Western Copper & Gold Corp
For the period ended Mar 31, 2026. Filed May 8, 2026.
View on SEC.govAbout this filing
What a company based outside the US has published at home or sent to its shareholders. It is how many foreign companies share results and news between annual reports.
Mar 31, 2026 · Filed May 8, 2026
Use the contents to explore the available documents and sections.
Contents
EX-99.2 · Feasibility Study
Feasibility Study
On June 28, 2022, the Company released the results of its Feasibility Study (the "Study") on the Casino Project. The Study considered the Project being constructed as an open pit mine, with a concentrator processing 120,000 tonnes per day (t/d) to recover copper, gold, molybdenum and silver, as well as a 25,000 t/d oxide heap leach facility to recover gold, silver and copper.
The Study supersedes all previous studies and incorporates an updated mineral resource estimate with an effective date of April 29, 2022, and mineral reserve estimate with an effective date of June 13, 2022. The Study examines the development of the Casino Project, which comprises the processing of 1.43 billion tonnes of Mineral Reserve for both the mill and heap leach, with deposition of mill tailings and mine waste in the Tailings Management Facility ("TMF") consistent with the design concepts considered during the Best Available Tailings Technology ("BATT") Study as a base case development.** **
6
| WESTERN COPPER AND GOLD CORPORATION | MANAGEMENT DISCUSSION AND ANALYSIS |
|---|---|
| Three months ended March 31, 2026 | |
| (Expressed in Canadian dollars, unless otherwise indicated) | |
The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.