STANDARD LITHIUM LTD.
For the period ended Oct 20, 2026. Filed Oct 20, 2026.
View on SEC.govAbout this filing
What a company based outside the US has published at home or sent to its shareholders. It is how many foreign companies share results and news between annual reports.
Oct 20, 2026 · Filed Oct 20, 2026
Use the contents to explore the available documents and sections.
SLI$1.46+6.6%Stored close · as of Nov 6, 2026
Contents
EX-99.1 · Table 10.2: Samples Collected During the Well Exploration Program
Table 10.2: Samples Collected During the Well Exploration Program
| Well | Depth (m / ft) | Depth of Interval Cored (m / ft) | Total Interval Cored (m / ft) | Core Recovered (m / ft) | Num. of Rotary Sidewall Core Samples | Smackover Formation Intervals Sampled | Total Volume of Brine Produced (bbls) |
|---|---|---|---|---|---|---|---|
| Charles Davis Heirs #1 | 3,818 m 12,525 ft | -- | -- | -- | -- | Upper | 3,849 |
| Middle | 76 | ||||||
| Pine Forest #1 | 3,856 m 12,650 ft | 3,680-3,716 m 12,075-12,193 ft | 36 m 118.2 ft | 17 m 54.2 ft | 14 | Upper | 1,770 |
| Lundell Creek #1 | 3,673 m 12,052 ft | 3,370-3,512 m 11,056-11,521 ft | 142 m 464.9 ft | 113 m 371.8 ft | -- | Upper | 706 |
| October 2026 | 10-4 |
|---|
Franklin ProjectEast Texas, USNI 43-101 Technical Report on Preliminary Economic Assessment
The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.