by focusing on our customer technology platforms. In addition to transforming technology to enhance our employee and customer experiences, we believe these programs will also ensure we remain on modern systems that help reduce enterprise risk related to end-of-life systems.

Current wording

Transformation: We are modernizing and unlocking efficiencies within our systems and processes on operational excellence, safety, operation and maintenance management. These efforts include investments in proven technologies backed with standardized processes that are changing the way we plan, schedule, and execute work in the field and how we engage and provide service to our customers. We continue to focus on our customer technology platforms. In addition to transforming technology to enhance our employee and customer experiences, we believe these programs will modernize systems and further reduce our enterprise risk related to end-of-life systems. During the first quarter, we also initiated a multi-year program, Value Captured, aimed at accelerating certain transformation activities in response to growing customer affordability concerns. This program is focused on operational efficiencies, evaluating target operating models and improving long-term scalability.

Previous wording

A summary of our consolidated financial results for the three and nine months ended September 30, 2025 and 2024 are presented below:

Current wording

A summary of our consolidated financial results for the three months ended March 31, 2026 and 2025 are presented below:

Previous wording

The increase in net income available to common shareholders for the three and nine months ended September 30, 2025 was primarily due to higher revenues driven by our capital investments, partially offset by higher operating expenses, including increased operation and maintenance expense and depreciation expense attributed to our net plant balances, as well as increased interest expense.

Current wording

The increase in net income available to common shareholders for the three months ended March 31, 2026 was primarily due to higher revenues associated with our capital investments, partially offset by higher operating expenses, including increased operation and maintenance expense and depreciation expense attributed to our net plant balances, as well as increased interest expense.

Previous wording

Columbia Operations aggregates the results of the fully regulated and wholly owned subsidiaries of NiSource Gas Distribution Group, Inc. Each Columbia distribution company is an operating segment which we aggregate to form the Columbia Operations reportable segment. NIPSCO Operations aggregates the results of NIPSCO Holdings I, and its majority-owned subsidiaries, including NIPSCO, which has both regulated gas and electric operations in northern Indiana. The remainder of our operations, which are not significant enough on a stand-alone basis to warrant treatment as a reportable segment, are presented as "Corporate and Other" within the Notes to the Condensed Consolidated Financial Statements (unaudited) and primarily are comprised of interest expense on holding company debt, and unallocated corporate costs and activities.

Current wording

Columbia Operations aggregates the results of the fully regulated and wholly owned subsidiaries of NiSource Gas Distribution Group, Inc. Each Columbia distribution company is an operating segment which we aggregate to form the Columbia Operations reportable segment. NIPSCO Operations aggregates the results of NIPSCO Holdings I and its majority-owned subsidiaries, including NIPSCO, which has both fully regulated gas and electric operations in northern Indiana. The remainder of our operations, which are not significant enough on a stand-alone basis to warrant treatment as a reportable segment, are presented as "Corporate and Other" within the Notes to the Condensed Consolidated Financial Statements (unaudited) and primarily are comprised of interest expense on holding company debt, unallocated corporate costs and activities and new business development costs associated with GenCo.

Previous wording

Financial and operational data for the Columbia Operations segment for the three and nine months ended September 30, 2025 and 2024 are presented below.

Current wording

Financial and operational data for the Columbia Operations segment for the three months ended March 31, 2026 and 2025 are presented below.

Previous wording

The underlying reasons for changes in our operating revenues for the three and nine months ended September 30, 2025 compared to the same period in 2024 are presented below.

Current wording

The underlying reasons for changes in our operating revenues for the three months ended March 31, 2026 compared to the same period in 2025 are presented below.

Previous wording

In general, we calculate the weather-related revenue variance based on changing customer demand driven by weather variance from normal heating degree days, net of weather and revenue normalization mechanisms. Our composite heating degree days reported do not directly correlate to the weather-related dollar impact on the results of Columbia Operations. Heating degree days experienced during different times of the year or in different operating locations may have more or less impact on volume and dollars depending on when and where they occur. When the detailed results are combined for reporting, there may be weather-related dollar impacts on operations when there is not an apparent or significant change in our aggregated composite heating degree day comparison.

Current wording

In general, we calculate the weather-related revenue variance based on changing customer demand driven by weather variance from normal heating degree days, net of weather and revenue normalization mechanisms. Normal weather is aligned with the definitions used in base rates for each jurisdiction, which typically reflect a 20-year average for all operating companies, other than Columbia of Virginia, which uses a 30-year average. In certain circumstances, normal weather as defined in base rates may differ from the assumptions used in normalization mechanisms. Our composite heating degree days reported do not directly correlate to the weather-related dollar impact on the results of Columbia Operations. Heating degree days experienced during different times of the year or in different operating locations may have more or less impact on volume and dollars depending on when and where they occur. When the detailed results are combined for reporting, there may be weather-related dollar impacts on operations when there is not an apparent or significant change in our aggregated composite heating degree day comparison.

Previous wording

Cost of energy for the Columbia Operations segment is principally comprised of the cost of natural gas procured on behalf of and sold to customers while providing transportation services. All of our Columbia Operations companies have state-approved recovery mechanisms that provide a means for full recovery of prudently incurred gas costs. These are tracked costs that are passed through directly to the customer, and the gas costs included in revenues are matched with the gas cost expense recorded in the period. Any difference in actual costs incurred and amounts billed to customers is recorded on the Condensed Consolidated Balance Sheets (unaudited) as under-recovered or over-recovered gas cost to be included in future customer billings. Therefore, increases in these tracked operating expenses are offset by increases in operating revenues and have essentially no impact on net income. Certain Columbia Operations companies continue to offer choice opportunities, where customers can choose to purchase gas from a third-party supplier through regulatory initiatives in their respective jurisdictions.

Current wording

Cost of energy for the Columbia Operations segment is principally comprised of the cost of natural gas procured and transported on behalf of and sold to customers while providing distribution services, as well as the transportation and storage costs of acquiring natural gas. All of our Columbia Operations companies have state-approved recovery mechanisms that provide a means for full recovery of prudently incurred gas costs. These are tracked costs that are passed through directly to the customer, and the gas costs included in revenues are matched with the gas cost expense recorded in the period. Any difference in actual costs incurred and amounts billed to customers is recorded on the Condensed Consolidated Balance Sheets (unaudited) as under-recovered or over-recovered gas cost to be included in future customer billings. Therefore, increases in these tracked operating expenses are offset by increases in operating revenues and have essentially no impact on net income. Certain Columbia Operations companies continue to offer choice opportunities, where customers can choose to purchase gas from a third-party supplier through regulatory initiatives in their respective jurisdictions.

Previous wording

The underlying reasons for changes in our operating expenses for the three and nine months ended September 30, 2025 compared to the same period in 2024 are presented below.

Current wording

The underlying reasons for changes in our operating expenses for the three months ended March 31, 2026 compared to the same period in 2025 are presented below.

Previous wording

Financial and operational data for the NIPSCO Operations segment, which services both gas and electric customers, for the three and nine months ended September 30, 2025 and 2024 are presented below.

Current wording

Financial and operational data for the NIPSCO Operations segment, which services both gas and electric customers, for the three months ended March 31, 2026 and 2025 are presented below.

Previous wording

The underlying reasons for changes in our operating revenues for the three and nine months ended September 30, 2025 compared to the same period in 2024 are presented below.

Current wording

The underlying reasons for changes in our operating revenues for the three months ended March 31, 2026 compared to the same period in 2025 are presented below.

Previous wording

The results of operations for the NIPSCO Operations segment include income from both electric and gas service lines. In general, we calculate the weather-related revenue variance based on changing customer demand driven by weather variance from normal cooling degree days and normal heating degree days, net of NIPSCO Gas' weather normalization mechanism. Our composite cooling and heating degree days reported do not directly correlate to the weather-related dollar impact on the results of NIPSCO Operations. Cooling and heating degree days experienced during different times of the year or in different operating locations may have more or less impact on volume and dollars depending on when they occur. When the detailed results are combined for reporting, there may be weather-related dollar impacts on operations when there is not an apparent or significant change in our aggregated composite cooling and heating degree day comparison.

Current wording

The results of operations for the NIPSCO Operations segment include income from both electric and gas services. In general, we calculate the weather-related revenue variance based on changing customer demand driven by weather variance from normal cooling degree days and normal heating degree days, net of NIPSCO Gas' weather normalization mechanism. Our composite cooling and heating degree days reported do not directly correlate to the weather-related dollar impact on the results of NIPSCO Operations. Cooling and heating degree days experienced during different times of the year or in different operating locations may have more or less impact on volume and dollars depending on when they occur. When the detailed results are combined for reporting, there may be weather-related dollar impacts on operations when there is not an apparent or significant change in our aggregated composite cooling and heating degree day comparison.

Previous wording

The increase in total volumes sold to electric customers for the three months ended September 30, 2025 compared to the same period in 2024 was primarily attributable to increased residential and industrial usage, partially offset by decreased commercial usage. The increase in total volumes sold to electric customers for the nine months ended September 30, 2025 compared to the same period in 2024 was primarily attributable to increased industrial and residential usage due to colder weather and increased customer count, partially offset by decreased commercial and wholesale and other usage

Current wording

The decrease in total volumes sold to electric customers for the three months ended March 31, 2026 compared to the same period in 2025 was primarily attributable to decreased residential and wholesale usage, partially offset by increased industrial and commercial usage, as well as increased residential and commercial customer count.

Previous wording

The increase in total volumes sold to gas customers for the three months ended September 30, 2025 compared to the same period in 2024 was primarily attributable to increased usage by industrial customers. The increase in total volumes sold to gas customers for the nine months ended September 30, 2025 compared to the same period in 2024 was primarily attributable to increased usage by industrial and commercial customers, as well as increased residential usage due to colder weather.

Current wording

The decrease in total volumes sold to gas customers for the three months ended March 31, 2026 compared to the same period in 2025 was primarily attributable to decreased usage by residential customers due to warmer weather, as well as decreased usage from industrial and commercial customers, partially offset by increases in residential and commercial customer count.

Previous wording

Cost of energy for the NIPSCO Operations segment's electric activities is principally comprised of the cost of coal, natural gas purchased for internal generation of electricity, transportation of coal and natural gas, and the cost of power purchased from generators of electricity for its generation and transmission activities. For its gas distribution activities, NIPSCO Operations' cost of energy is principally comprised of the cost of natural gas procured on behalf of and sold to customers while providing transportation and distribution services. NIPSCO Operations has state-approved recovery mechanisms that provide a means for full recovery of prudently incurred costs of energy. The majority of these costs of energy are passed through directly to the customer, and the costs of energy included in operating revenues are matched with the cost of energy expense recorded in the period. Any difference in actual costs incurred and amounts billed to customers is recorded on the Condensed Consolidated Balance Sheets (unaudited) as under-recovered or over-recovered fuel and gas costs to be included in future customer billings. Therefore, increases in these tracked operating expenses are offset by increases in operating revenues and have essentially no impact on net income.

Current wording

Cost of energy for the NIPSCO Operations segment's electric activities is principally comprised of the cost of coal, natural gas purchased for internal generation of electricity, transportation of coal and natural gas, and the cost of power purchased from generators of electricity for its generation and transmission activities. For its gas distribution activities, NIPSCO Operations' cost of energy is principally comprised of the cost of natural gas procured and transported on behalf of and sold to customers while providing distribution services, as well as the transportation and storage costs of acquiring natural gas. NIPSCO Operations has state-approved recovery mechanisms that provide a means for full recovery of prudently incurred costs of energy. The majority of these costs of energy are passed through directly to the customer, and the costs of energy included in operating revenues are matched with the cost of energy expense recorded in the period. Any difference in actual costs incurred and amounts billed to customers is recorded on the Condensed Consolidated Balance Sheets (unaudited) as under-recovered or over-recovered fuel and gas costs to be included in future customer billings. Therefore, increases in these tracked operating expenses are offset by increases in operating revenues and have essentially no impact on net income.

Previous wording

The underlying reasons for changes in our operating expenses for the three and nine months ended September 30, 2025 compared to the same period in 2024 are presented below.

Current wording

The underlying reasons for changes in our operating expenses for the three months ended March 31, 2026 compared to the same period in 2025 are presented below.

Previous wording

The current replacement plan primarily includes renewable sources of energy, including wind, solar, battery storage, and flexible natural gas resources to be obtained through a combination of NIPSCO ownership and PPAs. NIPSCO has sold, and may in the future sell, renewable energy credits from its renewable generation to third parties to offset customer costs. Since 2020, five PPA projects (two wind and three solar) and eight owned projects (two wind, four solar and two solar plus storage) have been placed into service totaling 3,051 MW of nameplate capacity, including Dunns Bridge II, Fairbanks, Gibson and Appleseed, which were placed into service in January, May, and August 2025, respectively. NIPSCO has executed several PPAs to purchase 100% of the output from renewable generation facilities at a fixed price per MWh. Each facility supplying the energy has an associated nameplate capacity, and payments under the PPAs do not begin until the associated generation facility is placed into service. See "Executive Summary - Energy Transition" in this Management's Discussion for additional information. We expect the Templeton and Carpenter projects to be placed in service between 2025 and 2027.

Current wording

NIPSCO has one remaining project under the 2021 plan still under development. We expect the Templeton project, a wind BTA project with nameplate capacity of 200 MW, to be placed in service in 2027. See "Executive Summary - Energy Transition" in this Management's Discussion for additional information. NIPSCO has sold, and may in the future sell, renewable energy credits from its renewable generation to third parties to offset customer costs.

Previous wording

We continually evaluate the availability of adequate financing to fund our ongoing business operations, working capital and core safety and infrastructure investment programs. Our financing is sourced through cash flow from operations and the issuance of debt and/or equity. External debt financing is provided primarily through the issuance of long-term debt, accounts receivable securitization programs and our $1.85 billion commercial paper program, which is backstopped by our committed revolving credit facility with a total availability from third-party lenders of $1.85 billion. We believe these sources provide adequate capital to fund our operating activities and capital expenditures in 2025 and beyond.

Current wording

We continually evaluate the availability of adequate financing to fund our ongoing business operations, working capital and core safety and infrastructure investment programs. Our financing is sourced through cash flow from operations, the issuance of debt and/or equity, and minority interest investments. Equity issuances are primarily conducted through our ATM program. Additionally, we received proceeds from tax credit transfers related to previously and currently monetized credits, which are returned to customers over a ten‑year period for investment tax credits and a one-year period for production tax credits. External debt financing is provided primarily through the issuance of long-term debt, accounts receivable securitization programs and our commercial paper program, which is backstopped by our committed revolving credit facility. In March 2026, we increased our commercial paper program limit from $1.85 billion to $2.50 billion. We believe these sources provide adequate capital to fund operating activities and capital expenditures for our base business (i.e., excluding operations and capital expenditures related to serving data center customers) in 2026 and beyond.

Previous wording

As discussed above under “Data Center Contract and Strategy,” the aggregate cost of the Contract Assets is currently estimated to be approximately $7 billion. We expect to finance the construction and development of these assets through a combination of funds received under the Data Center Contract and debt, equity financing raised by NiSource and capital contributions from affiliates of Blackstone to NIPSCO Holdings II and Generation Holdings II in connection with such Blackstone affiliates’ minority interest investments in those entities. For additional information on these minority interest investments, refer to Part II, Item 5 (Other Information) and to our Annual Report on Form 10-K for the year ended December 31, 2024, including Note 19 to our Consolidated Financial Statements included therein. In addition, we may consider other funding sources, structures or partnerships as market conditions and strategic considerations evolve. If we enter into additional data center contracts, we expect that we would need to develop additional generation assets and obtain additional financing in connection with such development.

Current wording

The aggregate cost of Contract Assets and Pool Resource Assets supporting our existing data center customers is currently estimated to be between$9.25 to $9.75 billion. We expect to finance the construction and development of these assets and purchases of market capacity through a number of sources including but not limited to funds received under our data center contracts, debt, and equity financing raised by NiSource and capital contributions from affiliates of Blackstone to NIPSCO Holdings II and Generation Holdings II in connection with such Blackstone affiliates’ minority interest investments in those entities. For additional information on these minority interest investments, refer to Note 4, "Noncontrolling Interests," and Note 19, "Other Commitments and Contingencies - E. Other Matters," in our Annual Report on Form 10-K for the year ended December 31, 2025. If we enter into additional data center contracts, we expect that we would need to develop additional generation assets to serve our new data center customers. In order to fund the development of these assets, which may be significant, we would be required to obtain significant additional financing, for which we may consider other funding sources, structures, or partnerships, which may include JVs, off-balance sheet arrangements in the form of BTAs, or other arrangements to support maintenance of our investment grade credit ratings.

Previous wording

See Note 6, "Equity," Note 7, "Short-Term Borrowings," and Note 8, "Long-Term Debt," in the Notes to the Condensed Consolidated Financial Statements (unaudited) for more information on our financing activities.

Current wording

See Note 6, "Equity," Note 7, "Short-Term Borrowings," in the Notes to the Condensed Consolidated Financial Statements (unaudited) for more information on our financing activities.

Previous wording

The increase in cash from operating activities was primarily attributable to year over year changes in exchange gas receivables, higher net income before deferred income taxes and depreciation and a reduction in inventory resulting from an elevated rate of withdrawals due to warmer weather in 2025.

Current wording

The year over year decrease in cash from operating activities was primarily attributable to changes in exchange gas receivables, accounts payable and prepayments as well as a change in inventory. These impacts were partially offset by higher net income, change in accounts receivable, and depreciation.

Previous wording

Year over year increase in investing activities was primarily comprised of milestone payments to renewable generation asset developers for certain of our BTA projects and advanced deposits.

Current wording

The year over year decrease in investing activities was primarily driven by prior year milestone payments to renewable generation asset developers for certain of our BTA projects and prior year advanced deposits offset by current year capital expenditures.

Previous wording

(2)TDISC – 7 was originally filed on May 27, 2025 and refiled on July 2, 2025, due to the Electric Rate Case Order. The refiling adjusted the capital in the tracker to go down from $744.7 million to $315.6 million.

Current wording

(2)TDSIC – 7 was originally filed in May 2025. TDSIC - 7 was refiled in February 2026, due to the electric rate case Step 2 Compliance Filing. The refiling adjusted the capital in the tracker from $315.6 million to $175.4 million.

Previous wording

Debt Covenants. We are subject to a financial covenant under our revolving credit facility, which requires us to maintain a debt to capitalization ratio that does not exceed 70.0%. As of September 30, 2025, the ratio was 54.7%.

Current wording

Debt Covenants. We are subject to a financial covenant under our revolving credit facility, which requires us to maintain a debt to capitalization ratio that does not exceed 70.0%. As of March 31, 2026, the ratio was 51.5%.

Previous wording

Credit Ratings. The credit rating agencies periodically review our ratings, taking into account factors such as our capital structure and earnings profile. The following table includes our and NIPSCO's credit ratings and ratings outlook as of September 30, 2025. There were no changes to the below credit ratings or outlooks since February 2020.

Current wording

Credit Ratings. The credit rating agencies periodically review our ratings, taking into account factors such as our capital structure and earnings profile. The following table includes our and NIPSCO's credit ratings and ratings outlook as of March 31, 2026.

Previous wording

Certain of our subsidiaries have agreements that contain ''ratings triggers'' that require increased collateral if our credit rating or the credit ratings of certain of our subsidiaries are below investment grade. These agreements are primarily for insurance purposes and for the physical purchase or sale of power. As of September 30, 2025, the collateral requirement that would be required in the event of a downgrade below the ratings trigger levels would amount to approximately $141.8 million. In addition to agreements with ratings triggers, there are other agreements that contain ''adequate assurance'' or ''material adverse change'' provisions that could necessitate additional credit support such as letters of credit and cash collateral to transact business.

Current wording

Certain of our subsidiaries have agreements that contain ''ratings triggers'' that require increased collateral if our credit rating or the credit ratings of certain of our subsidiaries are below investment grade. These agreements are primarily for insurance purposes and for the physical purchase or sale of power. As of March 31, 2026, the collateral requirement of approximately $158.5 million would be required in the event of a downgrade below investment grade. In addition to agreements with ratings triggers, there are other agreements that contain ''adequate assurance'' or ''material adverse change'' provisions that could necessitate additional credit support such as letters of credit and cash collateral to transact business.

Previous wording

Equity. Our authorized capital stock consists of 770,000,000 shares, $0.01 par value, 750,000,000 are common stock and 20,000,000 are preferred stock. As of September 30, 2025, 477,136,079 shares of common stock were outstanding and no shares of preferred stock were outstanding.

Current wording

Equity. Our authorized capital stock consists of 770,000,000 shares, $0.01 par value, 750,000,000 are common stock and 20,000,000 are preferred stock. As of March 31, 2026, 479,364,801 shares of common stock were outstanding and no shares of preferred stock were outstanding.

Previous wording

Contractual Obligations. A summary of contractual obligations is included in the Company's Annual Report on Form 10-K for the year ended December 31, 2024. We will be required to make substantial cash payments under supply and other agreements, including the EPC Contracts, although we may terminate the EPC Contracts for convenience and make associated termination payments if the Data Center Contract is terminated or the underlying assets are not approved by the IURC. The expected payments under the EPC Contracts and other contracts relating to our data center developments and potential future data center developments are included in the estimated amounts set forth in row “Capital Investments (Data Center Contract)” in the table included under “Investing Activities” above. Except for these items and our March and June 2025 debt issuances, there were no additional material changes from year-end during the nine months ended September 30, 2025. Refer to Note 8, "Long-Term Debt," in the Notes to the Condensed Consolidated Financial Statements (unaudited) for additional information regarding the debt issuances. Refer to “Executive Summary - NIPSCO Data Center Contract and Strategy” and Footnote 14, Commitments and Contingencies for additional information regarding the EPC Contracts and equipment supply contracts.

Current wording

Contractual Obligations. A summary of contractual obligations is included in the Company's Annual Report on Form 10-K for the year ended December 31, 2025. Since December 31, 2025, NIPSCO and GenCo have executed several capacity agreements and other agreements to support data center contracts. In addition, GenCo has exercised an option and intends to convert its ESA relating to the Tipton BESS Project to a BTA. Except for these items there were no additional material changes from year-end during the three months ended March 31, 2026. Refer to Note 13, "Other Commitments and Contingencies," in the Notes to the Condensed Consolidated Financial Statements (unaudited) for additional information regarding the EPC Contracts and equipment supply contracts.

Previous wording

Guarantees, Indemnities and Other Off Balance Sheet Arrangements. We and certain of our subsidiaries enter into various agreements providing financial or performance assurance to third parties on behalf of certain subsidiaries as a part of normal business. Such agreements include guarantees and stand-by letters of credit. Refer to Note 14, "Other Commitments and Contingencies," in the Notes to the Condensed Consolidated Financial Statements (unaudited) for additional information about such arrangements.

Current wording

Guarantees, Indemnities and Other Off Balance Sheet Arrangements. We and certain of our subsidiaries enter into various agreements providing financial or performance assurance to third parties on behalf of certain subsidiaries as a part of normal business. Such agreements include guarantees and stand-by letters of credit. Refer to Note 13, "Other Commitments and

Previous wording

Comparability of our line item operating results is impacted by regulatory trackers that allow for the recovery in rates of certain costs such as those described below. Increases in the costs that are subject to approved regulatory tracker mechanisms generally lead to increased regulatory assets, which ultimately result in a corresponding increases in operating revenues and expenses and, therefore, have essentially no impact on total operating income results. Certain approved regulatory tracker mechanisms allow for abbreviated regulatory proceedings in order for the operating companies to quickly implement revised rates and recover associated costs.

Current wording

Comparability of our operating results is impacted by regulatory trackers that allow for the recovery in rates of certain costs. Certain approved regulatory tracker mechanisms allow for abbreviated regulatory proceedings in order for the operating companies to quickly implement revised rates and recover associated costs.

Previous wording

A portion of the Columbia Operations' and NIPSCO Operations' revenue is related to the recovery of gas costs, the review and recovery of which occurs through standard regulatory proceedings. All states in our operating area require periodic review of actual gas procurement activity to determine prudence and to confirm the recovery of prudently incurred energy commodity costs supplied to customers.

Current wording

A portion of the NIPSCO Operations' and Columbia Operations' gas distribution revenue is related to the recovery of gas costs through GCAs, the review of which occurs through standard regulatory proceedings. All states in our operating area require periodic review of actual gas procurement activity to determine prudence and confirm the recovery of prudently incurred energy commodity costs supplied to customers.

Previous wording

We recognize that energy efficiency reduces emissions, conserves natural resources and saves our customers money. Our gas distribution companies offer programs such as energy efficiency upgrades, home checkups and weatherization services. The increased efficiency of natural gas appliances and improvements in home building codes and standards contributes to a long-term trend of declining average use per customer. While we are looking to expand offerings so the energy efficiency programs can benefit as many customers as possible, our gas distribution operations utilities have pursued changes in rate design to more effectively match recoveries with costs incurred. Columbia of Ohio has adopted a straight fixed variable rate design for residential and small commercial customers that closely links the recovery of fixed costs with fixed charges. Columbia of Maryland and Columbia of Virginia have regulatory approval for weather and revenue normalization adjustments for certain customer classes, which adjust monthly revenues that exceed or fall short of approved levels. Columbia of Pennsylvania continues to operate its pilot residential weather normalization adjustment and also has a fixed customer charge. This weather normalization adjustment only adjusts revenues when actual weather compared to normal varies by more than 3%. Columbia of Kentucky charges certain customer classes a mix of fixed and weather normalized volumetric rates during the peak heating season. NIPSCO Gas and Electric include a fixed customer charge for residential and small commercial and industrial customer classes. NIPSCO Gas has implemented a weather normalization adjustment for certain of its customer classes.

Current wording

We recognize that energy efficiency reduces emissions, conserves natural resources and saves our customers money. Our gas distribution companies offer programs such as energy efficiency upgrades, home checkups and weatherization services. The increased efficiency of natural gas appliances and improvements in home building codes and standards contribute to a long-term trend of declining average use per customer. While we are looking to expand offerings so the energy efficiency programs can benefit as many customers as possible, our gas distribution operations utilities have pursued changes in rate design to more effectively match recoveries with costs incurred. Columbia of Ohio has adopted a straight fixed variable rate design for residential and small commercial customers that closely links the recovery of fixed costs with fixed charges. Columbia of Maryland and Columbia of Virginia have regulatory approval for weather and revenue normalization adjustments for certain customer classes, which adjust monthly revenues that exceed or fall short of approved levels. Columbia of Pennsylvania continues to operate its pilot residential weather normalization adjustment and also has a fixed customer charge. This weather normalization adjustment only adjusts revenues when actual weather compared to normal varies by more than 5%. Columbia of Kentucky incorporates a weather normalization adjustment for certain customer classes and also has a fixed customer charge. NIPSCO Gas has also received approval and implemented a weather normalization adjustment for certain of its customer classes. NIPSCO Gas and Electric include a fixed customer charge for residential and small commercial and industrial customer classes.

Previous wording

(2)The approved rate case resulted in a black box settlement, representing a settlement to a specific revenue increase but not a specified ROE. The settlement provides use of a 9.75% ROE for future SAVE filings.

Current wording

(1)The approved rate case resulted in a black box settlement, representing a settlement to a specific revenue increase but not a specified ROE. The settlement provides use of a 9.75% ROE for future SAVE filings.

Showing the first 40 of 51 pairs. Open the source sections for the rest.

Rearranged current paragraphs (2)

Current report — wording carried from elsewhere

We continue to experience strong demand from potential data center customers in our northern Indiana service territory and are engaged in negotiations with potential additional counterparties. Agreements we enter into with additional counterparties will be served by means of customized, dedicated generation assets, Pool Resource Assets, or a combination.

Current report — wording carried from elsewhere

Contingencies," in the Notes to the Condensed Consolidated Financial Statements (unaudited) for additional information about such arrangements.