Skip to main content

STANDARD LITHIUM LTD.

For the period ended Oct 20, 2026. Filed Oct 20, 2026.

View on SEC.gov

About this filing

What a company based outside the US has published at home or sent to its shareholders. It is how many foreign companies share results and news between annual reports.

Oct 20, 2026 · Filed Oct 20, 2026

Use the contents to explore the available documents and sections.

SLI$1.46+6.6%Stored close · as of Nov 6, 2026
See the whole filing, with its images and exhibits
Contents

EX-99.1 · Table 10.2: Samples Collected During the Well Exploration Program

Table 10.2: Samples Collected During the Well Exploration Program

WellDepth (m / ft)Depth of Interval Cored (m / ft)Total Interval Cored (m / ft)Core Recovered (m / ft)Num. of Rotary Sidewall Core SamplesSmackover Formation Intervals SampledTotal Volume of Brine Produced (bbls)
Charles Davis Heirs #13,818 m 12,525 ft--------Upper3,849
Middle76
Pine Forest #13,856 m 12,650 ft3,680-3,716 m 12,075-12,193 ft36 m 118.2 ft17 m 54.2 ft14Upper1,770
Lundell Creek #13,673 m 12,052 ft3,370-3,512 m 11,056-11,521 ft142 m 464.9 ft113 m 371.8 ft--Upper706
October 202610-4

Franklin ProjectEast Texas, USNI 43-101 Technical Report on Preliminary Economic Assessment

ContentsView on SEC.gov

The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.