What changed in Management’s Discussion and Analysis?

Read the current filing

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 135 previous paragraphs and 138 current paragraphs.

88 unchanged; 44 reworded; 5 added; 2 removed; 1 previous and 1 current paragraphs rearranged.

Tables are not compared: 15 previous and 15 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (5)

Current report

The increase in total volumes sold to electric customers for the three months ended September 30, 2024 compared to the same period in 2023 was primarily attributable to increased usage across all customer classes.

Current report

(1) Pending regulatory approval.

Current report

(6)Columbia of Kentucky, and the intervening parties filed a Joint Stipulation, Settlement Agreement and Recommendation on October 14, 2024, for an annual revenue increase of $14.3 million.

Current report

(7)The parties to Columbia of Pennsylvania’s rate case filed a Joint Petition for Partial Settlement on August 22, 2024, for an annual revenue increase of $74.0 million. On October 1, 2024, the Administrative Law Judge issued their recommended decision to approve the Partial Settlement without modification.

Current report

(8)New rates proposed to be implemented in 2 steps, with implementation of Step 1 rates effective no later than September 2025 and Step 2 rates to be effective no later than March 2026.
Removed paragraphs (2)

Previous report

In December 2023, the U.S. Department of Energy ("DOE") amended the congressionally-mandated efficiency standards for residential home furnaces manufactured after December 2028. We are assessing the potential impacts associated with these new standards.
Reworded paragraphs (44)

Previous wording

Our goal is to develop strategies that benefit all stakeholders as we (i) focus on long-term infrastructure investment and safety programs to better serve our customers, (ii) align our tariff structures with our cost structure, and (iii) address changing customer energy demand. These strategies focus on improving safety and reliability, enhancing customer experience, pursuing regulatory and legislative initiatives to increase accessibility for customers currently not on our gas and electric service, ensuring customer affordability and reducing emissions while generating sustainable returns. The safety of our customers, communities and employees remains our focus. Serving as a guiding practice for our SMS, NiSource is certified in conformance to the American Petroleum Institute Recommended Practice 1173, which is the foundation to our journey towards operational excellence. We also made advancements in key strategic initiatives, described in further detail below.

Current wording

Our goal is to develop strategies that benefit all stakeholders as we (i) focus on long-term infrastructure investment and safety programs to better serve our customers, (ii) align our tariff structures with our cost structure, and (iii) address changing customer energy demand. These strategies focus on improving safety and reliability, enhancing customer experience, pursuing regulatory and legislative initiatives to increase accessibility for customers currently not on our gas and electric service, ensuring customer affordability and reducing emissions while generating sustainable returns. The safety of our customers, communities and employees remains our focus. Serving as a guiding practice for our SMS, NiSource is certified in conformance to the American Petroleum Institute Recommended Practice 1173, which is the foundation to our journey towards operational excellence. We continue to make advancements in key strategic initiatives, described in further detail below.

Previous wording

Energy Transition: We continue to advance our energy transition strategy, primarily through the continuation and enhancement of existing programs, such as retiring and replacing remaining coal-fired electric generation by 2028 with a balanced mix of low- or zero-emission electric generation, ongoing pipe replacement and modernization programs, and deployment of advanced leak detection and repair. Our electric generation transition, initiated through the NIPSCO 2018 Integrated Resource Plan ("2018 Plan") is well underway, and we are continually adjusting to the dynamic energy landscape. As of June 30, 2024, we have executed and received IURC approval for BTAs and PPAs for wind, solar and solar plus storage projects, with a combined nameplate capacity of 1,950 MW and 1,400 MW, respectively, under the 2018 Plan. On January 17, 2024, the IURC approved full ownership of the Cavalry and Dunns Bridge II projects, allowing NIPSCO to leverage provisions of the IRA, to monetize renewable tax credits more effectively. Full ownership of these projects provide enhanced benefits to customers as compared to the previous tax equity partnership structure approved by the IURC. In March 2024, we filed with the IURC to modify the ownership structure for Gibson and Fairbanks solar projects to become fully owned projects and to modify the cost of the Fairbanks project as contemplated in the contractual actions referenced above. In May 2024, the Cavalry project was placed in service. We remain on track to retire R.M Schahfer's remaining two coal units by the end of 2025. For additional information, see "Results and Discussion of Segment Operations - NIPSCO Operations," in this Management's Discussion.

Current wording

Energy Transition: We are advancing our energy transition strategy, primarily through the continuation and enhancement of existing programs, such as retiring and replacing remaining coal-fired electric generation by 2028 with a balanced mix of low- or zero-emission electric generation, ongoing pipe replacement and modernization programs, and deployment of advanced leak detection and repair. Our electric generation transition, initiated through the NIPSCO 2018 Integrated Resource Plan ("2018 Plan") is well underway, and we are continually adjusting to the dynamic energy landscape. As of September 30, 2024, we have executed and received IURC approval for BTAs and PPAs for wind, solar and solar plus storage projects, with a combined nameplate capacity of 1,950 MW and 1,400 MW, respectively, under the 2018 Plan. In January 2024, the IURC approved full ownership of the Cavalry and Dunns Bridge II projects. In August 2024 the IURC approved full ownership of the Gibson and Fairbanks projects and modification of the cost of the Fairbanks project as contemplated in the contractual actions. Full ownership of these projects allows NIPSCO to leverage provisions of the IRA, monetize renewable tax credits more effectively, and provide enhanced benefits to customers as compared to the previous tax equity partnership structure approved by the IURC. In May 2024, the Cavalry project was placed in service. We remain on track to retire R.M Schahfer's remaining two coal units by the end of 2025. For additional information, see "Results and Discussion of Segment Operations - NIPSCO Operations," in this Management's Discussion.

Previous wording

In 2021, we announced and filed with the IURC the Preferred Energy Resource Plan associated with our 2021 Integrated Resource Plan ("2021 Plan"). The 2021 Plan affirms plans to retire the coal unit at the Michigan City Generating Station by the end of 2028. The 2021 Plan calls for the replacement of the retiring units with a diverse portfolio of resources including demand side management resources, incremental solar, stand-alone energy storage and upgrades to existing facilities at the Sugar Creek Generating Station, among other steps. In the first half of 2024, Sugar Creek completed an Advanced Gas Path Tech upgrade that enhanced its overall production capabilities by an estimated 68 MW. Additionally, the 2021 Plan calls for a new natural gas peaking facility to replace existing vintage gas peaking facilities at the R.M. Schahfer Generating Station to support system reliability and resiliency, and upgrades to the electric transmission system. In September of 2023, we filed a request for issuance of a certificate of public convenience and necessity for an approximately 400 MW natural gas peaking generation facility with the IURC. The planned retirement of the two vintage gas peaking facilities at the R.M. Schahfer Generating Station is also expected to occur by the end of 2028. Final retirement dates for these units, as well as Michigan City, will be subject to MISO approval.

Current wording

In 2021, we announced and filed with the IURC the Preferred Energy Resource Plan associated with our 2021 Integrated Resource Plan ("2021 Plan"). The 2021 Plan affirms plans to retire the coal unit at the Michigan City Generating Station by the end of 2028. The 2021 Plan calls for the replacement of the retiring units with a diverse portfolio of resources including demand side management resources, incremental solar, stand-alone energy storage and upgrades to existing facilities at the Sugar Creek Generating Station, among other steps. In the first half of 2024, Sugar Creek completed an Advanced Gas Path Tech upgrade that enhanced its overall production capabilities by an estimated 68 MW. Additionally, the 2021 Plan calls for a new natural gas peaking facility to replace existing vintage gas peaking facilities at the R.M. Schahfer Generating Station to support system reliability and resiliency, and upgrades to the electric transmission system. In September of 2023, we filed a request for issuance of a certificate of public convenience and necessity for an approximately 400 MW natural gas peaking generation facility with the IURC, which was approved in October of 2024. The planned retirement of the two vintage gas peaking facilities at the R.M. Schahfer Generating Station is also expected to occur by the end of 2028. Final retirement dates for these units, as well as Michigan City, will be subject to MISO approval.

Previous wording

NIPSCO’s 2024 Integrated Resource Plan ("2024 Plan") is currently in-progress and formal stakeholder engagement began in the second quarter. The 2024 Plan will inform future generation investments needed to ensure reliability for NIPSCO’s customers and will incorporate factors such as anticipated load growth from data centers and other economic development opportunities, new EPA emissions rules, and evolving MISO resource accreditation rules. The 2024 Plan will be submitted to the IURC in November 2024 and will include an updated Preferred Energy Resource Plan. We have seen an acceleration of customer interest in our northern Indiana service territory in the form of data center development. We believe data center development can enhance our local tax base, diversify the employment base across the state of Indiana, and provide greater value to existing customers and shareholders. We are evaluating the potential for data center development in our service territory and will move as quickly as possible while maintaining the integrity of our commercial, planning, regulatory, procurement and operational execution processes.

Current wording

NIPSCO’s 2024 Integrated Resource Plan ("2024 Plan") is currently in-progress and formal stakeholder engagement began in the second quarter. The 2024 Plan will inform future generation investments needed to ensure reliability for NIPSCO’s customers and will incorporate factors such as anticipated load growth from data centers and other economic development opportunities, new EPA emissions rules, and evolving MISO resource accreditation rules. The 2024 Plan will be submitted to the IURC in December 2024 and will include an updated Preferred Energy Resource Plan. We have seen an acceleration of customer interest in our northern Indiana service territory in the form of data center development. We believe data center development can enhance our local tax base, diversify the employment base across the state of Indiana, and provide greater value to existing customers and shareholders. We are evaluating the potential for data center development in our service territory, including ways to effectively manage the potential power demand, generation sources, and transmission capabilities to meet potential load growth from any data center customer, while at the same time focusing on our environmental goals. We expect that management of load growth would require new generation and transmission capabilities. We plan to move as efficiently as possible while maintaining the integrity of our commercial, planning, regulatory, procurement and operational execution processes.

Previous wording

We are faced with increased competition for employee and contractor talent in the current labor market which has resulted in increased costs to attract and retain talent. We are ensuring that we use all internal human capital programs (development, leadership enablement programs, succession, performance management) to promote retention of our current employees along with having a competitive and attractive employee value proposition for potential recruits. With a focus on workforce planning, we are evaluating our future talent footprint by creating flexible work arrangements where possible to ensure we have the right people, in the right role, and at the right time.

Current wording

We are faced with increased competition for employee and contractor talent in the current labor market which has resulted in increased costs to attract and retain talent. We are ensuring that we use all internal human capital programs (development, leadership enablement programs, succession, performance management) to promote retention of our current employees along with having a competitive and attractive employee value proposition for potential recruits. With a focus on workforce planning we continue to evaluate talent needs and flexible work arrangements where possible to support a broader talent footprint for sourcing needed talent.

Previous wording

A summary of our consolidated financial results for the three and six months ended June 30, 2024 and 2023 are presented below:

Current wording

A summary of our consolidated financial results for the three and nine months ended September 30, 2024 and 2023 are presented below:

Previous wording

The increase in net income available to common shareholders for the three and six months ended June 30, 2024 was primarily due to higher revenues, net of cost of energy, driven by rate increases from regulatory outcomes. Additionally, net income available to common shareholders increased due to the elimination of the preferred stock dividends following the redemption of both the Series A and B preferred stock . Higher net income available to common shareholders is primarily offset by increased net income attributable to noncontrolling interest following the consummation of the NIPSCO Minority Interest Transaction. See Note 6, "Equity," in the Notes to the Condensed Consolidated Financial Statements (unaudited) for additional information.

Current wording

The increase in net income available to common shareholders for the three and nine months ended September 30, 2024 was primarily due to higher revenues, net of cost of energy, driven by our continued investment in safety, reliability and low or zero emission generation as well as increased AFUDC Equity, reported in Other Deductions, Net, primarily related to the mechanical completion of NIPSCO's Cavalry and Dunns Bridge II projects. Additionally, net income available to common shareholders increased due to the elimination of the preferred stock dividends following the redemption of both the Series A and B preferred stock. For the three and nine months ended September 30, 2024, the increase in net income available to common shareholders is primarily offset by higher depreciation expense attributed to our planned capital expenditures and higher interest expense. Increased net income attributable to noncontrolling interest following the consummation of the NIPSCO Minority Interest Transaction reduces net income available to common shareholders for the nine months ended September 30, 2024 . See Note 6, "Equity," in the Notes to the Condensed Consolidated Financial Statements (unaudited) for additional information.

Previous wording

Refer to Note 14, "Income Taxes," in the Notes to the Condensed Consolidated Financial Statements (unaudited) for information on income taxes and the change in the effective tax rates for the periods presented.

Current wording

Refer to Note 13, "Income Taxes," in the Notes to the Condensed Consolidated Financial Statements (unaudited) for information on income taxes and the change in the effective tax rates.

Previous wording

In response to the NIPSCO Minority Interest Transaction, our operations are now evaluated through two primary reportable segments, Columbia Operations and NIPSCO Operations. Our historical segment disclosures have been recast to be consistent with the current presentation. Columbia Operations aggregates the results of the fully regulated and wholly owned subsidiaries of NiSource Gas Distribution Group, Inc. (a holding company that owns Columbia of Kentucky, Columbia of Maryland, Columbia of Ohio, Columbia of Pennsylvania, and Columbia of Virginia). Each Columbia distribution company is an operating segment which we aggregate to form the Columbia Operations reportable segment. NIPSCO Operations aggregates the results of NIPSCO Holdings I, and its majority-owned subsidiaries, including NIPSCO, which has both fully regulated gas and electric operations in Northwest Indiana. The remainder of our operations, which are not significant enough on a stand-alone basis to warrant treatment as a reportable segment, are presented as "Corporate and Other" within the Notes to the Condensed Consolidated Financial Statements (unaudited) and primarily are comprised of interest expense on holding company debt, and unallocated corporate costs and activities.

Current wording

In response to the NIPSCO Minority Interest Transaction, our operations are now evaluated through two primary reportable segments, Columbia Operations and NIPSCO Operations. Our historical segment disclosures have been recast to be consistent with the current presentation. Columbia Operations aggregates the results of the fully regulated and wholly owned subsidiaries of NiSource Gas Distribution Group, Inc. Each Columbia distribution company is an operating segment which we aggregate to form the Columbia Operations reportable segment. NIPSCO Operations aggregates the results of NIPSCO Holdings I, and its majority-owned subsidiaries, including NIPSCO, which has both fully regulated gas and electric operations in Northwest Indiana. The remainder of our operations, which are not significant enough on a stand-alone basis to warrant treatment as a reportable segment, are presented as "Corporate and Other" within the Notes to the Condensed Consolidated Financial Statements (unaudited) and primarily are comprised of interest expense on holding company debt, and unallocated corporate costs and activities.

Previous wording

Financial and operational data for the Columbia Operations segment for the three and six months ended June 30, 2024 and 2023 are presented below.

Current wording

Financial and operational data for the Columbia Operations segment for the three and nine months ended September 30, 2024 and 2023 are presented below.

Previous wording

The underlying reasons for changes in our operating revenues for the three and six months ended June 30, 2024 compared to the same period in 2023 are presented below.

Current wording

The underlying reasons for changes in our operating revenues for the three and nine months ended September 30, 2024 compared to the same period in 2023 are presented below.

Previous wording

The increase in total volumes for the six months ended June 30, 2024, compared to the same period in 2023, is primarily attributable to increased industrial usage offset by off-system sales.

Current wording

The increase in total volumes for the three months ended September 30, 2024, compared to the same period in 2023, is primarily attributable to increased industrial usage offset by off-system sales.

Previous wording

The decrease in total volumes for the three months ended June 30, 2024, compared to the same period in 2023, is primarily attributable to the effects of warmer weather offset by industrial usage.

Current wording

The increase in total volumes for the nine months ended September 30, 2024, compared to the same period in 2023, is primarily attributable to increased industrial usage offset by off-system sales.

Previous wording

The underlying reasons for changes in our operating expenses for the three and six months ended June 30, 2024 compared to the same period in 2023 are presented below.

Current wording

The underlying reasons for changes in our operating expenses for the three and nine months ended September 30, 2024 compared to the same period in 2023 are presented below.

Previous wording

Financial and operational data for the NIPSCO Operations segment, which services both gas and electric customers, for the three and six months ended June 30, 2024 and 2023 are presented below.

Current wording

Financial and operational data for the NIPSCO Operations segment, which services both gas and electric customers, for the three and nine months ended September 30, 2024 and 2023 are presented below.

Previous wording

The underlying reasons for changes in our operating revenues for the three and six months ended June 30, 2024 compared to the same period in 2023 are presented below.

Current wording

The underlying reasons for changes in our operating revenues for the three and nine months ended September 30, 2024 compared to the same period in 2023 are presented below.

Previous wording

The increase in total volumes sold to electric customers for the three and six months ended June 30, 2024 compared to the same period in 2023 was primarily attributable to increased usage by residential and wholesale customers offset by industrial customers.

Current wording

The increase in total volumes sold to electric customers for the nine months ended September 30, 2024 compared to the same period in 2023 was primarily attributable to increased usage by wholesale, residential and commercial customers offset by decreased usage by industrial customers.

Previous wording

The decrease in total volumes sold to gas customers for the three and six months ended June 30, 2024 compared to the same period in 2023 was primarily attributable to decreased usage by industrial and residential customers.

Current wording

The decrease in total volumes sold to gas customers for the three and nine months ended September 30, 2024 compared to the same period in 2023 was primarily attributable to decreased usage by industrial and residential customers.

Previous wording

The underlying reasons for changes in our operating expenses for the three and six months ended June 30, 2024 compared to the same period in 2023 are presented below.

Current wording

The underlying reasons for changes in our operating expenses for the three and nine months ended September 30, 2024 compared to the same period in 2023 are presented below.

Previous wording

NIPSCO continues to work with the EPA to obtain an administrative approval associated with the operation of R.M. Schahfer’s remaining two coal units until 2025. In the event that the approval is not obtained, future operations could be impacted. We cannot estimate the financial impact on us if this approval is not obtained. Refer to Item 1A. Risk Factors, "Operational Risks," of the 2023 Annual Report on Form 10-K for further detail.

Current wording

NIPSCO continues to await EPA decision on an administrative approval associated with the operation of R.M. Schahfer’s remaining two coal units until 2025. In the event that the approval is not obtained, future operations could be impacted. We cannot estimate the financial impact on us if this approval is not obtained. Refer to Item 1A. Risk Factors, "Operational Risks," of the 2023 Annual Report on Form 10-K for further detail.

Previous wording

Since 2020, two wind PPA projects, two wind BTA projects and three solar BTA projects have been placed into service, totaling 1,665 MW of nameplate capacity plus additional battery energy storage system capacity at Cavalry. NIPSCO has executed commercial agreements for each of the seven remaining identified projects. Dunns Bridge II, Fairbanks, Gibson, GreenRiver, Appleseed, Carpenter and Templeton have received IURC approval. NIPSCO has filed for a new gas peaking facility to be located at R.M. Schahfer Generating Station. On January 17, 2024 the IURC approved increases to the project costs as well as the full ownership of Cavalry and Dunns Bridge II, allowing NIPSCO to leverage provisions of the IRA to monetize tax credits for the benefit of customers in lieu of utilizing tax equity partnerships. See "Executive Summary - Energy Transition" in this Management's Discussion for additional information. We expect the majority of our remaining BTA and PPA projects to be placed in service in 2024 and 2025.

Current wording

Since 2020, two wind PPA projects, two wind BTA projects and three solar BTA projects have been placed into service, totaling 1,665 MW of nameplate capacity plus additional battery energy storage system capacity at Cavalry. NIPSCO has executed commercial agreements for each of the seven remaining identified projects. Dunns Bridge II, Fairbanks, Gibson, GreenRiver, Appleseed, Carpenter and Templeton have received IURC approval. In January 2024, the IURC approved increases to the project costs as well as the full ownership of Cavalry and Dunns Bridge II. In August 2024, the IURC approved full ownership of Gibson and Fairbanks as well as increases to the cost of the Fairbanks project. NIPSCO has also contracted with a developer to convert the previously approved Templeton PPA to a BTA and has provided a notice of intent to file with the IURC. In October 2024 the IURC approved the certificate of public convenience and necessity for NIPSCO's planned gas peaking facility to be located at the R.M. Schahfer Generating Station. See "Executive Summary - Energy Transition" in this Management's Discussion for additional information. We expect the majority of our remaining BTA and PPA projects to be placed in service between 2025 and 2027.

Previous wording

•On February 22, 2024, we entered into an ATM equity program that provides an opportunity to issue and sell shares of our common stock up to an aggregate issuance of $900.0 million through December 31, 2025. As of June 30, 2024, the ATM program (including the impact of the forward sale agreements) had approximately $400.0 million of equity available for issuance.

Current wording

•On February 22, 2024, we entered into an ATM equity program that provides an opportunity to issue and sell shares of our common stock up to an aggregate issuance of $900.0 million through December 31, 2025. As of September 30, 2024, the ATM program (including the impact of open forward sale agreements) had approximately $297.7 million of equity available for issuance.

Previous wording

•On March 14, 2024 we completed the issuance and sale of $650.0 million of 5.35% senior unsecured notes maturing in 2034, which resulted in approximately $642.6 million of net proceeds after discount and debt issuance costs.

Current wording

•On March 14, 2024, we completed the issuance and sale of $650.0 million of 5.350% senior unsecured notes maturing in 2034, which resulted in approximately $642.6 million of net proceeds after discount and debt issuance costs.

Previous wording

•On May 16, 2024, we completed the issuance and sale of $500.0 million of 6.95% fixed-to-fixed reset rate junior subordinated notes maturing in 2054, which resulted in approximately $493.4 million of net proceeds after debt issuance costs.

Current wording

•On May 16, 2024, we completed the issuance and sale of $500.0 million of 6.950%fixed-to-fixed reset rate junior subordinated notes maturing in 2054, which resulted in approximately $493.4 million million of net proceeds after debt issuance costs.

Previous wording

•On June 24, 2024, we completed the issuance and sale of $600.0 million of 5.20% senior unsecured notes maturing in 2029, which resulted in approximately $593.7 million of net proceeds after discount and debt issuance costs.

Current wording

•On June 24, 2024, we completed the issuance and sale of $600.0 million of 5.200% senior unsecured notes maturing in 2029, which resulted in approximately $593.7 million of net proceeds after discount and debt issuance costs.

Previous wording

Year over year increase in investing activities was primarily comprised of capital expenditures related to system growth and reliability and milestone payments to renewable generation asset developers for certain of our BTA projects.

Current wording

Year over year decrease in investing activities was primarily comprised of lower capital expenditures spending.

Previous wording

We remain on track to make capital investments totaling $3.3 billion to $3.5 billion during the 2024 period. We also expect to invest approximately $16.4 billion during the 2024-2028 period, including capital investments to support our generation transition strategy. These forecasted capital investments are subject to continuing review and adjustment. Actual capital expenditures may vary from these estimates.

Current wording

We remain on track to make capital investments totaling $3.3 billion to $3.5 billion during the 2024 period. We also expect to invest approximately $19.3 billion during the 2025-2029 period, including capital investments to support our generation transition strategy. These forecasted capital investments are subject to continuing review and adjustment. Actual capital expenditures may vary from these estimates.

Previous wording

Noncontrolling Interest. We received $2.16 billion upon closing the NIPSCO Minority Interest Transaction. Proceeds from the closing of the NIPSCO Minority Interest Transaction were used to repay short-term debt, including our credit agreements. Under the terms of the LLC Agreement, BIP is obligated to provide up to $250 million in additional capital contributions over a three-year period after the Closing. The obligation is backed by an Equity Commitment Letter from Blackstone. BIP may contribute additional capital above $250 million as necessary to maintain its percentage ownership interest. Refer to Note 4, "Noncontrolling Interests," in the Notes to the Condensed Consolidated Financial Statements (unaudited) for information on contributions and distributions from noncontrolling interests.

Current wording

Noncontrolling Interest. We received $2.16 billion upon closing the NIPSCO Minority Interest Transaction. Proceeds from the closing of the NIPSCO Minority Interest Transaction were used to repay short-term debt, including our credit agreements. Under the terms of the Amended LLC Agreement, BIP is obligated to provide up to $250 million in additional capital contributions over a three-year period after the Closing. The obligation is backed by an Equity Commitment Letter from Blackstone. BIP may contribute additional capital above $250 million as necessary to maintain its percentage ownership interest. Refer to Note 4, "Noncontrolling Interests," in the Notes to the Condensed Consolidated Financial Statements (unaudited) for information on contributions and distributions from noncontrolling interests.

Previous wording

Debt Covenants. We are subject to a financial covenant under our revolving credit facility, which require us to maintain a debt to capitalization ratio that does not exceed 70.0%. As of June 30, 2024, the ratio was 57.8%.

Current wording

Debt Covenants. We are subject to a financial covenant under our revolving credit facility, which requires us to maintain a debt to capitalization ratio that does not exceed 70.0%. As of September 30, 2024, the ratio was 52.7%.

Previous wording

Certain of our subsidiaries have agreements that contain ''ratings triggers'' that require increased collateral if our credit rating or the credit ratings of certain of our subsidiaries are below investment grade. These agreements are primarily for insurance purposes and for the physical purchase or sale of power. As of June 30, 2024, the collateral requirement that would be required in the event of a downgrade below the ratings trigger levels would amount to approximately $110.4 million. In addition to agreements with ratings triggers, there are other agreements that contain ''adequate assurance'' or ''material adverse change'' provisions that could necessitate additional credit support such as letters of credit and cash collateral to transact business.

Current wording

Certain of our subsidiaries have agreements that contain ''ratings triggers'' that require increased collateral if our credit rating or the credit ratings of certain of our subsidiaries are below investment grade. These agreements are primarily for insurance purposes and for the physical purchase or sale of power. As of September 30, 2024, the collateral requirement that would be required in the event of a downgrade below the ratings trigger levels would amount to approximately $112.4 million. In addition to agreements with ratings triggers, there are other agreements that contain ''adequate assurance'' or ''material adverse change'' provisions that could necessitate additional credit support such as letters of credit and cash collateral to transact business.

Previous wording

Equity. Our authorized capital stock consists of 770,000,000 shares, $0.01 par value, of which 750,000,000 are common stock and 20,000,000 are preferred stock. As of June 30, 2024, 448,398,632 shares of common stock were outstanding.

Current wording

Equity. Our authorized capital stock consists of 770,000,000 shares, $0.01 par value, of which 750,000,000 are common stock and 20,000,000 are preferred stock. As of September 30, 2024, 466,707,452 shares of common stock were outstanding.

Previous wording

Contractual Obligations. A summary of contractual obligations is included in the Company's Annual Report on Form 10-K for the year ended December 31, 2023. Except for our 2024 debt issuances, there were no additional material changes from year- end during the six months ended June 30, 2024. Refer to Note 8, "Long-Term Debt," in the Notes to the Condensed Consolidated Financial Statements (unaudited) for additional information regarding the debt issuances.

Current wording

Contractual Obligations. A summary of contractual obligations is included in the Company's Annual Report on Form 10-K for the year ended December 31, 2023. Except for our 2024 debt issuances, there were no additional material changes from year-end during the nine months ended September 30, 2024. Refer to Note 8, "Long-Term Debt," in the Notes to the Condensed Consolidated Financial Statements (unaudited) for additional information regarding the debt issuances.

Previous wording

We recognize that energy efficiency reduces emissions, conserves natural resources and saves our customers money. Our gas distribution companies offer programs such as energy efficiency upgrades, home checkups and weatherization services. The increased efficiency of natural gas appliances and improvements in home building codes and standards contributes to a long-term trend of declining average use per customer. While we are looking to expand offerings so the energy efficiency programs can benefit as many customers as possible, our Columbia Operations and NIPSCO Operations have pursued changes in rate design to more effectively match recoveries with costs incurred. Columbia of Ohio has adopted a straight fixed variable rate design for residential customers that closely links the recovery of fixed costs with fixed charges. Columbia of Maryland and Columbia of Virginia have regulatory approval for weather and revenue normalization adjustments for certain customer classes, which adjust monthly revenues that exceed or fall short of approved levels. Columbia of Pennsylvania continues to operate its pilot residential weather normalization adjustment and also has a fixed customer charge. This weather normalization adjustment only adjusts revenues when actual weather compared to normal varies by more than 3% during the winter heating season. Columbia of Kentucky incorporates a weather normalization adjustment for certain customer classes and also has a fixed customer charge.

Current wording

We recognize that energy efficiency reduces emissions, conserves natural resources and saves our customers money. Our gas distribution companies offer programs such as energy efficiency upgrades, home checkups and weatherization services. The increased efficiency of natural gas appliances and improvements in home building codes and standards contributes to a long-term trend of declining average use per customer. While we are looking to expand offerings so the energy efficiency programs can benefit as many customers as possible, our Columbia Operations and NIPSCO Operations have pursued changes in rate design to more effectively match recoveries with costs incurred. Columbia of Ohio has adopted a straight fixed variable rate design for residential customers that closely links the recovery of fixed costs with fixed charges. Columbia of Maryland, Columbia of Virginia and NIPSCO Gas have regulatory approval for weather and revenue normalization adjustments for certain customer classes, which adjust monthly revenues that exceed or fall short of approved levels. Columbia of Pennsylvania continues to operate its pilot residential weather normalization adjustment and also has a fixed customer charge. This weather normalization adjustment only adjusts revenues when actual weather compared to normal varies by more than 3% during the winter heating season. Columbia of Kentucky incorporates a weather normalization adjustment for certain customer classes and also has a fixed customer charge.

Previous wording

(4)New rates will be implemented in 2 steps, with implementation of Step 1 rates to be effective no later than September 2024 and Step 2 rates no later than March 2025.

Current wording

(4)New rates will be implemented in 2 steps, with implementation of Step 1 rates effective in August 2024 and Step 2 rates to be effective no later than March 2025.

Previous wording

(5)New rates were implemented in 2 steps, with implementation of Step 1 rates in August 2023 and Step 2 rates effective in March 2024.

Current wording

(5)New rates were implemented in 2 steps, with implementation of Step 1 rates effective in August 2023 and Step 2 rates effective in March 2024.

Previous wording

(6)Rates to be effective on an interim basis and subject to refund.

Current wording

(9)Rates to be effective on an interim basis and subject to refund.

Previous wording

On November 30, 2023, the House Transportation & Infrastructure Committee introduced new pipeline safety reauthorization legislation known as the PIPES Act of 2023 to reauthorize PHMSA’s safety programs for the next four years. The proposed legislation includes several priorities for our company, including excavation damage prevention grants to improve states’

Current wording

On November 30, 2023, the House Transportation & Infrastructure Committee introduced new pipeline safety reauthorization legislation known as the PIPES Act of 2023 to reauthorize PHMSA’s safety programs for the next four years. The proposed legislation includes several priorities for our company, including excavation damage prevention grants to improve states’ damage prevention programs, a PHMSA study on blending hydrogen in distribution pipelines, new criminal penalties for intentionally damaging pipeline facilities, and creation of a Voluntary Information Sharing System to allow for industry participants to share learnings and best practices in a protected manner across the pipeline industry.

Previous wording

Transition Climate Risks. We actively engage with and monitor the impact that proposed legislative and regulatory programs related to GHG emissions, at both the federal and state levels, would have on our business.

Current wording

Transition Climate Risks. We actively engage with and monitor the impact that proposed legislative and regulatory programs related to GHG emissions would have on our business, at both the federal and state levels.

Previous wording

In May 2024, the EPA published final greenhouse gas standards and guidelines for fossil fuel-fired power plants. The rules are not expected to impact NIPSCO’s existing electric generation, but, depending on the outcome of ongoing litigation, may impose certain operational limitations on other existing and new electric generation. We are assessing the potential impacts of these rules through the current 2024 Plan process.

Current wording

In May 2024, the EPA published final greenhouse gas standards and guidelines for fossil fuel-fired power plants. The rules are not expected to impact NIPSCO’s existing electric generation, but, depending on the outcome of ongoing litigation, may impose certain operational limitations on other existing and new electric generation. We are assessing the potential impacts of these rules through the current 2024 NIPSCO Integrated Resource Planning process.

Previous wording

The Climate Solutions Now Act of 2022 requires Maryland to reduce GHG emissions by 60% by 2031 (from 2006 levels), and it requires the state to reach net zero emissions by 2045. The Maryland Department of the Environment ("MDE") adopted a plan to achieve its 2031 goal and is required to adopt a plan for its 2045 net zero goal by 2030. In June 2024, Governor Moore signed an executive order to advance Maryland’s Pollution Reduction Plan, which directs the MDE to propose a zero-emission heating equipment standard regulation and a clean heat standard regulation. The Act also enacts a state policy to move to broader electrification of both existing buildings and new construction, and requires the Public Service Commission ("PSC") to complete a study assessing the capacity of gas and electric distribution systems to successfully serve customers under a transition to a highly electrified building sector. The PSC released their report on December 29, 2023, and concluded that high levels of electrification can be handled by Maryland's electric systems through 2031. The Maryland Department of the Environment issued draft proposed Building Energy Performance Standards (BEPS), which would require net zero direct greenhouse gas emissions from large buildings by 2040 with interim targets, or an alternative compliance fee. Columbia of Maryland is advocating for compliance pathways that use RNG, hydrogen, and emissions offsets. Separately, the PSC has also initiated a proceeding related to Near-Term, Priority Actions and Comprehensive, Long-Term Planning for Maryland's Gas Companies. Columbia of Maryland will continue to monitor these matters, but we cannot predict their final impact on our business at this time.

Current wording

The Climate Solutions Now Act of 2022 requires Maryland to reduce GHG emissions by 60% by 2031 (from 2006 levels), and it requires the state to reach net zero emissions by 2045. The Maryland Department of the Environment ("MDE") adopted a plan to achieve its 2031 goal and is required to adopt a plan for its 2045 net zero goal by 2030. In June 2024, Governor Moore signed an executive order to advance Maryland’s Pollution Reduction Plan, which directs the MDE to propose a zero-emission heating equipment standard regulation and a clean heat standard regulation. The Act also enacts a state policy to move to broader electrification of both existing buildings and new construction, and requires the Public Service Commission ("PSC") to complete a study assessing the capacity of gas and electric distribution systems to successfully serve customers under a transition to a highly electrified building sector. The PSC released their report on December 29, 2023, and concluded that high levels of electrification can be handled by Maryland's electric systems through 2031. On September 6, 2024, the Maryland Department of the Environment issued updated proposed Building Energy Performance Standards (BEPS), which would require net zero direct greenhouse gas emissions from large buildings by 2040 with interim targets, or payments of an alternative compliance fee. Columbia of Maryland is advocating for compliance pathways that use RNG, hydrogen, and emissions offsets. Separately, the PSC has also initiated a proceeding related to Near-Term, Priority Actions and Comprehensive, Long-Term Planning for Maryland's Gas Companies. Columbia of Maryland will continue to monitor these matters, but we cannot predict their final impact on our business at this time.

Showing the first 40 of 44 pairs. Open the source sections for the rest.

Rearranged current paragraphs (1)

Current report — wording carried from elsewhere

•On September 9, 2024, we completed the issuance and sale of $500.0 million of 6.375% fixed-to-fixed reset rate junior subordinated notes maturing in 2055, which resulted in approximately $493.6 million of net proceeds after debt issuance costs.
Rearranged previous paragraphs (1)

Previous report — wording carried elsewhere

damage prevention programs, a PHMSA study on blending hydrogen in distribution pipelines, new criminal penalties for intentionally damaging pipeline facilities, and creation of a Voluntary Information Sharing System to allow for industry participants to share learnings and best practices in a protected manner across the pipeline industry.