EX-99.1 · Exploration Progress

The 2023 exploration campaign focused on expanding resource density within the Grota do Cirilo mineral concessions, with the Company’s combined Measured, Inferred and Indicated tonnages increasing to 108.9Mt grading at 1.40% Li2O, from the previous estimate of 85.6Mt at 1.43% Li2O. Of this newly enlarged resource estimate, 87% comprises the higher confidence Measured and Indicated categories.

Specifically, the Phase 3 orebody (Nezinho do Chicão) was extended eastwards approaching the Phase 4 ore bodies (Maxixe, Tamboril and Lavra do Meio), in so doing consolidating 4 pegmatites into a singular, larger open pit encompassing 40.1Mt of Measured, Indicated and Inferred resource. The remaining Phase 4 (Murial) deposit is to be developed within a separate pit some 330m north of the Phase 3 megapit. The Phase 4 (Murial) deposit has grown in scale to 16.1Mt of combined Measured, Indicated and Inferred resource, notably up from the prior 5.6Mt resource. This new Phase 3 and 4 resource strike extends 3.2km, from the southern end of Nezinho do Chicão to the north end of Murial. Drilling confirms that the deposits remain open to the west and east.

Table 2: Sigma Lithium Consolidated Resource Estimate

​ · ​ · ​ · ​ · ​ · ​ · ​
CUT-OFF GRADE (%Li20)CATEGORYTONNES (MT)(%Li20)
0.3%Measured45.21.41
0.3%Indicated49.11.39
0.3%M & I94.31.40
0.3%Inferred14.61.37
0.3%M, I & I108.91.40

In addition, the exploration program led to the discovery of two additional spodumene-bearing deposits, known as Barreiro Extension and Phase 5 (Elvira). Barreiro Extension is located 550m northwest of the Phase 2 (Barreiro) deposit; the Company is exploring the potential connectivity of these resources. Phase 5 (Elvira) is a cluster of large pegmatites located 4km south of Nezinho do Chicão. The 2023 drill campaign resulted in a maiden resource estimate for Elvira of 2.1Mt of Inferred lithium at an average grade of 1.16% Li2O. However, the Company believes, given drill intercepts to date, that the resource could grow to 20Mt over time.

The Company currently plans to drill approximately 10,000 meters in 2024, with the goal of further increasing the Company’s estimated mineral resources. The Company expects any additional mineral resource growth achieved will be utilized as feedstock material to extend its operating life, if warranted after completing and analyzing a preliminary economic assessment, pre-feasibility study and feasibility study.

Royalties**