Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsSummary of Consolidated Financial ResultsResults and Discussion of Segment OperationsColumbia OperationsNIPSCO OperationsLiquidity and Capital ResourcesRegulatory, Environmental and Safety MattersMarket Risk DisclosuresCurrent report: 10-Q
Period ended 2024-06-30; filed 2024-08-07.
0001111711-24-000032
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsSummary of Consolidated Financial ResultsResults and Discussion of Segment OperationsColumbia OperationsNIPSCO OperationsLiquidity and Capital ResourcesRegulatory, Environmental and Safety MattersMarket Risk DisclosuresThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 137 previous paragraphs and 135 current paragraphs.
84 unchanged; 43 reworded; 5 added; 9 removed; 1 previous and 3 current paragraphs rearranged.
Tables are not compared: 15 previous and 15 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (5)
Current report
NIPSCO’s 2024 Integrated Resource Plan ("2024 Plan") is currently in-progress and formal stakeholder engagement began in the second quarter. The 2024 Plan will inform future generation investments needed to ensure reliability for NIPSCO’s customers and will incorporate factors such as anticipated load growth from data centers and other economic development opportunities, new EPA emissions rules, and evolving MISO resource accreditation rules. The 2024 Plan will be submitted to the IURC in November 2024 and will include an updated Preferred Energy Resource Plan. We have seen an acceleration of customer interest in our northern Indiana service territory in the form of data center development. We believe data center development can enhance our local tax base, diversify the employment base across the state of Indiana, and provide greater value to existing customers and shareholders. We are evaluating the potential for data center development in our service territory and will move as quickly as possible while maintaining the integrity of our commercial, planning, regulatory, procurement and operational execution processes.
Current report
The decrease in total volumes for the three months ended June 30, 2024, compared to the same period in 2023, is primarily attributable to the effects of warmer weather offset by industrial usage.
Current report
•On May 16, 2024, we completed the issuance and sale of $500.0 million of 6.95% fixed-to-fixed reset rate junior subordinated notes maturing in 2054, which resulted in approximately $493.4 million of net proceeds after debt issuance costs.
Current report
(4)New rates will be implemented in 2 steps, with implementation of Step 1 rates to be effective no later than September 2024 and Step 2 rates no later than March 2025.
Current report
In May 2024, the EPA published final greenhouse gas standards and guidelines for fossil fuel-fired power plants. The rules are not expected to impact NIPSCO’s existing electric generation, but, depending on the outcome of ongoing litigation, may impose certain operational limitations on other existing and new electric generation. We are assessing the potential impacts of these rules through the current 2024 Plan process.
Removed paragraphs (9)
Previous report
The increase in preferred dividends and redemption premium for the three months ended March 31, 2024 was primarily due to the inclusion of $14 million Series B preferred redemption premium, offset by a shortened dividend accrual period due to the early redemption of Series A Preferred Stock in 2023 and the reduction of accrual for Series B Preferred Stock in 2024. See Note 6, "Equity," in the Notes to the Condensed Consolidated Financial Statements (unaudited) for additional information.
Previous report
(2) Columbia of Ohio received a final order with rates effective May 2024.
Previous report
(3)Coincident with the implementation of Step 1 and Step 2 base rates in Cause No. 45772, TDSIC-3 cumulative capital investment of $554.7 million at Step 1 and $74.2 million at Step 2 moved out of this tracker and into base rates.
Previous report
(4)Columbia of Kentucky placed these rates into effect, as of January 3, 2024, subject to refund, depending on a Commission order ruling on the Application.
Previous report
(4)New rates were implemented in 2 steps, with implementation of Step 1 rates in September 2022. The Step 2 rates were filed on February 21, 2023, with rates effective March 2023.
Previous report
(6)On March 20, 2024, NIPSCO filed a unanimous settlement agreement that, if approved, will result in increased incremental revenue of $120.9 million. Pending the approval of the settlement agreement, new rates expected to be implemented in 2 steps, with implementation of Step 1 rates to be effective in September 2024 and Step 2 Rates in March 2025.
Previous report
In May 2023, the EPA proposed changes to the CCR regulations for inactive surface impoundments at inactive facilities, referred to as “legacy CCR surface impoundments.” The EPA is also proposing to extend a subset of requirements in the CCR regulations to areas not previously subject to the CCR regulations, referred to as CCR management units (“CCRMUs”). In November 2023, the EPA issued a Notice of Data Availability seeking comment on updated lists of legacy impoundments and CCRMUs, as well as a risk assessment for legacy impoundments and CCRMUs. On April 25, 2024 new EPA rules have been issued and we are evaluating the potential impact on our business.
Previous report
In May 2023, the EPA released a package of proposed regulatory actions to reduce carbon dioxide emissions from new natural gas-fired electric generating units (EGUs), existing natural gas-fired EGUs, and existing coal-fired EGUs. The EPA finalized the rules on April 25, 2024. We are reviewing the potential impacts of these rules on our business.
Reworded paragraphs (43)
Previous wording
Energy Transition: We continue to advance our energy transition strategy, primarily through the continuation and enhancement of existing programs, such as retiring and replacing remaining coal-fired electric generation by 2028 with a balanced mix of low- or zero-emission electric generation, ongoing pipe replacement and modernization programs, and deployment of advanced leak detection and repair. Our electric generation transition, initiated through the NIPSCO 2018 Integrated Resource Plan ("2018 Plan") is well underway, and we are continually adjusting to the dynamic energy landscape. As of March 31, 2024, we have executed and received IURC approval for BTAs and PPAs for wind, solar and solar plus storage projects,with a combined nameplate capacity of 1,950 MW and 1,400 MW, respectively, under the 2018 Plan. We have also taken contractual actions on a number of our other renewable projects to address the timing of these projects as well as consider the broad market issues facing the industry. We remain on track to retire R.M Schahfer's remaining two coal units by the end of 2025. On January 17, 2024, the IURC approved full ownership of the Cavalry and Dunns Bridge II projects, allowing NIPSCO to leverage provisions of the Inflation Reduction Act passed in 2022, to monetize renewable tax credits more effectively. Full ownership of these projects provide enhanced benefits to customers as compared to the previous tax equity partnership structure approved by the IURC. In March 2024, we filed with the IURC to modify the ownership structure for Gibson and Fairbanks solar projects to become fully owned projects and to modify the cost of the Fairbanks project as contemplated in the contractual actions referenced above. We are continuing to evaluate the impact of this legislation on our remaining projects, with potential to drive increased value to customers. For additional information, see "Results and Discussion of Segment Operations - NIPSCO Operations," in this Management's Discussion.
Current wording
Energy Transition: We continue to advance our energy transition strategy, primarily through the continuation and enhancement of existing programs, such as retiring and replacing remaining coal-fired electric generation by 2028 with a balanced mix of low- or zero-emission electric generation, ongoing pipe replacement and modernization programs, and deployment of advanced leak detection and repair. Our electric generation transition, initiated through the NIPSCO 2018 Integrated Resource Plan ("2018 Plan") is well underway, and we are continually adjusting to the dynamic energy landscape. As of June 30, 2024, we have executed and received IURC approval for BTAs and PPAs for wind, solar and solar plus storage projects, with a combined nameplate capacity of 1,950 MW and 1,400 MW, respectively, under the 2018 Plan. On January 17, 2024, the IURC approved full ownership of the Cavalry and Dunns Bridge II projects, allowing NIPSCO to leverage provisions of the IRA, to monetize renewable tax credits more effectively. Full ownership of these projects provide enhanced benefits to customers as compared to the previous tax equity partnership structure approved by the IURC. In March 2024, we filed with the IURC to modify the ownership structure for Gibson and Fairbanks solar projects to become fully owned projects and to modify the cost of the Fairbanks project as contemplated in the contractual actions referenced above. In May 2024, the Cavalry project was placed in service. We remain on track to retire R.M Schahfer's remaining two coal units by the end of 2025. For additional information, see "Results and Discussion of Segment Operations - NIPSCO Operations," in this Management's Discussion.
Previous wording
In 2021, we announced and filed with the IURC the Preferred Energy Resource Plan associated with our 2021 Integrated Resource Plan ("2021 Plan"). The 2021 Plan affirms plans to retire the coal unit at the Michigan City Generating Station by the end of 2028. The 2021 Plan calls for the replacement of the retiring units with a diverse portfolio of resources including demand side management resources, incremental solar, stand-alone energy storage and upgrades to existing facilities at the Sugar Creek Generating Station, among other steps. Additionally, the 2021 Plan calls for a new natural gas peaking facility to replace existing vintage gas peaking facilities at the R.M. Schahfer Generating Station to support system reliability and resiliency, and upgrades to the electric transmission system. In September of 2023, we filed a request for issuance of a certificate of public convenience and necessity for an approximately 400 MW natural gas peaking generation facility with the IURC. The planned retirement of the two vintage gas peaking facilities at the R.M. Schahfer Generating Station is also expected to occur by the end of 2028. Final retirement dates for these units, as well as Michigan City, will be subject to MISO approval.
Current wording
In 2021, we announced and filed with the IURC the Preferred Energy Resource Plan associated with our 2021 Integrated Resource Plan ("2021 Plan"). The 2021 Plan affirms plans to retire the coal unit at the Michigan City Generating Station by the end of 2028. The 2021 Plan calls for the replacement of the retiring units with a diverse portfolio of resources including demand side management resources, incremental solar, stand-alone energy storage and upgrades to existing facilities at the Sugar Creek Generating Station, among other steps. In the first half of 2024, Sugar Creek completed an Advanced Gas Path Tech upgrade that enhanced its overall production capabilities by an estimated 68 MW. Additionally, the 2021 Plan calls for a new natural gas peaking facility to replace existing vintage gas peaking facilities at the R.M. Schahfer Generating Station to support system reliability and resiliency, and upgrades to the electric transmission system. In September of 2023, we filed a request for issuance of a certificate of public convenience and necessity for an approximately 400 MW natural gas peaking generation facility with the IURC. The planned retirement of the two vintage gas peaking facilities at the R.M. Schahfer Generating Station is also expected to occur by the end of 2028. Final retirement dates for these units, as well as Michigan City, will be subject to MISO approval.
Previous wording
Transformation: Our enterprise-wide transformation roadmap focuses on operational excellence, safety, operation and maintenance management, and unlocking efficiencies. We are committed to identifying and implementing initiatives that will enable us to streamline work and improve logistics company-wide. These efforts include investments in proven technologies backed with standardized processes that will change the way we plan, schedule, and execute work in the field and how we engage and provide service to our customers. Taken together, all of our optimization initiatives will prioritize safety and continue to optimize our long-term growth profile. We are making progress towards our transformation goals with the anticipated third quarter 2024 launch of the first phase of our WAM program, an information technology system that optimizes the scheduling, dispatch, and execution of our field operations.
Current wording
Transformation: Our enterprise-wide transformation roadmap focuses on operational excellence, safety, operation and maintenance management, and unlocking efficiencies. We are committed to identifying and implementing initiatives that will enable us to streamline work and improve logistics company-wide. These efforts include investments in proven technologies backed with standardized processes that will change the way we plan, schedule, and execute work in the field and how we engage and provide service to our customers. Taken together, all of our optimization initiatives will prioritize safety and continue to optimize our long-term growth profile. We are making progress towards our transformation goals with a successful completion of the first phase of our WAM program, an enterprise resource planning system that will optimize the scheduling, dispatch, and execution of our field operations. This phase of the program implemented the solution within our electric distribution operations, while our second phase for gas distribution operations is anticipated to be completed by the third quarter of 2025.
Previous wording
Economic Environment: We continue to monitor risks related to increasing order and delivery lead times for construction and other materials, potential unavailability of materials due to global shortages in raw materials, and decreased construction labor productivity in the event of disruptions in the availability of materials. We continue to see increasing prices associated with certain materials and supplies. To the extent that work delays occur or our costs increase, our business operations, results of operations, cash flows, and financial condition could be materially adversely affected.
Current wording
Economic Environment: We continue to monitor risks related to increasing order and delivery lead times for construction and other materials, potential unavailability of materials due to global shortages in raw materials, and decreased construction labor productivity in the event of disruptions in the availability of materials. We continue to see increasing prices associated with environmental remediation services and certain materials and supplies. To the extent that work delays occur or our costs increase, our business operations, results of operations, cash flows, and financial condition could be materially adversely affected.
Previous wording
A summary of our consolidated financial results for the three months ended March 31, 2024 and 2023 are presented below:
Current wording
A summary of our consolidated financial results for the three and six months ended June 30, 2024 and 2023 are presented below:
Previous wording
The increase in net income available to common shareholders for the three months ended March 31, 2024 was primarily due to higher revenues, net of cost of energy, driven by rate increases from regulatory outcomes. Higher net income is offset by increased net income attributable to noncontrolling interest following the consummation of the NIPSCO Minority Interest Transaction.
Current wording
The increase in net income available to common shareholders for the three and six months ended June 30, 2024 was primarily due to higher revenues, net of cost of energy, driven by rate increases from regulatory outcomes. Additionally, net income available to common shareholders increased due to the elimination of the preferred stock dividends following the redemption of both the Series A and B preferred stock . Higher net income available to common shareholders is primarily offset by increased net income attributable to noncontrolling interest following the consummation of the NIPSCO Minority Interest Transaction. See Note 6, "Equity," in the Notes to the Condensed Consolidated Financial Statements (unaudited) for additional information.
Previous wording
We continue to monitor and evaluate the impacts of final or proposed income tax regulations issued on provisions of the IRA including but not limited to renewable energy tax credits and the excise tax on stock buybacks guidance issued on April 9, 2024. While our analysis is not complete, we do not believe these proposed regulations will materially impact the excise tax liability recorded in 2023. See Note 6 to the Consolidated Financial Statements in the Company’s Annual Report on Form 10-K for the year ended December 31, 2023 for a discussion of the excise tax on stock buybacks.
Current wording
We continue to monitor and evaluate the impacts of final or proposed income tax regulations issued on provisions of the IRA including but not limited to renewable energy tax credits.
Previous wording
In response to the NIPSCO Minority Interest Transaction, our operations are now evaluated through two primary reportable segments, Columbia Operations and NIPSCO Operations. Columbia Operations aggregates the results of the fully regulated and wholly owned subsidiaries of NiSource Gas Distribution Group, Inc. (a holding company that owns Columbia of Kentucky, Columbia of Maryland, Columbia of Ohio, Columbia of Pennsylvania, and Columbia of Virginia). Each Columbia distribution company is an operating segment which we aggregate to form the Columbia Operations reportable segment. NIPSCO Operations aggregates the results of NIPSCO Holdings I,and its majority-owned subsidiaries, including NIPSCO, which has both fully regulated gas and electric operations in Northwest Indiana. . The remainder of our operations, which are not significant enough on a stand-alone basis to warrant treatment as a reportable segment, are presented as "Corporate and Other" within the Notes to the Condensed Consolidated Financial Statements (unaudited) and primarily are comprised of interest expense on holding company debt, and unallocated corporate costs and activities.
Current wording
In response to the NIPSCO Minority Interest Transaction, our operations are now evaluated through two primary reportable segments, Columbia Operations and NIPSCO Operations. Our historical segment disclosures have been recast to be consistent with the current presentation. Columbia Operations aggregates the results of the fully regulated and wholly owned subsidiaries of NiSource Gas Distribution Group, Inc. (a holding company that owns Columbia of Kentucky, Columbia of Maryland, Columbia of Ohio, Columbia of Pennsylvania, and Columbia of Virginia). Each Columbia distribution company is an operating segment which we aggregate to form the Columbia Operations reportable segment. NIPSCO Operations aggregates the results of NIPSCO Holdings I, and its majority-owned subsidiaries, including NIPSCO, which has both fully regulated gas and electric operations in Northwest Indiana. The remainder of our operations, which are not significant enough on a stand-alone basis to warrant treatment as a reportable segment, are presented as "Corporate and Other" within the Notes to the Condensed Consolidated Financial Statements (unaudited) and primarily are comprised of interest expense on holding company debt, and unallocated corporate costs and activities.
Previous wording
Financial and operational data for the Columbia Operations segment for the three months ended March 31, 2024 and 2023 are presented below.
Current wording
Financial and operational data for the Columbia Operations segment for the three and six months ended June 30, 2024 and 2023 are presented below.
Previous wording
The underlying reasons for changes in our operating revenues for the three months ended March 31, 2024 compared to the same period in 2023 are presented below.
Current wording
The underlying reasons for changes in our operating revenues for the three and six months ended June 30, 2024 compared to the same period in 2023 are presented below.
Previous wording
The increase in total volumes for the three months ended March 31, 2024, compared to the same period in 2023, is primarily attributable to increased industrial usage.
Current wording
The increase in total volumes for the six months ended June 30, 2024, compared to the same period in 2023, is primarily attributable to increased industrial usage offset by off-system sales.
Previous wording
The underlying reasons for changes in our operating expenses for the three months ended March 31, 2024 compared to the same period in 2023 are presented below.
Current wording
The underlying reasons for changes in our operating expenses for the three and six months ended June 30, 2024 compared to the same period in 2023 are presented below.
Previous wording
Financial and operational data for the NIPSCO Operations segment, which services both gas and electric customers, for the three months ended March 31, 2024 and 2023 are presented below.
Current wording
Financial and operational data for the NIPSCO Operations segment, which services both gas and electric customers, for the three and six months ended June 30, 2024 and 2023 are presented below.
Previous wording
The underlying reasons for changes in our operating revenues for the three months ended March 31, 2024 compared to the same period in 2023 are presented below.
Current wording
The underlying reasons for changes in our operating revenues for the three and six months ended June 30, 2024 compared to the same period in 2023 are presented below.
Previous wording
The increase in total volumes sold to electric customers for the three months ended March 31, 2024 compared to the same period in 2023 was primarily attributable to increased usage by commercial and wholesale customers partially offset by industrial and residential customers usage.
Current wording
The increase in total volumes sold to electric customers for the three and six months ended June 30, 2024 compared to the same period in 2023 was primarily attributable to increased usage by residential and wholesale customers offset by industrial customers.
Previous wording
The decrease in total volumes sold to gas customers for the three months ended March 31, 2024 compared to the same period in 2023 was primarily attributable to decreased usage by industrial and residential customers.
Current wording
The decrease in total volumes sold to gas customers for the three and six months ended June 30, 2024 compared to the same period in 2023 was primarily attributable to decreased usage by industrial and residential customers.
Previous wording
The underlying reasons for changes in our operating expenses for the three months ended March 31, 2024 compared to the same period in 2023 are presented below.
Current wording
The underlying reasons for changes in our operating expenses for the three and six months ended June 30, 2024 compared to the same period in 2023 are presented below.
Previous wording
NIPSCO continues to execute on an electric generation transition consistent with the 2018 Plan and 2021 Plan, which outlines the path to retire the remaining two coal units at R.M. Schahfer by the end of 2025 and the remaining coal-fired generation at Michigan City by the end of 2028, to be replaced by lower-cost, reliable and cleaner options. See "Project Status" discussion, below, and "Liquidity and Capital Resources" in this Management's Discussion for information on anticipated in-service dates related to our electric generation transition and additional information on our capital investment spend.
Current wording
NIPSCO continues to execute on an electric generation transition consistent with the 2018 Plan and 2021 Plan, which outlines the path to retire the remaining two coal units at R.M. Schahfer by the end of 2025 and the remaining coal-fired generation at Michigan City by the end of 2028, to be replaced by lower-cost, reliable and cleaner options.
Previous wording
Since 2020, two wind PPA projects, two wind BTA projects and two solar BTA projects have been placed into service, totaling 1,465 MW of nameplate capacity. NIPSCO has executed commercial agreements for each of the eight remaining identified projects. Dunns Bridge II, Cavalry, Fairbanks, Gibson, GreenRiver, Appleseed, Carpenter and Templeton have received IURC approval. NIPSCO has filed for a new gas peaking facility to be located at R.M. Schahfer Generating Station. On November 22, 2023 the IURC approved NIPSCO's request to convert the Gibson project from a PPA to a BTA. On January 17, 2024 the IURC approved increases to the project costs as well as the full ownership of Cavalry and Dunns Bridge II, allowing NIPSCO to leverage provisions of the IRA to monetize tax credits for the benefit of customers in lieu of utilizing tax equity partnerships. In March 2024, we filed with the IURC to modify the ownership structure for Gibson and Fairbanks solar projects to become fully owned projects and to modify the cost of the Fairbanks project. See "Executive Summary - Energy Transition" in this Management's Discussion for additional information. We expect the majority of our remaining BTA and PPA projects to be placed in service in 2024 and 2025.
Current wording
Since 2020, two wind PPA projects, two wind BTA projects and three solar BTA projects have been placed into service, totaling 1,665 MW of nameplate capacity plus additional battery energy storage system capacity at Cavalry. NIPSCO has executed commercial agreements for each of the seven remaining identified projects. Dunns Bridge II, Fairbanks, Gibson, GreenRiver, Appleseed, Carpenter and Templeton have received IURC approval. NIPSCO has filed for a new gas peaking facility to be located at R.M. Schahfer Generating Station. On January 17, 2024 the IURC approved increases to the project costs as well as the full ownership of Cavalry and Dunns Bridge II, allowing NIPSCO to leverage provisions of the IRA to monetize tax credits for the benefit of customers in lieu of utilizing tax equity partnerships. See "Executive Summary - Energy Transition" in this Management's Discussion for additional information. We expect the majority of our remaining BTA and PPA projects to be placed in service in 2024 and 2025.
Previous wording
We continually evaluate the availability of adequate financing to fund our ongoing business operations, working capital and core safety and infrastructure investment programs. Our financing is sourced through cash flow from operations and the issuance of debt and/or equity. External debt financing is provided primarily through the issuance of long-term debt, accounts receivable securitization programs and our $1.85 billion commercial paper program, which is backstopped by our committed revolving credit facility with a total availability from third-party lenders of $1.85 billion.
Current wording
We continually evaluate the availability of adequate financing to fund our ongoing business operations, working capital and core safety and infrastructure investment programs. Our financing is sourced through cash flow from operations and the issuance of debt and/or equity. External debt financing is provided primarily through the issuance of long-term debt, accounts receivable securitization programs and our $1.85 billion commercial paper program, which is backstopped by our committed revolving credit facility with a total availability from third-party lenders of $1.85 billion. Sources of financing activities for the current year are as follows:
Previous wording
•On December 31, 2023, we consummated the NIPSCO Minority Interest Transaction in exchange for a capital contribution of $2.16 billion in cash. See Note 4, "Noncontrolling Interests,"in the Notes to the Condensed Consolidated Financial Statements (unaudited) for more information.
Current wording
•On December 31, 2023, we consummated the NIPSCO Minority Interest Transaction in exchange for a capital contribution of $2.16 billion in cash.
Previous wording
•On January 3, 2024, we applied the proceeds from the NIPSCO Minority Interest Transaction and repaid in full our $1.0 billion term credit agreement and our $650.0 million term credit agreement. On March 14, 2024 we completed the issuance and sale of $650.0 million of 5.35% senior unsecured notes maturing in 2034, which resulted in approximately $642.6 million of net proceeds after discount and debt issuance costs. See Note 7, "Short-Term Borrowings," and Note 8, "Long-Term Debt," in the Notes to the Condensed Consolidated Financial Statements (unaudited) for more information.
Current wording
•On January 3, 2024, we applied the proceeds from the NIPSCO Minority Interest Transaction and repaid in full our $1.0 billion term credit agreement and our $650.0 million term credit agreement.
Previous wording
•On February 22, 2024, we entered into an ATM equity program that provides an opportunity to issue and sell shares of our common stock up to an aggregate issuance of $900.0 million through December 31, 2025. As of March 31, 2024, the ATM program (including the impact of the forward sale agreement) had approximately $700.0 million of equity available for issuance. See Note 6, "Equity," in the Notes to the Condensed Consolidated Financial Statements (unaudited) for more information.
Current wording
•On February 22, 2024, we entered into an ATM equity program that provides an opportunity to issue and sell shares of our common stock up to an aggregate issuance of $900.0 million through December 31, 2025. As of June 30, 2024, the ATM program (including the impact of the forward sale agreements) had approximately $400.0 million of equity available for issuance.
Previous wording
•On March 15, 2024, we redeemed all 20,000 outstanding shares of Series B Preferred Stock for a redemption price of $25,000 per share and all 20,000 outstanding shares of Series B-1 Preferred Stock for a redemption price of $0.01 per share or $500.0 million in total. See Note 6, "Equity," in the Notes to the Condensed Consolidated Financial Statements (unaudited) for more information.
Current wording
•On March 15, 2024, we redeemed all 20,000 outstanding shares of Series B Preferred Stock for a redemption price of $25,000 per share and all 20,000 outstanding shares of Series B-1 Preferred Stock for a redemption price of $0.01 per share or $500.0 million in total.
Previous wording
We believe these sources provide adequate capital to fund our operating activities and capital expenditures in 2024 and beyond.
Current wording
We believe these sources provide adequate capital to fund our operating activities and capital expenditures in 2024 and beyond. See Note 4, "Noncontrolling Interests," Note 6, "Equity," Note 7, "Short-Term Borrowings," and Note 8, "Long-Term Debt," in the Notes to the Condensed Consolidated Financial Statements (unaudited) for more information on our financing activities.
Previous wording
Investing activities have been consistent year over year, and is primarily comprised of capital expenditures related to system growth and reliability and milestone payments to renewable generation asset developers for certain of our BTA projects.
Current wording
Year over year increase in investing activities was primarily comprised of capital expenditures related to system growth and reliability and milestone payments to renewable generation asset developers for certain of our BTA projects.
Previous wording
As we evaluate progress on the renewable generation projects, we remain on track to make capital investments totaling $3.3 billion to $3.5 billion during the 2024 period. We also expect to invest approximately $16.4 billion during the 2024-2028 period, including capital investments to support our generation transition strategy. These forecasted capital investments are subject to continuing review and adjustment. Actual capital expenditures may vary from these estimates.
Current wording
We remain on track to make capital investments totaling $3.3 billion to $3.5 billion during the 2024 period. We also expect to invest approximately $16.4 billion during the 2024-2028 period, including capital investments to support our generation transition strategy. These forecasted capital investments are subject to continuing review and adjustment. Actual capital expenditures may vary from these estimates.
Previous wording
Regulatory Capital Programs. We are in the process of upgrading and modernizing our gas infrastructure to enhance safety and reliability by reducing leaks. An ancillary benefit of these programs is the reduction of GHG emissions. In 2024, we continue to move forward on core infrastructure and environmental investment programs supported by complementary regulatory and customer initiatives across all six states of our operating area.
Current wording
Regulatory Capital Programs. We are in the process of upgrading and modernizing our electric system to enhance safety and reliability by addressing aged infrastructure and deploying advanced grid technologies. We are also upgrading and modernizing our gas infrastructure to enhance safety and reliability by reducing leaks. An ancillary benefit of these programs is the reduction of GHG emissions. In 2024, we continue to move forward on core infrastructure and environmental investment programs supported by complementary regulatory and customer initiatives across all six states of our operating area.
Previous wording
Noncontrolling Interest. We received $2.16 billion upon closing the NIPSCO Minority Interest Transaction. Proceeds from the closing of the NIPSCO Minority Interest Transaction were used to repay short-term debt, including our credit agreements. Under the terms of the LLC Agreement, BIP is obligated to provide up to $250 million in additional capital contributions over a three-year period after the Closing, which obligation is backed by an Equity Commitment Letter from Blackstone. BIP may contribute additional capital above $250 million as necessary to maintain its percentage ownership interest. Refer to Note 4,
Current wording
Noncontrolling Interest. We received $2.16 billion upon closing the NIPSCO Minority Interest Transaction. Proceeds from the closing of the NIPSCO Minority Interest Transaction were used to repay short-term debt, including our credit agreements. Under the terms of the LLC Agreement, BIP is obligated to provide up to $250 million in additional capital contributions over a three-year period after the Closing. The obligation is backed by an Equity Commitment Letter from Blackstone. BIP may contribute additional capital above $250 million as necessary to maintain its percentage ownership interest. Refer to Note 4, "Noncontrolling Interests," in the Notes to the Condensed Consolidated Financial Statements (unaudited) for information on contributions and distributions from noncontrolling interests.
Previous wording
Debt Covenants. We are subject to a financial covenant under our revolving credit facility, which require us to maintain a debt to capitalization ratio that does not exceed 70.0%. As of March 31, 2024, the ratio was 57.0%.
Current wording
Debt Covenants. We are subject to a financial covenant under our revolving credit facility, which require us to maintain a debt to capitalization ratio that does not exceed 70.0%. As of June 30, 2024, the ratio was 57.8%.
Previous wording
Certain of our subsidiaries have agreements that contain ''ratings triggers'' that require increased collateral if our credit rating or the credit ratings of certain of our subsidiaries are below investment grade. These agreements are primarily for insurance purposes and for the physical purchase or sale of power. As of March 31, 2024, the collateral requirement that would be required in the event of a downgrade below the ratings trigger levels would amount to approximately $108.6 million. In addition to agreements with ratings triggers, there are other agreements that contain ''adequate assurance'' or ''material adverse change'' provisions that could necessitate additional credit support such as letters of credit and cash collateral to transact business.
Current wording
Certain of our subsidiaries have agreements that contain ''ratings triggers'' that require increased collateral if our credit rating or the credit ratings of certain of our subsidiaries are below investment grade. These agreements are primarily for insurance purposes and for the physical purchase or sale of power. As of June 30, 2024, the collateral requirement that would be required in the event of a downgrade below the ratings trigger levels would amount to approximately $110.4 million. In addition to agreements with ratings triggers, there are other agreements that contain ''adequate assurance'' or ''material adverse change'' provisions that could necessitate additional credit support such as letters of credit and cash collateral to transact business.
Previous wording
Equity. Our authorized capital stock consists of 770,000,000 shares, $0.01 par value, of which 750,000,000 are common stock and 20,000,000 are preferred stock. As of March 31, 2024, 448,197,604 shares of common stock were outstanding.
Current wording
Equity. Our authorized capital stock consists of 770,000,000 shares, $0.01 par value, of which 750,000,000 are common stock and 20,000,000 are preferred stock. As of June 30, 2024, 448,398,632 shares of common stock were outstanding.
Previous wording
Contractual Obligations. A summary of contractual obligations is included in the Company's Annual Report on Form 10-K for the year ended December 31, 2023. Except for our March 2024 debt issuance, there were no additional material changes from year-end during the three months ended March 31, 2024. Refer to Note 8, "Long-Term Debt," in the Notes to the Condensed Consolidated Financial Statements (unaudited) for additional information regarding the debt issuances.
Current wording
Contractual Obligations. A summary of contractual obligations is included in the Company's Annual Report on Form 10-K for the year ended December 31, 2023. Except for our 2024 debt issuances, there were no additional material changes from year- end during the six months ended June 30, 2024. Refer to Note 8, "Long-Term Debt," in the Notes to the Condensed Consolidated Financial Statements (unaudited) for additional information regarding the debt issuances.
Previous wording
Comparability of our line item operating results is impacted by regulatory trackers that allow for the recovery in rates of certain costs such as those described below. Increases in the expenses that are subject to approved regulatory tracker mechanisms generally lead to increased regulatory assets, which ultimately result in a corresponding increase in operating revenues and, therefore, have essentially no impact on total operating income results. Certain approved regulatory tracker mechanisms allow for abbreviated regulatory proceedings in order for the operating companies to quickly implement revised rates and recover associated costs.
Current wording
Comparability of our line item operating results is impacted by regulatory trackers that allow for the recovery in rates of certain costs such as those described below. Increases in the costs that are subject to approved regulatory tracker mechanisms generally lead to increased regulatory assets, which ultimately result in a corresponding increases in operating revenues and expenses and, therefore, have essentially no impact on total operating income results. Certain approved regulatory tracker mechanisms allow for abbreviated regulatory proceedings in order for the operating companies to quickly implement revised rates and recover associated costs.
Previous wording
We recognize that energy efficiency reduces emissions, conserves natural resources and saves our customers money. Our gas distribution companies offer programs such as energy efficiency upgrades, home checkups and weatherization services. The increased efficiency of natural gas appliances and improvements in home building codes and standards contributes to a long-term trend of declining average use per customer. While we are looking to expand offerings so the energy efficiency programs can benefit as many customers as possible, our Columbia Operations and NIPSCO Operations have pursued changes in rate design to more effectively match recoveries with costs incurred. Columbia of Ohio has adopted a straight fixed variable rate design for residential customers that closely links the recovery of fixed costs with fixed charges. Columbia of Maryland and Columbia of Virginia have regulatory approval for weather and revenue normalization adjustments for certain customer classes, which adjust monthly revenues that exceed or fall short of approved levels. Columbia of Pennsylvania continues to operate its pilot residential weather normalization adjustment and also has a fixed customer charge. This weather normalization adjustment only adjusts revenues when actual weather compared to normal varies by more than 3%. Columbia of Kentucky incorporates a weather normalization adjustment for certain customer classes and also has a fixed customer charge.
Current wording
We recognize that energy efficiency reduces emissions, conserves natural resources and saves our customers money. Our gas distribution companies offer programs such as energy efficiency upgrades, home checkups and weatherization services. The increased efficiency of natural gas appliances and improvements in home building codes and standards contributes to a long-term trend of declining average use per customer. While we are looking to expand offerings so the energy efficiency programs can benefit as many customers as possible, our Columbia Operations and NIPSCO Operations have pursued changes in rate design to more effectively match recoveries with costs incurred. Columbia of Ohio has adopted a straight fixed variable rate design for residential customers that closely links the recovery of fixed costs with fixed charges. Columbia of Maryland and Columbia of Virginia have regulatory approval for weather and revenue normalization adjustments for certain customer classes, which adjust monthly revenues that exceed or fall short of approved levels. Columbia of Pennsylvania continues to operate its pilot residential weather normalization adjustment and also has a fixed customer charge. This weather normalization adjustment only adjusts revenues when actual weather compared to normal varies by more than 3% during the winter heating season. Columbia of Kentucky incorporates a weather normalization adjustment for certain customer classes and also has a fixed customer charge.
Previous wording
While increased efficiency of electric appliances and improvements in home building codes and standards has similarly impacted the average use per electric customer in recent years, NIPSCO Operations expects future growth in per customer usage as a result of increasing electric applications. Further growth is anticipated as electric vehicles become more prevalent. These ongoing changes in use of electricity will likely lead to development of innovative rate designs, and NIPSCO Operations will continue efforts to design rates that increase the certainty of recovery of fixed costs.
Current wording
While increased efficiency of electric appliances and improvements in home building codes and standards has impacted the average use per electric customer in recent years, NIPSCO Operations expects future growth in residential and commercial customer usage as a result of increasing electric applications, such as electric vehicles becoming more prevalent. These ongoing changes in use of electricity will likely lead to development of innovative rate designs, and NIPSCO Operations will continue efforts to design rates that increase the certainty of recovery of fixed costs.
Previous wording
(5) New rates will be implemented in 2 steps, with implementation of Step 1 rates in August 2023 and Step 2 rates effective in March 2024, with service provided in February 2024.
Current wording
(5)New rates were implemented in 2 steps, with implementation of Step 1 rates in August 2023 and Step 2 rates effective in March 2024.
Previous wording
(7) Rates expected to be effective on an interim basis and subject to refund.
Current wording
(6)Rates to be effective on an interim basis and subject to refund.
Previous wording
On November 30, 2023, the House Transportation & Infrastructure Committee introduced new pipeline safety reauthorization legislation known as the PIPES Act of 2023 to reauthorize PHMSA’s safety programs for the next four years. The proposed legislation includes several priorities for our company, including excavation damage prevention grants to improve states’ damage prevention programs, a PHMSA study on blending hydrogen in distribution pipelines, new criminal penalties for intentionally damaging pipeline facilities, and creation of a Voluntary Information Sharing System to allow for industry participants to share learnings and best practices in a protected manner across the pipeline industry.
Current wording
On November 30, 2023, the House Transportation & Infrastructure Committee introduced new pipeline safety reauthorization legislation known as the PIPES Act of 2023 to reauthorize PHMSA’s safety programs for the next four years. The proposed legislation includes several priorities for our company, including excavation damage prevention grants to improve states’
Previous wording
The Climate Solutions Now Act of 2022 requires Maryland to reduce GHG emissions by 60% by 2031 (from 2006 levels), and it requires the state to reach net zero emissions by 2045. The Maryland Department of the Environment adopted a plan to achieve its 2031 goal and is required to adopt a plan for their 2045 net zero goal by 2030. The Act also enacts a state policy to move to broader electrification of both existing buildings and new construction, and requires the Public Service Commission ("PSC") to complete a study assessing the capacity of gas and electric distribution systems to successfully serve customers under a transition to a highly electrified building sector. The PSC released their report on December 29, 2023, and concluded that high levels of electrification can be handled by Maryland's electric systems through 2031. The Maryland Department of the Environment issued proposed Building Energy Performance Standards (BEPS), which would require net zero direct greenhouse gas emissions from large buildings by 2040 with interim targets. Columbia of Maryland is advocating for compliance pathways that use RNG, hydrogen, and emissions offsets. Separately, the PSC has also initiated a proceeding related to Near-Term, Priority Actions and Comprehensive, Long-Term Planning for Maryland's Gas Companies. Columbia of Maryland will continue to monitor these matters, but we cannot predict their final impact on our business at this time.
Current wording
The Climate Solutions Now Act of 2022 requires Maryland to reduce GHG emissions by 60% by 2031 (from 2006 levels), and it requires the state to reach net zero emissions by 2045. The Maryland Department of the Environment ("MDE") adopted a plan to achieve its 2031 goal and is required to adopt a plan for its 2045 net zero goal by 2030. In June 2024, Governor Moore signed an executive order to advance Maryland’s Pollution Reduction Plan, which directs the MDE to propose a zero-emission heating equipment standard regulation and a clean heat standard regulation. The Act also enacts a state policy to move to broader electrification of both existing buildings and new construction, and requires the Public Service Commission ("PSC") to complete a study assessing the capacity of gas and electric distribution systems to successfully serve customers under a transition to a highly electrified building sector. The PSC released their report on December 29, 2023, and concluded that high levels of electrification can be handled by Maryland's electric systems through 2031. The Maryland Department of the Environment issued draft proposed Building Energy Performance Standards (BEPS), which would require net zero direct greenhouse gas emissions from large buildings by 2040 with interim targets, or an alternative compliance fee. Columbia of Maryland is advocating for compliance pathways that use RNG, hydrogen, and emissions offsets. Separately, the PSC has also initiated a proceeding related to Near-Term, Priority Actions and Comprehensive, Long-Term Planning for Maryland's Gas Companies. Columbia of Maryland will continue to monitor these matters, but we cannot predict their final impact on our business at this time.
Showing the first 40 of 43 pairs. Open the source sections for the rest.
Rearranged current paragraphs (3)
Current report — wording carried from elsewhere
•On March 14, 2024 we completed the issuance and sale of $650.0 million of 5.35% senior unsecured notes maturing in 2034, which resulted in approximately $642.6 million of net proceeds after discount and debt issuance costs.
Current report — wording carried from elsewhere
•On June 24, 2024, we completed the issuance and sale of $600.0 million of 5.20% senior unsecured notes maturing in 2029, which resulted in approximately $593.7 million of net proceeds after discount and debt issuance costs.
Current report — wording carried from elsewhere
damage prevention programs, a PHMSA study on blending hydrogen in distribution pipelines, new criminal penalties for intentionally damaging pipeline facilities, and creation of a Voluntary Information Sharing System to allow for industry participants to share learnings and best practices in a protected manner across the pipeline industry.
Rearranged previous paragraphs (1)
Previous report — wording carried elsewhere
"Noncontrolling Interests," in the Notes to the Condensed Consolidated Financial Statements (unaudited) for information on contributions from noncontrolling interest activity.