Skip to main content

NISOURCE INC.

For the period ended Jun 30, 2025. Filed Aug 6, 2025.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Jun 30, 2025 · Filed Aug 6, 2025

NI$44.15-0.7%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 132 previous paragraphs and 133 current paragraphs.

82 unchanged; 41 reworded; 9 added; 6 removed; 3 previous and 1 current paragraphs rearranged.

Tables are not compared: 15 previous and 15 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (9)

Current report

The Company will monitor the implementation of the OBBBA and assess any future implications that may arise. For more information on the OBBBA, refer to "Summary of Consolidated Financial Results."

Current report

The increase in total volumes sold to electric customers for the three months ended June 30, 2025 compared to the same period in 2024 was primarily attributable to increased industrial usage, offset by decreased commercial and wholesale and other usage. The increase in total volumes sold to electric customers for the six months ended June 30, 2025 compared to the same period in 2024 was primarily attributable to increased industrial and residential usage, partially offset by decreased commercial and wholesale and other usage

Current report

•In June 2025, we executed a forward sale agreement, which allows us to issue a fixed number of shares at a price to be settled in the future. The forward purchaser under our forward sale agreement borrowed 2,518,393 shares from third parties, which the forward purchaser sold, through its affiliated agent, at a weighted average price of $39.71 per share.

Current report

•On June 27, 2025, we completed the issuance and sale of an additional $750.0 million of 5.850% senior unsecured notes maturing in 2055 (the "2055 Notes"). The terms of the 2055 Notes, other than the issue date and the price to the public, are identical to the terms of, and constitute a reopening of, our 5.850% senior unsecured notes maturing in 2055 issued on March 27, 2025. With the incremental issuance, we now have $1.5 billion of 5.850% senior unsecured notes maturing in 2055. On June 27, 2025, we also completed the issuance and sale of $900.0 million of 5.350% senior unsecured notes maturing in 2035 (the "2035 Notes"). These issuances of the additional 2055 Notes and the 2035 Notes resulted in approximately $1.616 billion of total net proceeds after discount and debt issuance costs.

Current report

(2)The capital investment remaining within the tracker after the Step 1 Compliance Filing, on June 30, 2025, is $203.7 million for TDISC-6.

Current report

(5)TDISC – 7 was originally filed on May 27, 2025 and refiled on July 2, 2025, due to the Electric Rate Case Order. The refiling adjusted the capital in the tracker to go down from $744.7 million to $315.6 million.

Current report

(4)New rates will be implemented in multiple steps, with implementation of the first step in July 2025 and final rates effective no later than March 2026.

Current report

Regarding federal policies, we continue to monitor the status of climate change-related legislation and regulation, including the OBBBA signed into law on July 4, 2025. As of the date of this filing, management has evaluated the provisions of the OBBBA and does not believe the bill will have a material impact on the Company’s financial position or results of operations. None of the Company’s in-flight renewable energy projects are impacted by the phaseout of tax credits in the OBBBA.

Current report

On June 11, 2025, the EPA proposed to repeal GHG emissions standards for fossil fuel-fired power plants that were finalized by the previous federal administration in May 2024. The proposed repeal would eliminate key requirements from the 2024 Carbon Pollution Standards, including capacity factor thresholds and carbon capture and storage (CCS) mandates. If finalized, this action would remove regulatory constraints that could significantly impact NIPSCO’s planned gas generation, allowing customers to avoid approximately $675 million in additional cost as assessed through the 2024 NIPSCO IRP.
Removed paragraphs (6)

Previous report

(2)TDSIC-5 was effective October 2024 through March 2025. An order was received for TDSIC-6 on March 26, 2025, and billing began in April 2025.

Previous report

(5)Rates went into effect January 2, 2025, subject to refund.

Previous report

(5)On February 7, 2025, NIPSCO and certain intervening parties filed a Joint Stipulation and Settlement Agreement with the IURC reflecting an annual revenue increase of $257.0 million. New rates proposed to be implemented in 2 steps, with implementation of Step 1 rates effective no later than September 2025 and Step 2 rates to be effective no later than March 2026.

Previous report

(6)Rates are effective on an as filed basis and subject to refund. Columbia of Virginia and certain intervening parties, filed a Joint Stipulation and Proposed Recommendation for settlement on December 5, 2024, for an annual revenue increase of $28.2 million, net of SAVE. A hearing examiner’s report was received on February 27, 2025 recommending the adoption of Joint Stipulation and Proposed Recommendation without modification.

Previous report

Regarding federal policies, we continue to monitor the status of climate change-related legislation and regulation, including the IIJA and IRA and the potential forthcoming budget reconciliation legislation from Congress in 2025. We have identified and pursued potential opportunities associated with the IIJA and the IRA that align with our strategy. These opportunities include tax incentives for renewable generation and storage projects, tax credit transferability and grant funding for grid resiliency, hydrogen hubs and leak detection. The new federal administration has signaled through executive actions a desire to roll-back several climate-related policies including funding for IIJA and IRA programs. We continue to evaluate and monitor how these changes will impact our business.

Previous report

In May 2024, the EPA published final GHG standards and guidelines for fossil fuel-fired power plants. The rules are not expected to impact NIPSCO’s existing electric generation, but, depending on the outcome of ongoing litigation and potential future changes to the rules, may impose certain operational limitations on other existing and new electric generation. Through the 2024 NIPSCO IRP process, we assessed that cost to electric customers would be approximately $675 million greater due to these rules.
Reworded paragraphs (41)

Previous wording

Management's Discussion is designed to provide an understanding of our operations and financial performance and should be read in conjunction with our Annual Report on Form 10-K for the fiscal year ended December 31, 2024.

Current wording

Management's Discussion is designed to provide an understanding of our operations and financial performance and should be read in conjunction with our Condensed Consolidated Financial Statements (unaudited) included in this report and our Annual Report on Form 10-K for the fiscal year ended December 31, 2024.

Previous wording

We are an energy holding company under the Public Utility Holding Company Act of 2005 whose utility subsidiaries are fully regulated natural gas and electric utility companies serving customers in six states. We generate substantially all of our operating income through these rate-regulated businesses, which are summarized for financial reporting purposes into two primary reportable segments: Columbia Operations and NIPSCO Operations. Refer to ''Note 16, "Business Segment Information," for further discussion of our business segments.

Current wording

We are an energy holding company under the Public Utility Holding Company Act of 2005 whose utility subsidiaries are fully regulated natural gas and electric utility companies serving customers in six states. We generate substantially all of our operating income through these rate-regulated businesses, which are summarized for financial reporting purposes into two primary reportable segments: Columbia Operations and NIPSCO Operations. Refer to ''Note 17, "Business Segment Information," in the Notes to the Condensed Consolidated Financial Statements (unaudited) for further discussion of our business segments.

Previous wording

Energy Transition: We continue to advance our energy transition strategy, primarily through the continuation and enhancement of existing programs, such as retiring and replacing remaining coal-fired electric generation by 2028 with a balanced mix of low- or zero-emission electric generation, ongoing pipe replacement and modernization programs, and deployment of advanced leak detection and repair. Our electric generation transition, initiated through our 2018 Integrated Resource Plan ("2018 Plan") is well underway, and we are continually adjusting to the dynamic energy landscape. As of March 31, 2025, we have placed in service owned renewable and storage projects, developed under BTAs, with combined nameplate capacities of 1,500 MW and 101 MW respectively. Renewable PPA projects with a combined nameplate capacity of 600 MW have also been placed in service. In addition, renewable BTA projects with combined nameplate capacities of 650 MW, and renewable PPA projects with a combined nameplate capacity of 600 MW were under development as of March 31, 2025, all of which have received IURC approval, with the exception of the Templeton project, which is currently pending approval. The capacity figure for BTA projects in development includes the Templeton project. In October 2024, NIPSCO contracted with a developer to convert the previously approved Templeton PPA to a BTA and in February 2025 filed a CPCN with the IURC. In 2024, the IURC approved full ownership of the Cavalry, Dunns Bridge II, Fairbanks and Gibson and the cost of the Fairbanks project as contemplated in contractual actions. Full ownership of these projects allows NIPSCO to leverage provisions of the IRA, monetize renewable tax credits more effectively, and provide enhanced benefits to customers as compared to the previous tax equity partnership structure approved by the IURC. We remain on track to retire R.M Schahfer's remaining two coal units by the end of 2025. For additional information, see "Results and Discussion of Operations - NIPSCO Operations," in this Management's Discussion, and see item 1A. Risk Factors in this Quarterly Report on Form 10-Q.

Current wording

Energy Transition: We continue to advance our energy transition strategy, primarily through the continuation and enhancement of existing programs, such as retiring and replacing remaining coal-fired electric generation by 2028 with a balanced mix of low- or zero-emission electric generation, ongoing pipe replacement and modernization programs, and deployment of advanced leak detection and repair. Our electric generation transition, initiated through our 2018 Integrated Resource Plan ("2018 Plan") is well underway, and we are continually adjusting to the dynamic energy landscape. As of June 30, 2025, we have placed in service owned renewable and storage projects with combined nameplate capacities of 1,750 MW and 101 MW respectively. Renewable PPA projects with a combined nameplate capacity of 800 MW have also been placed in service. In addition, renewable BTA projects with combined nameplate capacities of 400 MW, and renewable PPA projects with a combined nameplate capacity of 400 MW were under development as of June 30, 2025, all of which have received IURC approval, with the exception of Templeton, which is currently pending approval. For additional information, see Note 15, "Other Commitments and Contingencies - D. Other Matters". We remain on track to retire R.M. Schahfer's remaining two coal units by the end of 2025. We are continuing to evaluate the development and potential impacts of federal and state executive orders on our generation transition plans. For additional information, see "Results and Discussion of Operations - NIPSCO Operations," in this Management's Discussion, and see Part I, Item 1A. "Risk Factors" in our Annual Report on Form 10-K for the fiscal year ended December 31, 2024.

Previous wording

NIPSCO's 2021 Integrated Resource Plan ("2021 Plan") lays out a timeline to retire the Michigan City Generating Station by the end of 2028. The 2021 Plan calls for the replacement of the retiring units with a diverse portfolio of resources including demand side management resources, incremental solar, stand-alone energy storage and upgrades to existing facilities at the Sugar Creek Generating Station, among other steps. In 2024, Sugar Creek completed an Advanced Gas Path Tech upgrade that enhanced its overall production capabilities. Additionally, the 2021 Plan calls for a new natural gas peaking facility to replace existing vintage gas peaking facilities at the R.M. Schahfer Generating Station to support system reliability and resiliency, and upgrades to the electric transmission system. In October 2024, we received approval for the issuance of a CPCN for an approximately 400 MW natural gas peaking generation facility from the IURC to replace R.M. Schahfer's existing peaking facilities. The planned retirement of the two vintage gas peaking facilities at the R.M. Schahfer Generating Station is also expected to occur by the end of 2028. Final retirement dates for these units, as well as Michigan City, will be subject to MISO approval.

Current wording

NIPSCO's 2021 Integrated Resource Plan ("2021 Plan") lays out a timeline to retire the Michigan City Generating Station by the end of 2028. The 2021 Plan calls for the replacement of the retiring units with a diverse portfolio of resources including demand side management resources, incremental solar, stand-alone energy storage and upgrades to existing facilities at the Sugar Creek Generating Station, among other steps. Additionally, the 2021 Plan calls for a new natural gas peaking facility to replace existing vintage gas peaking facilities at the R.M. Schahfer Generating Station to support system reliability and resiliency, and upgrades to the electric transmission system. In October 2024, we received approval for the issuance of a CPCN for an approximately 400 MW natural gas peaking generation facility from the IURC to replace R.M. Schahfer's existing peaking facilities. The planned retirement of the two vintage gas peaking facilities at the R.M. Schahfer Generating Station is also expected to occur by the end of 2028. Final retirement dates for these units, as well as Michigan City, will be subject to MISO approval.

Previous wording

NIPSCO's 2024 Integrated Resource Plan ("2024 Plan") was submitted to the IURC on December 9, 2024. The 2024 Plan maintains the retirement decisions and capacity additions identified in the 2018 and 2021 Integrated Resource Plans and calls for additional generation resources through 2029 to support capacity requirements. The 2024 Plan informs future generation investments required to ensure reliability for NIPSCO’s customers and incorporates factors such as anticipated load growth from data centers and other economic development opportunities, new EPA emissions rules, and evolving MISO resource accreditation rules. Customer interest related to data center development in our northern Indiana service territory has accelerated. We believe data center development can enhance our local tax base, diversify the employment base across the state of Indiana, and provide greater value to existing customers and shareholders. We are evaluating the potential for data center development in our service territory, including ways to effectively manage the potential power demand, generation sources, and transmission capabilities to meet potential load growth from any data center customer, while at the same time focusing on our environmental goals. We expect the management of large load growth would require new generation resources. We plan to move as efficiently as possible while maintaining the integrity of our commercial, planning, regulatory, procurement and operational execution processes.

Current wording

NIPSCO's 2024 Integrated Resource Plan ("2024 Plan") was submitted to the IURC on December 9, 2024. The 2024 Plan maintains the retirement decisions and capacity additions identified in the 2018 and 2021 Integrated Resource Plans and calls for additional generation resources through 2029 to support capacity requirements. The 2024 Plan informs future generation investments required to ensure reliability for NIPSCO’s customers and incorporates factors such as anticipated load growth from data centers and other economic development opportunities, EPA emissions rules, and evolving MISO resource accreditation rules. Customer interest related to data center development in our northern Indiana service territory has accelerated. We believe data center development can enhance our local tax base, diversify the employment base across the state of Indiana, and provide greater value to existing customers and shareholders. We are evaluating the potential for data center development in our service territory, including ways to effectively manage the potential power demand, generation sources, and transmission capabilities to meet potential load growth from any data center customer, while at the same time focusing on our environmental goals. We expect the management of large load growth would require new generation resources. We plan to move as efficiently as possible while maintaining the integrity of our commercial, planning, regulatory, procurement and operational execution processes.

Previous wording

Transformation: Our enterprise-wide transformation roadmap focuses on operational excellence, safety, operation and maintenance management, and unlocking efficiencies. We are committed to identifying and implementing initiatives that will enable us to streamline work and improve logistics company-wide. These efforts include investments in proven technologies backed with standardized processes that will change the way we plan, schedule, and execute work in the field and how we engage and provide service to our customers. Taken together, all of our optimization initiatives will prioritize safety and continue to optimize our long-term growth profile. We are making progress towards our transformation goals with a successful completion of the first phase of our WAM program, an enterprise resource planning system that will optimize the scheduling, dispatch, and execution of our field operations. This phase of the program implemented the solution within our electric distribution and transmission operations, while remaining phases for gas distribution operations and generation operations are anticipated to be completed by the end of 2025. In addition to transforming technology to enhance our employee and customer experiences, these programs will also ensure we remain on modern systems that help reduce enterprise risk related to end-of-life systems.

Current wording

Transformation: Our enterprise-wide transformation roadmap focuses on operational excellence, safety, operation and maintenance management, and unlocking efficiencies. We are committed to identifying and implementing initiatives that will enable us to streamline work and improve logistics company-wide. These efforts include investments in proven technologies backed with standardized processes that will change the way we plan, schedule, and execute work in the field and how we engage and provide service to our customers. Taken together, all of our optimization initiatives will prioritize safety and continue to optimize our long-term growth profile. We implemented the first and second phases of a three phased WAM ERP program, with the final phase supporting generation assets anticipated to be completed by the end of 2025. Phase one of the program implemented the solution within our electric and transmission operations, while the second phase of the program included all gas distribution operations across our operating territories. The second phase of the program was the largest to-date. This ERP system will optimize the scheduling, dispatch, and execution of our field operations. In addition to transforming technology to enhance our employee and customer experiences, we believe these programs will also ensure we remain on modern systems that help reduce enterprise risk related to end-of-life systems.

Previous wording

Economic Environment: We continue to monitor risks related to order and delivery lead times for construction and other materials, potential unavailability of materials due to global shortages in raw materials, and decreased construction labor productivity in the event of disruptions in the availability of materials. We continue to see increasing prices associated with certain materials and supplies and are tracking the potential impact of new and proposed tariffs. To the extent that work plan delays occur or our costs increase, our business operations, results of operations, cash flows, and financial condition could be materially adversely affected.

Current wording

Economic Environment: We continue to monitor risks related to order and delivery lead times for construction and other materials, potential unavailability of materials due to global shortages in raw materials, and decreased construction labor productivity in the event of disruptions in the availability of materials. We continue to see elevated prices associated with certain materials and supplies and are tracking the potential impact of new and proposed tariffs. To the extent that work plan delays occur or our costs increase, our business operations, results of operations, cash flows, and financial condition could be materially adversely affected.

Previous wording

A summary of our consolidated financial results for the three months ended March 31, 2025 and 2024 are presented below:

Current wording

A summary of our consolidated financial results for the three and six months ended June 30, 2025 and 2024 are presented below:

Previous wording

The increase in net income available to common shareholders for the three months ended March 31, 2025 was primarily due to higher revenues driven by our capital investments, partially offset by higher operating expenses, including increased depreciation expense attributed to our net plant balances and higher interest expense. See Note 6, "Equity," in the Notes to the Condensed Consolidated Financial Statements (unaudited) for additional information.

Current wording

The increase in net income available to common shareholders for the three and six months ended June 30, 2025 was primarily due to higher revenues driven by our capital investments, partially offset by higher operating expenses, including increased depreciation expense attributed to our net plant balances, as well as increased interest expense and other one-time expenses. See Note 6, "Equity," in the Notes to the Condensed Consolidated Financial Statements (unaudited) for additional information.

Previous wording

We continue to monitor and evaluate the impacts of final or proposed income tax regulations issued on provisions of the IRA including but not limited to renewable energy tax credits.

Current wording

On July 4, 2025, President Donald J. Trump signed into law the OBBBA, a comprehensive piece of legislation that includes sweeping changes to federal tax and spending policies. As of the date of this filing, management has evaluated the provisions of the OBBBA and does not believe the bill will have a material impact on the Company’s financial position or results of operations. We continue to monitor and evaluate the impacts of final or proposed income tax regulations issued on provisions of the IRA including but not limited to renewable energy tax credits, as well as the impacts of the OBBBA.

Previous wording

Financial and operational data for the Columbia Operations segment for the three months ended March 31, 2025 and 2024 are presented below.

Current wording

Financial and operational data for the Columbia Operations segment for the three and six months ended June 30, 2025 and 2024 are presented below.

Previous wording

The underlying reasons for changes in our operating revenues for the three months ended March 31, 2025 compared to the same period in 2024 are presented below.

Current wording

The underlying reasons for changes in our operating revenues for the three and six months ended June 30, 2025 compared to the same period in 2024 are presented below.

Previous wording

The increase in total volumes sold to gas customers for the three months ended March 31, 2025 compared to the same period in 2024 was primarily attributable to increases for residential and commercial customers due to colder weather.

Current wording

The increase in total volumes for the three months ended June 30, 2025, compared to the same period in 2024, is primarily attributable to an increase for residential and commercial customers due to colder weather, partially offset by industrial customers.

Previous wording

The increase in total volumes for the three months ended March 31, 2025, compared to the same period in 2024, is primarily attributable to an increase for residential and commercial customers due to colder weather.

Current wording

The increase in total volumes for the six months ended June 30, 2025, compared to the same period in 2024, is primarily attributable to an increase for residential and commercial customers due to colder weather.

Previous wording

The underlying reasons for changes in our operating expenses for the three months ended March 31, 2025 compared to the same period in 2024 are presented below.

Current wording

The underlying reasons for changes in our operating expenses for the three and six months ended June 30, 2025 compared to the same period in 2024 are presented below.

Previous wording

Financial and operational data for the NIPSCO Operations segment, which services both gas and electric customers, for the three months ended March 31, 2025 and 2024 are presented below.

Current wording

Financial and operational data for the NIPSCO Operations segment, which services both gas and electric customers, for the three and six months ended June 30, 2025 and 2024 are presented below.

Previous wording

The underlying reasons for changes in our operating revenues for the three months ended March 31, 2025 compared to the same period in 2024 are presented below.

Current wording

The underlying reasons for changes in our operating revenues for the three and six months ended June 30, 2025 compared to the same period in 2024 are presented below.

Previous wording

The increase in total volumes sold to electric customers for the three months ended March 31, 2025 compared to the same period in 2024 was primarily attributable to increased residential and industrial usage.

Current wording

The increase in total volumes sold to gas customers for the three and six months ended June 30, 2025 compared to the same period in 2024 was primarily attributable to increased usage by industrial customers as well as increased residential customer sales due to colder weather.

Previous wording

Cost of energy for the NIPSCO Operations segment's electric activities is principally comprised of the cost of coal, natural gas purchased for internal generation of electricity, transportation of coal and natural gas, and the cost of power purchased from generators of electricity for its generation and transmission activities. For its gas distribution activities, NIPSCO Operations' cost of energy is principally comprised of the cost of natural gas procured on behalf of and sold to customers while providing transportation and distribution services. NIPSCO Operations has state-approved recovery mechanisms that provide a means for full recovery of prudently incurred costs of energy. The majority of these costs of energy are passed through directly to the customer, and the costs of energy included in operating revenues are matched with the cost of energy expense recorded in the period. Any difference in actual costs incurred and amounts billed to customers is recorded on the Condensed Consolidated Balance Sheets (unaudited) as under-recovered or over-recovered fuel and gas costs to be included in future customer billings. Therefore, increases in these tracked operating expenses are offset by increases in operating revenues and have essentially no impact on net income.

Current wording

Cost of energy for the NIPSCO Operations segment's electric activities is principally comprised of the cost of coal, natural gas purchased for internal generation of electricity, transportation of coal and natural gas, and the cost of power purchased from generators of electricity for its generation and transmission activities. For its gas distribution activities, NIPSCO Operations' cost of energy is principally comprised of the cost of natural gas procured on behalf of and sold to customers while providing transportation and distribution services. NIPSCO Operations has state-approved recovery mechanisms that provide a means for full recovery of prudently incurred costs of energy. The majority of these costs of energy are passed through directly to the customer, and the costs of energy included in operating revenues are matched with the cost of energy expense recorded in the period. Any difference in actual costs incurred and amounts billed to customers is recorded on the Condensed Consolidated Balance Sheets (unaudited) as under-recovered or over-recovered fuel and gas costs to be included in future customer billings.

Previous wording

The underlying reasons for changes in our operating expenses for the three months ended March 31, 2025 compared to the same period in 2024 are presented below.

Current wording

The underlying reasons for changes in our operating expenses for the three and six months ended June 30, 2025 compared to the same period in 2024 are presented below.

Previous wording

NIPSCO continues to execute on an electric generation transition consistent with the 2018 Plan and 2021 Plan and maintained in the 2024 Plan, which outlines the path to retire the remaining two coal units at R.M. Schahfer by the end of 2025 and the remaining coal-fired generation at Michigan City by the end of 2028, to be replaced by lower-cost, reliable and cleaner options. NIPSCO is evaluating the impacts of federal and state executive orders on its generation transition plans.

Current wording

NIPSCO continues to execute on an electric generation transition consistent with the 2018 Plan and 2021 Plan and maintained in the 2024 Plan. The 2024 plan outlines the path to retire the remaining two coal units at R.M. Schahfer by the end of 2025 and the remaining coal-fired generation at Michigan City by the end of 2028, to be replaced by lower-cost, reliable and cleaner options. NIPSCO is evaluating potential impacts of federal and state executive orders on its generation transition plans.

Previous wording

The current replacement plan primarily includes renewable sources of energy, including wind, solar, battery storage, and flexible natural gas resources to be obtained through a combination of NIPSCO ownership and PPAs. NIPSCO has sold, and may in the future sell, renewable energy credits from its renewable generation to third parties to offset customer costs. NIPSCO has executed several PPAs to purchase 100% of the output from renewable generation facilities at a fixed price per MWh. Each facility supplying the energy will have an associated nameplate capacity, and payments under the PPAs will not begin until the associated generation facility is constructed by the owner/seller. NIPSCO has also executed several BTAs with developers to construct renewable generation facilities.

Current wording

The current replacement plan primarily includes renewable sources of energy, including wind, solar, battery storage, and flexible natural gas resources to be obtained through a combination of NIPSCO ownership and PPAs. NIPSCO has sold, and may in the future sell, renewable energy credits from its renewable generation to third parties to offset customer costs. Since 2020, two wind and one solar PPA projects and seven owned projects (two wind, three solar and two solar plus storage) have been placed into service totaling 2,651 MW of nameplate capacity, including Dunns Bridge II and Fairbanks, which were placed into service in January and May 2025, respectively. NIPSCO has executed several PPAs to purchase 100% of the output from renewable generation facilities at a fixed price per MWh. Each facility supplying the energy has an associated nameplate capacity, and payments under the PPAs will not begin until the associated generation facility is constructed by the owner/seller. See "Executive Summary - Energy Transition" in this Management's Discussion for additional information. We expect the majority of our remaining BTA and PPA projects to be placed in service between 2025 and 2027.

Previous wording

We continually evaluate the availability of adequate financing to fund our ongoing business operations, working capital and core safety and infrastructure investment programs. Our financing is sourced through cash flow from operations and the issuance of debt and/or equity. External debt financing is provided primarily through the issuance of long-term debt, accounts receivable securitization programs and our $1.85 billion commercial paper program, which is backstopped by our committed revolving credit facility with a total availability from third-party lenders of $1.85 billion. We believe these sources provide adequate capital to fund our operating activities and capital expenditures in 2025 and beyond. Sources of financing activities for the quarter ended March 31, 2025 are as follows:

Current wording

We continually evaluate the availability of adequate financing to fund our ongoing business operations, working capital and core safety and infrastructure investment programs. Our financing is sourced through cash flow from operations and the issuance of debt and/or equity. External debt financing is provided primarily through the issuance of long-term debt, accounts receivable securitization programs and our $1.85 billion commercial paper program, which is backstopped by our committed revolving credit facility with a total availability from third-party lenders of $1.85 billion. We believe these sources provide adequate capital to fund our operating activities and capital expenditures in 2025 and beyond. Sources of financing activities for the current year are as follows:

Previous wording

◦As of March 31, 2025, the ATM program (inclusive of the forward sale agreements) had approximately $147.5 million of equity available for issuance.

Current wording

•As of June 30, 2025, the ATM program (inclusive of the forward sale agreements) had approximately $47.5 million of equity available for issuance.

Previous wording

The increase in cash from operating activities was primarily driven by year over year change in exchange gas receivables, higher net income, accounts payable, prepayments and other current assets, partially offset by higher accounts receivables due to colder weather.

Current wording

The increase in cash from operating activities was primarily driven by year over year change in exchange gas receivables, higher net income, deferred income taxes and investments, partially offset by higher inventory and accounts receivables due to colder weather.

Previous wording

We remain on track to make capital investments totaling $4.0 billion to $4.3 billion during the 2025 period. We also expect to invest approximately $19.4 billion during the 2025-2029 period, including capital investments to support our generation transition strategy. These forecasted capital investments are subject to continuing review and adjustment. Actual capital expenditures may vary from these estimates.

Current wording

We remain on track to make capital investments totaling $4.0 billion to $4.3 billion during the 2025 period. In addition to ongoing capital expenditures, these capital investments include advanced deposits for project costs as well as milestone payments to the renewable generation asset developers. We also expect to invest approximately $19.4 billion during the 2025-2029 period, including capital investments to support our generation transition strategy. These forecasted capital investments are subject to continuing review and adjustment. Actual capital investments may vary from these estimates.

Previous wording

(4)The capital investment remaining after the Step 2 Compliance Filing, on February 13, 2025, is $5.8 million for TDSIC-8 and $2.3 million for FMCA-3.

Current wording

(4)The capital investment remaining after the Step 2 Compliance Filing, on February 13, 2025, is $5.8 million for TDSIC-8.

Previous wording

NIPSCO Gas filed a FMCA CPCN on April 21, 2025. The petition is seeking recovery of spend incurred related to certain federally mandated Pipeline Safety IV Compliance Plan costs. The request includes $244.1 million of estimated capital, including indirect costs and AFUDC.

Current wording

NIPSCO Gas filed an FMCA CPCN on April 21, 2025. The petition is seeking recovery of spend incurred related to certain federally mandated Pipeline Safety IV Compliance Plan costs. The request includes $244.1 million of estimated capital, including indirect costs and AFUDC.

Previous wording

Debt Covenants. We are subject to a financial covenant under our revolving credit facility, which requires us to maintain a debt to capitalization ratio that does not exceed 70.0%. As of March 31, 2025, the ratio was 53.8%.

Current wording

Debt Covenants. We are subject to a financial covenant under our revolving credit facility, which requires us to maintain a debt to capitalization ratio that does not exceed 70.0%. As of June 30, 2025, the ratio was 55.2%.

Previous wording

Certain of our subsidiaries have agreements that contain ''ratings triggers'' that require increased collateral if our credit rating or the credit ratings of certain of our subsidiaries are below investment grade. These agreements are primarily for insurance purposes and for the physical purchase or sale of power. As of March 31, 2025, the collateral requirement that would be required in the event of a downgrade below the ratings trigger levels would amount to approximately $146.1 million. In addition to agreements with ratings triggers, there are other agreements that contain ''adequate assurance'' or ''material adverse change'' provisions that could necessitate additional credit support such as letters of credit and cash collateral to transact business.

Current wording

Certain of our subsidiaries have agreements that contain ''ratings triggers'' that require increased collateral if our credit rating or the credit ratings of certain of our subsidiaries are below investment grade. These agreements are primarily for insurance purposes and for the physical purchase or sale of power. As of June 30, 2025, the collateral requirement that would be required in the event of a downgrade below the ratings trigger levels would amount to approximately $145.0 million. In addition to agreements with ratings triggers, there are other agreements that contain ''adequate assurance'' or ''material adverse change'' provisions that could necessitate additional credit support such as letters of credit and cash collateral to transact business.

Previous wording

Equity. Our authorized capital stock consists of 770,000,000 shares, $0.01 par value, 750,000,000 are common stock and 20,000,000 are preferred stock. As of March 31, 2025, 470,618,280 shares of common stock were outstanding and no preferred stock were outstanding.

Current wording

Equity. Our authorized capital stock consists of 770,000,000 shares, $0.01 par value, 750,000,000 are common stock and 20,000,000 are preferred stock. As of June 30, 2025, 470,784,423 shares of common stock were outstanding and no shares of preferred stock were outstanding.

Previous wording

Contractual Obligations. A summary of contractual obligations is included in the Company's Annual Report on Form 10-K for the year ended December 31, 2024. Except for our March 2025 debt issuance, there were no additional material changes from year-end during the three months ended March 31, 2025. Refer to Note 8, "Long-Term Debt," in the Notes to the Condensed Consolidated Financial Statements (unaudited) for additional information regarding the debt issuances.

Current wording

Contractual Obligations. A summary of contractual obligations is included in the Company's Annual Report on Form 10-K for the year ended December 31, 2024. Except for our March and June 2025 debt issuances, there were no additional material changes from year-end during the six months ended June 30, 2025. Refer to Note 8, "Long-Term Debt," in the Notes to the Condensed Consolidated Financial Statements (unaudited) for additional information regarding the debt issuances.

Previous wording

We recognize that energy efficiency reduces emissions, conserves natural resources and saves our customers money. Our gas distribution companies offer programs such as energy efficiency upgrades, home checkups and weatherization services. The increased efficiency of natural gas appliances and improvements in home building codes and standards contributes to a long-term trend of declining average use per customer. While we are looking to expand offerings so the energy efficiency programs can benefit as many customers as possible, our gas distribution operations utilities have pursued changes in rate design to more effectively match recoveries with costs incurred. Columbia of Ohio has adopted a straight fixed variable rate design for residential and small commercial customers that closely links the recovery of fixed costs with fixed charges. Columbia of Maryland and Columbia of Virginia have regulatory approval for weather and revenue normalization adjustments for certain customer classes, which adjust monthly revenues that exceed or fall short of approved levels. Columbia of Pennsylvania continues to operate its pilot residential weather normalization adjustment and also has a fixed customer charge. This weather normalization adjustment only adjusts revenues when actual weather compared to normal varies by more than 3%. Columbia of Kentucky charges certain customer classes a mix of fixed and weather normalized volumetric rates during the peak heating season. NIPSCO Gas and Electric include a fixed customer charge for residential and small commercial and industrial customer classes. NIPSCO Gas has also received approval and implemented a weather normalization adjustment for certain of its customer classes.

Current wording

We recognize that energy efficiency reduces emissions, conserves natural resources and saves our customers money. Our gas distribution companies offer programs such as energy efficiency upgrades, home checkups and weatherization services. The increased efficiency of natural gas appliances and improvements in home building codes and standards contributes to a long-term trend of declining average use per customer. While we are looking to expand offerings so the energy efficiency programs can benefit as many customers as possible, our gas distribution operations utilities have pursued changes in rate design to more effectively match recoveries with costs incurred. Columbia of Ohio has adopted a straight fixed variable rate design for residential and small commercial customers that closely links the recovery of fixed costs with fixed charges. Columbia of Maryland and Columbia of Virginia have regulatory approval for weather and revenue normalization adjustments for certain customer classes, which adjust monthly revenues that exceed or fall short of approved levels. Columbia of Pennsylvania continues to operate its pilot residential weather normalization adjustment and also has a fixed customer charge. This weather normalization adjustment only adjusts revenues when actual weather compared to normal varies by more than 3%. Columbia of Kentucky charges certain customer classes a mix of fixed and weather normalized volumetric rates during the peak heating season. NIPSCO Gas and Electric include a fixed customer charge for residential and small commercial and industrial customer classes. NIPSCO Gas has implemented a weather normalization adjustment for certain of its customer classes.

Previous wording

(2)The approved rate case resulted in a black box settlement, representing a settlement to a specific revenue increase but not a specified ROE. The settlement provides use of a 9.70% ROE for future SAVE filings.

Current wording

(2)The approved rate case resulted in a black box settlement, representing a settlement to a specific revenue increase but not a specified ROE. The settlement provides use of a 9.75% ROE for future SAVE filings.

Previous wording

As directed by law in the Protecting Our Infrastructure of Pipelines and Enhancing Safety (PIPES) Act of 2020, PHMSA has revised, and continues to revise, the pipeline safety regulations focused on public safety and environmental hazard mitigation. Specific areas of focus for upcoming rulemaking include leak detection and repair criteria (the "LDAR" rule) and regulations that require operators to upgrade their existing low-pressure regulating stations with enhanced safeguards and update distribution integrity management plans, emergency response plans, and operation and maintenance plans (the Safety of Gas Distribution Pipelines, or "SGDP" rule).

Current wording

As directed by law in the Protecting Our Infrastructure of Pipelines and Enhancing Safety (PIPES) Act of 2020, PHMSA has revised, and continues to revise, the pipeline safety regulations focused on public safety and environmental hazard mitigation. The PIPES Act of 2020 specifically includes leak detection and repair criteria (the "LDAR" rule) and regulations that require operators to upgrade their existing low-pressure regulating stations with enhanced safeguards and update distribution integrity management plans, emergency response plans, and operation and maintenance plans (the Safety of Gas Distribution Pipelines, or "SGDP" rule).

Previous wording

We continue to evaluate and monitor PHMSA legislation and regulations but cannot predict the impact of changing pipeline safety regulations on our business at this time.

Current wording

We continue to evaluate and monitor PHMSA-related legislation and regulations but cannot predict the impact of changing pipeline safety regulations on our business at this time.

Previous wording

On March 12, 2025, the EPA announced it will undertake 31 deregulatory actions to advance the administration’s policy priorities as directed by various Executive Orders. These actions will address multiple existing water, waste, air and climate regulations including, but not limited to, GHG rules and the Legacy CCR rule. NiSource will continue to monitor these matters and assess the impacts to our business as regulations are proposed and finalized, or as otherwise required by law.

Current wording

On March 12, 2025, the EPA announced it will undertake 31 deregulatory actions to advance the administration’s policy priorities as directed by various executive orders. These actions will address multiple existing water, waste, air and climate regulations including, but not limited to, GHG rules and the Legacy CCR Rule. On July 29, 2025, the EPA proposed rescinding the 2009 Endangerment Finding, the scientific and legal foundation for federal GHG regulations under the Clean Air Act. NiSource will continue to monitor these matters and assess the impacts to our business as regulations are proposed and finalized, or as otherwise required by law.

Previous wording

We also continue to monitor evolving state policies related to GHG emissions. The Climate Solutions Now Act of 2022 requires Maryland to reduce GHG emissions by 60% by 2031 (from 2006 levels), and it requires the state to reach net zero emissions by 2045. The Maryland Department of the Environment ("MDE") adopted a plan to achieve its 2031 goal and is required to adopt a plan for their 2045 net zero goal by 2030. The Act also enacts a state policy to move to broader electrification of both existing buildings and new construction. In December 2024, the MDE issued updated final Building Energy Performance Standards, which would require net zero direct GHG emissions from large buildings by 2040 with interim targets, or payments of an alternative compliance fee. Columbia of Maryland is advocating for compliance pathways that use RNG, hydrogen, new technologies and emissions offsets. Under an executive order, Maryland is also developing a Clean Heat Standard and a Zero-Emission Heating Equipment Standard that are intended to transition gas appliances to electric heat pumps. Separately, the PSC has also initiated a proceeding related to Near-Term, Priority Actions and Comprehensive, Long-Term Planning for Maryland's Gas Companies. Columbia of Maryland cannot predict the final impact of these policies on our business at this time.

Current wording

We also continue to monitor evolving state policies related to GHG emissions from our gas distribution companies. The Climate Solutions Now Act of 2022 requires Maryland to reduce GHG emissions by 60% by 2031 (from 2006 levels), and it requires the state to reach net zero emissions by 2045. The Maryland Department of the Environment ("MDE") adopted a plan to achieve its 2031 goal and is required to adopt a plan for their 2045 net zero goal by 2030. The Act also enacts a state policy to move to broader electrification of both existing buildings and new construction. In December 2024, the MDE issued final Building Energy Performance Standards, which would require net zero direct GHG emissions from large buildings by 2040 with interim targets, or payments of an alternative compliance fee. Columbia of Maryland is advocating for compliance pathways that use RNG, hydrogen, new technologies and emissions offsets. Under an executive order, Maryland is also developing a Clean Heat Standard and a Zero-Emission Heating Equipment Standard that are intended to transition gas appliances to electric heat pumps. Separately, the Public Service Commission ("PSC") has also initiated a proceeding related to Near-Term, Priority Actions and Comprehensive, Long-Term Planning for Maryland's Gas Companies. On June 17, 2025, the PSC issued an order directing its Staff to prepare proposed regulations by December 1, 2025, eliminating Company contributions to main or service extensions to new residential and commercial customers. Columbia of Maryland cannot predict the final impact of these policies on our business at this time.

Previous wording

Commodity price risk resulting from derivative activities at our rate-regulated subsidiaries is limited and does not bear signification exposure to earnings risk, since our current regulatory mechanisms allow recovery of prudently incurred purchased power, fuel and gas costs through the rate-making process, including gains or losses on these derivative instruments. These changes are included in the GCA and FAC regulatory rate-recovery mechanisms. If these mechanisms were to be adjusted or eliminated, these subsidiaries may begin providing services without the benefit of the traditional rate-making process and may be more exposed to commodity price risk. For additional information, see "Results and Discussion of Segment Operations" in this Management's Discussion.

Current wording

Commodity price risk resulting from derivative activities at our rate-regulated subsidiaries is limited and does not bear significant exposure to earnings risk, since our current regulatory mechanisms allow recovery of prudently incurred purchased power, fuel and gas costs through the rate-making process, including gains or losses on these derivative instruments. These changes are included in the GCA and FAC regulatory rate-recovery mechanisms. If these mechanisms were to be adjusted or eliminated, these subsidiaries may begin providing services without the benefit of the traditional rate-making process and may be more exposed to commodity price risk. For additional information, see "Results and Discussion of Segment Operations" in this Management's Discussion.

Previous wording

Refer to Note 10, "Risk Management Activities," in the Notes to the Condensed Consolidated Financial Statements (unaudited) for further information on our commodity price risk assets and liabilities as of March 31, 2025 and December 31, 2024.

Current wording

Refer to Note 10, "Risk Management Activities," in the Notes to the Condensed Consolidated Financial Statements (unaudited) for further information on our commodity price risk assets and liabilities.

Showing the first 40 of 41 pairs. Open the source sections for the rest.

Rearranged current paragraphs (1)

Current report — wording carried from elsewhere

Therefore, increases in these tracked operating expenses are offset by increases in operating revenues and have essentially no impact on net income.
Rearranged previous paragraphs (3)

Previous report — wording carried elsewhere

Since 2020, two wind PPA projects and six owned projects (two wind, two solar and two solar plus storage) have been placed into service totaling 2,201 MW of nameplate capacity, including Dunns Bridge II which was placed into service in January 2025. See "Executive Summary - Energy Transition" in this Management's Discussion for additional information. We expect the majority of our remaining BTA and PPA projects to be placed in service between 2025 and 2027.

Previous report — wording carried elsewhere

•As of December 31, 2024 the ATM program had approximately $297.7 million of equity available for issuance through December 31, 2025.

Previous report — wording carried elsewhere

(4)New rates were implemented in 2 steps, with implementation of Step 1 rates effective in August 2023 and Step 2 rates effective in March 2024.