Cautionary Statement
The results of the economic analysis represent forward-looking information that are subject to a number of known and unknown risks, uncertainties, and other factors that may cause actual results to differ materially from those presented here. Forward-looking information includes Mineral Resource estimates; commodity prices; the production plan; projected recovery rates; use of a process method, infrastructure construction costs and schedule; and assumptions that project environmental approval and permitting.
| 19.2 | Evaluation Criteria |
| § | Project life: Life of mine (including construction and operation) is estimated to be 33 years. |
| § | Pricing for lithium carbonate of US$18,000 and LHM (lithium hydroxide monohydrate) of US$17,800 per ton was used. |
| § | Final production rate of 153,000 TPA LCE after all three phases of production reach full operation 9 years after the start of phase 1. |
| § | Final Production for 40,000 TPA lithium carbonate and 12,500 TPA LHM were used for each cumulative phase according to the ramp-up table below (Table 137). |