EX-99.1 · Table 21.6: Lithium Processing Facility Operating Costs

Table 21.6: Lithium Processing Facility Operating Costs

Cost AreaAnnual Cost ($ million)Cost ($/t Li2CO3)
Labour16.4234
Maintenance and Services17.1245
Power and Natural Gas34.8497
Reagents and Consumables161.52,307
Total229.83,283

Notes:

1.Figures may not sum due to rounding.
2.The annual cost is based on 70,000 tpa lithium carbonate production.
21.3.5Bromine Processing Facility

In addition to lithium production, the Project contemplates a secondary opportunity case for bromine recovery from lithium-depleted brine. The operating costs for the potential bromine processing facility were estimated based on a plant production capacity of 50,000 tpa bromine. The breakdown of cash operating costs for the bromine processing facility is provided in Table 21.7.

Reagents and consumables as well as maintenance costs are the primary contributors to the cash operating costs accounting for approximately 79% of the total facility operating cost. The annual average bromine facility cash operating cost is calculated at $955/t bromine produced or $47.8 million in total annual cost for 50,000 tpa bromine production.