Western Copper & Gold Corp
For the period ended Mar 31, 2026. Filed May 8, 2026.
View on SEC.govAbout this filing
What a company based outside the US has published at home or sent to its shareholders. It is how many foreign companies share results and news between annual reports.
Mar 31, 2026 · Filed May 8, 2026
Use the contents to explore the available documents and sections.
Contents
EX-99.2 · Drilling Program
Drilling Program
On March 27, 2024, the Company announced the results from the 2023 drilling program (the "Drill Program") at the Casino Project. The Drill Program was developed by Western's Technical and Sustainability Committee, which is comprised of members from Western, Rio Tinto and Mitsubishi Materials.
The 2023 Drill Program consisted of seven holes for 2,244 m ranging from 130 m to 556 m in length. The drill holes were located inside the current pit boundaries and were selected to provide a range of grades, host rocks, and mineralogy. The drill holes were also selected to convert indicated mineral resources to measured mineral resources.
Results from the Drill Program continued to show the importance of the Core Zone wherein relatively higher grades are encountered.
The Drill Program also included 783 m of geotechnical and hydrogeological drilling designed by Knight-Piesold Consulting, which targeted the ground conditions of the proposed open pit, stockpiles, tailings management facility, heap leaching facility, new airstrip, and the proposed Ranney well site.
The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.